Loading...
HomeMy WebLinkAbout20160406Application.pdfJULIA A. HILTON (lSB No. 7740) Idaho Power Company 1221West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 Telephone: (208) 388-6117 Facsimile: (208) 388-6936 i h i lton@ idahopower. com Attorney for ldaho Power Company IN THE MATTER OF THE APPLICATION OF PACIFICORP DBA ROCKY MOUNTAIN POWER AND IDAHO POWER COMPANY FOR AN ORDER AUTHORIZING THE EXCHANGE OF CERTAIN TMNSMISSION ASSETS IIHCT IVED ?flt6 i"[B l9 PH 3: 3l , .'t i".,1 :Ua!: , i'.J I +/; L-lvl-'' i.-" I f:{i},1in{l$$loN BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION cASENos l?c.qlbob IDAHO POWER COMPANY'S REDAGTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING Idaho Power Company ("!daho Power" or "Company") hereby respectfully submits to the ldaho Public Utilities Commission ("Commission"), in compliance with Order No. 33313, final documents pertaining to the exchange of certain transmission assets with PacifiCorp dlbla Rocky Mountain Power and Pacific Power (collectively referred to as "PacifiCorp"). !n addition, the Company seeks Commission verification that its regulatory accounting meets the requirements of the Commission's June 5, 2015, Order No. 33313. IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING . 1 !. INTRODUCTION Over the past 40 years, PacifiCorp and ldaho Power (together, the "Parties" or singularly, "Party") entered into numerous agreements ("Legacy Agreements") through which the Jim Bridger power plant and associated transmission assets were owned and operated. On October 24, 2014, the Parties entered into a Joint Purchase and Sale Agreement ("JPSA') and Joint Ownership and Operating Agreement ("JOOA") to reallocate their respective ownership interests to meet their respective load service obligations and improve operational efficiency, replacing the Legacy Agreements. On December 19, 2014, the Parties filed a joint application asking the Commission to approve the exchange of certain transmission assets. On June 5, 2015, the Commission approved the Parties' request in Order No. 33313. Following this approva! and other necessary regulatory approvals in other jurisdictions, the transaction closed .t ?f "D .rrrt €b'Q}"ber 30,.20J5. ,, II. FINAL ASSET EXCHANGE DOCUMENTS ln Order No. 33313, the Commission approved the Parties' request to exchange certain transmission assets subject to conditions regarding the financial benefits of the exchange and reporting requirements. Those conditions included a Commission directive to file final documents pertaining to the asset exchange, with: o Documents related to the true-up at closing; o The finaljournal entries; The updated list of the Parties' common equipment; The Parties' common transmission line loss methodology, once completed; and o For ldaho Power, a yearly report beginning within the first year after closing showing changes in transmission revenues. Order No. 33313 at 14. IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 2 o a Pursuant to the JPSA, the value of all assets exchanged at closing are based on December 31, 2014, net book values. The net book value true-up will occur no later than 180 days after closing, or April 27, 2016. This net book value true-up will include all ldaho Power planned improvements or ldaho Power extraordinary items placed in service between January 1,2015, and closing, or October 30, 2015. Because the true- up values wil! not be finalized until April 2016, the documents related to the true-up, including final journal entries, are not included in this compliance filing but will be filed no later than May 31,2016, in accordance with Order No. 33313. !n this filing, ldaho Power has included the initialjournal entries based on closing values, an updated list of the Parties'common equipment, the Parties'line loss methodology, and ldaho Power's annual report showing changes in transmission revenues. More information on each of the finaldocument categories is contained below. The lnitial Joumal Enties. ldaho Power's initial journal entries are provided as Attachment 1 to this filing and are based on closing values as of December 31, 2014. The Company will file the final journal entries, including true-up amounts, on or before May 31 ,2016. The Updated List of ldaho Power"s Common Equipment. Upon closing of the transaction, the Parties executed an amended and restated JOOA with an effective date of October 30, 2015 ("Amended and Restated JOOA"), which is attached hereto as Attachment 2. The Amended and Restated JOOA contains a Description of ldaho Power Common Equipment in Exhibit B, beginning on page 79. The updated list of ldaho Power common equipment includes equipment that was placed in service between the date the original JOOA was executed, October 24,2014, and December 31,2014. lt also removed duplicate entries and items mistakenly identified as jointly IDAHO POWER COMPANY'S REDAGTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 3 owned but re-labeled as common equipment and vice versa. Exhibit B to the Amended and Restated JOOA will be updated to reflect any ldaho Power common equipment placed in or removed from service between January 1,2015, and October 30, 2015, in connection with the true-up adjustment. The Company will provide an updated list of ldaho Power's common equipment once the true-up has been finalized. The Parties' Common Transmission Line Loss Methodologv. The Parties' Transmission Loss Calculation and Allocation Methodology ("Loss Methodology") is attached as Exhibit G to the Amended and Restated JOOA, beginning on page 145. ln accordance with Section 9.5 of the original JOOA, the Parties agreed upon a Loss Methodology which provides for a "true-up" between the Parties for their respective Open Access Transmission Tariff ("OATT")-based electric losses on transmission service scheduled pursuant to one Party's OATT for service in the other Party's balancing authority area effective October 30, 2015. The Parties' Loss Methodology was accepted by the Federal Energy Regulatory Commission ("FERC") on December 22,2015, in Docket No. ER16-210-000 and is detailed in Exhibit G of the Amended and Restated JOOA. ldaho Powefs Yearlv Report Showing Chanqes in Transmission Revenues. ln recognition of the impact the asset exchange wil! have on ldaho Power's transmission revenues, the Commission directed the Company (1) to establish a regulatory deferral account for transmission revenues resulting specifically from the transaction and its resulting change in ldaho Power's OATT rate and (2) to provide annual reports detailing the revenues creating the deferral and the deferral balance. Order No. 33313 at 13-14. A copy of ldaho Power's first annual report showing both the actual changes in transmission revenues resulting from the asset exchange between the Parties as well IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 4 as a forecast of changes over the next four years is provided in confidential Attachment 3 to this filing. The following three sections describe: (1) the impact of FERC's denial of ldaho Power's request for authorization to make a one-time "known and measureable" adjustment to the transmission formula rate to immediately reflect the load divisor impacts of the asset exchange; (2) the method by which the Company proposes to quantify changes in transmission revenues in compliance with Order No. 33313 and the resulting deferral balance for year-end 2015; and (3) the Company's forecast of year- end deferral balances for the years 2016 through 2019. III. IDAHO POWER'S FERC FILING REQUESTING A ONE.TIME ADJUSTMENT TO THE TRANSMISSION FORMULA RATE ldaho Power's transmission formula rate for transmission service provided under its OATT is determined using a historic period, which is the most recent calendar year ending December 31. The transmission formula rate is updated annually and in effect for the following October 1 through September 30 time period. ln order to minimize regulatory lag associated with changes resulting from the asset exchange, on July 28, 2015, in Docket No. ER15-2292-000, ldaho Power petitioned FERC for authorization to apply a one-time "known and measureable" adjustment to the contract demand input in its transmission formula rate load divisor. The load divisor is based on a rolling 12-month average of the transmission system peak, including the contract demands associated with the now terminated Legacy Agreements. ldaho Power petitioned FERC asserting that the adjustment was necessary so that ldaho Power's transmission formula rate would reflect actual contract demands on ldaho Power's transmission system. This adjustment would have resulted in an increase in the transmission formula rate charged to al! ldaho Power transmission customers taking OATT service effective IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 5 October 30, 2015. Absent this adjustment to the contract demand input of the transmission formula rate load divisor, the contract demand associated with the Legacy Agreements would not be completely eliminated from the load divisor until October 1, 2017. The methodology used by the Company to determine its annual total transmission