Loading...
HomeMy WebLinkAbout20180316Form 556.pdfldaho Public Utilities Commission Office of the SecretaryRECEIVED MAR I 6 20t8 Boise,ldaho A Rsctoxlr. CoorsRrnvr Fon lrrscRlrr,u W,[srE, IVlff.tlcEMrNT P.O. Box 159 . 1050 WEsr 400 Soum . BuRLEy,Ip,rno t3318 Brls: (20E)432-9082 . FAx: (20E)432-6915 . tr'll.lvslslr'.oRc March 14,2018 Diane Hanian, Commission Secretary ldaho Public Utilities Commission 472W Washington Boise, lD 83702 RE: SISW LFGE Project; Case No. IPC-E-17-04; Order No. 33772; Self Certification FERC Form 556 Dear Diane, ln accordance to 18 C.F.R. 5 292.207lallai), CAFCO ldaho Refuse Management LLC (CAFCO) is required to provide a copy of their self-certification to the State regulatory authorities of the state in which the facility and utilities reside. On March L3,2O!7, CAFCO and ldaho Power Company (IPCO) entered into an Energy Sale Agreement where CAFCO will sell power to IPCO from the Southern ldaho Solid Waste (SISW) Landfill Gas to Energy (LFGE) Generation Facility located at 1050 W 400 S, Burley, lD 83318. This letter and the attached copy of Form 556 are being sent to inform ldaho Public Utilities Commission that SISW, on behalf of CAFCO, has submitted a self certification notice to the Federal Energy Regulation Commission for their LFGE Generation Facility. Sincerely, Josh Bartlome Executive Director & CEO cc. Step hen F. Freiburger, PE; Project Manager encl. Stephen Freiburger From: Sent: To: Subject: Attachments: Nate Francisco < nfrancisco@sisw.org > Tuesday, March l-3,2018 2:50 PM Stephen Freiburger FW: FERC Receipt of Filing in New Docket FERC 556 Form 3.13.2018.pdf Stephen, Here is the confirmation email for the FERC Filing. Also, I have attached the Self-Cert form that I used for the filing. Thanks, Nate Francisco Environmental Manager Southern ldaho Solid Waste Office: (208!.432-9082 Cell: (208) 670-5777 ---Origina I Message--- From : e Fil i n g@ferc.gov [ma i lto:e Fi I i ng@ferc.gov] Sent: Tuesday, March 73, 2078 1:19 PM To : nf ra ncisco @sisw.o rg; ef i I i ngaccepta nce @ferc.gov Subject: FERC Receipt of Filing in New Docket Confirmation of Receipt This is to confirm receipt by the FERC Office of the Secretary of the following electronic submission -Submission lD:859005 -Docket(s) No.: New Docket -Filed By: CAFCo ldaho Refuse Management LLC -Signed By: Josh Bartlome -Filing Desc: Self-Certification of EG or FC of CAFCo ldaho Refuse Management LLC under New Docket. -Submission Datefiime: 3h3/2078 3:12:05 PM -Projected Filed Datefime: 3lL3/20L9 3:12:05 PM (Subject to Change based on OPM/FERC Closure) Additional detail about your filing is available via the following link https://ferconline.ferc.gov/SubmissionStatus.aspx?hashcode=ObNkSqki3bRMAPiUd rew Thank you for participating in the FERC Electronic Filing System. lf you have any questions, or if you detect errors in your submission or the FERC-generated PDF, please contact FERC at: I E-Mail: ferconlinesupport@ferc.gov mailto:ferconlinesupport@ferc.gov (do not send filings to this address) Voice Mail 866-208-3675. 2 FEDERAL EN ERGY REGULATORY COMMISSION WASHINGTON, DC OMB Control # 1902-0075 Expiration 06/30/2019 Fo rm 5 5 6 ;:Jlfti,H::'.H:l?;L',#i:il,I;'' status ror a sma, Power General Questions about completing this form should be sent to Form556@ferc.gov. lnformation about the Commission's QF program, answers to frequently asked questions about QF requirements or completing this form, and contact information for QF program staff are available at the Commission's QF website, www.ferc.gov/QF. The Commission's QF website also provides links to the Commission's QF regulations (18 C.F.R. S 131.80 and Part 292), as well as other statutes and orders pertaining to the Commission's QF program. Who Must File Any applicant seeking QF status or recertification of QF status for a generating facility with a net power production capacity (as determined in lines 7a through 79 below) greater than 1000 kW must file a self-certification or an application for Commission certification of QF status, which includes a properly completed Form 556. Any applicant seeking QF status for a generating facility with a net power production capacity 1000 kW or less is exempt from the certification requirement, and is therefore not required to complete or file a Form 556. See 18 C.F.R. 5 292.203. How to Complete the Form 556 This form is intended to be completed by responding to the items in the order they are presented, according to the instructions given. lf you need to back-track, you may need to clear certain responses before you will be allowed to change other responses made previously in the form. lf you experience problems, click on the nearest help button (1,1 ) for assistance, or contact Commission staff at Form556@ferc.gov. Certain lines in this form will be automatically calculated based on responses to previous lines, with the relevant formulas shown. You must respond to all of the previous lines within a section before the results of an automatically calculated field will be displayed. lf you disagree with the results of any automatic calculation on this form, contact Commission staffat Form556raferc.gov to discuss the discrepancy before filing. You must complete all lines in this form unless instructed otherwise. Do not alter this form or save this form in a different format. lncomplete or altered forms, or forms saved in formats other than PDF, will be rejected. How to File a Completed Form 556 Applicants are required to file their Form 556 electronically through the Commission's eFiling website (see instructions on page 2). By filing electronically, you will reduce your filing burden, save paper resources, save postage or courier charges, help keep Commission expenses to a minimum, and receive a much faster confirmation (via an email containing the docket number assigned to your facility) that the Commission has received your filing. lf you are simultaneously filing both a waiver request and a Form 556 as part of an application for Commission certification, see the "Waiver Requests" section on page 3 for more information on how to file. Paperwork Reduction Act Notice This form is approved by the Office of Management and Budget. Compliance with the information requirements established by the FERC Form No. 556 is required to obtain or maintain status as a QF. See '18 C.F.R. S 131.80 and Part 292. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The estimated burden for completing the FERC Form No. 556, including gathering and reporting information, is as follows: 3 hours for self-certification of a small power production facility, 8 hours for self-certifications of a cogeneration facility,6 hours for an application for Commission certification of a small power production facility, and 50 hours for an application for Commission certification of a cogeneration facility. Send comments regarding this burden estimate or any aspect of this collection of information, including suggestions for reducing this burden, to the following: lnformation Clearance Officer, Office of the Executive Director (ED-32), Federal Energy Regulatory Commission, 888 First Street N.E., Washington, DC20426 (DataClearance@ferc.gov);and DeskOfficerforFERC,Officeof lnformation and RegulatoryAffairs, Office of Management and Budget, Washington, DC 20503 (oira submis!iolqq111!,qop_g9v). lnclude the Control No. 1902-0075 in any correspondence. FERC Form 556 Page 2 - lnstructions Electronic Filing (eFiling) To electronically file your Form 556, visit the Commission's QF website at wuryJe_r_egqvlQ_E and click the eFiling link. lf you are eFiling your first document, you will need to register with your name, email address, mailing address, and phone number. lf you are registering on behalf of an employer, then you will also need to provide the employer name, alternate contact name, alternate contact phone number and and alternate contact email. Once you are registered, log in to eFiling with your registered email address and the password that you created at registration. Follow the instructions. When prompted, select one of the following QF-related filing types, as appropriate, from the Electric or General filing category. Filing category Filing Type as listed in eFiling Description Electric (Fee) Application for Commission Cert. as Cogeneration QF Use to submit an application for Commission certifi cation