HomeMy WebLinkAbout20180316Form 556.pdfldaho Public Utilities Commission
Office of the SecretaryRECEIVED
MAR I 6 20t8
Boise,ldaho
A Rsctoxlr. CoorsRrnvr Fon lrrscRlrr,u W,[srE, IVlff.tlcEMrNT
P.O. Box 159 . 1050 WEsr 400 Soum . BuRLEy,Ip,rno t3318
Brls: (20E)432-9082 . FAx: (20E)432-6915 . tr'll.lvslslr'.oRc
March 14,2018
Diane Hanian,
Commission Secretary
ldaho Public Utilities Commission
472W Washington
Boise, lD 83702
RE: SISW LFGE Project; Case No. IPC-E-17-04; Order No. 33772; Self Certification FERC Form 556
Dear Diane,
ln accordance to 18 C.F.R. 5 292.207lallai), CAFCO ldaho Refuse Management LLC (CAFCO) is
required to provide a copy of their self-certification to the State regulatory authorities of the
state in which the facility and utilities reside.
On March L3,2O!7, CAFCO and ldaho Power Company (IPCO) entered into an Energy Sale
Agreement where CAFCO will sell power to IPCO from the Southern ldaho Solid Waste (SISW)
Landfill Gas to Energy (LFGE) Generation Facility located at 1050 W 400 S, Burley, lD 83318.
This letter and the attached copy of Form 556 are being sent to inform ldaho Public Utilities
Commission that SISW, on behalf of CAFCO, has submitted a self certification notice to the
Federal Energy Regulation Commission for their LFGE Generation Facility.
Sincerely,
Josh Bartlome
Executive Director & CEO
cc. Step hen F. Freiburger, PE; Project Manager
encl.
Stephen Freiburger
From:
Sent:
To:
Subject:
Attachments:
Nate Francisco < nfrancisco@sisw.org >
Tuesday, March l-3,2018 2:50 PM
Stephen Freiburger
FW: FERC Receipt of Filing in New Docket
FERC 556 Form 3.13.2018.pdf
Stephen,
Here is the confirmation email for the FERC Filing. Also, I have attached the Self-Cert form that I used for the filing.
Thanks,
Nate Francisco
Environmental Manager
Southern ldaho Solid Waste
Office: (208!.432-9082
Cell: (208) 670-5777
---Origina I Message---
From : e Fil i n g@ferc.gov [ma i lto:e Fi I i ng@ferc.gov]
Sent: Tuesday, March 73, 2078 1:19 PM
To : nf ra ncisco @sisw.o rg; ef i I i ngaccepta nce @ferc.gov
Subject: FERC Receipt of Filing in New Docket
Confirmation of Receipt
This is to confirm receipt by the FERC Office of the Secretary of the following electronic submission
-Submission lD:859005
-Docket(s) No.: New Docket
-Filed By: CAFCo ldaho Refuse Management LLC -Signed By: Josh Bartlome -Filing Desc: Self-Certification of EG or FC of
CAFCo ldaho Refuse Management LLC under New Docket.
-Submission Datefiime: 3h3/2078 3:12:05 PM -Projected Filed Datefime:
3lL3/20L9 3:12:05 PM (Subject to Change based on OPM/FERC Closure)
Additional detail about your filing is available via the following link
https://ferconline.ferc.gov/SubmissionStatus.aspx?hashcode=ObNkSqki3bRMAPiUd
rew
Thank you for participating in the FERC Electronic Filing System. lf you have any questions, or if you detect errors in your
submission or the FERC-generated PDF, please contact FERC at:
I
E-Mail: ferconlinesupport@ferc.gov mailto:ferconlinesupport@ferc.gov (do not send filings to this address) Voice Mail
866-208-3675.
2
FEDERAL EN ERGY REGULATORY COMMISSION
WASHINGTON, DC
OMB Control # 1902-0075
Expiration 06/30/2019
Fo rm 5 5 6 ;:Jlfti,H::'.H:l?;L',#i:il,I;'' status ror a sma, Power
General
Questions about completing this form should be sent to Form556@ferc.gov. lnformation about the Commission's QF
program, answers to frequently asked questions about QF requirements or completing this form, and contact information for
QF program staff are available at the Commission's QF website, www.ferc.gov/QF. The Commission's QF website also
provides links to the Commission's QF regulations (18 C.F.R. S 131.80 and Part 292), as well as other statutes and orders
pertaining to the Commission's QF program.
Who Must File
Any applicant seeking QF status or recertification of QF status for a generating facility with a net power production capacity
(as determined in lines 7a through 79 below) greater than 1000 kW must file a self-certification or an application for
Commission certification of QF status, which includes a properly completed Form 556. Any applicant seeking QF status for a
generating facility with a net power production capacity 1000 kW or less is exempt from the certification requirement, and is
therefore not required to complete or file a Form 556. See 18 C.F.R. 5 292.203.
How to Complete the Form 556
This form is intended to be completed by responding to the items in the order they are presented, according to the
instructions given. lf you need to back-track, you may need to clear certain responses before you will be allowed to change
other responses made previously in the form. lf you experience problems, click on the nearest help button (1,1 ) for
assistance, or contact Commission staff at Form556@ferc.gov.
Certain lines in this form will be automatically calculated based on responses to previous lines, with the relevant formulas
shown. You must respond to all of the previous lines within a section before the results of an automatically calculated field
will be displayed. lf you disagree with the results of any automatic calculation on this form, contact Commission staffat
Form556raferc.gov to discuss the discrepancy before filing.
You must complete all lines in this form unless instructed otherwise. Do not alter this form or save this form in a different
format. lncomplete or altered forms, or forms saved in formats other than PDF, will be rejected.
How to File a Completed Form 556
Applicants are required to file their Form 556 electronically through the Commission's eFiling website (see instructions on
page 2). By filing electronically, you will reduce your filing burden, save paper resources, save postage or courier charges,
help keep Commission expenses to a minimum, and receive a much faster confirmation (via an email containing the docket
number assigned to your facility) that the Commission has received your filing.
lf you are simultaneously filing both a waiver request and a Form 556 as part of an application for Commission certification,
see the "Waiver Requests" section on page 3 for more information on how to file.
Paperwork Reduction Act Notice
This form is approved by the Office of Management and Budget. Compliance with the information requirements established
by the FERC Form No. 556 is required to obtain or maintain status as a QF. See '18 C.F.R. S 131.80 and Part 292. An agency may
not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently
valid OMB control number. The estimated burden for completing the FERC Form No. 556, including gathering and reporting
information, is as follows: 3 hours for self-certification of a small power production facility, 8 hours for self-certifications of a
cogeneration facility,6 hours for an application for Commission certification of a small power production facility, and 50 hours
for an application for Commission certification of a cogeneration facility. Send comments regarding this burden estimate or
any aspect of this collection of information, including suggestions for reducing this burden, to the following: lnformation
Clearance Officer, Office of the Executive Director (ED-32), Federal Energy Regulatory Commission, 888 First Street N.E.,
Washington, DC20426 (DataClearance@ferc.gov);and DeskOfficerforFERC,Officeof lnformation and RegulatoryAffairs,
Office of Management and Budget, Washington, DC 20503 (oira submis!iolqq111!,qop_g9v). lnclude the Control No.
1902-0075 in any correspondence.
FERC Form 556 Page 2 - lnstructions
Electronic Filing (eFiling)
To electronically file your Form 556, visit the Commission's QF website at wuryJe_r_egqvlQ_E and click the eFiling link.
lf you are eFiling your first document, you will need to register with your name, email address, mailing address, and phone
number. lf you are registering on behalf of an employer, then you will also need to provide the employer name, alternate
contact name, alternate contact phone number and and alternate contact email.
