Loading...
HomeMy WebLinkAbout20191227Application.pdfSIffi* an rDAcoRP companY LISA D. NORDSTROM Lead Counsel lnordstrom@idahopower.com RECEIVED 0i9 DEC 27 Pll lr: b2 IU ISSION December 27,2019 Diane Hanian, Secretary ldaho Public Utilities Commission 11331 W. Chinden Boulevard Building 8, Suite 201-A Boise, ldaho 83714 Re: Case No. IPC-E-19-40 Annual Compliance Filing to Update the Substation Allowance under Schedule 19, Large Power Service - ldaho Power Company's Application Dear Ms. Hanian: Enclosed for filing in the above matter please find an original and seven (7) copies of ldaho Power Company's Application Additionally, the Company is providing the workpapers used to calculate the per megawatt Substation Allowance and the stations overhead rate on a CD as Confidential Attachment 1. Please handle the confidential information in accordance with the Protective Agreement to be executed in this matter. lf you have any questions about the enclosed documents, please do not hesitate to contact me. Very truly yours, Ua-,a-Ksl-'+".-- Lisa D. Nordstrom Enclosures VIA HAND DELIVERY LDN:kkt LISA D. NORDSTROM (lSB No. 5733) ldaho Power Company 1221 West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 Telephone: (208) 388-5825 Faqsimile: (208) 388-6936 lnordstrom@idahoDower.com iIECEIVED :iiiIC2? Pl'l lr:lr2 tb5 ON Attorney for ldaho Power Company BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY TO UPDATE THE SUBSTATION ALLOWANCE UNDER SCHEDULE 19, LARGE POWER SERVICE CASE NO. TPC-E-19-40 APPLICATION ldaho Power Company ("ldaho Power" or "Company"), in accordance with /daho Code $ 61-503 and RP 052, hereby respectfully makes application to the ldaho Public Utilities Commission ("Commission") for an order approving the proposed update to the Substation Allowance amount outlined in Schedule 19, Large Power Service ("Schedule 19") from $69,397 to $49,253 effective March 15, 2020. ln support of this Application, ldaho Power represents as follows: APPLICATION - 1 ) ) ) ) ) ) I. BACKGROUND 1. This is the annual compliance filing to update the Substation Allowance amount contained within Schedule 19 as required by Commission Order Nos.328931 and 32914.2 2. Per Staffs request, the Company is filing this update to the Substation Allowance as a case rather than an advice filing as has been done in previous years. 3. ln Case No. IPC-E-13-09, the Commission found the determination of a standard terminal facilities equivalent for Schedule 19 customers, applied on a per megawatt ("MW") basis, is a just, reasonable, and equitable determination of allowances for Schedule 19 customers.s The cost estimation methodology the Company used in this filing is the same methodology the Company presented and approved by this Commission in Case Nos. IPC-E-13-09 and IPC-E-14-01.4 4. ln Order No.34277 issued in Case No, IPC-E-19-02, the Commission found that it was, ''reasonable and just to base estimated transformer costs on other actual, similar transformer costs rather than a budgetary prory"s as proposed by the Company. However, the Commission acknowledged the Company's willingness to I ln the Matter of the Petition of Glanbia Foods, lnc. tor Approval of a Line Extension Allowance Pursuant to ldaho Power Company's Rule H, Case No. IPC-E-13-09, Order No. 32893 (September 19, 2013\. 2 d., Order No. 32914 (October 29, 2013). 3 /d., Order No. 32893. 1 ln the Matter of the Application of ldaho Power Company to lmplement a Schedule 19 Substation Allowance and Transmission Vested lnterest (Tariff Advice No. 13-08), Case No. IPC-E-14-01, Order No. 32982 (February 25,20141. 5 h the Matter of the Application of ldaho Power Company to lncrease the Subslalion Allowance in Schedule 19, Large Power Service, Case No. IPC-E-19-02, Order No. 34277 (Marcl, 19, 2019). APPLICATION .2 work with Staff before the next year's substation allowance update to discuss potential changes to the materials used to calculate the allowance.6 5. Because the Company has most commonly purchased 44.8 mega volt amp ("MVA") transformers in recent years, both the Company and Staff agreed that it was appropriate to utilize the transformer costs for a 44.8 MVA transformer rather than continuing to use a budgetary estimate for a 30 MVA transformer as used in prior year's compliance filings to update the Substation Allowance amount. II. PROPOSAL FOR UPDATE 6. As reflected on Confidential Attachment 1, the updated Substation Allowance reflects updated material costs (including a 44.8 MVA