Re: Case No. IPC-E-19-08 - Recovery of Costs Associated with North Valmy Power Plant
Tariff Compliance Filing
Dear Ms. Hanian:
Idaho Power Company hereby submits the enclosed compliance filing in the above-
captioned proceeding pursuant to Idaho Public Utilities Commission Order No. 34349, which
includes the tariff schedules as listed below, reflecting the change in rates with an effective
date of June 1, 2019.
Fourteenth Revised Sheet No. 1-2 Cancelling Thirteenth Revised Sheet No. 1-2
Tenth Revised Sheet No. 3-2 Cancelling Ninth Revised Sheet No. 3-2
Thirteenth Revised Sheet No. 4-3 Cancelling Twelfth Revised Sheet No. 4-3
Thirteenth Revised Sheet No. 5-3 Cancelling Twelfth Revised Sheet No. 5-3
First Revised Sheet No. 6-6 Cancelling Original Sheet No. 6-6
Thirteenth Revised Sheet No. 7-2 Cancelling Twelfth Revised Sheet No. 7-2
First Revised Sheet No. 8-5 Cancelling Original Sheet No. 8-5
Tenth Revised Sheet No. 9-3 Cancelling Ninth Revised Sheet No. 9-3
Fourteenth Revised Sheet No. 9-4 Cancelling Thirteenth Revised Sheet No. 9-4
Twelfth Revised Sheet No. 15-2 Cancelling Eleventh Revised Sheet No. 15-2
Ninth Revised Sheet No. 19-3 Cancelling Eighth Revised Sheet No. 19-3
Thirteenth Revised Sheet No. 19-4 Cancelling Twelfth Revised Sheet No. 19-4
Thirteenth Revised Sheet No. 24-3 Cancelling Twelfth Revised Sheet No. 24-3
Twelfth Revised Sheet No. 26-1 Cancelling Eleventh Revised Sheet No. 26-1
Twelfth Revised Sheet No. 29-1 Cancelling Eleventh Revised Sheet No. 29-1
Twelfth Revised Sheet No. 30-1 Cancelling Eleventh Revised Sheet No. 30-1
Third Revised Sheet No. 32-1 Cancelling Second Sheet No. 32-1
Twelfth Revised Sheet No. 40-2 Cancelling Eleventh Revised Sheet No. 40-2
Tenth Revised Sheet No. 41-3 Cancelling Ninth Revised Sheet No. 41-3
Fourteenth Revised Sheet No. 41-4 Cancelling Thirteenth Revised Sheet No. 41-4
Ninth Revised Sheet No. 41-5 Cancelling Eighth Revised Sheet No. 41-5
Ninth Revised Sheet No. 41-6 Cancelling Eighth Revised Sheet No. 41-6
Tenth Revised Sheet No. 41-8 Cancelling Ninth Revised Sheet No. 41-8
Twelfth Revised Sheet No. 42-1 Cancelling Eleventh Revised Sheet No. 42-1
RECEIVED
2019 May 31 PM 12:16
IDAHO PUBLIC
UTILITIES COMMISSION
Diane Hanian, Secretary
Idaho Public Utilities Commission
May 31, 2019
Page 2
If you have any questions regarding this filing, please contact Senior Regulatory Analyst
Courtney Waites at (208) 388-5612 or cwaites@idahopower.com.
Very truly yours,
Lisa D. Nordstrom
LDN/kkt
Enclosures
Idaho Power Company Fourteenth Revised Sheet No. 1-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Thirteenth Revised Sheet No. 1-2
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 1
RESIDENTIAL SERVICE
STANDARD PLAN
(Continued)
RESIDENTIAL SPACE HEATING
All space heating equipment to be served by the Company's system shall be single-phase
equipment approved by Underwriters' Laboratories, Inc., and the equipment and its installation shall
conform to all National, State and Municipal Codes and to the following:
Individual resistance-type units for space heating larger than 1,650 watts shall be designed to
operate at 240 or 208 volts, and no single unit shall be larger than 6 kW. Heating units of 2 kW or
larger shall be controlled by approved thermostatic devices. When a group of heating units, with a total
capacity of more than 6 kW, is to be actuated by a single thermostat, the controlling switch shall be so
designed that not more than 6 kW can be switched on or off at any one time. Supplemental resistance-
type heaters, that may be used with a heat exchanger, shall comply with the specifications listed above
for such units.