revenue requirement and resulting transmission formula rate is set forth in Attachment H to ldaho Power's OATT. The annual total transmission revenue requirement is based on a historical period, using actual costs from the previous calendar year for almost all inputs. All long-term, firm demands on ldaho Power's transmission system, including the contract demand under the Legacy Agreements, are included as an input to variable E in the load divisor of the transmission formula rate calculation. Variable E is the average of ldaho Power's historical 12 monthly coincident peak metered load of ldaho Power's native load and network transmission customers and the long-term, firm reservations of point-to-point ('PTP") transmission customers. Throughout the FERC case (Docket No. ER15-2292-000), ldaho Power asserted that the input for the contract demand associated with the Legacy Agreements must be set to zero megawatts ("MW') so that the resulting rate reflects the actual contracted demands upon ldaho Power's transmission system. Interventions and protests were filed by Bonneville Power Administration, the City of Seattle, and Northwest & Intermountain Power Producers Coalition ("lntervenors"). lntervenors argued that ldaho Power should not be able to deviate from its historic rate design by altering one input to the formula. Despite the Company's best efforts to persuade FERC to allow a one-time adjustment to the transmission formula rate calculation, FERC ultimately declined to IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 6 authorize such an adjustment in its Order issued on November 19, 2015.1 FERC's Order stated that ldaho Power's backward-looking formula rate did not allow for a one- time adjustment to the contract demand input. Because load divisor amounts are based on the average of ldaho Power's historical demands for the previous calendar year, FERC's order will delay the full realization of increased OATT-related revenues resulting from termination of the Legacy Agreements until October 1,2017. IV. IDAHO POWER'S YEARLY REPORT SHOWING CHANGES lN TRANSMISSION REVENUES: 2015 ACTUALS !n Order No. 33313, the Commission recognized that the termination of the Legacy Agreements will eliminate the contract demands associated with the agreements from ldaho Power's transmission formula rate divisor over time, increasing the rate charged to the Company's transmission customers. The increase in ldaho Power's transmission formula rate wi!! lead to higher transmission revenues into the future, which will serve as a revenue credit to retail customer rates, ultimately reducing retail customer revenue requirement amounts. Because the test-year level of transmission revenues are set in a general rate case and ldaho Power's retail customers would not see the benefits of the increase in transmission revenues until the Company files its next general rate case, the Commission directed ldaho Power to establish a regulatory deferral account to track changes in transmission revenues resulting specifically from the transaction and its resulting change in the OATT rate. Order No.33313 at 13. FERC's OATT Rate Order prevents a change in the transmission formula rate charged to customers for PTP service during the October 1, 2015, through September 30, 2016, period. However, ldaho Power experienced immediate changes in other t tdaho Power Co., 153 FERC 1161,212 (2015) ('OATT Rate Orde/'). IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 7 transmission revenues beginning in November 20'15: Transmission Facilities revenues, Long-term PTP Transmission Service revenues, and Network Transmission Service revenues. The Company has computed the revenues in each of these categories with and without an asset exchange scenario to quantify changes to transmission revenues associated with the transaction. The 2015 amounts are based on actuals for November 1, 2015, through December 31, 2015, the two months since closing of the transaction. Included as confidential Attachment 3 to this filing is a copy of ldaho Power's yearly report titled "Changes in Transmission Revenues Resulting from the Asset Exchange." Column B of the report reflects 2015 changes in transmission revenues that are a result of the asset exchange with PacifiCorp. Termination of the Legacy Agreements resulted in an overall reduction to ldaho Power's transmission facilities billings of $2.3 million for the November 1,2015, through December 31,2015, time period. The $2.3 million reduction reflects the combination of a (1) $t million decrease related to the termination of 250 MW of transmission service associated with the lnterconnection and Transmission Service Agreement ("!TSA"), a (2) $1.5 million decrease in transmission facilities revenues due to the termination of three of the Legacy Agreements, the Restated and Amended Transmission Facilities Agreement ("RATFA"), the Restated Transmission Service Agreement ("RTSA"), and the Hemingway Joint Ownership and Operating Agreement ("Hemingway JOOA"), and a (3) $136,000 net increase associated with billings for common facilities under the Amended and Restated JOOA. The net of these changes are reflected on the Net Change in Transmission Facilities Revenues, Line 4 of the yearly report. The transaction also resulted in an increase of approximately $1.2 million during the November 1, 2015, through December 31, 2015, time period primarily due to IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 8 PacifiCorp's new OATT service, 310 MW of long-term, firm PTP transmission service, as can be seen on Line 7, Net Change in Long-Term PTP revenues. ln addition to setting the PTP rate, the transmission formula rate determines the annual and monthly network transmission revenue requirement amount. This amount is recovered from ldaho Power's network transmission customers on a monthly basis based on their respective load ratio shares of ldaho Power's transmission system peak. The Company's transmission system peak used to compute a network customer's monthly charge is the rolling 12-month average of the previous 12 calendar months' transmission system peaks; i.e., the transmission system peak used in November 2015 is the average of the transmission system peaks of December 2014 through November 2015. The termination of the Legacy Agreements resulted in a net decrease of ldaho Power's transmission system peak of over 1,000 MW beginning in November 2015, thereby increasing network customers' load ratio share; higher load ratio share amounts applied to equal revenue requirement amounts increase the amount network customers pay ldaho Power. The Company's network customers will see an increase in their load ratio share again in December 2015 as another month of a lower transmission system peak resulting from the termination of the Legacy Agreements is incorporated into the rolling 12-month average used for billing purposes. For the time period November 1, 2015, through December 31,2015, Idaho Power calculated an increase of $45,000 as a result of the increase in revenues from the Company's network transmission customers. This change is shown on Line 8, Network Transmission Service revenues. The full impact of the asset exchange will not be reflected in the transmission formula rate until October 1, 2017, creating a delay in the realization of increased PTP IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 9 transmission service revenues, even though some changes in transmission revenues became effective upon execution of the asset exchange. The net transmission revenue change during 2015 was a decrease of approximately $1.1 million, meaning ldaho Power recovered less transmission revenue in 2015 as a result of the asset exchange, creating a temporary regulatory liability balance. Although FERC's OATT Rate Order will result in fewer transmission revenue benefits than were presented in the original Application in Case No. IPC-E-14-41, the asset exchange remains a positive net beneficial transaction on a present value revenue requirement basis. V. IDAHO POWER'S YEARLY REPORT SHOWING CHANGES IN TRANSMISSION REVENUES: 2016-2019 FORECAST Idaho Power anticipates that the revenue delay related to FERC's OATT Rate Order will result in negative cumulative differences in total transmission revenue over the next three years before turning positive in the fourth year. To illustrate the point at which the Company anticipates the account balance will transition to a regulatory asset, ldaho Power has forecasted changes in transmission revenues over the 2016 through 2019 time period using the tracking methodology described in Section lV above. The forecast is intended to demonstrate the change over time as the deferral transitions from a receivable to a payable. Based on this forecast, ldaho Power anticipates 2018 will be the first year any changes in transmission revenues resulting from the asset exchange will be net positive when compared to a scenario without an asset exchange, with 2019 the year the cumulative account balance changes to a regulatory asset. The following discussion presents the Company's forecasting methodology in detail. ln addition to the three revenue categories discussed above, Transmission Facilities revenues, Longterm PTP Transmission Service revenues, and Network Transmission Service revenues, the Company will experience changes in Short-Term IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING . 1O and Non-Firm PTP Transmission Service revenues once the transmission formula rate begins to incorporate effects of the asset exchange in its inputs. Due to FERC's OATT Rate Order denying ldaho Power's request to make a one-time adjustment to reflect the transaction in the load denominator of the transmission formula rate, ldaho Power is able to forecast with more certainty changes to the transmission formula rate and project future regulatory deferral amounts. To estimate changes in transmission revenues, ldaho Power forecasted future transmission formula rate amounts under an asset exchange scenario and without an asset exchange scenario using the following assumptions: o Nominal, historical-based growth of certain transmission revenue requirement components; . An average 1.2 percent growth in ldaho Power's native load based on the growth assumption used in the Company's 2015 lntegrated Resource Plan ("lRP"). o Wheeling revenue credit amounts based on a three-year historical average. The asset exchange scenario incorporates the additional revenues ldaho Power will receive for billing of the common facilities under the JOOA. o Additional assumptions for the scenario with the asset exchange are: o The elimination of 1,836 MW of contract demands associated with the Legacy Agreements effective November 1 ,2015; and o The addition of PacifiCorp's 310 MW of long-term, firm PTP transmission service effective November 1, 2015. The following table summarizes the forecasted OATT PTP rate under each scenario: IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 11 OATT Formula Rate ($/kW per year) Oct 2015 - Sept 2016 Oct 2016 - Sept 2017 Oct2O17 - Sept 2018 Oct 2018 - Sept 2019 Oct 2019 - Sept 2020 Oct 2020 - Sept 2021 With Asset Exchange $23.43 $I $I $I $I $I Without Asset Exchange $23.43 $I $I $I $I $I Transmission Facilities Revenues. Under the asset exchange scenario, facilities revenues during 2016 through 2019 will continue to be less than would exist without the asset exchange due to the termination of the ITSA, RATFA, RTSA and the Hemingway JOOA. Because services provided under the ITSA were considered to be "OATT-like" and priced as such, revenues received under the ITSA fluctuated with changes in the transmission formula rate. The transaction will result in a decrease in revenues recorded in FERC Account 454 associated with the ITSA of $I in 2016 and up to $I in 2019. !n addition, the asset exchange will reduce FERC Account 454 revenues by an additional $9.0 million per year over the same time period due to the termination of the RATFA, RTSA, and the Hemingway JOOA. Because billing under the RATFA, RTSA, and the Hemingway JOOA was based on year-end asset values, it would be difficult to forecast revenues for future periods. lnstead, when analyzing an asset exchange scenario as compared to a scenario without an asset exchange, ldaho Power computed what 2016 amounts would have been and held those constant for the remaining years. Finally, the asset exchange will result in an increase in facilities revenues due to the billing of common facilities under the Amended and Restated JOOA. The net difference of amounts owed between the Parties will be approximately $815,000. Similar to other facilities revenues, billing of the common facilities is based on asset values and challenging to forecast so ldaho Power has held 2016 amounts continuous for 2017,2018, and 2019. The total forecasted net change in Transmission Facilities revenues for 2016 through 2019 can be seen on Line 4, Columns C through F of the yearly report. IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 12 Long-term PTP Transmission Seruice Revenues. To model changes in long- term, firm PTP transmission revenues, ldaho Power applied the transmission formula rate calculated under both the asset exchange scenario and the scenario without the asset exchange to current long-term, firm PTP transmission reservations, excluding ldaho Power merchant reservations. The total reservation amounts under each scenario were applied to the forecasted transmission formula rates, resulting in an expected increase in FERC Account 456 revenues in 2016 of $I as a result of the asset exchange. As shown on Line 7 of Attachment 3, long-term PTP revenues in 2017, 2018, and 2019 are estimated to increase $I, $I, and $I I, respectively. Network Transmission Seruice Revenues. As described previously, the transmission formula rate also determines the annual and monthly network transmission revenue requirement amount. To estimate the impact to network transmission service revenues, the Company first estimated the transmission system peak as the rolling 12-month average of the transmission system peak is used to compute a network transmission custome/s monthly charge. The Company's native load was grown at 1.2 percent on a monthly basis based on ldaho Power's 2015 IRP grourth assumption and existing long-term PTP transmission service reservations were added, including ldaho Power merchant reservations and the new long-term PTP transmission service reservation of 100 MW beginning July 2016, to compute ldaho Power's tota! monthly transmission system peak. As a result of the asset exchange, PacifiCorp executed 310 MW of new long-term PTP transmission service reservations in November 2015, and these reservations were added to the transmission system peak loads under the asset exchange scenario. IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 13 Next, each network transmission customer's load ratio share was computed based on the percentage of its demand as compared to the monthly transmission system peak amounts under each scenario. The monthly load ratio share was then applied to the monthly network transmission revenue requirement amount to estimate the network transmission service revenues during the 2016 through 2019 time period. Execution of the asset exchange and the resulting impacts on amounts charged to network transmission customers is estimated to increase FERC Account 456 network transmission system revenues of $I to $I annually through 2019, as reflected on Line 8, Column C through F of Attachment 3. Short-Term/Non-Firm Transmission Seruice Revenues. Because the transmission formula rate that went into effect October 1,2015, was based on calendar year 2014 data and FERC denied the Company's request to make a one-time adjustment to the transmission formula rate load divisor upon closing of the transaction, the asset exchange did not impact the transmission formula rate charged to customers taking short-term, non-firm PTP transmission service in 2015 or revenues received from short-term or non-firm transmission service in 2015. Changes in short-term and non- firm revenues are expected beginning October 1, 2016, when effects of the asset exchange begin to be incorporated into the transmission formula rate for PTP service. To estimate the change, ldaho Power used an average of the previous three calendar year's historical loads for short-term and non-firm transmission service and applied those loads to the transmission formula rate under the asset exchange scenario and without the asset exchange. Line 9, Columns C through F of Attachment 3 presents the variance for 2016 through 2019, starting with an additional $I and growing to approximat"ty $I by 2019. IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 14 2016-2019 Chanqes in Transmission Seruice Revenues. Although ldaho Power anticipates a decrease in transmission facilities revenues, the Company expects the increase in long-term PTP transmission service revenues, network transmission service revenues, and short-term and non-firm PTP transmission service revenues will surpass the decrease by year 2019. The following chart summarizes ldaho Power's forecasted changes in transmission service revenues by year as a result of the asset exchange that would be tracked for future recovery or credit: VI. VERIFICATION OF IDAHO POWER'S REGULATORY ACCOUNTING !n Order No. 33313, the Commission directed the Company to establish a regulatory deferral account for transmission revenues resulting specifically from the transaction and its resulting change in the OATT rates and to provide annual reports of the revenues going into the deferral account and the deferral balance. Order No. 33313 at 14. As shown above, absent the deferral, the financial impact to the Company resulting from the decrease in transmission revenues the first few years is significant and, consequently, it is important that the Company confirm it correctly calculated deferral amounts to be recovered from, or credited to, customers in a future rate proceeding. Therefore, ldaho Power seeks Commission verification that its regulatory accounting meets the requirements of the Commission's June 5, 2015, Order No. IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 15 Revenue Cateqory 20{5 (ml 2016 (m)2017 (m)2018 (m)2019 (m) Facilities Revenues ($2.4a1 ($I)($I)($I)($I) Long-Term PTP Transmission Service $1.21 $I $I $I $I Network Transm ission Service $0.05 $I $I $I $I Short-Term/Non-Firm Transmission Service $0.00 $I $I $I $I Total Change in Transmission Service Revenues ($1.08)($I)($I)$I $I Cumulative Change in Transmission Service Revenues ($1.0a1 ($I)($I)($I)$I 33313. Specifically, ldaho Power requests Commission acknowledgement that Company has correctly computed the deferral balance for 2015 and should use same methodology for computing future deferra! balances. VII. COMMUNICATIONS Communications and service of pleadings, with reference to this request for verification should be sent to the following: the the 1221West ldaho Street (83702) 1221West ldaho Street (83702) Julia A. Hilton ldaho Power Company P.O. Box 70 Boise, ldaho 83707 ih ilton@ ida hopower. com dockets@ idahopower. com Tim Tatum ldaho Power Company P.O. Box 70 Boise, ldaho 83707 ttatum@ idahopower. com DATED at Boise, ldaho, this 19th day of February 2016. IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 16 CERTIFICATE OF SERVICE ! HEREBY CERTIFY that on the 19th day of February 20161 served a true and correct copy of IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING upon the following named parties by the method indicated below, and addressed to the following: Commission Staff Daphne Huang Deputy Attorney General ldaho Public Utilities Commission 472 West Washington (83702) P.O. Box 83720 Boise, ldaho 83720-007 4 PacifiCorp Daniel E. Solander Yvonne R. Hogle Rocky Mountain Power 201 South Main Street, Suite 2400 Salt Lake City, Utah 84111 Industrial Gustomers of ldaho Power Peter J. Richardson RICHARDSON ADAMS, PLLC 515 North 27th Street (83702) P.O. Box 7218 Boise, ldaho 83707 Dr. Don Reading 6070 Hill Road Boise, ldaho 83703 X Hand Delivered U.S. Mail Overnight Mail FAX Email daphne.huang@puc.idaho.qov Hand Delivered U.S. Mai! Overnight Mail FAXX Email daniel.solander@pacificorp.com Yvon ne. hog le@pacificorp. com Hand Delivered U.S. Mai! Overnight Mail FAXX Email peter@richardsonadams.com _Hand DeliveredX U.S. Mail _Overnight Mail _FAXX Email dreadinq@mindsprinq.com IDAHO POWER COMPANY'S REDACTED ORDER NO. 33313 COMPLIANCE FILING AND REQUEST FOR VERIFICATION OF REGULATORY ACCOUNTING - 17 Chridta Bearry, Legdl Assistant BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NOS. IPC-E-1441 and PAC-E-14-11 ATTACHMENT 1 IDAHO POWER COMPANY CLOSING JOURNAL ENTRIES Closing joumal entries to exchange undivided ownership interests in equipment between PacifiCorp and Idaho Power Company to provide the parties with transmission capacity that better aligns with the current configuration of the parties respective transmission systems FERC Account 102 108 l0l Descriotion Electric Plant Purchased or Sold Accumulated Provision for Depreciation of Electric Plant Electric Plant in Service To clossiJy the uchange ofthe rndivided ownership inleresl in assels lo PactfrCorpjiom Eleclric Planl in Seruice ,o F-ERC account ii 102 - Electtic Plant Purchased or Sold in occordance with I 8 CFR, Port l0 I, Electric Plant lnstmclion 5. Cash Electric Plan Purchased or Sold 1'o record cash payment from PacrfiCorp for the dtllering values resulting from the nelting ofrhe uchange prices. Construction Work in Progress Accounts Payable 7b record lransaction cosls as ofNovenber 30, 201 5 incurred by ldaho Power lofacililate lhe uchange ofundivided ownership inleresl in assels with PacrfiCorp. Electric Plant in Service Accumulated Provision for Depreciation of Electric Plant Electric Plant Purchased or Sold To cleor l,'Ell(l accounl i I 02 - Electric Plant l'urchased or Sold lo b:leclric Plont in Senice and Accunulaled Provision lor l)eprecialionfor the value ofthe undivided wnership interest in ossets received from PacrfC orp. Other Accounts Receivable Accumulated Provision for Depreciation of Electric Plant Electric Plant Purchased or Sold To record a receivsblefor the cash payment duetiom PacrfiCorp lhal is a resull ol an error in the compulalion oflhe undivided ownership interesl in assets receivedJion PocrfiCorp. Current Income Tax - Operating Income Income Taxes Accrued Accumulated Deferred Income Taxes - Operating Property Deferred Income Tax Credit - Operating Income l'o record current ond deleffed tuesfor the undivided ownership inleresl received in ossets exchanged with PactfiCorp. Accumulated Defened Income Taxes - Operating Property Deferred Income Tax Credit - Other Income & Deductions 'lb record lhe reversal oflhe accumulated deferred income tu balonce for method, lde differences on lhe assets relinquished lo Pacifi('orp. Deferred Income Tax - Other Income & Deductions Accumulated Deferred Income Taxes - Other Property To establish the accumulated deJbiled income lu halance (non-rule hase ofsetling) fot lhe 16 basis dtflerence on lhe replocemenl property receivedfrom Pacrf('orp. Debit Credit 43,6s7,292 20,503,743 64,161,035 l 59,s38 I 59,538 868,523 868,523 73,390,985 29,895,539 43,495,445 3,090 78t 2,309 l3l t02 107 232 t0l 108 102 143 108 102 409.1 236 282.1 4r l.l 282.1 4n.2 5, 103,015 4,550,527 5,706,53 I 5,706,53 I 5,103,015 4,550,527 5,706,53 I 410.2 282.1 l,'inal Joumal enlries will he filed after lhal has ocarred. 5,706.53 I BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NOS. IPC-E -1441 and PAC-E -14-11 ATTACHMENT 2 EXECWION VERSION JOINT OWI\ERSHIP AITD OPERATING AGREEMENT BETWEEN IDAHO POWER COMPANY AND PACIFICORP DATED OCTOBER 30, 2015 EXECWION VERSION TABLE OF CONTENTS DEFINITIONS; RULES OF INTERPRETATION ............2 Definitions Rules of Construction........... ...................... l0 TERM....... .............. I I Effectiveness of this Agreement ................. l l Term......... ............. I I Termination ........... I I Effect of Termination............. ..................... 1l TRANSMISSION FACILITIES OWNERSHIP INTERESTS ........12 Ownership Interests .................12 Capacity Allocations ................12 Adjustment of Capacity Allocations and Ownership Interests............................ l3 Qualified Owner....... ................ 15 No Right to Use ....................... 15 Payments.. ............. 15 Waiver of Partition Rights ....... 15 Nonexclusive License to Enter and Use Real Property....................................... l6 Access to Antelope Substation for ldaho Power Maintenance of Department of Energy Facilities ................. 18 OPERATOR OF TRANSMISSION FACILITIES ................ .......... I8 Appointment of Operator............... ............. 18 Authority of Operator .............. 18 Delegation of Responsibilities .................... 19 Governmental Authorizations........ ............. 19 Audit .....................20 Insurance... ............21 Invoices.....2l Assistance 22 Remedies.. .............23 OPERATION AND MATNTENANCE OF TRANSMISSION FACILITIES ................ ............23 ARTICLE I l.l 1.2 ARTICLE II 2.1 ,, ., -.L 2.3 2.4 ARTICLE III 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 ARTICLE IV 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 ARTICLE V JOINT OWNERSHIP AND OPERATING AGREEMENT -1- 5.1 5.2 5.3 ARTICLE VI 6.1 6.2 ARTICLE 7.1 7.2 7.3 7.4 7.5 ARTICLE 8.1 8.2 8.3 8.4 ARTICLE IX 9.1 9.2 9.3 9.4 9.5 9.6 ARTICLE X l0.l 10.2 EXECUTION VERSION Compliance; Standard of Work ...................23 Operation and Maintenance; Outages and Outage Coordination; Capital Upgrades and Improvements ......................23 Requests for Generation or Transmission Interconnection Service...... ...............25 TRANSMISSION FACILITIES CAPITAL UPGRADES PROPOSED BY AN OWNER............... ..............26 Capital Upgrades... ...................26 McNary Transmission Project 28 VII PHYSICAL DAMAGE TO TRANSMISSION FACILITIES; CoNDEMNATION...... ...........28 Rebuilding Damaged Facilities.... ................28 Decision not to Rebuild Purchase of Ownership Interest ...................30 Cooperation................ ................ 30 Condemnation............. .............. 30 VIII RETIREMENT AND DECOMMISSIONING OF TRANSMISSION 29 FACILTTTES ................ .......... 3l Decision to Retire Transmission Facilities .................... 3l Costs of Decommissioning ............. ............ 3l Purchase of Ownership Interest ..................31 Cooperation ............32 TRANSMISSION SYSTEM BOUNDARIES ............ .....................32 Points of Interconnection; Points of Balancing Authority Area Adjacency........32 E-Tags ...................32 Dynamic Transfer Capability Rights ........... 3l Jim Bridger Pseudo Tie............. ..................33 Electric Losses .......32 Jim Bridger Project Generation RAS........... ..................33 TRANSMISSION SYSTEMS OPERATION AND MATNTENANCE .............. 32 Service Conditions. ...................32 Survival ..................34 ARTICLE XI FORCE MAJEURE ...................... 35 I l.l Force Majeure Defined .............35 JOINT OWNERSHIP AND OPERATING AGREEMENT -u- EXECUTION VERSION ll.2 Effect of Force Majeure ...........35 ARTICLE XII EVENTS OF DEFAULT .......36 l2.l Event of Default.. .....................36 12.2 Cure by Non-Defaulting Party. ...................36 12.3 Remedies.. .............37 ARTICLE XIII REPRESENTATIONS AND WARRANTIES............ ..................37 l3.l Representations and Warranties of Idaho Power........ ......................37 13.2 Representations and Warranties of PacifiCorp............... .................. 38 ARTICLE XIV TNDEMNIFICATION........... ...................38 l4.l Indemnities ............38 14.2 Notice and Participation.......... ....................39 ............40 14.4 No Release of Insurers. ............ 40 14.5 Mitigation. .............41 14.6 Assertion of Claims........41 14.7 Survival of Ob1igation................ .................41 14.8 Limitation on Liability .............41 ARTICLE XV PROPRIETARY TNFORMATION......... .....................4I l5.l Disclosure of Proprietary Information Prohibited.............. ..............41 15.2 Disclosure by Representatives ....................42 15.3 Permitted Disclosures ..............42 15.4 Injunctive Re1ief......... ..............42 15.5 Publicity ................42 15.6 Proprietary Information Defined...... ...........43 15.7 Survival .................43 ARTICLE XVr TAXES................ ..................43 16.l No Partnership ............ .............43 16.2 761 Election ................ .............43 16.3 Responsibility for Taxes .........44 16.4 Indemnification............. ...........44 16.5 Determination of Depreciation and Other Matters ........44 ARTICLE XVII DISPUTES.........................44 l7.l Exclusive Procedure.. ...............44 JOINT OWNERSHIP AND OPERATING AGREEMENT -l[- EXECUTION VERSION 17.2 Dispute Notices...... ..................47 17.3 Informal Dispute Resolution. ......................47 17 .4 Submission of Dispute to FERC or Approved Courts.... ..................47 17 -5 Continued Performance ...............................47 ARTICLE XVIII ASSIGNMENT.......... ......... 48 l8.l Prohibited Transfers and Assignments ........ 48 18.2 Permitted Assignments and Transfers ........48 18.3 FERC Approval .......................49 ARTICLE XIX MISCELLANEOUS ............................. 49 l9.l Notices ..................49 19.2 Parties Bound .........50 19.6 Headings 19.7 Relationship of Parties .................52 19.8 Severability ............52 19.9 No Third Party Beneficiaries ......................52 19.10 FurtherAssurances I 9.1 I Conflict of Interest 19.14 Entire Agreement .....................53 EXHIBITS 19.3 Amendments........... 19.4 Waivers 52 52 Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Description of PacifiCorp Common Equipment Description of Idaho Power Common Equipment Ownership Interests; Directional Capacity Allocations; Directional Capacity Allocation Percentages Monthly Transmission Facilities O&M Charge; Monthly Substation O&M Charge; Monthly Common Equipment Charge Department of Energy Equipment Located in the Antelope Substation JOINT OWNERSHIP AND OPERATING AGREEMENT -lv- EXECWION VERSION Exhibit F Acquisition Costs Exhibit G Joint Ownership Transmission Loss Calculation and Allocation Methodology SCTIEDULES Schedule 13.1(0 Idaho Power Governmental Authorizations Schedulel3.2(f) PacifiCorpGovernmentalAuthorizations JOINT OWNERSHIP AND OPERATING AGREEMENT EXECUTION VERSION JOINT OWNERSHIP AND OPERATING AGREEMENT This Joint Ownership and Operating Agreement, dated as of October 30, 2015, is between PacifiCorp, an Oregon corporation, ("EAgi-fie-elp'o), and ldaho Poweq an Idaho corporation ("]daho Power"). Each of PacifiCorp and Idaho Power are sometimes hereinafter referred to individually as "Part!y" and collectively as "Parties". RECITALS: WHEREAS, Idaho Power is a transmission provider which owns, controls and operates, or in certain cases only operates, equipment for the transmission of electric power and energy located in Idaho, Oregon, Washington and Wyoming (the "ldaho Power Transmission System"); WHEREAS, Idaho Power uses the Idaho Power Transmission System, its distribution system and its generation resources to provide retail and wholesale electric services, and is the NERC recognized Balancing Authority Operator of one Balancing Authority Area; WHEREAS, PacifiCorp is a transmission provider which owns, control and operates, or in certain cases only operates, equipment for the transmission of electric power and energylocatedinIdaho,oregon,WashingtonandWyoming(the..,,); and WHEREAS, PacifiCorp uses the PacifiCorp Transmission System, its distribution system generation resources to provide retail and wholesale electric services, and is the NERC recognized Balancing Authority Operator of two Balancing Authority Areas (PACW and PACE); WHEREAS, the Idaho Power Transmission System and the PacifiCorp Transmission System interconnect at the Points of Interconnection and the Idaho Power and PacifiCorp Balancing Authority Areas are considered Adjacent Balancing Authority Areas at the Points of Balancing Authority Area Adjacency; WHEREAS, the Idaho Power Transmission System and the PacifiCorp Transmission System include certain equipment for the transmission of electric power and energy located in Idaho and Wyoming that are jointly owned and were operated pursuant to certain legacy agreements between the Parties; WHEREAS, the Parties previously desired to exchange with one another certain jointly- owned and wholly-owned equipment to provide each Party with transmission capacity that better aligns with the current configuration of its Transmission System and current load service obligations, each of which had changed since the jointly-owned and wholly-owned equipment were originally constructed; WHEREAS, in order to facilitate such an exchange, the Parties previously entered into a Joint Purchase and Sale Agreement (the "JPSA"), dated as of October 24, 2014 (the "Execution Date"), pursuant to which at the closing of the transaction contemplated by the JPSA: (i) the ownership of certain jointly-owned equipment was reallocated and the ownership of certain additional equipment was exchanged between the Parties (as further described in Exhibit C, the "Transmission Faci '); and (ii) certain legacy agreements between the Parties were terminated and the transmission service contained therein converted to OATT service; JOINT OWNERSHIP AND OPERATING AGREEMENT Page I I EXECUTION VERSION WHEREAS, PacifiCorp individually owns additional equipment that serve and are a part of the PacifiCorp Transmission System and will not be part of the Transmission Facilities, but that PacifiCorp will make available to support the operation of the Transmission Facilities (as further described in Exhibit A, the "PacifiCoro Common E '); WHEREAS, Idaho Power individually owns additional equipment that serve and are a part of the Idaho Power Transmission System and will not be part of the Transmission Facilities, but that Idaho Power will make available to support the operation of the Transmission Facilities (as further described in Exhibit B, the "Idaho Power Common Equipment" and, together with the PacifiCorp Common Equipment, the "Common Equipmenf'); and WHEREAS, in connection with the JPSA, the Parties previously entered into this Joint Ownership and Operating Agreement, dated as of the Execution Date (the *2014 Agreement"), in orderto: (l) acknowledge each Party's ownership interest in the jointly-owned Transmission Facilities; (2) allocate the transmission capacity of the jointly-owned Transmission Facilities; (3) allocate operational responsibility for the Transmission Facilities as between the Parties; (4) define the responsibility of the Operators with respect to the operation and maintenance of the Transmission Facilities and Common Equipment; and (5) define the responsibilities of the Owners with respect to the operation of their Transmission Systems in relation to the other. WHEREAS, pursuant to 9.5 of the 2014 Agreement, the Parties agreed to, on or before the Effective Date, develop an OATT-based losses methodology (the "Losses Methodology"); and WHEREAS, the Parties have developed the Losses Methodology and now desire to amend and restate the 2014 Agreement in its entirety to, among other things, incorporate the Losses Methodology as Exhibit G thereto and make certain conforming revisions to Section 9.5 thereof. NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, Idaho Power and PacifiCorp agree as follows: ARTICLE I DEFINITIONS: RULES OF INTERPRETATION l.l Definitions. Unless the context otherwise requires, the following capitalized terms have the meanings given to them below: "Adjacent Balancine A 'has the meaning set forth in the Reliability Standards. "Affecled Jarty" has the meaning given to such term in Section I l.l. "Affiliate" means, with respect to a Person, each other Person that, directly or indirectly, controls, is controlled by or is under common control with, such designated Person; ptqviidgd, however, that in the case of PacifiCorp, the term "Affiliate" does not include Berkshire Hathaway Inc. or any of its affiliates (other than PacifiCorp and any direct or indirect JOINT OWNERSHIP AND OPERATING AGREEMENT Pagel2 EXECUTION VERSION subsidiaries of PacifiCorp), and no provision of this Agreement shall apply to, be binding on, create