Loading...
HomeMy WebLinkAbout20150911Response to Order No. 33374 .pdfqshs:r-.'l"fl;'..1 Case: Date: Prepared by: Subject: tPc-E-15-18 e/7L/ls John Reuter Response to PUC Order 33374 2'l Comet Lane P.O. Box 3432 Hailey, lD 83333 208.928.7583 Si tL.briseCiurler ( y.Co rl I Site Based Energy (SBE) has prepared responses and is providing supporting documentation in response to the ldaho Public Utilities Commission ("Commission") in response to Commission Order 33374 on September 4th, 20L5. 1. ldentify each owner or member and their respective percentage of ownership for each of the ten Limited Liability Corporations identified as "WRCE L LLC" through "WRCE 10 LLC." Provide a street and mailing address for each owner/member. SBE has provided a complete list of owners, percentage ownership, street and mailing addresses in Appendix A for each project "WRCE L LLC" through "WRCE 10 LLC" 2. Does Site Based Energy have an ownership interest in any of the ten projects? lf yes, identify the project and the ownership percentage of each project. SBE does not have an ownership interest in any of the projects. A full accounting of ownership percentages are included in Appendix A. 3. Provide evidence that Mr. Reuter and Site Based Energy have been authorized by each LLC to act in their behalf as the "contact person" regarding the Schedule 73 application process. SBE has a proxy agreement with each owner that are included in Appendix B. 4. lf the ownership of each solar project has not been fully allocated (i.e., to total 100%), identify the project(s) where ownership is not fully subscribed and the unsubscribed percentage of each project where ownership is not fully allocated. Project ownership is included in Appendix A. 5. Provide copies of the Articles or Certificate of Organization, any amendments, and annual reports for WRCE 1 LLC through WRCE 10. We have included statements of ownership for each Project in Appendix B. The contents of Appendix A and B are confidential client information and are marked as such. l've prepared these remarks on behalf of Site Based Energy and our Clients. elLLlLs John Reuter, Director of Energy Services Site Based Energy rl<a\\she P.O. Box 3432 Hailey, lD 83333 208.928.7583 Appendix A - Project Ownership Record ooooooooooooooooooooF'l Fl F{ Ft Fl Fl Ft Fl Fl Fls CLsla q,tr 3o 3[uEigfi9su E:E€:d:-E3.d #iB$i3E5ssI tEEs 5e E:es eZ 6- O- aL F{ a- aL CO Fi O- O- *5, --g E-* E.EEr9 il E f gE s f E E E ncESEri;*=ss;;e EY€i;gE SqtiEgE*="=alz.>o06u6oooI(oo(\t<f,cno(orntr')(\EOOmmO0oNF{NC!lrl rl Fl F{ ri Fl H Fl r-l rl ri ,9t:, (Eo6 E E c ;tts;siEe.!* s t S = r g E E E gq 6EPO 9H -.6-.g5= :# E^E E E + T ? C EgEE=EtE:g= 0, ElEzort-{hl (Y)stln(Of\@OlF{ H u r,u uJ r! u.J lJ.J l! lJ.J l! t!.=U U (J U U U U U U UoGG.d.d.d.G.G.d.d.d.&===33=3==3 Appendix B - Ownership Statements and Proxy Forms Date: June 10, 2015 Name: Valerie Praggastis Company: NA Title: NA Address: 106 N Cove Lane Phone: 208-720-2770 Project: WRCE 1 Oeat Representative, sbe site bosed enei$y City Of Hailey Business License # 1419 Letter of Proxv eOs\ 21 Corno! Lane P.O. B*x 34ll Hiiley, lD 83133 208.928.7583 \j|l $1.JA"5bi1A, 1? | t ], r,-) The purpose of this authorization form is to allow Site Based Energy (SBE) to act on behalf of the client to complete several necessary documents in the course of project development. Please review the statements below and check the pertinent authorization items to this project. Please note that by signing below you are authorizing SBE to act on your behalf as an authorized representative on only the items you initial and that SBE is not authorized to act on your behalf on any other matter for this project or for any other projects. SBE will also generally contact you before signing any documents on your behalf for a verbal consent, but is not required to do so. Representotive {on behalf of Co mrynyl authorizes SBE to serve as the primary contact with the ldaho PUC and ldaho Power for the purposes of a 100 kW solar PV project in Blain County, to communicate lnformation to the ldaho PUC and ldaho Power, and to execute any necessary documents on behalf of Client and the application. lnattal: VAp Representative (on behalf of Companyl authorizes SBE to represent Compony to complete and