Once you are registered, log in to eFiling with your registered email address and the password that you created at
registration. Follow the instructions. When prompted, select one of the following QF-related filing types, as appropriate,
from the Electric or General filing category.
Filing category Filing Type as listed in eFiling Description
Electric
(Fee) Application for Commission Cert. as Cogeneration QF
Use to submit an application for
Commission certifi cation or
Commission recertification of a
cogeneration facility as a QF.
(Fee) Application for Commission Cert. as Small Power QF
Use to submit an application for
Commission certification or
Commission recertification of a
small power production facility as a
QF.
Self-Certification Notice (QF, EG, FC)
Use to submit a notice of self-
certification of your facility
(cogeneration or small power
production) as a QF.
Self-Recertifi cation of Qua I ifyi n g Faci lity (QF)
Use to submit a notice of self-
recertification of your facil ity
(cogeneration or small power
production) as a QF.
Supplemental lnformation or Request
Use to correct or supplement a
Form 556 that was submitted with
errors or omissions, or for which
Commission staff has requested
additional information. Do not use
this filing type to report new
changes to a facility or its
ownership; rather, use a self-
recertifi cation or Commission
recertification to report such
changes.
General (Fee) Petition for Declaratory Order (not under FPA Part 1)
Use to submit a petition for
declaratory order granting a waiver
of Commission QF regulations
pursuant to 18 C.F.R. 55 292.20a(a)
(3) and/or 292.205(c). A Form 556 is
not required for a petition for
declaratory order unless
Commission recertification is being
requested as part of the petition.
You will be prompted to submit your filing fee, if applicable, during the electronic submission process. Filing fees can be paid
via electronic bank account debit or credit card.
During the eFiling process, you will be prompted to select your file(s) for upload from your computer.
FERC Form 556 Page 3 - lnstructions
Filing Fee
No filing fee is required if you are submitting a self-certification or self-recertification of your facility as a QF pursuant to 1 8
C.F.R.5 292.207(a).
A filing fee is required if you are filing either of the following:
('l ) an application for Commission certification or recertification of your facility as a QF pursuant to I 8 C.F.R. I 292.207(b), or
(2) a petition for declaratory order granting waiver pursuant to 18 C.F.R. 55 292.20a(a)(3) and/or 292.205(c).
The current fees for applications for Commission certifications and petitions for declaratory order can be found by visiting the
Commission's QF website at www.ferE.gov/QF and clicking the Fee Schedule link.
You will be prompted to submit your filing fee, if applicable, during the electronic filing process described on page 2.
Required Notice to Utilities and State Regulatory Authorities
Pursuant to 1 8 C.F.R. I 292.207(a)(ii), you must provide a copy of your self-certification or request for Commission certification
to the utilities with which the facility will interconnect and/or transact, as well as to the State regulatory authorities of the
states in which your facility and those utilities reside. Links to information about the regulatory authorities in various states
can be found by visiting the Commission's QF website at www.ferc.gov/QF and clicking the Notice Requirements link.
What to Expect From the Commission After You File
An applicant filing a Form 556 electronically will receive an email message acknowledging receipt of the filing and showing
the docket number assigned to the filing. Such email is typically sent within one business day, but may be delayed pending
confirmation by the Secretary of the Commission of the contents of the filing.
An applicant submitting a self-certification of QF status should expect to receive no documents from the Commission, other
than the electronic acknowledgement of receipt described above. Consistent with its name, a self-certification is a
certification by the applicanf itse/f that the facility meets the relevant requirements for QF status, and does not involve a
determination by the Commission as to the status of the facility. An acknowledgement of receipt of a self-certification, in
particular, does not represent a determination by the Commission with regard to the QF status of the facility. An applicant
self-certifying may, however, receive a rejection, revocation or deficiency letter if its application is found, during periodic
compliance reviews, not to comply with the relevant requirements.
An applicant submitting a request for Commission certification will receive an order either granting or denying certification of
QF status, or a letter requesting additional information or rejecting the application. Pursuant to 18 C.F.R. S 292.207(bX3), the
Commission must act on an application for Commission certification within 90 days of the later of the filing date of the
application or the filing date of a supplement, amendment or other change to the application.
Waiver Requests
18 C.F.R. 5 292.204(a)(3) allows an applicant to request a waiver to modify the method of calculation pursuant to 18 C.F.R. S
292.20a@)Q) to determine if two facilities are considered to be located at the same site, for good cause. 18 C.F.R. 5 292.205(c)
allows an applicant to request waiver of the requirements of 18 C.F.R. SS 292.205(a) and (b) for operating and efficiency upon
a showing that the facility will produce significant energy savings. A request for waiver of these requirements must be
submitted as a petition for declaratory order, with the appropriate filing fee for a petition for declaratory order. Applicants
requesting Commission recertification as part of a request for waiver of one of these requirements should electronically
submit their completed Form 556 along with their petition for declaratory order, rather than filing their Form 556 as a
separate request for Commission recertification. Only the filing fee for the petition for declaratory order must be paid to
cover both the waiver request and the request for recertification if such requests ore made simultoneously.
1 8 C.F.R. 5 292.203(dX2) allows an applicant to request a waiver of the Form 556 filing requirements, for good cause.
Applicants filing a petition for declaratory order requesting a waiver under 1 8 C.F.R. S 292.203(d)(2) do not need to complete
or submit a Form 556 with their petition.
FERC Form 556 Page 4 - lnstructions
Geographic Coord i nates
lf a street address does not exist for your facility, then line 3c of the Form 556 requires you to report your facility's geographic
coordinates (latitude and longitude). Geographic coordinates may be obtained from several different sources. You can find
links to online services that show latitude and longitude coordinates on online maps by visiting the Commission's QF
webpage at utwvylelc.gqvlQE and clicking the Geographic Coordinates link. You may also be able to obtain your geographic
coordinates from a GPS device, Google Earth (available free at hlplearth.saag!e.q9lrr, a property survey, various
engineering or construction drawings, a property deed, or a municipal or county map showing property lines.
Filing Privileged Data or Critical Energy lnfrastructure lnformation in a Form 556
The Commission's regulations provide procedures for applicants to either (1) request that any information submitted with a
Form 556 be given privileged treatment because the information is exempt from the mandatory public disclosure
requirements of the Freedom of lnformation Act, 5 U.S.C. 5 552, and should be withheld from public disclosure; or (2) identify
any documents containing critical energy infrastructure information (CEll) as defined in 18 C.F.R. 5 388.1 13 that should not be
made public.
lf you are seeking privileged treatment or CEll status for any data in your Form 556, then you must follow the procedures in I8
C.F.R. S 388.1 12. See www.ferc.gor2 lrelp/filing-guide/file-ceii.asp for more information.
Among other things (see 18 C.F.R. 5 388.1 12 for other requirements), applicants seeking privileged treatment or CEll status for
data submitted in a Form 556 must prepare and file both (1 ) a complete version of the Form 556 (containing the privileged
and/or CEll data), and (2) a public version of the Form 556 (with the privileged and/or CEll data redacted). Applicants
preparing and filing these different versions of their Form 556 must indicate below the security designation of this version of
their document. lf you are not seeking privileged treatment or CEll status for any of your Form 556 data, then you should not
respond to any of the items on this page.