or Commission recertification of a cogeneration facility as a QF. (Fee) Application for Commission Cert. as Small Power QF Use to submit an application for Commission certification or Commission recertification of a small power production facility as a QF. Self-Certification Notice (QF, EG, FC) Use to submit a notice of self- certification of your facility (cogeneration or small power production) as a QF. Self-Recertifi cation of Qua I ifyi n g Faci lity (QF) Use to submit a notice of self- recertification of your facil ity (cogeneration or small power production) as a QF. Supplemental lnformation or Request Use to correct or supplement a Form 556 that was submitted with errors or omissions, or for which Commission staff has requested additional information. Do not use this filing type to report new changes to a facility or its ownership; rather, use a self- recertifi cation or Commission recertification to report such changes. General (Fee) Petition for Declaratory Order (not under FPA Part 1) Use to submit a petition for declaratory order granting a waiver of Commission QF regulations pursuant to 18 C.F.R. 55 292.20a(a) (3) and/or 292.205(c). A Form 556 is not required for a petition for declaratory order unless Commission recertification is being requested as part of the petition. You will be prompted to submit your filing fee, if applicable, during the electronic submission process. Filing fees can be paid via electronic bank account debit or credit card. During the eFiling process, you will be prompted to select your file(s) for upload from your computer. FERC Form 556 Page 3 - lnstructions Filing Fee No filing fee is required if you are submitting a self-certification or self-recertification of your facility as a QF pursuant to 1 8 C.F.R.5 292.207(a). A filing fee is required if you are filing either of the following: ('l ) an application for Commission certification or recertification of your facility as a QF pursuant to I 8 C.F.R. I 292.207(b), or (2) a petition for declaratory order granting waiver pursuant to 18 C.F.R. 55 292.20a(a)(3) and/or 292.205(c). The current fees for applications for Commission certifications and petitions for declaratory order can be found by visiting the Commission's QF website at www.ferE.gov/QF and clicking the Fee Schedule link. You will be prompted to submit your filing fee, if applicable, during the electronic filing process described on page 2. Required Notice to Utilities and State Regulatory Authorities Pursuant to 1 8 C.F.R. I 292.207(a)(ii), you must provide a copy of your self-certification or request for Commission certification to the utilities with which the facility will interconnect and/or transact, as well as to the State regulatory authorities of the states in which your facility and those utilities reside. Links to information about the regulatory authorities in various states can be found by visiting the Commission's QF website at www.ferc.gov/QF and clicking the Notice Requirements link. What to Expect From the Commission After You File An applicant filing a Form 556 electronically will receive an email message acknowledging receipt of the filing and showing the docket number assigned to the filing. Such email is typically sent within one business day, but may be delayed pending confirmation by the Secretary of the Commission of the contents of the filing. An applicant submitting a self-certification of QF status should expect to receive no documents from the Commission, other than the electronic acknowledgement of receipt described above. Consistent with its name, a self-certification is a certification by the applicanf itse/f that the facility meets the relevant requirements for QF status, and does not involve a determination by the Commission as to the status of the facility. An acknowledgement of receipt of a self-certification, in particular, does not represent a determination by the Commission with regard to the QF status of the facility. An applicant self-certifying may, however, receive a rejection, revocation or deficiency letter if its application is found, during periodic compliance reviews, not to comply with the relevant requirements. An applicant submitting a request for Commission certification will receive an order either granting or denying certification of QF status, or a letter requesting additional information or rejecting the application. Pursuant to 18 C.F.R. S 292.207(bX3), the Commission must act on an application for Commission certification within 90 days of the later of the filing date of the application or the filing date of a supplement, amendment or other change to the application. Waiver Requests 18 C.F.R. 5 292.204(a)(3) allows an applicant to request a waiver to modify the method of calculation pursuant to 18 C.F.R. S 292.20a@)Q) to determine if two facilities are considered to be located at the same site, for good cause. 18 C.F.R. 5 292.205(c) allows an applicant to request waiver of the requirements of 18 C.F.R. SS 292.205(a) and (b) for operating and efficiency upon a showing that the facility will produce significant energy savings. A request for waiver of these requirements must be submitted as a petition for declaratory order, with the appropriate filing fee for a petition for declaratory order. Applicants requesting Commission recertification as part of a request for waiver of one of these requirements should electronically submit their completed Form 556 along with their petition for declaratory order, rather than filing their Form 556 as a separate request for Commission recertification. Only the filing fee for the petition for declaratory order must be paid to cover both the waiver request and the request for recertification if such requests ore made simultoneously. 1 8 C.F.R. 5 292.203(dX2) allows an applicant to request a waiver of the Form 556 filing requirements, for good cause. Applicants filing a petition for declaratory order requesting a waiver under 1 8 C.F.R. S 292.203(d)(2) do not need to complete or submit a Form 556 with their petition. FERC Form 556 Page 4 - lnstructions Geographic Coord i nates lf a street address does not exist for your facility, then line 3c of the Form 556 requires you to report your facility's geographic coordinates (latitude and longitude). Geographic coordinates may be obtained from several different sources. You can find links to online services that show latitude and longitude coordinates on online maps by visiting the Commission's QF webpage at utwvylelc.gqvlQE and clicking the Geographic Coordinates link. You may also be able to obtain your geographic coordinates from a GPS device, Google Earth (available free at hlplearth.saag!e.q9lrr, a property survey, various engineering or construction drawings, a property deed, or a municipal or county map showing property lines. Filing Privileged Data or Critical Energy lnfrastructure lnformation in a Form 556 The Commission's regulations provide procedures for applicants to either (1) request that any information submitted with a Form 556 be given privileged treatment because the information is exempt from the mandatory public disclosure requirements of the Freedom of lnformation Act, 5 U.S.C. 5 552, and should be withheld from public disclosure; or (2) identify any documents containing critical energy infrastructure information (CEll) as defined in 18 C.F.R. 5 388.1 13 that should not be made public. lf you are seeking privileged treatment or CEll status for any data in your Form 556, then you must follow the procedures in I8 C.F.R. S 388.1 12. See www.ferc.gor2 lrelp/filing-guide/file-ceii.asp for more information. Among other things (see 18 C.F.R. 5 388.1 12 for other requirements), applicants seeking privileged treatment or CEll status for data submitted in a Form 556 must prepare and file both (1 ) a complete version of the Form 556 (containing the privileged and/or CEll data), and (2) a public version of the Form 556 (with the privileged and/or CEll data redacted). Applicants preparing and filing these different versions of their Form 556 must indicate below the security designation of this version of their document. lf you are not seeking privileged treatment or CEll status for any of your Form 556 data, then you should not respond to any of the items on this page. The eFiling process described on page 2 will allow you to identify which versions of the