HomeMy WebLinkAbout20170526Decision Memo.pdfDECISION MEMORANDUM
TO COMMISSIONER ISELLAI\IDER
COMMISSIONER RAPER
COMMISSIONER AI\DERSON
COMMISSION SECRETARY
COMMISSION STAFF
LEGAL
FROM:DAPHNE IIUAITG
DEPUTY ATTOR}IEY GENERAL
DATE: MAY 26,2017
STJBJECT: IDAHO POWER,S APPLICATION TO APPROVE OR REJECT EI\ERGY
SALES AGREEMENT WITH SHINGLE CREEK LLC, CASE NO. IPC.E.
17-08
On May 17, 2017, Idaho Power Company filed an Application asking the
Commission to approve or reject its Energy Sales Agreement with Shingle Creek LLC. The
Agreement falls under the Public Utility Regulatory Policies Act of 1978 (PLJRPA), and is a
contract for the sale of electric energy purchased by Idaho Power, and generated by Shingle
Creek's hydro project ("Facility") near Riggins, Idaho. Idaho Power asked that its Application
be processed by Modified Procedure.
BACKGROT'ND
Under PURPA, electric utilities must purchase electric energy from "qualifying
facilities" (QFs) at rates approved by this Commission. l6 U.S.C. $ 824a-3; Idaho Power Co. v.
Idaho PUC,155 Idaho 780,789,316 P.3d 1278,1287 (2013). The purchase or "avoided cost"
rate shall not exceed the "'incremental cost' to the purchasing utility of power which, but for the
purchase of power from the QF, such utility would either generate itself or purchase from
another source." Order No. 32697 at7, citing Rosebud Enterprises v. Idaho PUC,l2Sldaho 624,
917 P.2d 781 (1996); I 8 C.F.R. $ 292.101(b)(6) (defining o'avoided cost").
The Commission has established two methods of calculating avoided costs,
depending on the size of the QF project: (l) the surrogate avoided resource (SAR) methodology,
and (2) the integrated resource plan (IRP) methodology. See Order No. 32697 at 7-8. The
Commission uses the SAR methodology - which applies to the Facility in this case - to establish
"published" avoided cost rates. 1d. Published rates are available for wind and solar QFs with a
DECISION MEMORANDUM
design capacity of up to 100 kilowatts (kW), and for QFs of all other resource types with a
design capacity of up to l0 average megawatts (aMW). Id. In this case, the Facility is a QF
under the "all other resource type" (specifically "non-seasonal hydro") category. Application at
2.
[r calculating avoided costs, the Commission has found it "reasonable, appropriate
and in the public interest to compensate QFs separately based on a calculation of not only the
energy they produce, but the capacity that they can provide to the purchasing utility." Order No.
32697 at 16. In calculating capacity, the Commission considers "each utility's capacity
deficiency based on load and resource balances found in each utility's [Integrated Resource Plan]
IRP," as well as "a QF's ability to contribute to a utility's need for capacity ." Id. at 16,21.
THE AGREEMENT
Idaho Power and Shingle Creek first entered into a PURPA agreement n 1982.
Application atZ. T\at contract is set to expire July 31, 2017. Id. The Agreement at issue in this
matter is a new contract that was entered into by Idaho Power and Shingle Creek on May 8,
2017. Id. Under the Agreement's terms, Shingle Creek elected to contact with Idaho Power for
a five-year term using the non-levelized, non-seasonal, hydro published avoided cost rates, as
established by the Commission (Order No. 33538) for replacement contracts and energy
deliveries of less than 10 alvtW. Id. at3-4.
The nameplate rating of the Facility is 222 kilowatts (kW), and Shingle Creek agrees
it will not exceed 10 alvtw on a monthly basis. Id. at 4. The Facility "is already interconnected
and selling energy to Idaho Power." Id. Nonetheless, the Agreement specifies its Scheduled
First Energy Date and Scheduled Operation Date as August I,2017. Id. The terms and
provisions of the Agreement include that "applicable interconnection charges and monthly
operational or maintenance charges under Schedule 72 wilLl be assessed to [Shingle Creek]." Id.
at 5. Also, PURPA QF generation "must be designated as a network resource ("DNR") to serve
Idaho Power's retail load on its system." 1d.
Under the Agreement, to maintain DNR status, "there must be a power purchase
agreement associated with [the Facility's] transmission service request in order to maintain
compliance with Idaho Power's non-discriminatory administration of its Open Access
Transmission Tariff (OATT) and maintains compliance with [Federal Energy Regulatory
Commission] FERC requirements." Id. The Agreement provides that it will not become
2DECISION MEMORANDUM
effective "until the Commission has approved all of [its] terms and conditions and declared that
all payments Idaho Power makes to Shingle Creek for purchases of energy will be allowed as
prudently incurred expenses for ratemaking purposes." Id. at 5.
STAF'F RECOMMENDATION
Staff recommends that the case be processed by Modified Procedure with a 2l-day
comment period, followed by a7-day reply period for Idaho Power.
COMI\{ISSION DECISION
Does the Commission wish to process this case under Modified Procedure with a2l-
day comment period followed by a7-day replyperiod for Idaho Power?
Huang
Deputy Aftorney
M:IPC-E-17-08_djh
3DECISION MEMORANDUM