SUMMER AND NON-SUMMER SEASONS
The summer season begins on June 1 of each year and ends on August 31 of each year. The
non-summer season begins on September 1 of each year and ends on May 31 of each year.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $5.00 $5.00
Energy Charge, per kWh
First 800 kWh 8.5422¢ 7.9371¢
801-2000 kWh 10.2715¢ 8.7504¢
All Additional kWh Over 2000 12.2019¢ 9.6910¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Tenth Revised Sheet No. 3-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Ninth Revised Sheet No. 3-2
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 3
MASTER-METERED MOBILE HOME PARK
RESIDENTIAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit):
Service Charge, per month $5.00
Energy Charge, per kWh
all kWh 8.5971¢
Minimum Charge
The monthly Minimum Charge shall be the sum of the Service Charge, the Energy Charge, and
the Power Cost Adjustment.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Thirteenth Revised Sheet No. 4-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Twelfth Revised Sheet No. 4-3
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 4
RESIDENTIAL SERVICE
ENERGY WATCH PILOT PLAN
(OPTIONAL)
SUSPENDED
(Continued)
TIME PERIODS
The time periods are defined as follows. All times are stated in Mountain Time.
Summer Season
On-Peak: 1:00 p.m. to 9:00 p.m. Monday through Friday
Off-Peak: 9:00 p.m. to 1:00 p.m. Monday through Friday and all hours on weekends and
holidays
Critical peak period (10 select summer days): 5:00 p.m. to 9:00 p.m.
Non-summer Season
Mid-Peak: 7:00 a.m. to 9:00 p.m. Monday through Friday
Off-Peak: 9:00 p.m. to 7:00 a.m. Monday through Friday and all hours on weekends and
holidays
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Service Charge, per month $5.00
Energy Charge, per kWh
Summer
Energy Watch Event hours 43.2898¢
On-Peak 12.1513¢
Off-Peak 6.9783¢
Non-summer
Mid-Peak 8.9775¢
Off-Peak 6.9783¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Thirteenth Revised Sheet No. 5-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Twelfth Revised Sheet No. 5-3
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 5
RESIDENTIAL SERVICE
TIME-OF-DAY PILOT PLAN
(OPTIONAL)
(Continued)
TIME PERIODS (Continued)
Holidays are New Year's Day (January 1), Memorial Day (last Monday in May), Independence
Day (July 4), Labor Day (first Monday in September), Thanksgiving Day (fourth Thursday in November),
and Christmas Day (December 25). If New Year’s Day, Independence Day , or Christmas Day falls on
Saturday, the preceding Friday will be designated a holiday. If New Year’s Day, Independence Day, or
Christmas Day falls on Sunday, the following Monday will be designated a holiday.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Service Charge, per month $5.00
Energy Charge, per kWh
Summer
Peak 12.7277¢
Off-Peak 7.2963¢
Non-summer
Peak 9.3954¢
Off-Peak 7.2963¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company First Revised Sheet No. 6-6
Cancels
I.P.U.C. No. 29, Tariff No. 101 Original Sheet No. 6-6
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 6
RESIDENTIAL SERVICE
ON-SITE GENERATION
(Continued)
CONDITIONS OF PURCHASE AND SALE (Continued)
9. The Customer shall notify the Company immediately if a Small On-Site Generation System
is permanently removed or disabled. Permanent removal or disablement for the purposes of this
Schedule is any removal or disablement of a Small On-Site Generation System lasting longer than six
(6) months. Customers with permanently removed or disabled systems will be removed from service
under this schedule and placed on the appropriate standard service schedule.
