Loading...
HomeMy WebLinkAbout20180911Application.pdft-r.EC E lV trD l-filt [['t I I g1'1ll: t+8 , 'l :1-: - ' ' r:'iisl'tl;;'t @ An IDACORP Company DONOVAN E. WALKER Lead Counsel dwalker@idahopower.com September 11,2018 VIA HAND DELIVERY Diane M. Hanian, Secretary ldaho Public Utilities Commission 472 West Washington Street Boise, ldaho 83702 Re: Case No. IPC-E-18-12 McCollum Enterprises, Limited Partnership - Canyon Springs Hydro Project ldaho Power Company's Application Regarding Energy Sales Agreement Dear Ms. Hanian Enclosed for filing in the above matter please find an original and seven (7) copies of Idaho Power Company's Application. Very yours, n E. Walker DEW:csb Enclosures 1221 W. ldaho St. (83702) PO. Box 70 Boise, lD 83707 DONOVAN E. WALKER (lSB No. 5921) ldaho Power Company 1221\Nest ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 Telephone: (208) 388-5317 Facsimile: (208) 388-6936 dwalker@idahopower. com ft[CEiVEI) ?0lB SIP I I AH il: [9 rrr rL \iiiih ;:*ll,iftl8sroru Attorney for ldaho Power Company BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION !N THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR APPROVAL OR REJECTION OF AN ENERGY SALES AGREEMENT WITH MCCOLLUM ENTERPRISES, LIMITED PARTNERSHIP, FOR THE SALE AND PURCHASE OF ELECTRIC ENERGY FROM THE CANYON SPRINGS HYDRO PROJECT. CASE NO. IPC-E-18-12 APPLICATION ldaho Power Company ("ldaho Power" or "Company"), in accordance with RP 52 and the applicable provisions of the Public Utility Regulatory Policies Act of 1978 ("PURPA"), hereby respectfully applies to the ldaho Public Utilities Commission ("Commission") for an order accepting or rejecting the Energy Sales Agreement ('ESA" or "Agreement") between Idaho Power and McCollum Enterprises, Limited Partnership ("McCollum" or "Seller") under which McCollum would sell and ldaho Power would purchase electric energy generated by the Canyon Springs Hydro Project ("Facility") located near the city of Twin Falls, ldaho. ) ) ) ) ) ) ) ) ) ) APPLICATION. 1 ln support of this Application, ldaho Power represents as follows: I. INTRODUCTION 1. The Seller currently has a Schedule 86 Uniform Agreement with ldaho Power that was executed on September 22,2004. The Schedule 86 agreement does not expire but can be terminated with 60 days' notice, which the Seller has already provided. 2. The ESA submitted herewith is a new contract with the same Qualifying Facility ('QF') for a new term and current terms and conditions. This ESA complies with the Commission's Order Nos. 32697, 32737, and 32802 from Case No. GNR-E-11-03. The ESA contains published rates for projects of 10 average megawatts ("aMW") or less pursuant to Commission Order No. 34062 from Case No. IPC-E-18-05. Because the Facility is an existing QF that is requesting to switch from Schedule 86 to an ESA, the ESA contains capacity payments for the entire term of the Agreement, with no sufficiency period. Pursuant to the Commission's direction in its Reconsideration Order No. 32737, the rates were calculated by Commission Staff for a QF in the "non-seasonal hydro" category pursuant to the surrogate avoided resource ('SAR') avoided cost methodology. 3. The ESA, dated August 28,2018, was signed by McCollum on August 24, 2018, and by ldaho Power on August28,2018. The ESA was executed in compliance with the Commission's orders directing the implementation of PURPA for the state of ldaho, and contains avoided cost rates pursuant to the Commission's Order No. 34062 dated May 16, 2018. II. BACKGROUND 4. Sections 201 and 210 of PURPA, and pertinent regulations of the Federal Energy Regulatory Commission ("FERC"), require that regulated electric utilities purchase power produced by cogenerators or small power producers that obtain QF status. The rate a QF receives for the sale of its power is generally referred to as the APPLICATION - 2 avoided cost rate and is to reflect the incremental cost to an electric utility of electric energy or capacity or both, which, but for the purchase from the QF, such utility would generate itself or purchase from another source. The Commission has authority under PURPA Sections 201 and 210 and the implementing regulations of FERC, 18 C.F.R. S 292, to set avoided costs, to order electric utilities to enter into fixed-term obligations for the purchase of energy from QFs, and to implement FERC rules. 5. On December 18, 2012, the Commission issued Order No. 32697, which established parameters for published and negotiated avoided cost rate calculations. The Commission further established and defined numerous contract terms and conditions for standard power purchase agreements entered into between regulated utilities and QFs. On January 2,2013, the Commission issued Errata to Order No. 32697, which corrected published avoided cost rates to include energy payments not discounted by transmission and line loss. Then the Commission issued Reconsideration Order Nos. 32737 and 32802 on February 5,2013, and May 5, 2013, respectively, which further clarified certain terms and conditions of power purchase agreements. Most recently, in Order No. 33898, the Commission directed ldaho Power to utilize July 2026 as its first capacity deficit in the Company's SAR methodology. However, because this ESA is a replacement contract, its rates contain capacity payment for the entire contract term. III. THE ENERGY SALES AGREEMENT 6. On Augusl 28, 2018, ldaho Power and McCollum entered into an ESA pursuant to the terms and conditions of the various Commission orders applicable to this PURPA agreement for a "non-seasonal hydro" project. A copy of the ESA is attached to this Application as Attachment 1. Under the terms of this ESA, the Seller elected to contract with ldaho Power for a20-year term using the non-levelized, non-seasonal hydro published avoided cost rates as currently established by the Commission in Order No. APPLICATION - 3 34062 dated May 16,2018, for replacement contracts and for energy deliveries of less than 10 aMW. 7. Prior to the Effective Date of this ESA, this Facility has been delivering energy to ldaho Power in accordance with a Schedule 86 Uniform Agreement dated September 22,2004. The Schedule 86 agreement does not expire but can be terminated with 60 days' notice, which the Seller has already provided. The Seller proposes to continue to operate and maintain a 112 kilowatt ("kW") (Maximum Capacity Amount, paragraph B-4, Appendix B) energy facility located near the city of Twin Falls, ldaho. The Facility is a QF under the applicable provisions of PURPA. 8. The nameplate rating of this Facility is 112 kW. As defined in paragraphs 1.23 and 4.1.4 of the ESA, the Seller will be required to provide data on the Facility that ldaho Power will use to confirm that under normal and/or average conditions, the Facility will not exceed 10 aMW on a monthly basis. Furthermore, as described in paragraph 7.5 of the ESA, should the Facility exceed 10 aMW on a monthly basis, Idaho Power will accept the energy (lnadvertent Energy) that does not exceed the Maximum Capacity Amount, but will not purchase or pay for this lnadvertent Energy. 9. This Facility is interconnected and already delivering energy to ldaho Power pursuant to a Schedule 86 Uniform Agreement. lt is expected that the First Energy Date and the Operation Date for this ESA and the termination of the Schedule 86 Uniform Agreement shall all occur at the same time. The Scheduled First Energy Date and the Scheduled Operation Date for the new ESA and the termination of the Schedule 86 Uniform Agreement will be at hour beginning 0100 on the first day of the month following the Commission's order approving the Agreement and allArticles lV and V requirements have been met. The Operation Date shall be no later than 120 days after a Commission final, non-appealable order has been issued approving this Agreement. See Appendix B. APPLICATION - 4 As specified in Articles lV and V of this ESA, the parties recognize that information provided under the previous agreement may still be applicable to this replacement ESA. As specified in the ESA, ldaho Power shall review the previously provided information and will accept the information as previously submitted, request updates to that information, and/or require new information to satisfy compliance with the various requirements for the Seller to be granted a First Energy Date and Operation Date for this replacement ESA. ln addition, ldaho Power will monitor the ongoing requirements through the ful! term of this ESA. 10. The ESA provides that all applicable interconnection charges and monthly operational or maintenance charges under Schedule 72 will be assessed to Seller. A Schedule 72 Generator lnterconnection Agreement, or "GlA," between the Seller and ldaho Power has been drafted but not yet signed. PURPA QF generation must be designated as a network resource ('DNR') to serve ldaho Power's retail load on its system. ln order for the Facility to maintain its DNR status, there must be a power purchase agreement associated with its transmission service request in order to maintain compliance with ldaho Power's non-discriminatory administration of its Open Access Transmission Tariff (OATT) and maintain compliance with FERC requirements. 11. Article 21 of the ESA provides that the ESA will not become effective until the Commission has approved all of the ESA's terms and conditions and declared that all payments ldaho Power makes to the Seller for purchases of energy will be allowed as prudently incurred expenses for ratemaking purposes. IV. MODIFIED PROCEDURE 12. ldaho Power believes that a hearing is not necessary to consider the issues presented herein and respectfully requests that this Application be processed under Modified Procedure; i.e., by written submissions rather than by hearing. RP 201, ef seg. APPLICATION - 5 lf, however, the Commission determines that a technical hearing is required, the Company stands ready to prepare and present its testimony in such hearing V. COMMUNICATIONS AND SERVICE OF PLEADINGS 13. Communications and service of pleadings, exhibits, orders, and other documents relating to this proceeding should be sent to the following Donovan E. Walker ldaho Power Company 1221West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707dwal@ Energy Contracts Idaho Power Company 1221West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 e n e rqvco ntracts@ id a hop owe r. co m dockets@ id ahopower. com VI. REQUEST FOR RELIEF 14. ldaho Power respectfully requests that the Commission issue an order: (1) authorizing that this matter may be processed by Modified Procedure; (2) accepting or rejecting the ESA between ldaho Power and McCollum; and, if accepted, (3) declaring that all payments for purchases of energy under the ESA between ldaho Power and McCollum be allowed as prudently incurred expenses for ratemaking purposes. Respectfully submitted this 11th day of September 2018. a OVAN E R Attorney for ldaho Power Company APPLICATION - 6 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on this 11th day of September 2018 I served a true and correct copy of the within and foregoing APPLICATION upon the following named parties by the method indicated below, and addressed to the following: McCollum Enterprises, Limited Partnership W. David McCollum McCollum Enterprises, Limited Partnership Canyon Springs Hydro P.O. Box 5492 Twin Falls, ldaho 83303 Joseph D. McCollum, Jr. 1110 Warm Springs Avenue Boise, ldaho 837 12-7949 Hand DeliveredX U.S. Mail Overnight Mail _ FAXX Email dave@canvonsprinqsqolf.com _x Hand Delivered U.S. Mail Overnight Mail FAX Email Christa Bearry,Legal APPLICATION .7 I BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION