HomeMy WebLinkAbout20210122Application.pdf. 1' ',1- t r i i-:i\"iir* i*- --i r'i*!;/ :l:; J*lH Ee f,H ll: 38 ntDltfs!Po,r,EiR. An IDACORP Company DONOVAN E. WALKER Lead Gounsel dwalker@idahooower.com January 22,2021 VIA ELECTRONIC MAIL Jan Noriyuki, Secretary ldaho Public Utilities Commission 11331 West Chinden Blvd., Building 8 Suite 2O1-A Boise, ldaho 83714 Re Case No. !PC-E-21-0'l Crystal Springs Hydro Project ldaho Power Company's Application re the Energy Sales Agreement Dear Ms. Noriyuki Attached for electronic filing is ldaho Power Company's Application in the above entitled matter. lf you have any questions about the attached documents, please do not hesitate to contact me. Very truly yours,fuzd*q Donovan E. Walker DEW:cld Enclosures DONOVAN E. WALKER (lSB No. 5921) ldaho Power Company 1221West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 Telephone: (208) 388-5317 Facsimile: (208) 388-6936 dwa lker@idahopower.com Attorney for ldaho Power Company BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR APPROVAL OR REJECTION OF AN ENERGY SALES AGREEMENT WITH CRYSTAL SPRINGS HYDROELECTRIC, 1.P., FOR THE SALE AND PURCHASE OF ELECTRIC ENERGY FROM THE CRYSTAL SPRINGS HYDRO PROJECT. ) ) ) ) ) ) ) ) ) CASE NO. IPC-E-21-01 APPLICATION ldaho Power Company ("!daho Power" or "Company"), in accordance with RP 52 and the applicable provisions of the Public Utility Regulatory Policies Act of 1978 ('PURPA'), hereby respectfully applies to the ldaho Public Utilities Commission ("Commission") for an order accepting or rejecting the Energy Sales Agreement ("ESA' or "Agreement") between ldaho Power and Crystal Springs Hydroelectric, L.P. ("Crystal Springs" or "Selle/') under which Crystal Springs would sell and ldaho Power would purchase electric energy generated by the Crysta! Springs Hydro Project ("Facility") located near the city of Buhl, ldaho. APPLICATION -.I !n support of this Application, ldaho Power represents as follows: !. INTRODUCTION 1. The Seller currently has a PURPA firm energy sales agreement with ldaho Power for this Facility that was executed on March 31, 1984. The expiration date of the 1984 energy sales agreement is March 31,2021. 2. The ESA submitted herewith is a new contract with the same Qualifying Facility ("QF') for a new term and current terms and conditions. This ESA complies with the Commission's Order Nos. 32697,32737, and 32802 from Case No. GNR-E-11-03. The ESA contains published rates for projects of 10 average megawatts ("aMW') or less pursuant to Commission Order No. 34350. The Facility is an existing QF that is seeking a replacement agreement. The replacement ESA contains capacity payments for the entire term of the Agreement, with no sufficiency period. See Order No. 32697 at21-22, Order No. 32737 at 5, and Order No. 32871. Pursuant to the Commission's direction in its Reconsideration Order No. 32737, the rates were calculated by Commission Staff for a QF in the "Non-Seasonal Hydro" category based on the surrogate avoided resource ('SAR") avoided cost methodology. 3. The ESA, dated January 21, 2021, was executed in compliance with the Commission's orders directing the implementation of PURPA for the state of ldaho and contains avoided cost rates pursuant to the Commission's Order No. 34683 dated May 29,2020. APPLICATION - 2 II. BACKGROUND 4. Sections 201 and 210 of PURPA, and pertinent regulations of the Federal Energy Regulatory Commission ("FERC"), require that regulated electric utilities purchase power produced by cogenerators or small power producers that obtain QF status. The rate a QF receives for the sale of its power is generally referred to as the avoided cost rate and is to reflect the incremental cost to an electric utility of electric energy or capacity or both which, but for the purchase from the QF, such utility would generate itself or purchase from another source. The Commission has authority under PURPA Sections 201 and 210 and the implementing regulations of FERC, 18 C.F.R. S 292, to set avoided costs, to order electric utilities to enter into fixedterm obligations for the purchase of energy from QFs, and to implement FERC rules. 5. On December 18, 2012, the Commission issued Order No. 32697, which established parameters for published and negotiated avoided cost rate calculations. The Commission further established and defined numerous contract terms and conditions for energy sales agreements entered into between regulated utilities and QFs. On January 2,2013, the Commission issued Errata to Order No. 32697, which corrected published avoided cost rates to include energy payments not discounted by transmission and line loss. Then the Commission issued Reconsideration Order Nos. 32737 and 32802 on February 5, 2013, and May 5,2013, respectively, which further clarified certain terms and conditions of power purchase agreements. Most recently, in Order No. 33898, the Commission directed ldaho Power to utilize July 2026 as its first capacity deficit in the Company's SAR methodology. However, this ESA is a replacement contract and its rates APPLICATION - 3 contain capacity payments for the entire contract term. III. THE ENERGY SALES AGREEMENT 6. On January 21,2021,|daho Power and the Seller entered into an ESA pursuant to the terms and conditions of the various Commission orders applicable to this PURPA agreement for a "Non-Seasonal Hydro" project. A copy of the ESA is attached to this Application as Attachment 1. Under the terms of this ESA, the Seller elected to contractwith ldaho Powerfor a2}-yearterm using the non-levelized, non-seasonalhydro published avoided cost rates as currently established by the Commission in Order No. 34683 dated May 29, 2020, for replacement contracts and for energy deliveries of less than 10 aMW. 7. The nameplate capacity in the replacement ESA submitted herewith is 2,775 kilowatts ('kV1/'). This Facility has been delivering energy to Idaho power in accordance with an energy sales agreement dated March 31, 1984, that expires on March 31,2021 ("1984 Agreement"). When the 1984 energy sales agreement was signed, the agreement specified 3 generating units with a combined nameplate rating of 2,441 kW. When the Facility was constructed and achieved operation 2 years later in 1986, it had 4 generator units. ln the year 2020, a professional engineer conducted some tests at the Facility and determined that the non-simultaneous total nameplate is 2,775 kW. When all four generating units are on-line and delivering energy, they cannot simultaneously deliver the total nameplate capacity of each individual generator due to hydraulic pressure losses. Operational tests conducted by a professional engineer in 1987 and repeated in 2020 confirmed that the Facility has a maximum simultaneous capacity amount of 2,SSO kW when allfour units are running simultaneously. The Seller plans to continue operating APPLICATION - 4 and maintaining the same facilities with the 2,775 kilowatt ('kW') (Nameplate Capacity Amount, paragraph B-1, Appendix B) generator. The Facility is a QF under the applicable provisions of PURPA. Because the project configuration in the replacement ESA is the same configuration that has been operating under the 1984 Agreement, the replacement ESA contains payment for capacity during the full term, rather than not being paid for capacity during ldaho Power's current capacity sufficiency period' Prior to the Effective Date of this ESA, this Facility has been delivering energy to ldaho Power in accordance with an energy sales agreement dated March 31, 1984, that expires on March 31,2021 ('1984 Agreement"). The Seller plans to continue operating and maintaining a 2,775 kilowatt ('kW') (Nameplate Capacity Amount, paragraph B-1, Appendix B) energyfacility located nearthe city of Buhl, ldaho. The Facility is a QF under the applicable provisions of PURPA. The prices in the 1984 Agreement included value for capacity. Therefore, ldaho Power believes that the Facility is eligible to receive value for capacity in this ESA for the full term. 8. The nameplate rating of this Facility is 2,775 kW. As defined in paragraphs 1.24 and 4.1.4 of the ESA, the Seller will be required to provide data on the Facility that ldaho Power will use to confirm that under normal and/or average conditions, the Facility will not exceed 10 aMW on a monthly basis. Furthermore, as described in paragraph 7.7 of the ESA, should the Facility exceed 10 aMW on a monthly basis, ldaho Power will accept the energy (lnadvertent Energy) that does not exceed the Maximum Capacity Amount, but will not purchase or pay for this lnadvertent Energy. 9. The Facility is already interconnected and selling energy to ldaho Power and the ESA specifies a Scheduled First Energy Date and Scheduled Operation Date for APPLICATION - 5 this Facility of April 1, 2021. See Appendix B. Articles lV and V of this ESA recognize that information provided under the previous agreement may still be applicable to this replacement ESA. As specified in the ESA, ldaho Power shall review the previously provided information and will accept the information as previously submitted, request updates to that information, and/or require new information to satisfy compliance with the various requirements for the Seller to be granted a First Energy Date and Operation Date for this replacement ESA. ln addition, ldaho Power will monitor the ongoing requirements through the full term of this ESA. 10. The ESA provides that all applicable interconnection charges and monthly operational or maintenance charges under Schedule 72 will be assessed to Seller. A Schedule 72 Generator lnterconnection Agreement, or "GlA," between the Seller and ldaho Power is in process but not yet signed. PURPA QF generation must be designated as a network resource ('DNR') to serve ldaho Power's retail load on its system. ln order for the Facility to maintain its DNR status, there must be a power purchase agreement associated with its transmission service request in order to maintain compliance with ldaho Power's non-discriminatory administration of its Open Access Transmission Tariff (OATT) and maintain compliance with FERC requirements. 11. The notification of Net Energy Amount monthly adjustments described in paragraph 6.2.3 must be provided no later than 5 p.m. Mountain Standard Time on the 25th day of the month that is prior to the month to be revised. lf the 25th day of the month falls on a weekend or holiday, then wriften notice must be received on the last business day prior to the 25th. 12. Article XXI of the ESA provides that the ESA will not become effective until APPLICATION - 6 the Commission has approved all of the ESA's terms and conditions and declared that all payments ldaho Power makes to the Seller for purchases of energy will be allowed as prudently incurred expenses for ratemaking purposes. IV. MODIFIED PROCEDURE 13. ldaho Power believes that a hearing is not necessary to consider the issues presented herein and respectfully requests that this Application be processed under Modified Procedure; i.e., by written submissions rather than by hearing. RP 201, ef seq. lf, however, the Commission determines that a technical hearing is required, the Company stands ready to prepare and present its testimony in such hearing. 