Loading...
HomeMy WebLinkAbout20191205Replacement Pages 38-39.pdf35ffi an lDAcoRP companv l RECEIVED 90EC-5 Pil 2'01 December 5,2019 VIA HAND DELIVERY Diane M. Hanian, Secretary 11331 W. Chinden Boulevard Building 8, Suite 201-A Boise, ldaho 83714 Re:Case No. IPC-E-19-30 Snedigar Hydro PURPA Project Energy Sales Agreement Replacement Pages 38-39 Dear Ms. Hanian On October 4,2019, in Case No. IPC-E-19-30, ldaho Power Company ("ldaho Power") filed an Application with the ldaho Public Utilities Commission ("Commission") regarding an Energy Sales Agreement ("ESA") between ldaho Power and David Snedigar ("Snediga/') under which ldaho Power will purchase electric generation from the Snedigar Hydro Qualifying Facility, Commission Staff identified clerical errors on pages 38 and 39 of Appendix B of the ESA. The last sentence of Section B-3, page 38, should read "December 27 ,2019", instead of December 27,2020, and the beginning of the second sentence of Section B- 7, page 39, should include the phrase: "The DNR status will continue if . . . ." ldaho Power has spoken with Snedigar about this issue and sent replacement pages for the ESA to Snedigar and Commission Staff on November 21 ,2019. Therefore, enclosed please find an original and seven (7) copies of replacement pages 38 and 39 of Appendix B of the ESA between ldaho Power and Snedigar. Very truly yours, Donovan E. Walker DEW/KKT Enclosures cc w/encl:Matt Hunter Yao Yin DONOVAN E. WALKER Lead Counsel dwalker@idahooower.com APPENDIX B FACILITY AND POINT OF DELIVERY Projecl Name: Snedigar Hydro Project Number: 3 1414080 B-I DESCRIPTION OF' FACILITY Siemens - Allis hydro induction generator, 600 Horsepower, 900 RPUs, 480 Volts. Barber turbine built in 1984, using 54.3 meters ofhead, Frances Runner wicket gate Penstock is 3,300 feet lon& 30 inches in diameter. Water source is from unnamed stream that is fed by springs and canal runoff. Facility Nameplate Capacity: 495 kW Qualifying Facility Category (Small Power Production or Cogeneration): Small Power Production Primary Enerry Source (Hydro, Wind, Solar, Biomass, Waste, Geothermal): Hydro Fueled or Non-Fueled Rate (Generator primarily fueled with fossil or non-fossil fuel): Non-Fueled Any modifications to the F'acility, including but not Iimited to the generator or turbine, that ( l) increases or decreases the Facility Nameplate Capacity, or (2) changes the Qualifying Facility Category, or (3) changes the Primary Energy Source or (4) changes to the generator fuel and subsequently the Fueled Rate or Non-Fueled Rate, will require a review of lhc Agreement terms, conditions and pricing and Idaho Power, at its sole determination, may adjust lhe pricing or terminate the Ageement. Ifthe Agreement is terminated because ofsaid modifications, the Sellcr will be responsible for any Termination Damages. B-2 LOCATION OF FACILITY Near: Buhl. Idaho Actual or nearest physical street address: 4580N 1500[ GPS Coordinates: l,atitude Decimal Degrees 42.661839 Longitude Decimal Degrees -114.'7 59506 State: Idahq County: Twin Falls Description ol lnterconnection Location Nexl to Power Plant a1 4580N 15008 B-3 SCHEDULTID I"IRS I I:NERCY DAI'E. AND OPERATION DAI'E This Facility is interconnected and already delivering energy to ldaho Power pursuant to a Firm Energy Sales Agreement thal expires on December 31,2019. 'the First Energy Date and the Operation Date for this Agreement will be at hour beginning 00:01 on January 1,2020, provided that the Commission approves the replacement Agreement and the Seller completes all of the Article IV and Article V requirements prior to December 27, 3gfglol9. 