GASE NO. IPC-E-19-12 IDAHO POWER COMPANY ATTACHMENT 1 Article ENERGY SALES AGREEMENT BETWEEN IDAHO POWER COMPANY AND MCCOLLUM ENTERPRISES, LIMITED PARTNERSHIP TABLE OF CONTENTS TITLE Definitions No Reliance on Idaho Power Warranties Conditions to Acceptance of Energy Term and Operation Date Purchase and Sale of Net Energy Purchase Price and Method of Payment Environmental Attributes Facility and Interconnection Metering, Metering Communications and SCADA Telemetry Records Operations Indemnifi cation and Insurance Force Majeure Liability; Dedication Several Obligations Waiver Choice of Laws and Venue Disputes and Default Governmental A uthorization Commission Order Successors and Assigns Modification Taxes Notices and Authorized Agents Additional Terms and Conditions Severability Counterparts Entire Agreement Signatures I 2 J 4 5 6 7 8 9 l0 ll t2 l3 14 l5 l6 17 l8 l9 20 2t 22 23 24 25 26 27 28 29 Appendix A Appendix B Appendix C Appendix D Appendix E Generation Scheduling and Reporting Facility and Point of Delivery Engineer' s Certifi cations Non Seasonal Hydro Facility Energy Prices Insurance Requirements ENERGY SALES AGREEMENT (Non-Seasonal Hydro Facility 10 average Monthly MW or Less) Project Name: Canyon Springs Hydro Project Project Number: 3 l4 I 6030 THIS SALES AGREEMENT ("Agreement"), entered into on this d ZOEA"t*""n MCCOLLUM ENTERPRISES, LIMITED PARTNERSHIP, an ldaho Corporation (Seller), and IDAHO POWER COMPANY, an Idaho corporation (Idaho Power), hereinafter sometimes referred to collectively as "Parties" or individually as "Party." WITNESSETH: WHEREAS, Seller owns, maintains and operates a PURPA Qualiffing Facility; and WHEREAS, Seller wishes to sell, and ldaho Power is required to purchase, electric energy produced by a PURPA Qualifring Facility. THEREFORE, In consideration of the mutual covenants and agreements hereinafter set forth, the Parties agree as follows: ARTICLE I: DEFINITIONS As used in this Agreement and the appendices attached hereto, the following terms shall have the following meanings: I.l "Adjusted Estimated Net Enerry Amount" - the Estimated Net Energy Amount specified in paragraph 6.2 including any adjustments that have been made in accordance with paragraphs 6.2.2,6.2.3 or 6.2.4. 1.2 "Authorized Agent" - a person or persons specified within paragraph 25.2 of this Agreement as being authorized and empowered, for and on behalf of the Seller, to execute instruments, agreements, certificates, and other documents (collectively "Documents") and to take actions on behalf of the Seller, and that Idaho Power Company and its directors, officers, employees, and agents are entitled to consider and deal with such persons as agents of the Seller for all purposes, 1 ,r{", 1.3 until such time as an authorized officer of the Seller shall have delivered to Idaho Power Company a notice in writing stating that such person is and shall no longer be an agent on behalf of the Seller. Any Documents executed by such persons shall be deemed duly authorized by the Seller for all purposes. "Commission" - The Idaho Public Utilities Commission. "Contract Year" - The period commencing each calendar year on the same calendar date as the Operation Date and ending three hundred sixty four (364) days thereafter. "Delay Cure Period" - One hundred twenty ( 120) days immediately following the Scheduled Operation Date. "Delay Damages" - Current month's lnitial Year Monthly Estimated Net Energy Amount as specified in paragraph 6.2.1 as of the Effective Date divided by the number of days in the current month multiplied by the number of days in the Delay Period in the current month multiplied by the current month's Delay Price. "Delay Period" - All days past the Scheduled Operation Date until the Seller's Facility achieves the Operation Date or the Agreement is terminated by ldaho Power. "Delay Price" - The current month's Mid-Columbia Market Energy Cost minus the current month's All Hours Enerry Price as specified in Appendix D of this Agreement. If this calculation results in a value less than zero (0), the result of this calculation will be zero (0). "Designated Network Resource (DNR)" - A resource that is designated for Idaho Power network load and does not include any resource, or any portion thereof,, that is committed for sale to third parties or otherwise cannot be called upon to meet Idaho Power's network load. "Designated Dispatch Facility" - Idaho Power's Load Serving Operations, or any subsequent group designated by Idaho Power. "Effective Date" - The date stated in the opening paragraph of this Energy Sales Agreement representing the date upon which this Energy Sales Agreement was fully executed by both Parties. 1.4 1.5 1.6 1.7 1.8 1.9 1.10 2 1.1I l.l2 "Environmental Attributes" - means any and all credits, benefits, emissions reductions, offsets, and allowances, howsoever entitled, attributable to the generation from the Facility, and its avoided emission of pollutants. Environmental Attributes include but are not limited to: ( I ) any avoided emission of pollutants to the air, soil or water such as sulfur oxides (SOx), nitrogen oxides (NOx), carbon monoxide (CO) and other pollutants; (2) any avoided emissions of carbon dioxide (COz), methane (CHr), nitrous oxide, hydrofluorocarbons, perfluorocarbons, sulfur hexafluoride and other greenhouse gases (GHGs) that have been determined by the United Nations Intergovernmental Panel on Climate Change, or otherwise by law, to contribute to the actual or potential threat of altering the Earth's climate by trapping heat in the atmosphere;r 13) the reporting rights to these avoided emissions, such as REC Reporting Rights. REC Reporting Rights are the right of a REC purchaser to report the ownership of accumulated RECs in compliance with federal or state law, if applicable, and to a federal or state agency or any other pafi at the REC purchaser's discretion, and include without limitation those REC Reporting Rights accruing under Section 1605(b) of The Energy Policy Act of 1992 and any present or future federal, state, or local law, regulation or bill, and international or foreign emissions trading program. RECs are accumulated on a MWh basis and one REC represents the Environmental Attributes associated with one (l) MWh of energy. EnvironmentalAttributes do not include (i) any energy, capacity, reliability or other power attributes from the Facility, (ii) production tax credits or investment tax credits associated with the construction or operation of the Facility and other financial incentives in the form of credits, reductions, or allowances associated with the Facility that are applicable to a state or federal income taxation obligation, (iii) the cash grant in lieu of the investment tax credit pursuant to Section 1603 of the American Recovery and Reinvestment Act of 2009, or (iv) emission reduction credits encumbered or used by the Facility for compliance with local, state, or federal operating and/or air quality permits. I Avoided emissions may or may not have any value for GHG compliance purposes. Although avoided emissions are included in the list of Environmental Attributes, this inclusion does not create any right to use those avoided emissions to comply with any GHG regulatory program. J I .13 1.14 1.15 1.16 1.17 1.18 l.l9 "Estimated Net Energy Amount" - the monthly estimated Net Energy (kwh) information provided by the Seller in accordance with paragraph 6.2 and which may be adjusted periodically throughout the Term of this Agreement in accordance with paragraph 6.2. "Eagiliry" - That electric generation facility described in Appendix B of this Agreement "Facilitv Nameplate Capacitv" - The sum of the individual Generation Unit Nameplate Capacity's that are installed at this Facility. "First Energy Date" - The day commencing at 00:01 hours, Mountain Time, following the day that Seller has satisfied the requirements of Article IV and after the Seller requested First Energy Date. "Forced Outage" - a partial or total reduction of a) the Facility's capacity to produce and/or deliver Net Energy to the Point of Delivery, or b) Idaho Power's ability to accept Net Energy at the Point of Delivery for non-economic reasons, as a result of Idaho Power or Facility: 1) equipment failure which was 4.[ the result of negligence or lack of preventative maintenance, or 2) responding to a transmission provider curtailment order, or 3) unplanned preventative maintenance to repair equipment that left unrepaired, would result in failure of equipment prior to the planned maintenance period, or 4) planned maintenance or construction of the Facility or electrical lines required to serve this Facility, or 5) icing events within the immediate water source used as the Facility's primary motive force that causes the Facility to reduce energy production. "Generation Interconnection Agreement (GIA)" - The interconnection agreement that specifies terms, conditions and requirements of interconnecting to the Idaho Power electrical system, which will include but not be limited to all requirements as specified by Schedule 72. "Generation Unit" - a complete hydro electrical generation system within the Facility that is able to generate and deliver energy to the Point of Delivery independent of other Generation Units within the same Facility. 4 1.20 "Heav.v Load Hours (HL)" - The daily hours, applicable to energy deliveries, from hour ending 0700 - 2200 Mountain Time, (16 hours) excluding all hours on all Sundays, New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving and Christmas. 1.21 "Inadvertent Energy" - Electric energy Seller does not intend to generate. Inadvertent energy is more particularly described in paragraph 7.7 of this Agreement. 1.22 "lnterconnection Facilities" - All equipment specified in the GIA. 1.23 "Initial Capacity Determination" - The process by which Idaho Power confirms that under normal or average design conditions the Facility will generate at no more than l0 average megawatts (MW) per month. 1.24 "Light Load Hours (LL)" - The daily hours from hour ending 2300 - 0600 Mountain Time (8 hours), plus all other hours on all Sundays, New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving and Christmas. 1.25 "Losses" - The loss of electrical energy expressed in kilowatt hours (kWh) occurring as a result of the transformation and transmission of energy between the point where the Facility's energy is metered and the Facility's Point of Delivery. The loss calculation formula will be as specified in Appendix B of this Agreement. 1.26 "Market Energy Reference Price" - Eighty-five percent (85%) of the Mid-Columbia Market Energy Cost. 1 .27 "Material Breach" - A Default (paragraph 19.2.1) subject to paragraph 19.2.2. 1.28 "Maximum Capacity Amount" - The maximum capacity (MW) of the Facility will be as specified in Appendix B of this Agreement. 