submit the appituattur iol rite utttleu frdtssuepdrurretnuiagttt-urLure. Nurdr ErerEy rur ArrrerrLd rruErdrn. rrrruat:7AP Signed on behalfofSite Based Energy Signed on behalf of Client ,l I IJ i"'L._^ 'i Name Paul Conrad- President 6ltolts State Lic.RCE * 30676 Western Community lnsurance - General Uability # 8D027604 ($be www. sitebasedenerg v. comBox3432 Hailey, lD 83333 p208.928.7 583 t 208.928.7 5U Jean D. Jewell Commission Secretary ldaho Put llc l-lti!!t!?s Connrisslon elelrs To Whom lt May Concern, Valerie Praggastis is the intended owner of WRCE L. I intend to proceed with the solar project using a Special Purpose Entity, LLC DBA. lf the projects are approved by the PUC, we will proceed with Site Based Energy, LLC for engineering, procurement, and contracting services to place the proiect in service if all of the approvals are completed and the economics work out. The accumulation of other similar sized projects at the same location makes complete sense in order to keep evervone's costs down, keep the facilities in a common area for ease of maintenance and security, and help generate income for local businesses. Siting south valley is the only way we can do something of a scale that is worth the investment and not encumber our real estate with the installation. we appreciate vour consideration. r;',I,,L[?il Valerie Praggastis iPO Box 4714 Ketchum lD 83340 L06 N Cove Lane Hailey, ldaho 83333 Jean D. Jewell Commission Secretary ldaho Public Utilities Commission To Whom lt May Concern, Walker Sand and Gravel is the planned owner of WRCE 2. We are proceeding with the solar project using a DBA. We are proceeding with Site Based Energy, LLC to provide development services tor a 7A0 kW solar installation. lf the projects are approved by the PUC, we will proceed with Site Based Energy, LLC for engineering, procurement, and contracting servlces to place the project in service. Brad Walker Member Walker Sand and Gravel 100 Walker Dr. Bellevue, lD 83313 PO Box 400 Bellevue, lD 83313 208-788-4525 Letter of Proxv %$pffiDate: June 10, 2015 Brad Walker Walker Sand and Gravel LLC Owner 100 Walker Dr. Bellevue ldaho 83313 248-788-4525 Projectr WRCE 2 Dear Representdtive, : ;" liT*l 1-lr'1 l)t't */it. f i!; |tra,i,J., 1tr y:: I u. ]l'i'l,it)ti .' :ft : The purpose of this authorization form is to allow Site Based Energy (SBE) to act on behalf of the client to cornplete several necessary documents in the course of project development. Please review the statements below and check the pertinent authorization items to this proJect. Please note that by signing below you are authorizing SBE to act on your behalf as an authorized representative on only the items you initial and that SBE is not authorized to act on your behalf on any other matter for this project or for any other projects, SBE will also generally contact you before signing any documents on your behalffor a verbal consent, but is not required to do so. Representotive (on behalf of Componyl authorizes SBE to serve as the primary contact with the ldaho PUC and ldaho Power for the purposes of a 10O kW solar PV project in Blain County, to communicate information to the ldaho PUC and ldaho Power, and to execute any necessary documents on behalf of Client and the application. lnitial: Fr.J Representotive (on behalf of Companyl authorizes SBE to represent Company to complete and submit the t application for the United States Department of Agriculture. Rural Energy for America Program. lnitial: li u,rJ Signed on behalf of Site Based Energy Signed on behalf of Client Name Paul Conra$ President 6ltalLs State Lic.RCE f 30676 Western Community lnsurance - General Liability# 8D027504 City Of Hailey Business License # 1419 {sbe P.O. Box 3432 Hailey, lD 83333 www. $lte basede n Ergy. qp.u p208.928.7583 f 208.928.7584 Jean D. Jewell Commission Secretary tdaho Public Utilities Commission e/9/1s To Whom lt May Concern, PaulConrad is the intended owner of WRCE 3. I intend to proceed with the solar project using a Special Purpose Entity, LLC DBA. lf the projects are approved by the PUC, we will proceed with Site Based Energy, LLC for engineering, procurement, and contracting services to place the project in service if all of the approvals are completed and the