The eFiling process described on page 2 will allow you to identify which versions of the electronic documents you submit are
public, privileged and/or CEll. The filenames for such documents should begin with "Public", "Priv", or "CEll", as applicable, to
clearly indicate the security designation of the file. Both versions of the Form 556 should be unaltered PDF copies of the Form
556, as available for download from www.ferc.gov/QF. To redact data from the public copy of the submittal, simply omit the
relevant data from the Form. For numerical fields, leave the redacted fields blank. For text fields, complete as much of the
field as possible, and replace the redacted portions of the field with the word "REDACTED" in brackets. Be sure to identify
above all fields which contain data for which you are seeking non-public status.
The Commission is not responsible for detecting or correcting filer errors, including those errors related to security
designation. lf your documents contain sensitive information, make sure they are filed using the proper security designation.
Non-Public Applicant is seeking privileged treatment and/or CEll status for data contained in the Form 556 lines
! indicated below. This non-public version of the applicant's Form 556 contains all data, including the data that is redacted
in the (separate) public version of the applicant's Form 556.
Public (redacted): Applicant is seeking privileged treatment and/or CEll status for data contained in the Form 556 lines
! indicated below. This public version of the applicants's Form 556 contains all data except for data from the lines
indicated below, which has been redacted.
Privileged: lndicate below which lines of your form contain data for which you are seeking privileged treatment
Critical Energy lnfrastructure lnformation (CEll): lndicate below which lines of your form contain data for which you are
seeking CEll status
C
.9
(o
E
o
C
E
.o
(o
.tJao-
1 a Full name of applicant (legal entity on whose behalf qualifying facility status is sought for this facility)
CAFCo Tdaho Refuse Management LLC c,/o Southern Idaho Solid Waste (SISW)
1b Applicant street address
1050 W 400 s
1c City
Burley
1d State/province
Idaho
le Postal code
83318
1f Country (if not United States)1g Telephone number
(208) 432-9082
t h Has the instant facility ever previously been certified as a QF? Yes ! No X
1 i lf yes, provide the docket number of the last known QF filing pertaining to this facility: QF
1j Under which certification process is the applicant making this filing?
- Notice of self-certification ,-- Application for Commission certification (requires filinga (see note below) u fee; see "Filing Fee" section on page 3)
Note: a notice of self-certification is a notice by the applicant itself that its facility complies with the requirements for
QF status. A notice of self-certification does not establish a proceeding, and the Commission does not review a
notice of self-certification to verifr compliance. See the "What to Expect From the Commission After You File"
section on page 3 for more information.
1k What type(s) of QF status is the applicant seeking for its facility? (check all that apply)
)( Qualifoing small power production facility status I Qualifying cogeneration facility status
1l What is the purpose and expected effective date(s) of this filing?
\ Original certification; facility expected to be installed by 4 / 2 / 78 and to begin operation on 5 / 1/ tB
Change(s) to a previously certified facility to be effective on
(identify type(s) of change(s) below, and describe change(s) in the Miscellaneous section starting on page 19)
Name change and/or other administrative change(s)
Change in ownership
Change(s) affecting plant equipment, fuel use, power production capacity and/or cogeneration thermal output
Supplement or correction to a previous filing submitted on
(describe the supplement or correction in the Miscellaneous section starting on page 19)
1m lf any of the following three statements is true, check the box(es) that describe your situation and complete the form
to the extent possible, explaining any special circumstances in the Miscellaneous section starting on page 19.
,-- The instant facility complies with the Commission's QF requirements by virtue of a waiver of certain regulationsu previously granted by the Commission in an order dated (speciff any other relevant waiver
orders in the Miscellaneous section starting on page 19)
,-- The instant facility would comply with the Commission's QF requirements if a petition for waiver submittedu concurrently with this application is granted
The instant facility complies with the Commission's regulations, but has special circumstances, such as the
! employment of unique or innovative technologies not contemplated by the structure of this form, that make
the demonstration of compliance via this form difficult or impossible (describe in Misc. section starting on p. 19)
FEDERAL ENERGY REGULATORY COMMISSION oMBContror # 1so2-oo7s
WASHINGTON, DC Expiration 06/30/201e
F o r m 5 5 6 ;:Jlftl[::::H:l?;:,'#i:nlQF) status for a smarr Power
(,
v
w
(,!
o
g
FERC Form 556 Page6-AllFacilities
tr
€3
tr
c
.9
(o
E
o
c
L,,(o
CotJ
2a Name of contact person
Josh Bartlome
2b Telephone number
(208) 432-9082
2c Which of the following describes the contact person's relationship to the applicant? (check one)
! Applicant (selfl ! Employee, owner or partner of applicant authorized to represent the applicant
I Employee of a company affiliated with the applicant authorized to represent the applicant on this matter
! Lawyer, consultant, or other representative authorized to represent the applicant on this matter
2d Company or organization name (if applicant is an individual, check here and skip to line 2e)
CAFCo Idaho Refuse Management LLC c/o Southern Idaho Solid Waste
2e Street address (if same as Applicant, check here and skip to line 3a)X
2l City 2g State/province
2h Postal code 2i Country (if not United States)
Co
(o
L.,o
EC(o
C
.9
(oU
.E
Co
=.E
(J(o
lJ-
3a Facility name
Milner Butte Landfill
3b Street address (if a street address does not exist for the facility, check here and skip to line 3c)
1050 W 400 S Burley, Idaho 83318
3c Geographic coordinates: lf you indicated that no street address exists for your facility by checking the box in line 3b,
then you must speciff the latitude and longitude coordinates of the facility in degrees (to three decimal places). Use
the following formula to convert to decimal degrees from degrees, minutes and seconds: decimal degrees =
degrees + (minutes/60) + (seconds/3600). See the "Geographic Coordinates" section on page 4 for help. lf you
provided a street address for your facility in line 3b, then specifying the geographic coordinates below is optional.
714.004 degrees 42.466 degreesl-l East (+)
Longitude fr west (_)
X lrtorttr (+)Latitude fr sor*' i-l
3d City (if unincorporated, check here and enter nearest city) !
Burley
3e State/province
Idaho
3f County (or check here for independent city)
Cas s ia
39 Country (if not United States)
tno
:=
f
O)C
U(ovlc(!
ldentify the electric utilities that are contemplated to transact with the facility
4a ldentify utility interconnecting with the facility
Idaho Power Company
4b ldentify utilities providing wheeling service or check here if none fi
4c ldentify utilities purchasing the useful electric power output or check here if none
Idaho Power Company
4d ldentify utilities providing supplementary power, backup power, maintenance power, and/or interruptible power
service or check here if none I
FERC Form 556 PageT - All Facilities
Co
(!
oo-oEc(o
o-
=rn
oC
=o
5a Direct ownership as of effective date or operation date: ldentifo all direct owners of the facility holding at least l0
percent equity interest. For each identified owner, also (1) indicate whether that owner is an electric utility, as
defined in section 3(22) of the Federal Power Act (16 U.S.C. 796(22)), or a holding company, as defined in section
1262(8) of the Public Utility Holding Company Act of 2005 (42 U.S.C. 1 6451 (8)), and (2) for owners which are electric
utilities or holding companies, provide the percentage of equity interest in the facility held by that owner. lf no
direct owners hold at least 10 percent equity interest in the facility, then provide the required information for the
two direct owners with the largest equity interest in the facility.
Electric utility or lf Yes,
holding o/o equity
Full legal names of direct owners company interest
l) carco Idaho Refuse Management LLC c/o SISW Yes !
Yes!
Yes !
Yes !
Yes !
Yes !
