HomeMy WebLinkAbout20201028Notice_of_Modified_Procedure_Order_No_34824.pdfNOTICE OF MODIFIED PROCEDURE
ORDER NO. 34824 1
Office of the Secretary
Service Date
October 28, 2020
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
On August 21, 2020, Idaho Power Company (“Company”) applied to the Commission
for approval to increase the collection percentage of the Energy Efficiency Rider (“Rider”),
outlined in tariff Schedule 91. If approved, the Company’s proposed changes would take effect
January 1, 2021.
On September 30, 2020, the Commission issued a Notice of Application and set an
intervention deadline of October 21, 2020. Order No. 34799. Industrial Customers of Idaho Power
and Idaho Conservation League petitioned to intervene, and the Commission granted their
petitions.
NOTICE OF MODIFIED PROCEDURE
YOU ARE HEREBY NOTIFIED that the Commission has determined that the public
interest may not require a formal hearing in this matter and will proceed under Modified Procedure
pursuant to Rules 201 through 204 of the Idaho Public Utilities Commission’s Rules of Procedure,
IDAPA 31.01.01.201 through .204. The Commission notes that Modified Procedure and written
comments have proven to be an effective means for obtaining public input and participation.
YOU ARE FURTHER NOTIFIED that persons desiring to state a position on this
Application may file a written comment explaining why the person supports or opposes the
Application. Persons who would like a hearing must specifically request a hearing in their written
comments. Persons shall have until November 18, 2020 to file written comments. Comments
must be filed by e-mail unless e-mail is unavailable. To comment by e-mail, please access the
Commission’s home page at www.puc.idaho.gov. Click the “Consumers” tab and then “Case
Comment Form” and complete the form using the case number as it appears on the front of this
document. Comments filed by e-mail must also be e-mailed to Idaho Power at the e-mail addresses
IN THE MATTER OF IDAHO POWER
COMPANY’S APPLICATION FOR
AUTHORITY TO REVISE THE ENERGY
EFFICIENCY RIDER, TARIFF SCHEDULE
91
)
)
)
)
)
)
)
CASE NO. IPC-E-20-33
NOTICE OF MODIFIED
PROCEDURE
ORDER NO. 34824
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 34824 2
listed below. If e-mail is unavailable, then comments may be mailed to the Commission and Idaho
Power at these addresses:
For the Idaho Public Utilities
Commission:
Commission Secretary
Idaho Public Utilities Commission
P.O. Box 83720
Boise, ID 83720-0074
secretary@puc.idaho.gov
Street Address for Express Mail:
11331 W. Chinden Blvd.
Building 8, Suite 201-A
Boise, Idaho 83714
For Idaho Power:
Lisa D. Nordstrom
Connie Aschenbrenner
Idaho Power Company
1221 West Idaho Street (83702)
P.O. Box 70
Boise, ID 83707-0070
E-Mail: lnordstrom@idahopower.com
caschenbrenner@idahopower.com
dockets@idahopower.com
YOU ARE FURTHER NOTIFIED that Idaho Power must file any reply comments by
December 2, 2020.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are received
within the time limit set, the Commission will consider this matter on its merits and enter its order
without a formal hearing. If written comments are received within the time limit set, the
Commission will consider them and, in its discretion, may set the same for formal hearing.
O R D E R
IT IS HEREBY ORDERED that Idaho Power’s Application be processed by Modified
Procedure, Rule 201-204 (IDAPA 31.01.01.201-.204). Persons interested in submitting written
comments must do so by November 18, 2020. Idaho Power must file any reply comments by
December 2, 2020.
IT IS FURTHER ORDERED that parties should continue to comply with Order No.
34781, issued September 17, 2020. All pleadings should be filed with the Commission
electronically and shall be deemed timely filed when received by the Commission Secretary. See
Rule 14.02. Service between parties should also be accomplished electronically. Voluminous
discovery-related documents may be filed and served on CD-ROM or a USB flash drive.
///
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 34824 3
DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this 28th
day of October 2020.
PAUL KJELLANDER, PRESIDENT
KRISTINE RAPER, COMMISSIONER
ERIC ANDERSON, COMMISSIONER
ATTEST:
Jan Noriyuki
Commission Secretary
I:\Legal\ELECTRIC\IPC-E-20-33\orders\IPCE2033_ntc_mod_proc_mh.docx