HomeMy WebLinkAbout20200423Notice_of_Application_Order_No_34644.pdfNOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 34644 1
Office of the Secretary
Service Date
April 23, 2020
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
On March 17, 2020, Idaho Power Company (“Idaho Power”) filed an Application
requesting consideration of an Energy Sales Agreement (“ESA” or “Agreement”) with the City of
Hailey for energy generated by the Hailey CSPP Hydro Project (“Facility”). The Facility is a
qualifying facility under the Public Utility Regulatory Policies Act of 1978. The Facility has a
scheduled First Energy Date under the ESA of June 25, 2020.
The Commission now sets deadlines for interested persons to comment on the
Application, and for Idaho Power to reply.
NOTICE OF APPLICATION
YOU ARE HEREBY NOTIFIED that the Facility is a 37.3-kilowatt nameplate
capacity hydro facility in Hailey, Idaho. The Agreement contains published non-seasonal, non-
levelized avoided cost rates for a 5-year term.
YOU ARE FURTHER NOTIFIED that the Facility has been delivering energy to Idaho
Power under a June 14, 1985 energy sales agreement that expires June 24, 2020.
YOU ARE FURTHER NOTIFIED that Idaho Power requests the Application be
processed by Modified Procedure. Idaho Power also asks the Commission to declare Idaho
Power’s purchases under the ESA will be allowed as prudently incurred expenses for ratemaking
purposes.
YOU ARE FURTHER NOTIFIED that the Application is available for public
inspection during regular business hours at the Commission’s office. These documents are also
available on the Commission’s web site at www.puc.idaho.gov. Click on the “ELECTRIC” icon,
select “Open Cases,” and click on the case number as shown on the front of this document.
IN THE MATTER OF IDAHO POWER
COMPANY’S APPLICATION FOR
APPROVAL OR REJECTION OF AN
ENERGY SALES AGREEMENT WITH THE
CITY OF HAILEY FOR THE SALE AND
PURCHASE OF ELECTRIC ENERGY FROM
THE HAILEY CSPP HYDRO PROJECT
)
)
)
)
)
)
)
)
CASE NO. IPC-E-20-16
NOTICE OF APPLICATION
NOTICE OF
MODIFIED PROCEDURE
ORDER NO. 34644
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 34644 2
YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held
pursuant to the Commission’s jurisdiction under Title 61 of the Idaho Code and specifically Idaho
Code §§ 61-501 to 61-503.
YOU ARE FURTHER NOTIFIED that all proceedings in this matter will be conducted
pursuant to the Commission’s Rules of Procedure, IDAPA 31.01.01.000 et seq.
NOTICE OF MODIFIED PROCEDURE
YOU ARE FURTHER NOTIFIED that the Commission has determined that the public
interest may not require a formal hearing in this matter, and that it will proceed under Modified
Procedure pursuant to Rules 201 through 204 of the Commission’s Rules of Procedure, IDAPA
31.01.01.201 through .204. The Commission notes that Modified Procedure and written comments
have proven to be an effective means for obtaining public input and participation.
YOU ARE FURTHER NOTIFIED that any person or party desiring to state a position
on this Application must file a written comment in support or opposition with the Commission by
May 14, 2020. The comment must contain a statement of reasons supporting the comment.
Persons desiring a hearing must specifically request a hearing in their written comments. Written
comments concerning this Application shall be sent electronically, unless email is not available,
to the Commission and the Applicant at the email addresses reflected below:
For the Idaho Public Utilities
Commission:
Commission Secretary
Idaho Public Utilities Commission
P.O. Box 83720
Boise, ID 83720-0074
Street Address for Express Mail:
11331 W. Chinden Blvd.
Building 8, Suite 201-A
Boise, Idaho 83714
For Idaho Power:
Donovan E. Walker
Energy Contracts
Idaho Power Company
1221 West Idaho Street 83702
P.O. Box 70
Boise, ID 83707-0070
Email: dwalker @idahopower.com
dockets@ idahopower.com
energycontracts@idahopower.com
Comments should contain the case caption and case number shown on the first page of
this document. Persons desiring to submit comments via email may do so by accessing the
Commission’s home page located at www.puc.idaho.gov. Click the “Case Comment Form” under
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 34644 3
“Consumers,” and complete the comment form using the case number as it appears on the front of
this document. These comments must also be sent to the Applicant.
YOU ARE FURTHER NOTIFIED that Idaho Power must file any reply comments by
May 21, 2020.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are received
within the time limit set, the Commission will consider this matter on its merits and enter its Order
without a formal hearing. If written comments are received within the time limit set, the
Commission will consider them and, in its discretion, may set the same for formal hearing.
O R D E R
IT IS HEREBY ORDERED that Idaho Power’s Application be processed by Modified
Procedure, Rule 201-204 (IDAPA 31.01.01.201-.204). Persons interested in submitting written
comments must do so by May 14, 2020. Idaho Power must file any reply comments by May 21,
2020.
IT IS FURTHER ORDERED that parties should continue to comply with Order No.
34602, issued March 17, 2020. All pleadings should be filed with the Commission electronically
and shall be deemed timely filed when received by the Commission Secretary. See Rule 14.02.
Service between parties should also be accomplished electronically. Voluminous discovery-related
documents may be filed and served on CD-ROM or a USB flash drive.
///
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 34644 4
DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this 23rd
day of April, 2020.
PAUL KJELLANDER, PRESIDENT
KRISTINE RAPER, COMMISSIONER
ERIC ANDERSON, COMMISSIONER
ATTEST:
Diane M. Hanian
Commission Secretary
I:\Legal\ELECTRIC\IPC-E-20-16\IPCE2016_ntc app mod proc_mh.docx