electronic documents you submit are public, privileged and/or CEll. The filenames for such documents should begin with "Public", "Priv", or "CEll", as applicable, to clearly indicate the security designation of the file. Both versions of the Form 556 should be unaltered PDF copies of the Form 556, as available for download from www.ferc.gov/QF. To redact data from the public copy of the submittal, simply omit the relevant data from the Form. For numerical fields, leave the redacted fields blank. For text fields, complete as much of the field as possible, and replace the redacted portions of the field with the word "REDACTED" in brackets. Be sure to identify above all fields which contain data for which you are seeking non-public status. The Commission is not responsible for detecting or correcting filer errors, including those errors related to security designation. lf your documents contain sensitive information, make sure they are filed using the proper security designation. Non-Public Applicant is seeking privileged treatment and/or CEll status for data contained in the Form 556 lines ! indicated below. This non-public version of the applicant's Form 556 contains all data, including the data that is redacted in the (separate) public version of the applicant's Form 556. Public (redacted): Applicant is seeking privileged treatment and/or CEll status for data contained in the Form 556 lines ! indicated below. This public version of the applicants's Form 556 contains all data except for data from the lines indicated below, which has been redacted. Privileged: lndicate below which lines of your form contain data for which you are seeking privileged treatment Critical Energy lnfrastructure lnformation (CEll): lndicate below which lines of your form contain data for which you are seeking CEll status C .9 (o E o C E .o (o .tJao- 1 a Full name of applicant (legal entity on whose behalf qualifying facility status is sought for this facility) CAFCo Tdaho Refuse Management LLC c,/o Southern Idaho Solid Waste (SISW) 1b Applicant street address 1050 W 400 s 1c City Burley 1d State/province Idaho le Postal code 83318 1f Country (if not United States)1g Telephone number (208) 432-9082 t h Has the instant facility ever previously been certified as a QF? Yes ! No X 1 i lf yes, provide the docket number of the last known QF filing pertaining to this facility: QF 1j Under which certification process is the applicant making this filing? - Notice of self-certification ,-- Application for Commission certification (requires filinga (see note below) u fee; see "Filing Fee" section on page 3) Note: a notice of self-certification is a notice by the applicant itself that its facility complies with the requirements for QF status. A notice of self-certification does not establish a proceeding, and the Commission does not review a notice of self-certification to verifr compliance. See the "What to Expect From the Commission After You File" section on page 3 for more information. 1k What type(s) of QF status is the applicant seeking for its facility? (check all that apply) )( Qualifoing small power production facility status I Qualifying cogeneration facility status 1l What is the purpose and expected effective date(s) of this filing? \ Original certification; facility expected to be installed by 4 / 2 / 78 and to begin operation on 5 / 1/ tB Change(s) to a previously certified facility to be effective on (identify type(s) of change(s) below, and describe change(s) in the Miscellaneous section starting on page 19) Name change and/or other administrative change(s) Change in ownership Change(s) affecting plant equipment, fuel use, power production capacity and/or cogeneration thermal output Supplement or correction to a previous filing submitted on (describe the supplement or correction in the Miscellaneous section starting on page 19) 1m lf any of the following three statements is true, check the box(es) that describe your situation and complete the form to the extent possible, explaining any special circumstances in the Miscellaneous section starting on page 19. ,-- The instant facility complies with the Commission's QF requirements by virtue of a waiver of certain regulationsu previously granted by the Commission in an order dated (speciff any other relevant waiver orders in the Miscellaneous section starting on page 19) ,-- The instant facility would comply with the Commission's QF requirements if a petition for waiver submittedu concurrently with this application is granted The instant facility complies with the Commission's regulations, but has special circumstances, such as the ! employment of unique or innovative technologies not contemplated by the structure of this form, that make the demonstration of compliance via this form difficult or impossible (describe in Misc. section starting on p. 19) FEDERAL ENERGY REGULATORY COMMISSION oMBContror # 1so2-oo7s WASHINGTON, DC Expiration 06/30/201e F o r m 5 5 6 ;:Jlftl[::::H:l?;:,'#i:nlQF) status for a smarr Power (, v w (,! o g FERC Form 556 Page6-AllFacilities tr €3 tr c .9 (o E o c L,,(o CotJ 2a Name of contact person Josh Bartlome 2b Telephone number (208) 432-9082 2c Which of the following describes the contact person's relationship to the applicant? (check one) ! Applicant (selfl ! Employee, owner or partner of applicant authorized to represent the applicant I Employee of a company affiliated with the applicant authorized to represent the applicant on this matter ! Lawyer, consultant, or other representative authorized to represent the applicant on this matter 2d Company or organization name (if applicant is an individual, check here and skip to line 2e) CAFCo Idaho Refuse Management LLC c/o Southern Idaho Solid Waste 2e Street address (if same as Applicant, check here and skip to line 3a)X 2l City 2g State/province 2h Postal code 2i Country (if not United States) Co (o L.,o EC(o C .9 (oU .E Co =.E (J(o lJ- 3a Facility name Milner Butte Landfill 3b Street address (if a street address does not exist for the facility, check here and skip to line 3c) 1050 W 400 S Burley, Idaho 83318 3c Geographic coordinates: lf you indicated that no street address exists for your facility by checking the box in line 3b, then you must speciff the latitude and longitude coordinates of the facility in degrees (to three decimal places). Use the following formula to convert to decimal degrees from degrees, minutes and seconds: decimal degrees = degrees + (minutes/60) + (seconds/3600). See the "Geographic Coordinates" section on page 4 for help. lf you provided a street address for your facility in line 3b, then specifying the geographic coordinates below is optional. 714.004 degrees 42.466 degreesl-l East (+) Longitude fr west (_) X lrtorttr (+)Latitude fr sor*' i-l 3d City (if unincorporated, check here and enter nearest city) ! Burley 3e State/province Idaho 3f County (or check here for independent city) Cas s ia 39 Country (if not United States) tno := f O)C U(ovlc(! ldentify the electric utilities that are contemplated to transact with the facility 4a ldentify utility interconnecting with the facility Idaho Power Company 4b ldentify utilities providing wheeling service or check here if none fi 4c ldentify utilities purchasing the useful electric power output or check here if none Idaho Power Company 4d ldentify utilities providing supplementary power, backup power, maintenance power, and/or interruptible power service or check here if none I FERC Form 556 PageT - All Facilities Co (! oo-oEc(o o- =rn oC =o 5a Direct ownership as of effective date or operation date: ldentifo all direct owners of the facility holding at least l0 percent equity interest. For each identified owner, also (1) indicate whether that owner is an electric utility, as defined in section 3(22) of the Federal Power Act (16 U.S.C. 796(22)), or a holding company, as defined in section 1262(8) of the Public Utility Holding Company Act of 2005 (42 U.S.C. 1 6451 (8)), and (2) for owners which are electric utilities or holding companies, provide the percentage of equity interest in the facility held by that owner. lf no direct owners hold at least 10 percent equity interest in the facility, then provide the required information for the two direct owners with the largest equity interest in the facility. Electric utility or lf Yes, holding o/o equity Full legal names of