Loading...
HomeMy WebLinkAbout28154.mod.docBEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE PETITION OF IDAHO POWER COMPANY FOR A DECLARATORY ORDER DETERMINING THE JURISDICTION OF THE COMMMISSION OVER THE LEASING OF FIBER OPTIC AND METALLIC CONDUCTOR CABLES ) ) ) ) ) ) CASE NO. IPC-E-99-10 NOTICE OF MODIFIED PROCEDURE ORDER NO.  28154 NOTICE OF PETITION FOR DECLARATORY ORDER YOU ARE HEREBY NOTIFIED that on August 30, 1999, Idaho Power Company filed a Petition for Declaratory Order requesting the Commission determine that the leasing of “dark” optical fibers and “dead” metallic conductors in cable owned by Idaho Power is not the provision of telecommunications service subject to the provisions of the Telecommunications Act of 1988 (Idaho Code, Title 62, Chapter 6). YOU ARE FURTHER NOTIFIED that the Petition states that the proposed service for customers the Twin Falls School District and St. Alphonsus Hospital / Intermountain Imaging Center will not include the electronic equipment which would be required to send or receive data over the communication conductors; hence the terms “dark” fiber and “dead” conductors. YOU ARE FURTHER NOTIFIED that Idaho Power previously filed three similar Petitions with the Commission relating to dark fiber services provided by Idaho Power to the state of Idaho, city of Boise, Albertsons, CSHQA and Trus Joist McMillan. In those previous cases, the Commission ruled that the provision of dark fiber services did not constitute telecommunication services pursuant to Title 62 of the Idaho Code. See Order Nos. 25425, 26514 and 26933. YOU ARE FURTHER NOTIFIED that according to the Petition, Twin Falls School District will use the dark fiber to link its local area network (LAN) to the Twin Falls High School data network to form a wide area network (WAN) to provide E-mail, student administration, Internet access and an educational software database. The total length of fiber to be leased would be approximately 12,900 feet. YOU ARE FURTHER NOTIFIED that according to the Petition, St. Alphonsus Hospital and the Intermountain Imaging Center are requesting installation of at least twelve (12) singlemode fiber optic cable between St. Al’s Hospital located on 999 N. Curtis Road, Boise, and the Intermountain Imaging Center at 927 W. Myrtle, Boise. This is a distance of approximately four (4) miles. St. Al’s Hospital will be leasing four (4) singlemode fibers as dark fibers. The fiber optic cable will be attached to Idaho Power’s distribution structures, transmission structures and mulled into innerducts inside Idaho Power’s underground conduit system. NOTICE OF MODIFIED PROCEDURE YOU ARE FURTHER NOTIFIED that the Commission has determined that the public interest may not require a formal hearing in these matters and will proceed under Modified Procedure pursuant to Rules 201 through 204 of the Idaho Public Utilities Commission's Rules of Procedure, IDAPA 31.01.01.201 through -.204. YOU ARE FURTHER NOTIFIED that any person desiring to state a position on this Petition for Declaratory Order may file a written comment in support or opposition with the Commission within twenty-one (21) days from the date of this Notice. The comment must contain a statement of reasons supporting the comment. Persons desiring a hearing must specifically request a hearing in their written comments. Written comments concerning this revision shall be mailed to the Commission and Idaho Power at the address reflected below: COMMISSION SECRETARY LARRY RIPLEY IDAHO PUBLIC UTILITIES COMMISSION IDAHO POWER COMPANY PO BOX 83720 P.O. BOX 70 BOISE, IDAHO 83720-0074 BOISE, IDAHO. 83707 Street Address for Express Mail: Attorney for Idaho Power Company WASHINGTON ST BOISE, IDAHO 83702-5983 These comments should contain the case caption and case number shown on the first page of this document. YOU ARE FURTHER NOTIFIED that if no written comments are received within the time limit set, the Commission will consider these matters on their merits and enter its Order without a formal hearing. If written comments are received within the time limit set, the Commission will consider them and, in its discretion, may set the same for formal hearing. YOU ARE FURTHER NOTIFIED that Petition and its supporting documents has been filed with the Commission and is available for public inspection during regular business hours at the Commission offices. YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held pursuant to the Commission's jurisdiction under Title 61 of the Idaho Code and that the Commission may enter any final Order consistent with its authority under Title 61. YOU ARE FURTHER NOTIFIED that all proceedings in this matter will be conducted pursuant to the Commission’s Rules of Procedure, IDAPA 31.01.01.000 et seq. FINDINGS The Commission has jurisdiction over this matter by virtue of Idaho Code §§ 61-501, 62-614,and 62-619 and Grever v. Idaho Telephone Co., 94 Idaho 900, 499 P.2d 1256 (1972). Moreover, the Commission has authority to consider the Petition for Declaratory Order pursuant to Rule 101 of the Commission’s Rules of Procedure, IDAPA 31.01.01. Preliminarily, the Commission finds that Idaho Power’s Petition satisfies the technical requirements of Rule 101 and Idaho Power’s Petition in this case does not necessitate that the Commission resolve issues of a factual nature. Rather, it appears that the Commission must simply determine whether, based upon the factual scenario posed in the Idaho Power’s Petition, Idaho Power’s proposed conduct regarding the leasing of dark fiber or metallic conductors constitutes telecommunications services for purposes of Title 62 of the Idaho Code (the Telecommunications Act of 1988). Therefore, the Commission finds that this Petition may be considered under Modified Procedure. O R D E R IT IS HEREBY ORDERED that upon review of the filings in this case and determination of the Commission, that this Case No. IPC-E-99-10 shall be processed by Modified Procedure, Commission Rules of Procedure 201-204, IDAPA 31.01.01.201-04. DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho, this day of September 1999. DENNIS S. HANSEN, PRESIDENT MARSHA H. SMITH, COMMISSIONER PAUL KJELLANDER, COMMISSIONER ATTEST: Myrna J. Walters Commission Secretary O:ipce9910_cc NOTICE OF MODIFIED PROCEDURE ORDER NO. 28154 1 Office of the Secretary Service Date September 17, 1999