SUMMER AND NON-SUMMER SEASONS
The summer season begins on June 1 of each year and ends on August 31 of each year. The non-
summer season begins on September 1 of each year and ends on May 31 of each year.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set forth
in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy
Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential
and Small Farm Energy Credit).
The following rate structure and charges are subject to change upon Commission approval:
Summer Non-summer
Service Charge, per month $5.00 $5.00
Energy Charge, per kWh
First 800 kWh 8.5422¢ 7.9371¢
801-2000 kWh 10.2715¢ 8.7504¢
All Additional kWh Over 2000 12.2019¢ 9.6910¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Thirteenth Revised Sheet No. 7-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Twelfth Revised Sheet No. 7-2
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 7
SMALL GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $5.00 $5.00
Energy Charge, per kWh
First 300 kWh 9.7383¢ 9.7383¢
All Additional kWh 11.5984¢ 10.2174¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company First Revised Sheet No. 8-5
Cancels
I.P.U.C. No. 29, Tariff No. 101 Original Sheet No. 8-5
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 8
SMALL GENERAL SERVICE
ON-SITE GENERTION
(Continued)
CONDITIONS OF PURCHASE AND SALE (Continued)
7. If the Company is required by the Commission to institute curtailment of deliveries of
electricity to its customers, the Company may require the Customer to curtail its consumption of electricity
in the same manner and to the same degree as other Customers on the Company’s standard service
schedules.
8. The Customer shall grant to the Company all access to all Company equipment and
facilities including adequate and continuing access rights to the property of the Customer for the purpose
of installation, operation, maintenance, replacement, or any other service required of said equipment as
well as all necessary access for inspection, switching, and any other operational requirements of the
Customer’s Interconnections Facilities.
9. The Customer shall notify the Company immediately if a Small On-Site Generation System
is permanently removed or disabled. Permanent removal or disablement for the purposes of this
Schedule is any removal or disablement of a Small On-Site Generation System lasting longer than six
(6) months. Customers with permanently removed or disabled systems will be removed from service
under this schedule and placed on the appropriate standard service schedule.
SUMMER AND NON-SUMMER SEASONS
The summer season begins on June 1 of each year and ends on August 31 of each year. The non-
summer season begins on September 1 of each year and ends on May 31 of each year.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set forth
in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy
Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential
and Small Farm Energy Credit).
The following charges are subject to change upon Commission approval:
Summer Non-summer
Service Charge, per month $5.00 $5.00
Energy Charge, per kWh
First 300 kWh 9.7383¢ 9.7383¢
All Additional kWh 11.5984¢ 10.2174¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Tenth Revised Sheet No. 9-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Ninth Revised Sheet No. 9-3
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95
(Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy
Credit).
SECONDARY SERVICE Summer Non-summer
Service Charge, per month $16.00 $16.00
Basic Charge, per kW of Basic Load Capacity
First 20 kW $0.00 $0.00
All Additional kW $1.01 $1.01
Demand Charge, per kW of Billing Demand
First 20 kW $0.00 $0.00
All Additional kW $5.98 $4.39
Energy Charge, per kWh
First 2,000 kWh 10.3916¢ 9.3541¢
All Additional kWh 4.8099¢ 4.3636¢
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Fourteenth Revised Sheet No. 9-4
Cancels
I.P.U.C. No. 29, Tariff No. 101 Thirteenth Revised Sheet No. 9-4
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
PRIMARY SERVICE Summer Non-summer
Service Charge, per month $285.00 $285.00
Basic Charge, per kW of
Basic Load Capacity $1.28 $1.28
Demand Charge, per kW of
Billing Demand $5.10 $4.46
On-Peak Demand Charge, per kW of
On-Peak Billing Demand $0.95 n/a
Energy Charge, per kWh
On-Peak 4.8827¢ n/a
Mid-Peak 4.5054¢ 4.0401¢
Off-Peak 4.2587¢ 3.9044¢
.