economics work out. The accumulation of other similar sized projects at the same location makes complete sense in order to keep everyone's costs down, keep the facilities in a common area for ease of maintenance and security, and help generate income for local businesses. Siting south valley is the only way we can do something of a scale that is worth the investment and not encumber our real estate with the installation. We appreciate your consideration. Thank you, Paul Conrad PO Box 3432 1320 Heroic Rd Hailey, ldaho 83333 Letter of Prorv fl{O't\sbe Date: June 10, 2015 Name: Company: Title: Address: Phone: Project: WRCE site oosed cn+r!ry :l (,onr!l LJne 00. Bo" jaJl llnriey lD8llll 108 928.75ii l Deat Representotive, The purpose of this authorization form is to allow Site Based Energy (SBE) to act on behalf of the client to complete several necessary documents in the course of project development. Please review the statements below and check the pertinent authorization items to this project. Please note that by signing below you are authorizing SBE to act on your behalf as an authorized representative on only the items you initial and that SBE is not authorized to act on your behalf on any other matter for this project or for any other projects. SBE will also generally contact you before signing any documents on your behalffor a verbal consent, but is not required to do so. Representotive (on behalf of Componyl authorizes SBE to serve as the primary contact with the ldaho PUC and ldaho Power for the purposes of a 100 kW solar PV project in Blain County, to communicate information to the ldaho PUC and ldaho Power, and to execute any necessary documents on behalf of Client and the application. lnitial: Representotive (on behalf of Componyl authorizes SBE to represent Compony to complete and submit the application for the United States Department of Agriculture. Rural Energy for America Program. lnitial: Signed on behalf of Site Based Energy ,/ Name Paul Conrad- President 6/t0/L5 state Lic.RcE fr30676 Western Community lnsurance - General liability f 8D027504 City Of Hailey Business License # 1419 i \.., "l...1.*. -_ <$"he www. sitebasedenerov. comP.O. Box 3432 Hailey, lD 83333 p208.928.7583 f 208.928.7584 Jean D. Jewell Commission Secretary ldaho Public Utilities Commission slsl]-s To Whom lt May Concern, Dave Stone is the intended owner of WRCE 4. I intend to proceed with the solar project using a Special Purpose Entity, LLC DBA. lf the projects are approved by the PUC, we will proceed with Site Based Energy, LLC for engineering, procurement, and contracting services to place the project in service if all of the approvals are completed and the economics work out. The accumulation of other similar sized projects at the same location makes complete sense in order to keep everyone's costs down, keep the facilities in a common area for ease of maintenance and security, and help generate income for local businesses. Siting south valley is the only way we can do something of a scale that is worth the investment and not encumber our real estate with the installation. We appreciate your consideration. 134 Sothern Comfort Rd Hailey, ldaho 83333 Letter of Proxv Date: June 10, 2015 Name: ffi/ tO 4'fontg Company: 5uN ,roe\ *1r9o Tiilet AJpal*oJa*Ilfz.{ gocrt(Gr"rs Phone: Aot' ,'78' ?1r'3 Project: WRCE Dear Representotive, +'(s"he www.sitebasedeneroy.com sb0 site bosed a,irrif.i). .r1 Co,nnl lrne Prl 8oY t4i.r Hrriey lD 8)i-l) 204"926.7 56 J fl<aY{). \ C-wo$ . 4*W{Ly( The purpose of this authorization form is to allow Site Based Energy (SBE) to act on behalf of the client to complete several necessary documents in the course of project development. Please review the statements below and check the pertinent authorization items to this project. Please note that by signing below you are authorizing SBE to act on your behalf as an authorized representative on only the items you initial and that SBE is not authorized to act on your behalf on any other matter for this project or for any other projects. SBE will also generally contact you before signing any documents on your behalffor a verbal consent, but is not required to do so. Representotive (on behalf of Componyl authorizes SBE to serve as the primary