Yes !
Yes !
Yes !
Yes !
NoX
NoI
NoE
NoE
NoE
NoE
NoE
NoE
NoE
NoE
z
a_
9
%
I
6
z
6
z
2)
3)
4)
s)
6)
7\
8)
e)
10)
! Check here and continue in the Miscellaneous section starting on page '19 if additional space is needed
5b Upstream (i.e., indirect) ownership as of effective date or operation date: ldentify all upstream (i.e., indirect) owners
of the facility that both (1 ) hold at least 1 0 percent equity interest in the facility, and (2) are electric utilities, as
defined in section 3(22) of the Federal Power Act (l 6 U.S.C. 796(22)), or holding companies, as defined in section
1262(8) of the Public Utility Holding CompanyActof 2005 (42 U.S.C.16451(8)). Also providethe percentageof
equity interest in the facility held by such owners. (Note that, because upstream owners may be subsidiaries of one
another, total percent equity interest reported may exceed 100 percent.)
Check here if no such upstream owners exist. I
o/o equity
Full legal names of electric utility or holding company upstream owners interest
r)
2)
3)
4)
s)
6)
7)
8)
e)
10)
z
z
6
z
6
6
z
%
z
z
Check here and continue in the Miscellaneous section starting on page 19 if additional space is needed
5c ldentify the facility operator
Brent Dozier
FERC Form 556 PageS-AllFacilities
o-C
Ol
oClrJ
6a Describe the primary energy input: (check one main category and, if applicable, one subcategory)
I Biomass (specifi) ! Renewable resources (specify) ! Geothermal
I Landfill gas ! Hydro power - river I Fossilfuel (specify)
! Manure digester gas ! Hydro power - tidal ! Coal (not waste)
! Municipalsolidwaste ! Hydropower-wave ! Fueloil/diesel
! Sewage digester gas ! Solar - photovoltaic ! Natural gas (not waste)
I Wood E Solar-thermal O Otherfossilfuel
n other biomass (describe on page 19) ! wind " (describe on page 19)
! waste (speciry type betow in tine 6b) tr ?,iiriffi:Xfjljil'"" ! other (describe on pase 1e)
6b lf you specified "waste" as the primary energy input in line 6a, indicate the type of waste fuel used: (check one)
! Waste fuel listed in 18 C.F.R. 5 292.202(b) (specify one of the following)
E Anthracite culm produced prior to July 23, 1985
- Anthracite refuse that has an average heat content of 6,000 Btu or less per pound and has an averageu ash content of 45 percent or more
,-- Bituminous coal refuse that has an average heat content of 9,500 Btu per pound or less and has an
" average ash content of 25 percent or more
Top or bottom subbituminous coal produced on Federal lands or on lndian lands that has been
,--, determined to be waste by the United States Department of the lnterior's Bureau of Land Management
' (BLM) or that is located on non-Federal or non-lndian lands outside of BLM's jurisdiction, provided that
the applicant shows that the latter coal is an extension of that determined by BLM to be waste
Coal refuse produced on Federal lands or on lndian lands that has been determined to be waste by the
E BLM or that is located on non- Federal or non-lndian lands outside of BLM's jurisdiction, provided that
applicant shows that the latter is an extension of that determined by BLM to be waste
,.--., Lignite produced in association with the production of montan wax and lignite that becomes exposed
- as a result of such a mining operation
! Gaseous fuels (except natural gas and synthetic gas from coal) (describe on page 1 9)
Waste natural gas from gas or oil wells (describe on page 19 how the gas meets the requirements of l8
n C.F.R. S 2.400 for waste natural gas; include with your filing any materials necessary to demonstrate
compliance with 18 C.F.R. 5 2.400)
! Materials that a government agency has certified for disposal by combustion (describe on page 19)
! Heat from exothermic reactions (describe on page 19) ! Residual heat (describe on page 19)
I Used rubber tires ! Plastic materials ! Refinery off-gas ! Petroleum coke
Other waste energy input that has little or no commercial value and exists in the absence of the qualifoing
! facility industry (describe in the Miscellaneous section starting on page 1 9; include a discussion of the fuel's
lack of commercial value and existence in the absence of the qualifying facility industry)
6c Provide the average energy input, calculated on a calendar year basis, in terms of Btu/h for the following fossil fuel
energy inputs, and provide the related percentage of the total average annual energy input to the facility (1 8 C.F.R, S
292.2020)). For any oil or natural gas fuel, use lower heating value (18 C.F.R. S 292.202(m)).
Annual average energy Percentage oftotal
Fuel input for specified fuel annual energy input
Natural gas 0 Btu/h 0 o/o
Oil-based fuels 0 Btu/h 0Vo
Coal 0 Btu/h 0Vo
FERC Form 556 Page9-AllFacilities
Co
(o
E
o
C
.=
U(o
LL
E.9
L
LJo
lndicate the maximum gross and maximum net electric power production capacity of the facility at the point(s) of
delivery by completing the worksheet below. Respond to all items. lf any of the parasitic loads and/or losses identified in
lines 7b through 7e are negligible, enter zero for those lines.
7a The maximum gross power production capacity at the terminals of the individual generator(s)
under the most favorable anticipated design conditions 2,6L0 kw
7b Parasitic station power used at the facility to run equipment which is necessary and integral to
the power production process (boiler feed pumps, fans/blowers, office or maintenance buildings
directly related to the operation of the power generating facility, etc.). lf this facility includes non-
power production processes (for instance, power consumed by a cogeneration facility's thermal
host) , do not include any power consumed by the non-power production activities in your
reported parasitic station power.587.4 kw
7c Electrical losses in interconnection transformers
39. 9 kw
7d Electrical losses in ACIDC conversion equipment, if any
0kw
7e Other interconnection losses in power lines or facilities (other than transformers and AC/DC
conversion equipment) between the terminals of the generator(s) and the point of interconnection
with the utility 17.7 kw
7f Total deductions from gross power production capacity = 7b + 7c + 7d + 7e
54 s . 0 kw
79 Maximum net power production capacity =7a -7f
1,965.0 kw
7h Description of facility and primary components: Describe the facility and its operation. ldentifi all boilers, heat
recovery steam generators, prime movers (any mechanical equipment driving an electric generator), electrical
generators, photovoltaic solar equipment, fuel cell equipment and/or other primary power generation equipment
used in the facility. Descriptions of components should include (as applicable) specifications of the nominal
capacities for mechanical output, electrical output, or steam generation of the identified equipment. For each piece
of equipment identified, clearly indicate how many pieces of that type of equipment are included in the plant, and
which components are normally operating or normally in standby mode. Provide a description of how the
components operate as a system. Applicants for cogeneration facilities do not need to describe operations of
systems that are clearly depicted on and easily understandable from a cogeneration facility's attached mass and
heat balance diagram; however, such applicants should provide any necessary description needed to understand
the sequential operation of the facility depicted in their mass and heat balance diagram. lf additional space is
needed, continue in the Miscellaneous section starting on page 19.
LFG is currently drawn from Cefls 1-5 and Ce1I 6 is anticlpated to begin LEG
collection in 2020. LFG is drawn to the processing facility with two of (21 HSI
blowers which are mounted on the flare skid. LFG used for energ:y producti-on is
drawn from the flare skid to the conditioner skid by two of (2) HSI b1owers for
treatment before use in energy production. A11 excess gas that is not used for
energy production is burned off through an enclosed flare mounted next to the
flare skj-d. The conditioning skid is a pretreatment for the LEG before it is
burned in the Dresser-Rand HGM560/4 Generator Sets. Pretreatment cool-s the LFG,
knocking out moisture and some compounds harmful to the generator set enqines.