direct owners company interest l) carco Idaho Refuse Management LLC c/o SISW Yes ! Yes! Yes ! Yes ! Yes ! Yes ! Yes ! Yes ! Yes ! Yes ! NoX NoI NoE NoE NoE NoE NoE NoE NoE NoE z a_ 9 % I 6 z 6 z 2) 3) 4) s) 6) 7\ 8) e) 10) ! Check here and continue in the Miscellaneous section starting on page '19 if additional space is needed 5b Upstream (i.e., indirect) ownership as of effective date or operation date: ldentify all upstream (i.e., indirect) owners of the facility that both (1 ) hold at least 1 0 percent equity interest in the facility, and (2) are electric utilities, as defined in section 3(22) of the Federal Power Act (l 6 U.S.C. 796(22)), or holding companies, as defined in section 1262(8) of the Public Utility Holding CompanyActof 2005 (42 U.S.C.16451(8)). Also providethe percentageof equity interest in the facility held by such owners. (Note that, because upstream owners may be subsidiaries of one another, total percent equity interest reported may exceed 100 percent.) Check here if no such upstream owners exist. I o/o equity Full legal names of electric utility or holding company upstream owners interest r) 2) 3) 4) s) 6) 7) 8) e) 10) z z 6 z 6 6 z % z z Check here and continue in the Miscellaneous section starting on page 19 if additional space is needed 5c ldentify the facility operator Brent Dozier FERC Form 556 PageS-AllFacilities o-C Ol oClrJ 6a Describe the primary energy input: (check one main category and, if applicable, one subcategory) I Biomass (specifi) ! Renewable resources (specify) ! Geothermal I Landfill gas ! Hydro power - river I Fossilfuel (specify) ! Manure digester gas ! Hydro power - tidal ! Coal (not waste) ! Municipalsolidwaste ! Hydropower-wave ! Fueloil/diesel ! Sewage digester gas ! Solar - photovoltaic ! Natural gas (not waste) I Wood E Solar-thermal O Otherfossilfuel n other biomass (describe on page 19) ! wind " (describe on page 19) ! waste (speciry type betow in tine 6b) tr ?,iiriffi:Xfjljil'"" ! other (describe on pase 1e) 6b lf you specified "waste" as the primary energy input in line 6a, indicate the type of waste fuel used: (check one) ! Waste fuel listed in 18 C.F.R. 5 292.202(b) (specify one of the following) E Anthracite culm produced prior to July 23, 1985 - Anthracite refuse that has an average heat content of 6,000 Btu or less per pound and has an averageu ash content of 45 percent or more ,-- Bituminous coal refuse that has an average heat content of 9,500 Btu per pound or less and has an " average ash content of 25 percent or more Top or bottom subbituminous coal produced on Federal lands or on lndian lands that has been ,--, determined to be waste by the United States Department of the lnterior's Bureau of Land Management ' (BLM) or that is located on non-Federal or non-lndian lands outside of BLM's jurisdiction, provided that the applicant shows that the latter coal is an extension of that determined by BLM to be waste Coal refuse produced on Federal lands or on lndian lands that has been determined to be waste by the E BLM or that is located on non- Federal or non-lndian lands outside of BLM's jurisdiction, provided that applicant shows that the latter is an extension of that determined by BLM to be waste ,.--., Lignite produced in association with the production of montan wax and lignite that becomes exposed - as a result of such a mining operation ! Gaseous fuels (except natural gas and synthetic gas from coal) (describe on page 1 9) Waste natural gas from gas or oil wells (describe on page 19 how the gas meets the requirements of l8 n C.F.R. S 2.400 for waste natural gas; include with your filing any materials necessary to demonstrate compliance with 18 C.F.R. 5 2.400) ! Materials that a government agency has certified for disposal by combustion (describe on page 19) ! Heat from exothermic reactions (describe on page 19) ! Residual heat (describe on page 19) I Used rubber tires ! Plastic materials ! Refinery off-gas ! Petroleum coke Other waste energy input that has little or no commercial value and exists in the absence of the qualifoing ! facility industry (describe in the Miscellaneous section starting on page 1 9; include a discussion of the fuel's lack of commercial value and existence in the absence of the qualifying facility industry) 6c Provide the average energy input, calculated on a calendar year basis, in terms of Btu/h for the following fossil fuel energy inputs, and provide the related percentage of the total average annual energy input to the facility (1 8 C.F.R, S 292.2020)). For any oil or natural gas fuel, use lower heating value (18 C.F.R. S 292.202(m)). Annual average energy Percentage oftotal Fuel input for specified fuel annual energy input Natural gas 0 Btu/h 0 o/o Oil-based fuels 0 Btu/h 0Vo Coal 0 Btu/h 0Vo FERC Form 556 Page9-AllFacilities Co (o E o C .= U(o LL E.9 L LJo lndicate the maximum gross and maximum net electric power production capacity of the facility at the point(s) of delivery by completing the worksheet below. Respond to all items. lf any of the parasitic loads and/or losses identified in lines 7b through 7e are negligible, enter zero for those lines. 7a The maximum gross power production capacity at the terminals of the individual generator(s) under the most favorable anticipated design conditions 2,6L0 kw 7b Parasitic station power used at the facility to run equipment which is necessary and integral to the power production process (boiler feed pumps, fans/blowers, office or maintenance buildings directly related to the operation of the power generating facility, etc.). lf this facility includes non- power production processes (for instance, power consumed by a cogeneration facility's thermal host) , do not include any power consumed by the non-power production activities in your reported parasitic station power.587.4 kw 7c Electrical losses in interconnection transformers 39. 9 kw 7d Electrical losses in ACIDC conversion equipment, if any 0kw 7e Other interconnection losses in power lines or facilities (other than transformers and AC/DC conversion equipment) between the terminals of the generator(s) and the point of interconnection with the utility 17.7 kw 7f Total deductions from gross power production capacity = 7b + 7c + 7d + 7e 54 s . 0 kw 79 Maximum net power production capacity =7a -7f 1,965.0 kw 7h Description of facility and primary components: Describe the facility and its operation. ldentifi all boilers, heat recovery steam generators, prime movers (any mechanical equipment driving an electric generator), electrical generators, photovoltaic solar equipment, fuel cell equipment and/or other primary power generation equipment used in the facility. Descriptions of components should include (as applicable) specifications of the nominal capacities for mechanical output, electrical output, or steam generation of the identified equipment. For each piece of equipment identified, clearly indicate how many pieces of that type of equipment are included in the plant, and which components are normally operating or normally in standby mode. Provide a description of how the components operate as a system. Applicants for cogeneration facilities do not need to describe operations of systems that are clearly depicted on and easily understandable from a cogeneration facility's attached mass and heat balance diagram; however, such applicants should provide any necessary description needed to understand the sequential operation of the facility depicted in their mass and heat balance diagram. lf additional space is needed, continue in the Miscellaneous section starting on page 19. LFG is currently drawn from Cefls 1-5 and Ce1I 6 is anticlpated to begin LEG collection in 2020. LFG is drawn to the processing facility with two of (21 HSI blowers which are mounted on the flare skid. LFG used for energ:y producti-on is drawn from the flare skid to the conditioner skid by two of (2) HSI b1owers for treatment before use in energy production. A11 excess gas that is not used for energy production is burned off through an enclosed flare mounted next to the flare skj-d. The conditioning skid is a pretreatment for the LEG before it is burned in the Dresser-Rand HGM560/4 Generator Sets. Pretreatment cool-s the LFG, knocking out moisture and some compounds harmful to the generator set enqines. After the LFG is cooled it is then reheated and sent to the generator sets for energy production. Currently the system is composed of two (2) Dresser-Rand HGM560/4 with the anticipation of and additional Dresser-Rand HGM560/4 generator set with in the next five years. FERC Form 556 Page 'l 0 - Small Power Production Pursuant to 18 C.F.R. I29220a@), the power production capacity of any small power production facility, together with the power production capacity of any other small power production facilities that use the same energy resource, are owned by the same person(s) or its affiliates, and are located at the same site, may not exceed 80 megawatts. To demonstrate compliance with this size limitation, or to demonstrate that your facility is exempt from this size limitation under the Solar, Wind, Waste, and Geothermal Power Production lncentives Act of 1990 (Pub. L. 101-575,1 04 Stat. 2834 (1990) os omended by Pub. L. 102-46,1 05 Stat. 249 (1991)), respond to lines 8a through 8e below (as applicable). 