HomeMy WebLinkAbout20220601Final Approved Tariffs.pdfConnie Aschenbrenner
Rate Design Senior Manager
caschenbrenner@idahopower.com
May 31, 2022
ELECTRONICALLY FILED
Jan Noriyuki, Secretary
Idaho Public Utilities Commission
11331 W. Chinden Blvd., Bldg 8,
Suite 201-A (83714)
PO Box 83720
Boise, Idaho 83720-0074
Re: Case No. IPC-E-22-11, Power Cost Adjustment
Compliance Filing – Tariff Schedule 55
Dear Ms. Noriyuki:
Idaho Power Company hereby submits the enclosed compliance filing in the above-
captioned proceeding pursuant to Idaho Public Utilities Commission Order No. 35421, which
includes its Tariff Schedule 55 as listed below, reflecting the change in rates with an
effective date of June 1, 2022.
Seventeenth Revised Sheet No. 55-1 Cancelling Sixteenth Revised Sheet No. 55-1
Twelfth Revised Sheet No. 55-2 Cancelling Eleventh Revised Sheet No. 55-2
Eleventh Revised Sheet No. 55-3 Cancelling Tenth Revised Sheet No. 55-3
If you have any questions regarding this filing, please contact Regulatory Consultant Jessi
Brady at (208) 388-5764 or jbrady@idahopower.com.
Very truly yours,
Connie Aschenbrenner
LDN:sg
Enclosure
RECEIVED
2022 May 31 PM 4:40
IDAHO PUBLIC
UTILITIES COMMISSION
Idaho Power Company Seventeenth Revised Sheet No. 55-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Sixteenth Revised Sheet No. 55-1
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 35421 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2022 1221 West Idaho Street, Boise, Idaho
SCHEDULE 55
POWER COST ADJUSTMENT
APPLICABILITY
This schedule is applicable to the electric energy delivered to all Idaho retail Customers served
under the Company’s schedules and Special Contracts. These loads are referred to as "firm" load for
purposes of this schedule.
BASE POWER COST AND PROJECTED POWER COST
The Base Power Cost of the Company's rates, expressed in cents per kWh, is computed by
dividing the sum of the Company's power cost components by firm kWh sales. The power cost
components are segmented into three categories as described in the table below:
The Projected Power Cost is the Company estimate, expressed in cents per kWh, of the power
cost components for the forecasted time period beginning April 1 each year and ending the following
March 31.
BALANCING ADJUSTMENT
The Balancing Adjustment is based upon the differences between previous Projected Power Cost
and the power costs actually incurred. The Balancing Adjustment is 0.2579 cents per kWh.
EARNINGS SHARING
Order Nos. 30978, 32424, 33149, and 34071 directed the Company to share a portion of its
earnings above a certain threshold with customers through the annual Power Cost Adjustment. The
Company’s 2021 earnings were above the prescribed threshold resulting in a credit of 0.0038 cents per
kWh.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2022 June 1, 2022
Per ON 35421
Jan Noriyuki Secretary
Idaho Power Company Twelfth Revised Sheet No. 55-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Eleventh Revised Sheet No. 55-2
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 35421 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2022 1221 West Idaho Street, Boise, Idaho
SCHEDULE 55
POWER COST ADJUSTMENT
(Continued)
POWER COST ADJUSTMENT
The Power Cost Adjustment (PCA) is the sum of: 1) 95 percent of the difference between the
Projected Power Costs in Category 1 and the Base Power Costs in Category 1; 2) 100 percent of the
difference between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2;
3) 100 percent of the difference between the Projected Power Costs in Category 3 and the Base Power
Costs in Category 3; 4) the Balancing Adjustment; and 5) Earnings Sharing. The following table calculates
the rates for Categories 1, 2 and 3.
The following table shows the determination of PCA rates for Categories 1, 2, and 3:
Category Description
Base Power
Cost
Projected
Power Cost Difference Sharing
% Rate
(¢ per kWh)
1
The sum of fuel
expense and
purchased
power expense
(excluding
purchases from
cogeneration
and small power
producers), less
the sum of off-
system surplus
sales revenue
and revenue
from market-
based special
contract pricing.
1.0234 1.7131 0.6897 95% 0.6552
2
Purchased
power expense
from
cogeneration
and small power
producers.
0.8531 1.3549 0.5018 100% 0.5018
3
Demand
response
incentive
payments.
0.0751 0.0541 -0.0209 100% -0.0209
Total 1.9516 3.1221 1.1705 1.13606
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2022 June 1, 2022
Per ON 35421
Jan Noriyuki Secretary
Idaho Power Company Eleventh Revised Sheet No. 55-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Tenth Revised Sheet No. 55-3
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 35421 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2022 1221 West Idaho Street, Boise, Idaho
SCHEDULE 55
POWER COST ADJUSTMENT
(Continued)
The monthly Power Cost Adjustment rates applied to the Energy rate of all metered schedules and
Special Contracts are shown below. The monthly Power Cost Adjustment applied to the per unit charges
of the nonmetered schedules is the monthly estimated usage times the cents per kWh rates shown below.
Schedule Category
Balancing
djustment
Earnings
Sharing
Total PCA
1 2 3
1 0.6552 0.5018 (0.0209) 0.2579 (0.0047) 1.3893
3 0.6552 0.5018 (0.0209) 0.2579 (0.0045) 1.3895
5 0.6552 0.5018 (0.0209) 0.2579 (0.0045) 1.3895
6 0.6552 0.5018 (0.0209) 0.2579 (0.0047) 1.3893
7 0.6552 0.5018 (0.0209) 0.2579 (0.0059) 1.3881
8 0.6552 0.5018 (0.0209) 0.2579 (0.0059) 1.3881
9S 0.6552 0.5018 (0.0209) 0.2579 (0.0035) 1.3905
9P 0.6552 0.5018 (0.0209) 0.2579 (0.0031) 1.3909
9T 0.6552 0.5018 (0.0209) 0.2579 (0.0035) 1.3905
15 0.6552 0.5018 (0.0209) 0.2579 (0.0122) 1.3818
19S 0.6552 0.5018 (0.0209) 0.2579 (0.0035) 1.3905
19P 0.6552 0.5018 (0.0209) 0.2579 (0.0027) 1.3913
19T 0.6552 0.5018 (0.0209) 0.2579 (0.0025) 1.3915
24 0.6552 0.5018 (0.0209) 0.2579 (0.0038) 1.3902
40 0.6552 0.5018 (0.0209) 0.2579 (0.0042) 1.3898
41 0.6552 0.5018 (0.0209) 0.2579 (0.0074) 1.3866
42 0.6552 0.5018 (0.0209) 0.2579 (0.0030) 1.3910
26 0.6552 0.5018 (0.0209) 0.2579 *1.3940
29 0.6552 0.5018 (0.0209) 0.2579 *1.3940
30 0.6552 0.5018 (0.0209) 0.2579 *1.3940
* Earnings Sharing Credits are applied as monthly amounts per the table below.
Schedule Special Contract Monthly Credit
26 Micron ($1,307.24)
29 Simplot ($328.56)
30 DOE ($432.24)
EXPIRATION
The Power Cost Adjustment included on this schedule will expire May 31, 2023.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2022 June 1, 2022
Per ON 35421
Jan Noriyuki Secretary