Loading...
HomeMy WebLinkAbout20200102Final Approved Tariffs .pdf LISA D. NORDSTROM Lead Counsel lnordstrom@idahopower.com December 27, 2019 ELECTRONICALLY FILED Diane Hanian, Secretary Idaho Public Utilities Commission 11331 W. Chinden Boulevard Building 8, Suite 201-A Boise, Idaho 83714 Re: Case No. IPC-E-19-32 Rate Decrease for Costs Associated with the Boardman Power Plant Tariff Compliance Filing Dear Ms. Hanian: Idaho Power Company hereby submits the enclosed compliance filing in the above- captioned proceeding pursuant to Idaho Public Utilities Commission Order No. 34519, which includes the tariff schedules as listed below, reflecting the change in rates with an effective date of January 1, 2020. Fifteenth Revised Sheet No. 1-2 Cancelling Fourteenth Revised Sheet No. 1-2 Eleventh Revised Sheet No. 3-2 Cancelling Tenth Revised Sheet No. 3-2 Fourteenth Revised Sheet No. 4-3 Cancelling Thirteenth Revised Sheet No. 4-3 Fourteenth Revised Sheet No. 5-3 Cancelling Thirteenth Revised Sheet No. 5-3 Second Revised Sheet No. 6-6 Cancelling First Revised Sheet No. 6-6 Fourteenth Revised Sheet No. 7-2 Cancelling Thirteenth Revised Sheet No. 7-2 Second Revised Sheet No. 8-5 Cancelling First Revised Sheet No. 8-5 Eleventh Revised Sheet No. 9-3 Cancelling Tenth Revised Sheet No. 9-3 Fifteenth Revised Sheet No. 9-4 Cancelling Fourteenth Revised Sheet No. 9-4 Fifteenth Revised Sheet No. 15-2 Cancelling Fourteenth Revised Sheet No. 15-2 Tenth Revised Sheet No. 19-3 Cancelling Ninth Revised Sheet No. 19-3 Fourteenth Revised Sheet No. 19-4 Cancelling Thirteenth Revised Sheet No. 19-4 Fourteenth Revised Sheet No. 24-3 Cancelling Thirteenth Revised Sheet No. 24-3 Thirteenth Revised Sheet No. 26-1 Cancelling Twelfth Revised Sheet No. 26-1 Thirteenth Revised Sheet No. 29-1 Cancelling Twelfth Revised Sheet No. 29-1 Thirteenth Revised Sheet No. 30-1 Cancelling Twelfth Revised Sheet No. 30-1 Fourth Revised Sheet No. 32-1 Cancelling Third Revised Sheet No. 32-1 Thirteenth Revised Sheet No. 40-2 Cancelling Twelfth Revised Sheet No. 40-2 Thirteenth Revised Sheet No. 41-3 Cancelling Twelfth Revised Sheet No. 41-3 Eleventh Revised Sheet No. 41-5 Cancelling Tenth Revised Sheet No. 41-5 Eleventh Revised Sheet No. 41-6 Cancelling Tenth Revised Sheet No. 41-6 Thirteenth Revised Sheet No. 42-1 Cancelling Twelfth Revised Sheet No. 42-1 RECEIVED 2019 December 27, PM 4:05 IDAHO PUBLIC UTILITIES COMMISSION Diane Hanian December 27, 2019 Page 2 If you have any questions regarding this filing, please contact Senior Regulatory Analyst Courtney Waites at (208) 388-5612 or cwaites@idahopower.com. Very truly yours, Lisa D. Nordstrom LDN:kkt Enclosures Idaho Power Company Fifteenth Revised Sheet No. 1-2 Cancels I.P.U.C. No. 29, Tariff No. 101 Fourteenth Revised Sheet No. 1-2 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 1 RESIDENTIAL SERVICE STANDARD PLAN (Continued) RESIDENTIAL SPACE HEATING All space heating equipment to be served by the Company's system shall be single-phase equipment approved by Underwriters' Laboratories, Inc., and the equipment and its installation shall conform to all National, State and Municipal Codes and to the following: Individual resistance-type units for space heating larger than 1,650 watts shall be designed to operate at 240 or 208 volts, and no single unit shall be larger than 6 kW. Heating units of 2 kW or larger shall be controlled by approved thermostatic devices. When a group of heating units, with a total capacity of more than 6 kW, is to be actuated by a single thermostat, the controlling switch shall be so designed that not more than 6 kW can be switched on or off at any one time. Supplemental resistance- type heaters, that may be used with a heat exchanger, shall comply with the specifications listed above for such units. SUMMER AND NON-SUMMER SEASONS The summer season begins on June 1 of each year and ends on August 31 of each year. The non-summer season begins on September 1 of each year and ends on May 31 of each year. MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy Credit). Summer Non-summer Service Charge, per month $5.00 $5.00 Energy Charge, per kWh First 800 kWh 8.5332¢ 7.9288¢ 801-2000 kWh 10.2607¢ 8.7412¢ All Additional kWh Over 2000 