8a ldentify any facilities with electrical generating equipment located within 1 mile of the electrical generating equipment of the instant facility, and for which any of the entities identified in lines 5a or 5b, or their affiliates, holds at least a 5 percent equity interest. Check here if no such facilities exist. I -- Check here andcontinue in the Miscellaneous section starting on page 19 if additional space is needed Common owner(s) Root docket # (if any) Maximum net power production capacity KW KW KW Facility location (city or county, state) r) 2) 3) QF QF QF 8b The Solar, Wind, Waste, and Geothermal Power Production lncentives Act of 1990 (lncentives Act) provides exemption from the size limitations in 18 C.F.R. 5 292.2O4(a) for certain facilities that were certified prior to 1995. Are you seeking exemption from the size limitations in 1 8 C.F.R. 5 292.20aQ) by virtue of the lncentives Act? ! Yes (continue at line 8c below) X No (skip lines 8c through 8e) 8c Wastheoriginal noticeofself-certificationorapplicationforCommissioncertificationofthefacilityfiledonor before December 31,1994? Yes No 8d Did construction of the facility commence on or before December 31,1999? Yes No o L.,C(o2 E€L(tIo.HUtrt+ .=OJCOo.NE(^!! -c E=o TJ 8e lf you answered No in line 8d, indicate whether reasonable diligence was exercised toward the completion of the facility, taking into account all factors relevant to construction? Yes | ] No lf you answered Yes, provide a brief narrative explanation in the Miscellaneous section starting on page 1 9 of the construction timeline (in particular, describe why construction started so long after the facility was certified) and the diligence exercised toward completion of the facility. Pursuant to 18 C.F.R. 5 292.204(b), qualifying small power production facilities may use fossil fuels, in minimal amounts, for only the following purposes: ignition; start-up; testing; flame stabilization; control use; alleviation or prevention of unanticipated equipment outages; and alleviation or prevention of emergencies, directly affecting the public health, safety, or welfare, which would result from electric power outages. The amount of fossil fuels used for these purposes may not exceed 25 percent of the total energy input of the facility during the 1 2-month period beginning with the date the facility first produces electric energy or any calendar year thereafter. 9a Certification of compliance with 18 C.F.R. 5 292.2O4(b) with respect to uses of fossil fuel: I Applicant certifies that the facility will use fossil fuels exclusively for the purposes listed above. u9LJ-kv o-o O--UUEE;v,.9=(tr(UU:] E-co.=u= 9b Certificationof compliancewith 18C.F.R.5292.2O4(b) with respecttoamountof fossilfuelusedannually: Applicant certifies that the amount of fossil fuel used at the facility will not, in aggregate, exceed 25 I percent of the total energy input of the facility during the 12-month period beginning with the date the facility first produces electric energy or any calendar year thereafter. lnformation Required for Small Power Production Facility lf you indicated in line 1k that you are seeking qualifying small power production facility status for your facility, then you must respond to the items on this Otherwise, ski 10. *) FERC Form 556 Page l1 - Cogeneration Facilities lnformation Required for Cogeneration Facility lf you indicated in line 1 k that you are seeking qualifying cogeneration facility status for your facility, then you must respond to the items on 11 th 13. Otherwise,11 13 7J c .9 (o PE SEotrrJk - .llGl? ocot, Pursuant to 18 C.F.R. 5 292.202(c), a cogeneration facility produces electric energy and forms of useful thermal energy (such as heat or steam) used for industrial, commercial, heating, or cooling purposes, through the sequential use of energy. Pursuant to 18 C.F.R. 5 292.2O2(s), "sequential use" of energy means the following: (1) for a topping- cycle cogeneration facility, the use of reject heat from a power production process in sufficient amounts in a thermal application or process to conform to the requirements of the operating standard contained in 18 C.F.R. S 292.205(a); or (2) for a bottoming-cycle cogeneration facility, the use of at least some reject heat from a thermal application or process for power production. 10a What type(s) of cogeneration technology does the facility represent? (check all that apply) I Topping-cycle cogeneration Bottoming-cycle cogeneration 10b To help demonstrate the sequential operation of the cogeneration process, and to support compliance with other requirements such as the operating and efficiency standards, include with your filing a mass and heat balance diagram depicting average annual operating conditions. This diagram must include certain items and meet certain requirements, as described below. You must check next to the description of each requirement below to certify that you have complied with these requirements. Check to certify compliance with indicated requirement Requirement Diagram must show orientation within system piping and/or ducts of all prime movers, heat recovery steam generators, boilers, electric generators, and condensers (as applicable), as well as any other primary equipment relevant to the cogeneration process. Any average annual values required to be reported in lines 10b, 12a,13a, 13b, 13d, 131 14a, 15b, 15d and/or l5f must be computed over the anticipated hours of operation. Diagram must specifo all fuel inputs by fuel type and average annual rate in Btu/h. Fuel for supplementary firing should be specified separately and clearly labeled. All specifications of fuel inputs should use lower heating values. Diagram must specify average gross electric output in kW or MW for each generator. tr T L] t-l T I Diagram must specify average mechanical output (that is, any mechanical energy taken off of the shaft of the prime movers for purposes not directly related to electric power generation) in horsepower, if any. Typically, a cogeneration facility has no mechanical output. At each point for which working fluid flow conditions are required to be specified (see below), such flow condition data must include mass flow rate (in lb/h or kg/s), temperature (in'F, R,'C or K), absolute pressure (in psia or kPa) and enthalpy (in Btu/lb or kJlkg). Exception: For systems where the working fluid is liquid only (no vapor at any point in the cycle) and where the type of liquid and specific heat of that liquid are clearly indicated on the diagram or in the Miscellaneous section starting on page 19, only mass flow rate and temperature (not pressure and enthalpy) need be specified. For reference, specific heat at standard conditions for pure liquid water is approximately 1.002 Btu/ (lb*R) or 4.1 95 kJl(kg*K). Diagram must specify working fluid flow conditions at input to and output from each steam turbine or other expansion turbine or back-pressure turbine. Diagram must specify working fluid flow conditions at delivery to and return from each thermal application. Diagram must specify working fluid flow conditions at make-up water inputs. T LI FERC Form 556 Page 12 - Cogeneration Facilities oo (I IJ 1J -EE E= E(oO lJ-Ec(oOEEC(q,ig EI, E8OEtro6.ts.! +,ff60-0J=frd OOINbtl c{ .uto-xLU \" EPAct 2005 cogeneration facilities: The Energy Policy Act of 2005 (EPAct 2005) established a new section 210(n) of the Public Utility Regulatory Policies Act of 1978 (PURPA), 16 USC 824a-3(n), with additional requirements for any qualiffing cogeneration facility that (1) is seeking to sell electric energy pursuant to section 210 of PURPA and (2) was either not a cogeneration facility on August 8, 2005, or had not filed a self-certification or application for Commission certification of QF status on or before February 1 ,2006. These requirements were implemented by the Commission in 18 C.F.R. 5 292.205(d). Complete the lines below, carefully following the instructions, to demonstrate whether these additional requirements apply to your cogeneration facility and, if so, whether your facility complies with such requirements. l la Was your facility operating as a qualiffing cogeneration facility on or before August 8, 2005? Yes - No 1 1b Was the initial filing seeking certification of your facility (whether a notice of self-certification or an application for Commission certification) filed on or before February 1,2006? Yes i No lf the answer to either line 1 1a or 1 1b is Yes, then continue at line 1 1c below. Otherwise, if the answers to both lines 1 1a and 1 1 b are No, skip to line 1 1e below. 