1.29 "Mid-Columbia Market Energy Cost" - is Eighty-two and four tenths percent (82.4%) of the monthly arithmetic average of each day's Intercontinental Exchange ("ICE") daily firm Mid-C Peak Avg and Mid-C Off-Peak Avg index prices. Each day's index prices will reflect the relative proportions of peak hours and off peak hours in the month as follows: 5 The Mid-Columbia Market Energy Cost actual calculation being: n 824 * (I {(lCE Mid-C Peak Avg* * HL hours for day) +x:l (lCE Mid-C Off-Peak Avg* * LL hours for day)) I (n*24)) where n: number of days in the month If the ICE Mid-C Index prices are not reported for a particular day or days, prices derived from the respective averages of HL and LL prices for the immediately preceding and following reporting periods or days shall be substituted into the formula stated in this definition and shall therefore be multiplied by the appropriate respective numbers of HL and LL Hours for such particular day or days with the result that each hour in such month shall have a related price in such formula. If the day for which prices are not reported has in it only LL Hours (for example a Sunday), the respective averages shall use only prices reported for LL hours in the immediately preceding and following reporting periods or days. If the day for which prices are not reported is a Saturday or Monday or is adjacent on the calendar to a holiday, the prices used for HL Hours shall be those for HL hours in the nearest (forward or backward) reporting periods or days for which HL prices are reported. If the ICE Mid-C Index reporting is discontinued by the reporting agency, both Parties will mutually agree upon a replacement index, which is similar to the ICE Mid-C Index. The selected replacement index will be consistent with other similar agreements and a commonly used index by the electrical industry. 1.30 "Monthly Nameplate Energv" - Facility Nameplate Capacity (kW) multiplied by the hours in the applicable month. l.3l "Nameplate Capacity" -The full-load electrical quantities assigned by the designer to a Generation Unit and its prime mover or other piece of electrical equipment, such as transformers and circuit breakers, under standardized conditions, expressed in amperes, kilovolt-amperes, kilowatts, volts or other appropriate units. Usually indicated on a nameplate attached to the 6 1.32 1.33 1.34 r.35 1.36 1.37 individual machine or device. This value is established for the term of this Agreement in Appendix B, item B-l of this Agreement and validated in paragraph4.l.4 of this Agreement. "Net Energy" - All of the electric energy produced by the Facility, less Station Use and Losses, expressed in kilowatt hours (kWh) delivered by the Facility to Idaho Power at the Point of Delivery. Subject to the terms of this Agreement, Seller commits to deliver all Net Energy to Idaho Power at the Point of Delivery for the full term of the Agreement. Net Energy does not include Inadvertent Energy. "Operation Date" - The day commencing at 0001 hours, Mountain Time, following the day that all requirements of paragraph 5.2 have been completed and after the Seller requested Operation Date. "Point of Delivery" - The location specified in the GIA and referenced in Appendix B, where Idaho Power's and the Seller's electrical facilities are interconnected and the energy from this Facility is delivered to the Idaho Power electrical system. "Prudent Electrical Practices" - Those practices, methods and equipment that are commonly and ordinarily used in electrical engineering and operations to operate electric equipment lawfully, safely, dependably, efficiently and economically. "Renewable Energy Certificate" or "&Ee" means a certificate, credit, allowance, green tag, or other transferable indicia, howsoever entitled, indicating generation of renewable energy by the Facility, and includes all Environmental Attributes arising as a result of the generation of electricity associated with the REC. One REC represents the Environmental Attributes associated with the generation of one thousand (l,000) kWh of Net Energy. "Scheduled Operation Date" - The date specified in Appendix B when Seller anticipates achieving the Operation Date. The Scheduled Operation Date provided by the Seller shall be a reasonable estimate of the time it will take to complete Facility construction to achieve the Operation Date. 1.38 "Schedule - Idaho Power's TariffNo l0l, Schedule 72 or its successor schedules as 7 approved by the Commtsston. 1.39 "Season" - The three periods identified in paragraph 6.2.1 of this Agreement. 1.40 "Station Use" - Electric energy that is used to operate equipment that is auxiliary or otherwise related to the production of electricity by the Facility. 1.41 "Termination Damages" - Financial damages the non-defaulting party has incurred as a result of termination of this Agreement. ARTICLE II: NO RELIANCE ON IDAHO POWER 2.1 2.2 3.1 3.2 Seller Independent Investigation - Seller warrants and represents to Idaho Power that in entering into this Agreement and the undertaking by Seller of the obligations set forth herein, Seller has investigated and determined that it is capable of performing hereunder and has not relied upon the advice, experience or expertise of Idaho Power in connection with the transactions contemplated by this Agreement. Seller Independent Experts - All professionals or experts including, but not limited to, engineers, attorneys or accountants, that Seller may have consulted or relied on in undertaking the transactions contemplated by this Agreement have been solely those of Seller. ARTICLE III: WARRANTIES No Warranty by Idaho Power - Any review, acceptance or failure to review Seller's design, specifications, equipment or facilities shall not be an endorsement or a confirmation by Idaho Power and Idaho Power makes no warranties, expressed or implied, regarding any aspect of Seller's design, specifications, equipment or facilities, including, but not limited to, safety, durability, reliability, strength, capacity, adequacy or economic feasibility. Oualifuing Facilitv Status - Seller warrants that the Facility is a "Qualifuing Facility," as that term is used and defined in 18 CFR 292.201etseq. and Seller will take such steps as may be required to maintain the Facility's Qualifiing Facility status during the term of this Agreement and Seller's failure to maintain Qualifuing Facility status will be a Material Breach of this Agreement. Idaho Power reserves the right to review the Facility's Qualifying Facility status and associated 8 ).5 4.1 support and compliance documents at any time during the term of this Agreement. FERC License / Exemption / Determination - Seller warrants that Seller possesses a valid license, exemption from licensing, or a determination of a qualiflzing conduit hydropower facility (pursuant to section 30 of the Federal Power Act) from the Federal Energy Regulatory Commission ("FERC") for the Facility. Seller recognizes that Seller's possession and retention of a valid FERC license, exemption, or a determination of a qualifoing conduit hydropower facility is a material part of the consideration for Idaho Power's execution of this Agreement. If applicable, Seller will take such steps as may be required to maintain a valid FERC license, exemption, or a determination of a qualifoing conduit hydropower facility for the Facility during the term of this Agreement, and Seller's failure to maintain a valid FERC license or exemption will be a material breach of this Agreement. ARTICLE IV: CONDITIONS ACCEPTANCE OF ENERGY This Facility has been delivering energy to Idaho Power in accordance with a Schedule 86 Uniform Agreement dated September 22,2004. The Scheduled First Energy Date and the Scheduled Operation Date for the new Energy Sales Agreement and the termination of the Schedule 86 Uniform Agreement will be at hour beginning 0100 on the first day of the month following the Commission's Order approving the Agreement and all Article IV and Article V requirements have been met. Some of the requirements of this Article may be similar to the requirements of the 2004 Schedule 86 Agreement. Prior to the First Energy Date and as a condition of Idaho Power's acceptance of deliveries of energy from the Seller under this Agreement, Idaho Power shall review the previously provided information and at Idaho Power's sole discretion may I ) accept the previously provided information as meeting the requirements of this Article or, 2) require updates to the previously provided information or 3) require the Seller to provide new information to complete the following requirements. 4.1.1 Submit proof to Idaho Power that all licenses, permits, determinations and approvals necessary for Seller's operations have been obtained from applicable federal, state or 9 4.1.2 4.1.3 4.1.4 local authorities, including, but not limited to, evidence of compliance with Subpart B, 18 CFR292.201 et seq. as a certified Qualifoing Facility. Opinion of Counsel - Submit to Idaho Power an opinion letter signed by an attorney admiued to practice and in good standing in the State of ldaho providing an opinion that Seller's licenses, permits, determinations and approvals as set forth in paragraph 4.1 .l above are legally and validly issued, are held in the name of the Seller and, based on a reasonable independent review, counsel is of the opinion that Seller is in substantial compliance with said permits as of the date of the Opinion Letter. The opinion letter will be in a form acceptable to ldaho Power and will acknowledge that the attorney rendering the opinion understands that Idaho Power is relying on said opinion. Idaho Power's acceptance of the form will not be unreasonably withheld. The opinion letter will be governed by and shallbe interpreted in accordance with the legal opinion accord of the American Bar Association Section of Business Law ( l99l ). Commission Approval - Confirm with Idaho Power that Commission approval of this Agreement in a form acceptable to Idaho Power has been received. Initial Capacity Determination - Submit to Idaho Power such data as Idaho Power may reasonably require to perform the Initial Capacity Determination. Such data will include but not be limited to, Generation Unit Nameplate Capacity, equipment specifications, prime mover data, resource characteristics, normal and/or average operating design conditions and Station Use data. Upon receipt of this information, Idaho Power will review the provided data and if necessary, request additional data to complete the Initial Capacity Determination within a reasonable time. 4.1.4.1 If the Maximum Capacity Amount specified in Appendix B of this Agreement and the cumulative manufacturer's Nameplate Capacity rating of the individual Generation Units at this Facility does not exceed ten (10) MW, the Seller shall submit detailed, manufacturer, verifiable data of the Nameplate Capacity ratings of the individual Generation Units to be installed at this Facility. Idaho Power 10 4.1.5 will verifu that the data provided establishes the combined Nameplate Capacity rating of the Generation Units to be installed at this Facility does not exceed ten (10) MW and determine if the Seller has satisfied the Initial Capacity Determination. 4.1.4.2 If the Maximum Capacity or the cumulative manufacture's Nameplate Capacity Rating of the individual Generation Units at this Facility exceeds ten (10) MW, Idaho Power will review all data submitted by Seller to determine if it is a reasonable estimate that the Facility will not exceed ten (10) average monthly MW in any month. Nameplate Capacitv - Submit to Idaho Power manufacturer's and engineering documentation that establishes the Nameplate Capacity of each individual Generation Unit that is included within this entire Facility. The sum of the individual Generation Unit Capacity ratings shall be equal to Facility Nameplate Capacity. Upon receipt of this data, Idaho Power shall review the provided data and determine if the Nameplate Capacity specified is reasonable based upon the manufacturer's specified generation ratings for the specific Generation Units. Completion certificate - Submit a certificate executed by an authorized agent of the Seller attesting that all mechanical and electrical equipment of the designated Generation Unit has been completed to enable the Generation Unit to beginning testing and delivery of Test Energy in a safe manner. Insurance - Submit written proof to Idaho Power of all insurance required in Article XIII. Interconnection - Provide written confirmation from Idaho Power's business unit that administers the GIA that Seller has satisfied all interconnection and testing requirements that will enable the Facility to be safely connected to the Idaho Power electrical system. 