12.1891¢ 9.6808¢ PAYMENT The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Eleventh Revised Sheet No. 3-2 Cancels I.P.U.C. No. 29, Tariff No. 101 Tenth Revised Sheet No. 3-2 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 3 MASTER-METERED MOBILE HOME PARK RESIDENTIAL SERVICE (Continued) MONTHLY CHARGE The Monthly Charge is the sum of the following charges and may also include charges as set forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy Credit): Service Charge, per month $5.00 Energy Charge, per kWh all kWh 8.5881¢ Minimum Charge The monthly Minimum Charge shall be the sum of the Service Charge, the Energy Charge, and the Power Cost Adjustment. PAYMENT The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Fourteenth Revised Sheet No. 4-3 Cancels I.P.U.C. No. 29, Tariff No. 101 Thirteenth Revised Sheet No. 4-3 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 4 RESIDENTIAL SERVICE ENERGY WATCH PILOT PLAN (OPTIONAL) SUSPENDED (Continued) TIME PERIODS The time periods are defined as follows. All times are stated in Mountain Time. Summer Season On-Peak: 1:00 p.m. to 9:00 p.m. Monday through Friday Off-Peak: 9:00 p.m. to 1:00 p.m. Monday through Friday and all hours on weekends and holidays Critical peak period (10 select summer days): 5:00 p.m. to 9:00 p.m. Non-summer Season Mid-Peak: 7:00 a.m. to 9:00 p.m. Monday through Friday Off-Peak: 9:00 p.m. to 7:00 a.m. Monday through Friday and all hours on weekends and holidays MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy Credit). Service Charge, per month $5.00 Energy Charge, per kWh Summer Energy Watch Event hours 43.2443¢ On-Peak 12.1385¢ Off-Peak 6.9710¢ Non-summer Mid-Peak 8.9681¢ Off-Peak 6.9710¢ PAYMENT The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Fourteenth Revised Sheet No. 5-3 Cancels I.P.U.C. No. 29, Tariff No. 101 Thirteenth Revised Sheet No. 5-3 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 5 RESIDENTIAL SERVICE TIME-OF-DAY PILOT PLAN (OPTIONAL) (Continued) TIME PERIODS (Continued) Holidays are New Year's Day (January 1), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25). If New Year’s Day, Independence Day , or Christmas Day falls on Saturday, the preceding Friday will be designated a holiday. If New Year’s Day, Independence Day, or Christmas Day falls on Sunday, the following Monday will be designated a holiday. MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy Credit). Service Charge, per month $5.00 Energy Charge, per kWh Summer Peak 12.7143¢ Off-Peak 7.2886¢ Non-summer Peak 9.3855¢ Off-Peak 7.2886¢ PAYMENT The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Second Revised Sheet No. 6-6 Cancels I.P.U.C. No. 29, Tariff No. 101 First Revised Sheet No. 6-6 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 6 RESIDENTIAL SERVICE ON-SITE GENERATION (Continued) CONDITIONS OF PURCHASE AND SALE (Continued) 9. The Customer shall notify the Company immediately if a Small On-Site Generation System is permanently removed or disabled. Permanent removal or disablement for the purposes of this Schedule is any removal or disablement of a Small On-Site Generation System lasting longer than six (6) months. Customers with permanently removed or disabled systems will be removed from service under this schedule and placed on the appropriate standard service schedule. SUMMER AND NON-SUMMER SEASONS The summer season begins on June 1 of each year and ends on August 31 of each year. The non- summer season begins on September 1 of each year and ends on May 31 of each year. MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy Credit). The following rate structure and charges are subject to change upon Commission approval: Summer Non-summer Service Charge, per month $5.00 $5.00 Energy Charge, per kWh First 800 kWh 8.5332¢ 7.9288¢ 801-2000 kWh 10.2607¢ 8.7412¢ All Additional kWh Over 2000 12.1891¢ 9.6808¢ PAYMENT The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Fourteenth Revised Sheet No. 7-2 Cancels I.P.U.C. No. 29, Tariff No. 101 Thirteenth Revised Sheet No. 7-2 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 7 SMALL GENERAL SERVICE (Continued) MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy Credit). Summer Non-summer Service Charge, per