Loading...
HomeMy WebLinkAbout20181015Application.pdf38ffi*. RTC E IVED ?il|fi StT l5 Pfl \r 22 An IDACORP Company DONOVAN E. WALKER Lead Counsel dwalker@idahopower.com IU ISSION October 15,2018 VlA HAND DELIVERY Diane M. Hanian, Secretary ldaho Public Utilities Commission 472 West Washington Street Boise, ldaho 83702 Re Case No. IPC-E-18-13 ldaho Power Company's Annual Compliance Filing to Update the Load and Gas Forecast Components of the lncremental Cost lntegrated Resource Plan Avoided Cost Methodology Dear Ms. Hanian: Enclosed for filing in the above matter please find an origina! and seven (7) copies of ldaho Power Company's Annual Compliance Filing. very yours, Donovan E. Walker DEW:csb Enclosures 1221 W. ldaho St. (83702) PO. Box 70 Boise, lD 83707 DONOVAN E. WALKER (lSB No. 5921) ldaho Power Company 1221West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 Telephone: (208) 388-5317 Facsimile: (208) 388-6936 4u1q lke r@ id a h opqwer. cqm IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING TO UPDATE THE LOAD AND GAS FORECASTS IN THE INCREMENTAL COST INTEGRATED RESOURCE PLAN AVOIDED COST MODEL. NECEIVED ?'Jll; 0iI I 5 PH Ir: 22 Attorney for ldaho Power Company BEFORE THE !DAHO PUBLIC UTILIT!ES COMMISSION ) ) ) ) ) ) ) CASE NO. rPC-E-18-13 IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING ldaho Power Company ("ldaho Power") hereby respectfully submits to the ldaho Public Utilities Commission ("Commission") this filing, in compliance with Order Nos. 32697 and 32802, to update the load forecast and natural gas forecast components of the !ncremental Cost lntegrated Resource Plan ("lClRP") avoided cost methodology. I. INTRODUCTION ln its final Order No. 32697, the Commission determined that the inputs to the ICIRP avoided cost methodology, utilized for all proposed Public Utility Regulatory Policies Act of 1978 ('PURPA") Qualifying Facility ('QF") projects that exceed the published rate eligibility cap, will be updated every two years upon acknowledgement of the utility's lntegrated Resource Plan ("lRP") filing, with the exception of the load forecast IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING - 1 and the natural gas forecast-which are to be updated annually by October 15 of each year. The Commission stated: We find that, in order to maintain the most accurate and up- to-date reflection of a utility's true avoided cost, utilities must update fue! price forecasts and load forecasts annually -between IRP filings. For the sake of consistency, these annual updates should occur simultaneously with SAR updates - on June 1 of each year. ln addition, it is appropriate to consider long-term contract commitments because of the potential effect that such commitments have on a utility's load and resource balance. We find it reasonable to include long- term contract considerations in an IRP Methodology calculation at such time as the QF and utility have entered into a signed contract for the sale and purchase of QF power. We further find it appropriate to consider PURPA contracts that have terminated or expired in each utility's load and resource balance. We find it reasonable that all other variables and assumptions utilized within the IRP Methodology remain fixed between IRP filings (every two years). Order No. 32697, p.22. The date for the annual update was later changed from June 1 to October 15 of each year. Order No. 32802. The load forecast, natural gas forecast, and contract information presented below in compliance with the Commission's orders has been incorporated into ldaho Power's ICIRP avoided cost methodology. Consistent with the Commission's prior orders, this methodology will be utilized by ldaho Power as the starting point for the negotiation of its contractual avoided cost rates as of October 15,2018. II. LOAD FORECAST ldaho Power's most recent load forecast from October 2018 shows, on average, a decrease in its customer loads when compared to the October 2017 load forecast that was provided to the Commission for the 2017 update in Case No. !PC-E-17-15 and approved by the Commission in Order No. 33957. Table 1 and Graph 1 below show the average annual load forecast for both the previously approved October 2017 load forecast and the