14. Because the existing contract will run its full term and expire on March 31, 2021 ,the parties request that the Commission set a procedural schedule that would result in a final Commission determination prior to the expiration of the existing contract' V. COMMUNICATIONS AND SERVICE OF PLEADINGS 15. Communications and service of pleadings, exhibits, orders, and other documents relating to this proceeding should be sent to the following: Donovan E. Walker ldaho Power Company 1221 West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 dwal ker@idahopower.com dockets@idahopower.com Energy Contracts ldaho Power Company 1221West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 en erq vco ntracts@ id a ho power. co m VI. REQUEST FOR RELIEF 16. ldaho Power respectfully requests that the Commission issue an order: (1) authorizing that this matter may be processed by Modified Procedure; (2) accepting or rejecting the ESA between ldaho Power and the Seller; and, if accepted, (3) declaring APPLICATION - 7 that all payments for purchases of energy under the ESA between ldaho power and the seller be allowed as prudently incured expenses for ratemaking purposes. Respectfully submitted this 22nd day of January 2021. fuz*)at4- DONOVAN E. WALKER Attorney for ldaho Power Company APPLICAT]ON - 8 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on this 22nd day of January 2021,1 served a true and correct copy of the within and foregoing APPLICATION upon the following named parties by the method indicated below, and addressed to the following: Dell Keehn 7829 Center Blvd SE #100 Snoqualmie, WA 98065 -Hand DeliveredX U.S. Mail _Ovemight Mail _FAXX Email CC@WeatherlvComPanies.com aem2impress@qmail.com Christy Davenport, Legal Assistant APPLICATION - 9 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NO. IPC-E-21-01 IDAHO POWER COMPANY ATTACHMENT 1 ARTICLE ENERGY SALES AGREEMENT BETWEEN IDAHO POWER COMPANY AND CRYSTAL SPRINGS TryDROELECTRIC, L.P. TABLE OF CONTENTS TITLE Definitions No Reliance on Idaho Power Warranties Conditions to Acceptance of Energy Term and Operation Date Purchase and Sale of Net EnergY Purchase Price and Method of Payment Environmental Attributes Facility and Interconnection Metering, Metering Communications and SCADA Telemetry Records Operations Indemnification and Insurance Force Majeure Liability; Dedication Several Obligations Waiver Choice of Laws and Venue Disputes and Default Governmental Authorization Commission Order Successors and Assigns Modification Taxes Notices and Authorized Agents Additional Terms and Conditions Severability Counterparts Entire Agreement Signatures 1 2 J 4 5 6 7 8 9 l0 11 12 13 t4 15 t6 17 l8 t9 20 2l 22 23 24 25 26 27 28 29 Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Generation Scheduling and Reporting Facility and Point of Delivery Engineer' s Certifications Forms of Liquid Security Non-Seasonal Hydro Facility Energy Prices Insurance Requirements ENERGY SALES AGREEMENT (Non-Seasonal Hydro Facility l0 average Monthly MW or Less) Project Name: Crystal Springs Hydro project Project Number: 3 1615060 THIS ENERGY SALES AGREEMENT ("AGREEMENT"), entered into on this 2lst day of January 202l,between CRYSTAL SPRINGS HYDROELECTRIC, L.p., (Seller), and IDAHO pOWER COMPANY, an Idaho corporation (Idaho Power), hereinafter sometimes referred to collectively as "Parties" or individually as "Party." WITNESSETH: WHEREAS, Seller owns, maintains and operates a PURPA Qualiffing Facility; and WHEREAS, Seller wishes to sell, and Idaho Power is required to purchase, electric generation produced by a PURPA Qualifying Facility. THEREFORE, In consideration of the mutual covenants and agreements hereinafter set forth, the Parties agree as follows: ARTICLE I: DEFINITIONS As used in this Agreement and the appendices attached hereto, the following tenns shall have the following meanings: 1.1 "Adjusted Estimated Net Enere.v Amount" - The Estimated Net Energy Amount specified in paragraph 6.2 including any adjustments that have been made in accordance with paragraphs 6.2.2,6.2.3 or 6.2.4. 1.2 "Authorized Asent" - A person or persons specified within paragraph 25.2 of this Agreement as being authorized and ernpowered, for and on behalf of the Seller, to execute instruments, agreements, certificates, and other documents (collectively "Documents") and to take actions on behalf of the Seller, and that Idaho Power Company and its directors, officers, employees, and I agents are entitled to consider and deal with such persons as agents ofthe Seller for all purposes, until such time as an authorized officer of the Seller shall have delivered to Idaho Power Company a notice in writing stating that such person is and shall no longer be an agent on behalf of the Seller. Any Documents executed by such persons shall be deemed duly authorized by the Seller for all purposes. 1.3 o'Commission" - The Idaho Public Utilities Commission' 1.4 ,,@@! year', - The period commencing each calendar year on the same calendar date as the Operation Date and ending three hundred sixty-four (364) days thereafter' 1.5 ,.Delay Cure Period" - One hundred twenty (120) days immediately following the Scheduled Operation Date. 1.6 ooDelav Damaqes" - Current month's Initial Year Monthly Estimated Net Energy Amount as specified in paragraph 6.2.1 as of the Effective Date divided by the number of days in the current month multiplied by the number of days in the Delay Period in the current month multiplied by the current month's DelaY Price. 1.7 ,.Delay period,'- All days past the Scheduled Operation Date until the Seller's Facility achieves the operation Date or the Agreernent is terminated by Idaho Power. 1.8 ..Delav Price" - The current month's Mid-Columbia Market Energy Cost minus the current month's All Hours Energy Price as specified in Appendix E-3 of this Agreement. If this calculation results in a value less than zero (0), the result of this calculation will be zero (0). 1.9 ,,Desisnated Network Resource (DNR)" - A resource that is designated for Idaho Power network load and does not include any resource, or any portion thereof, that is committed for sale to third parties or otherwise cannot be called upon to meet Idaho Power's network load' 1.10 .,Desisnated Dispatch Facility" - Idaho Power's Load Serving Operations, or any subsequent group designated bY Idaho Power' I . I I ,,Effective Date" - The date stated in the opening paragfaph of this Energy Sales Agreement representing the date upon which this Energy Sales Agreement was fully executed by both 2 Parties. l.l2 "Environmental Attributes" -Any and all credits, benefits, emissions reductions, offsets, and allowances, howsoever entitled, attributable to the generation from the Facility, and its avoided emission of pollutants. Environmental Attributes include but are not limited to: (l) any avoided emission of pollutants to the air, soil or water such as sulfur oxides (SOx), nitrogen oxides (NOx), carbon monoxide (CO) and other pollutants; (2) any avoided emissions of carbon dioxide (COr, methane (CHo), nitrous oxide, hydrofluorocarbons, perfluorocarbons, sulfur hexafluoride and other greenhouse gases (GHGs) that have been determined by the United Nations Intergovernmental Panel on Climate Change, or otherwise by law, to contribute to the actual or potential threat of altering the Earth's climate by trapping heat in the atmosphere;t 13) the reporting rights to these avoided emissions, such as REC Reporting Rights. REC Reporting Rights are the right of a REC purchaser to report the ownership of accumulated RECs in compliance with federal or state law, if applicable, and to a federal or state agency or any other party at the REC purchaser's discretion, and include without limitation those REC Reporting Rights accruing under Section 1605(b) of The Energy Policy Act of 1992 and, any present or future federal, state, or local law, regulation or bill, and international or foreign emissions trading program. RECs are accumulated on a MWh basis and one REC represents the Environmental Attributes associated with one (l) MWh of energy. Environmental Attributes do not include (i) any energy, capacity, reliability or other power attributes from the Facility, (ii) production tax credits or investment tax credits associated with the construction or operation of the Facility and other financial incentives in the form of credits, reductions, or allowances associated with the Facility that are applicable to a state or federal income taxation obligation, (iii) the cash grant in lieu of the investment tax credit pursuant to Section 1603 of the American Recovery and Reinvestment Act of 2009, or (iv) emission reduction credits encumbered or used by the Facility for compliance with local, state, or federal operating and/or air quality permits. I Avoided emissions may or may not have any value for GHG compliance purposes. Although avoided emissions are included in the list of Environmental Attributes, this inclusion does not create any right to use thoseavoided emissions to comply with any GHG regulatory program. J 1.13 1.14 1.15 1.16 t.t7 1.18 1.19 1.20 "Estimated Net Enere.v Amount" - The monthly Estimated Net Energy Amount (kwh) provided by the Seller in accordance with paragraph 6.2 and which may be adjusted periodically throughout the Term of this Agreement in accordance with paragraph6.2. "Facilit)r" - That electric generation facility described in Appendix B of this Agreernent "Facility Nameplate Capacitv" - The sum of the individual Generation Unit Nameplate Capacities that are installed at this Facility. "First Enersy Date" - The day commencing at 00:01 hours, Mountain Time, following the day that Seller has satisfied the requirements of Article IV and after the Seller requested Fint Energy Date. ..Ucgd_e.U!AE" - A partial or total reduction of a) the Facility's capacity to produce and/or deliver Net Energy to the Point of Delivery, or b) Idaho Power's ability to accept Net Energy at the Point of Delivery for non-economic reasons, as a result of Idaho Power or Facility: 1) equipment failure which was p! the result of negligence or lack of preventative maintenance, or 2) responding to a transmission provider curtailment order, or 3) unplanned preventative maintenance to repair equipment that left unrepaired, would result in failure of equipment prior to the planned maintenance period, or 4) planned maintenance or construction of the Facility or electrical lines required to serve this Facility, or 5) icing events within the immediate water source used as the Facility's primary motive force that causes the Facility to reduce energy production. .,&el961-4ateg" - Fueled Rates shall apply to Qualiffing Facility projects fueled with fossil fuels as described in Schedule 73, Rate Options. "Generator Interconnection Aeresrnent (GIA)" - The interconnection agreement that specifies terms, conditions and requirements of interconnecting to the Idaho Power electrical system, which will include but not be limited to all requirements as specified by Schedule 72. "Generation Unit" - A complete electrical generation system within the Facility that is able to generate and deliver electricity to the Point of Delivery independent of other Generation Units within the same Facility. 4 t.2t "Heav.v Load Hours (HL)" - The daily hours, applicable to energy deliveries, from hour ending 0700 - 2200 Mountain Time, (16 hours) excluding all hours on all Sundays, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving and Christmas. "Inadvertent Enerq.v" - Electric energy Seller did not intend to generate. Inadvertent energy is described in paragraph 7.7 of this Agreernent. "Interconnection Facilities'- All equipment specified in the GIA. "Initial Capacitv De " - The process by which Idaho Power confirms that under normal or average design conditions the Facility will generate at no more than ten (10) average megawatts (MW) per month. "Lieht Load Hours (LL)" - The daily hours from hour ending 2300 - 0600 Mountain Time (8 hours), plus all other hours on all Sundays, New Year's Day, Memorial Day, Independenc eDay, Labor Day, Thanksgiving and Christmas. "Losses" - The loss of electrical energy expressed in kilowatt houn (kWh) occurring as a result of the transformation and transmission of energy between the point where the Facility's energy is metered and the Facility's Point of Delivery. The loss calculation formula will be as specified in Appendix B of this Agreement. "Market Eners.v Reference Price" - Eighty-five percent (85%) of the Mid-Columbia Market Energy Cost. "@E[gach" - A Default (paragraph 19.2.1) subject to paragraph 19.2.2. "Maximum capacity Amount" - The maximum capacity (Mw) of the Facility will be as specified in Appendix B of this Agreement. "Mid-colnmbia Market E " - Eighty-two and four tenths percent (82.4%) of the monthly arithmetic average of each day's Intercontinental Exchange ("ICE') daily firm Mid-C Peak Avg and Mid-C Off-Peak Avg index prices. Each day's index prices will reflect the relative proportions of peak houn and off peak hours in the month as follows: 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 5 The Mid-Columbia Market Energy Cost actual calculation being n .824 * (I {GCE Mid-C Peak Avg* * HL hours for day) + x:1 (ICE Mid-C Off-Peak Avg* * LL hours for day)) I (n*24)) where n: number of days in the month If the ICE Mid-C Index prices are not reported for a particular day or days, prices derived from the respective averages of HL and LL prices for the immediately preceding and following reporting periods or days shall be substituted into the formula stated in this definition and shall therefore be multiplied by the appropriate respective numbers of HL and LL Hours for such particular day or days with the result that each hour in such month shall have a related price in such formula. If the day for which prices are not reported has in it only LL Hours (for example a Sunday), the respective averages shall use only prices reported for LL hours in the immediately preceding and following reporting periods or days. If the day for which prices are not reported is a Saturday or Monday or is adjacent on the calendar to a holiday, the prices used for HL Hours shall be those for HL hours in the nearest (forward or backward) reporting periods or days for which HL prices are reported. If the ICE Mid-C Index reporting is discontinued by the reporting agency, both Parties will mutually agree upon a replacement index, which is similar to the ICE Mid-C Index. The selected replacanent index will be consistent with other similar agreements and a commonly used index by the electrical industry. 