38 B-4 B-5 B-6 B-7 MAXIMUM CAPACITY AMOLINT: The Maximum Capacity Amount is 495 kW which is consistent with the value provided by the Seller to ldaho Power in accordance with the GIA. This value is the maximum generation (kW) that potentially could be delivered by the Seller's Facility to the ldaho Power electrical system at any moment in time. POINT OF DELIVERY "Point of Delivery" means, unless otherwise agreed by both Parties, the point ofwhere the Seller's Facility energr is delivered to the ldaho Power electrical system. The GIA will determine the specific Point of Delivery for this Facility. The Point of Delivery identified by the GIA will become an integral part ofthis Ag'eement. LOSSES Ifthe ldaho Power metering equipment is capable ofmeasuring the energr deliveries by the Seller to the ldaho Power electrical system at the Point of Delivery, no Losses will be calculated for this Facility. lfthe Idaho Power metering equipment is unable to measure the energy deliveries directly at the Point of Delivery, the Losses will be calculated. This loss calculalion is currently set at 1.24olo ofthe kwh electricity production recorded on the Facility generation metering equipment. lfal any time during the term ofthis Agreement, ldaho Power determines that the loss calculation needs to be revised due to a change in the electrical equipment or some other factor, then ldaho Power may adjust the calculation and retroactively adjust the previous month's kWh loss calculations. DESICNATED NETWORK RESOURCE (DNR) This Facility is an ldaho Power DNR pursuant to an existing enerry sales agreement. lhc I)\R rlqt u\ \\ ill cont in!tq!!* this Agreement is 1) executed and approved by the Commission, and 2) a CIA has been executed by both parties and 3) the Seller is in compliance with all requirements of that GIA. 3g 40 Idaho Power cannol accept or pay for generalion from this Facility ifthe Facility has not achieved the status of being an ldaho Power DNR. Federal Energy Regulatory Commission ('FERC) rules require ldaho Power to prepare and submit the application to achieve DNR status for this Facility. Because much ofthe information Idaho Power needs to prepare the DNR application is specific to the Seller's Facility, Idaho Power's ability to file the DNR application in a timely manner is contingent upon timely receipt ofthe required information from the Seller. Prior to ldaho Power beginning the process to enable ldaho Power to submit a request for DNR status for lhis Facility, the Scller shall have I ) filed a Generation Interconnection application, 2) submitted all information required by ldaho Power lo complete the application, and 3) either executed this Agreement or, at a minimum, provided ldaho Power with confirmation of the Seller's intenl to complete this Agreement in a timely manner. S€ller's failure to provide complete and accurat€ information in s timely manner can significantly impact Idaho Power's ability and cost to attain the DNR designation for the Seller's Facility ard the Seller shall bear the costs of any of these delays that are a result of any actior or inaction by the Seller. APPENDIX B FACILITY AND POINT OF DELIVERY Project Name: Snedigar Hydro Project Numbcr: 3 1414080 B.I I)ES(]RIPTION OF FACILITY Siemens - Allis hydro induction generator, 600 l lorsepower, 900 RPUs, 480 Volts. Barber turbine built in 1984, using 54.3 meters ofhead, Frances Runner wicket gate Penstock is 3,300 feet long, 30 inches in diameter. Water source is from unnamed stream that is fed by springs and canal runoff. Facility Nameplate Capacity: 495 kW Qualifying Facility Category (Small Power Production or Cogeneration)Small Power Production Primary Enerry Source (llydro, Wind, Solar, Biomass, Waste, Ceothermal): Hydro Fueled or Non-Fueled Rate (Generator primarily fueled with fossil or non-fossil fuel): Non-Fueled Any modifications to the Facility, including but nol limited to the generator or turbine, that ( I ) increases or decreases the Facility Nameplate Capacity, or (2) changes the Qualilying Facility Category, or (3) changes the Primary Energ;i Source or (4) changes to the generator fuel and subsequently the Fueled Rate or Non-Fueled Rate, will require a review of the Agreement terms, conditions and pricing and ldaho Power, at its sole delermination, may adjust the pricing or terminate the Ageement. lf the Agreement is terminated