After the LFG is cooled it is then reheated and sent to the generator sets for
energy production. Currently the system is composed of two (2) Dresser-Rand
HGM560/4 with the anticipation of and additional Dresser-Rand HGM560/4 generator
set with in the next five years.
FERC Form 556 Page 'l 0 - Small Power Production
Pursuant to 18 C.F.R. I29220a@), the power production capacity of any small power production facility, together
with the power production capacity of any other small power production facilities that use the same energy
resource, are owned by the same person(s) or its affiliates, and are located at the same site, may not exceed 80
megawatts. To demonstrate compliance with this size limitation, or to demonstrate that your facility is exempt
from this size limitation under the Solar, Wind, Waste, and Geothermal Power Production lncentives Act of 1990
(Pub. L. 101-575,1 04 Stat. 2834 (1990) os omended by Pub. L. 102-46,1 05 Stat. 249 (1991)), respond to lines 8a
through 8e below (as applicable).
8a ldentify any facilities with electrical generating equipment located within 1 mile of the electrical generating
equipment of the instant facility, and for which any of the entities identified in lines 5a or 5b, or their affiliates, holds
at least a 5 percent equity interest.
Check here if no such facilities exist. I
-- Check here andcontinue in the Miscellaneous section starting on page 19 if additional space is needed
Common owner(s)
Root docket #
(if any)
Maximum net power
production capacity
KW
KW
KW
Facility location
(city or county, state)
r)
2)
3)
QF
QF
QF
8b The Solar, Wind, Waste, and Geothermal Power Production lncentives Act of 1990 (lncentives Act) provides
exemption from the size limitations in 18 C.F.R. 5 292.2O4(a) for certain facilities that were certified prior to 1995.
Are you seeking exemption from the size limitations in 1 8 C.F.R. 5 292.20aQ) by virtue of the lncentives Act?
! Yes (continue at line 8c below) X No (skip lines 8c through 8e)
8c Wastheoriginal noticeofself-certificationorapplicationforCommissioncertificationofthefacilityfiledonor
before December 31,1994? Yes No
8d Did construction of the facility commence on or before December 31,1999? Yes No
o
L.,C(o2
E€L(tIo.HUtrt+ .=OJCOo.NE(^!! -c
E=o
TJ
8e lf you answered No in line 8d, indicate whether reasonable diligence was exercised toward the completion of
the facility, taking into account all factors relevant to construction? Yes | ] No lf you answered Yes, provide
a brief narrative explanation in the Miscellaneous section starting on page 1 9 of the construction timeline (in
particular, describe why construction started so long after the facility was certified) and the diligence exercised
toward completion of the facility.
Pursuant to 18 C.F.R. 5 292.204(b), qualifying small power production facilities may use fossil fuels, in minimal
amounts, for only the following purposes: ignition; start-up; testing; flame stabilization; control use; alleviation or
prevention of unanticipated equipment outages; and alleviation or prevention of emergencies, directly affecting
the public health, safety, or welfare, which would result from electric power outages. The amount of fossil fuels
used for these purposes may not exceed 25 percent of the total energy input of the facility during the 1 2-month
period beginning with the date the facility first produces electric energy or any calendar year thereafter.
9a Certification of compliance with 18 C.F.R. 5 292.2O4(b) with respect to uses of fossil fuel:
I Applicant certifies that the facility will use fossil fuels exclusively for the purposes listed above.
u9LJ-kv
o-o
O--UUEE;v,.9=(tr(UU:]
E-co.=u=
9b Certificationof compliancewith 18C.F.R.5292.2O4(b) with respecttoamountof fossilfuelusedannually:
Applicant certifies that the amount of fossil fuel used at the facility will not, in aggregate, exceed 25
I percent of the total energy input of the facility during the 12-month period beginning with the date the
facility first produces electric energy or any calendar year thereafter.
lnformation Required for Small Power Production Facility
lf you indicated in line 1k that you are seeking qualifying small power production facility status for your facility, then you
must respond to the items on this Otherwise, ski 10.
*)
FERC Form 556 Page l1 - Cogeneration Facilities
lnformation Required for Cogeneration Facility
lf you indicated in line 1 k that you are seeking qualifying cogeneration facility status for your facility, then you must respond
to the items on 11 th 13. Otherwise,11 13
7J
c
.9
(o
PE
SEotrrJk
- .llGl?
ocot,
Pursuant to 18 C.F.R. 5 292.202(c), a cogeneration facility produces electric energy and forms of useful thermal
energy (such as heat or steam) used for industrial, commercial, heating, or cooling purposes, through the sequential
use of energy. Pursuant to 18 C.F.R. 5 292.2O2(s), "sequential use" of energy means the following: (1) for a topping-
cycle cogeneration facility, the use of reject heat from a power production process in sufficient amounts in a
thermal application or process to conform to the requirements of the operating standard contained in 18 C.F.R. S
292.205(a); or (2) for a bottoming-cycle cogeneration facility, the use of at least some reject heat from a thermal
application or process for power production.
10a What type(s) of cogeneration technology does the facility represent? (check all that apply)
I Topping-cycle cogeneration Bottoming-cycle cogeneration
10b To help demonstrate the sequential operation of the cogeneration process, and to support compliance with
other requirements such as the operating and efficiency standards, include with your filing a mass and heat
balance diagram depicting average annual operating conditions. This diagram must include certain items and
meet certain requirements, as described below. You must check next to the description of each requirement
below to certify that you have complied with these requirements.
Check to certify
compliance with
indicated requirement Requirement
Diagram must show orientation within system piping and/or ducts of all prime movers,
heat recovery steam generators, boilers, electric generators, and condensers (as
applicable), as well as any other primary equipment relevant to the cogeneration
process.
Any average annual values required to be reported in lines 10b, 12a,13a, 13b, 13d, 131
14a, 15b, 15d and/or l5f must be computed over the anticipated hours of operation.
Diagram must specifo all fuel inputs by fuel type and average annual rate in Btu/h. Fuel
for supplementary firing should be specified separately and clearly labeled. All
specifications of fuel inputs should use lower heating values.
Diagram must specify average gross electric output in kW or MW for each generator.
tr
T
L]
t-l
T
I
Diagram must specify average mechanical output (that is, any mechanical energy taken
off of the shaft of the prime movers for purposes not directly related to electric power
generation) in horsepower, if any. Typically, a cogeneration facility has no mechanical
output.
At each point for which working fluid flow conditions are required to be specified (see
below), such flow condition data must include mass flow rate (in lb/h or kg/s),
temperature (in'F, R,'C or K), absolute pressure (in psia or kPa) and enthalpy (in Btu/lb
or kJlkg). Exception: For systems where the working fluid is liquid only (no vapor at any
point in the cycle) and where the type of liquid and specific heat of that liquid are clearly
indicated on the diagram or in the Miscellaneous section starting on page 19, only mass
flow rate and temperature (not pressure and enthalpy) need be specified. For reference,
specific heat at standard conditions for pure liquid water is approximately 1.002 Btu/
(lb*R) or 4.1 95 kJl(kg*K).
Diagram must specify working fluid flow conditions at input to and output from each
steam turbine or other expansion turbine or back-pressure turbine.
Diagram must specify working fluid flow conditions at delivery to and return from each
thermal application.
Diagram must specify working fluid flow conditions at make-up water inputs.