1.31 ..Monthly Nameplate Enere.y" - Facility Nameplate Capacity (kW) multiplied by the hours in the applicable month. l.3Z ,.Namgplefg_eapggiry" - The fullJoad electrical quantities assigned by the designer to a Generation Unit and its prime mover or other piece of electrical equipment, expressed in kilovolf amperes, kilowatts, horsepower or other appropriate units. The nameplate is usually attached to the individual machine or device. This value is established for the term of this Agreement in Appendix B, itern B-1 of this Agreement and validated in paragraph4.l.4 of this Agreement' 6 1.33 "Ne1-Engrgy" - All of the electric energy produced by the Facility, less Station Use and Losses, expressed in kilowatt hours (kWh) delivered by the Facility to Idaho power at the point of Delivery. Subject to the terms of this Agreement, Seller commits to deliver all Net Energy to Idaho Power at the Point of Delivery for the full term of the Agreement. Net Energy does not include Inadvertent Energy. 1.34 "NQn-Fueled-Rates" - Non-Fueled Rates shall apply to Quali$ing Facility projects that do not use fossil fuels as their primary fuel as described in Schedule 73, Rate Options. 1.35 "Operation Dale" - The day commencing at 00:01 hours, Mountain Time, following the day that all requirements of paragraph 5.2 have been completed and after the Seller requested Operation Date. 1.36 "Point-qf Delivgry" - The location specified in the GIA and referenced in Appendix B, where Idaho Power's and the Seller's electrical facilities are interconnected and the energy from this Facility is delivered to the Idaho power electrical system. 1.37 "Prudent Electrical Practices" - Those practices, methods and equipment that are commonly and ordinarily used in electrical engineering and operations to operate electric equipment lawfully, safely, dependably, effi ciently and economically. 1.38 "Renewable Energ.v Certificate" or "ItEg" - A certificate, credit, allowance, green tag, or other transferable indicia, howsoever entitled, indicating generation of renewable energy by the Facility, and includes all Environmental Attributes arising as a result of the generation of electricity associated with the REC. one REC represents the Environmental Attributes associated with the generation of one thousand (1,000) kWh of Net Energy. 1.39 "Scheduled Operation Date" - The date specified in Appendix B when Seller anticipates achieving the Operation Date. The Scheduled Operation Date provided by the Seller shall be a reasonable estimate of the date that the Seller anticipates that the Seller's Facility shall achieve the Operation Date and complete Article V compliance items. 1.40 "Schedule 72" - Idaho Power's TariffNo. 101, Schedul e 72 or its successor schedules as approved by the Commission. 7 t.4l 1.42 1.43 t.44 t.45 2.1 2.2 3.1 3.2 ,.&h@e 7,3,, - Idaho Power's TariffNo. l0l, Schedule 73 or its successor schedules as approved by the Commission. .,securit), Deposit,, - $45 per kw Nameplate capacity of the entire Facility. ..S@sq,,-Thethreeperiodsidentifiedinparagraph6.2.lofthisAgreement. ,,Station Use,, - Electric energy that is used to operate equipment that is auxiliary or otherwise related to the production of electricity by the Facility' ooTermination Damases" - Financial damages the non-defaulting party has incurred as a result of termination of this Agreement. ARTICLE II: NO RELIANCE ON IDAHO POWER Seller Independent Investieation - Seller warrants and represents to ldaho Power that in entering into this Agreernent and the undertaking by Seller of the obligations set forth herein, Seller has investigated and determined that it is capable of performing hereunder and has not relied upon the advice, experience or expertise of Idaho Power in connection with the transactions contemplated by this Agreement. Seller Independent Experts - All professionals or experts including, but not limited to, engineers, attorneys or accountants, that Seller may have consulted or relied on in undertaking the transactions contemplated by this Agreement have been solely those of Seller. ARTICLE III: WARRANTIES No Warranty by Idaho Power - Any review or acceptance Seller's design, specifications, equipment or facilities shall not be an endorsernent or a confirmation by Idaho Power and Idaho Power makes no waranties, expressed or implied, regarding any aspect of Seller's design, specifications, equipment or facilities, including, but not limited to, safety, durability, reliability, strength, capacity, adequacy or economic feasibility' Oualifyine Facility Status - Seller warrants that the Facility is a "Qualifying Facility," as that term is used and defined in l8 C.F.R. 5292.201et seq. and Seller will take such steps as may be 8 J.J 4.1 required to maintain the Facility's QualiSing Facility status during the term of this Agreement and Seller's failure to maintain Qualifying Facility status will be a Material Breach of this Agreement. Idaho Power reseryes the right to review the Facility's Qualiffing Facility status and associated support and compliance documents at any time during the term of this Agreement. FERC License / Exemption / Determination - Seller warrants that Seller possesses a valid license, exemption from licensing, or a determination of a qualifring conduit hydropower facility (pursuant to section 30 of the Federal Power Act) from the Federal Energy Regulatory Commission ('FERC') for the Facility. Seller recognizes that Seller's possession and retention of a valid FERC license, exernption, or a determination of a qualiffing conduit hydropower facility is a material part of the consideration for Idaho Power's execution of this Agreement. If applicable, Seller will take such steps as may be required to maintain a valid FERC license, exemption, or a determination of a qualiffing conduit hydropower facility for the Facility during the term of this Agreement, and Seller's failure to maintain a valid FERC license or exemption will be a material breach of this Agreement. ARTICLE IV: CONDITIONS TO ACCEPTANCE oF ENERGY First Enerey Date - Prior to the Effective Date of this Agreement, this Facility has been delivering energy to Idaho Power in accordance with a Firm Energy Sales Agreement dated March 3l,lgg4, and some of the requirements of this Article are similar to the requirements of the 1984 agreement. Prior to the First Energy Date and as a condition of Idaho Power's acceptance of deliveries of energy from the Seller under this Agreement, Idaho Power shall review the previously provided information and at Idaho Power's sole discretion may 1) accept the previously provided information as meeting the requirernents of this Article or, 2) require updates to the previously provided information or 3) require the Seller to provide new information to complete the following requiranents. 4.1.1 Licenses. Leases. Permits. Determinations. Approvals - Submit proof to Idaho power that all licenses, leases, permits, determinations and approvals necessary for Seller's I 4.t.2 4.1.3 4.1.4 operations have been obtained from applicable federal, state or local authorities, including, but not limited to, evidence of compliance with Subpart B, l8 C.F.R.5292.201 et seq. as a certified Qualifring Facility' Ooinion of Counsel - Submit to Idaho Power an opinion letter signed by an attomey admitted to practice and in good standing in the State of Idaho providing an opinion that Seller's licenses, permits, determinations and approvals as set forth in paragraph 4.1.1 above are legally and validly issued, are held in the name of the Seller and, based on a reasonable independent review, counsel is of the opinion that Seller is in substantial compliance with said perrnits as of the date of the opinion letter. The opinion letter will be in a form acceptable to Idaho Power and will acknowledge that the attorney rendering the opinion understands that Idaho Power is relying on said opinion. Idaho Power's acceptance of the form will not be unreasonably withheld. The opinion letter will be governed by and shall be interpreted in accordance with the legal opinion accord of the American Bar Association Section of Business Law (1991). Commission Approval - Confirm with Idaho Power that Commission approval of this Agreement in a form acceptable to Idaho Power has been received' Initial Capacity Determination - Submit to Idaho Power such data as Idaho Power may reasonably require to perform the Initial Capacity Determination. Such data will include but not be limited to, Generation Unit Nameplate Capacity, equipment specifications, prime mover data, resource characteristics, normal and/or average operating desigrr conditions and Station Use data. Upon receipt of this information, Idaho Power will review the provided data and if necessary, request additional data to complete the lnitial Capacity Determination within a reasonable time. 4.1.4.1 If the Maximum Capacity Amount specified in Appendix B of this Agreement and the cumulative manufacturer's Nameplate Capacity rating of the individual Generation Units at this Facility does not exceed ten (10) MW, the Seller shall submit detailed, manufacturer, verifiable data of the Nameplate Capacity ratings 10 4.1.5 of the individual Generation Units to be installed at this Facility. Idaho power will verify that the data provided establishes the combined Nameplate Capacity rating of the Generation Units to be installed at this Facility does not exceed ten (10) MW and will determine if the Seller has satisfied the Initial Capacity Determination. 4.1.4'2 If the Maximum Capacity or the cumulative manufacture's Nameplate Capacity Rating of the individual Generation Units at this Facility exceeds ten (10) MW, Idaho Power will review all data submitted by Seller to determine if it is a reasonable estimate that the Facility will not exceed ten (10) average MW in any month. Nameplate Capacitv - Submit to Idaho Power manufacturer's and engineering documentation that establishes the Nameplate Capacity of each individual Generation Unit that is included within this entire Facility. The sum of the individual Generation Unit capacity ratings shall be equal to Facility Nameplate Capacity. Upon receipt of this data, Idaho Power shall review the provided data and determine if the Nameplate Capacity specified is reasonable based upon the manufacturer's specified generation ratings for the specific Generation Units. Completion Certificate - Submit a certificate executed by an authorized agent of the Seller attesting that all mechanical and electrical equipment of the designated Generation Unit has been completed to enable the Generation Unit to begin testing and deliver Test Energy in a safe manner. Insurance - Submit written proof to Idaho Power of all insurance required in Article XIII. Interconnection - Provide written confirmation from Idaho Power's business unit that administers the GIA that Seller has satisfied all interconnection, hourly metering and testing requirements that will enable the Facility to be safely connected to the Idaho Power electrical system. 4.1.6 4.1.7 4.1.8 11 4.1.g Desienated Network Resource (DNR) - Confirm that the Seller's Facility has completed all of the requirements to be an Idaho Power DNR capable of delivering energy up to the amount of the Maximum Capacity at the Point of Delivery' 4.l.g.l As specified in Appendix B item 7 of this Agreement, the Seller's Facility must achieve DNR status prior to Idaho Power accepting any energy from this Facility. Appendix B item 7 provides information on the initial application process required to enable Idaho Power to determine if network transmission capacity is available for this Facility's Maximum Capacity Amount and/or if Idaho Power transmission network upgrades will be required. The results of this study process and any associated costs will be included in the GIA for this Facility. 4.1.9.2 At least thirty (30) days prior to the Scheduled First Energy Date and after the Facility has completed all requirements of the GIA that enable the Facility to come online, Idaho Power will complete the process for getting the Seller's Facility approved as an Idaho Power DNR. If the Seller estimates that the actual First Energy is expected to be different then the Scheduled First Energy Date specified in Appendix B of this Agreement, the Seller must notify Idaho Power of this revised date no later than 30 days prior to Scheduled First Energy Date. The Facility cannot deliver any energy to ldaho Power until it is approved as a DNR and after completing all the requirernents of the GIA and complying with the requirements of this Agreement. 