HomeMy WebLinkAbout20170602Final Approved Tariffs.pdf
LISA NORDSTROM
Lead Counsel
lnordstrom@idahopower.com
June 1, 2017
ELECTRONICALLY FILED
Diane Hanian, Secretary
Idaho Public Utilities Commission
472 West Washington Street
P.O. Box 83720
Boise, Idaho 83720-0074
Re: Case No. IPC-E-17-06, Power Cost Adjustment
Compliance Filing – Tariff Schedule 55
Dear Ms. Hanian:
Idaho Power Company hereby submits the enclosed compliance filing in the
above-captioned proceeding pursuant to Idaho Public Utilities Commission Order No.
33775, which includes its Tariff Schedule 55 as listed below, reflecting the change in
rates with an effective date of June 1, 2017.
Eleventh Revised Sheet No. 55-1 Cancelling Tenth Revised Sheet No. 55-1
Sixth Revised Sheet No. 55-2 Cancelling Sixth Revised Sheet No. 55-2
Fifth Revised Sheet No. 55-3 Cancelling Fourth Revised Sheet No. 55-3
If you have any questions regarding this filing, please contact Regulatory Analyst
Nicole Blackwell at (208) 388-5764 or nblackwell@idahopower.com.
Very truly yours,
Lisa D. Nordstrom
LDN/kkt
Enclosure
RECEIVED
2017 June 1 AM 10:22
IDAHO PUBLIC
UTILITIES COMMISSION
Idaho Power Company Eleventh Revised Sheet No. 55-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Tenth Revised Sheet No. 55-1
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 33775 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2017 1221 West Idaho Street, Boise, Idaho
SCHEDULE 55
POWER COST ADJUSTMENT
APPLICABILITY
This schedule is applicable to the electric energy delivered to all Idaho retail Customers served
under the Company’s schedules and Special Contracts. These loads are referred to as "firm" load for
purposes of this schedule.
BASE POWER COST
The Base Power Cost of the Company's rates is computed by dividing the sum of the
Company's power cost components by firm kWh sales. The power cost components are segmented
into three categories: Category 1, Category 2 and Category 3. Category 1 power costs include the sum
of fuel expense and purchased power expense (excluding purchases from cogeneration and small
power producers), less the sum of off-system surplus sales revenue and revenue from market-based
special contract pricing. Category 2 power costs include purchased power expense from cogeneration
and small power producers. Category 3 power costs include demand response incentive payments.
The Base Power Cost is 2.0838 cents per kWh, which is comprised of Category 1 power costs of
1.0927 cents per kWh, Category 2 power costs of 0.9108 cents per kWh and Category 3 power costs of
0.0803 cents per kWh.
PROJECTED POWER COST
The Projected Power Cost is the Company estimate, expressed in cents per kWh, of the
Category 1, Category 2 and Category 3 power cost components for the forecasted time period
beginning April 1 each year and ending the following March 31. The Projected Power Cost is 2.5708
cents per kWh, which is comprised of Category 1 power costs of 1.2815 cents per kWh, Category 2
power costs of 1.2365 cents per kWh and Category 3 power costs of 0.0528 cents per kWh.
TRUE-UP AND TRUE-UP OF THE TRUE-UP
The True-up is based upon the difference between the previous Projected Power Cost and the
power costs actually incurred. The True-up of the True-up is the difference between the previous
year’s approved True-Up revenues and actual revenues collected. The total True-up is 0.2585 cents
per kWh.
EARNINGS SHARING
Order Nos. 30978, 32424, and 33149 directed the Company to share a portion of its earnings
above a certain threshold with customers through the annual Power Cost Adjustment. The Company’s
2016 earnings were below the prescribed threshold resulting in a credit of 0.0000.