T
LI
FERC Form 556 Page 12 - Cogeneration Facilities
oo
(I
IJ
1J
-EE
E=
E(oO lJ-Ec(oOEEC(q,ig
EI,
E8OEtro6.ts.! +,ff60-0J=frd
OOINbtl c{ .uto-xLU \"
EPAct 2005 cogeneration facilities: The Energy Policy Act of 2005 (EPAct 2005) established a new section 210(n) of
the Public Utility Regulatory Policies Act of 1978 (PURPA), 16 USC 824a-3(n), with additional requirements for any
qualiffing cogeneration facility that (1) is seeking to sell electric energy pursuant to section 210 of PURPA and (2)
was either not a cogeneration facility on August 8, 2005, or had not filed a self-certification or application for
Commission certification of QF status on or before February 1 ,2006. These requirements were implemented by the
Commission in 18 C.F.R. 5 292.205(d). Complete the lines below, carefully following the instructions, to demonstrate
whether these additional requirements apply to your cogeneration facility and, if so, whether your facility complies
with such requirements.
l la Was your facility operating as a qualiffing cogeneration facility on or before August 8, 2005? Yes - No
1 1b Was the initial filing seeking certification of your facility (whether a notice of self-certification or an application
for Commission certification) filed on or before February 1,2006? Yes i No
lf the answer to either line 1 1a or 1 1b is Yes, then continue at line 1 1c below. Otherwise, if the answers to both lines
1 1a and 1 1 b are No, skip to line 1 1e below.
11c With respect to the design and operation of the facility, have any changes been implemented on or after
February 2, 2006 that affect general plant operation, affect use ofthermal output, and/or increase net power
production capacity from the plant's capacity on February 1,2006?
Yes (continue at line 1 1d below)
No. Your facility is not subject to the requirements of 18 C.F.R. 5 292.205(d) at this time. However, it may be
subject to to these requirements in the future if changes are made to the facility. At such time, the applicant
would need to recertify the facility to determine eligibility. Skip lines 1 1d through 1 1j.
1 1d Does the applicant contend that the changes identified in line 1 1 c are not so significant as to make the facility
a "new" cogeneration facility that would be subject to the 18 C.F.R. S 292.205(d) cogeneration requirements?
Yes. Provide in the Miscellaneous section starting on page l9 a description of any relevant changes made to
the facility (including the purpose of the changes) and a discussion of why the facility should not be
considered a "new" cogeneration facility in light of these changes. Skip lines 11e through 11j.
No. Applicant stipulates to the fact that it is a "new" cogeneration facility (for purposes of determining the
applicability of the requirements of 1 8 C.F.R. 5 292.205(d)) by virtue of modifications to the facility that were
initiated on or after February 2,2006. Continue below at line 1 1e.
lle Willelectricenergyfromthefacilitybesoldpursuanttosection2l0of PURPA?
Yes. The facility is an EPAct 2005 cogeneration facility. You must demonstrate compliance with l8 C.F.R. 5
292.205(d)(2) by continuing at line 1 1f below.
No. Applicant certifies that energy will not be sold pursuant to section 210 of PURPA. Applicant also certifies
its understanding that it must recertify its facility in order to determine compliance with the requirements of
18 C.F.R. 5 292.205(d) before selling energy pursuant to section 210 of PURPA in the future. Skip lines 1 1f
through '11j.
tr
11f ls the net power production capacity of your cogeneration facility, as indicated in line 79 above, less than or
equal to 5,000 kW?
Yes, the net power production capacity is less than or equal to 5,000 kW. 1 8 C.F.R. 5 292.205(d)(4) provides a
rebuttable presumption that cogeneration facilities of 5,000 kW and smaller capacity comply with the
, . requirements for fundamental use of the facility's energy output in 18 C.F.R. S 292.205(dX2). Applicant
' certifies its understanding that, should the power production capacity of the facility increase above 5,000
kW, then the facility must be recertified to (among other things) demonstrate compliance with 18 C.F.R. S
292.2o5(d)(2). Skip lines 119 through 11j.
No, the net power production capacity is greater than 5,000 kW. Demonstrate compliance with the
i - requirements for fundamental use of the facility's energy output in 18 C.F.R. 5 292.205(dX2) by continuing on
the next Page at line 1 19.
FERC Form 556 Page 13 - Cogeneration Facilities
ao
o.E{EJoEl,
6UFf(o'i:
EE
tE€Esb?Cooc(,)u8'=F
BEEtFtn-o=OFN=uoserJ.r dC
IJ.J
o
Lines I 1g through 1 1 k below guide the applicant through the process of demonstrating compliance with the
requirements for "fundamental use" of the facility's energy output. 18 C.F.R. 5 292.205(d)(2). Only respond to the
lines on this page if the instructions on the previous page direct you to do so. Otherwise, skip this page.
18 C.F.R. S 292.205(dX2) requires that the electrical, thermal, chemical and mechanical output of an EPAct 2005
cogeneration facility is used fundamentally for industrial, commercial, residential or institutional purposes and is
not intended fundamentally for sale to an electric utility, taking into account technological, efficiency, economic,
and variable thermal energy requirements, as well as state laws applicable to sales of electric energy from a
qualifying facility to its host facility. lf you were directed on the previous page to respond to the items on this page,
then your facility is an EPAct 2005 cogeneration facility that is subject to this "fundamental use" requirement.
The Commission's regulations provide a two-pronged approach to demonstrating compliance with the
requirements for fundamental use of the facility's energy output. First, the Commission has established in 1 8 C.F.R.
5 292.205(dX3) a "fundamental use test" that can be used to demonstrate compliance with 18 C.F.R. S 292.205(d)(2).
Under the fundamental use test, a facility is considered to comply with 18 C.F.R. S 292.205(dX2) if at least 50 percent
of the facility's total annual energy output (including electrical, thermal, chemical and mechanical energy output) is
used for industrial, commercial, residential or institutional purposes.
Second, an applicant for a facility that does not pass the fundamental use test may provide a narrative explanation
of and support for its contention that the facility nonetheless meets the requirement that the electrical, thermal,
chemical and mechanical output of an EPAct 2005 cogeneration facility is used fundamentally for industrial,
commercial, residential or institutional purposes and is not intended fundamentally for sale to an electric utility,
taking into account technological, efficiency, economic, and variable thermal energy requirements, as well as state
laws applicable to sales of electric energy from a qualifying facility to its host facility.
Complete lines I 1g through 1 1j below to determine compliance with the fundamental use test in 18 C.F.R. 5
292.205(dX3). Complete lines 1 1g through 11j even if you do not intend to rely upon the fundamental use test to
demonstrate compliance with l8 C.F.R.5 292.205(d)(2).
I t g Amount of electrical, thermal, chemical and mechanical energy output (net of internal
generation plant losses and parasitic loads) expected to be used annually for industrial,
commercial, residential or institutional purposes and not sold to an electric utility MWh
I t h Total amount of electrical, thermal, chemical and mechanical energy expected to be
sold to an electric utility MWh
1 1 i Percentage of total annual energy output expected to be used for industrial,
commercial, residential or institutional purposes and not sold to a utility
=100*119/019+11h)0 o/o
1lj ls the response in line 1 1i greater than or equal to 50 percent?
Yes. Your facility complies with 18 C.F.R. S 292.205(d)(2) by virtue of passing the fundamental use test
provided in l8 C.F.R. S 292.205(dX3). Applicant certifies its understanding that, if it is to rely upon passing
the fundamental use test as a basis for complying with 18 C.F.R. 5 292.205(d)(2), then the facility must
comply with the fundamental use test both in the 12-month period beginning with the date the facility first
produces electric energy, and in all subsequent calendar years.
