HomeMy WebLinkAbout20230623Notice_of_Application_Order_No_35822.pdfNOTICE OF APPLICATION NOTICE OF MODIFIED PROCEDURE ORDER NO. 35822 1 Office of the Secretary Service Date June 23, 2023 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF IDAHO POWER COMPANY’S APPLICATION FOR APPROVAL OF A SPECIAL CONTRACT UNDER TARIFF SCHEDULE 34 TO PROVIDE ELECTRIC SERVICE TO LAMB WESTON, INC. ) ) ) ) ) ) ) ) CASE NO. IPC-E-23-18 NOTICE OF APPLICATION NOTICE OF MODIFIED PROCEDURE ORDER NO. 35822 On May 23, 2023, Idaho Power Company (“Company”) applied to the Idaho Public Utilities Commission (“Commission”) for an Order approving a special contract under Schedule 34 between the Company and Lamb Weston, Inc. (“Lamb Weston”) (the Company and Lamb Weston referred to collectively as “the Parties”). The Commission now issues this Notice of Application and Notice of Modified Procedure establishing public comment and Company reply deadlines. BACKGROUND On or about August 25, 2022, the Company informed Lamb Weston that service under Schedule 19 would no longer be possible once the power consumption for the premises exceeded 20,000 kilowatts (“kW”). At that time, Lamb Weston informed the Company that it expected to exceed 20,000 kW as soon as July of 2023. The Company stated the Parties then came to an agreement and filed this case as soon as possible. The Company did not expect the Commission to issue an order in this case before July of 2023. Should Lamb Weston consume more than 20,000 kW before a final order is issued in this case, the Company stated that it would continue to provide Lamb Weston with power under Schedule 19’s rates unless otherwise directed by the Commission. NOTICE OF APPLICATION YOU ARE HEREBY NOTIFIED that the Company stated that each special contract is tailored to the consumer. To accomplish this, the Company reviews total usage, time of consumption, capability of the system’s connections, and several other factors. YOU ARE FURTHER NOTIFIED that the Parties have agreed to adjust the amount of power required by Lamb Weston’s contract (on a monthly basis) based upon Lamb Weston’s continued need. Lamb Weston expects a peak of its steady state of production to be around 32,000 NOTICE OF APPLICATION NOTICE OF MODIFIED PROCEDURE ORDER NO. 35822 2 kilowatts (“kW”). It expects that it may need as much as 34,000 kW in March of 2024. Lamb Weston plans to expand its facility. This expansion is expected to increase its power consumption by approximately 14,000 kW. YOU ARE FURTHER NOTIFIED that the Company stated proposed Schedule 34 would service Lamb Weston under the same rate as Schedule 19 for the first 20,000 kW. The price for electricity consumed beyond 20,000 kW would be based on “(1) capacity cost per kilowatt, recovered through a monthly Contract Demand charge and a monthly Billing Demand charge (“Block 2 Demand”), and (2) energy priced at a marginal cost-based rate, recovered through the Block 2 Energy Charge (“Block 2 Energy”).” Application at 8. YOU ARE FURTHER NOTIFIED that the Block 2 Energy under the proposed Schedule 34 would be 0.058694 per kW hour effective May 31, 2024, if approved. YOU ARE FURTHER NOTIFIED that the Company proposed an initial power factor adjustment for capacity up to 20,000 kW at a 90% power factor; the Company also proposed a 95% power factor for usage above 20,000 kW. The Company proposed this proposed initial power factor run through April 2024. YOU ARE FURTHER NOTIFIED that the Parties negotiated a provision whereby the Company would be able to reevaluate compensation of Block 2 Energy after the proposed special contract has been in place for five years. YOU ARE FURTHER NOTIFIED that the Application and proposed special contract have been filed with the Commission and are available for public inspection during regular business hours at the Commission’s office. The Application and proposed special contract are also available on the Commission’s website at www.puc.idaho.gov. Click on the “ELECTRIC” icon, select “Open Cases,” and then click on the case number as shown on the front of this document. YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held pursuant to the Commission’s jurisdiction under Title 61 of the Idaho Code. YOU ARE FURTHER NOTIFIED that all proceedings in this matter will be conducted pursuant to the Commission’s Rules of Procedure, IDAPA 31.01.01.000 et seq. NOTICE OF MODIFIED PROCEDURE YOU ARE FURTHER NOTIFIED that the Commission has determined that the public interest may not require a formal hearing in this matter and will proceed under Modified Procedure NOTICE OF APPLICATION NOTICE OF MODIFIED PROCEDURE ORDER NO. 35822 3 pursuant to Rules 201 through 204 of the Idaho Public Utilities Commission’s Rules of Procedure. The Commission notes that Modified Procedure and written comments have proven to be an effective means for obtaining public input and participation. YOU ARE FURTHER NOTIFIED that persons desiring to state a position on this Application may file a written comment explaining why the person supports or opposes the Application. Persons who would like a hearing must specifically request a hearing in their written comments. Persons shall have until August 15, 2023, to file written comments. Comments must be filed through the Commission’s website or by e-mail unless computer access is unavailable. To comment electronically, please access the Commission’s home page at www.puc.idaho.gov. Click the “Case Comment Form” and complete the form using the case number as it appears on the front of this document. To file by e-mail, the customer must e-mail the comments to the Commission Secretary and the Company at the e-mail addresses listed below. If computer access is unavailable, then comments may be mailed to the Commission and Company at these addresses: For the Commission: Commission Secretary Idaho Public Utilities Commission P.O. Box 83720 Boise, ID 83720-0074 secretary@puc.idaho.gov Street Address for Express Mail: 11331 W. Chinden Blvd. Building 8, Suite 201-A Boise, ID 83714 For the Company: Megan Goicoechea Allen Lisa D. Nordstrom Connie Aschenbrenner Pawel P. Goralski 1221 W. Idaho Street (83702) P.O. Box 70 Boise, ID 83707 mgoicoecheaallen@idahopower.com lnordstrom@idahopower.com Caschenbrenner@idahopower.com pgoralski@idahopower.com dockets@idahopower.com energycontracts@idahopower.com YOU ARE FURTHER NOTIFIED that the Parties must file any reply comments by August 22, 2023. YOU ARE FURTHER NOTIFIED that if no written comments or protests are received within the time limit set, the Commission will consider this matter on its merits and enter its order without a formal hearing. If written comments are received within the time limit set, the Commission will consider them and, in its discretion, may set the same for formal hearing. NOTICE OF APPLICATION NOTICE OF MODIFIED PROCEDURE ORDER NO. 35822 4 O R D E R IT IS HEREBY ORDERED that this case be processed by Modified Procedure. Persons wishing to file written comments must do so by August 15, 2023. The Parties must file any reply comments by August 22, 2023. IT IS FURTHER ORDERED that parties comply with Order No. 35375, issued April 21, 2022. Generally, all pleadings should be filed with the Commission electronically and will be deemed timely filed when received by the Commission Secretary. See Rule 14.02. Service between parties should continue to be accomplished electronically when possible. However, voluminous discovery-related documents may be filed and served on CD-ROM or a USB flash drive. DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this 23rd day of June 2023. __________________________________________ ERIC ANDERSON, PRESIDENT __________________________________________ JOHN R. HAMMOND JR., COMMISSIONER __________________________________________ EDWARD LODGE, COMMISSIONER ATTEST: Jan Noriyuki Commission Secretary I:\Legal\ELECTRIC\IPC-E-23-18_LW\orders\IPCE2318_Ntc_App_Mod_md.docx