contact with the ldaho PUC and ldaho Power for the purposes of a 100 kW solar PV project in Blain County, to communicate information to the ldaho PUC and ldaho Power, and to execute any necessary documents on behalf of Client and the application. lnitial: Representotive (on behalf of Co mponyl authorizes SBE to represenl Compony to complete and submit the application for the United States Department of Agriculture, Rural Energy for America Program. lnitial: Signed on behalf of Site Based Energy ( Name Paul Conrad- President 6/tolts R I ro6s state Lic.RCE # 30676 Western Community lnsurance - General Liability S 8D027504 City Of Hailey Business License fi 1419 \. -,"r'r't* Signed on behalf of Client P.O. Box 3432 Hailey, lD 83333 p208.928. 7583 t 208.928 ^7 584 l-ettar of Prrrrv <shgDate: June 10, 2015 Name: Company: Title: Address: Phone: ProJectrWRCE Dear Representatlve, 2l ComelLane P.O. Bor 3432 tlolley, lD 83333 208.928.7583 sitebascdenergy.coni The purpose of this authorization form is to allow Slte Based Energy (SBE) to act on behalf of the cllent to complete several necessary documents in the course of proJect development. Please revlew the.statements below and check the pertinent authorlzatlon lte.ms to thls proJect, Please note that by slgnlng below you are authorlzlng SBE to act on your behalf as an authorlzed representatlve on only the items you initial and that SBE ls not authgrized to act on your behalf on any other matter for this prolect or for any other projects. SBE wlll also generally contact you before slgnlng any documents on your behalffor a verbal consent, but is not required to do so. Reprcsentotlve (on behalf of Companyl aulhorlzes SBE to serve as the prlmary contact with the ldaho PUC and ldaho Power for the purposes of a 100 kW solar PV proJect In Blaln County, to communlcate lnformatlon to the ldaho PUC and ldaho Power, and to execute any necessary documents on behalf of Cllent and the appllcatlon. lnltlal: Representatlve (on behalf of Componyl authorlzes SBE to represenlCompany to complete and submit the applicatlon for the Unlt€d Stetes Department of Agricuhure. Rural Energy for America Program. lnitialr Slgned on behalfofSlte Based Energy Name Paul Conrad- Presldent 6lLOlTs State Llc.RCE # 30675 Westem Communlty lnsurance - Genera! Liablllty # 8D027604 Slgned on behalf of Cllent City Of Halley Buslness license S 1419 (g"h"g www. sitebaseden erov.comP.O. Box 3432 Hailey, lD 83333 p208.928.7583 f 208.928.7584 lean D. Jewell Commission Secretary ldaho Public Utilitles Commission e19lt5 To Whom lt May Concern, Mike Goitiandia is the lntended owner of WRCE 5. I intend to proceed wlth the solar project using a Special Purpose Entity, LLC DBA, lf the projeas are approved by the PUC, we wlll proceed with Site Based Energy, LLC for engineerlng procurement, and contractlng services to place the project in service lf all of the approvals are completed and the economics work out, The accumulation of other similar sized projects at the sarne location makes complete sense ln order to keep everyone's costs down, keep the facilities ln a common area for ease of maintenance and securlty, and help'generate lncome for local buslnesses. Siting south valley is the only way we can do something of a scale that ls worth the lnvestment and not encumber our real estate with the installation. We appreciate your consideration. Thank you, 103 S Clear Creek Ketchum,ldaho Jean D. Jewell Commission Secretary ldaho Public Utilities Commission slelLs To Whom lt May Concern, Joe Matheny is the intended owner of WRCE 6. I intend to proceed with the solar project using a Special Purpose Entity, LLC DBA. lf the projects are approved by the PUC, we will proceed with Site Based Energy, LLC for engineering, procurement, and contracting services to place the project in service if allof the approvals are completed and the economics work out. The accumulation of other similar sized projects at the same location makes complete sense in order to keep everyone's costs down, keep the facilities in a common area for ease of maintenance and security, and help generate income for local businesses. Siting south valley is the only way we can do something of a scale that is worth the investment and not encumber our