any liability of, or otherwise restrict the activities of, Berkshire Hathaway Inc. or any of its affiliates (other than PacifiCorp and any direct or indirect subsidiaries of PacifrCorp). For the purposes of this definition, 6ccontrol" (including with correlative meanings, the terms "controlled by" and "under common cont "), as used with respect to any Person, shall mean (a) the direct or indirect right to cast at least fifty percent (50%) of the votes exercisable at an annual general meeting (or its equivalent) of such Person or, if there are no such rights, ownership of at least fifty percent (50%) of the equity or other ownership interest in such Person, or (b) the right to direct the policies or operations of such Person. "1\FUre" means allowance for funds used during construction and has the meaning set forth in l8 CFR $ 101, Electric Plant Instructions $ 17 (2014), as amended from time-to-time. "Asreemen!" means this Joint Ownership and Operating Agreement (including all Exhibits and Schedules attached hereto), as the same may be amended and supplemented from time to time in accordance with the terms hereof. "4!q-gndmen!'has the meaning given to such term in Section 6.1(aXi). "Approved Courts" has the meaning given to such term in Section 17.4. "Automatic Generation C 'has the meaning set forth in the Reliability Standards. "Balancing Author " means the collection of generation, transmission and loads within the metered boundaries of each Owner determined in accordance with the Reliability Standards. "BankruD!" means, with respect to any Person, that such Person: (a) files a petition or otherwise commences, authorizes or acquiesces in the commencement of a proceeding or cause of action under any bankruptcy, insolvency, reorganization or similar law, or has any such petition filed or commenced against it; (b) makes an assignment or any general arrangement for the benefit of creditors; (c) otherwise becomes insolvent (however evidenced); (d) has a liquidator, administrator, receiver, trustee, conservator or similar official appointed with respect to it or any substantial portion of its property or assets; or (e) is generally unable to pay its debts as they fall due. "Businegs.Days" means any day except a Saturday, Sunday and any day which is a legal holiday or a day on which banking institutions in New York, New York are authorized or obligated by Governmental Requirements to close. "Capital Upgrade No " has the meaning given to such term in Section 6.1(.a). "ClAinq!," has the meaning given to such term in Section 14.1(a). "Closing_Date" has the meaning given to such term in the JPSA. "Code" has the meaning given to such term in Section 16.2. \ JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 3 EXECWION VERSION "Commercially Reaso " means the level of effom that a reasonable electric utility would take in light of the then known facts and circumstances to accomplish the required action at a then commercially reasonable cost (taking into account the benefits to be gained thereby). "Common Equipmenf'has the meaning given to such term in the recitals and includes all ancillary equipment necessary to support the operation of the Substations, including land, site preparation, improvements (control building and other permanent buildings), communications equipment, control equipment, SCADA, relays, batteries, battery chargers, cable trench, cabling, local service, security equipment, fencing, yard gravel, and grounding. Each Owner's Common Equipment, sorted by Substation, on the Effective Date is identified on Exhibit A or Exhibit B. "epllinuine Olvner" has the meaning given to such term in Section 7.3. "Costs" means, with respect to the construction, reconstruction or upgrade of the Transmission Facilities or Common Equipment by or on behalf of the Operator responsible for such Transmission Facilities or Common Equipment pursuant to this Agreement, including capital upgrades and improvements thereto, such Operator's actual cost of: (a) preliminary surveys and investigations and property acquisitions in connection therewith; and (b) the development, design, engineering, procurement, construction, reconstruction and upgrade of such Transmission Facilities and Common Equipment, including an allowance for AFUDC and applicable overheads determined in accordance with such Operator's customary practices, as calculated in accordance with FERC's Uniform System of Accounts; provided, however, AFUDC shall be recovered by Operators, if at all, in accordance with Section 4.7(b). "Damagg_Noflge" has the meaning given to such term in Section 7.1(a). "Dg41gp1!.Fac[]j1jeg," has the meaning given to such term in Section 7.1(a). "Decommissioning " has the meaning given to such term in Section 8.3. "Dgfauldng_Pg4y" has the meaning given to such term in Section 12.1. "Delegate" has the meaning given to such term in Section 4.3. "Directional Capacity Allocation" has the meaning given to such term in Section 3.2(a). "Directional Capac " has the meaning given to such term in Section 3.2(a). o'Dispute" has the meaning given to such term in Section 17.1 . "DjS@" has the meaning given to such term in Section 17.2. "Dynamic Transfer Cap 'means the intra-hour deviation from scheduled flow. "Effective Date" has the meaning given to such term in Section 2.1. "Elg9ling_QurngI" has the meaning given to such term in Section 6.1(a). JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 4 ./ EXECUTION VERSION "E4sgy_E4ergg4ey" has the meaning set forth in the applicable version of NERC Reliability Standard EOP-002, which pertains to capacity and energy emergencies. "Even11pj[De.[au!!'has the meaning given to such term in Section 12.1. "Execulion Date" has the meaning given to such term in the recitals. "ExeguIiv$y' has the meaning given to such term in Section 17.3(a). " " has the meaning given to such term in Section 3.8ft). "FERC" means the Federal Energy Regulatory Commission. "FERC Methodoloey" has the meaning given to such term in Section 4.7(b). " 'means the Uniform System of Accounts Prescribed for Public Utilities and Licensees Subject to the Jurisdiction of the Federal Power Act prescribed by FERC, and codified as of the Execution Date at l8 C.F.R. Part l0l, as the same may be amended from time to time. "Force Mqi-eure" has the meaning given to such term in Section I I.l. "Good Utilify PractH'means any of the practices, methods and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period, or any of the practices, methods and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, would have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Good Utility Practice is not intended to be limited to the optimum practice, method, or act to the exclusion of all others, but rather to be acceptable practices, methods, or acts generally accepted in the region, including those practices required by Federal Power Act section 21 5(a)(4), I 6 U.S.C. $ 824o(a)(a)(20 I 4). "Governmental Authoff'means any federal, state, local or municipal governmental body; any governmental, quasi-governmental, regulatory or administrative agency, commission, body or other authority exercising or entitled to exercise any administrative, executive, judicial, legislative, policy, regulatory or taxing authority or power, including FERC, NAESB, NERC or any regional reliability council; or any court or governmental tribunal, in each case, having jurisdiction over the Person or matter in question, including either Owner (including in its capacity as Operator) or any of its Affiliates or the ownership, use, operation and maintenance, repair and reconstruction, or retirement and decommissioning of all or a portion of the Transmission Facilities or the Common Equipment. ..@,,meanSanylicense,permit,order,approval,filing, waiver, exemption, variance, clearance, entitlement, allowance, franchise, or other authorization from or by a Governmental Authority that is applicable to the Person or matter in question. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 5 EXECUTION VERSION "Governmental Requ " means all laws, statutes, ordinances, rules, regulations, codes, and similar acts or promulgations or other legally enforceable requirements of any Govemmental Authority that are applicable to the Person or matter in question. "ldaho Power" has the meaning given to such term in the preamble. "Idaho Power Commo " has the meaning given to such term in the recitals. "Idaho Power License" has the meaning given to such term in Section 3.8(aXi). "Idaho Power Real h " has the meaning given to such term in Section 3.8(g)(i). "Idaho Power Sites" has the meaning given to such term in Section 3.8(aXii). "Idaho Power Transm ' has the meaning given to such term in the recitals. "Indemnified Party" has the meaning given to such term in Section l4.l(a). "Indemnifyine Party" has the meaning given to such term in Section l4.l(a). "lnterconnection 'has the meaning given to such term in Section 5.3. "ln!erru@.e@'has the meaning given to such term in Section lO.l(c). "Ji!0_Bl!deer Pro.i-ec!" means the four-unit Jim Bridger coal fired electric power plant and related facilities, of which Idaho Power's ownership share is l/3, and PacifiCorp's ownership share is 2/3 and which is metered at the bus bar located at the Jim Bridger Project. "Jim Bridger Project " means the gross generation output of the four Jim Bridger Project generators metered on the low side of the generator step up transformers, minus the calculated losses on the four step up transformers, minus the tertiary loads on the 345/230 kV transformers # I and #2, minus the 230134 kV transformer #5 load, as calculated below: Jim Bridger total generation - ((Jim Bridger Unitl)2 + (Jim Bridger tJnit212 + (Jim Bridger Unit3)2 + (Jim Bridger Unit4)2) x(4.4 x 10-6) - 1.2 -XFMRltertiary - XFMR2tertiary - XFMR5. "Jim Brideer Transm " means the calculated line losses on the Jim Bridger- Goshen, Jim Bridger-Populus #l and #2, Populus-Kinport, and Populus-Borah #l and #2345kV lines, and the transformer losses on the Jim Bridger 345/230 kV transformers # l, 2 and 3. "JPSA" has the meaning given to such term in the recitals. '5losses" mean any and all damages and losses, deficiencies, liabilities, taxes, obligations, penalties, judgments, settlements, claims, payments, fines, interest, costs and expenses, whether or not resulting from third party claims, including the costs and expenses of any and all actions and demands, assessments, judgments, settlements and compromises relating thereto and the costs and expenses ofattorneys', accountants', consultants' and other professionals' fees and JOINT OWNERSHIP AND OPERATING AGREEMENT Page 16 EXECUTION VERSION expenses incurred in the investigation or defense thereof or the enforcement of rights hereunder and costs and expenses of remediation (including, in the case of remediation, all expenses and costs associated with financial assurance); ry4!e!l, however, that in no event shall Losses include lost profits or damages and losses excluded under Section 14.8(a). "MgIAreI" has the meaning given to such term in Section 17.3(a). "McNarv Transmission 'has the meaning given to such term in Section 6.2. "McNarv Transmissio 'has the meaning given to such term in Section 6.2. "Monthly Common Equipment Charqe" has the meaning given to such term in Exhibit D. " 'has the meaning given to such term in Exhibit D. "NAESB" means the North American Energy Standards Board. "Neeotiation End Date,'has the meaning given to such term in Section 6.2. "NERC'means the North American Electric Reliability Corporation. "Non-Defaulting Pafty" means an Owner that is not a Defaulting Party. .o@'meanS,inagivencircumstanceorcontextwithrespectto certain Transmission Facilities or Common Equipment, the Owner which is not also serving as the Operator in such circumstance or context with respect to such Transmission Facilities or Common Equipment. "OATT" means, with respect to each Owner, the Owner's Open Access Transmission Tariff on file with FERC. "Opqating_Owngt" means, in a given circumstance or context with respect to certain Transmission Facilities or Common Equipment, the Owner which is also serving as the Operator in such circumstance or context with respect to such Transmission Facilities or Common Equipment. "Q@I" means PacifiCorp or ldaho Power, in its capacity as Operator under this Agreement. "othe1-1Cos6'has the meaning given to such term in Section 4.7(a). "Other Costs Records" has the meaning given to such term in Section 4.5. "Owner" means PacifiCorp or Idaho Power, in its capacity as an owner of Transmission Facilities or Common Equipment under this Agreement. JOINT OWNERSHIP AND OPERATING AGREEMENT Page l7 EXECUTION VERSION "9-I,ngIShi@!" means: (a) in respect of an Owner and a Segment, the ownership interest (expressed as a percentage) of such Owner in such Segment as described in Section 3.1(a) and set forth on Exhibit C, as the same may be adjusted from time to time pursuant to Section 3.3(b); and (b) in respect of an Owner and Common Equipment, the one hundred percent (100%) ownership interest of such Owner in such Common Equipment. "PacifiCorp" has the meaning given to such term in the preamble. "PacifiCom Common E " has the meaning given to such term in the recitals. "Bgp.ifieprp License" has the meaning given to such term in Section 3.8(aXii). "PacifiCom Real Prop " has the meaning given to such term in Section 3.8(a)fi). "PacifiC.elp.!!19g" has the meaning given to such term in Section 3.8(aXi). "PacifiCorp Transmis 'has the meaning given to such term in the recitals. 66Pg.rty" and "Parfes" have the meanings given to such terms in the preamble. "Path!" means the specific rated electric transmission paths within the Western Interconnection that are identified in the WECC path rating catalogue and that are identified in Exhibit C, which rated paths the Parties acknowledge may be comprised of transmission line or substation equipment that are in addition to those identified on Exhibit C. "Persqq" means an individual, partnership, corporation, limited liability company, joint venture, association, trust, unincorporated organization, Govemmental Authority, or other form of entity. "Points of Balancine Authority Area Adjacency" means the points at which Idaho Power's Balancing Authority Area is an Adjacent Balancing Authority Area with each of PacifiCorp's PACE and PACW Balancing Authority Areas. "Points of lnterconn " means the points of interconnection between ldaho Power's Transm ission System and Pacifi Corp' s Transm ission System. "Prior Projects" has the meaning given to such term in Section 5.2(e). "Pro Rata Share" or ".ProRa!A_Bas!E" means a proportionate allocation of a quantity between the Owners that is calculated by multiplying the quantity being allocated by each Owner's Ownership Interest or Directional Capacity Allocation Percentage or other metric, as the context provides. "Proprietary Information" has the meaning given to such term in Section 15.6. "QuAliFred Owner" means an Owner that has an OATT on file with FERC under which is authorized to provide transmission service on its transmission system. JOINT OWNERSHIP AND OPERATINC AGREEMENT Page | 8 EXECUTION VERSION "Real Property Lice " has the meaning given to such term in Section 3.8(aXii). "Real Property Rieht$'has the meaning given to such term in Section 3.8(a)(ii). "Regulations" has the meaning given to such term in Section 16.2. "Reliability Stand 'means the electric reliability standards approved by FERC pursuant to Federal Power Act Section 215, 16 U.S.C. $82ao(d) (2014). "Remainine Olvnq" has the meaning given to such term in Section 8.3. "Bgpresenlatives" means, in respect of an Owner or Operator, the directors, officers, shareholders, partners, members, employees, agents, consultants, contractors or other representatives of such Owner or Operator. "Retired Transmissi " has the meaning given to such term in Section 8.1. "Segmen!" means a Substation Segment or a Transmission Segment. "SgbgIation9," means the substations that are identified on Exhibit C. "Substation Sesment" means the Transmission Facilities that are identified on a specific row of Exhibit C as a Substation. "Transmission Segmenf'means the Transmission Facilities that are identified on a specific row of Exhibit C as a transmission line. "Tax Indemnifrine Party" has the meaning given to such term in Section 16.4. "Tax Indemnitee Party" has the meaning given to such term in Section 16.4. 66@" has the meaning given to such term in Section 16.3. 66l:grm" has the meaning given to such term in Section 2.2. " " has the meaning given to such term in Section 2.3(a\. "Total Directional Capacity" has the meaning given to such term in Section 3.2(a). "Tlansfer" has the meaning given to such term in Section l8.l. "TIanq&ree" has the meaning given to such term in Section 15.1. "Transferor" has the meaning given to such term in Section 15.1. "Transmission Facilfu" has the meaning given to such term in the recitals. ..,,means,inrespectofeachoperator,eachagreement, instrument or other contract relating to or in connection with the Transmission Facilities or Common Equipment it is responsible for, that such Operator enters into pursuant to this JOINT OWNERSHIP AND OPERATING AGREEMENT Page l9 EXECUTION VERSION Agreement and, in respect of the Prior Projects, that the Operating Owner entered into prior to the Effective Date; but does not include transmission service agreements. "Transmission Faci 'has the meaning given to such term in Section 3.8(.aXii). "Transmission Svst " means, in the case of PacifiCorp, the PacifiCorp Transmission System, and, in the case of ldaho Power, the Idaho Power Transmission System. "WECC" means the Western Electricity Coordinating Council. "WIS Agreement" has the meaning given to such term in Section 14.8(b). Rules of Construction. The following rules of interpretation shall apply in this Agreement: (a) The masculine shall include the feminine and neuter. (b) References to "Articles," "Sections," "Exhibits" and "Schedule" shall be to articles, sections, exhibits and schedules ofthis Agreement. (c) The Exhibits and Schedules attached hereto are incorporated in and are intended to be a part of this Agreement. (d) This Agreement was negotiated and prepared by both Parties with the advice and participation