HomeMy WebLinkAbout20170814Comments.pdfDiane Holt
From:
Sent:
To:
Subiect:
Name:joseph humphrey
Case Number: wood river valley
Email : joe@consultingee.com
Te le p ho ne : 208-7 2O-34O7
Address: po box 5
sun valley id, 83353
joe@consultingee.com
Friday, August 11,2017 5:16 PM
Beverly Barker; Diane Holt; Matthew Evans
Case Comment Form:joseph humphrey
ilC- E'/6 -z?
Name of Utility Company: ldaho Power
Comment: lt is imperative that the existing WOOD RIVER to KETCHUM 138kv line be re-built as soon as possible. The line
has served us well during its 55 year life.
Theexistingroutehasproventominimizethedangersoffire,snowslides,orvehiculardamage. Thelineliesinexisting
right-ofwaywhichprecededresidentialdevelopmentinthearea. Anupgradetosteelpoles,concretefoundations,and
perhaps longer spans should require minimum design time. Statistically, the existence of a new line would be an
improvement over existing conditions.
The debate over underground lines,solar sources, battery storage, diesel or gas generators,etc can be reviewed as these
infant resources mature.
U niq ue ldentifie r: 7 5.L67 .L7 2.L29
1