4.1.10 Written Acceptance - Request and obtain written confirmation from Idaho Power that all conditions to acceptance of energy have been fulfilled. Such written confirmation shall be provided within a commercially reasonable time following the Seller's request and will not be unreasonably withheld by Idaho Power. t2 5.1 5.2 ARTICLE V: TERM AND OPERATION DATE Term - Subject to the provisions of paragraph 5.2 below, this Agreanent shall become effective on the Effective Date and shall continue in full force and effect for a period of twenty (20) Contract Years from the Operation Date, except that if the Operation Date is granted for a date that is after the Scheduled Operation Date identified in Appendix B, in which case the Term shall start on the Scheduled Operation Date. Operation Date - Prior to the Effective Date of this Agreement, this Facility has been delivering energy to Idaho Power in accordance with a Firm Energy Sales Agreanent dated March 31,1984, and some of the requirements of this Article are similar to the requirements of the 1984 agreement. Prior to the Operation Date and as a condition of Idaho Power's acceptance of deliveries of energy from the Seller under this Agreement, Idaho Power shall review the previously provided information and at Idaho Power's sole discretion may l) accept the previously provided information as meeting the requirements of this Article or, 2) require updates to the previously provided information or 3) require the Seller to provide new information to complete the following requiranents. A single Operation Date will be granted for the entire Facility and may occur only after the Facility has achieved all of the following: a) The Facility is online and delivering electricity to Idaho Power at the Point of Delivery. b) Seller has dernonstrated to Idaho Power's satisfaction that all mechanical and electrical testing has been completed satisfactorily and the Facility is able to provide energy in a consistent, reliable and safe manner. c) Engineer's Certifications - Submit an executed Engineer's Certification of Design & Construction Adequacy and an Engineer's Certification of Operations and Maintenance (O&M) Policy as described in Commission Order No. 21690. These certificates will be in the form specified in Appendix C but may be modified to the extent necessary to recognize the different engineering disciplines providing the certificates. d) Seller has requested an Operation Date from Idaho Power in a written format. e) Seller has received written confirmation from Idaho Power of the Operation Date. 13 5.3 Ooeration Date Delay - Seller shall cause the Facility to achieve the Operation Date on or before the Scheduled Operation Date. Delays in the interconnection and transmission network upgrade study, design and construction process (This includes any delay in making the required deposit payments set forth in the Facility's GIA) that ry! caused by Idaho Power or Force Majeure events accepted by both Parties, shall not prevent Delay Damages or Termination Damages from being due and owing as calculated in accordance with this Agreement. Termination - If Seller fails to achieve the Operation Date prior to the Scheduled Operation Date, such failure will be a Material Breach and shall subject the Seller to Delay Damages during the Delay Cure Period. If Seller fails to achieve an Operation Date during the Delay Cure Period, Idaho Power may immediately terminate this Agreement with no further notice required. Delay Damaees Billine and Payment - Idaho Power shall calculate and submit to the Seller any Delay Damages due Idaho Power within fifteen (15) days after the end of each month or within 30 days of the date this Agreernent is terminated by Idaho Power. Termination Damaees Billing and Payment - Idaho Power shall calculate and submit to the Seller any Termination Damages due Idaho Power within thirty (30) days after this Agreement has been terminated. Seller shall respond within 15 days. In the event of a dispute regarding the calculation of Termination Damages, either party may resort to a court of competent jurisdiction. Seller Payment - Seller shall pay Idaho Power any calculated Delay or Termination Damages within 15 days from when Idaho Power presents these final adjusted billings to the Seller. Final adjusted billing being the original billing adjusted to reflect any mutually agreed to changes from the original billing. Seller's failure to pay these damages within the specified time will be a Material Breach of this Agreement and Idaho Power shall draw funds from the Security Deposit provided by the Seller in an amount equal to the calculated damages. Security Deposit - Within thirry (30) days of the date of a final non-appealable Commission Order approving this Agreanent as specified in Article XXI, the Seller shall post and maintain liquid security in a form as described in Appendix D equal to or exceeding the amount specified within this Agreement as the Security Deposit until such time as the Security Deposit is released by Idaho t4 5.4 5.5 5.6 5.7 5.8 6.1 6.2 Power as specified in paragraph 5.8.1. Failure to post this Security Deposit in the time specified above will be a Material Breach of this Agreement and Idaho Powermay terminate this Agreanent. In accordance with Commission Order No. 32697 E(1X8), this Article 5.8 shall not be required in situations where the parties are entering into a new Energy Sales Agreement ("ESA") for an existing Qualifying Facility ("QF") project already in commercial operation so long as the new ESA is between the same parties and there are no material modifications to the existing QF project. 5.8.1 Securitv Deposit Release - Idaho Power shall release any remaining Security Deposit provided by Seller promptly after either the Facility has achieved its Operation Date or this Agreement has been terminated and only after all final adjusted Delay and Termination Damages have been paid in full to Idaho Power. ARTICLE VI: PURCHASE AND SALE oF NET ENERGY Net Energ.v Purchase and Delivery - Except when either Party's performance is excused as provided herein, Idaho Power will purchase and Seller will sell all of the Net Energy to Idaho Power at the Point of Delivery. All Inadvertent Energy produced by the Facility will also be delivered by the Seller to Idaho Power at the Point of Delivery. Estimated Net Enerey Amounts - Neither the monthly Estimated Net Energy Amounts provided as of the Effective Date of this Agreement nor monthly Adjusted Estimated Net Energy Amounts provided during the term of this Agreement shall exceed ten (10) average monthly MW nor be greater than the Maximum Capacity Amount (measured in kW) multiplied by the hours in the applicable month. Seller agrees to provide initial and revised Estimated Net Energy Amounts using an automated electronic input portal provided by Idaho Power. If the electronic portal is not available, Seller will provide Estimated Net Energy Amounts to Idaho Power via ernail or alternate methods as specified by Idaho Power. 15 6.2.1 Monthly Estimated Net Enere.v Amounts orovided as of the Effective Date of this Agreement: Month kwh Season 1 Season 2 March April May July August Novernber December June Septernber October January February 390,000 1,500,000 1,500,000 825,000 1,060,000 550,000 480,000 1,350,000 1,310,000 1,520,000 395,000 310,000 Season 3 6.2.2 Seller's Adjustment of Estimated Net Enerw Amounts - Prior to the Operation Date, the Seller may revise all of the previously provided monthly Estimated Net Energy Amounts. This revision must be submi6ed using the electronic portal provided by Idaho Power if available' If portal is not available, then written notice must be provided to Idaho Power by electronic notice (electronic mail) as agteed to by both Parties. 6.2.3 Seller's Adjustment of Estimated Net Enerey Amounts After the OPeration Date - After the Operation Date, the Seller may revise any future monthly Estimated Net Energy Amounts by providing written notice no later than 5 PM Mountain Standard time on the 25h day of the month that is prior to the month to be revised. If the 256 day of the month falls on a weekend or holiday, then Idaho Power must receive the revision no later than the last business day prior to the 25ft day of the month. For example, if the Seller would like to revise the Estimated Net Energy Amount for October, they would need to submit a 16 6.2.4 revised schedule no later than September 25ft or the last business day prior to September 25,J^. a.) This revision must be submitted using the electronic portal provided by Idaho Power if available. If portal is not available, then written notice must be provided to Idaho Power by electronic notice (elecffonic mail) as agreed to by both parties. b.) If the Seller does not update the electronic portal or provide written notice of changes to the Estimated Net Energy Amounts, then it will be deemed to be an election of no change from the most recently provided monthly Estimated Net Energy Amounts. Idaho Power is unable to accept any requested changes to the Estimated Net Energy Amounts if the date and time that Idaho Power receives the requested change is after the deadline. Idaho Power Adjustnent of Monthly Estimated Net Eners.v Amounts - If Idaho Power is excused from accepting the Seller's Net Enerry as specified in paragraph 12.2.1 or if the Seller declares a Suspension of Energy Deliveries as specified in paragraph 12.3.1 and the Seller's declared Suspension of Energy Deliveries is accepted by Idaho Power, the monthly estimated Net Energy amount as specified in paragraph 6.2 for the specific month in which the reduction or suspension under paragraph 12.2.1 or 12.3.1 occurs will be temporarily reduced in accordance with the following and only for the actual month in which the event occurred: NEA Current Month's Estimated Net Energy Amount (Paragraph 6.2) SGU a.) If Idaho Power is excused from accepting the Seller's Net Energy as specified in paragraph 12.2.1this value will be equal to the percentage of curtailment as specified by Id"ho Power multiplied by the TGU as defined below. b.) If the Seller declares a Suspension of Energy Deliveries as specified in paragraph 12.3.1 this value will be the sum of the individual Generation Units size ratings as specified in Appendix B that are impacted by the circumstances causing the Seller to declare a Suspension ofEnergy Deliveries. t7 TGU Sum of all of the individual generator ratings of the Generation Units at this Facility as specified in Appendix B of this agreement. Actual hours the Facility's Net Energy deliveries were eitherRSH reduced or suspended under paragraph 12.2.1 or 12.3.1 TH Actual total hours in the current month Resulting formula being: Adjusted i,ffiL = NEA ((+#x NEA) " (#)) 6.3 7.1 Amount This Adjusted Estimated Net Energy Amount will be used in applicable Surplus Energy calculations for only the specific month in which Idaho Power was excused from accepting the Seller's Net Energy or the Seller declared a Suspension of Energy Deliveries. Failure to Deliver Minimum Amounts of Net Enere.v - Unless excused by an event of Force Majeure or Idaho Power's inability to accept Net Energy, Seller's failure to deliver Net Energy in any Contract Year in an amount equal to at least ten percent (10%) of the sum of the monthly estimated Net Energy amounts in effect as of the Operation Date shall constitute an event of default. ARTICLE VII: PURCHASE PRICE AND METHOD OF PAYMENT Surplus Enerqv - (1) Net Energy produced by the Seller's Facility and delivered to the Idaho Power electrical systun during the month which exceeds one hundred ten percent (110%) of the monthly Adjusted Estimated Net Energy Amount for the corresponding month specified in paragraph 6.2, or (2) if the Net Energy produced by the Seller's Facility and delivered to the Idaho Power electrical system during the month is less than ninety percent (90%) of the monthly Adjusted Estimated Net Energy Amount for the corresponding month specified inparagraph 6.2, 18 7.2 then all Net Energy delivered by the Facility to the Idaho Power electrical system for that given month, or (3) all Net Energy produced by the Seller's Facility and delivered by the Facility to the Idaho Power electrical system prior to the Operation Date, or (4) all monthly Net Energy that exceeds the Monthly Nameplate Energy. Surplus Enere.v Price - For all Surplus Energy, Idaho Power shall pay to the Seller the current month's Market Energy Reference Price or the applicable All Hours Energy price, whichever is lower. Base Eners.v - The Net Energy produced by the Seller's Facility and delivered to the Idaho Power electrical system after the Facility has achieved an Operation Date which is greater than or equal to ninety percent (90o/o) and less than or equal to one hundred ten percent (l l0%) ofthe monthly Adjusted Estimated Net Energy Amount for the corresponding month specified in paragraph 6.2. Base Enersy Heav.v Load Purchase Price - For all Base Energy received during Heavy Load Hours, Idaho Power will pay the monthly non-levelized Base Energy Heavy Load purchase price as specified in Appendix E. Base Enerey Lieht Load Purchase Price - For all Base Energy received during Light Load Hours, Idaho Power will pay the monthly non-levelized Base Energy Light Load purchase price as specified in Appendix E. All Hours Enerey Price - The price to be used in the calculation of the Surplus Energy price and Delay Damage Price shall be the monthly non-levelized All Hours Energy in Appendix E. Inadvertent Energy - 7.7.1 Inadvertent Energy is electric energy produced by the Facility, expressed in kWh, which the Seller delivers to Idaho Power at the Point of Delivery that exceeds ten thousand (10,000) kW multiplied by the hours in the specific month in which the energy was delivered. (For example, January contains 744 hours. 