4.1.6 4.1.7 4.1.8 4.1.9 DesisnatedNetwork Resource (DNR) - Confirm that the Seller's Facility has completed all of the requirements to be an Idaho Power DNR capable of delivering energy up to the amount of the Maximum Capacity at the Point of Delivery. 11 4.1.9.1 As specified in Appendix B item 7 of this Agreement, the Seller's Facility must have achieved the status of being an Idaho Power DNR prior to Idaho Power accepting any energy from this Facility. Appendix B item 7 provides information on the initial application process required to enable Idaho Power to determine if network transmission capacity is available for this Facility's Maximum Capacity Amount and/or if Idaho Power transmission network upgrades will be required. The results of this study process and any associated costs will be included in the GIA for this Facility. 4.1.9.2 After the Facility has completed all requirements of the GIA that enable the Facility to come online and at least thirty (30) days prior to the Scheduled First Energy Date, Idaho Power will complete the process for approving the Seller's Facility as an ldaho Power DNR. If the Seller estimates that the actual First Energy is expected to be different then the Scheduled First Energy Date specified in Appendix B of this Agreement, the Seller must notifu Idaho Power of this revised date no later than 30 days prior to Scheduled First Energy Date. The Facility cannot deliver any energy to Idaho Power until it is approved as a DNR after completing allthe requirements of the GIA and complying with the requirements of this Agreement. 4.1 .10 Written Acceptance - Request and obtain written confirmation from ldaho Power that all conditions to acceptance of energy have been fulfilled. Such written confirmation shall be provided within a commercially reasonable time following the Seller's request and will not be unreasonably withheld by Idaho Power. ARTICLE V: TERM AND OPERATION DATE Term - Subject to the provisions of paragraph 5.2 below, this Agreement shall become effective on the Effective Date and shall continue in full force and effect for a period of twenty (20) Contract Years from the Operation Date, except that if the Operation Date is granted for a date that is after 12 5.1 5.2 the Scheduled Operation Date identified in Appendix B, in which case the Term shall start on the Scheduled Operation Date. Operation Date - This Facility has been delivering energy to ldaho Power in accordance with a Schedule 86 Uniform Agreement dated September 22,2004. The Scheduled First Energy Date and the Scheduled Operation Date for the new Energy Sales Agreement and the termination of the Schedule 86 Uniform Agreement will be at hour beginning 0100 on the first day of the month following the Commission's Order approving the Agreement and all Article IV and Article V requirements have been met. Some of the requirements of this Article may be similar to the requirements of the 2004 Schedule 86 Agreement. Idaho Power shall review the previously provided information and at Idaho Power's sole discretion may l) accept the previously provided information as meeting the requirements of this Article or, 2) require updates to the previously provided information or 3) require the Seller to provide new information to complete the following requirements. A single Operation Date will be granted for the entire Facility and may occur only after the Facility has achieved all of the following: a) The Facility has achieved a First Energy Date. b) Seller has demonstrated to Idaho Power's satisfaction that all mechanical and electrical testing has been completed satisfactorily and the Facility is able to provide energy in a consistent, reliable and safe manner. c) Engineer's Certifications - Submit an executed Engineer's Certification of Design & Construction Adequacy and an Engineer's Certification of Operations and Maintenance (O&M) Policy as described in Commission Order No.21690. These certificates will be in the form specified in Appendix C but may be modified to the extent necessary to recognize the different engineering disciplines providing the certificates. d) Seller has requested an Operation Date from Idaho Power in a written format. e) Seller has received written confirmation from Idaho Power of the Operation Date. This confirmation will not be unreasonably withheld by Idaho Power. 13 5.3 Qrreration Date Delav - Seller shall cause the Facility to achieve the Operation Date on or before 5.4 5.5 5.6 6.1 the Scheduled Operation Date. Delays in the interconnection and transmission network upgrade study, design and construction process (This includes any delay in making the required deposit payments set forth in the Facility's GIA) that are not caused by Idaho Power or Force Majeure events accepted by both Parties, shall not prevent Delay Damages or Termination Damages from being due and owing as calculated in accordance with this Agreement. Termination - If Seller fails to achieve the Operation Date prior to the Scheduled Operation Date, such failure will be a Material Breach and shall subject the Seller to Delay Damages during the Delay Cure Period. If Seller fails to achieve an Operation Date during the Delay Cure Period, ldaho Power may immediately terminate this Agreement with no further notice required. Delay Damages billing and payment - Idaho Power shall calculate and submit to the Seller any Delay Damages due Idaho Power within fifteen (15) days after the end of each month or within 30 days of the date this Agreement is terminated by Idaho Power. Termination Damages billins and payment - Idaho Power shall calculate and submit to the Seller any Termination Damages due Idaho Power within thirfy (30) days after this Agreement has been terminated. Seller Payment - Seller shall pay Idaho Power any calculated Delay or Termination Damages within seven (7) days of when ldaho Power presents these billings to the Seller. Seller's failure to pay these damages within the specified time will be a Material Breach of this Agreement. ARTICLE VI: PURCHASE AND SALE OF NET ENERGY Net Energy Purchase and Delivery - Except when either Party's performance is excused as provided herein, Idaho Power will purchase and Seller will sell all of the Net Energy to Idaho Power at the Point of Delivery. All Inadvertent Energy produced by the Facility will also be delivered by the Seller to Idaho Power at the Point of Delivery. t4 5.7 6.2 6.2.2 6.2.3 Estimated Net Energy Amounts - Neither the monthly estimated Net Energy amounts provided as of the Effective Date of this Agreement nor monthly Adjusted Estimated Net Energy Amounts provided during the term of this Agreement shall exceed ten (10) average monthly MW nor be greater than the Maximum Capacity Amount (measured in kW) multiplied by the hours in the applicable month. 6.2.1 Monthly Estimated Net Energv Amounts provided as of the Effective Date of this Agreement: Month kwh Season I Season 2 March April May July August November December June September October January February 50,787 49,275 50,01 5 5 1,581 54,637 49,821 44,769 49,427 51,648 52,621 51,906 47,946 Season 3 Seller's Adjustment of Estimated Net Energy Amounts - Priorto the Operation Date, the Seller may revise all of the previously provided monthly estimated Net Energy amounts by providing written notice to ldaho Power in accordance with paragraph 25.1 . Seller's Adjustment of Estimated Net Energy Amounts After the Operation Date - After the Operation Date, the Seller may revise any future monthly estimated Net Energy amounts by providing written notice no later than 5 PM Mountain Standard time on the last business day of the notification month specified in the following schedule: t5 Notification Month November December January February March April May June July August September October Future monthly Estimated Net Energy Amounts el ble to be revised January and any future months February and any future months March and any future months April and any future months May and any future months June and any future months July and any future months August and any future months September and any future months October and any future months November and any future months December and any future months a.) This written notice must be provided to Idaho Power in accordance with paragraph 25.1 or by electronic notice provided and verified via return electronic verification ofreceipt to the electronic notices address specified in paragraph 25.1. b.) Failure to provide timely written notice of changes to the Estimated Net Energy Amounts will be deemed to be an election of no change from the most recently provided monthly estimated Net Energy amounts. 6.2.4 Idaho Power Adjustment of Monthly Estimated Net Energy Amounts - If Idaho Power is excused from accepting the Seller's Net Energy as specified in paragraph 12.2.1 or if the Seller declares a Suspension of Energy Deliveries as specified in paragraph 12.3.1 and the Seller's declared Suspension of Energy Deliveries is accepted by Idaho Power, the monthly estimated Net Energy amount as specified in paragraph 6.2 for the specific month in which the reduction or suspension under paragraph 12.2.1 or 12.3.1 occurs will be temporarily reduced in accordance with the following and only for the actual month in which the event occurred: l6 NEA Current Month's Estimated Net Energy Amount (Paragraph 6.2) SGU a.) If Idaho Power is excused from accepting the Seller's Net Enerry as specified in paragraph 12.2.1 this value willbe equal to the percentage of curtailment as specified by ld*o Power multiplied by the TGU as defined below. b.) If the Seller declares a Suspension of Energy Deliveries as specified in paragraph 12.3.1 this value will be the sum of the individual Generation Units size ratings as specified in Appendix B that are impacted by the circumstances causing the Sellerto declare a Suspension ofEnergy Deliveries. TGU Sum of all of the individual generator ratings of the Generation Units at this Facility as specified in Appendix B of this agreement. RSH 1-H Actual hours the Facility's Net Energy deliveries were either reduced or suspended under paragraph 12.2.1 or 12.3.1 Actual total hours in the current month NEA X NEA This Adjusted Estimated Net Energy Amount will be used in applicable Surplus Energy calculations for only the specific month in which Idaho Power was excused from accepting the Seller's Net Energy or the Seller declared a Suspension of Energy Deliveries. Failure to Deliver Minimum Amounts of Net Enerry - Unless excused by an event of Force Majeure or Idaho Power's inability to accept Net Energy, Seller's failure to deliver Net Energy in any Contract Year in an amount equalto at least ten percent (10%) of the sum of the monthly estimated Net Energy amounts in effect as of the Operation Date shall constitute an event of default. Adjusted Net Energy Amount ))TH(r SGU TGU )(X RSH 6.3 t7 Resulting formula being: 7.1 7.2 7.3 7.4 7.5 ARTICLE VII: PURCHASE PRICE AND METHOD OF PAYMENT Surplus Energy - (l) Net Energy produced by the Seller's Facility and delivered to the Idaho Power electrical system during the month which exceeds one hundred ten percent (l l0%) of the monthly Adjusted Estimated Net Energy Amount for the corresponding month specified in paragraph 6.2, or (2) if the Net Energy produced by the Seller's Facility and delivered to the Idaho Power electrical system during the month is less than ninety percent (90%) of the monthly Adjusted