TRANSMISSION SERVICE Summer Non-summer
Service Charge, per month $285.00 $285.00
Basic Charge, per kW of
Basic Load Capacity $0.68 $0.68
Demand Charge, per kW of
Billing Demand $4.79 $4.30
On-Peak Demand Charge, per kW of
On-Peak Billing Demand $0.95 n/a
Energy Charge, per kWh
On-Peak 4.8048¢ n/a
Mid-Peak 4.4430¢ 3.9896¢
Off-Peak 4.2045¢ 3.8659¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Twelfth Revised Sheet No. 15-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Eleventh Revised Sheet No. 15-2
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 15
DUSK TO DAWN CUSTOMER
LIGHTING
(Continued)
NEW FACILITIES
Where facilities of the Company are not presently available for a lamp installation which will
provide satisfactory lighting service for the Customer's Premises, the Company may install overhead or
underground secondary service facilities, including secondary conductor, poles, anchors, etc., a
distance not to exceed 300 feet to supply the desired service, all in accordance with the charges
specified below.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
1. Monthly Per Unit Charge on existing facilities:
AREA LIGHTING
High Pressure Average Base
Sodium Vapor Lumens Rate
100 Watt 8,550 $ 9.51
200 Watt 19,800 $11.35
400 Watt 45,000 $15.38
FLOOD LIGHTING
High Pressure Average Base
Sodium Vapor Lumens Rate
200 Watt 19,800 $13.60
400 Watt 45,000 $16.04
Metal Halide
400 Watt 28,800 $14.73
1000 Watt 88,000 $23.41
2. For New Facilities Installed Before June 1, 2004: The Monthly Charge for New Facilities
installed prior to June 1, 2004, will continue to be assessed a monthly facilities charge in accordance
with the changes specified in Schedule 66.
3. For New Facilities Installed On or After June 1, 2004: The non-refundable charge for
New Facilities to be installed, such as underground service, overhead secondary conductor, poles,
anchors, etc., shall be equal to the work order cost.
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt, and becomes past due
15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Ninth Revised Sheet No. 19-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Eighth Revised Sheet No. 19-3
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
FACILITIES BEYOND THE POINT OF DELIVERY
At the Customer’s request and at the option of the Company, transformers and other facilities
installed beyond the Point of Delivery to provide Primary or Transmission Service may be owned,
operated, and maintained by the Company in consideration of the Customer paying a Facilities Charge
to the Company. This service is provided under the provisions set forth in Rule M, Facilities Charge
Service.
POWER FACTOR ADJUSTMENT
Where the Customer’s Power Factor is less than 90 percent, as determined by measurement
under actual load conditions, the Company may adjust the kW measured to determine the Billing
Demand by multiplying the measured kW by 90 percent and dividing by the actual Power Factor.
TEMPORARY SUSPENSION
When a Customer has properly invoked Rule G, Temporary Suspension of Demand, the Basic
Load Capacity, the Billing Demand, and the On-Peak Billing Demand shall be prorated based on the
period of such suspension in accordance with Rule G. In the event the Customer's metered demand is
less than 1,000 kW during the period of such suspension, the Basic Load Capacity and Billing Demand
will be set equal to 1,000 kW for purposes of determining the Customer's Monthly Charge.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
SECONDARY SERVICE Summer Non-summer
Service Charge, per month $39.00 $39.00
Basic Charge, per kW of
Basic Load Capacity $0.91 $0.91
Demand Charge, per kW of
Billing Demand $5.92 $4.24
On-Peak Demand Charge, per kW of
On-Peak Billing Demand $1.01 n/a
Energy Charge, per kWh
On-Peak 6.3640¢ n/a
Mid-Peak 5.0387¢ 4.6864¢
Off-Peak 4.4718¢ 4.1636¢
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Thirteenth Revised Sheet No. 19-4
Cancels
I.P.U.C. No. 29, Tariff No. 101 Twelfth Revised Sheet No. 19-4
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
MONTHLY CHARGE (Continued)
PRIMARY SERVICE Summer Non-summer
Service Charge, per month $299.00 $299.00
Basic Charge, per kW of $1.26 $1.26
Basic Load Capacity
Demand Charge, per kW of $6.04 $4.48
Billing Demand
On-Peak Demand Charge, per kW of
On-Peak Billing Demand $0.95 n/a
Energy Charge, per kWh
On-Peak 5.2377¢ n/a
Mid-Peak 4.1650¢ 3.9261¢
Off-Peak 3.7162¢ 3.5099¢
TRANSMISSION SERVICE Summer Non-summer
Service Charge, per month $299.00 $299.00
Basic Charge, per kW of
Basic Load Capacity $0.70 $0.70
Demand Charge, per kW of
Billing Demand $5.86 $4.35
On-Peak Demand Charge, per kW of
On-Peak Billing Demand $0.95 n/a
Energy Charge, per kWh
On-Peak 5.1782¢ n/a
Mid-Peak 4.1357¢ 3.9076¢
Off-Peak 3.6920¢ 3.4935¢
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt, and becomes past due
15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Thirteenth Revised Sheet No. 24-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Twelfth Revised Sheet No. 24-3
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 24
AGRICULTURAL IRRIGATION
SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95
(Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy
Credit).