real estate with the installation. We appreciate your consideration.'ffy P0 Box 54 Richfield, ldaho 83349 L€ttpr 6f Prdrv sl$hg Address:fiu 8oY S{ R;crt"d Ip t:.lql Phone:|of'3og't5{7 Project: WRCE ) I lomct LiDc PO 8or 34;2 Ilarley. l0 83333 r0o.92tt. /58:J \i:, , | 'i Dear Representotive, The purpose of this authorization form is to allow Site Based Energy (SBE) to act on behalf of the client to complete several necessary documents in the course of project development. Please review the statements below and check the pertinent authorization items to this project. Please note that by signing below you are authorizing SBE to act on your behalf as an authorized representative on only the items you initial and that SBE is not authorized to act on your behalf on any other matter for this project or for any other projects. SBE will also generally contact you before signing any documents on your behalf for a verbal consent, but is not required to do so. Representotive (on behalf of Co mponyl authorizes SBE to serve as the primary contact with the ldaho PUC and ldaho Power for the purposes of a 100 kW solar PV project in Elain County, to communlcate information to the ldaho PUC and ldaho Power, and to execute any necessary documents on behalf of Client and the application. lnitial: Representotive (on behalf of Componyl authorizesSBEtorepresentCompony tocompleteandsubmitthe application for the United States Department of Agriculture. Rural €nergy for America Program. lnitial: Signed on behalf of Site Based Energy Signed on behalf of Client | \,-' "/('\-* Name Paul Conrad- President Sll0lLS State Lic.RCE f 30676 Western Community lnsurance - General Liability fl 8D027604 City Of Hailey Business License # 1419 :t/ - /5 P.O. Box 3432 Hailey, lD 83333 {s""he p208.928.7583 f 208.928.7 5U Jean D, Jewell Commission Secretary ldaho Public Utilities Commission s/s115 To Whom lt May Concern, MattThorntonistheintendedownerofWRCET. lintendtoproceedwiththesolarprojectusinga Special Purpose Entity, LLC DBA. lf the projects are approved by the PUC, we will proceed with Site Based Energy, LLC for engineering, procurement, and contracting services to place the project in service if all of the approvals are completed and the economics work out. The accumulation of other similar sized projects at the same location makes complete sense in order to keep everyone's costs down, keep the lacilities in a common area for ease of maintenance and security, and help generate income for local businesses. Siting south valley is the only way we can do something of a scale that is worth the investment and not encumber our real estate with the installation. We appreciate your consideration. Thank you, ,,/r/j L:-1/ " /'(4uo,a Matt Thornton 12508 Hwy 75 Ketchum, ldaho 83340 Ia*---\ _ teger of Proly q'S\dlfh&l b',,f'*/*\ Date: Jun€ 10, 2015 Name: $\A,lf,Tluc*lon co m p a n y,Ttrlp.r'to n $rattn Title:)3q-trp$41alr Address ; t a, b g 6 )tt{^{ "5 Uz}Clurn'r,, \A' I }3tl0 Phone:pgf. 1rb.55-)0 ProjectlWRCE Aear Reptesentotive, fhe purpose of this authoriration form ls to allow Site Based Energy (SBE) to act on behalf of the client to complete several necessary documents in the course of proJect development. Please review the statements below and check the pertinent authorization items to this project. Pleass note that by signing below you are authorrring SBE to act on your behalf as an authorized representative on only the items you initial and that sBE is not authorized to act on your behalf on any other matter for this project or for any other projectl. SBE will also generally cont.ct you before signing any documents on your behalffor a verbal consent, but is not required to do so. frepresentative (on behalf of Comganyl authorires SBE to serve as the primary contact with the ldaho PUC and ldaho Power for the purposes of a 1@ kW solar PV project in Blain County, to communic.te inforrnation to the ldaho PUC and ldaho Power, and to execute any necessary documents on behalf of Client and the application, lnitial: Representotive (on behalf of Componyl authorizes SBE to represenl Compony lo complete and subrnit the application for the United States Department of Agriculture. Rural Energy for America Program. lnitial: Si8ned on behalf of Site Eased Energy Signed on behalf of Client ,'f,qi/! 