Estimated Net Energy Amount for the corresponding month specified in parugraph 6.2, then all Net Energy delivered by the Facility to the Idaho Power electrical system for that given month, or (3) all Net Energy produced by the Seller's Facility and delivered by the Facility to the Idaho Power electrical system prior to the Operation Date, or (4) all monthly Net Energy that exceeds the Monthly Nameplate Energy. Surplus Energy Price - For all Surplus Energy, Idaho Power shall pay to the Seller the current month's Market Energy Reference Price or the applicable All Hours Energy Price, whichever is lower. Base Energy - The Net Energy produced by the Seller's Facility and delivered to the ldaho Power electrical system after the Facility has achieved an Operation Date which is greater or equal to ninety percent (90%) and less than or equal to one hundred ten percent (l l0%) of the monthly Adjusted Estimated Net Energy Amount for the corresponding month specified in paragraph 6.2. Base Energy Heavy Load Purchase Price - For all Base Energy received during Heavy Load Hours, Idaho Power will pay the monthly non-levelized Base Energy Heavy Load Purchase Price as specified in Appendix D. Base Energy Light Load Purchase Price - For all Base Energy received during Light Load Hours, Idaho Power will pay the monthly non-levelized Base Energy Light Load Purchase Price as specified in Appendix D. All Hours Energy Price - The price to be used in the calculation of the Surplus Energy Price and Delay Damage Price shallbe the monthly non-levelized All Hours Energy in Appendix D. l8 7.6 '7.7 7.8 7.9 Inadvertent Enerry - 7.7.1 Inadvertent Energy is electric energy produced by the Facility, expressed in kWh, which the Seller delivers to Idaho Power at the Point of Delivery that exceeds ten thousand (10,000) kW multiplied by the hours in the specific month in which the energy was delivered. (For example, January contains 744 hours. 744 hours' times 10,000 kW : 7,440,000 kwh. Energy delivered in January in excess of 7,440,000 kWh in this example would be Inadvertent Energy.) 7.7.2 Although Seller intends to design and operate the Facility to generate no more than ten (10) average MW monthly and therefore does not intend to generate Inadvertent Energy, Idaho Power will accept Inadvertent Energy that does not exceed the Maximum Capacity Amount but will not purchase or pay for Inadvertent Energy. 7.7.3 Delivering Inadvertent Energy to Idaho Power for 2 consecutive months and/or in any 3 months during a Contract Year will be a Material Breach of this Agreement and Idaho Power may terminate this Agreement within sixty (60) days after the Material Breach has occurred. Payments - Undisputed Base Energy and Surplus Energy payments, less any payments due to Idaho Power will be disbursed to the Seller within thirty (30) days of the date which Idaho Power receives and accepts the documentation of the monthly Base Energy and Surplus Energy actually delivered to Idaho Power as specified in Appendix A. Continuing Jurisdiction of the Commission - This Agreement is a special contract and, as such, the rates, terms and conditions contained in this Agreement will be construed in accordance with Idaho Power Company v. Idaho Public Utilities Commission and Afton Energy. Inc., I 07 Idaho 781,693 P.zd 427 (1984), Idaho Power Company v. Idaho Public Utilities Commission,l0T ldaho 1122, 695 P.2d I 261 (1985), Afton Energy. Inc. v. Idaho Power Company, I I I Idaho 925,729 P.2d 400 (1986), Section 210 of the Public Utility Regulatory Policies Act of 1978 and l8 CFR 5292.303- 308 t9 ARTICLE VIII: ENVIRONME,NTAL ATTRIBUTES 8.t Pursuant to Commission Order 32697 and32802 the Environmental Attributes and Renewable Energy Certificates as defined within this Agreement and directly associated with the production of energy from the Seller's Facility are owned by the Seller. 9.1 Design of Facilit_v - Seller will design, construct, install, own, operate and maintain the Facility and any Seller-owned Interconnection Facilities so as to allow safe and reliable generation and delivery of Net Energy and Inadvertent Energy to the Idaho Power Point of Delivery for the full term of the Agreement in accordance with the GIA. ARTICLE X: METE TIONS AND SCADA TELEMETRY 10.1 Metering - Idaho Power shall, provide, install, and maintain metering equipment needed for metering the electrical energy production from the Facility. The metering equipment will be capable of measuring, recording, retrieving and reporting the Facility's hourly gross electrical energy production, Station Use, maximum energy deliveries (kW) and any other energy measurements at the Point of Delivery that Idaho Power needs to administer this Agreement and integrate this Facility's energy production into the Idaho Power electrical system. Specific equipment, installation details and requirements for this metering equipment will be established in the GIA process and documented in the GIA. Seller shall be responsible for all initial and ongoing costs of this equipment as specified in Schedule 72 and the GIA. 10.2 Metering Communications - Seller shall, at the Seller's sole initial and ongoing expense, arrange for, provide, install, and maintain dedicated metering communications equipment capable of transmitting the metering data specified in paragraph l0.l to Idaho Power in a frequency, manner and form acceptable to Idaho Power. Seller shall grant Idaho Power sole control and use of this 20 ARTICLE IX: FACILITY AND INTERCONNECTION 10.3 dedicated metering communications equipment. Specific details and requirements for this metering communications equipment will be established in the GIA process and documented in the GIA. Supervisory Control and Data Acquisition (SCADA) Telemetry - In addition to the requirements of paragraph l0.l and 10.2,Idaho Power may require telemetry equipment and telecommunications which will be capable of providing Idaho Power with continuous instantaneous SCADA telemetry of the Seller's Net Energy and Inadvertent Energy production in a form acceptable to Idaho Power. Seller shall grant Idaho Power sole control and use of this dedicated SCADA and telecommunications equipment. Specific details and requirements for this SCADA Telemetry and telecommunications equipment will be established in the GIA process and documented in the GIA. Seller shall be responsible for all initial and ongoing costs of this equipment as specified in Schedule 72 and the GIA. ARTICLE XI - RECORDS 1 1.1 Maintenance of Records - Seller shall maintain monthly records at the Facility or such other location mutually acceptable to the Parties. These records shall include total generation, Net Energy, Station Use, Surplus Energy, Inadvertent Energy and maximum hourly generation (kW) and be recorded in a form and content acceptable to Idaho Power. Monthly records shall be retained for a period ofnot less than five years. 11.2 Inspection - Either Parfy, after reasonable notice to the other Party, shall have the right, during normal business hours, to inspect and audit any or all records pertaining to the Seller's Facility generation, Net Energy, Station Use, Surplus Energy, Inadvertent Energy and maximum generation (kW) records pertaining to the Seller's Facility. ARTICLE XII: OPERATIONS 12 .l Communications - Idaho Power and the Seller shall maintain appropriate operating communications through ldaho Power's Designated Dispatch Facility in accordance with the GIA. 21 12 .2 Acceptance of Energy - 12.2.1 Idaho Power shall be excused from accepting and paying for Net Energy or accepting Inadvertent Energy which would have otherwise been produced by the Facility and delivered by the Seller to the Point of Delivery: a.) If energy deliveries are interrupted due an event of Force Majeure or Forced Outage. b.) If interruption of energy deliveries is allowed by Section 210 ofthe Public Utility Regulatory Policies Act of 1978 and 18 CFR $292.304 c.) If temporary disconnection and/or interruption of energy deliveries is in accordance with Schedule 72 or other provisions as specified within the GIA. d.) If Idaho Power determines that curtailment, interruption or reduction of Net Energy or Inadvertent Energy deliveries is necessary because of line construction, electrical system maintenance requirements, emergencies, electrical system operating conditions, electrical system reliability emergencies on its system, or as otherwise required by Prudent Electrical Practices. 12.2.2 If, in the reasonable opinion of Idaho Power, Seller's operation of the Facility or Interconnection Facilities is unsafe or may otherwise adversely affect Idaho Power's equipment, personnel or service to its customers, Idaho Power may temporarily disconnect the Facility from Idaho Power's transmission/distribution system as specified within the GIA or Schedule 72 or take such other reasonable steps as Idaho Power deems appropriate. 12.2.3 Under no circumstances will the Seller deliver energy from the Facility to the Point of Delivery in an amount that exceeds the Maximum Capacity Amount at any moment in time. Seller's failure to limit deliveries to the Maximum Capacity Amount will be a Material Breach of this Agreement. 22 12.3 12.2.4 If ldaho Power is unable to accept the energy from this Facility and is not excused from accepting the Facility's energ], Idaho Power's damages shall be limited to only the value of the estimated energy that Idaho Power was unable to accept valued at the applicable energy prices specified in this Agreement. Idaho Power will have no responsibility to pay for any other costs, lost revenue or consequential damages the Facility may incur. Seller Declared Suspension of Enerqv Deliveries 12.3.1 If the Seller's Facility experiences a Forced Outage, and the Seller initiates a Declared Suspension of Energy Deliveries, Seller shall, after giving notice as provided in paragraph 12.3.2 below, temporarily reduce deliveries of Net Energy (kW) to ldaho Power from the Facility to not exceed the reduced energy deliveries (kW) stated by the Seller in the initial declaration for a period of not less than 48 hours ("Declared Suspension of Energy Deliveries"). The Seller's Declared Suspension of Energy Deliveries will begin at the start of the next full hour following the Seller's telephone notification as specified in paragraph 12.3.2 and will continue for the time as specified (not less than 48 hours) in the wriften notification provided by the Seller. In the month(s) in which the Declared Suspension of Energy occurred, the Estimated Net Energy Amount will be adjusted as specified in parugraph 6.2.3. If the Seller desires to initiate a Declared Suspension of Energy Deliveries as provided in paragraph 12.3.1, the Seller will notifu the Designated Dispatch Facility by telephone. The beginning hour of the Declared Suspension of Energy Deliveries will be at the earliest the next full hour after making telephone contact with Idaho Power. The Seller will, within 24 hours after the telephone contact, provide Idaho Power a written notice in accordance with Article XXV that will contain the beginning hour and expected duration of the Declared Suspension of Energy Deliveries, a description of the conditions that caused the Seller to initiate a Declared Suspension of Energy Deliveries and the reduced level(kW) of energy deliveries the Facility is requesting that will be set as the maximum energy deliveries to Idaho Power for the duration of the Declared Suspension of Energy Delivery event (not 23 12.3.2 less than 48 hours). Idaho Power will review the documentation provided by the Seller to determine ldaho Power's acceptance of the described Forced Outage as qualifuing for a Declared Suspension of Energy Deliveries as specified in paragraph 12.3.1. Idaho Power's acceptance of the Seller's Forced Outage as an acceptable Forced Outage will be based upon the clear documentation provided by the Seller that the Forced Outage is not due to an event of Force Majeure or by neglect, disrepair or lack of adequate preventative maintenance of the Seller's Facility. 