SECONDARY SERVICE In-Season Out-of-Season
Service Charge, per month $22.00 $3.50
Demand Charge, per kW of
Billing Demand $6.98 n/a
Energy Charge
In-Season
First 164 kWh per kW of Demand 5.7696¢ n/a
All Other kWh per kW of Demand 5.4781¢ n/a
Out-of-Season
All kWh n/a 6.6235¢
TRANSMISSION SERVICE In-Season Out-of-Season
Service Charge, per month $299.00 $3.50
Demand Charge, per kW of
Billing Demand $6.58 n/a
Energy Charge
In-Season
First 164 kWh per kW of Demand 5.5269¢ n/a
All Other kWh per kW of Demand 5.2558¢ n/a
Out-of-Season
All kWh n/a 6.3220¢
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Twelfth Revised Sheet No. 26-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Eleventh Revised Sheet No. 26-1
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 26
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
MICRON TECHNOLOGY, INC.
BOISE, IDAHO
SPECIAL CONTRACT DATED DECEMBER 29, 2009
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
Monthly Contract Demand Charge
$1.65 per kW of Contract Demand.
Monthly Billing Demand Charge
$10.84 per kW of Billing Demand but not less than Minimum Monthly Billing Demand.
Minimum Monthly Billing Demand
The Minimum Monthly Billing Demand will be 25,000 kilowatts.
Daily Excess Demand Charge
$0.287 per each kW over the Contract Demand.
Monthly Energy Charge
2.7793¢ per kWh.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Twelfth Revised Sheet No. 29-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Eleventh Revised Sheet No. 29-1
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 29
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
J. R. SIMPLOT COMPANY
POCATELLO, IDAHO
SPECIAL CONTRACT DATED JUNE 29, 2004
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
Contract Demand Charge
$2.28 per kW of Contract Demand
Demand Charge,
$7.78 per kW of Billing Demand but no less than the Contract Demand less 5,000 kW
Daily Excess Demand Charge
$0.288 per each kW over the Contract Demand
Energy Charge
2.7985¢ per kWh
Monthly Facilities Charge
A Monthly Facilities Charge will be paid for the Company’s investment in Distribution Facilities.
A Monthly Facilities Charge rate of 1.41% will be paid for facilities installed for 31 years or less and a
rate of 0.59% will be paid for facilities installed more than 31 years.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Twelfth Revised Sheet No. 30-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Eleventh Revised Sheet No. 30-1
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 30
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
UNITED STATES DEPARTMENT OF ENERGY
IDAHO OPERATIONS OFFICE
SPECIAL CONTRACT DATED SEPTEMBER 15, 2011
CONTRACT NO. GS-OOP-09-BSD-0651
AVAILABILITY
This schedule is available for firm retail service of electric power and energy delivered for the
operations of the Department of Energy's facilities located at the Idaho National Engineering Laboratory
site, as provided in the Contract for Electric Service between the parties.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
1. Demand Charge, per kW of
Billing Demand $8.39
2. Energy Charge, per kWh 2.9332¢
SPECIAL CONDITIONS
1. Billing Demand. The Billing Demand shall be the average kW supplied during the 30-
minute period of maximum use during the month.