4L,,;t-- Name Paul Conrad- Prosidcnt 6/La/$ state Lic.RcE r 30676 Western Community lnsurance - General Liability $ 8D027604 CltV Of Hailey Business License fl 1419 P.O. Box 3432 Haitey, lD E3333 (sbe p208.928.7583 f 208.928.7584 Jean D. Jewell Commission Secretary ldaho Public Utilities Commission els/ts To Whom lt May Concern, Chris Spain is the intended owner of WRCE 8. I intend to proceed with the solar project using a Special Purpose Entity, LLC DBA. lf the projects are approved by the PUC, we will proceed with Site Based Energy, LLC for engineering, procurement, and contracting services to place the project in service if all of the approvals are completed and the economics work out. The accumulation of other similar sized projects at the same location makes complete sense in order to keep everyone's costs down, keep the facilities in a common area for ease of maintenance and security, and help generate income for local businesses. Siting south valley is the only way we can do something of a scale that is worth the investment and not encumber our real estate with the installation. We appreciate your consideration. 1150 Wdst Canyon Rd Signed on behalf of Site Based Energy /i. .,'I t-.'\{'r.}*^*-.---\ be bosed ona.(ti: Signed on behalf of Client City Of Hailey Business License # 1419 Letter of Proxv <$Date: June 10, 2015 r,rame' ]ff 6. lpqtrr companv: K,ndr.L ,C*P';;l:i"'' b;!:.i!-t "k[,^ FuTitle: '06.o1.-1 Address: I IS OU. C*1r^^ (.'.^rhAddress: I ISO LJ. l*oYctu\ '*Phone: {Ort- 386- t 3 ?O 2I ( orn€t i.Jn€ PO For l4l.l tliiley, l0 8.]ilJ 109.928.758 3 rrt.,rl ,,,rii,:,".j(.j! \ ,,1 Project: WRCE Dear Representotive, The purpose of this authorization form is to allow Site Based Energy (SBE) to act on behalf of the client to cornplete several necessary documents in the course of project development. Please review the statements below and check the pertinent authorization items to thls project. Please note that by signing below you are authorizing SBE to act on your behalf as an authorized representative on only the items you initial and that SBE is not authorized to act on your behalf on any other matter for this project or for any other projects. SBE will also generally contact you before signing any documents on your behalf for a verbal consent, but is not required to do so. Representotive (on behalf of Co mponyl authorizes SBE to serve as the primary contact with the ldaho PUC and ldaho Power for the purposes of a 100 kW solar PV project in Blain County, to communicate information to the ldaho PUC and ldaho Power, and to execute any necessary documents on behalf of Client and the application. lnitial: Representotive (on behalf of Componyl authorizes SBE to representComponyto complete and submit the application for the United States Department of Agriculture. Rural Energy for America Program. lnitial: Name Paul Conrad- President 6/]io/ls State Lic.RCE f 30676 western Community lnsurance - General Liability # 8D027604 P.O. Box 3432 Hailey, lD 83333 (g"hg p208.928.7583 f 208.928.7584 Jean D. Jewell Commission Secretary ldaho Public Utilities Commission slelts To Whom lt May Concern, Logan Gietzen is the intended owner of WRCE 9. I lntend to proceed with the solar project using a Special Purpose Entity, LLC DBA. lf the projects are approved by the PUC, we will proceed with Site Based Energy, LLC for engineering, procurement, and contracting servlces to place the project ln service if all of the approvals are completed and the economics work out. The accumulation of other similar sized projects at the same location makes complete sense ln order to keep everyone's costs down, keep the facilities in a common area for ease of maintenance and security, and help generate income for local businesses. Siting south valley Is the only way we can do something of a scale that is worth the investment and not encumber our real estate with the installation. We appreciate your consideration. Thank you, 1.. t./ ,,;U Logan Gietzen PO Box 457 125 9e Ave Buhl,ldaho 83316 Letter of Proxv Date: June 10, 2015 Name: Logan Gietzen Company: Title: Address: Phone: 208-280-0493 Project: WRCE 9 Oear Representative, i,{.i, r. il., i} } I i -r )f)3..),'lr lalj j The