Loading...
HomeMy WebLinkAbout20231031Notice_of_Application_Order_No_35974.pdf NOTICE OF APPLICATION NOTICE OF INTERVENTION DEADLINE ORDER NO. 35974 1 Office of the Secretary Service Date October 31, 2023 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF IDAHO POWER COMPANY’S 2023 INTEGRATED RESOURCE PLAN ) ) ) ) ) ) ) ) CASE NO. IPC-E-23-23 NOTICE OF APPLICATION NOTICE OF INTERVENTION DEADLINE ORDER NO. 35974 On June 1, 2023, Idaho Power Company (“Company”) filed an application (“Application”) with the Idaho Public Utilities Commission (“Commission”) requesting that the Commission issue an order acknowledging the Company’s 2023 Integrated Resource Plan (“2023 IRP”). NOTICE OF APPLICATION YOU ARE HEREBY NOTIFIED that the Company states that the 2023 IRP represents a comprehensive analysis of the optimal mix of both demand- and supply-side resources available to reliably serve customer demand and flexible capacity needs from 2024 to 2043. Application at 1-2. YOU ARE FURTHER NOTIFIED that the Company represents that the primary goals of the 2023 IRP are to: (1) identify sufficient resources to reliably serve the growing demand for energy within Idaho Power’s service area throughout the 20-year planning period (2024-2043); (2) ensure the selected Preferred Portfolio balances cost and risk, while including environmental considerations; (3) give equal and balanced treatment to supply-side resources, demand-side measures, and transmission resources; and (4) involve the public in the planning process in a meaningful way. Id. at 5. YOU ARE FURTHER NOTIFIED that the Company represents that it used the AURORA model to develop portfolios for the 2023 IRP. Id. at 7-8. The Company states that two notable trends emerged in the 2023 IRP, the vital nature of added transmission and the substantial downward trend in portfolio greenhouse gas emissions. Id. at 10. YOU ARE FURTHER NOTIFIED that the Company represents that it identified several key resources or potential projects to evaluate in additional detail, and the Company required the model to build portfolios both with and without each resource or project. Id. at 14. The Company NOTICE OF APPLICATION NOTICE OF INTERVENTION DEADLINE ORDER NO. 35974 2 states that these models with and without views include: (1) with and without the B2H project; (2) with and without different phases of the Gateway West projects; and (3) with and without specific Valmy Unit 1 and Unit 2 natural gas conversion assumptions. Id. YOU ARE FURTHER NOTIFIED the Company represents that, based on its analysis, the Company selected a Preferred Portfolio, identified in the 2023 IRP as “Valmy 1 & 2”, referring to the portfolio’s conversion of both Valmy units from coal to natural gas. Id. at 14-15. The Company states that this Preferred Portfolio is the least-cost, least-risk option that incorporates positive changes toward clean, low-cost resources without compromising system reliability. Id. YOU ARE FURTHER NOTIFIED that the Company’s Preferred Portfolio adds 3,325 megawatts (“MW”) of solar, 1,800 MW of wind, 1,453 MW of storage (four- and eight-hour batteries, as well as long-duration 100-hour storage), 360 MW of additional energy efficiency (“EE”), 340 MW of hydrogen (“H2”), 160 MW of new demand response (“DR”), and 30 MW of geothermal. Id. at 3. Additionally, the Preferred Portfolio includes conversions of multiple coal-fired generation units to natural gas, showing the Company exiting coal entirely in 2030 and adding a net total of 261 MW of natural gas via coal conversions through 2043 (reflecting the addition of 967 MW of gas conversions and 706 MW of gas conversion exits, netting 261 MW of additional gas generation). Id. YOU ARE FURTHER NOTIFIED the Company represents that, in total, the Preferred Portfolio adds 6,888 MW of incremental resource capacity over the next 20 years and includes the B2H transmission line beginning in July 2026 and three Gateway West transmission line segments phased in from 2029 to 2040. Id. YOU ARE FURTHER NOTIFIED that the 2023 IRP contains the Company’s Near-Term Action Plan that reflects near-term actionable items of the