October 13,2017
VIA HAND DELIVERY
Diane M. Hanian, Secretary
ldaho Public Utilities Commission
472 West Washington Street
Boise, ldaho 83702
Re: Case No. IPC-E-17-15
ldaho Power Company's Annual Compliance Filing to Update the Load and
Gas Forecast Components of the lncremental Cost lntegrated Resource
Plan Avoided Cost Methodology
Dear Ms. Hanian
Enclosed for filing in the above matter please find an original and seven (7) copies
of ldaho Power Company's Annual Compliance Filing.
Very yours,
E. Walker
DEW:csb
Enclosures
1221 W. ldaho 5t. (83702)
PO. Box 70
Boise, lD 83707
An IDACORP Companv
DONOVAN E. WALKER (lSB No. 5921)
ldaho Power Company
1221West ldaho Street (83702)
P.O. Box 70
Boise, ldaho 83707
Telephone: (208) 388-5317
Facsimile: (208) 388-6936
dwa lker@ id a hopower. com
IDAHO POWER COMPANY'S ANNUAL
COMPLIANCE FILING TO UPDATE THE
LOAD AND GAS FORECASTS !N THE
INCREMENTAL COST INTEGRATED
RESOURCE PLAN AVOIDED COST
MODEL.
Attorney for ldaho Power Company
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
)
)
)
)
)
)
)
CASE NO. tPC-E-17-15
IDAHO POWER COMPANY'S
ANNUAL COMPLIANCE FILING
ldaho Power Company ("ldaho Power") hereby respectfully submits to the Idaho
Public Utilities Commission ("Commission") this filing in compliance with Order Nos.
32697 and 32802 to update the load forecast and natural gas forecast components of the
lncremental Cost lntegrated Resource Plan ("lClRP") avoided cost methodology.
!. INTRODUCTION
ln its final Order No. 32697, the Commission determined that the inputs to the
ICIRP avoided cost methodology, utilized for all proposed Public Utility Regulatory
Policies Act of 1978 ("PURPA") Qualifying Facility ("QF') projects that exceed the
IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING - 1
I ,'\
published rate eligibility cap, will be updated every two years upon acknowledgement of
the utility's Integrated Resource Plan ("lRP") filing, with the exception of the Ioad forecast
and the natural gas forecast-which is to be updated annually by October 15 of each
year. The Commission stated
We find that, in order to maintain the most accurate and up-
to-date reflection of a utility's true avoided cost, utilities must
update fuel price forecasts and load forecasts annually -
between IRP filings. For the sake of consistency, these
annual updates should occur simultaneously with SAR
updates - on June 1 of each year. ln addition, it is appropriate
to consider long-term contract commitments because of the
potential effect that such commitments have on a utility's load
and resource balance. We find it reasonable to include long-
term contract considerations in an IRP Methodology
calculation at such time as the QF and utility have entered into
a signed contract for the sale and purchase of QF power. We
further find it appropriate to consider PURPA contracts that
have terminated or expired in each utility's load and resource
balance. We find it reasonable that all other variables and
assumptions utilized within the IRP Methodology remain fixed
between IRP filings (every two years).
Order No. 32697, p.22. The date for the annual update was later changed from June 1
to October 15 of each year. Order No. 32802.
The load forecast, natural gas forecast, and contract information presented below
in compliance with the Commission's Orders have been incorporated into ldaho Power's
ICIRP avoided cost methodology. Consistent with the Commission's prior Orders, this
methodology will be utilized by ldaho Power as the starting point for the negotiation of its
contractual avoided cost rates as of October 15,2017.
II. LOAD FORECAST
ldaho Power's most recent load forecast from October 2017 shows, on average,
an increase in its customer loads when compared to the October 2016load forecast that
IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING - 2
was provided to the Commission for the 2016 update in Case No. IPC-E-16-22 and
approved by the Commission in Order No. 33646.
Table 1 and Graph 1 below show the average annual load forecast for both the
previously approved October 2016load forecast and the most recent 2017 load forecast
through 2034.
TABLE 1
Average Annua! Load Forecast
Year
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
October 2016
(aMW)
1,810
1,840
1,864
1,874
1,894
1,914
1,935
1,955
1,975
1,990
2,007
2,018
2,039
2,053
2,067
2,074
2,095
2,112
October 2017
(aMW)
1,900
1,950
1,877
1,994
1,927
1,949
1,979
1,994
2,017
2,033
2,048
2,059
2,093
2,099
2,114
2,125
2,145
2,161
IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING - 3
GRAPH 1
Load Forecast
2,200
2,150
2,700
2,050
2,000
1,950
3[yl$/ 1,e00
1,850
1,800
L,750
L,700
"$ ,9t "S d,' ,"-d| ,S "S ".s,'
.uS
"&" "$ C p d," "-di "^S "S "&"
III. NATURAL GAS PRICE FORECAST
The natural gas price forecast that was updated in October 2016 was the U.S.