2. Power Factor Adjustment. When the Power Factor is less than 95 percent during the
30-minute period of maximum load for the month, Company may adjust the measured Demand to
determine the Billing Demand by multiplying the measured kW of Demand by 0.95 and dividing by the
actual Power Factor.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Third Revised Sheet No. 32-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Second Revised Sheet No. 32-1
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 32
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
J. R. SIMPLOT COMPANY
CALDWELL, IDAHO
SPECIAL CONTRACT DATED APRIL 8, 2015
APPLICABILITY
Service under this schedule is applicable beginning the first day of the month in the first month
that the aggregate power requirement at one or more Points of Delivery at the Simplot Facility located
near or at 16551 Simplot Boulevard, Caldwell, Idaho, exceeds 20,000 kW.
SUMMER AND NON-SUMMER SEASONS
The summer season begins on June 1 of each year and ends on August 31 of each year. The
non-summer season begins on September 1 of each year and ends on May 31 of each year.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
Summer Non-Summer
Contract Demand Charge
per kW of Contract Demand $1.76 $1.76
Demand Charge
per kW of Billing Demand but no less
than the Contract Demand less 10,000 kW $14.69 $8.54
Daily Excess Demand Charge
per each kW over the Contract Demand $0.294 $0.294
Energy Charge
per kWh $0.030855 $0.030276
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Twelfth Revised Sheet No. 40-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Eleventh Revised Sheet No. 40-2
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 40
NON-METERED GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The average monthly kWh of energy usage shall be estimated by the Company, based on the
Customer's electric equipment and one-twelfth of the annual hours of operation thereof. Since the
service provided is non-metered, failure of the Customer's equipment will not be reason for a reduction
in the Monthly Charge. The Monthly Charge shall be computed at the following rate, and may also
include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency
Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees).
Energy Charge, per kWh 8.103¢
Minimum Charge, per month $1.50
ADDITIONAL CHARGES
Applicable only to municipalities or agencies of federal, state, or county governments with an
authorized Point of Delivery having the potential of intermittent variations in energy usage.
Intermittent Usage Charge, per unit, per month $1.00
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Tenth Revised Sheet No. 41-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Ninth Revised Sheet No. 41-3
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
SERVICE OPTIONS (Continued)
"A" - Idaho Power-Owned, Idaho Power-Maintained System (Continued)
Monthly Charges
The monthly charges are as follows, and may also include charges as set forth in
Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and
Schedule 95 (Adjustment for Municipal Franchise Fees).
Lamp Charges, per lamp (41A)
Standard High Pressure Average Base
Sodium Vapor Lumens Rate
70 Watt 5,540 $11.40
100 Watt 8,550 $10.87
200 Watt 19,800 $14.57
250 Watt 24,750 $15.85
400 Watt 45,000 $18.07
Non-Metered Service – Variable Energy
Energy Charge, per kWh 7.369¢
Pole Charges
For Company-owned poles installed after October 5, 1964 required to be used
for street lighting only:
Charge
Wood pole, per pole $1.81
Steel pole, per pole $7.18
Facilities Charges
Customers assessed a monthly facilities charge prior to June 1, 2004 will
continue to be assessed a monthly facilities charge in accordance with the
charges specified in Schedule 66.
Payment
The monthly bill rendered for service supplied hereunder is payable upon receipt,
and becomes past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Fourteenth Revised Sheet No. 41-4
Cancels
I.P.U.C. No. 29, Tariff No. 101 Thirteenth Revised Sheet No. 41-4
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
SERVICE OPTIONS (Continued)
"B" - Customer-Owned, Idaho Power-Maintained System - No New Service
The Customer's lighting system, including posts or standards, fixtures, initial installation
of lamps and underground cables with suitable terminals for connection to the Company's
distribution system, is installed and owned by the Customer and maintained by Idaho Power.
