HomeMy WebLinkAbout20220328Final Approved Tariff.pdfConnie Aschenbrenner
Rate Design Senior Manager
caschenbrenner@idahopower.com
VIA ELECTRONIC MAIL
March 15, 2022
Jan Noriyuki, Secretary
Idaho Public Utilities Commission
11331 W. Chinden Blvd., Bldg 8,
Suite 201-A (83714)
PO Box 83720
Boise, Idaho 83720-0074
Re: IPC-E-22-01
Application to Update the Substation Allowance Under Schedule 19, Large
Power Service
Compliance Filing – Schedule 19, Large Power Service
Dear Ms. Noriyuki:
Pursuant to RP 133, Idaho Power Company hereby submits the enclosed
compliance filing in the above-captioned proceeding pursuant to Idaho Public Utilities
Commission Order No. 35345, which includes its Schedule 19 as listed below,
reflecting modifications to its Large Power Service with an effective date of March 15,
2022.
Eighth Revised Sheet No. 19-6 Cancelling Seventh Revised Sheet No. 19-6
If you have any questions regarding this filing, please contact me at (208) 388-5994
or caschenbrenner@idahopower.com.
Very truly yours,
Connie Aschenbrenner
CA/sg
Enclosure
RECEIVED
2022 MAR 15 PM 4:54
IDAHO PUBLIC
UTILITIES COMMISSION
Idaho Power Company Eighth Revised Sheet No. 19-6
Cancels
I.P.U.C. No. 29, Tariff No. 101 Seventh Revised Sheet No. 19-6
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 35345 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – March 15, 2022 1221 West Idaho Street, Boise, Idaho
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
SPECIAL ARRANGEMENTS FOR SUBSTATION ALLOWANCES AND/OR TRANSMISSION VESTED
INTEREST (Continued)
Definitions (Continued)
Transmission Vested Interest Portion is that part of the Company’s transmission system in which
a Transmission Vested Interest is held.
Substation Allowance
If a Schedule 19 Customer’s request for service requires the installation of new or upgraded
transformer capacity in Substation Facilities, the following considerations will be included in the separate
agreement between the Customer and the Company:
The Customer will initially pay for the cost of new or upgraded Substation Facilities
required because of the Customer’s request. The Customer will be eligible to receive a one-time
Substation Allowance based upon subsequent sustained usage of capacity by the Customer.
a. Substation Allowance: The maximum possible allowance will be
determined by multiplying the Customer’s actual increase in load by $57,640 per MW, but
will not exceed the actual cost of the Substation Facilities.
b. Substation Allowance Refunds: The Substation Allowance will be refunded
to the Customer over a five-year period, with annual payments based on the Customer’s
Basic Load Capacity at the time of refund. The first refund will be paid one year following
the first month energy is delivered through the new Substation Facilities.
The refunds will occur based on the following adjustment, which will be
added to the Substation Allowance received in the previous year. If there is no
change in load from the previous year, the Substation Allowance for that year is
equal to the Substation Allowance from the previous year:
((Change in load from the previous year as measured in MW) x (Substation Allowance per MW))
Number of Substation Allowance Refunds remaining in five-year period
The Customer’s annual refunds will be made in accordance with the
Substation Allowance amount stated in the separate construction agreement
between the Customer and the Company.
Transmission Vested Interest
If a Schedule 19 Customer’s request for service requires the installation of new or upgraded
capacity in Transmission Facilities, and those Transmission Facilities are serving the Customer by a
radial feed, the following considerations will be included in the separate agreement between the
Customer and the Company:
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
Mar. 15, 2022 Mar. 15, 2022
Per ON 35345
Jan Noriyuki Secretary