Loading...
HomeMy WebLinkAbout20220328Final Approved Tariff.pdfConnie Aschenbrenner Rate Design Senior Manager caschenbrenner@idahopower.com VIA ELECTRONIC MAIL March 15, 2022 Jan Noriyuki, Secretary Idaho Public Utilities Commission 11331 W. Chinden Blvd., Bldg 8, Suite 201-A (83714) PO Box 83720 Boise, Idaho 83720-0074 Re: IPC-E-22-01 Application to Update the Substation Allowance Under Schedule 19, Large Power Service Compliance Filing – Schedule 19, Large Power Service Dear Ms. Noriyuki: Pursuant to RP 133, Idaho Power Company hereby submits the enclosed compliance filing in the above-captioned proceeding pursuant to Idaho Public Utilities Commission Order No. 35345, which includes its Schedule 19 as listed below, reflecting modifications to its Large Power Service with an effective date of March 15, 2022. Eighth Revised Sheet No. 19-6 Cancelling Seventh Revised Sheet No. 19-6 If you have any questions regarding this filing, please contact me at (208) 388-5994 or caschenbrenner@idahopower.com. Very truly yours, Connie Aschenbrenner CA/sg Enclosure RECEIVED 2022 MAR 15 PM 4:54 IDAHO PUBLIC UTILITIES COMMISSION Idaho Power Company Eighth Revised Sheet No. 19-6 Cancels I.P.U.C. No. 29, Tariff No. 101 Seventh Revised Sheet No. 19-6 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 35345 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – March 15, 2022 1221 West Idaho Street, Boise, Idaho SCHEDULE 19 LARGE POWER SERVICE (Continued) SPECIAL ARRANGEMENTS FOR SUBSTATION ALLOWANCES AND/OR TRANSMISSION VESTED INTEREST (Continued) Definitions (Continued) Transmission Vested Interest Portion is that part of the Company’s transmission system in which a Transmission Vested Interest is held. Substation Allowance If a Schedule 19 Customer’s request for service requires the installation of new or upgraded transformer capacity in Substation Facilities, the following considerations will be included in the separate agreement between the Customer and the Company: The Customer will initially pay for the cost of new or upgraded Substation Facilities required because of the Customer’s request. The Customer will be eligible to receive a one-time Substation Allowance based upon subsequent sustained usage of capacity by the Customer. a. Substation Allowance: The maximum possible allowance will be determined by multiplying the Customer’s actual increase in load by $57,640 per MW, but will not exceed the actual cost of the Substation Facilities. b. Substation Allowance Refunds: The Substation Allowance will be refunded to the Customer over a five-year period, with annual payments based on the Customer’s Basic Load Capacity at the time of refund. The first refund will be paid one year following the first month energy is delivered through the new Substation Facilities. The refunds will occur based on the following adjustment, which will be added to the Substation Allowance received in the previous year. If there is no change in load from the previous year, the Substation Allowance for that year is equal to the Substation Allowance from the previous year: ((Change in load from the previous year as measured in MW) x (Substation Allowance per MW)) Number of Substation Allowance Refunds remaining in five-year period The Customer’s annual refunds will be made in accordance with the Substation Allowance amount stated in the separate construction agreement between the Customer and the Company. Transmission Vested Interest If a Schedule 19 Customer’s request for service requires the installation of new or upgraded capacity in Transmission Facilities, and those Transmission Facilities are serving the Customer by a radial feed, the following considerations will be included in the separate agreement between the Customer and the Company: IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Mar. 15, 2022 Mar. 15, 2022 Per ON 35345 Jan Noriyuki Secretary