HomeMy WebLinkAbout20220118Final Approved Tariffs.pdf
Connie Aschenbrenner
Rate Design Senior Manager
caschenbrenner@idahopower.com
January 10, 2022
ELECTRONICALLY FILED
Jan Noriyuki, Secretary
Idaho Public Utilities Commission
11331 W. Chinden Blvd., Bldg 8,
Suite 201-A (83714)
PO Box 83720
Boise, Idaho 83720-0074
Re: Case No. IPC-E-21-38, Application for Modification of the Power Cost Adjustment
Mechanism
Compliance Filing – Schedule 55, Power Cost Adjustment
Dear Ms. Noriyuki:
Idaho Power Company hereby submits the enclosed compliance filing in the above-
captioned proceeding pursuant to Idaho Public Utilities Commission Order No. 35290, which
includes its Schedule 55 as listed below, reflecting the modifications to power costs
adjustment mechanism with an effective date of January 10, 2022.
Sixteenth Revised Sheet No. 55-1 Cancelling Fifteenth Revised Sheet No. 55-1
Eleventh Revised Sheet No. 55-2 Cancelling Tenth Revised Sheet No. 55-2
Tenth Revised Sheet No. 55-3 Cancelling Ninth Revised Sheet No. 55-3
If you have any questions regarding this filing, please contact me at (208) 388-5994 or
caschenbrenner@idahopower.com.
Very truly yours,
Connie Aschenbrenner
CA/sg
Enclosure
RECEIVED
2022 January 10, PM 4:41
IDAHO PUBLIC
UTILITIES COMMISSION
Idaho Power Company Sixteenth Revised Sheet No. 55-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Fifteenth Revised Sheet No. 55-1
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 35290 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – January 10, 2022 1221 West Idaho Street, Boise, Idaho
SCHEDULE 55
POWER COST ADJUSTMENT
APPLICABILITY
This schedule is applicable to the electric energy delivered to all Idaho retail Customers served
under the Company’s schedules and Special Contracts. These loads are referred to as "firm" load for
purposes of this schedule.
BASE POWER COST AND PROJECTED POWER COST
The Base Power Cost of the Company's rates, expressed in cents per kWh, is computed by
dividing the sum of the Company's power cost components by firm kWh sales. The power cost
components are segmented into three categories as described in the table below:
The Projected Power Cost is the Company estimate, expressed in cents per kWh, of the power
cost components for the forecasted time period beginning April 1 each year and ending the following
March 31.
BALANCING ADJUSTMENT
The Balancing Adjustment is based upon the differences between previous Projected Power Cost
and the power costs actually incurred. The Balancing Adjustment is (0.1222) cents per kWh.
EARNINGS SHARING
Order Nos. 30978, 32424, 33149, and 34071 directed the Company to share a portion of its
earnings above a certain threshold with customers through the annual Power Cost Adjustment. The
Company’s 2020 earnings were below the prescribed threshold resulting in a credit of 0.0000 cents per
kWh.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
Jan. 18, 2022 Jan. 10, 2022
Per O.N. 35290
Jan Noriyuki Secretary
Idaho Power Company Eleventh Revised Sheet No. 55-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Tenth Revised Sheet No. 55-2
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 35290 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – January 10, 2022 1221 West Idaho Street, Boise, Idaho
SCHEDULE 55
POWER COST ADJUSTMENT
(Continued)
POWER COST ADJUSTMENT
The Power Cost Adjustment (PCA) is the sum of: 1) 95 percent of the difference between the
Projected Power Costs in Category 1 and the Base Power Costs in Category 1; 2) 100 percent of the
difference between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2;
3) 100 percent of the difference between the Projected Power Costs in Category 3 and the Base Power
Costs in Category 3; 4) the Balancing Adjustment; and 5) Earnings Sharing. The following table calculates
the rates for Categories 1, 2 and 3.
The following table shows the determination of PCA rates for Categories 1, 2, and 3:
Category Description
Base
Power
Cost
Projected
Power
Cost
Difference Sharing
% Rate
(¢ per kWh)
1
The sum of fuel expense and
purchased power expense
(excluding purchases from
cogeneration and small power
producers), less the sum of off-
system surplus sales revenue and
revenue from market-based
special contract pricing.
1.0612 1.5174 0.4562 95% 0.4334
2
Purchased power expense from
cogeneration and small power
producers.
0.8846 1.3557 0.4711 100% 0.4711
3 Demand response incentive
payments. 0.0779 0.0527 -0.0252 100% -0.0252
Total 2.0237 2.9258 0.9021 0.8793
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
Jan. 18, 2022 Jan. 10, 2022
Per O.N. 35290
Jan Noriyuki Secretary
Idaho Power Company Tenth Revised Sheet No. 55-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Ninth Revised Sheet No. 55-3
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 35290 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – January 10, 2022 1221 West Idaho Street, Boise, Idaho
SCHEDULE 55
POWER COST ADJUSTMENT
(Continued)
The monthly Power Cost Adjustment rates applied to the Energy rate of all metered schedules and
Special Contracts are shown below. The monthly Power Cost Adjustment applied to the per unit charges
of the nonmetered schedules is the monthly estimated usage times the cents per kWh rates shown below.
Schedule Category
Balancing
Adjustment
Earnings
Sharing
Total PCA
1 2 3
1 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
3 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
5 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
6 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
7 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
8 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
9S 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
9P 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
9T 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
15 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
19S 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
19P 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
19T 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
24 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
40 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
41 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
42 0.4334 0.4711 (0.0252) (0.1222) - 0.7571
26 0.4334 0.4711 (0.0252) (0.1222) * 0.7571
29 0.4334 0.4711 (0.0252) (0.1222) * 0.7571
30 0.4334 0.4711 (0.0252) (0.1222) * 0.7571
* Earnings Sharing Credits are applied as monthly amounts, and are currently $0.00 per month.
EXPIRATION
The Power Cost Adjustment included on this schedule will expire May 31, 2022.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
Jan. 18, 2022 Jan. 10, 2022
Per O.N. 35290
Jan Noriyuki Secretary