12.4 Scheduled Maintenance - On or before January 3l't of each calendar year, Seller shall submit a written proposed maintenance schedule of significant Facility maintenance for that calendar year and ldaho Power and Seller shall mutually agree as to the acceptability of the proposed schedule. If the Seller intends to perform planned maintenance at approximately the same time every year, the Seller may submit a maintenance schedule for the first calendar year and include a statement that this maintenance schedule shall be consistent for all future years, until such time as the Seller notifies ldaho Power of a change to this schedule. The Parties determination as to the acceptability of the Seller's timetable for scheduled maintenance will take into consideration Prudent Electrical Practices, Idaho Power system requirements and the Seller's preferred schedule. Neither Party shall unreasonably withhold acceptance of the proposed maintenance schedule. 12.5 ldaho Power Maintenance Information - Upon receiving a written request from the Seller, Idaho Power shall provide publicly available information in regards to Idaho Power planned maintenance information that may impact the Facility. 12.6 Contact Prior to Curtailment - Idaho Power will make a reasonable attempt to contact the Seller prior to interrupting the interconnection or curtailing deliveries from the Seller's Facility. Seller understands that in the case of emergency circumstances, real time operations of the electrical system, and/or unplanned events, Idaho Power may not be able to provide notice to the Seller prior to interruption, curtailment, or reduction of electrical energy deliveries to Idaho Power. 24 ARTICLE XIII: INDEMNIFICATION AND INSURANCE 13.1 Indemnification - Each Party shall agree to hold harmless and to indemni$u the other Party, its officers, agents, affiliates, subsidiaries, parent company and employees against all loss, damage, expense and liability to third persons for injury to or death of person or injury to property, proximately caused by the indemnifring Pargr's, (a) construction, ownership, operation or maintenance of, or by failure of, any of such Party's works or facilities used in connection with this Agreement, or (b) negligent or intentional acts, erors or omissions. The indemniling Party shall, on the other Party's request, defend any suit asserting a claim covered by this indemnity. The indemnifoing Party shall pay all documented costs, including reasonable attorney fees that may be incurred by the other Party in enforcing this indemnity. 13.2 Insurance - During the term ofthis Agreement, Seller shall secure and continuously carry insurance as specified in Appendix E. ARTICLE XIV: FORCE MAJEURE 14.1 As used in this Agreement, o'Force Majeure" or "an event of Force Majeure" means any cause beyond the control of the Seller or of Idaho Power which, despite the exercise of due diligence, such Party is unable to prevent or overcome. Force Majeure includes, but is not limited to, acts of God, fire, flood, storms, wars, hostilities, civil strife, strikes and other labor disturbances, earthquakes, fires, lightning, epidemics, sabotage, or changes in law or regulation occurring after the effective date, which, by the exercise of reasonable foresight such party could not reasonably have been expected to avoid and by the exercise of due diligence, it shall be unable to overcome. Fluctuations and/or changes of the motive force and/or the fuel supply are not events of Force Majeure. If either Party is rendered wholly or in part unable to perform its obligations under this Agreement because of an event of Force Majeure, both Parties shall be excused from whatever performance is affected by the event of Force Majeure, provided that: 25 (l)The non-performing Party shall, as soon as is reasonably possible after the occurrence of the Force Majeure, give the other Party written notice describing the particulars of the occurrence. The suspension of performance shall be of no greater scope and of no longer duration than is required by the event of Force Majeure. No obligations of either Party which arose before the occurrence of the Force Majeure event and which could and should have been fully performed before such occurrence shall be excused as a result ofsuch occurrence. (3) ARTICLE XV: LIABILITY; DEDICATION Limitation of Liabilitv. Nothing in this Agreement shall be construed to create any duty to, any standard of care with reference to, or any liability to any person not a Party to this Agreement. Neither party shall be liable to the other for any indirect, special, consequential, nor punitive damages, except as expressly authorized by this Agreement. Dedication. No undertaking by one Party to the other under any provision of this Agreement shall constitute the dedication of that Party's system or any portion thereof to the Party or the public or affect the status of Idaho Power as an independent public utility corporation or Seller as an independent individual or entity. ARTICLE XVI: SEVERAL OBLIGATIONS Except where specifically stated in this Agreement to be otherwise, the duties, obligations and liabilities of the Parties are intended to be several and not joint or collective. Nothing contained in this Agreement shall ever be construed to create an association, trust, partnership or joint venture or impose a trust or partnership duty, obligation or liability on or with regard to either Party. Each Party shall be individually and severally liable for its own obligations under this Agreement. (2) l5.l 15.2 16.1 26 t7.t I8.r 18.2 ARTICLE XVII: WAIVER Any waiver at any time by either Party of its rights with respect to a default under this Agreement or with respect to any other matters arising in connection with this Agreement shall not be deemed a waiver with respect to any subsequent default or other matter. ARTICLE XVIII: CHOICE OF LAWS AND VENUE This Agreement shall be construed and interpreted in accordance with the laws of the State of Idaho without reference to its choice of law provisions. Venue for any litigation arising out of or related to this Agreement will lie in the District Court of the Fourth Judicial District of Idaho in and for the County of Ada. ARTICLE XIX: DISPUTES AND DEFAULT 19.1 Disputes - All disputes related to or arising under this Agreement, including, but not limited to, the interpretation of the terms and conditions of this Agreement, will be submitted to the Commission for resolution. 19.2 Notice of Default '19.2.1 Defaults. If either Party fails to perform any of the terms or conditions of this Agreement (an "event of default"), the non-defaulting Party shall cause notice in writing to be given to the defaulting Party, specifying the manner in which such default occurred. If the defaulting Party shall fail to cure such default within the sixty (60) days after service of such notice, or if the defaulting Party reasonably demonstrates to the other Party that the default can be cured within a commercially reasonable time but not within such sixty (60) day period and then fails to diligently pursue such cure, then the non-defaulting Party may, at its option, terminate this Agreement and/or pursue its legal or equitable remedies. 19.2.2 Material Breaches - The notice and cure provisions in paragraph 19.2.1 do not apply to defaults identified in this Agreement as Material Breaches. Material Breaches must be 27 cured as expeditiously as possible following occurence of the breach. Idaho Power can terminate the Agreement at any time following the Material Breach unless there is a specific cure, or cure period, identified by this Agreement for that specific Material Breach then that cure, or cure period, shall apply. 19.3 Prior to the Operation Date and thereafter for the full term of this Agreement, Seller will provide Idaho Power with the following: I 9.3. I Insurance - Evidence of compliance with the provisions of Appendix E. If Seller fails to comply, such failure will be a Material Breach. 19.3.2 Engineer's Certifications - Every three (3) years after the Operation Date, Seller will supply Idaho Power with a completed Certification of Ongoing Operations and Maintenance form as specified in Appendix C. The certification will be from a Registered Professional Engineer licensed in the State of Idaho. Seller's failure to supply the required certificate will be an event of default. Such a default may only be cured by Seller providing the required certificate; and 19.3.3 Licenses / Permits / Determinations - During the full term of this Agreement, Seller shall maintain compliance with all permits, licenses and determinations described in paragraph 4.1.1 of this Agreement. In addition, Seller will supply Idaho Power with copies of any new or additional permits, licenses or determinations. At least every fifth Contract Year, Seller will update the documentation described in Paragraph 4.1 .1 . If at any time Seller fails to maintain compliance with the permits, licenses and determinations described in paragraph 4.1.1 or to provide the documentation required by this paragraph, such failure will be an event of default and may only be cured by Seller submitting to Idaho Power evidence of compliance from the permitting agency. ARTICLE XX: GOVERNMENTAL AUTHORIZATION 20.1 This Agreement is subject to the jurisdiction of those governmental agencies having control over either Party of this Agreement. 28 21.1 22.1 23.1 24.1 ARTICLE XXI: COMMISSION ORDER Idaho Power shall file this Agreement for its acceptance or rejection by the Commission. This Agreement shall only become finally effective upon the Commission's approval of all terms and provisions hereof without change or condition and declaration that all payments to be made to Seller hereunder shall be allowed as prudently incurred expenses for ratemaking purposes. ARTICLE XXII: SUCC AND ASSIGNS This Agreement and shall be binding upon and inure to the benefit of the respective successors and assigns of the Parties hereto. Neither this Agreement nor any rights or obligations of either Party hereunder may be assigned, in whole or in part, by operation of law or otherwise, without the prior written consent of both Parties, which consent shall not be unreasonably withheld. Any party with which Idaho Power may consolidate, merge, convey or transfer substantially all of its electric utility assets, shall automatically, without further act, and without need of consent or approval by the Seller, succeed to all of Idaho Power's rights, obligations and interests under this Agreement. Any purported assignment in derogation of the foregoing shall be void. This article shall not prevent a financing entity with recorded or secured rights from exercising all rights and remedies available to it under law or contract. Idaho Power shall have the right to be notified by the financing entity that it is exercising such rights or remedies. ARTICLE XXIII: MODIFICATION No modification to this Agreement shall be valid unless it is in writing and signed by both Parties and subsequently approved by the Commission. ARTICLE XXIV: TAXES Each Party shall pay before delinquency all taxes and other governmental charges which, if failed to be paid when due, could result in a lien upon the Facility or the Interconnection Facilities. 