744 hours times 10,000 kw : 7,440,000 kwh. Energy delivered in January in excess of 7,440,000 kWh in this example would be Inadvertent Energy.) l9 7.3 7.4 7.5 7.6 7.7 j.7.2 Although Seller intends to design and operate the Facility to generate no more than ten (10) average MW monthly and therefore does not intend to generate and deliver Inadvertent Energy, Idaho Power will accept Inadvertent Energy that does not exceed the Maximum Capacity Amount but will not purchase or pay for Inadvertent Energy. 7.7.3 Delivering Inadvertent Energy to Idaho Power for two (2) consecutive months and/or in any three (3) months during a Contract Year will be a Material Breach of this Agreement and Idaho Power may terminate this Agreement within sixty (60) days after the Material Breach has occurred' 7 .8 Payments - Undisputed Base Energy and surplus Energy payments, less any payments due to Idaho power will be disbursed to the Seller within thirty (30) days of the date which Idaho Power receives and accepts the documentation of the monthly Base Energy and Surplus Energy actually delivered to Idaho power as specified in Appendix A. Seller agrees to use payrnent method as specified by Idaho power which could be ACH (Automated Clearing House), electronic, wire, paper checks or any other method for making payments to Seller' 7.g Continuine Jurisdiction of the Commission - This Agreernent is a special contract and the rates, terms and conditions contained in this Agreanent will be construed in accordance with Idaho power Company v. Idaho Public Utilities Commission and Afton Enersy. Inc., 107 Idaho 781, 693 695p.2d1 261 (1985), Afton Energv.Inc. v.Idaho Power Company, l l l Idaho 925,729 P.2d400 (19g6), Section 210 of the Public Utility Regulatory Policies Act of 1978 and 18 C.F.R. 5292.303- 308 ARTICLE VIII: ENVIRONMENTAL ATTRIBUTES 8.1 pursuant to Commission Order No. 32697 and Order N o. 32802 the Environmental Attributes and Renewable Energy Certificates as defined within this Agreement and directly associated with the production of energy from the Seller's Facility are owned by the Seller. 20 9.1 ARTICLE IX: FACILITY AND INTERCONNECTION Desier of Facility - Seller will design, construct, install, own, operate and maintain the Facility and any Seller-owned Interconnection Facilities so as to allow safe and reliable generation and delivery of Net Energy and Inadvertent Energy to the Idaho Power Point of Delivery for the full term of the Agreement in accordance with the GIA. ARTICLE X: METERING" METERING COMMUNICATIONS AND SCADA TELEMETRY 10.1 Metering - Idaho Power shall, provide, install, and maintain metering equipment needed for metering the electrical energy production from the Facility. The metering equipment will be capable of measuring, recording, retrieving and reporting the Facility's hourly gross electrical energy production, Station Use, maximum energy deliveries (kW) and any other electricity measurements at the Point of Delivery that Idaho Power needs to administer this Agreement and integrate this Facility's electricity delivered to the Idaho Power electrical system. Specific equipment, installation details and requirements for this metering equipment will be established in the GIA process and documented in the GIA. Seller shall be responsible for all initial and ongoing costs of this equipment as specified in Schedule 72 andthe GIA. 10.2 Meterine Communications - Seller shall, at the Seller's sole initial and ongoing expense, arange for, provide, install, and maintain dedicated metering communications equipment capable of transmitting the metering data specified in paragraph 10.1 to Idaho Power in a frequency, manner and form acceptable to Idaho Power. Seller shall grant Idaho Power sole control and use of this dedicatedmetering communications equipment. Specifrc details andrequirements forthismetering communications equipment will be established in the GIA process and documented in the GIA. 10.3 Suoervisory Control and Data Acquisition (SCADA) Telemetry- In addition to the requirernents of paragraph 10.1 and 10.2, Idaho Power may require telemetry equipment and telecommunications which will be capable of providing Idaho Power with continuous instantaneous SCADA telemetry of the Seller's Net Energy and lnadvertent Energy production in 2l a form acceptable to Idaho Power. Seller shall grant Idaho Power sole control and use of thrs dedicated SCADA and telecommunications equipment. Specific details and requirements for this SCADA Telemetry and telecommunications equipment will be established in the GIA process and documented in the GIA. Seller shall be responsible for all initial and ongoing costs of this equipment as specified in Schedule 72 and the GIA. ARTICLE XI - RECORDS l1.l MaintenanceofRecords - Seller shall maintain monthly records at the Facility or such other location mutually acceptable to the Parties. These records shall include total generationo Net Energy, Station Use, Surplus Energy, lnadvertent Energy and maximum hourly generation (kV/) and be recorded in a form and content acceptable to Idaho Power. Monthly records shall be retained for a period ofnot less than five (5) years. ll.2 lnspection - Either Party, after reasonable notice to the other Party, shall have the right, during normal business hours, to inspect and audit any or all records pertaining to the Seller's Facility generation, Net Energy, Station Use, Surplus Energy, Inadvertent Energy and maximum generation (kW) records pertaining to the Seller's Facility. ARTICLE XII: OPERATIONS 12.l Communications - Idaho Power and the Seller shall maintain appropriate operating communications through Idaho Power's Designated Dispatch Facility in accordance with the GIA. 12 .2 Acceptance of Energy - 12.2.1 Idaho Power shall be excused from accepting and paying for Net Energy or accepting Inadvertent Energy which would have otherwise been produced by the Facility and delivered by the Seller to the Point of Delivery: a.) If generation deliveries are intemrpted due an event of Force Majeure or Forced Outage. b.) If intemrption of generation deliveries is allowed by Section 210 of the 22 12.2.2 12.2.3 12.2.4 Public Utility Regulatory policies Act of l97g and tg c.F.R. s2gz.3o4 c.) If temporary disconnection andlor intemrption of energy deliveries is in accordance with Schedule 72 or other provisions as specified within the GIA. d.) If Idaho Power determines that curtailment, intemrption or reduction of Net Energy or Inadvertent Energy deliveries is necessary because of line construction, electrical systern maintenance requirements, emergencies, electrical system operating conditions, electrical system reliability emergencies on its system, or as otherwise required by Prudent Electrical Practices. If, in the reasonable opinion of Idaho Power, Seller's operation of the Facility or Interconnection Facilities is unsafe or may otherwise adversely affect Idaho power's equipment, personnel or service to its customers, Idaho Powermay temporarily disconnect the Facility from Idaho Power's transmission/distribution system as specified within the GIA or Schedule 72 or take such other reasonable steps as Idaho Power deems appropriate. Under no circumstances will the Seller deliver generation from the Facility to the point of Delivery in an amount that exceeds the Maximum Capacity Amount at any moment in time. Seller's failure to limit deliveries to the Maximum Capacity Amount will be a Material Breach of this Agreement. If Idaho Power is unable to accept the generation from this Facility and is not excused from accepting the Facility's generation, Idaho Power's damages shall be limited to only the value of the estimated electricity that Idaho Power was unable to accept valued at the applicable energy prices specified in this Agreement. Idaho power will have no responsibility to pay for any other costs, lost revenue or consequential damages the Facility may rncur. 23 12.3 Seller Declared Suspension of Enersv Deliveries l1.3.l If the Seller's Facility experiences a Forced Outage, and the Seller initiates a Declared Suspension of Energy Deliveries, Seller shall, after giving notice as provided in paragraph l2.3.2below, ternporarily reduce deliveries of Net Energy (kW) to Idaho Power from the Facility to not exceed the reduced energy deliveries (kW) stated by the Seller in the initial declaration for a period ofnot less than forty-eight (a8) hours ("Declared Suspension of Energy Deliveries"). The Seller's Declared Suspension of Energy Deliveries will begin at the start of the next full hour following the Seller's telephone notification as specified in paragraph 12.3.2 and will continue for the time as specified in the written notification provided by the Seller. In the month(s) in which the Declared Suspension of Energy occurred, the Estimated Net Energy Amount will be adjusted as specified in paragraph 6.2.3. lZ.3.Z If the Seller desires to initiate a Declared Suspension of Energy Deliveries as provided in paragraph lz.3.l,the Seller will notify the Designated Dispatch Facility by telephone. The beginning hour of the Declared Suspension of Energy Deliveries will be at the earliest the next full hour after making telephone contact with Idaho Power. The Seller will, within twenty four (24) hours after the telephone contact, provide Idaho Power a written notice in accordance with Article XXV that will contain the beginning hour and expected duration of the Declared Suspension of Energy Deliveries, a description of the conditions that caused the Seller to initiate a Declared Suspension of Energy Deliveries and the reduced level (kW) of energy deliveries the Facility is requesting that will be set as the maximum energy deliveries to Idaho Power for the duration of the Declared Suspension of Energy Delivery event (not less than 48 hours). Idaho Power will review the documentation provided by the Seller to determine Idaho Power's acceptance of the described Forced Outage as qualiffing for a Declared Suspension of Energy Deliveries as specifred in paragraph l2.3.l.IdahoPower'sacceptanceoftheseller'sForcedOutageasanacceptable Forced Outage will be based upon the clear documentation provided by the Seller that the 24 Forced Outage is not due to an event of Force Majeure or by neglect, disrepair or lack of adequate preventative maintenance of the Seller's Facility. l2'4 Scheduled Maintenance - on or before January 3l't of each calendar year, Seller shall submit a written proposed maintenance schedule of significant Facility maintenance for that calendar year and Idaho Power and Seller shall mutually agree as to the acceptability of the proposed schedule. If the Seller intends to perform planned maintenance at approximately the same time every year, the Seller may submit a maintenance schedule for the first calendar year and include a statement that this maintenance schedule shall be consistent for all future years, until such time as the Seller notifies Idaho Power of a change to this schedule. The Parties determination as to the acceptability of the Seller's timetable for scheduled maintenance will take into consideration prudent Electrical Practices, Idaho Power system requirements and the Seller's preferred schedule. Neither party shall unreasonably withhold acceptance of the proposed maintenance schedule. l2'5 Idaho Power Maintenance Information - Upon receiving a written request from the Seller, Idaho Power shall provide publicly available information with regard to Idaho power planned maintenance information that may impact the Facility. 