Loading...
HomeMy WebLinkAbout20170602Final Approved Tariffs.pdf LISA NORDSTROM Lead Counsel lnordstrom@idahopower.com June 1, 2017 ELECTRONICALLY FILED Diane Hanian, Secretary Idaho Public Utilities Commission 472 West Washington Street P.O. Box 83720 Boise, Idaho 83720-0074 Re: Case No. IPC-E-17-06, Power Cost Adjustment Compliance Filing – Tariff Schedule 55 Dear Ms. Hanian: Idaho Power Company hereby submits the enclosed compliance filing in the above-captioned proceeding pursuant to Idaho Public Utilities Commission Order No. 33775, which includes its Tariff Schedule 55 as listed below, reflecting the change in rates with an effective date of June 1, 2017. Eleventh Revised Sheet No. 55-1 Cancelling Tenth Revised Sheet No. 55-1 Sixth Revised Sheet No. 55-2 Cancelling Sixth Revised Sheet No. 55-2 Fifth Revised Sheet No. 55-3 Cancelling Fourth Revised Sheet No. 55-3 If you have any questions regarding this filing, please contact Regulatory Analyst Nicole Blackwell at (208) 388-5764 or nblackwell@idahopower.com. Very truly yours, Lisa D. Nordstrom LDN/kkt Enclosure RECEIVED 2017 June 1 AM 10:22 IDAHO PUBLIC UTILITIES COMMISSION Idaho Power Company Eleventh Revised Sheet No. 55-1 Cancels I.P.U.C. No. 29, Tariff No. 101 Tenth Revised Sheet No. 55-1 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 33775 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – June 1, 2017 1221 West Idaho Street, Boise, Idaho SCHEDULE 55 POWER COST ADJUSTMENT APPLICABILITY This schedule is applicable to the electric energy delivered to all Idaho retail Customers served under the Company’s schedules and Special Contracts. These loads are referred to as "firm" load for purposes of this schedule. BASE POWER COST The Base Power Cost of the Company's rates is computed by dividing the sum of the Company's power cost components by firm kWh sales. The power cost components are segmented into three categories: Category 1, Category 2 and Category 3. Category 1 power costs include the sum of fuel expense and purchased power expense (excluding purchases from cogeneration and small power producers), less the sum of off-system surplus sales revenue and revenue from market-based special contract pricing. Category 2 power costs include purchased power expense from cogeneration and small power producers. Category 3 power costs include demand response incentive payments. The Base Power Cost is 2.0838 cents per kWh, which is comprised of Category 1 power costs of 1.0927 cents per kWh, Category 2 power costs of 0.9108 cents per kWh and Category 3 power costs of 0.0803 cents per kWh. PROJECTED POWER COST The Projected Power Cost is the Company estimate, expressed in cents per kWh, of the Category 1, Category 2 and Category 3 power cost components for the forecasted time period beginning April 1 each year and ending the following March 31. The Projected Power Cost is 2.5708 cents per kWh, which is comprised of Category 1 power costs of 1.2815 cents per kWh, Category 2 power costs of 1.2365 cents per kWh and Category 3 power costs of 0.0528 cents per kWh. TRUE-UP AND TRUE-UP OF THE TRUE-UP The True-up is based upon the difference between the previous Projected Power Cost and the power costs actually incurred. The True-up of the True-up is the difference between the previous year’s approved True-Up revenues and actual revenues collected. The total True-up is 0.2585 cents per kWh. EARNINGS SHARING Order Nos. 30978, 32424, and 33149 directed the Company to share a portion of its earnings above a certain threshold with customers through the annual Power Cost Adjustment. The Company’s 2016 earnings were below the prescribed threshold resulting in a credit of 0.0000. Schedule Description ¢ per kWh 1 Residential Service 0.0000 3 Master Metered Mobile Home Park 0.0000 5 Residential – Time-of-Day Pilot Plan 0.0000 7 Small General Service 0.0000 9S Large General Service – Secondary 0.0000 9P