most recent 2018load forecast through 2036. IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING - 2 TABLE 1 Average Annual Load Forecast Year 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 October 2017 (aMW) 1,850 1,877 1,894 1,927 1,949 1,979 1,994 2,017 2,033 2,048 2,059 2,083 2,099 2,114 2,125 2,145 2,161 2,178 2,192 October 2018 (aMW) 1,805 1,833 1,849 1,876 1,ggg 1,923 1,946 1,972 1,990 2,008 2,022 2,048 2,066 2,084 2,096 2,117 2,134 2,154 2,168 aMW 2,250 2,200 2,t50 2,100 2,050 2,000 1,950 1,900 1,850 1,800 L,750 t,700 GRAPH 1 Load Forecast -Qqtelsr 2017 Load Forecast (aMW) -Qq1e!s1 2018 Load Forecast (aMW) ".i. "S d9" "d) "d "S .t9" "S {r" "d .t}t "d Ct "..f "dP "dP C "d "&" IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING - 3 III. NATURAL GAS PRICE FORECAST As of October 15,2018, ldaho Power will update the natural gas price forecast within the ICIRP avoided cost mode! to reflect the most recent U.S. Energy lnformation Administration ("ElA") Natural Gas Henry Hub Spot Price: High Oil and Gas Resource and Technology forecast published on February 6,2018. This is an update of the same EIA forecast approved in last year's filing. Case No. IPC-E-17-15, Order No. 33957. Use of this forecast indicates a decrease in the average annual natural gas forecast prices over the remaining period in comparison to the EIA 2017 natural gas price forecast that was used in the ICIRP avoided cost modelfrom the previous update. Table 2 and Graph 2 display the 2017 EIA natural gas price forecast and the current 2018 EIA natura! gas price forecast. TABLE 2 EIA NaturalGas Henry Hub Spot Price: High Oiland Gas Resource and Techno]cgy Year October 2017 (nominal $/MMBtu) October 2018 (nomina! $/MMBtu) 3.22 4.24 4.81 4.39 4.21 4.39 4.56 4.74 4.65 4.73 5.05 5.14 5.09 5.05 4.84 4.83 5.32 5.41 5.47 3.04 3.36 3.73 3.66 3.57 3.53 3.66 3.81 4.01 4.19 4.33 4.43 4.49 4.56 4.62 4.65 4.70 4.77 4.89 IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING - 4 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 GRAPH 2 Natural Gas Price Forecast So -20L7 Henry Hub EIA* (nominal) -2018 Henry Hub EIA* (nominal) ".i" "S "e" "-d) "^S "^S "^$ ,S "&" "$ "-S "-d "&t "S "E "S "^&' C "&' Note * EIA Natural Gas Henry Hub Spot Price: High Oil and Gas Resource and Technology, adjusted for ldaho City Gate delivery. IV. CONTRACT TERMINATIONS. EXPIRATIONS. AND ADDITTONS ldaho Power currently has three non-PURPA, long-term power purchase agreements: Elkhorn Valley Wind (101 megawatts ('MW")), Raft River Geothermal (13 MW), and Neal Hot Springs Geothermal (22 MW). ldaho Power currently has 134 contracts with PURPA QFs with a total nameplate capacity of 1,149 MW. lncluded in this update for signed Energy Sales Agreements ("ESA") is one new Oregon solar QF ESA totaling 3.00 MW, one new ldaho hydro QF ESA for2.10 MW, and four replacement ESAs for existing ldaho QF projects totaling 7.17 MW. Please see Attachment 1 attached hereto for a list of new and terminated contracts since the last update on October 15, So Ss J dl {,r} =(o .= Egs: (uo L CL (E>z(9 Gg fP(Ezs1 IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING - 5 2017. New ESAs, terminated or expired contracts, as well as new complete ESA applications are all included in the ICIRP model on a continuous basis. V. CONCLUSION ldaho Power hereby respectfully submits this updated load forecast, natural gas forecast, and contract information in compliance with the Commission's directives in Order Nos. 32697 and 32802 and asks the Commission to accept the same for filing. Respectfully submitted this 1Sth day of October 2018. E. WALKER Attorney for ldaho Power Company IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING - 6 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NO. IPC-E-I 8-13 IDAHO POWER COMPANY ATTAGHMENT 1 On-Line Facility Type Project Name State Replacement Contract Date Project Size (MW) Hydro Biomass Hydro Hydro 0.2s 5.2s 0.s6 0.11 Curry Cattle Co. Tamarack CSPP Clear Springs Trout Canyon Springs ID ID ID ID Projects Not On-Line L2lls/2017 3127/2078 71612078 812812078 TOTAT 7.L7 Facility Type Project Name State Contract Date Project Size (MW) Solar Hydro Ontario Solar MC6 Hydro OR ID 2126/2018 4/2312078 3.00 2.LO TOTAL 5.10