12'6 Contact Prior to Curtailment - Idaho Power will make a reasonable attempt to contact the Seller prior to intemrpting the interconnection or curtailing deliveries from the Seller,s Facility. Seller understands that in the case of emergency circumstances, real time operations of the electrical system, andlor unplanned events, Idaho Power may not be able to provide notice to the Seller prior to intemrption, curtailment, or reduction of electrical energy deliveries to Idaho power. ARTICLE XIII' INDEMNIFICATIoN AND INSURANCE 13'l Indemnification - Each Party shall agree to hold harmless and to indemnify the other party, its officers, agents, afftliates, subsidiaries, parent company and anployees against all loss, damage, expense and liability to third persons for injury to or death of person or injury to property, proximately caused by the indemniffing Party's, (a) construction, ownership, operation or maintenance of or by failure of, any of such Party's works or facilities used in connection with this 25 Agreement, or (b) negligent or intentional acts, elrors or omissions. The indemniffing Party shall, on the other party's request, defend any suit asserting a claim covered by this indemnity. The indemnifying party shall pay all documented costs, including reasonable attorney fees that may be incurred by the other Party in enforcing this indemnity' 13.Z Insurance - During the term of this Agreement, Seller shall secure and continuously carry insurance as specified in APPendix F. ARTICLE XIV: FORCE MAJEURE l4.l Force Majeure - As used in this Agreement, "Force Majeure" or "an event of Force Majeure" means any cause beyond the control of the Seller or of Idaho Power which, despite the exercise of due diligence, such Party is unable to prevent or overcome. Force Majeure includes, but is not limited to, acts of God, fire, flood, stoms, wars, hostilities, civil strife, strikes and other labor disturbances, earthquakes, fires, lightning, epidemics, sabotage, or changes in law or regulation occurring after the effective date, which, by the exercise ofreasonable foresight such party could not reasonably have been expected to avoid and by the exercise ofdue diligence, it shall be unable to overcome. Fluctuations and/or changes of the motive force and/or the fuel supply are not events of Force Majeure. If either Party is rendered wholly or in part unable to perform its obligations under this Agreernent because of an event of Force Majeure, both Parties shall be excused from whatever performance is affected by the event of Force Majeure, provided that: (l) The non-performing Party shall, as soon as is reasonably possible after the occurrence of the Force Majeure, give the other Partywritten notice describing the particulars of the occurrence' (Z) The suspension of performance shall be of no greater scope and of no longer duration than is required by the event of Force Majeure' (3) No obligations of either Party which arose before the occurrence of the Force Majeure event and which could and should have been fully performed before such occulrence shall be excused as a result ofsuch occrlrence' 26 ARTICLE XV: LIABILITY: DEDICATION 15.1 Limitation of Liability - Nothing in this Agreernent shall be consfued to create any duty to, any standard of care with reference to, or any liability to any penion not a Party to this Agreement. Neither party shall be liable to the other for any indirect, special, consequential, nor punitive damages, except as expressly authorized by this Agreunent. 15.2 Dedication - No undertaking by one Party to the other under any provision of this Agreement shall constitute the dedication ofthat Party's system or any portion thereofto the party or the public or affect the status of Idaho Power as an independent public utility corporation or Seller as an independent individual or entity. ARTICLE XVI: SEVERAL OBLIGATIONS l6.l Several Oblieations - Except where specifically stated in this Agreement to be otherwise, the duties, obligations and liabilities of the Parties are intended to be several and not joint or collective. Nothing contained in this Agreement shall ever be construed to create an association, trust, partnership or joint venture or impose a trust or partnership duty, obligation or liability on or with regard to either Party. Each Party shall be individually and severally liable for its own obligations under this Agreement. ARTICLE XVII: WATVER 17.l Waiver - Any waiver at any time by either Party of its rights with respect to a default under this Agreement or with respect to any other matters arising in connection with this Agreement shall not be deemed a waiver with respect to any subsequent default or other matter. ARTICLE XVIII: CHOICE OF LAWS AND VENUE l8.l State of Idaho Laws - This Agreement shall be construed and interpreted in accordance with the laws of the State of Idaho without reference to its choice of law provisions. l8-2 Venue - For any litigation arising out of or related to this Agreement will lie in the District Court of the Fourth Judicial District of Idaho in and for the County of Ada. 27 ARTICLE XIX: DISPUTES AND DEFAULT 19.1 Disputes - All disputes related to or arising under this Agreement, including, but not limited to, the interpretation of the terms and conditions of this Agreunent, will be submitted to the Commission for resolution. 19.2 Notice of Default lg.2.l Defaults - If either Party fails to perform any of the terms or conditions of this Agreement (an "event of default"), the non-defaulting Party shall cause notice in writing to be given to the defaulting Party, specifying the manner in which such default occurred. If the defaulting Party shall fail to cure such default within the sixty (60) days after service of such notice, or if the defaulting Party reasonably demonstrates to the other Party that the default can be cured within a commercially reasonable time but not within such sixty (60) day period and then fails to diligently pursue such cure, then the non-defaulting Party may, at its option, terminate this Agreernent and/or pursue its legal or equitable remedies' 19.2.2 Material Breaches - The notice and cure provisions in paragraph 19.2.1 do not apply to defaults identified in this Agreement as Material Breaches. Material Breaches must be cured as expeditiously as possible following occulrence of the breach. Idaho Power can terminate the Agreement at any time following the Material Breach unless there is a specific cure, or cure period, identified by this Agreement for that specific Material Breach then that cure, or cure period, shall apply. 19.3 Operation Date Requirements - Prior to the Operation Date and thereafter for the full term of this Agreement, Seller will provide Idaho Power with the following: 19.3.1 Insurance - Evidence of compliance with the provisions of Appendix F. If Seller fails to comply, such failure will be a Material Breach' 19.3.2 Eneineer's Certifications - Every three (3) years after the Operation Date, Seller will supply Idaho Power with a completed Certification of Ongoing Operations and Maintenance form as specified in Appendix C. The certification will be from a 28 19.3.3 Registered Professional Engineer licensed in the State of Idaho. Seller,s failure to supply the required certificate will be an event of default. Such a default may only be cured by Seller providing the required certificate; and Licenses / Leases / Permits / Determinations - During the full term of this Agreement, Seller shall maintain compliance with all leases, permits, licenses and determinations described in paragraph 4.1.1 of this Agreement. In addition, Seller will supply Idaho Power with copies of any new or additional permits, licenses or determinations. At least every fifth Contract Year, Seller will update the documentation described in paragraph 4.1.1-If atany time Seller fails to maintain compliance with the leases, permits, licenses and determinations described in paragraph 4.1.1 or to provide the documentation required by this paragraph, such failure will be an event of default and may onlv be cured by Seller submitting to Idaho Power evidence of compliance from the permitting agency ARTICLE XX: GOVERNMENTAL AUTHORZATIoN 20.1 This Agreement is subject to the jurisdiction of those governmental agencies having control over either Party of this Agreanent. ARTICLE XXI: COMMISSION ORDER 2l.l Commission Order - Idaho Power shall file this Agreement for its acceptance or rejection by the Commission. This Agreernent shall only become finally effective upon the Commission,s approval of all terms and provisions hereof without change or condition and declaration that all paynents to be made to Seller hereunder shall be allowed as prudently incurred expenses for ratemaking purposes. 22.1 ARTICLE XXII: SUCCESSORS AND ASSIGNS This Agreement shall be binding upon and inure to the benefit of the respective successors and assigns of the Parties hereto. Neither this Agreement nor any rights or obligations of either party 29 hereunder may be assigned, in whole or in part, by operation of law or otherwise, without the prior written consent of both parties, which consent shall not be unreasonably withheld. Any party with which Idaho power may consolidate, merge, convey or transfer substantially all of its electric utility assets, shall automatically, without further act, and without need of consent or approval by the Seller, succeed to all of Idaho Power's rights, obligations and interests under this Agreement. Any purported assignment in derogation of the foregoing shall be void. This article shall not prevent a financing entity with recorded or secured rights from exercising all rights and remedies available to it under law or contract. Idaho power shall have the right to be notified by the financing entity that it is exercising such rights or remedies. ARTICLE XXIII: MODIFICATION Z3.l No modification to this Agreement shall be valid unless it is in writing and signed by both Parties and subsequently approved by the Commission' ARTICLE XXIV: TAXES 24.1 Each party shall pay before delinquency all taxes and other governmental charges which, if failed to be paid when due, could result in a lien upon the Facility or the Interconnection Facilities. ARTICLE XXV: NOTICES AND AUTHORIZED AGENTS Z5.l Notices - All written notices under this Agreement shall be directed as follows and shall be considered delivered when faxed, e-mailed and confirmed with deposit in the U.S. Mail, first- class, postage PrePaid, as follows: To Seller: Orisinal document to: Dell Keehn 7829 Center Blvd SE #100 Snoqualmie, WA 98065 42s-396-3134 CCr'a) WeatherlvComoanies.com 30 To Idaho Power: Orieinal document to: Vice President, Power Supply Idaho Power Company PO Box 70 Boise, Idaho 83707 energycontracts @idahopower. com Copy of document to: Cogeneration and Small Power production Idaho Power Company PO Box 70 Boise, Idaho 83707 energycontracts @ idahopower. com Either Party may change the contact person and/or address information listed above, by providing written notice from an authorized person representing the party. 2s.2 Authorized Aeent(s) Name Dell Keehn Curt Carlson Tom McCauley Anne Sisson Title Owner Manager Operator Operator The Seller may modify the Authorized Agents by requesting and completing an Authorized Agent form provided by Idaho Power. This document will include the requested changes and require signature(s) from an authorized party ofthe Seller. 3t AITTICLE XXVI: ADDITIONAL TERMS AND CONDITIONS 261 Equal Employment. Seller agrees to comply with all applicable equal employment opporhrnity, small business, and affirmative action laws and regulations. All Equal Employment Opporrunity and affirmative action laws and regulations are hereby incorporated by this reference, including provisions of 38 U.S.C. S4zlz,Executive Order 1 1246, as amended, and any subsequent executive orders or other laws or regulations relating to equal opportunity for employment on government contracts. To the extent this Agreement is covered by Executive Order ll246,the EqualOpportunityClausescontainedin4l C.F.R. $60-1.4,41 C'F.R. $60-250.5, and4l C.F.R. $60-74 1 .5 are incorporated herein by reference. 