Schedule Description ¢ per kWh
1 Residential Service 0.0000
3 Master Metered Mobile Home Park 0.0000
5 Residential – Time-of-Day Pilot Plan 0.0000
7 Small General Service 0.0000
9S Large General Service – Secondary 0.0000
9P Large General Service – Primary 0.0000
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 2, 2017 June 1, 2017
Per O.N. 33775
Diane M. Hanian Secretary
Idaho Power Company Sixth Revised Sheet No. 55-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Fifth Revised Sheet No. 55-2
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 33775 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2017 1221 West Idaho Street, Boise, Idaho
SCHEDULE 55
POWER COST ADJUSTMENT
(Continued)
EARNINGS SHARING (Continued)
9T Large General Service – Transmission 0.0000
15 Dusk to Dawn Lighting 0.0000
19S Large Power Service – Secondary 0.0000
19P Large Power Service – Primary 0.0000
19T Large Power Service – Transmission 0.0000
24 Agricultural Irrigation Service 0.0000
40 Unmetered General Service 0.0000
41 Street Lighting 0.0000
42 Traffic Control Lighting 0.0000
Monthly Credit
26 Micron $0.00
29 Simplot $0.00
30 DOE $0.00
REFUND OF ENERGY EFFICIENCY (“EE”) RIDER FUNDS
The following rate schedules will receive a rate credit associated with the refund of EE Rider
funds in the form of a cents per kWh rate.
Schedule Description ¢ per kWh
1 Residential Service (0.1148)
3 Master Metered Mobile Home Park (0.1097)
5 Residential – Time-of-Day Pilot Plan (0.1107)
7 Small General Service (0.1463)
9S Large General Service – Secondary (0.0864)
9P Large General Service – Primary (0.0750)
9T Large General Service – Transmission (0.0846)
15 Dusk to Dawn Lighting (0.2486)
19S Large Power Service – Secondary (0.0746)
19P Large Power Service – Primary (0.0661)
19T Large Power Service – Transmission (0.0625)
24 Agricultural Irrigation Service (0.0939)
40 Unmetered General Service (0.1032)
41 Street Lighting (0.1633)
42 Traffic Control Lighting (0.0730)
26 Micron (0.0579)
29 Simplot (0.0543)
30 DOE (0.0565)
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 2, 2017 June 1, 2017
Per O.N. 33775
Diane M. Hanian Secretary
Idaho Power Company Fifth Revised Sheet No. 55-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Fourth Revised Sheet No. 55-3
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 33775 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective – June 1, 2017 1221 West Idaho Street, Boise, Idaho
SCHEDULE 55
POWER COST ADJUSTMENT
(Continued)
POWER COST ADJUSTMENT
The Power Cost Adjustment is the sum of: 1) 95 percent of the difference between the Projected
Power Costs in Category 1 and the Base Power Costs in Category 1; 2) 100 percent of the difference
between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2; 3) 100
percent of the difference between the Projected Power Costs in Category 3 and the Base Power Costs
in Category 3; 4) the True-ups; 5) Earnings Sharing; and 6) the refund of EE Rider funds.
The monthly Power Cost Adjustment rates applied to the Energy rate of all metered schedules
and Special Contracts are shown below. The monthly Power Cost Adjustment applied to the per unit
charges of the nonmetered schedules is the monthly estimated usage times the cents per kWh rates
shown below.
Schedule Description ¢ per kWh
1 Residential Service 0.6213
3 Mastered Metered Mobile Home Park 0.6264
5 Residential – Time-of-Day Pilot Plan 0.6254
7 Small General Service 0.5898
9S Large General Service – Secondary 0.6497
9P Large General Service – Primary 0.6611
9T Large General Service – Transmission 0.6515
15 Dusk to Dawn Lighting 0.4875
19S Large Power Service – Secondary 0.6615
19P Large Power Service – Primary 0.6700
19T Large Power Service – Transmission 0.6736
24 Agricultural Irrigation Service 0.6422
40 Unmetered General Service 0.6329
41 Street Lighting 0.5728
42 Traffic Control Lighting 0.6631
26 Micron 0.6782
29 Simplot 0.6818
30 DOE 0.6796
EXPIRATION
The Power Cost Adjustment included on this schedule will expire May 31, 2018.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 2, 2017 June 1, 2017
Per O.N. 33775
Diane M. Hanian Secretary