NOTICE OF FILING
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 35228 1
Office of the Secretary
Service Date
November 19, 2021
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF IDAHO POWER
COMPANY’S ANNUAL COMPLIANCE
FILING TO UPDATE THE LOAD AND
GAS FORECASTS IN THE
INCREMENTAL COST INTEGRATED
RESOURCE PLAN AVOIDED COST
MODEL
)
)
)
)
)
)
)
)
CASE NO. IPC-E-21-35
NOTICE OF FILING
NOTICE OF
MODIFIED PROCEDURE
ORDER NO. 35228
On October 15, 2021, Idaho Power Company (“Company”) made a compliance filing
requesting the Commission issue an order accepting its updated load forecast, natural gas price
forecast, and contracts used as inputs to calculate its incremental cost Integrated Resource Plan
(“IRP”) avoided cost rates. The Company must update these inputs by October 15 of each year.
See Order Nos. 32697 and 32802. IRP avoided cost rates are available to qualifying facilities
(“QFs”) that are above the resource-specific project eligibility cap for published avoided cost rates
under Idaho’s implementation of the Public Utility Regulatory Policies Act of 1978 (“PURPA”).
The Company requested its Filing be processed by Modified Procedure.
With this Order the Commission issues notice of the Company’s Filing and establishes
public comment and Company reply deadlines.
NOTICE OF FILING
YOU ARE HEREBY NOTIFIED that the Company currently forecasts an average
annual load growth from 2021 through 2040 that constitutes a slight increase from the average
annual load growth forecast approved by the Commission in 2020 during the previous IRP update.
Application at 2-3; Order No. 34881.
YOU ARE FURTHER NOTIFIED that the Company states it developed its natural gas
forecast using the most recent Henry Hub and Sumas Basis Annuals from S&P Global Platt’s
Long-term Forecast, which was published in July 2021. Id. at 4.
YOU ARE FURTHER NOTIFIED that the Company states it has three non-PURPA,
long-term power purchase agreements with projects that are currently online—Elkhorn Valley
Wind (101 megawatts (“MW”)), Raft River Geothermal (13 MW), and Neal Hot Springs
Geothermal (22 MW)—in addition to a long term power purchase agreement with Jackpot
NOTICE OF FILING
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 35228 2
Holdings, LLC for a 120 MW project scheduled to be online in December 2022. Id. at 5. In addition
to its agreements with non-PURPA projects, the Company has 129 contracts for PURPA QFs
which, in the aggregate, have a total nameplate capacity of 1,137.8 MW. Id.
YOU ARE FURTHER NOTIFIED that the Company’s Filing is available for public
inspection during regular business hours at the Commission’s office. These documents are also
available on the Commission’s web site at www.puc.idaho.gov. Click on the “ELECTRIC” icon,
select “Open Cases,” then click on the case number as shown on the front of this document.
YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held
pursuant to the Commission’s jurisdiction under Title 61 of the Idaho Code.
YOU ARE FURTHER NOTIFIED that all proceedings in this matter will be conducted
pursuant to the Commission’s Rules of Procedure, IDAPA 31.01.01.000 et seq.
NOTICE OF MODIFIED PROCEDURE
YOU ARE FURTHER NOTIFIED that the Commission has determined that the public
interest may not require a formal hearing in this matter, and that it will proceed under Modified
Procedure pursuant to Rules 201 through 204 of the Commission’s Rules of Procedure, IDAPA
31.01.01.201 through .204. The Commission notes that Modified Procedure and written comments
have proven to be an effective means for obtaining public input and participation.
YOU ARE FURTHER NOTIFIED that persons desiring to state a position on this
Application may file a written comment explaining why they support or oppose the Application.
Persons who would like a hearing must specifically request a hearing in their written comments.
Persons interested in filing written comments must do so by December 21, 2021. Comments
must be filed by e-mail unless e-mail is unavailable. To comment by e-mail, please access the
Commission’s home page at www.puc.idaho.gov. Click the “Consumers” tab and then “Case
Comment Form” and complete the form using the case number as it appears on the front of this
document. Comments filed by e-mail must also be e-mailed to the Company at the e-mail addresses
listed below. If e-mail is unavailable, then comments may be mailed to the Commission and
Company at these addresses:
NOTICE OF FILING
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 35228 3
For the Idaho Public Utilities
Commission:
Commission Secretary
Idaho Public Utilities Commission
P.O. Box 83720
Boise, ID 83720-0074
secretary@puc.idaho.gov
Street Address for Express Mail:
11331 W. Chinden Blvd.
Building 8, Suite 201-A
Boise, ID 83714
For the Company:
Donovan E. Walker
Idaho Power Company
P.O. Box 70
Boise, ID 83707
dwalker@idahopower.com
YOU ARE FURTHER NOTIFIED that the Company must file any reply comments
by December 28, 2021.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are received
within the time limit set, the Commission will consider this matter on its merits and enter its order
without a formal hearing. If written comments are received within the time limit set, the
Commission will consider them and, in its discretion, may set the same for formal hearing.
O R D E R
IT IS HEREBY ORDERED that this case be processed by Modified Procedure, Rules
201-204 (IDAPA 31.01.01.201 - .204). Persons must file any written comments by December 21,
2021. The Company must file any reply comments by December 28, 2021.
IT IS FURTHER ORDERED that parties should continue to comply with Order No.
35058, issued June 3, 2021. All pleadings should be filed with the Commission electronically and
shall be deemed timely filed when received by the Commission Secretary. See Rule 14.02. Service
between parties should also be accomplished electronically. Voluminous discovery-related
documents may be filed and served on CD-ROM or a USB flash drive.
NOTICE OF FILING
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 35228 4
DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this 19th day
of November 2021.
PAUL KJELLANDER, PRESIDENT
KRISTINE RAPER, COMMISSIONER
ERIC ANDERSON, COMMISSIONER
ATTEST:
Jan Noriyuki
Commission Secretary