Preferred Portfolio necessary to successfully position the Company to provide reliable, economic, and environmentally sound service to our customers into the future. Id. at 15. YOU ARE FURTHER NOTIFIED that the Company represents that the 2023 IRP incorporates prior recommendations it received concerning several issues, and the 2023 IRP provides additional analysis/discussion of those issues. Id. at 17. YOU ARE FURTHER NOTIFIED that the Application and supporting documentation have been filed with the Commission and are available for public inspection during regular NOTICE OF APPLICATION NOTICE OF INTERVENTION DEADLINE ORDER NO. 35974 3 business hours at the Commission’s office. These documents are also available on the Commission’s website at www.puc.idaho.gov. Click on the “ELECTRIC” icon, select “Open Cases,” and click on the case number as shown on the front of this document. YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held pursuant to the Commission’s jurisdiction under Title 61 of the Idaho Code, and that all proceedings in this matter will be conducted pursuant to the Commission’s Rules of Procedure, IDAPA 31.01.01.000 et seq. NOTICE OF INTERVENTION DEADLINE YOU ARE FURTHER NOTIFIED that persons desiring to intervene in this matter to obtain parties’ rights of participation must file a Petition to Intervene with the Commission pursuant to this Commission’s Rules of Procedure 71-73, IDAPA 31.01.01.072-073. Persons who wish to intervene as a party must file a Petition to Intervene no later than 21 days after the date of service of this Order. Persons desiring to present their views without parties’ rights of participation do not have to intervene and may present their comments without prior notification to the Commission or the parties. YOU ARE FURTHER NOTIFIED that the Commission Secretary shall issue a Notice of Parties after the deadline for intervention has passed. The Notice of Parties shall assign exhibit numbers to each party in this proceeding. YOU ARE FURTHER NOTIFIED that once the Notice of Parties is issued, Commission Staff (“Staff”) will informally confer with the parties to discuss a schedule to process this case and other issues as may be raised by the parties. YOU ARE FURTHER NOTIFIED that the following persons are designated as the Company’s representatives in this matter: Lisa D. Nordstrom Megan Goicoechea Allen Idaho Power Company 1221 West Idaho Street (83702) P.O. Box 70 Boise, Idaho 83707 lnordstrom@idahopower.com mgoicoecheaallen@idahopower.com dockets@idahopower.com Timothy Tatum Alison Williams Idaho Power Company 1221 West Idaho Street (83702) P.O. Box 70 Boise, Idaho 83707 ttatum@idahopower.com awilliams@idahopower.com NOTICE OF APPLICATION NOTICE OF INTERVENTION DEADLINE ORDER NO. 35974 4 ORDER IT IS HEREBY ORDERED that persons desiring to intervene in this case for the purpose of obtaining parties’ rights of participation must file a Petition to Intervene with the Commission, under Rules 71-73, IDAPA 31.01.01.071-073, no later than 21 days after the service date of this Order. IT IS FURTHER ORDERED that, after the Secretary issues a Notice of Parties, Staff will informally confer with the parties to discuss the appropriate scheduling of this case. IT IS FURTHER ORDERED that parties comply with Order No. 35375, issued April 21, 2022. Generally, all pleadings should be filed with the Commission electronically and will be deemed timely filed when received by the Commission Secretary. See Rule 14.02. Service between parties should continue to be accomplished electronically when possible. However, voluminous discovery-related documents may be filed and served on CD-ROM or a USB flash drive. DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this 31st day of October 2023. __________________________________________ ERIC ANDERSON, PRESIDENT __________________________________________ JOHN R. HAMMOND JR., COMMISSIONER __________________________________________ EDWARD LODGE, COMMISSIONER ATTEST: ____________________________________ Jan Noriyuki Commission Secretary I:\Legal\ELECTRIC\IPC-E-23-23_IRP\orders\IPCE2323_Ntc_App_Int_cb.docx