month $5.00 $5.00 Energy Charge, per kWh First 300 kWh 9.7281¢ 9.7281¢ All Additional kWh 11.5862¢ 10.2067¢ PAYMENT The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Second Revised Sheet No. 8-5 Cancels I.P.U.C. No. 29, Tariff No. 101 First Revised Sheet No. 8-5 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 8 SMALL GENERAL SERVICE ON-SITE GENERTION (Continued) CONDITIONS OF PURCHASE AND SALE (Continued) 7. If the Company is required by the Commission to institute curtailment of deliveries of electricity to its customers, the Company may require the Customer to curtail its consumption of electricity in the same manner and to the same degree as other Customers on the Company’s standard service schedules. 8. The Customer shall grant to the Company all access to all Company equipment and facilities including adequate and continuing access rights to the property of the Customer for the purpose of installation, operation, maintenance, replacement, or any other service required of said equipment as well as all necessary access for inspection, switching, and any other operational requirements of the Customer’s Interconnections Facilities. 9. The Customer shall notify the Company immediately if a Small On-Site Generation System is permanently removed or disabled. Permanent removal or disablement for the purposes of this Schedule is any removal or disablement of a Small On-Site Generation System lasting longer than six (6) months. Customers with permanently removed or disabled systems will be removed from service under this schedule and placed on the appropriate standard service schedule. SUMMER AND NON-SUMMER SEASONS The summer season begins on June 1 of each year and ends on August 31 of each year. The non- summer season begins on September 1 of each year and ends on May 31 of each year. MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy Credit). The following charges are subject to change upon Commission approval: Summer Non-summer Service Charge, per month $5.00 $5.00 Energy Charge, per kWh First 300 kWh 9.7281¢ 9.7281¢ All Additional kWh 11.5862¢ 10.2067¢ PAYMENT The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Eleventh Revised Sheet No. 9-3 Cancels I.P.U.C. No. 29, Tariff No. 101 Tenth Revised Sheet No. 9-3 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 9 LARGE GENERAL SERVICE (Continued) MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy Credit). SECONDARY SERVICE Summer Non-summer Service Charge, per month $16.00 $16.00 Basic Charge, per kW of Basic Load Capacity First 20 kW $0.00 $0.00 All Additional kW $1.01 $1.01 Demand Charge, per kW of Billing Demand First 20 kW $0.00 $0.00 All Additional kW $5.97 $4.39 Energy Charge, per kWh First 2,000 kWh 10.3807¢ 9.3443¢ All Additional kWh 4.8048¢ 4.3590¢ IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Fifteenth Revised Sheet No. 9-4 Cancels I.P.U.C. No. 29, Tariff No. 101 Fourteenth Revised Sheet No. 9-4 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 9 LARGE GENERAL SERVICE (Continued) PRIMARY SERVICE Summer Non-summer Service Charge, per month $285.00 $285.00 Basic Charge, per kW of Basic Load Capacity $1.28 $1.28 Demand Charge, per kW of Billing Demand $5.09 $4.46 On-Peak Demand Charge, per kW of On-Peak Billing Demand $0.95 n/a Energy Charge, per kWh On-Peak 4.8776¢ n/a Mid-Peak 4.5007¢ 4.0359¢ Off-Peak 4.2542¢ 3.9003¢ . TRANSMISSION SERVICE Summer Non-summer Service Charge, per month $285.00 $285.00 Basic Charge, per kW of Basic Load Capacity $0.68 $0.68 Demand Charge, per kW of Billing Demand $4.78 $4.30 On-Peak Demand Charge, per kW of On-Peak Billing Demand $0.95 n/a Energy Charge, per kWh On-Peak 4.7997¢ n/a Mid-Peak 4.4383¢ 3.9854¢ Off-Peak 4.2001¢ 3.8618¢ PAYMENT The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Fifteenth Revised Sheet No. 15-2 Cancels I.P.U.C. No. 29, Tariff No. 101 Fourteenth Revised Sheet No. 15-2 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 15 DUSK TO DAWN CUSTOMER LIGHTING (Continued) NEW FACILITIES Where facilities of the Company are not presently available for a lamp installation which will provide satisfactory lighting service for the Customer's Premises, the Company may install overhead or underground secondary service facilities, including secondary conductor, poles, anchors, etc., a distance not to exceed 300 feet to supply the desired service, all in accordance with the charges specified below. MONTHLY CHARGE Effective October 1, 2019, High Pressure Sodium Vapor lighting systems are not available for new installation. The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees). 