transformer), labor rates, and stations overhead rate. 7. The Substation Allowance amount decreased from $69,397 to $49,253, or 29 percent. The prlmary driver for the decrease of the Substation Allowance is attributed to the reduction in the denominator (44.8 MVA instead of 30 MVA). More details on the other primary drivers of the changes are provided below: a. Material Costs. Total material costs increased by approximately 5 percent. The cost of the 44.8 MVA transformer increased by 20 percent, primarily offset by a 6 percent reduction to the cost of the 4-unit metalclad. The cost used for both the 44.8 MVA transformer and the 4-unit metalclad were based on recent actual purchases. Other material cost changes constitute less than 0.5 percent of the total material costs. Total changes in material costs were partially offset by a slight decrease in the general overhead rate from 9.81 percent to 9.57 percent. 6/d.at3 APPLICATION - 3 b. Labor Costs. Total labor costs increased by approximately 16 percent. The construction labor rate increased by 2.75 percent, which contributed to the increase in the labor costs. Additionally, the Company has included 80 hours for System Protection Engineering. These are labor costs that the Company incurs for substation projects but upon review of this year's proposed update it was discovered the costs associated with this activity had been inadvertently omitted in prior year's calculations. System Protection Engineering includes time for project scoping, fault studies, settings and logic development, panel shop testing, and commission relaying. On average, System Protection Engineering is between 80 and 120 hours for a System Protection Engineer. 8. Workpapers The Company is providing the workpapers used to calculate the per megawatt Substation Allowance and the stations overhead rate on a CD as a Confidential Attachment 1 to this filing. 9. Proposed Tariffs. The proposed tariff change for Schedule 19 is reflected in Attachment 2 to this Application (in both legislative and clean formats). III. MODIFIED PROCEDURE 10. ldaho Power believes that a hearing is not necessary to consider the issues presented herein and respectfully requests that this Application be processed under Modified Procedure; i.e., by written submissions rather than by hearing. RP 201, el seq. IV. COMMUNICATIONS AND SERVICE OF PLEADINGS 11. Communications and service of pleadings with reference to this Application should be sent to the following: APPLICATION - 4 Lisa D. Nordstrom ldaho Power Company 122'l West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 lnordstrom@idahopower. com dockets@ idahopower.com v. coNcLustoN 12. For the reasons set forth above, ldaho Power respectfully requests that the Commission issue an order authorizing an update to the Substation Allowance under Schedule 19, from $69,397 to $49,253 effective March 15,2020; however, the Company would not oppose a later effective date if the Commission or Commission Staff does not believe the Company's proposed timeline is sufficient to process the issues presented by the Company in this matter. Respectfully submitted this 27th day of December 2019. LI D. NORDS OM Attorney for ldaho Power Company APPLICATION - 5 Connie Aschenbrenner ldaho Power Company 1221 West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 caschenbrenner@idahopower.com BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NO. IPC-E-19-40 IDAHO POWER COMPANY CONFIDENTIAL ATTACHMENT 1 PROVIDED ON CD BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION GASE NO. |PC-E-19-40 IDAHO POWER COMPANY ATTACHMENT 2 SCHEDULE 19 CLEAN FORMAT SCHEDULE 19 LARGE POWER SERVICE (Continued) PECIAL ARRANGEMENTS FOR SU BSTATION ALLOWANCES AND/OR TRANSMISSION VESTED INTE EST (Continued) Definitions (Continued) Transmission Vested lnterest Portion is that part of the Company's transmission system in which a Transmission Vested lnterest is held Substation Allowance lf a Schedule 19 Customer's request for service requires the installation of new or upgraded transformer capacity in Substation Facilities, the following considerations will be included in the separate agreement between the Customer and the Company: The Customer will initially pay for the cost of new or upgraded Substation Facilities required because of the Customer's request. The Customer will be eligible to receive a one- time Substation Allowance based upon subsequent sustained usage of capacity by the Customer. a Substation Allowance: The maximum possible allowance will be determined by multiplying the Customer's actual increase in load by $49,253 per MW, but will not exceed the actual cost of the Substation Facilities. b. Substation Allowance Refunds: The Substation Allowance will be refunded to the Customer over a five-year period, with annual payments based on the Customer's Basic Load Capacity at the time of refund. The first refund will be paid one year following the first month energy is delivered through the new Substation Facilities. The refunds will occur based on the following adjustment, which will be added to the Substation Allowance received in the previous year. lf there is no change in load from the previous year, the Substation Allowance for that year is equal to the Substation Allowance from the previous year. ((Change in load from the previous year as measured in MW) x (Substation Allowance per MVv)) Number of Substation Allowance Retunds remaining in five-year period The Customer's annual refunds will be made in accordance with the Substation Allowance amount stated in the separate construction agreement between the Customer and the Company. Transmission Vested lnterest lf a Schedule 19 Customer's request for service requires the installation of new or upgraded capacity in Transmission Facilities, and those Transmission Facilities are serving the Customer by a radial feed, the following considerations will be included in the separate agreement between the Customer and the Company. IDAHO lssued per Order No. Effective - March 15, 2020 lssued by IDAHO POWER COMPANY Timothy E. Tatum, Vice President, Regulatory Affairs '1221 West ldaho Street, Boise, ldaho ldaho Power Company Sixth Revised Sheet No. 19-6 Cancels l P.U.C. No. 29, Tariff No. 101 Fifth Revised Sheet No. 19-6 SGHEDULE 19 LEGISLATIVE FORMAT ldaho Power Company FfthSlEI Revised Sheet No. 19-6 Cancels FeurthFifth Revised Sheet No. 19-6t.P.u.c.No.29 Tariff No. '101 SPECIAL A SCHEDULE 19 LARGE POWER SERVICE (Continued) RRANGE MENTS FOR SU BS oN ALLOWANCES AND/OR TRANSMISSION VESTED Defi nitions (Continued) Transmission Vested lnterest Portion is that part of the Company's lransmission system in which a Transmission Vested lnterest is held. Substation Allowance lf a Schedule 19 Customer's request for service requires the installation of new or upgraded transformer capacity in Substation Facilities, the following considerations will be included in the separate agreement between the Customer and the Company: The Customer will initially pay for the cost of new or upgraded Substation Facilities required because of the Customer's request. The Customer will be eligible to receive a one- time Substation Allowance based upon subsequent sustained usage of capacity by the Customer, a. Substation Allowance:The maximum possible allowance will be determined by multiplying the Customer's actual increase in load by $693€749. ?! 3 per MW, but will not exceed the actual cost of the Substation Facilities. b Substation Al nce Refunds: The Substation Allowance will be refunded to the Customer over a five-year period, with annual payments based on the Customer's Basic Load Capacity at the time of refund. The first refund will be paid one year following the first month energy is delivered through the new Substation Facilities. Number of Substation Allowance Refunds remaining in five-year period The Customer's annual refunds will be made in accordance with the Substation Allowance amount stated in the separate construction agreement between the Customer and the Company. IDAHO lssued per Ordet No. 2+77 Effective - Ap+il-+March 15,201920 AdYi€e-Ne {€-04 lssued by IDAHO POWER COMPANY Timothy E. Tatum, Vice President, Regulatory Affairs 1221 West ldaho Street, Boise, ldaho INTEREST (Continued) The refunds will occur based on the following adjustment, which will be added to the Substation Allowance received in the previous year, lf there is no change in load from the previous year, the Substation Allowance for that year is equal to the Substation Allowance from the previous year: ((Change in load from the previous year as measured in MW) x (Substation Allowance per MVV)) Transmission Vested lnterest lf a Schedule 19 Customer's request for service requires the installation of new or upgraded capacity in Transmission Facilities, and those Transmission Facilities are serving the Customer by a radial feed, the following considerations will be included in the separate agreement between the Customer and the Company.