because ofsaid modifications, the Seller will be responsible for any Termination Damages. B-2 LOCATION OF FACILITY Near: Buhl. Idaho Actual or ncarest physical strect address: 4580N 1500E CPS Coordinates: Latitude Decimal Degrees 4?.661839 LongitudeDecimalDegrecs -114.759506 Statc: Idaho County: ]'win Falls Description of Interconnection Location: Ncxt to Power Plant at 4580N 15008 B-3 SCHIIDUI-ED FIRST ENIIRGY DATF, AND OPL,RATION DATE This Facility is interconnected and already delivering eners/ to ldaho Power pursuant to a Firm Energy Sales Agreement that expires on December 31,2019. The First Energy Date and the Operation Date for this Agreement will be at hour beginning 00:01 on January l, 2020, provided that the Commission approves the replacement Agreement and the Seller compleles all ol the Article IV and Article V requirements prior to December 27, 2019. 38 B-4 B-5 MAXIMUM CAPACITY AMOT,NT: The Maximum Capacity Amount is 495 kW which is consistent with the value provided by the Seller to ldaho Power in accordance with the CIA.'l'his value is the m.rximum generation (kW) that potentially could be delivered by the Seller's Facility to the Idaho Power electrical system al any moment in time. POINT OF DELIVERY "Point of Delivery" means, unless otherwise agreed by both Parties, the poinl ofwhere the Seller's Facility enerry is delivered to rhe ldaho Power electrical system. The GIA will determine the specific Point of Delivery for this Facility. The Point of Delivery identified by the GIA will become an integral part ofthis Agreement. LOSSES Ifthe Idaho Power metering equipment is capable ofmeasuring the energy deliveries by the Seller to the Idaho Power electrical system at the Point of Delivery, no Losses will be calculated for this Facility. Ifthe Idaho Power metering equipment is unable to measure the energr deliveries directly at the Point of Delivery, the Losses will be calculated. This loss calculation is currently set at 1.24olo ofthe kWh electricity production recorded on the Facility generation metering equipment. Ifat any time during the term ofthis Ageement, ldaho Power determines that the loss calculation needs to be revised due to a change in the electrical equipment or some other factor, then ldaho Power may adjust the calculation and retroactively adjust the previous month's kWh loss calculations. DESIGNATED NETWORK RESOURCE (DNR) This Facility is an Idaho Power DNR pursuant to an existing energ)i sales agreement. The DNR status will continue if this Agreement is l) executed and approved by the Commission, and 2) a CIA has been executed by both parties and 3) the Seller is in compliance with all requirements of that clA. B-6 B-1 39 ldaho Power cannot accept or pay for generation lrom this Facility ifthe Facility has not achievcd the status of being an Idaho Power DNR. Federal Energy Regulatory Commission C'FERC') rules require ldaho Power to prepare and submit the application to achieve DNR slatus lor this Facility. Because much ofthe information Idaho Power needs to prepare the DNR application is specific to the Seller's Facility, Idaho Power's abiliry to file the DNR application in a timely manner is contingent upon timely receipt ofthe required information from the Seller. Priorto Idaho Power beginning the process to enable Idaho Power to submit a request for DNR status for this Facility, the Seller shall have I ) filed a Generation lnterconnection application, 2) submitted all information required by Idaho Power to complete the application, and 3) either executed this Agreement or, at a minimum, provided ldaho Power with confirmation of the Seller's intent to complete this Agreement in a timely manner, Seller's failure to provide complete and accurate informstion in a timely manner can significantly impact Idaho Power's ability and cost to attain the DNR designation for the Seller's Facility and the Seller shall bear the costs of any of these delays that are a result of any action or inaction by the Seller. 40