Energy lnformation Administration's ("ElA") Reference Case forecast for Natural Gas
Henry Hub Spot Price. Subsequent to that update, ldaho Power utilized EIA's Natural
Gas Henry Hub Spot Price: High Oil and Gas Resource and Technology forecast,
adjusted for pricing at Sumas and transport for ldaho City Gate delivery, in its IRP
process.
As of October 15,2017, ldaho Power will update the natural gas price forecast
within the ICIRP avoided cost model to reflect the most recent EIA Natural Gas Henry
Hub Spot Price: High Oil and Gas Resource and Technology forecast published on
January 5,2017. Use of this forecast indicates a decrease in the average annual natural
-Qst6!sp
2015 Load Forecast (aMW)
-October
2017 Load Forecast (aMW)
IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING - 4
gas forecast prices over the remaining period in comparison to the EIA 2016 natural gas
price forecast that was used in the ICIRP avoided cost model from the previous update.
Table 2 and Graph 2 display the 2016 EIA natura! gas price forecast and the
current 2017 EIA natural gas price forecast.
TABLE 2
EIA Natural Gas Henry Hub Spot Price forecast
October 2016* October 2017**
(nominalYear $/MMBtu) (nominal $/MMBtu)
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
3.21
3.83
4.34
4.90
4.89
5.03
5.59
6.00
6.27
6.22
6.31
6.50
6.69
6.84
6.93
7.11
7.19
7.32
2.83
3.22
4.24
4.81
4.39
4.21
4.39
4.56
4.74
4.65
4.73
5.05
5.14
5.09
5.05
4.84
4.83
5.32
IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING - 5
GRAPH 2
Natural Gas Price Forecast
-2015
Henry Hub EIA* (nominal)
-2017
Henry Hub EIA** (nominal)
Notes: *2016 EIA Natural Gas Henry Hub Spot Price: Reference Case.**2017 EIA Natural Gas Henry Hub Spot Price: High Oil and Gas Resource and Technology, adjusted for
ldaho City Gate delivery.
!V. CONTRACT TERMINATIONS,IRATIONS. AND ADDITIONS
ldaho Power currently has three non-PURPA, long-term power purchase
agreements: Elkhorn Valley Wind (101 megawatts ("MW')), Raft River Geothermal (13
MW), and Neal Hot Springs Geothermal (22 MW). ldaho Power currently has 133
contracts with PURPA QF projects with a total nameplate capacity of 1,150 MW. lncluded
in this update for signed Energy Sales Agreements ("ESA") are four new Oregon solar
QF ESAs totaling 23.75 MW, one new ldaho biomass QF ESA for 5 MW, and three
replacement ESAs for existing ldaho QF hydro projects totaling 2.75 MW. Please see
Attachment 1 attached hereto for a list of new and terminated contracts since the last
=Pco
1f>:(!
.E
Eoc
@(J
o-ri(!(9
6L)P(!z
Se
57
Ss
Ss
S+
5E
52
s1
So
IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING - 6
"$ C "^o9 "-&t "-6P "-dP "S "$ .,-S
"^&" "$ ,S ""tr "&" "d ',^E "S "^dy
update on October 15,2016. New ESAs, terminated or expired contracts, as well as new
complete ESA applications are all included in the ICIRP model on a continuous basis.
V. CONCLUSION
ldaho Power hereby respectfully submits this updated load forecast, natural gas
forecast, and contract information in compliance with the Commission's directives in
Order Nos. 32697 and 32802 and asks the Commission to accept the same for filing.
Respectfully submitted this 13th day October 2017 .
DONOVAN E. WALKER
Attorney for Idaho Power Company
IDAHO POWER COMPANY'S ANNUAL COMPLIANCE FILING - 7
BEFORE THE
IDAHO PUBLIG UTILITIES COMMISSION
GASE NO. IPC-E-17-15
IDAHO POWER COMPANY
ATTACHMENT 1
Facility Type Project Name State Replacement Contract Date
Hydro
Hydro
Hydro
Shoshone CSPP
Shingle Creek
Rock Creek #1
ID
ID
ID
Projects Not On-Line
70/3u2Ot6
s/8/2017
s/2s12077
0.36
o.22
2.17
TOTAT 2.75
Facility Type Project Name State Contract Date Project Size (MW)
Solar
Solar
Solar
Biomass
Solar
Brush Solar
Morgan Solar
Vale lSolar
SISW LFGE
Baker Solar Center
OR
OR
OR
ID
OR
LO/31/2OL6
70l3L12076
7013L/2076
3h312077
6lzLl2Ot7
2.75
3.00
3.00
s.00
15.00
TOTAL 28.75
Terminated/Expired Energy Sales Agreements
Facility Type Project Name State Terminated/Expired Date Project Size (MW)
Cogeneration
Hydro
Magic Valley
MillCreek Hydro
ID
OR
LLlzLl2016
6/30/2OL7
L0.00
0.80
TOTAL 10.80
Projects On-Line
Project Size (MW)