HomeMy WebLinkAbout20230915Final Approved Tariff.pdf
CONNIE ASCHENBRENNER
Rate Design Senior Manager
cashenbrenner@idahopower.com
August 15, 2023
Jan Noriyuki, Secretary
Idaho Public Utilities Commission
11331 W. Chinden Boulevard
Building 8, Suite 201-A
Boise, Idaho 83714
Re: Case No. IPC-E-22-30
Application of Idaho Power Company for Authority to Establish Compensation
for the Mandatory Interruption Requirement of Schedule 20 - Speculative
High-Density Load
Dear Ms. Noriyuki:
Idaho Power Company hereby submits the enclosed compliance filing in the above-
captioned proceeding pursuant to Idaho Public Utilities Commission Order No. 35888,
which includes its tariff Schedule 20 as listed below, reflecting an effective date of August
14, 2023.
Original Sheet No. 20-8
If you have any questions regarding this filing, please contact Regulatory Consultant
Paul Goralski at (208) 388-2608 or pgoralski@idahopower.com.
Sincerely,
Connie Aschenbrenner
CA:cd
Enclosure
RECEIVED
2023 August 15 PM 2:43
IDAHO PUBLIC
UTILITIES COMMISSION
Idaho Power Company
I.P.U.C. No. 29, Tariff No. 101 Original Sheet No. 20-8
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 35888 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – August 14, 2023 1221 West Idaho Street, Boise, Idaho
SCHEDULE 20
SPECULATIVE HIGH-DENSITY LOAD
(Continued)
INTERRUPTION COMPENSATION
Fixed Capacity Reduction Rate:
Large General Service Rates $0.0734 per kilowatt of reduction per event hour
Large Power Service Rates $0.0835 per kilowatt of reduction per event hour
DEFINITIONS
Actual kW Reduction. The kilowatt (kW) reduction during an Interruption Event, which is the
difference between a Participant’s hourly average kW measured at the Facility Site’s meter and the
corresponding hour of the Adjusted Baseline kW.
Adjusted Baseline kW. The Original Baseline kW plus or minus the “Day of” Load Adjustment
amount.
“Day of” Load Adjustment. The difference between the Original Baseline kW and the actual
metered kW during the hour prior to the Participant receiving notification of an event. Scalar values will
be calculated by dividing the Original Baseline kW for each Interruption Event hour by the Baseline kW
of the hour preceding the event notification time. The scalars are multiplied by the actual event day kW
for the hour preceding the event notification time to create the Adjusted Baseline kW from which load
reduction is measured. The Adjusted Baseline kW for each hour will be capped at 120% of the maximum
kW amount for any hour from the Highest Energy Use Days or the hours during the event day prior to
event notification.
Facility Site(s). All of a Participant’s facility or equipment that is metered from a single service
location that a Participant has taken service under Schedule 20.
Highest Energy Usage Days. The three days out of the immediate past 10 non-event Business
Days that have the highest sum total kW as measured across the Interruption Event daily parameters.
Interruption Compensation. The Actual kW Reduction for each hour multiplied by the Fixed
Capacity Reduction Rate. Participants are paid based on the average event kilowatt reduction.
Load Control Device. Refers to any technology, device, or system utilized under Schedule 20 to
enable the Company to initiate the Interruption Event.
Interruption Event. Refers to an event where the Company requests or calls for interruption of
specific loads with the use of one or more Load Control Devices.
Original Baseline kW. The arithmetic mean (average) kW of the Highest Energy Usage Days
during the Interruption Event daily parameters, calculated for each Facility Site for each hour.
IDAHO PUBLIC UTILITIES COMMISSIONApproved EffectiveSept. 15, 2023 Aug. 15, 2023 Per ON 35925 & 35888 Jan Noriyuki Secretary