11c With respect to the design and operation of the facility, have any changes been implemented on or after February 2, 2006 that affect general plant operation, affect use ofthermal output, and/or increase net power production capacity from the plant's capacity on February 1,2006? Yes (continue at line 1 1d below) No. Your facility is not subject to the requirements of 18 C.F.R. 5 292.205(d) at this time. However, it may be subject to to these requirements in the future if changes are made to the facility. At such time, the applicant would need to recertify the facility to determine eligibility. Skip lines 1 1d through 1 1j. 1 1d Does the applicant contend that the changes identified in line 1 1 c are not so significant as to make the facility a "new" cogeneration facility that would be subject to the 18 C.F.R. S 292.205(d) cogeneration requirements? Yes. Provide in the Miscellaneous section starting on page l9 a description of any relevant changes made to the facility (including the purpose of the changes) and a discussion of why the facility should not be considered a "new" cogeneration facility in light of these changes. Skip lines 11e through 11j. No. Applicant stipulates to the fact that it is a "new" cogeneration facility (for purposes of determining the applicability of the requirements of 1 8 C.F.R. 5 292.205(d)) by virtue of modifications to the facility that were initiated on or after February 2,2006. Continue below at line 1 1e. lle Willelectricenergyfromthefacilitybesoldpursuanttosection2l0of PURPA? Yes. The facility is an EPAct 2005 cogeneration facility. You must demonstrate compliance with l8 C.F.R. 5 292.205(d)(2) by continuing at line 1 1f below. No. Applicant certifies that energy will not be sold pursuant to section 210 of PURPA. Applicant also certifies its understanding that it must recertify its facility in order to determine compliance with the requirements of 18 C.F.R. 5 292.205(d) before selling energy pursuant to section 210 of PURPA in the future. Skip lines 1 1f through '11j. tr 11f ls the net power production capacity of your cogeneration facility, as indicated in line 79 above, less than or equal to 5,000 kW? Yes, the net power production capacity is less than or equal to 5,000 kW. 1 8 C.F.R. 5 292.205(d)(4) provides a rebuttable presumption that cogeneration facilities of 5,000 kW and smaller capacity comply with the , . requirements for fundamental use of the facility's energy output in 18 C.F.R. S 292.205(dX2). Applicant ' certifies its understanding that, should the power production capacity of the facility increase above 5,000 kW, then the facility must be recertified to (among other things) demonstrate compliance with 18 C.F.R. S 292.2o5(d)(2). Skip lines 119 through 11j. No, the net power production capacity is greater than 5,000 kW. Demonstrate compliance with the i - requirements for fundamental use of the facility's energy output in 18 C.F.R. 5 292.205(dX2) by continuing on the next Page at line 1 19. FERC Form 556 Page 13 - Cogeneration Facilities ao o.E{EJoEl, 6UFf(o'i: EE tE€Esb?Cooc(,)u8'=F BEEtFtn-o=OFN=uoserJ.r dC IJ.J o Lines I 1g through 1 1 k below guide the applicant through the process of demonstrating compliance with the requirements for "fundamental use" of the facility's energy output. 18 C.F.R. 5 292.205(d)(2). Only respond to the lines on this page if the instructions on the previous page direct you to do so. Otherwise, skip this page. 18 C.F.R. S 292.205(dX2) requires that the electrical, thermal, chemical and mechanical output of an EPAct 2005 cogeneration facility is used fundamentally for industrial, commercial, residential or institutional purposes and is not intended fundamentally for sale to an electric utility, taking into account technological, efficiency, economic, and variable thermal energy requirements, as well as state laws applicable to sales of electric energy from a qualifying facility to its host facility. lf you were directed on the previous page to respond to the items on this page, then your facility is an EPAct 2005 cogeneration facility that is subject to this "fundamental use" requirement. The Commission's regulations provide a two-pronged approach to demonstrating compliance with the requirements for fundamental use of the facility's energy output. First, the Commission has established in 1 8 C.F.R. 5 292.205(dX3) a "fundamental use test" that can be used to demonstrate compliance with 18 C.F.R. S 292.205(d)(2). Under the fundamental use test, a facility is considered to comply with 18 C.F.R. S 292.205(dX2) if at least 50 percent of the facility's total annual energy output (including electrical, thermal, chemical and mechanical energy output) is used for industrial, commercial, residential or institutional purposes. Second, an applicant for a facility that does not pass the fundamental use test may provide a narrative explanation of and support for its contention that the facility nonetheless meets the requirement that the electrical, thermal, chemical and mechanical output of an EPAct 2005 cogeneration facility is used fundamentally for industrial, commercial, residential or institutional purposes and is not intended fundamentally for sale to an electric utility, taking into account technological, efficiency, economic, and variable thermal energy requirements, as well as state laws applicable to sales of electric energy from a qualifying facility to its host facility. Complete lines I 1g through 1 1j below to determine compliance with the fundamental use test in 18 C.F.R. 5 292.205(dX3). Complete lines 1 1g through 11j even if you do not intend to rely upon the fundamental use test to demonstrate compliance with l8 C.F.R.5 292.205(d)(2). I t g Amount of electrical, thermal, chemical and mechanical energy output (net of internal generation plant losses and parasitic loads) expected to be used annually for industrial, commercial, residential or institutional purposes and not sold to an electric utility MWh I t h Total amount of electrical, thermal, chemical and mechanical energy expected to be sold to an electric utility MWh 1 1 i Percentage of total annual energy output expected to be used for industrial, commercial, residential or institutional purposes and not sold to a utility =100*119/019+11h)0 o/o 1lj ls the response in line 1 1i greater than or equal to 50 percent? Yes. Your facility complies with 18 C.F.R. S 292.205(d)(2) by virtue of passing the fundamental use test provided in l8 C.F.R. S 292.205(dX3). Applicant certifies its understanding that, if it is to rely upon passing the fundamental use test as a basis for complying with 18 C.F.R. 5 292.205(d)(2), then the facility must comply with the fundamental use test both in the 12-month period beginning with the date the facility first produces electric energy, and in all subsequent calendar years. No. Your facility does not pass the fundamental use test. lnstead, you must provide in the Miscellaneous section starting on page 19 a narrative explanation of and support for why your facility meets the requirement that the electrical, thermal, chemical and mechanical output of an EPAct 2005 cogeneration facility is used fundamentally for industrial, commercial, residential or institutional