No. Your facility does not pass the fundamental use test. lnstead, you must provide in the Miscellaneous
section starting on page 19 a narrative explanation of and support for why your facility meets the
requirement that the electrical, thermal, chemical and mechanical output of an EPAct 2005 cogeneration
facility is used fundamentally for industrial, commercial, residential or institutional purposes and is not
intended fundamentally for sale to an electric utility, taking into account technological, efficiency, economic,
and variable thermal energy requirements, as well as state laws applicable to sales of electric energy from a
QF to its host facility. Applicants providing a narrative explanation of why their facility should be found to
comply with 18 C.F.R. 5 292.205(d){2) in spite of non-compliance with the fundamental use test may want to
review paragraphs 47 through 61 of Order No. 671 (accessible from the Commission's QF website at
www.ferc.gov/QF), which provide discussion of the facts and circumstances that may support their
explanation. Applicant should also note that the percentage reported above will establish the standard that
that facility must comply with, both for the 12-month period beginning with the date the facility first
produces electric energy, and in all subsequent calendar years. See Order No. 671 at paragraph 51. As such,
the applicant should make sure that it reports appropriate values on lines 1 1g and 1 t h above to serve as the
relevant annual standard, taking into account expected variations in production conditions.
\.,
FERC Form 556 Page 14 - Topping-Cycle Cogeneration Facilities
lnformation Required for Topping-Cycle Cogeneration Facility
lf you indicated in line 1 0a that your facility represents topping-cycle cogeneration technology, then you must respond to
the items on pages l4 and 15. Otherwise,14 and 15.
TJThe thermal energy output of a topping-cycle cogeneration facility is the net energy made available to an industrial
or commercial process or used in a heating or cooling application. Pursuant to sections 292.202(c), (d) and (h) of the
Commission's regulations (18 C.F.R. 55 292.202(c), (d) and (h)), tne thermal energy output of a qualifying topping-
cycle cogeneration facility must be useful. ln connection with this requirement, describe the thermal output of the
topping-cycle cogeneration facility by responding to lines 12a and 12b below.
12a ldentify and describe each thermal host, and specifo the annual average rate of thermal output made available
to each host for each use. For hosts with multiple uses of thermal output, provide the data for each use in
separate rows' Average annual rate of
thermal output
attributable to use (net of
Name of entity (thermal host) Thermal host's relationship to facility; heat contained in process
taking thermal output Thermal host's use of thermal output return or make-up water)
Select thermal host's relationship to facility
1)
Select thermal host's use of thermal output Btu/h
Select thermal host's relationship to facility
Select thermal host's use of thermal output Btu/h
Select thermal host's relationship to facility
3)
Select thermal host's use of thermal output Btu/h
Select thermal host's relationship to facility4)
Select thermal host's use of thermal output Btu/h
Select thermal host's relationship to facilitys)
Select thermal host's use of thermal output Btu/h
Select thermal host's relationship to facility
6)
Select thermal host's use of thermal output Btu/h
I Check here and continue in the Miscellaneous section starting on page 19 if additional space is needed
o
LJ
Vo)E
()
O- +r-
e6
(ooE
vtoo-ccF
f
d)r^f 1 2b Demonstration of usefulness of thermal output: At a minimum, provide a brief description of each use of the
thermal output identified above. ln some cases, this brief description is sufficient to demonstrate usefulness.
However, if your facility's use of thermal output is not common, and/or if the usefulness of such thermal output is
not reasonably clear, then you must provide additional details as necessary to demonstrate usefulness. Your
application may be rejected and/or additional information may be required if an insufficient showing of usefulness
is made. (Exception: lf you have previously received a Commission certification approving a specific use of thermal
output related to the instant facility, then you need only provide a brief description of that use and a reference by
date and docket number to the order certifying your facility with the indicated use. Such exemption may not be
used if any change creates a material deviation from the previously authorized use.) lf additional space is needed,
continue in the Miscellaneous section starting on page 19.
FERC Form 556 Page 15 - Topping-Cycle Cogeneration Facilities
rJ
o
o
o
ECC(o.9
PE
i!ub,q
ogs!'ru {>zvao)cCOr)lJ
&E
Applicants for facilities representing topping-cycle technology must demonstrate compliance with the topping-
cycle operating standard and, if applicable, efficiency standard. Section 292.205(aXl ) of the Commission's
regulations (18 C.F.R. 5 292.205(aX1)) establishes the operating standard for topping-cycle cogeneration facilities:
the useful thermal energy output must be no less than 5 percent of the total energy output. Section 292.205(a)(2)
(18 C.F.R. 5 292.205(aX2)) establishes the efficiency standard for topping-cycle cogeneration facilities for which
installationcommencedonorafterMarch'l 3, 1980: theuseful poweroutputofthefacilityplusone-halftheuseful
thermal energy output must (A) be no less than 42.5 percent of the total energy input of natural gas and oil to the
facility; and (B) if the useful thermal energy output is less than 1 5 percent of the total energy output of the facility,
be no less than 45 percent of the total energy input of natural gas and oil to the facility. To demonstrate
compliance with the topping-cycle operating andlor efficiency standards, or to demonstrate that your facility is
exempt from the efficiency standard based on the date that installation commenced, respond to lines 13a through'l3l below.
lf you indicated in line 10a that your facility represents both topping-cycle and bottoming-cycle cogeneration
technology, then respond to lines 13a through 131 below considering only the energy inputs and outputs
attributable to the topping-cycle portion of your facility. Your mass and heat balance diagram must make clear
which mass and energy flow values and system components are for which portion (topping or bottoming) of the
cogeneration system.
13a lndicate the annual average rate of useful thermal energy output made available
to the host(s), net of any heat contained in condensate return or make-up water Btu/h
I 3b lndicate the annual average rate of net electrical energy output
KW
13c Multiply line l3b by 3,412 to convert from kW to Btu/h
o Btu/h
l3d lndicate the annual average rate of mechanical energy output taken directly off
of the shaft of a prime mover for purposes not directly related to power production
(this value is usually zero)hp
l3e Multiply line 13d by 2,544to convert from hp to Btu/h
0 Btu/h
l3f lndicate the annual average rate of energy input from natural gas and oil
Btu/h
l39 Topping-cycle operating value = 100 * l3a / (13a + 13c + 13e)
0 o/o
13h Topping-rycle efficiency value = 100 * (0.5*13a + 'l3c + 13e) / 13f
a o/o
l3i Compliance with operating standard: ls the operating value shown in line 139 greater than or equal lo 5o/o?
Yes (complies with operating standard) No (does not comply with operating standard)
13j Did installation of the facility in its current form commence on or after March 13, 1980?
Yes. Your facility is subject to the efficiency requirements of 18 C.F.R. 5 292.205(a)(2). Demonstrate. compliance with the efficiency requirement by responding to line l3k or 'l 31, as applicable, below.
No. Your facility is exempt from the efficiency standard. Skip lines 'l 3k and 131.
1 3k Compliance with efficiency standard (for low operating value): lf the operating value shown in line 1 39 is less
than 15ol0, then indicate below whether the efficiency value shown in line 13h greater than or equal lo 45o/o:
Yes (complies with efficiency standard) No (does not comply with efficiency standard)
13! Compliancewithefficiencystandard(forhighoperatingvalue): lftheoperatingvalueshowninlinel39is
greater than or equal to 15olo, then indicate below whether the efficiency value shown in line 13h is greater than or
equal to 42.5o/o:
Yes (complies with efficiency standard) No (does not comply with efficiency standard)
FERC Form 556 Page 16 - Bottoming-Cycle Cogeneration Facilities
Information Required for Bottoming-Cycle Cogeneration Facility
lf you indicated in line 1 0a that your facility represents bottoming-cycle cogeneration technology, then you must respond
to the items on 16 and 17. Otherwise, skip l6and 17.