1. Monthly Per Unit Charge on existing facilities: AREA LIGHTING High Pressure Sodium Vapor LED Equivalent Base Rate Watts Average Lumens Watt (Maximum) Lumen (Minimum) 100 8,550 40 3,600 $ 9.50 200 19,800 85 7,200 $11.34 400 45,000 200 18,000 $15.36 FLOOD LIGHTING High Pressure Sodium Vapor LED Equivalent Base Rate Watts Average Lumens Watt (Maximum) Lumen (Minimum) 200 19,800 85 8,100 $13.59 400 45,000 150 18,000 $16.02 Metal Halide LED Equivalent Base Rate Watts Average Lumens Watt (Maximum) Lumen (Minimum) 400 28,800 150 18,000 $14.71 1,000 88,000 300 32,000 $23.39 2. For New Facilities Installed Before June 1, 2004: The Monthly Charge for New Facilities installed prior to June 1, 2004, will continue to be assessed a monthly facilities charge in accordance with the changes specified in Schedule 66. 3. For New Facilities Installed On or After June 1, 2004: The non-refundable charge for New Facilities to be installed, such as underground service, overhead secondary conductor, poles, anchors, etc., shall be equal to the work order cost. PAYMENT The monthly bill for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Tenth Revised Sheet No. 19-3 Cancels I.P.U.C. No. 29, Tariff No. 101 Ninth Revised Sheet No. 19-3 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 19 LARGE POWER SERVICE (Continued) FACILITIES BEYOND THE POINT OF DELIVERY At the Customer’s request and at the option of the Company, transformers and other facilities installed beyond the Point of Delivery to provide Primary or Transmission Service may be owned, operated, and maintained by the Company in consideration of the Customer paying a Facilities Charge to the Company. This service is provided under the provisions set forth in Rule M, Facilities Charge Service. POWER FACTOR ADJUSTMENT Where the Customer’s Power Factor is less than 90 percent, as determined by measurement under actual load conditions, the Company may adjust the kW measured to determine the Billing Demand by multiplying the measured kW by 90 percent and dividing by the actual Power Factor. TEMPORARY SUSPENSION When a Customer has properly invoked Rule G, Temporary Suspension of Demand, the Basic Load Capacity, the Billing Demand, and the On-Peak Billing Demand shall be prorated based on the period of such suspension in accordance with Rule G. In the event the Customer's metered demand is less than 1,000 kW during the period of such suspension, the Basic Load Capacity and Billing Demand will be set equal to 1,000 kW for purposes of determining the Customer's Monthly Charge. MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees). SECONDARY SERVICE Summer Non-summer Service Charge, per month $39.00 $39.00 Basic Charge, per kW of Basic Load Capacity $0.91 $0.91 Demand Charge, per kW of Billing Demand $5.91 $4.24 On-Peak Demand Charge, per kW of On-Peak Billing Demand $1.01 n/a Energy Charge, per kWh On-Peak 6.3573¢ n/a Mid-Peak 5.0334¢ 4.6815¢ Off-Peak 4.4671¢ 4.1592¢ IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Fourteenth Revised Sheet No. 19-4 Cancels I.P.U.C. No. 29, Tariff No. 101 Thirteenth Revised Sheet No. 19-4 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 19 LARGE POWER SERVICE (Continued) MONTHLY CHARGE (Continued) PRIMARY SERVICE Summer Non-summer Service Charge, per month $299.00 $299.00 Basic Charge, per kW of $1.26 $1.26 Basic Load Capacity Demand Charge, per kW of $6.03 $4.48 Billing Demand On-Peak Demand Charge, per kW of On-Peak Billing Demand $0.95 n/a Energy Charge, per kWh On-Peak 5.2322¢ n/a Mid-Peak 4.1606¢ 3.9220¢ Off-Peak 3.7123¢ 3.5062¢ TRANSMISSION SERVICE Summer Non-summer Service Charge, per month $299.00 $299.00 Basic Charge, per kW of Basic Load Capacity $0.70 $0.70 Demand Charge, per kW of Billing Demand $5.85 $4.35 On-Peak Demand Charge, per kW of On-Peak Billing Demand $0.95 n/a Energy Charge, per kWh On-Peak 5.1728¢ n/a Mid-Peak 4.1314¢ 3.9035¢ Off-Peak 3.6881¢ 3.4898¢ PAYMENT The monthly bill for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Fourteenth Revised Sheet No. 24-3 Cancels I.P.U.C. No. 29, Tariff No. 101 Thirteenth Revised Sheet No. 24-3 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 24 AGRICULTURAL IRRIGATION SERVICE (Continued) MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy Credit). SECONDARY SERVICE In-Season Out-of-Season Service Charge, per month $22.00 $3.50 Demand Charge, per kW of Billing Demand $6.97 n/a Energy Charge In-Season First 164 kWh per kW of Demand 5.7635¢ n/a All Other kWh per kW of Demand 5.4723¢ n/a Out-of-Season All kWh n/a 6.6165¢ TRANSMISSION SERVICE In-Season Out-of-Season Service Charge, per month $299.00 $3.50 Demand Charge, per kW of Billing Demand $6.57 n/a Energy Charge In-Season First 164 kWh per kW of Demand 5.5211¢ n/a All Other kWh per kW of Demand 5.2503¢ n/a Out-of-Season All kWh n/a 6.3154¢ IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Thirteenth Revised Sheet No. 26-1 Cancels I.P.U.C. No. 29, Tariff No. 101 Twelfth Revised Sheet No. 26-1 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 26 IDAHO POWER COMPANY ELECTRIC SERVICE RATE FOR MICRON TECHNOLOGY, INC. BOISE, IDAHO SPECIAL CONTRACT DATED DECEMBER 29, 2009 MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees). Monthly Contract Demand Charge $1.65 per kW of Contract Demand. Monthly Billing Demand Charge $10.83 per kW of Billing Demand but not less than Minimum Monthly Billing Demand. Minimum Monthly Billing Demand The Minimum Monthly Billing Demand will be 25,000 kilowatts. Daily Excess Demand Charge $0.287 per each kW over the Contract Demand. Monthly Energy Charge 2.7764¢ per kWh. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Thirteenth Revised Sheet No. 29-1 Cancels I.P.U.C. No. 29, Tariff No. 101 Twelfth Revised Sheet No. 29-1 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 29 IDAHO POWER COMPANY ELECTRIC SERVICE RATE FOR J. R. SIMPLOT COMPANY POCATELLO, IDAHO SPECIAL CONTRACT DATED JUNE 29, 2004 MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees). Contract Demand Charge $2.28 per kW of Contract Demand Demand Charge, $7.77 per kW of Billing Demand but no less than the Contract Demand less 5,000 kW Daily Excess Demand Charge $0.288 per each kW over the Contract Demand Energy Charge 2.7956¢ per kWh Monthly Facilities Charge A Monthly Facilities Charge will be paid for the Company’s investment in Distribution Facilities. A Monthly Facilities Charge rate of 1.41% will be paid for facilities installed for 31 years or less and a rate of 0.59% will be paid for facilities installed more than 31 years. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Thirteenth Revised Sheet No. 30-1 Cancels I.P.U.C. No. 29, Tariff No. 101 Twelfth Revised Sheet No. 30-1 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 30 IDAHO POWER COMPANY ELECTRIC SERVICE RATE FOR UNITED STATES DEPARTMENT OF ENERGY IDAHO OPERATIONS OFFICE SPECIAL CONTRACT DATED SEPTEMBER 15, 2011 CONTRACT NO. GS-OOP-09-BSD-0651 AVAILABILITY This schedule is available for firm retail service of electric power and energy delivered for the operations of the Department of Energy's facilities located at the Idaho National Engineering Laboratory site, as provided in the Contract for Electric Service between the parties. MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees). 1. Demand Charge, per kW of Billing Demand $8.38 2. Energy Charge, per kWh 2.9301¢ SPECIAL CONDITIONS 1. Billing Demand. The Billing Demand shall be the average kW supplied during the 30- minute period of maximum use during the month. 2. Power Factor Adjustment. When the Power Factor is less than 95 percent during the 30-minute period of maximum load for the month, Company may adjust the measured Demand to determine the Billing Demand by multiplying the measured kW of Demand by 0.95 and dividing by the actual Power Factor. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Fourth Revised Sheet No. 32-1 Cancels I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 32-1 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 32 IDAHO POWER COMPANY ELECTRIC SERVICE RATE FOR J. R. SIMPLOT COMPANY CALDWELL, IDAHO SPECIAL CONTRACT DATED APRIL 8, 2015 APPLICABILITY Service under this schedule is applicable beginning the first day of the month in the first month that the aggregate power requirement at one or more Points of Delivery at the Simplot Facility located near or at 16551 Simplot Boulevard, Caldwell, Idaho, exceeds 20,000 kW. SUMMER AND NON-SUMMER SEASONS The summer season begins on June 1 of each year and ends on August 31 of each year. The non-summer season begins on September 1 of each year and ends on May 31 of each year. MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees). Summer Non-Summer Contract Demand Charge per kW of Contract Demand $1.76 $1.76 Demand Charge per kW of Billing Demand but no less than the Contract Demand less 10,000 kW $14.67 $8.53 Daily Excess Demand Charge per each kW over the Contract Demand $0.294 $0.294 Energy Charge per kWh $0.030823 $0.030244 IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Thirteenth Revised Sheet No. 40-2 Cancels I.P.U.C. No. 29, Tariff No. 101 Twelfth Revised Sheet No. 40-2 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 40 NON-METERED GENERAL SERVICE (Continued) MONTHLY CHARGE The average monthly kWh of energy usage shall be estimated by the Company, based on the Customer's electric equipment and one-twelfth of the annual hours of operation thereof. Since the service provided is non-metered, failure of the Customer's equipment will not be reason for a reduction in the Monthly Charge. The Monthly Charge shall be computed at the following rate, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees). Energy Charge, per kWh 8.094¢ Minimum Charge, per month $1.50 ADDITIONAL CHARGES Applicable only to municipalities or agencies of federal, state, or county governments with an authorized Point of Delivery having the potential of intermittent variations in energy usage. Intermittent Usage Charge, per unit, per month $1.00 PAYMENT The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Thirteenth Revised Sheet No. 41-3 Cancels I.P.U.C. No. 29, Tariff No. 101 Twelfth Revised Sheet No. 41-3 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 41 STREET LIGHTING SERVICE (Continued) SERVICE OPTIONS (Continued) "A" - Idaho Power-Owned, Idaho Power-Maintained System (Continued) LED Shield In the event a Customer requests the Company install a shield on an LED fixture, the Customer will be responsible for the material cost of the equipment, as well as the design cost estimate which includes labor, time, and mileage costs for the alteration of the existing LED fixture. Monthly Charges The monthly charges are as follows, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees). Lamp Charges, per lamp (41A) High Pressure Sodium Vapor LED Equivalent Base Rate Watts Average Lumens Watt (Maximum) Lumen (Minimum) 70 5,540 40 3,600 $11.39 100 8,550 40 3,600 $10.86 200 19,800 85 7,200 $14.55 250 24,750 140 10,800 $15.83 400 45,000 200 18,000 $18.05 Non-Metered Service – Variable Energy Energy Charge, per kWh 7.361¢ Pole Charges For Company-owned poles installed after October 5, 1964 required to be used for street lighting only: Charge Wood pole, per pole $1.81 Steel pole, per pole $7.18 Facilities Charges Customers assessed a monthly facilities charge prior to June 1, 2004 will continue to be assessed a monthly facilities charge in accordance with the charges specified in Schedule 66. Payment The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Eleventh Revised Sheet No. 41-5 Cancels I.P.U.C. No. 29, Tariff No. 101 Tenth Revised Sheet No. 41-5 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 41 STREET LIGHTING SERVICE (Continued) SERVICE OPTIONS (Continued) "B" - Customer-Owned, Idaho Power-Maintained System - No New Service (Continued) Non-Metered Service, per lamp (41B) Standard High Pressure Sodium Vapor Average Base Energy and Maintenance Charges: Lumens Rate 70 Watt 5,450 $3.07 100 Watt 8,550 $3.43 200 Watt 19,800 $4.96 250 Watt 24,750 $6.11 400 Watt 45,000 $8.64 Non-Metered Service – Variable Energy Energy Charge, per kWh 7.361¢ Metered Service, per lamp (41BM) Standard High Pressure Sodium Vapor Maintenance Charges: 70 Watt $1.36 100 Watt $1.26 200 Watt $1.25 250 Watt $1.36 400 Watt $1.36 