purposes and is not intended fundamentally for sale to an electric utility, taking into account technological, efficiency, economic, and variable thermal energy requirements, as well as state laws applicable to sales of electric energy from a QF to its host facility. Applicants providing a narrative explanation of why their facility should be found to comply with 18 C.F.R. 5 292.205(d){2) in spite of non-compliance with the fundamental use test may want to review paragraphs 47 through 61 of Order No. 671 (accessible from the Commission's QF website at www.ferc.gov/QF), which provide discussion of the facts and circumstances that may support their explanation. Applicant should also note that the percentage reported above will establish the standard that that facility must comply with, both for the 12-month period beginning with the date the facility first produces electric energy, and in all subsequent calendar years. See Order No. 671 at paragraph 51. As such, the applicant should make sure that it reports appropriate values on lines 1 1g and 1 t h above to serve as the relevant annual standard, taking into account expected variations in production conditions. \., FERC Form 556 Page 14 - Topping-Cycle Cogeneration Facilities lnformation Required for Topping-Cycle Cogeneration Facility lf you indicated in line 1 0a that your facility represents topping-cycle cogeneration technology, then you must respond to the items on pages l4 and 15. Otherwise,14 and 15. TJThe thermal energy output of a topping-cycle cogeneration facility is the net energy made available to an industrial or commercial process or used in a heating or cooling application. Pursuant to sections 292.202(c), (d) and (h) of the Commission's regulations (18 C.F.R. 55 292.202(c), (d) and (h)), tne thermal energy output of a qualifying topping- cycle cogeneration facility must be useful. ln connection with this requirement, describe the thermal output of the topping-cycle cogeneration facility by responding to lines 12a and 12b below. 12a ldentify and describe each thermal host, and specifo the annual average rate of thermal output made available to each host for each use. For hosts with multiple uses of thermal output, provide the data for each use in separate rows' Average annual rate of thermal output attributable to use (net of Name of entity (thermal host) Thermal host's relationship to facility; heat contained in process taking thermal output Thermal host's use of thermal output return or make-up water) Select thermal host's relationship to facility 1) Select thermal host's use of thermal output Btu/h Select thermal host's relationship to facility Select thermal host's use of thermal output Btu/h Select thermal host's relationship to facility 3) Select thermal host's use of thermal output Btu/h Select thermal host's relationship to facility4) Select thermal host's use of thermal output Btu/h Select thermal host's relationship to facilitys) Select thermal host's use of thermal output Btu/h Select thermal host's relationship to facility 6) Select thermal host's use of thermal output Btu/h I Check here and continue in the Miscellaneous section starting on page 19 if additional space is needed o LJ Vo)E () O- +r- e6 (ooE vtoo-ccF f d)r^f 1 2b Demonstration of usefulness of thermal output: At a minimum, provide a brief description of each use of the thermal output identified above. ln some cases, this brief description is sufficient to demonstrate usefulness. However, if your facility's use of thermal output is not common, and/or if the usefulness of such thermal output is not reasonably clear, then you must provide additional details as necessary to demonstrate usefulness. Your application may be rejected and/or additional information may be required if an insufficient showing of usefulness is made. (Exception: lf you have previously received a Commission certification approving a specific use of thermal output related to the instant facility, then you need only provide a brief description of that use and a reference by date and docket number to the order certifying your facility with the indicated use. Such exemption may not be used if any change creates a material deviation from the previously authorized use.) lf additional space is needed, continue in the Miscellaneous section starting on page 19. FERC Form 556 Page 15 - Topping-Cycle Cogeneration Facilities rJ o o o ECC(o.9 PE i!ub,q ogs!'ru {>zvao)cCOr)lJ &E Applicants for facilities representing topping-cycle technology must demonstrate compliance with the topping- cycle operating standard and, if applicable, efficiency standard. Section 292.205(aXl ) of the Commission's regulations (18 C.F.R. 5 292.205(aX1)) establishes the operating standard for topping-cycle cogeneration facilities: the useful thermal energy output must be no less than 5 percent of the total energy output. Section 292.205(a)(2) (18 C.F.R. 5 292.205(aX2)) establishes the efficiency standard for topping-cycle cogeneration facilities for which installationcommencedonorafterMarch'l 3, 1980: theuseful poweroutputofthefacilityplusone-halftheuseful thermal energy output must (A) be no less than 42.5 percent of the total energy input of natural gas and oil to the facility; and (B) if the useful thermal energy output is less than 1 5 percent of the total energy output of the facility, be no less than 45 percent of the total energy input of natural gas and oil to the facility. To demonstrate compliance with the topping-cycle operating andlor efficiency standards, or to demonstrate that your facility is exempt from the efficiency standard based on the date that installation commenced, respond to lines 13a through'l3l below. lf you indicated in line 10a that your facility represents both topping-cycle and bottoming-cycle cogeneration technology, then respond to lines 13a through 131 below considering only the energy inputs and outputs attributable to the topping-cycle portion of your facility. Your mass and heat balance diagram must make clear which mass and energy flow values and system components are for which portion (topping or bottoming) of the cogeneration system. 13a lndicate the annual average rate of useful thermal energy output made available to the host(s), net of any heat contained in condensate return or make-up water Btu/h I 3b lndicate the annual average rate of net electrical energy output KW 13c Multiply line l3b by 3,412 to convert from kW to Btu/h o Btu/h l3d lndicate the annual average rate of mechanical energy output taken directly off of the shaft of a prime mover for purposes not directly related to power production (this value is usually zero)hp l3e Multiply line 13d by 2,544to convert from hp to Btu/h 0 Btu/h l3f lndicate the annual average rate of energy input from natural gas and oil Btu/h l39 Topping-cycle operating value = 100 * l3a / (13a + 13c + 13e) 0 o/o 13h Topping-rycle efficiency value = 100 * (0.5*13a + 'l3c + 13e) / 13f a o/o l3i Compliance with operating standard: ls the operating value shown in line 139 greater than or equal lo 5o/o? Yes (complies with operating standard) No (does not comply with operating standard) 13j Did installation of the facility in its current form commence on or after March 13, 1980? Yes. Your facility is subject to the efficiency requirements of 18 C.F.R. 5 292.205(a)(2). Demonstrate. compliance with the efficiency requirement by responding to line l3k or 'l 31, as applicable, below. No. Your facility is exempt from the efficiency standard. Skip lines 'l 3k and 131. 1 3k Compliance with efficiency standard (for low operating value): lf the operating value shown in line 1 39 is less than 15ol0, then indicate below whether the efficiency value shown in line 13h greater than or equal lo 45o/o: Yes (complies with efficiency standard) No (does not comply with efficiency standard) 13! Compliancewithefficiencystandard(forhighoperatingvalue): lftheoperatingvalueshowninlinel39is greater than or equal to 15olo, then indicate below whether the efficiency value shown in line 13h is greater than or equal to 42.5o/o: Yes (complies with efficiency standard) No (does not comply with efficiency standard) FERC Form 556 Page 16 - Bottoming-Cycle Cogeneration Facilities Information Required for Bottoming-Cycle Cogeneration Facility lf you indicated in line 1 0a that your facility represents bottoming-cycle cogeneration technology, then you must respond to the items on 16 and 17. Otherwise, skip l6and 17. The thermal energy output of a bottoming-cycle cogeneration facility is the energy related to the process(es) from which at least some of the reject heat is then used for power production. Pursuant to sections 292.202(c) and (e) of the Commission's regulations (18 C.F.R. S 292.202(c) and (e)) , the thermal energy output of a qualiffing bottoming- cycle cogeneration facility must be useful. ln connection with this requirement, describe the process(es) from which at least some of the reject heat is used for power production by responding to lines 14a and 14b below. 