purpose of this authorization form is to allow Site Based Energy {SBE) to act on behalf of the client to complete several necessary documents in the course of project development. Please review the statements below and check the pertinent authorization items to this project. Please note that by signing below you are authorizing SBE to act on your behalf as an authorized representative on only the items you initial and that SBE is not authorized to act on your behalf on any other matter for this project or for any other projects. SBE will also generally contact you before signing any documents on your behalf for a verbal consent, but is not required to do so. Representative (on behalf of Companyl authorizes SBE to serve as the primary contact with the ldaho PUC and ldaho.fower for the purposes of a 100 kW solar PV project in Blain County, to communicate information to the tdaho \UC and ldaho Power, and to execute any necessary documents on behalf of Client and the application. lnitial: \\-+t- Representotive (on behalf of Companyl authorizes SBE to represenl Compony to complete and submit the application for the United States Department of Agriculture. Rural Energy for America Program. lnitial: 1 Signed on behalf of Site Based Energy Signed on behalf of Client ,l \,,t/IV Name I . u-r,'s, ('n,-, iL)Name Paul Conrad- President 6ltolt5 stare Lic.RCE # 30676 Western Community lnsurance - General Liability f 8D027604 City Of Hailey Business License # 1419 {sbe www.sitebasedenerqv.com p208.928.7583 f208.928.7584P.O. Box 3432 Hailey, lD 83333 Jean D. Jewell Commission Secretary ldaho Public Utilities Commission elelts To Whom lt May Concern, John Allen is the intended owner of WRCE 10. I intend to proceed with the solar project using a Special Purpose Entity, LLC DBA. lf the projects are approved by the PUC, we will proceed with Site Based Energy, LLC for engineering, procurement, and contracting services to place the project in service if all of the approvals are completed and the economics work out. The accumulation of other similar sized projects at the same location makes complete sense in order to keep everyone's costs down, keep the facilities in a common area for ease of maintenance and security, and help generate income for local businesses. Siting south valley is the only way we can do something of a scale that is worth the investment and not encumber our real estate with the installation. We appreciate your consideration. John Allen PO Box 3873 1220 Airport Way Hailey, ldaho 83333 Letter of Proxv Date: June 10, 2015 Name: Company: Title; Address: Phone: Project: WRCE Name Paul Conrad- President 6/to/ts State Lic.RCE # 30676 Western Community lnsurance - General Liability # 8D027604 t City Of Hailey Business License # 1419 /--/,4/- Name ?l Cornet Larrt P.O. Bcx i4Jl Haitey, lO 8333J 208 92n.7581 .,1, i,.j.;,-,-:r,,,u / Dear Representotive, The purpose of this authorization form is to allow Site Based Energy (SBE) to act on behalf of the client to complete several necessary documents in the course of project development. Please review the statements below and check the pertinent authorization items to this project. Please note that by signing below you are authorizing SBE to act on your behalfas an authorlzed representative on only the items you initial and that SBE is not authorized to act on your behalf on any other matter for this project or for any other projects. SBE will also generally contact you before signing any documents on your behalf for a verbal consent, but is not required to do so. Representqtive (on behalf of Componyl authorizes SBE to serve as the primary contact with the ldaho PUC and ldaho Power for the purposes of a 100 kW solar PV project in Blain County, to communicate information to the ldaho PUC and ldaho Power, and to execute any necessary documents on behalf of Client and the application. lnitial: Representotive (on behalf of Componyl authorizes SBE to represenl Compony lo complete and submit the application for the United States Department of Agriculture. Rural Energy for America Program. lnitlal: Signed on behalf of Site Based Energy Signed on behalf of Client \ -./{ .\t*- <$"he www. sitebasedenerov. comP.O. Box 3432 Hailey, lD 83333 p208.928.7583 t 208.928.7 5U