Large General Service – Primary 0.0000 IDAHO PUBLIC UTILITIES COMMISSION Approved Effective June 2, 2017 June 1, 2017 Per O.N. 33775 Diane M. Hanian Secretary Idaho Power Company Sixth Revised Sheet No. 55-2 Cancels I.P.U.C. No. 29, Tariff No. 101 Fifth Revised Sheet No. 55-2 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 33775 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – June 1, 2017 1221 West Idaho Street, Boise, Idaho SCHEDULE 55 POWER COST ADJUSTMENT (Continued) EARNINGS SHARING (Continued) 9T Large General Service – Transmission 0.0000 15 Dusk to Dawn Lighting 0.0000 19S Large Power Service – Secondary 0.0000 19P Large Power Service – Primary 0.0000 19T Large Power Service – Transmission 0.0000 24 Agricultural Irrigation Service 0.0000 40 Unmetered General Service 0.0000 41 Street Lighting 0.0000 42 Traffic Control Lighting 0.0000 Monthly Credit 26 Micron $0.00 29 Simplot $0.00 30 DOE $0.00 REFUND OF ENERGY EFFICIENCY (“EE”) RIDER FUNDS The following rate schedules will receive a rate credit associated with the refund of EE Rider funds in the form of a cents per kWh rate. Schedule Description ¢ per kWh 1 Residential Service (0.1148) 3 Master Metered Mobile Home Park (0.1097) 5 Residential – Time-of-Day Pilot Plan (0.1107) 7 Small General Service (0.1463) 9S Large General Service – Secondary (0.0864) 9P Large General Service – Primary (0.0750) 9T Large General Service – Transmission (0.0846) 15 Dusk to Dawn Lighting (0.2486) 19S Large Power Service – Secondary (0.0746) 19P Large Power Service – Primary (0.0661) 19T Large Power Service – Transmission (0.0625) 24 Agricultural Irrigation Service (0.0939) 40 Unmetered General Service (0.1032) 41 Street Lighting (0.1633) 42 Traffic Control Lighting (0.0730) 26 Micron (0.0579) 29 Simplot (0.0543) 30 DOE (0.0565) IDAHO PUBLIC UTILITIES COMMISSION Approved Effective June 2, 2017 June 1, 2017 Per O.N. 33775 Diane M. Hanian Secretary Idaho Power Company Fifth Revised Sheet No. 55-3 Cancels I.P.U.C. No. 29, Tariff No. 101 Fourth Revised Sheet No. 55-3 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No. 33775 Timothy E. Tatum, Vice President, Regulatory Affairs Effective – June 1, 2017 1221 West Idaho Street, Boise, Idaho SCHEDULE 55 POWER COST ADJUSTMENT (Continued) POWER COST ADJUSTMENT The Power Cost Adjustment is the sum of: 1) 95 percent of the difference between the Projected Power Costs in Category 1 and the Base Power Costs in Category 1; 2) 100 percent of the difference between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2; 3) 100 percent of the difference between the Projected Power Costs in Category 3 and the Base Power Costs in Category 3; 4) the True-ups; 5) Earnings Sharing; and 6) the refund of EE Rider funds. The monthly Power Cost Adjustment rates applied to the Energy rate of all metered schedules and Special Contracts are shown below. The monthly Power Cost Adjustment applied to the per unit charges of the nonmetered schedules is the monthly estimated usage times the cents per kWh rates shown below. Schedule Description ¢ per kWh 1 Residential Service 0.6213 3 Mastered Metered Mobile Home Park 0.6264 5 Residential – Time-of-Day Pilot Plan 0.6254 7 Small General Service 0.5898 9S Large General Service – Secondary 0.6497 9P Large General Service – Primary 0.6611 9T Large General Service – Transmission 0.6515 15 Dusk to Dawn Lighting 0.4875 19S Large Power Service – Secondary 0.6615 19P Large Power Service – Primary 0.6700 19T Large Power Service – Transmission 0.6736 24 Agricultural Irrigation Service 0.6422 40 Unmetered General Service 0.6329 41 Street Lighting 0.5728 42 Traffic Control Lighting 0.6631 26 Micron 0.6782 29 Simplot 0.6818 30 DOE 0.6796 EXPIRATION The Power Cost Adjustment included on this schedule will expire May 31, 2018. IDAHO PUBLIC UTILITIES COMMISSION Approved Effective June 2, 2017 June 1, 2017 Per O.N. 33775 Diane M. Hanian Secretary