The thermal energy output of a bottoming-cycle cogeneration facility is the energy related to the process(es) from
which at least some of the reject heat is then used for power production. Pursuant to sections 292.202(c) and (e) of
the Commission's regulations (18 C.F.R. S 292.202(c) and (e)) , the thermal energy output of a qualiffing bottoming-
cycle cogeneration facility must be useful. ln connection with this requirement, describe the process(es) from which
at least some of the reject heat is used for power production by responding to lines 14a and 14b below.
14a ldentifr and describe each thermal host and each bottoming-cycle cogeneration process engaged in by each
host. For hosts with multiple bottoming-cycle cogeneration processes, provide the data for each process in
seporate rows'
Has the energy input to
Name of entity (thermal host) the thermal host been
performing the process from augmented for purposes
which at least some of the of increasing power
reject heat is used for power Thermal host's relationship to facility; production capacity?production Thermal host's process type (if Yes, describe on p. 19)
1)
to facilthermal host's relationsh
thermal host's
Yes No
Yes No2)
to facil
thermal host's roce55
thermal host's relationsh
3)
to faci
ethermal host's roce55
thermal host's relationshi Yes , NoL
i- Check here and continue in the Miscellaneous section starting on page 19 if additional space is needed
o
(J
U
Io)
FO-O=
E9m(ootvtO
(U r-C':
otnf
14b Demonstration of usefulness of thermal output: At a minimum, provide a brief description of each process
identified above. ln some cases, this brief description is sufficient to demonstrate usefulness. However, if your
facility's process is not common, and/or if the usefulness of such thermal output is not reasonably clear, then you
must provide additional details as necessary to demonstrate usefulness. Your application may be rejected and/or
additional information may be required if an insufficient showing of usefulness is made. (Exception: lf you have
previously received a Commission certification approving a specific bottoming-cycle process related to the instant
facility, then you need only provide a brief description of that process and a reference by date and docket number
to the order certiffing your facility with the indicated process. Such exemption may not be used if any material
changes to the process have been made.) lf additional space is needed, continue in the Miscellaneous section
starting on page 19.
FERC Form 556 Page 17 - Bottoming-Cycle Cogeneration Facilities
ffi
I
gg
EC
3b.=ros3EroI4r rL'<uO=.iro)uEC'=OE'Uo i.=
5 rr.r
6
Applicants for facilities representing bottoming-cycle technology and for which installation commenced on or after
March 13, 1990 must demonstrate compliance with the bottoming-cycle efficiency standards. Section 292.205(b) of
the Commission's regulations (18 C.F.R. 5 292.205(b)) establishes the efficiency standard for bottoming-cycle
cogeneration facilities: the useful power output of the facility must be no less than 45 percent of the energy input
of natural gas and oil for supplementary firing. To demonstrate compliance with the bottoming-cycle efficiency
standard (if applicable), or to demonstrate that your facility is exempt from this standard based on the date that
installation of the facility began, respond to lines 15a through 15h below.
lf you indicated in line 10a that your facility represents both topping-cycle and bottoming-cycle cogeneration
technology, then respond to lines 15a through I5h below considering only the energy inputs and outputs
attributable to the bottoming-cycle portion of your facility. Your mass and heat balance diagram must make clear
which mass and energy flow values and system components are for which portion of the cogeneration system
(topping or bottoming).
15a Did installation of the facility in its current form commence on or after March 13, 1980?
. Yes. Your facility is subject to the efficiency requirement of 18 C.F.R. S 292.205(b). Demonstrate compliance
with the efficiency requirement by responding to lines l5b through l5h below.
i No. Your facility is exempt from the efficiency standard. Skip the rest of page 17.
1 5b lndicate the annual average rate of net electrical energy output
KW
15c Multiply line 15b by 3,412 to convert from kW to Btu/h
0 Btu/h
15d lndicate the annual average rate of mechanical energy output taken directly off
of the shaft of a prime mover for purposes not directly related to power production
(this value is usually zero)hp
1 5e Multiply line 1 5d by 2,544 lo convert from hp to Btu/h
0 Btu/h
15f lndicate the annual average rate of supplementary energy input from natural gas
or oil Btu/h
l59 Bottoming-cycle efficiency value = 100 * (15c + 15e) / 15f
a o/o
15h Compliance with efficiency standard: lndicate below whether the efficiency value shown in line l59 is greater
than or equal to 45026:
[-J Yes (complies with efficiency standard) [ No (does not comply with efficiency standard)
FERC Form 556 Page 18 - All Facilities
Certificate of Completeness, Accuracy and Authority
Applicant must certify compliance with and understanding of filing requirements by checking next to each item below and
signing at the bottom of this section. Forms with incomplete Certificates of Completeness, Accuracy and Authority will be
rejected by the Secretary of the Commission.
Signer identified below certifies the following: (check all items and applicable subitems)
He or she has read the filing, including any information contained in any attached documents, such as cogeneration
I mass and heat balance diagrams, and any information contained in the Miscellaneous section starting on page 19, and
knows its contents.
He or she has provided all of the required information for certification, and the provided information is true as stated,
to the best of his or her knowledge and belief.
He or she possess full power and authority to sign the filing; as required by Rule 2005(aX3) of the Commission's Rules of
Practice and Procedure (18 C.F.R. S 385.2005(a)(3)), he or she is one of the following: (check one)
! The person on whose behalf the filing is made
I An officer of the corporation, trust, association, or other organized group on behalf of which the filing is made
- An officer, agent, or employe of the governmental authority, agency, or instrumentality on behalf of which thex filing is made
- A representative qualified to practice before the Commission under Rule 2101 of the Commission's Rules ofu Practice and Procedure (18 C.F.R. 5 385.2101) and who possesses authority to sign
He or she has reviewed all automatic calculations and agrees with their results, unless otherwise noted in the
Miscellaneous section starting on page 19.
He or she has provided a copy of this Form 556 and all attachments to the utilities with which the facility will
interconnect and transact (see lines 4a through 4d), as well as to the regulatory authorities of the states in which the
facility and those utilities reside. See the Required Notice to Public Utilities and State Regulatory Authorities section on
page 3 for more information.
Provide your signature, address and signature date below. Rule 2005(c) of the Commission's Rules of Practice and
Procedure (18 C.F.R. 5 385.2005(c)) provides that persons filing their documents electronically may use typed characters
representing his or her name to sign the filed documents. A person filing this document electronically should sign (by
typing his or her name) in the space provided below.
Your Signature
Josh Bartlome
Your address
1050 I,i 400 s
BurIey, Idaho 83318
Date
3/73/2078
Audit Notes
Commission Staff Use Only:
X
FERC Form 556 Page 19-AllFacilities
Miscellaneous
Use this space to provide any information for which there was not sufficient space in the previous sections of the form to
provide. Foreachsuchitemof informationclearlyidentifythelinenumberthattheinformationbelongsfo. Youmayalsouse
this space to provide any additional information you believe is relevant to the certification of your facility.
Your response below is not limited to one page. Additional page(s) will automatically be inserted into this form if the
length of your response exceeds the space on this page. Use as many pages as you require.