Customer-owned lighting systems receiving maintenance under Option B must have Idaho
Power standard wattage high pressure sodium vapor lamps installed in all street lighting
fixtures.
Customer-owned systems installed on or after June 1, 2004 which are constructed,
operated, or modified in such a way as to allow for the potential or actual variation in energy
usage, such as through, but not limited to, the use of wired outlets or useable plug-ins, are
required to be metered in order to record actual energy usage.
Customer-owned systems installed prior to June 1, 2004 that are constructed, operated,
or modified in such a way as to allow for the potential or actual variation in energy usage may
have the estimated annual variations in energy usage charged the Non-Metered Service –
Variable Energy Charge until the street lighting system is converted to Metered Service, or until
the potential for variations in energy usage has been eliminated, whichever is sooner.
Energy And Maintenance Service
Energy and Maintenance Service includes operation of the system, energy, lamp
renewals, cleaning of glassware, and replacement of defective photocells which are
standard to the Company-owned street light units. Service does not include the labor or
material cost of replacing cables, standards, broken glassware or fixtures, painting, or
refinishing of metal poles. Individual lamps will be replaced on burnout as soon as
reasonably possible after notification by the Customer and subject to the Company’s
operating schedules and requirements.
Monthly Charges
The monthly charges are as follows, and may also include charges as set forth in
Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and
Schedule 95 (Adjustment for Municipal Franchise Fees).
Non-Metered Service, per lamp (41B)
Standard High Pressure Sodium Vapor
Energy and Maintenance Charges: Average Base
Lumens Rate
70 Watt 5,450 $3.07
100 Watt 8,550 $3.43
200 Watt 19,800 $4.97
250 Watt 24,750 $6.12
400 Watt 45,000 $8.65
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Ninth Revised Sheet No. 41-5
Cancels
I.P.U.C. No. 29, Tariff No. 101 Eighth Revised Sheet No. 41-5
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
SERVICE OPTIONS (Continued)
"B" - Customer-Owned, Idaho Power-Maintained System - No New Service (Continued)
Non-Metered Service – Variable Energy
Energy Charge, per kWh 7.369¢
Metered Service, per lamp (41BM)
Standard High Pressure Sodium Vapor
Maintenance Charges:
70 Watt $1.36
100 Watt $1.26
200 Watt $1.25
250 Watt $1.36
400 Watt $1.36
Service Charge, per meter $3.36
Energy Charge, per kWh 5.059¢
Payment
The monthly bill rendered for service supplied hereunder is payable upon receipt,
and becomes past due 15 days from the date on which rendered.
"C" - Customer-Owned, Customer-Maintained System
The Customer's lighting system, including posts or standards, fixtures, initial installation
of lamps and underground cables with suitable terminals for connection to the Company's
distribution system, is installed, owned, and maintained by the Customer. The Customer is
responsible for notifying the Company of any changes or additions to the lighting equipment or
loads being served under Option C – Non-Metered Service. Failure to notify the Company of
such changes or additions will result in the termination of non-metered service under Option C
and the requirement that service be provided under Option C - Metered Service.
All new Customer-owned lighting systems installed outside of Subdivisions on or after
January 1, 2012 are required to be metered in order to record actual energy usage.
Customer-owned systems installed prior to June 1, 2004 that are constructed, operated,
or modified in such a way as to allow for the potential or actual variation in energy usage may
have the estimated annual variations in energy usage charged the Non-Metered Service -
Energy Charge until the street lighting system is converted to Metered Service, or until the
potential for variations in energy usage has been eliminated, whichever is sooner.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Ninth Revised Sheet No. 41-6
Cancels
I.P.U.C. No. 29, Tariff No. 101 Eighth Revised Sheet No. 41-6
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
SERVICE OPTIONS (Continued)
"C" - Customer-Owned, Customer-Maintained System (Continued)
Monthly Charges
The monthly charges are as follows, and may also include charges as set forth in
Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and
Schedule 95 (Adjustment for Municipal Franchise Fees). For non-metered service, the
average monthly kWh of energy usage shall be estimated by the Company based on the
total wattage of the Customer’s lighting system and 4,059 hours of operation.
