HomeMy WebLinkAbout20141218American Falls Solar II Reply Comments.pdfWlliams Bradbory
Artngr-;htili,fll YS Ar L Aw
?0lri DIC tg pH t: 3t+
iiAiiL, i ,r ,, ,
uT I L trtE,! cff,t- r,i iss t c i;
December 18,2014
Ms. Jean Jewell
Commission Secretary
Idatro Public Utilities Commission
472W. Washington
Boise,lD 83702
Re: IPC-E-14-32 through IPC-E-14-36
Dear Ms. Jewell:
Please find enclosed an original and seven copies of the Reply Comments of Murphy
Flat Power,LLC, Simco Solar, LLC, American Falls Solar, LLC, American Falls Solar II,
LLC, and Orchard Ranch Solar, LLC for filing in the above referenced cases.
Thank you for your assistance in this matter. Please feel free to give me a call should
you have any questions.
Sincerely,
&{il(.ililt;
RLWjr
Enclosures
1015 !f. Hays Strcet - Boise,ID 83702
Phone: 208-34+6633 - Fax: 208-3440077 - www.williamsbradbury.com
't
Ronald L. Williams, ISB No. 3034
Williams Bradbury, P.C.
l0l5 W. Hays St.
Boise,lD 83702
Telephone: 208-344-6633
Fax:208-344-0077
ron@williamsbradbury.com
Auorneyfor Murphy Flat Power, LLC, Simco Solar, LLC, American Falls Solar, LLC,
American Falls Solar II, LLC, and Orchard Ranch Solar, LLC
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION ) CASE NO. IPC-E-14-32
oF rDAHO POWER COMPANY FOR )
APPROVAL OR REJECTION OF AN ) REPLY COMMENTS
ENERGY SALES AGREEMENT WITH )
MURPHY FLAT POWER, LLC FOR THE )
SALE AND PURCHASE OF ELECTRIC )ENERGY. )
IN THE MATTER OF',THE APPLICATION ) CASE NO. IPC-E-14-33
oF rDAHO POWER COMPANY FOR )
APPROVAL OR REJECTION OF AN ) REPLY COMMENTS
ENERGY SALES AGRE,EMENT WITH )
SIMCO SOLAR, LLC F',OR THE SALE )
AND PURCHASE OF ELECTRIC )ENERGY. )
IN THE MATTER OF THE APPLTCATTON ) CASE NO. rPC-E-14-34
oF IDAHO POWER COMPANY FOR )
APPROVAL OR REJECTTON OF AN ) REPLY COMMENTS
ENERGY SALES AGREEMENT WITH )
AMERICAN FALLS SOLAR, LLC FOR )
THE SALE AND PURCHASE OF )
ELECTRIC ENERGY. )
rN THE MATTER OF THE APPLICATION ) CASE NO.IPC-E-14-35
oF IDAHO POWER COMPANY FOR )
APPROVAL OR REJECTION OF AN ) REPLY COMMENTS
ENERGY SALES AGREEMENT WITH )
AMERTCAN FALLS SOLAR II, LLC FOR )
THE SALE AND PURCHASE OF )
ELECTRIC ENERGY. )
;-..J
C)rrtC)
-D
GJ(,
Solar Projects Reply Comments - PAGE I
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPAI\TY FOR
APPROVAL OR REJECTION OF AN
ENERGY SALES AGREEMENT WITH
ORCHARD RANCH SOLAR, LLC FOR
THE SALE AND PURCHASE OF
ELECTRIC ENERGY.
CASE NO. IPC-E.I4-36
REPLY COMMENTS
COMES NOW Murphy Flat Power,LLC ("Murphy Flat"), Simco Solar, LLC ("Simco
Solar"), American Falls Solar, LLC ("American Falls Solar"), American Falls Solar II, LLC
("American Falls Solar II"), and Orchard Ranch Solar, LLC ("Orchard Ranch"), (collectively,
the "Solar Projects") by and through their attomey of record, Ronald L. Williams, Williams
Bradbury, P.C., hereby submit the following Reply Comments.
1. Murphy Flat, Simco Solar and American Falls Solar do not object to Staff s
recommendation that the avoided cost rates consistent with Idaho Power's Response to Staff s
Third Production Request be substituted for the avoided cost rates contained in the Energy Sales
Agreements ("ESAs") for each of these three Solar Projects. Murphy Flat, Simco Solar and
American Falls Solar consent to Idaho Power preparing and submitting a revised Appendix E for
each Solar Project's ESA reflecting the price changes as shown on Idaho Power's response to the
Third Production Request.
2. American Falls Solar II and Orchard Ranch concur in Staff s recommendation
that their respective ESAs be approved by the Commission incorporating the avoided cost rates
contained in Affachment I of Idaho Power's November 20,2014,Initial Comments
(Replacement Appendix E to the original Agreement).
3. Simco Solar and Orchard Ranch have communicated to Idaho Power a change in
location and Idaho Power has concurred in those changes. Simco Solar and Orchard Ranch
Solar Projects Reply Comments - PAGE 2
hereby consent to Idaho Power submitting a revised Appendix B to the Commission noting those
location adjustments.
WHEREFORE, the Solar Projects respectfully request that:
(i) the ESAs for Murphy Flat, Simco Solar and American Falls be approved by
the Commission with a substituted Appendix E (*Solar Facility Energt Prices and Integration
Charges") to be submitted by Idaho Power that reflects the price changes as shown on Idaho
Power's response to the Third Production Request of Commission Staff,
(ii) the ESAs for American Falls Solar II and Orchard Ranch be approved by the
Commission with the Replacement Appendix E submitted by Idaho Power on November 20,
2014, and
(iii) the ESAs for Simco Solar and Orchard Ranch be approved with the
substituted Appendix Bs to be submitted by Idaho Power reflecting those location changes.
Respectfully submitted this JS- day of December, 2014.
il/l,C-
Attorneyfor the Solar Projects
Ronald L. Williams
Solar Projects Reply Comments - PAGE 3
CERTIF'ICATE OT' SERVICE
I hereby certify that on tlr" /g* day of December, 2Ol4,I caused to be served, via the
method(s) indicated below, true and correct copies of the foregoing document, upon:
Jean Jewell, Secretary
Idaho Public Utilities Commission
47 2 W est Washington Street
P.O. Box 83720
Boise,lD 83720-0074
ij ewell@puc. state. id.us
Donovan E. Walker
Randy C. Allphin
Regulatory Dockets
Idaho Power Company
1221 West Idaho Sfeet
P.O. Box 70
Boise,lD 83707
dwalker@idatrooower. com
rallphin@ idahopower. com
dockets@ idahopower. com
Kristine A. Sasser
Deputy attorney general
Idaho Public Utilities Commission
472W. Washington St.
PO Box 83720
Boise, lD 83720-0074
kris. sasser@puc. idaho. gov
Hand Delivered _4
U.S. Mail
Fax
Fed. Express
Email
Hand Delivered
U.S. Mail
Fa:<
Fed. Express
Email
Hand Delivered
U.S. Mail
Fax
Fed. Express
Email
BY: ?u t/"hr;
Ronald L. Williams
Attorneyfor the Solar Projects
Solar Projects Reply Comments - PAGE 4