Service Charge, per meter $3.36 Energy Charge, per kWh 5.054¢ Payment The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. "C" - Customer-Owned, Customer-Maintained System The Customer's lighting system, including posts or standards, fixtures, initial installation of lamps and underground cables with suitable terminals for connection to the Company's distribution system, is installed, owned, and maintained by the Customer. The Customer is responsible for notifying the Company of any changes or additions to the lighting equipment or loads being served under Option C – Non-Metered Service. Failure to notify the Company of such changes or additions will result in the termination of non-metered service under Option C and the requirement that service be provided under Option C - Metered Service. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Eleventh Revised Sheet No. 41-6 Cancels I.P.U.C. No. 29, Tariff No. 101 Tenth Revised Sheet No. 41-6 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 41 STREET LIGHTING SERVICE (Continued) SERVICE OPTIONS (Continued) "C" - Customer-Owned, Customer-Maintained System (Continued) All new Customer-owned lighting systems installed outside of Subdivisions on or after January 1, 2012 are required to be metered in order to record actual energy usage. Customer-owned systems installed prior to June 1, 2004 that are constructed, operated, or modified in such a way as to allow for the potential or actual variation in energy usage may have the estimated annual variations in energy usage charged the Non-Metered Service - Energy Charge until the street lighting system is converted to Metered Service, or until the potential for variations in energy usage has been eliminated, whichever is sooner. Monthly Charges The monthly charges are as follows, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees). For non-metered service, the average monthly kWh of energy usage shall be estimated by the Company based on the total wattage of the Customer’s lighting system and 4,059 hours of operation. Non-Metered Service (41C) Energy Charge, per kWh 5.168¢ Metered Service (41CM) Service Charge, per meter $3.36 Energy Charge, per kWh 5.054¢ IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary Idaho Power Company Thirteenth Revised Sheet No. 42-1 Cancels I.P.U.C. No. 29, Tariff No. 101 Twelfth Revised Sheet No. 42-1 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 34519 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – January 1, 2020 1221 West Idaho Street, Boise, Idaho SCHEDULE 42 TRAFFIC CONTROL SIGNAL LIGHTING SERVICE APPLICABILITY Service under this schedule is applicable to Electric Service required for the operation of traffic control signal lights within the State of Idaho. Traffic control signal lamps are mounted on posts or standards by means of brackets, mast arms, or cable. CHARACTER OF SERVICE The traffic control signal fixtures, including posts or standards, brackets, mast arm, cable, lamps, control mechanisms, fixtures, service cable, and conduit to the point of, and with suitable terminals for, connection to the Company's underground or overhead distribution system, are installed, owned, maintained and operated by the Customer. Service is limited to the supply of energy only for the operation of traffic control signal lights. The installation of a meter to record actual energy consumption is required for all new traffic control signal lighting systems installed on or after June 1, 2004. For traffic control signal lighting systems installed prior to June 1, 2004 a meter may be installed to record actual usage upon the mutual consent of the Customer and the Company. MONTHLY CHARGE The monthly kWh of energy usage shall be either the amount estimated by the Company based on the number and size of lamps burning simultaneously in each signal and the average number of hours per day the signal is operated, or the actual meter reading as applicable. The Monthly Charge shall be computed at the following rate, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees). Energy Charge, per kWh 5.735¢ PAYMENT The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Jan. 2, 2020 Jan. 1, 2020 Per O.N. 34519 Diane M. Hanian Secretary