Non-Metered Service (41C)
Energy Charge, per kWh 5.1730¢
Metered Service (41CM)
Service Charge, per meter $3.36
Energy Charge, per kWh 5.059¢
NO NEW SERVICE
AVAILABILITY
Service under this schedule is available throughout the Company's service area within the State
of Idaho to any Customer who, on October 31, 1981, was receiving service under this schedule.
APPLICABILITY
Service under this schedule is applicable to service required by municipalities for the lighting of
public streets, alleys, public grounds, and thoroughfares. Street lighting lamps will be energized each
night from dusk until dawn.
SERVICE LOCATION AND PERIOD
Street lighting facility locations, type of unit and lamp sizes, as changed from time to time by
written request of the Customer and agreed to by the Company, shall be provided for Customers
receiving service under this schedule. The in-service date for each street lighting facility shall also be
maintained.
The minimum service period for any street lighting facility is 10 years. The Company, upon written
notification from the Customer, will remove a street lighting facility:
1. At no cost to the Customer, if such facility has been in service for no less than the
minimum service period. The Company will not grant a request from a Customer for reinstallation of
street lighting service for a minimum period of two years from the date of removal.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Tenth Revised Sheet No. 41-8
Cancels
I.P.U.C. No. 29, Tariff No. 101 Ninth Revised Sheet No. 41-8
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE (Continued)
ORNAMENTAL LIGHTING - CUSTOMER-OWNED SYSTEM (Continued)
Monthly Charges
The monthly charges are as follows, and may also include charges as set forth in
Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
Non-Metered Service (With Maintenance), per lamp
Average Base
Lumens Rate
Mercury Vapor
175 Watt 7,654 $4.71
400 Watt 19,125 $8.78
Non-Metered Service – Variable Energy
Energy Charge, per kWh 7.369¢
Metered Service (With Maintenance) per lamp
Mercury Vapor
175 Watt $1.31
400 Watt $1.32
Service Charge, per meter $3.36
Energy Charge, per kWh 5.059¢
Payment
The monthly bill rendered for service supplied hereunder is payable upon receipt, and
becomes past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary
Idaho Power Company Twelfth Revised Sheet No. 42-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Eleventh Revised Sheet No. 42-1
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 34349 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2019 1221 West Idaho Street, Boise, Idaho
SCHEDULE 42
TRAFFIC CONTROL SIGNAL
LIGHTING SERVICE
APPLICABILITY
Service under this schedule is applicable to Electric Service required for the operation of traffic
control signal lights within the State of Idaho. Traffic control signal lamps are mounted on posts or
standards by means of brackets, mast arms, or cable.
CHARACTER OF SERVICE
The traffic control signal fixtures, including posts or standards, brackets, mast arm, cable,
lamps, control mechanisms, fixtures, service cable, and conduit to the point of, and with suitable
terminals for, connection to the Company's underground or overhead distribution system, are installed,
owned, maintained and operated by the Customer. Service is limited to the supply of energy only for
the operation of traffic control signal lights.
The installation of a meter to record actual energy consumption is required for all new traffic
control signal lighting systems installed on or after June 1, 2004. For traffic control signal lighting
systems installed prior to June 1, 2004 a meter may be installed to record actual usage upon the
mutual consent of the Customer and the Company.
MONTHLY CHARGE
The monthly kWh of energy usage shall be either the amount estimated by the Company based
on the number and size of lamps burning simultaneously in each signal and the average number of
hours per day the signal is operated, or the actual meter reading as applicable. The Monthly Charge
shall be computed at the following rate, and may also include charges as set forth in Schedule 55
(Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for
Municipal Franchise Fees).
Energy Charge, per kWh 5.741¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 31, 2019 June 1, 2019
Per O.N. 34349
Diane M. Hanian Secretary