29 25.1 ARTICLE XXV: NOTICES AND AUTHORIZED AGENTS Notices - All written notices under this Agreement shall be directed as follows and shall be considered delivered when faxed, e-mailed and confirmed with deposit in the U.S. Mail, first- class, postage prepaid, as follows: To Seller: Original document to: W. David McCollum McCollum Enterprises Limited Partnership Canyon Springs Hydro P.O. Box 5492 Twin Falls, ID 83303 208-732-s680 dave@canyon spri n gsgol f.com Joseph D. McCollum, Jr. I I l0 Warm Springs Ave. Boise, lD 83712-7949 Tele: (208) 345-6709 Mobile: (208) 631-1422 To Idaho Power: Original document to: Vice President, Power Supply Idaho Power Company PO Box 70 Boise, Idaho 83707 Emai I : energycontracts@idahopower.com Copy of document to: Cogeneration and Small Power Production Idaho Power Company PO Box 70 Boise, Idaho 83707 E-mail: energycontracts@idahopower.com Either Party may change the contact person and/or address information listed above, by providing written notice from an authorized person representing the Party 30 2s.2 26.1 26.2 Authorized Agent(s) Name W. David McCollum Joseph McCollum Title Owner Owner The Seller may modifo the Authorized Agents by requesting and completing an Authorized Agent form provided by ldaho Power. This document will include the requested changes and require signature(s) from an authorized party ofthe Seller. XXVI: ADDITIONAL Equal Employment. During performance, pursuant to this Agreement, Seller agrees to comply with all applicable equal employment opportunity, small business, and affirmative action laws and regulations. All Equal Employment Opportunity and affirmative action laws and regulations are hereby incorporated by this reference, including provisions of 38 U.S.C.5 4212, Executive Order 11246, as amended, and any subsequent executive orders or other laws or regulations relating to equal opportunity for employment on government contracts. To the extent this Agreement is covered by Executive Order 11246, the Equal Opportunity Clauses contained in 4l C.F.R. 60-1.4,41 C.F.R. 60-250.5, and 4l CFR 60-741.5 are incorporated herein by reference. Prior to the Seller executing this Agreement, the Seller shall have: a) Submitted an interconnection application for this Facility and is in compliance with all payments and requirements of the interconnection process. b) Acknowledged responsibility for all interconnection costs and any costs associated with acquiring adequate firm transmission capacity to enable the project to be classified as an Idaho Power DNR. If final interconnection or transmission studies are not complete at the time the Seller executes this Agreement, the Seller understands that the Seller's obligations to pay Delay and Termination Damages associated with the project's failure to achieve the 3l Operation Date by the Scheduled Operation Date as specified in this Agreement is not relieved by final interconnection or transmission costs, processes or schedules. c) Provide acceptable and verifiable evidence to Idaho Power that demonstrates the Facility is eligible for the published avoided costs requested by the Seller and contained within this Agreement. Commission Order 34062 effective June l, 2018, provides the current published avoided costs for Non-Seasonal Hydro Facilities, Seasonal Hydro Facilities, Other Facilities, Solar Facilities, and Wind Facilities. Commission Order 32697 provides for full capacity payments for existing projects that have requested replacement contracts after their existing contract expires. This Agreement includes the following appendices, which are attached hereto and included by reference: 26.3 27.1 28.1 Appendix A Appendix B Appendix C Appendix D Appendix E, Generation Scheduling and Reporting Facility and Point of Delivery Engineer' s Certifi cations Non-Seasonal Hydro Facility Energy Prices Insurance Requirements ARTICLE XXVII: SEVERABILITY The invalidity or unenforceability of any term or provision of this Agreement shall not affect the validity or enforceability of any other terms or provisions and this Agreement shall be construed in all other respects as if the invalid or unenforceable term or provision were omitted. ARTICLE XXVIII: COUNTERPARTS This Agreement may be executed in two or more counterparts, each of which shall be deemed an original but all of which together shall constitute one and the same instrument. 3Z 29.1 By Dated AR.|ICLE XXIX: ENTIRE AGREEMENT I'his Agreement constitutes the entire Agreement of the Parties concerning the subject matter hereof and supersedes all prior or contemporaneous oral or written agreements between the Parties concerning the subject rnatter hereof. IN WII-NESS WHEREOF, The Parties hereto have caused this Agreement to be executed in their respective names on the dates set forth belorv: ldaho Power Company McCollLrm []nterprises, Limited Paftncrship By { -l-essia Park Vice President, Power Supply W. Dav id O,wner % \fi-Aott 3-q*a{8Datcd ''ldalro Powcr""Sellcr" ii 33 APPENDIX A A _I MONTHLY POWER PRODUCTION AND SWITCHING REPORT At the end of each month the following required documentation will be submitted to: Idaho Power Company Attn: Cogeneration and Small Power Production PO Box 70 Boise, Idaho 83707 The meter readings required on this report will be the readings on the Idaho Power meter equipment measuring the Facility's total energy production and Station Usage delivered to Idaho Power and the maximum generated energy (kW) as recorded on the metering equipment and/or any other required energy measurements to adequately administer this Agreement. This document shall be the document to enable Idaho Power to begin the energy payment calculation and payment process. The meter readings on this report may not be used to calculate the actual payment, but instead will be a check of the automated meter reading information that will be gathered as described in item A-2 below: 34 Idaho Power Company Cogeneration and Small Power Production MONTHLY POWER PRODUCTION AND SWITCHING REPORT Month Year Project Name Address City Project Phone Number: State zip Facility Output Station Usage Metered Maximum kw Meter Number: End of Month kWh Meter Reading: Beginning of Month kWh Meter: Difference: Times Meter Constant: kWh for the Month: Metered Demand: Net Generation Breaker Opening Record Breaker Closing Record Date Time Meter Date Time Meter * Breaker Opening Reason Codes 1 Lack of Adequate Prime Mover 2 Forced Outage of Facility 3 Disturbance of IPCo System 4 Scheduled Maintenance 5 Testing of Protection Systems 6 Cause Unknown 7 Other (Explain) I hereby certify that the above meter readings are true and correct as of Midnight on the last day of the above month and that the switching record is accurate and complete as required by the Energy Sales Agreement to which I am a Party. Signature 35 Date ,(l Reason A-2 AUTOMATED METER READING COLLECTION PROCESS Monthly, Idaho Power will use the provided metering and telemetry equipment and processes to collect the meter reading information from the Idaho Power provided metering equipment that measures the Net Energy and energy delivered to supply Station Use for the Facility recorded at 12:00 AM (MidnighQ of the last day of the month. The meter information collected will include energy production, Station Use, the maximum generated power (kW) and any other required energy measurements to adequately administer this Agreement. A-3 SELLER CONTACT INFORMATION Seller' s Contact Information Project Management David McCollum Home Phone: 208-732-5680 Cell Phone: 208-731 -3000 dave@canyonspringsgolf.com Joe McCollum Home Phone: 208-645-6709 Cell Phone: 208-631 -1 422 24-Hour Project Operational Contact David McCollum Home Phone: 208-732-5680 Cell Phone: 208-731 -3000 dave@canyonspringsgolf.com Lamar Sytlen Cell Phone: 208-731 -2593 Proj ect On-site Contact information David McCollum Home Phone: 208-732-5680 Cell Phone: 208-731 -3000 dave@canyonspringsgol f.com Lamar Sytlen Cell Phone: 208-731 -2593 Canyon Springs Golf Course Phone: 208-734-7609 36 B-l APPENDIX B FACILITY AND POTNT OF DELIVERY Project Name: Canyon Springs Hydro Project Project Number: 3 l4 1 6030 DESCRIPTION OF FACILITY Siemens-Allis Induction Generator, Model 444T,150 HP,480 volt,3 phase generator. located in the steel hydro buildingjustNE ofthe upper Canyon Springs Golf Course parking lot. Water source is an artesian well located about 70 feet due south of the hydro building. Nameplate: 150 HP (per photo of nameplate). 150 HP equals I 12 kw. B-2 LOCATION OF FACILITY Near: Twin Falls, Idaho Actual or nearest physical street address: Canyon Springs Golf Course, 199 Canyon Springs Rd., Twin Falls, ID 83301 GPS Coordinates: Latitude Decimal Degrees 42.605619 LongitudeDecimalDegrees -114.4772 State: Idaho County: Twin Falls Description of Interconnection Location: Canyon Springs Golf Course, 199 Canyon Springs Rd., Twin Falls,lD 83301 B-3 SCHEDULED FIRST ENERGY AND OPERATION DATE This Facility is interconnected and already delivering energy to ldaho Power pursuant to a Schedule 86 Uniform Agreement. It is expected that the First Energy Date and the Operation Date for this Agreement and the termination of the Schedule 86 Uniform Agreement shall all occur at the same time. The Scheduled First Energy Date and the Scheduled Operation Date for the new Energy Sales Agreement and the termination of the Schedule 86 Uniform Agreement will be at hour beginning 0100 on the first day of the month following the Commission's Order approving the Agreement and allArticle IV and Article V requirements have been met. 37 B-4 B-5 B-6 B-7 MAXIMUM CAPACITY AMOUNT: The maximum capacity amount is I l2 kw which is consistent with the value provided by the Seller to Idaho Power in accordance with the GIA. This value is the maximum energy (kw) that potentially could be delivered by the Seller's Facility to the Idaho Power electrical system at any moment in time. POTNT OF DELIVERY "Point of Delivery" means, unless otherwise agreed by both Parties, the point of where the Seller's Facility energy is delivered to the Idaho Power electrical system. The GIA will determine the specific Point of Delivery for this Facility. The Point of Delivery identified by the GIA will become an integral part of this Agreement. LOSSES If the ldaho Power metering equipment is capable of measuring the exact energy deliveries by the Seller to the ldaho Power electrical system at the Point of Delivery, no Losses will be calculated for this Facility. If the Idaho Power metering equipment is unable to measure the exact energy deliveries by the Seller to the Idaho Power electrical system at the Point of Delivery, the Losses will be calculated. The current loss factor is set at 0.8%.lf at any time during the term of this Agreement, Idaho Power or Seller determines that the loss calculation does not correctly reflect the actual kWh Losses attributed to the electrical equipment between the Facility and the Idaho Power electrical system, Idaho Power may adjust the calculation and retroactively adjust the previous month's kWh loss calculations. DESIGNATED NETWORK RESOURCE (DNR) This Facility is an Idaho Power DNR pursuant to an existing energy sales agreement. The DNR status will continue if this Agreement is l) executed and approved by the Commission 2) a GIA 38 has been executed by both parties and 3) the Seller is in compliance with all requirements of that GIA. Idaho Power cannot accept or pay for generation from this Facility if the Facility has not achieved the status of being an ldaho Power DNR. Federal Energy Regulatory Commission ("FERC") rules require Idaho Power to prepare and submit the application to achieve DNR status for this Facility. Because much of the information Idaho Power needs to prepare the DNR application is specific to the Seller's Facility, Idaho Power's ability to file the DNR application in a timely manner is contingent upon timely receipt of the required information from the Seller. Prior to Idaho Power beginning the process to enable Idaho Power to submit a request for DNR status for this Facility, the Seller shall have I ) filed a Generation Interconnection application, 2) submitted all information required by Idaho Power to complete the application, and 3) either executed this Agreement or, at a minimum, provided Idaho Power with confirmation of the Seller's intent to complete this Agreement in a timely manner. Seller's failure to provide complete and accurate information in a timely manner can significantly impact Idaho Power's ability and cost to attain the DNR designation for the Seller's Facility and the Seller shall bear the costs of any of these delays that are a result ofany action or inaction by the Seller. 