26.2 Prior to the Seller executing this Agreement, the Seller shall have: a) Submitted an interconnection application for this Facility and is in compliance with all payments and requirements of the interconnection process' b) Acknowledged responsibility for all interconnection costs and any costs associated with acquiring adequate firm transmission capacity to enable the project to be classified as an Idaho Power DNR. If final interconnection or ffansmission studies are not complete at the time the Seller executes this Agreement, the Seller understands that the Seller's obligations to pay Delay and Termination Damages associated with the project's failure to achieve the Operation Date by the Scheduled Operation Date as specified in this Agreement is not relieved by final interconnection or transmission costs, processes or schedules. c) Provide acceptable and verifiable evidence to Idaho Power that demonstrates the Facility is eligible for the published avoided costs requested by the Seller and contained within this Agreement. Commission Order N o. 34628 effective June I , 2020, provides the current published avoided costs for Non-Seasonal Hydro Facilities, Seasonal Hydro Facilities, Other Facilities, Solar Facilities, and Wind Facilities. Commission Order No. 32697 provides for full capacity payments for existing projects that have requested replacernent contracts after their existing contract expires' 32 26.3 This Agreement includes the following appendices, which are attached hereto and included by reference: Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Generation Scheduling and Reporting Facility and Point of Delivery Engineer's Certifi cations Forms of Liquid Security Non-Seasonal Hydro Facility Energy prices Insurance Requirements ARTICLE XXVII: SEVERABILITY 27.1 The invalidity or unenforceability of any term or provision of this Agreement shall not affect the validity or enforceability of any other terms or provisions and this Agreement shall be construed in all other respects as if the invalid or unenforceable term or provision were omitted. ARTICLE XXWII: COUNTERPARTS 28'l This Agreement may be executed in two or more counterparts, each of which shall be deemed an original but all of which together shall constitute one and the same instrument. 33 1 ARTTCLE XXt& ENTIRE AqB-EEMENT :9.1 Tlrir Agqpcur corutituter ttc orrttru Agwnoru of drc Fnfiicr conecming thc rubjecl mlncr hcmOf rn( $Datcdct all prior or &'ontcmpotulcous orrl or wrlnen eEruGmoU bawcn thc Prrqcr curowrlng thc subJcct mallcr hcrcof. N WrTNESS WHIREOn Thc Psrti$ hcrcro havc eurd tbir AS$srtrcot ro bc arocuud in thcir rwpcc$ve nmcs on thc dltcr sct fonh belorv: 'f' ldrho Power Compony Cryrttl Spriqgt Hydroclectdc' L.P- ?y By Vicc Prceidenf. Ponrr SupplY I)cll ltuchn 0rms Oetcd Drtcd Ja rJ. l( )" ]-l "tdrho hrrtr"'Sclhf" 34 APPENDIX A A-1 MONTHLY POWER PRODUCTION AND SWITCHING REPORT At the end of each month, the power production and switching report will be emailed to: csppaccounting@idahopower. com If email is not available, then the report can be mailed to: Idaho Power Company Cogeneration and Small Power Production Reports C/O Financial Accounting 1221 W.Idaho Boise,Idaho 83702 The meter readings required on this report will be the readings on the Idaho Power meter equipment measuring the Facility's total enerry production and Station Usage delivered to Idaho Power and the maximum generated energy (kW) as recorded on the metering equipment and/or any other required energy measurements to adequately administer this Agreement. This document shall be the document to enable Idaho Power to begin the energy payment calculation and payment process. The meter readings on this report may not be used to calculate the actual payment, but instead will be a check of the automated meter reading information that will be gathered as described in item A-2 below: 35 Project Name Address City Idaho Power Company Cogeneration and Small Power Production MONTIILY POWER PRODUCTION A}[D SWITCHING REPORT Month Year Project Phone Number: State zip Meter Number: End of Month kWh Meter Reading: Beginning of Month kWh Meter: Difference: Times Meter Constant: kWh for the Month: Metered Demand: Breaker Opening Record Date Time Meter *Reason Metered Maximum kw Net Generation Breaker Closing Record Date Time Meter Facility Output Station Usase * 1 Lack of Adequate Prime Mover 2 Forced Outage of Facility 3 Disturbance of IPCo System 4 Scheduled Maintenance 5 Testing of Protection Systems 6 Cause Unknown 7 Other @xplain) I hereby certify that the above meter readings are true and correct as of Midnight on the last day of the above month and that the switching record is accurate and complete as required by the Energy Sales Agreement to which I am a Party. Signature 36 Date A.2 AUTOMATED METER READING COLLECTION PROCESS Monthly, Idaho Power will use the provided metering and telemetry equipment and processes to collect the meter reading information from the ldaho Power provided metering equipment that measures the Net Energy and energy delivered to supply Station Use for the Facility recorded at 12:00 AM (Midnight) of the last day of the month. The meter information collected will include but not be limited to energy production, Station Use, the maximum generated power (kW) and any other required energy measurements to adequately administer this Agreernent. A.3 SELLER CONTACT INFORMATION Seller's Contact Information Proiect Management Name: Curt Carlson Cell Phone: 425-396-3134 24-Hour Proiect Ooerational Contact Name: Tom McCauley Cell Phone: 208-308-5050 Proiect On-site Contact information Name: Tom McCauley Cell Phone: 208-308-5050 37 APPENDIX B FACILITY AND POINT OF DELIVERY Project Name: Crystal Springs Hydro Project Project Number: 3 1615060 B-I DESCRIPTION OF FACILITY The Seller's Facility is a hydroelectric generating station utilizing four generating units. Three of the units have Ingersoll Rand fixed orifice split case turbines and the other unit is a Canyon Industries 4-nozzel,2-runner horizontal Pelton wheel turbine which automatically adjusts to water level to maximize efficiency. The power plant produces power at 4,600 volts. The voltage is transformed to 46,000 volts and delivered to Idaho Power. The meter is located in the adjacent substation. Combining each of the four generator unit's individual nameplate capacity results in a total Facility nameplate capacity of 2,775 kW but operational restrictions prevent the Facility from achieving the combined nameplate capacity. When all four generating units are on-line and delivering energy, they cannot simultaneously deliver the total nameplate capacity of each individual generator due to hydraulic pressure losses. Operational tests conducted by a professional engineer in 1987 and repeated in2020 confirmed that the Facility has a maximum simultaneous capacity amount of 2,550 kW when all four units are running simultaneously. The water source for the Facility is the Cedar Draw in Twin Falls County. The water is supplied year-round through seep streams and is supplernented during the irrigation season by the Twin Falls canal irrigation system. The water enters the penstock at a diversion and travels approximately 9600 feet through a five-foot diameter conduit to the power plant. The water then re-enters the stream through the tailrace. The generating units and controls are enclosed in a 30 by 90 foot building. Facility Nameplate Capacity: 2.775 kW Qualifying Facility Category (Small Power Production or Cogeneration): Small Power Production Primary Energy Source (Hydro, Wind, Solar, Biomass, Waste, Geothermal): Hydro Fueled or Non-Fueled Rate (Generator primarily fueled with fossil or non-fossil fuel): Non-Fueled Any modifications to the Facility, including but not limited to the generator or turbine, that (l) increases or decreases the Facility Nameplate Capacity, or (2) changes the Qualiffing Facility Category, or (3) changes the Primary Energy Source or (4) changes to the generator fuel and subsequently the Fueled Rate or Non-Fueled Rate, will require a review of the Agreement terms, conditions and pricing and Idaho Power, at its sole determination, may adjust the pricing or terminate the Agreernent. If the Agreement is terminated because of said modifications, the Seller will be responsible for any Termination Damages. 38 B-2 LOCATION OF FACILITY Near: Buhl,Idaho Actual or nearest physical street address: NW l/4 528, T9S, R14E GPS Coordinates: Latitude Decimal Degrees 42.65 Longitude Decimal Degrees -114.66 State: Idaho County: Twin Falls Description of Interconnection Location:4347 N 1970 E, Buhl ID 83316 SCHEDULED FIRST ENERGY DATE AND OPERATION DATE This Facility is interconnected and already delivering energy to Idaho Power pursuant to a Firm Energy Sales Agreement that the parties agree will expire on March 31,2021. The First Energy Date and the Operation Date for this Agreement will be at hourbeginning 00:01 on April 1,2021, provided that the Commission approves the replacernent Agreement and the Seller completes all of the Article IV and Anicle V requirements prior to April 1,2021. B-4 MAXIMUM CAPACITY AMOUNT: The Maximum Capacity Amount is 2,550 kW which is consistent with the value provided by the Seller to Idaho Power in accordance with the GIA. This value is the maximum generation that potentially could be delivered by the Seller's Facility to the Idaho Power electrical system at any moment in time. POTNT OF DELTVERY "Point of Delivery" means, unless otherwise agreed by both Parties, the point of where the Seller's Facility energy is delivered to the Idaho Power electrical system. The GIA will determine the specific Point of Delivery for this Facility. The Point of Delivery identified by the GIA will become an integral part of this Agreement. LOSSES If the Idaho Power metering equipment is capable of measuring the energy deliveries by the Seller to the Idaho Power electrical system at the Point of Delivery, no Losses will be calculated for this 39 B-5 B-3 B-6 B-7 Facility. If the Idaho Power metering equipment is unable to measure the energy deliveries directly at the Point of Delivery, the Losses will be calculated. This loss calculation is currently set at 0.8% of the kWh electricity production recorded on the Facility generation metering equipment. If at any time during the term of this Agreement, Idaho Power determines that the loss calculation needs to be revised due to a change in the electrical equipment or some other factor, then Idaho Power may adjust the calculation and retroactively adjust the previous month's kWh loss calculations. DESIGNATED NETWORK RESOURCE (DNR) This Facility is an Idaho Power DNR pursuant to an existing energy sales agreement. The DNR status will continue if this Agreement is l) executed and approved by the Commission, and2) a GIA has been executed by both parties and 3) the Seller is in compliance with all requirements of that GIA. Idaho Power cannot accept or pay for generation from this Facility if the Facility has not achieved the status of being an Idaho Power DNR. Federal Energy Regulatory Commission ("FERC") rules require Idaho Power to prepare and submit the application to achieve DNR status for this Facility. Because much of the information Idaho Power needs to prepare the DNR application is specific to the Seller's Facility, Idaho Power's ability to file the DNR application in a timely manner is contingent upon timely receipt of the required information from the Seller. Prior to Idaho Power beginning the process to enable Idaho Power to submit a request for DNR status for this Facility, the Seller shall have 1) frled a Generation lnterconnection application,2) submitted all information required by Idaho Power to complete the application, and 3) either executed this Agreernent or, at a minimum, provided Idaho Power with confirmation of the Seller's intent to complete this Agreernent in a timely manner. Seller's failure to provide complete and accurate information in a timely manner can significantly impact ldaho Power's ability and cost to attain the DNR designation for the Seller's Facility and the Seller shall bear the costs ofany ofthese delays that are a result of any action or inaction by the Seller. 40 APPENDIX C ENGINEER'S CERTIFICATION OF OPERATIONS & MAINTENANCE POLICY The undersigned , on behalf of himself/herself and hereinafter collectively referred to as "Engineer," hereby states and certifies to the Seller as follows: l. That Engineer is a Licensed Professional Engineer in good standing in the State of Idaho. 2. That Engineer has reviewed the Energy Sales Agreement, hereafter referred to as the "Agreement," between Idaho Power as Buyer, and _as Seller, dated 3. That the cogeneration or small powerproduction project which is the subject of the Agreement and this Statement is identified as Idaho Power Company Facility No.and is hereinafter referred to as the "Project." 4. That the Project, which is commonly known as the Project, is located in Section Township Range Boise Meridian,County,Idaho. 