14a ldentifr and describe each thermal host and each bottoming-cycle cogeneration process engaged in by each host. For hosts with multiple bottoming-cycle cogeneration processes, provide the data for each process in seporate rows' Has the energy input to Name of entity (thermal host) the thermal host been performing the process from augmented for purposes which at least some of the of increasing power reject heat is used for power Thermal host's relationship to facility; production capacity?production Thermal host's process type (if Yes, describe on p. 19) 1) to facilthermal host's relationsh thermal host's Yes No Yes No2) to facil thermal host's roce55 thermal host's relationsh 3) to faci ethermal host's roce55 thermal host's relationshi Yes , NoL i- Check here and continue in the Miscellaneous section starting on page 19 if additional space is needed o (J U Io) FO-O= E9m(ootvtO (U r-C': otnf 14b Demonstration of usefulness of thermal output: At a minimum, provide a brief description of each process identified above. ln some cases, this brief description is sufficient to demonstrate usefulness. However, if your facility's process is not common, and/or if the usefulness of such thermal output is not reasonably clear, then you must provide additional details as necessary to demonstrate usefulness. Your application may be rejected and/or additional information may be required if an insufficient showing of usefulness is made. (Exception: lf you have previously received a Commission certification approving a specific bottoming-cycle process related to the instant facility, then you need only provide a brief description of that process and a reference by date and docket number to the order certiffing your facility with the indicated process. Such exemption may not be used if any material changes to the process have been made.) lf additional space is needed, continue in the Miscellaneous section starting on page 19. FERC Form 556 Page 17 - Bottoming-Cycle Cogeneration Facilities ffi I gg EC 3b.=ros3EroI4r rL'<uO=.iro)uEC'=OE'Uo i.= 5 rr.r 6 Applicants for facilities representing bottoming-cycle technology and for which installation commenced on or after March 13, 1990 must demonstrate compliance with the bottoming-cycle efficiency standards. Section 292.205(b) of the Commission's regulations (18 C.F.R. 5 292.205(b)) establishes the efficiency standard for bottoming-cycle cogeneration facilities: the useful power output of the facility must be no less than 45 percent of the energy input of natural gas and oil for supplementary firing. To demonstrate compliance with the bottoming-cycle efficiency standard (if applicable), or to demonstrate that your facility is exempt from this standard based on the date that installation of the facility began, respond to lines 15a through 15h below. lf you indicated in line 10a that your facility represents both topping-cycle and bottoming-cycle cogeneration technology, then respond to lines 15a through I5h below considering only the energy inputs and outputs attributable to the bottoming-cycle portion of your facility. Your mass and heat balance diagram must make clear which mass and energy flow values and system components are for which portion of the cogeneration system (topping or bottoming). 15a Did installation of the facility in its current form commence on or after March 13, 1980? . Yes. Your facility is subject to the efficiency requirement of 18 C.F.R. S 292.205(b). Demonstrate compliance with the efficiency requirement by responding to lines l5b through l5h below. i No. Your facility is exempt from the efficiency standard. Skip the rest of page 17. 1 5b lndicate the annual average rate of net electrical energy output KW 15c Multiply line 15b by 3,412 to convert from kW to Btu/h 0 Btu/h 15d lndicate the annual average rate of mechanical energy output taken directly off of the shaft of a prime mover for purposes not directly related to power production (this value is usually zero)hp 1 5e Multiply line 1 5d by 2,544 lo convert from hp to Btu/h 0 Btu/h 15f lndicate the annual average rate of supplementary energy input from natural gas or oil Btu/h l59 Bottoming-cycle efficiency value = 100 * (15c + 15e) / 15f a o/o 15h Compliance with efficiency standard: lndicate below whether the efficiency value shown in line l59 is greater than or equal to 45026: [-J Yes (complies with efficiency standard) [ No (does not comply with efficiency standard) FERC Form 556 Page 18 - All Facilities Certificate of Completeness, Accuracy and Authority Applicant must certify compliance with and understanding of filing requirements by checking next to each item below and signing at the bottom of this section. Forms with incomplete Certificates of Completeness, Accuracy and Authority will be rejected by the Secretary of the Commission. Signer identified below certifies the following: (check all items and applicable subitems) He or she has read the filing, including any information contained in any attached documents, such as cogeneration I mass and heat balance diagrams, and any information contained in the Miscellaneous section starting on page 19, and knows its contents. He or she has provided all of the required information for certification, and the provided information is true as stated, to the best of his or her knowledge and belief. He or she possess full power and authority to sign the filing; as required by Rule 2005(aX3) of the Commission's Rules of Practice and Procedure (18 C.F.R. S 385.2005(a)(3)), he or she is one of the following: (check one) ! The person on whose behalf the filing is made I An officer of the corporation, trust, association, or other organized group on behalf of which the filing is made - An officer, agent, or employe of the governmental authority, agency, or instrumentality on behalf of which thex filing is made - A representative qualified to practice before the Commission under Rule 2101 of the Commission's Rules ofu Practice and Procedure (18 C.F.R. 5 385.2101) and who possesses authority to sign He or she has reviewed all automatic calculations and agrees with their results, unless otherwise noted in the Miscellaneous section starting on page 19. He or she has provided a copy of this Form 556 and all attachments to the utilities with which the facility will interconnect and transact (see lines 4a through 4d), as well as to the regulatory authorities of the states in which the facility and those utilities reside. See the Required Notice to Public Utilities and State Regulatory Authorities section on page 3 for more information. Provide your signature, address and signature date below. Rule 2005(c) of the Commission's Rules of Practice and Procedure (18 C.F.R. 5 385.2005(c)) provides that persons filing their documents electronically may use typed characters representing his or her name to sign the filed documents. A person filing this document electronically should sign (by typing his or her name) in the space provided below. Your Signature Josh Bartlome Your address 1050 I,i 400 s BurIey, Idaho 83318 Date 3/73/2078 Audit Notes Commission Staff Use Only: X FERC Form 556 Page 19-AllFacilities Miscellaneous Use this space to provide any information for which there was not sufficient space in the previous sections of the form to provide. Foreachsuchitemof informationclearlyidentifythelinenumberthattheinformationbelongsfo. Youmayalsouse this space to provide any additional information you believe is relevant to the certification of your facility. Your response below is not limited to one page. Additional page(s) will automatically be inserted into this form if the length of your response exceeds the space on this page. Use as many pages as you require.