39 APPENDIX C ENGIN EER'S CERTIFICATION OPE,RATIONS & MAINTENANCE POLICY The undersigned on behalf of himself/herself and hereinafter collectively referred to as "Engineer," hereby states and certifies to the Seller as follows: L That Engineer is a Licensed Professional Engineer in good standing in the State of ldaho. 2. That Engineer has reviewed the Energy Sales Agreement, hereinafter referred to as the ''Agreement,''betweenIdahoPowerasBuyer,and-aSSeller,dated 3. That the cogeneration or small power production project which is the subject of the Agreement and this Statement is identified as ldaho Power Company Facility No and is hereinafter referred to as the "Project." 4. That the Project, which is commonly known as the Project, is located in Section Township Range _, Boise Meridian,County, Idaho 5. That Engineer recognizes that the Agreement provides for the Project to furnish electrical energy to Idaho Power fo. a _ year period. 6. That Engineer has substantial experience in the design, construction and operation of electric power plants of the same type as this Project. 7. That Engineer has no economic relationship to the Design Engineer of this Project. 8. That Engineer has reviewed and/or supervised the review of the Policy for Operation and Maintenance ("O&M") for this Project and it is his professional opinion that, said Project has been designed and built to appropriate standards, and adherence to said O&M Policy will result in the Project's producing at or near the design electrical output, efficiency and plant factor for the full Contact Term of OF years. 40 9. That Engineer recognizes that ldaho Power, in accordance with paragraph 5.2 of the Agreement, is relying on Engineer's representations and opinions contained in this Statement. 10. That Engineer certifies that the above statements are complete, true and accurate to the best of his/her knowledge and therefore sets his/her hand and seal below. By (P.8. Stamp) Date 4t APPENDIX C ENGINEER' S CERTI FICATION ONGOING OPERATIONS AND MATNTENANCE The undersigned on behalf of himself/herself hereinafter collectively referred to as "Engineer," hereby states and certifies to the Seller as follows: 1 . That Engineer is a Licensed Professional Engineer in good standing in the State of ldaho. 2. That Engineer has reviewed the Energy Sales Agreement, hereinafter referred to as the "Agreement," between ldaho Power as Buyer, and as Seller, dated 3. That the cogeneration or small power production project which is the subject of the Agreement and this Statement is identified as Idaho Power Company Facility No and hereinafter referred OF and to as the "Project". 4. That the Project, which is commonly known as the is located in Section Township Range Boise Meridian,County, Idaho. 5. That Engineer recognizes that the Agreement provides for the Project to furnish electrical energy to Idaho Power for a year period. 6. That Engineer has substantial experience in the design, construction and operation of electric power plants of the same type as this Project. 7. That Engineer has no economic relationship to the Design Engineer of this Project. 42 8. That Engineer has made a physical inspection of said Project, its operations and maintenance records since the last previous certified inspection. The Engineer certifies, based on the Project's appearance and the information provided by the Project, that the Project's ongoing O&M has been completed in accordance with said O&M Policy; that it is in reasonably good operating condition; and it is in the Engineer's professional opinion that if adherence to said O&M Policy continues, the Project will continue producing at or near its design electrical output, efficiency and plant factor for the remaining years of the Agreement. 9. That Engineer recognizes that Idaho Power, in accordance with paragraph 5.2 of the Agreement, is relying on Engineer's representations and opinions contained in this Statement. 10. That Engineer ceftifies that the above statements are complete, true and accurate to the best of his/her knowledge and therefore sets his/her hand and seal below. By (P.E. Stamp) Date 43 APPENDIX C ENGINEER'S CERTIFICATION DESIGN & CONSTRUCTION ADEQUACY hereinafter collectively referred to as "Engineer", hereby states and certifies to Idaho Power as follows: l. That Engineer is a Licensed Professional Engineer in good standing in the State of Idaho. 2. That Engineer has reviewed the Energy Sales Agreement, hereinafter referred to as the ''Agreement'',betweenIdahoPowerasBuyer,andasSeller,dated J That the cogeneration or small power production project, which is the subject of the Agreement and this Statement, is identified as Idaho Power Company Facility No and OF Theundersigned,oflbehalfofhimself/herselfand is hereinafter referred to as the "Project". 4. That the Project, which is commonly known as the is located in SectionTownshipRange-,BoiseMeridian,-Coun[,Idaho. 5. That Engineer recognizes that the Agreement provides for the Project to furnish electrical energy to Idaho Power for a year period. 6. That Engineer has substantial experience in the design, construction and operation of electric power plants of the same type as this Project. 7. That Engineer has no economic relationship to the Design Engineer of this Project and has made the analysis of the plans and specifications independently. 8. That Engineer has reviewed the engineering design and construction of the Project, including the civil work, electrical work, generating equipment, prime mover conveyance system, Seller furnished Interconnection Facilities and other Project facilities and equipment. 9. That the Project has been constructed in accordance with said plans and specifications, all 44 applicable codes and consistent with Prudent Electrical Practices as that term is described in the Agreement. 10. That the design and construction of the Project is such that with reasonable and prudent operation and maintenance practices by Seller, the Project is capable of performing in accordance with the terms of the Agreement and with Prudent Electrical Practices for a _ year period. ll. That Engineer recognizes that Idaho Power, in accordance with paragraph 5.2 of the Agreement, in interconnecting the Project with its system, is relying on Engineer's representations and opinions contained in this Statement. 12. That Engineer certifies that the above statements are complete, true and accurate to the best of his/her knowledge and therefore sets his/her hand and seal below. By (P.8. Stamp) Date 45 D-1 NON SEASONAL HYDRO FACILITY ENERGY PRICES (Prices based on 112 kw of Capacity) Base Ener&v Heavy Load Purchase Price - For all Base Energy received during Heavy Load Hours, Idaho Power will pay the non-levelized energy price in accordance with Commission Order 34062 effective June 1,2018, with full capacity payments per Commission Order 32697 and seasonalization factors applied: Season 1-(73.50%) Mills/kWh Season 2-(120.00%) Mills/kWh Season3-(100.00%) Mills/kWhYear 201 8 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 44.14 46.92 49.13 49.91 51.02 52.8s 54.64 56.62 58.0 r 59.50 60.74 62.23 63.36 64.49 6s.86 67.01 68.42 69.70 71.95 73.39 75.26 72.07 76.60 80.22 8t.48 83.30 86.28 89.21 92.45 94.72 97.15 99.16 l0l .59 103.44 r 0s.28 107.52 109.41 l l l.70 I13.80 117.47 119.82 122.88 60.06 63.83 66.85 67.90 69.42 71.90 74.34 77.04 78.93 80.96 82.64 84.66 86.20 87.74 89.60 91.17 93.09 94.83 97.89 99.85 102.40 46 APPENDIX D l D-2 Base Energy Light Load Purchase Price - For all Base Energy received during Light Load Hours, Idaho Power will pay the non-levelized energy price in accordance with Commission Order 34062 effective June 1,2018, with full capacity payments per Commission Order 32697 and seasonalization factors applied: Season 1-(73.50%) Mills/kWh Season 2-(120.00%) Mills/kWh Season 3 - (100.00 %) Mills/kWhYear 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 38.79 41.57 43.78 44.56 45.67 47.50 49.29 51.27 52.66 54.1 5 55.39 56.87 58.01 59.14 60.5 r 61.66 63.07 64.35 66.60 68.04 69.91 63.33 67.86 71.48 72.74 74.57 77.55 80.47 83.71 85.98 88.41 90.43 92.86 94.70 96.55 98.79 100.67 102.97 105.06 108.73 I I 1.08 114.14 52.78 56.5s 59.57 60.62 62.14 64.62 67.06 69.76 71.65 73.68 75.36 77.38 78.92 80.46 82.32 83.89 85.8 1 87.55 90.61 92.57 95.12 47 D-3 All Hours Energ.y Price - The price to be used in the calculation of the Surplus Energy Price and Delay Damage Price shall be the non-levelized energy price in accordance with Commission Order 34062 effective June 1, 2018, with full capacity payments per Commission Order 32697 and seasonalization factors applied: Season 1-(73.50%) Mills/kWh Season2-(120.00%) Mills/kWh Season3-(100.00%) Mills/kWhYear 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 41.76 44.54 46.7s 47.52 48.64 50.47 52.26 54.24 s5.63 57.12 58.36 59.84 60.98 62.11 63.48 64.63 66.04 67.32 69.57 71.01 72.88 68.1 8 72.71 76.33 77.59 79.41 82.40 85.32 88.s6 90.83 93.26 9s.28 97.70 99.55 101 .40 103.63 105.52 107.82 109.91 113.58 1 1s.93 1 18.99 s6.82 60.59 63.61 64.66 66.1 8 68.66 71.10 73.80 75.69 77.72 79.40 81.42 82.96 84.s0 86.36 87.93 89.8s 91.s9 94.6s 96.61 99.16 48 APPENDIX E INSURANCE REQUIREMENTS The Seller shall secure and continuously carry insurance as specified within this Appendix for the term of the Agreement. Insurance Requirements: l. All insurance required by this Agreement shall be placed with an insurance company with an A.M. Best Company rating of A- or better. 2. If the insurance coverage required in this Appendix is cancelled, materially changed or lapses for any reason, the Seller will immediately notifi Idaho Power in writing. This notice will advise Idaho Power of the specific reason for cancellation, material change or lapse and the steps being taken to comply with these Insurance Requirements. Failure to provide this notice and to comply with these Insurance Requirements within 5 days of the cancellation, material change or lapse will constitute a Material Breach and Idaho Power may terminate this Agreement. 3. Prior to the First Energy date and subsequently within l0 days of the annual anniversary of the Operation Date, the Seller shall provide a Certificate of Insurance in the name of Idaho Power Company and list Idaho Power Company as an Additional Insured Endorsement and Waiver of Subrogation Endorsement. 4. The Certificate of Insurance shall evidence the appropriate insurance coverage of Comprehensive General Liability Insurance for both bodily injury and property damage with limits equal to $1,000,000, each occurrence, combined single limit. The deductible for such insurance shall be consistent with current Insurance Industry Utility practices for similar property. 49