5. That Engineer recognizes that the Agreement provides for the Project to furnish electrical energy to Idaho Power for a _ year period. 6. That Engineer has substantial experience in the design, construction and operation of electric power plants of the same type as this Project. 7. That Engineer has no economic relationship to the Design Engineer of this Project. 8. That Engineer has reviewed anilor supervised the review of the Policy for Operation and Maintenance ('O&M") for this Project and it is his professional opinion that, said Project has been designed and built to appropriate standards, and adherence to said O&M Policy will result in the Project's producing at or near the design electrical output, efficiency and plant factor for the full Contact Term of years. 9. That Engineer recognizes that Idaho Power, in accordance with paragraph 5.2 of the Agreement, is 4t relying on Engineā‚¬r's representations and opinions contained in this Staternent. 10. That Engineer certifies that the above statements are complete, true and accurate to the best of his/her knowledge and therefore sets hislher hand and seal below. By (P.E. Stamp) Date 42 APPENDIX C ENGINEER'S CERTIFICATION OF ONGOING OPERATIONS AND MAINTENANCE The undersigned on behalf of himselflherself and hereinafter collectively referred to as "Engineer," hereby states and certifies to the Seller as follows: l. That Engineer is a Licensed Professional Engineer in good standing in the State ofldaho. 2. That Engineer has reviewed the Energy Sales Agreement, hereafter referred to as the "Agreement," between Idaho Power as Buyer,and as Seller, dated 3. That the cogeneration or small power production project which is the subject of the Agreement and this Statement is identified as Idaho Power Company FacilityNo.and hereinafter referred to as the "Project". 4. That the Project, which is commonly known as the ect, is located in Section Township Range Boise Meridian,County,Idaho. 5. That Engineer recognizes that the Agreement provides for the Project to furnish electrical energy to Idaho Power for a _ year period. 6. That Engineer has substantial experience in the design, construction and operation of electric power plants of the same t)?e as this Project. 7. That Engineer has no economic relationship to the Design Engineer of this Project. 43 8. That Engineer has made a physical inspection of said Project, its operations and maintenance records since the last previous certified inspection. The Engineer certifies, based on the Project's appearance and the information provided by the Project, that the Project's ongoing O&M has been completed in accordance with said O&M Policy; that it is in reasonably good operating condition; and it is in the Engineer's professional opinion that if adherence to said O&M Policy continues, the Project will continue producing at or near its design electrical output, efficiency and plant factor for the remaining years of the Agreement. 9. That Engineer recognizes that Idaho Power, in accordance with paragraph 5.2 of the Agreement, is relying on Engineer's representations and opinions contained in this Statement. 10. That Engineer certifies that the above staternents are complete, true and accurate to the best of his/her knowledge and therefore sets his/her hand and seal below. By (P.E. Stamp) Date 44 APPENDIX C ENGINEER'S CERTIFICATION OF DESIGN & CONSTRUCTION ADEQUACY The undersigned , on behalf of himself/herself and _hereinafter collectivelyreferred to as "Engineer", hereby states and certifies to Idaho Power as follows: l. That Engineer is a Licensed Professional Engineer in good standing in the State of Idaho. 2. That Engineer has reviewed the Energy Sales Agreement, hereafter referred to as the "Agreement", between Idaho Power as Buyer, and AS Seller, dated J.That the cogeneration or small power production project, which is the subject of the Agreement and this Statement, is identified as Idaho Power Company FacilityNo is hereinafter referred to as the "Project". and 4. That the Project, which is commonly known as the Project, is located in Section Township Range Boise Meridian,County,Idaho. 5. That Engineer recognizes that the Agreernent provides for the Project to furnish electrical energy to Idaho Power for a _ year period. 6. That Engineer has substantial experience in the design, construction and operation of electric power plants of the same type as this Project. 7 . That Engineer has no economic relationship to the Design Engineer of this Project and has made the analysis of the plans and specifications independently. 8. That Engineer has reviewed the engineering design and construction of the Project, including the civil work, electrical work, generating equipment, prime mover conveyance system, Seller furnished Interconnection Facilities and other Project facilities and equipment. 9. That the Project has been constructed in accordance with said plans and specifications, all 45 applicable codes and consistent with Prudent Electrical Practices as that term is described in the Agreement. 10. That the design and construction of the Project is such that with reasonable and prudent operation and maintenance practices by Seller, the Project is capable of performing in accordance with the terms of the Agreernent and with Prudent Electrical Practices for a _ year period. 11. That Engineer recognizes that Idaho Power, in accordance with paragraphS.2 of the Agreement, in interconnecting the Project with its systan, is relying on Engineer's representations and opinions contained in this Statement. 12. That Engineer certifies that the above statements are complete, true and accurate to the best of his/her knowledge and therefore sets his/trer hand and seal below. By (P.E. Stamp) Date 46 APPENDIX D FORMS OF LIQUID SECURITY The Seller shall provide Idaho Power with commercially reasonable security instruments such as Cash, Cash Escrow Security, Guarantee or Letter of Credit as those terms are defined below or other forms of liquid financial security that would provide readily available cash to Idaho Power to satisfr the Security Deposit requirement and any other security requirements within this Agreement. For the purpose of this Appendix D, the term "Credit Requirements" shall mean acceptable financial creditworthiness of the entity providing the security instrument in relation to the term of the obligation in the reasonable judgment of Idaho Power, provided that any guarantee and/or Letter of Credit issued by any other entity with a short-term or long-term investment grade credit rating by Standard & Poor's Corporation or Moody's Investor Services, Inc. shall be deemed to have acceptable financial creditworthiness. Cash - Seller shall deposit cash in the amount of the required Security Deposit with Idaho Power. Idaho Power will not be responsible to calculate or pay any interest on these funds deposited with Idaho Power. 2. Cash Escrow Security - Seller shall deposit funds in an escrow account established by the Seller in a banking institution acceptable to both Parties equal to the required security amount(s). A single escrow account may be established for all security requirements, however detailed accounting of the individual security requirements must be maintained by 47 the Seller and Seller shall be obligated to maintain the appropriate amounts to satisff each security requirement within the individually identified accounts. The Seller shall be responsible for all costs 3. Guarantee or Letter of Credit Security - Seller shall post and maintain in an amount equal to the Security Deposit: (a) a guaranty from a party that satisfies the Credit Requirements, in a form acceptable to Idaho Power at its discretion, or (b) an irrevocable Letter of Credit in a form acceptable to Idaho Power, in favor of Idaho Power. The Letter of Credit will be issued by a financial institution acceptable to both parties. A single aggregate Guarantee or Letter of Credit may be provided for all security requirements, however detailed accounting of the individual security requirements must be maintained by the Seller and Seller shall be obligated to maintain the appropriate amounts to satisfy each security requirernent within the individually identified accounts. The Seller shall be responsible for all costs associated with establishing and maintaining the Guarantee(s) or Letter(s) of Credit. 48 E-t APPENDX E NON-SEASONAL HYDRO FACILITY ENERGY PRICES (Prices based on the Nameplate Capacity Amount of 2,775 kW, Non-Fueled Rates) Base Enere.v Heavy Load Purchase Price - For all Base Energy received during Heavy Load Hours, Idaho Power will pay the non-levelized energy price in accordance with Commission Order No. 34628 effective June l, 2020, with full capacity payments per Commission Order No. 32697 and seasonalization factors applied: Year Season I - (73.50%) Mills/kWh Season 2-(120.00%) Mills/kWh Season3-(100.00%) Mills/kWh 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 203s 2036 2037 2038 2039 2040 2041 40.37 40.72 41.78 43.63 46.34 49.02 51.10 52.72 53.78 54.37 55.21 56.51 58.05 59.51 60.79 62.t2 64.07 65.72 67.06 68.43 69.76 6s.90 66.47 68.21 71.23 75.66 80.04 83.43 86.07 87.81 88.76 90.1 3 92.26 94.77 97.16 99.25 101.42 104.61 107.30 109.49 111.73 113.90 54.92 s5.39 56.84 59.36 63.05 66.70 69.52 71.72 73.17 73.97 75.11 76.88 78.97 80.97 82.71 84.s2 87.1 8 89.42 91.24 93.11 94.92 49 E-2 Base Enerey Lieht Load Purchase Price - For all Base Energy received during Light Load Hours, Idaho Power will pay the non-levelized energy price in accordance with Commission Order No. 34628 effective June l, 2020, \rnth full capacity payments per Commission Order No. 32697 and seasonalization factors applied: Season I - (73.50 %) Season 2 - (120.00 %) Season 3 - (100.00 %) Year Mills/kWh Mills&Wh MillslkWh 2021 35.01 57.17 47.64 2022 3s.36 57.74 48.11 2023 36.43 59.47 49.56 2024 38.28 62.49 s2.08 2025 40.99 66.93 55.77 2026 43.67 71.30 59.42 2027 4s.7s 74.69 62.24 2028 47.36 77.33 64.44 2029 48.43 79.07 6s.89 2030 49.02 80.03 66.69 2031 49.86 8l.40 67.83 2032 sl.l6 83.52 69.60 2033 s2.70 86.03 71.69 2034 54.16 88.42 73.69203s 55.44 90.52 75.432036 56.77 92.69 77.24 2037 s8.72 95.87 79.902038 60.37 98.57 82.14 2039 61.71 100.7s 83.96 2040 63.08 10299 8s.83 2041 64.41 105.16 87.64 50 E-3 All Hours Enerey Price - The price to be used in the calculation of the Surplus Energy Price and Delay Damage Price shall be the non-levelized energyprice in accordance with Commission Order 34628 effective June 1, 2020, with full capacity payments per Commission Order No. 32697 and seasonalization factors applied: Year Season l - (73.50%\ MillslkWh Season2-(120.00%) MillslkWh Season3-(100.00%) Mills/kWh 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 37.98 38.33 39.39 41.25 43.96 46.64 48.72 50.33 51.40 51.99 52.82 54.13 55.67 57.13 58.41 59.74 61.69 63.34 64.68 66.05 67.38 62.02 62.59 64.32 67.34 71.77 76.15 79.54 82.1 8 83.92 84.88 86.24 88.37 90.88 93.27 95.37 97.53 100.72 103.42 105.60 107.84 1r0.01 51.68 52.16 s3.60 56.t2 59.81 63.46 66.28 68.48 69.93 70.73 71.87 73.64 75.74 77.73 79.47 81.28 83.94 86.1 8 88.00 89.87 91.68 51 APPENDX F INSURANCE REQUIREMENTS The Seller shall secure and continuously carry insurance as specified within this Appendix for the term of the Agreernent. lnsurance Requirements: l. All insurance required by this Agreanent shall be placed with an insurance company with an A.M. Best Company rating of A- or better. 2. If the insurance coverage required in this Appendix is cancelled, materially changed or lapses for any reason, the Seller will immediately noti$ Idaho Power in writing. This notice will advise Idaho Power of the specific reason for cancellation, material change or lapse and the steps being taken to comply with these Insurance Requirements. Failure to provide this notice and to comply with these Insurance Requirements within five (5) days of the cancellation, material change or lapse will constitute a Material Breach and Idaho Power may terminate this Agreement. 3. Prior to the First Energy date and subsequently within ten (10) days of the annual anniversary of the Operation Date, the Seller shall provide a Certificate of lnsurance in the name of Idaho Power Company and list Idaho Power Company as an Additional Insured Endorsement and Waiver of Subrogation Endorsement. 4. The Certificate of Insurance shall evidence the appropriate insurance coverage of Comprehensive General Liability Insurance for both bodily injury and property damage with limits equal to one million dollars ($1,000,000), each occurrence, combined single limit. The deductible for such insurance shall be consistent with current Insurance Industry Utility practices for similar property. 52