of counsel. The Parties have agreed to the wording of this Agreement and none ofthe provisions hereofshall be construed against one Party on the ground that such Party is the author of this Agreement or any part hereof. (e) Each reference in this Agreement to any agreement or document or a portion or provision thereof shall be construed as a reference to the relevant agreement or document as amended, supplemented or otherwise modified from time to time with the written approval of both the Parties. (0 Each reference in this Agreement to Governmental Requirements and to terms defined in, and other provisions of, Governmental Requirements shall be references to the same (or a successor to the same) as amended, supplemented or otherwise modified from time to time. (g) The term "day" shall mean a calendar day, the term "month" shall mean a calendar month, and the term "year" shall mean a calendar year. Whenever an event is to be performed, a period commences or ends, or a payment is to be made on or by a particular date and the date in question falls on a day which is not a Business Day, the event shall be performed, or the payment shall be made, on the next succeeding Business Day; provided. however, that all calculations shall be made regardless of whether any given day is a Business Day and whether or not any given period ends on a Business Day. (h) Each reference in this Agreement to a Person includes its successors and permitted assigns; and each reference to a Governmental Authority includes any Govemmental Authority succeeding to its functions and capacities. JOINT OWNERSHIP AND OPERATING AGREEMENT 1.2 Page I l0 EXECWION VERSION (i) In this Agreement, the words "include," "includes" and "including" are to be construed as being at all times followed by the words "without limitation." 0) The words "hereof," "herein" and "hereunder" and words of similar import when used in this Agreement shall, unless otherwise specified, refer to this Agreement as a whole and not to any particular provision of this Agreement. ARTICLB II TERM 2.1 Effectiveness of this Aereement. This Agreement, including the Parties' rights and obligations hereunder, shall become effective, if at all, on the Closing Date (the "Effeglive Date"). For the avoidance of doubt, no aspect of this Agreement, other than this Section 2. l, shall have any effect unless and until the Eflective Date occurs. If the Effective Date does not occur and the JPSA is terminated, this Agreement, including this Section 2.1. shall become void ab initio. 2.2 Term. The term of this Agreement ("Term") shall commence upon the Effective Date and shall continue in full force and effect until terminated in accordance with the provisions hereof. 2.3 Termination. (a) Subject to Section 2.4(a) and Section 2.4(b), this Agreement shall terminate solely with respect to certain Transmission Facilities and Common Equipment (each, "Terminated Transmissi '), and not otherwise with respect to any other Transmission Facilities or Common Equipment or other obligations hereunder, if one or more of the following events occur: (i) The Terminated Transmission Facilities are damaged and destroyed and the Owners decide not to repair or rebuild (or cannot reach agreement to repair or rebuild) them in accordance with Article VII; or (ii) The Terminated Transmission Facilities are retired and decommissioned in accordance with Article VIII. (b) Subject to Section 2.4(c), this entire Agreement shall terminate if one or more of the following events occur: (i) Mutual agreement of the Parties to terminate this Agreement; or (ii) This Agreement is terminated by exercise of remedies pursuant to Section 12.3. 2.4 Effect of Termination. If this Agreement is terminated pursuant to Section 2.3(a) with respect to any Terminated Transmission Facilities, then, except as for those provisions that are expressly intended to survive termination and, subject to Section 2.4(b) and receipt of any necessary Governmental Authorizations required by Governmental Requirements, this Agreement shall terminate and become void and of no further force and effect, without further action by either Party solely with JOINT OWNERSHIP AND OPERATING AGREEMENT Pagel ll EXECUTION VERSION respect to such Terminated Transmission Facilities, provided that neither Party shall be relieved from any of its obligations or liabilities hereunder accruing prior thereto. (a) In the event that this Agreement is terminated pursuant to Section 2.3(a) with respect to any Terminated Transmission Facilities and the Non-Operating Owner continues to own all or a portion of the Ownership Interest(s) in such Terminated Transmission Facilities, then: (i) the Operator shall, upon written notice from the Non-Operating Owner delivered to the Operator no later than fifteen (15) Business Days after termination of this Agreement solely with respect to such Terminated Transmission Facilities pursuant to Section 2.3(a), continue to perform such of its obligations and covenants in Articles VI, !![!, and VIII as are set forth in the notice; (ii) such obligations and covenants, together with Articles XI, XIV, XV, XVI, XVII, and XIX (to the extent applicable to the surviving covenants and obligations), shall continue in full force and effect notwithstanding the termination of this Agreement solely with respect to such Terminated Transmission Facilities pursuant to Section 2.3(a); and (iii) the Parties shall amend this Agreement to reflect such changes to this Agreement as shall be necessary and mutually acceptable to the Parties to conform this Agreement solely as it relates to such Terminated Transmission Facilities to the surviving provisions of this Agreement in accordance with this Section 2.4(.b.). (b) If this Agreement is terminated pursuant to Section 2.3(b), then, except as for those provisions that are expressly intended to survive termination of this Agreement and, subject to receipt of any necessary Governmental Authorizations required by Governmental Requirements, including FERC approval, this Agreement shall terminate and become void and of no further force and effect, without further action by either Party, provided that neither Party shall be relieved from any of its obligations or liabilities hereunder accruing prior thereto. rnlx svil s sroN rrc fi.TTISIEo#rNnnsnrp Nru ns srs 3.1 Ownershiplnterests. (a) Pursuant to the JPSA, as of the Closing Date: (i) the percentage of ownership in a Segment that is owned by ldaho Power is set forth in column A of Exhibit C, and the percentage of ownership in a Segment that is owned by PacifiCorp is set forth in column B of Exhibit C; and (ii) when the Owners each own a percentage of a Segment, each of the Owners own an undivided ownership interest in such Segment as tenants-in-common. (b) The Owners agree that they shall enter into such additional documentation as shall reasonably be required to document the Owners' Ownership Interests in the Transmission Facilities and any change in the Owners' Ownership Interests in the Transmission Facilities as a result of the application of Section 3.3(b), provided that in no event shall an Owner be responsible for paying any amount to the other Owner as a result of any change in any Ownership Interest in the Transmission Facilities, except as expressly provided for in this Agreement or as otherwise agreed to in writing by the Parties. 3.2 CapacityAllocations. (a) Directional Capacity Allocation. The Parties agree that the total directional transmission capacity in megawatts of each Segment and Path is set forth in columns E and H of Exhibit C (the "Total Directiona "), and is allocated to: (i) Idaho Power (A) as expressed in megawatts as set forth in columns C and F of Exhibit C and (B) as expressed as a JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 12 EXECUTION VERSION percentage of the total directional transmission capacity of each Segment and Path as set forth in columns I and K of Exhibit C; and (ii) PacifiCorp (A) as expressed in megawatts as set forth in columns D and G of Exhibit C and (B) as expressed as a percentage of the total directional transmission capacity of each Segment and Path as set forth in columns J and L of Exhibit C. Each of the allocations of directional transmission capacity of each of the Segments and Paths to each of the Owners expressed in megawatts in Sections 3.2(aXiXA) and 3.2(aXiiXA) is herein referredtoasthe..,'andeachoftheallocationsofdirectional transmission capacity of each of the Segments and Paths to each of the Owners in percentages in Sections 3.2(a)(iXB) and 3.2(aXiiXB) is herein referred to as the "Directional Ca@.i!y Allocation Percentage." (b) Scheduling Over Seements which are Not Part of a Path. Each Owner shall have the right to post and sell its Directional Capacity Allocation over each Segment (which is not part of a Path) in accordance with its OATT, and each Owner shall schedule energy or make available for scheduling each Segment (which is not part of a Path) in each direction consistent with its applicable Directional Capacity Allocation Percentage of the Total Directional Capacity of the Segment in each direction and pursuant to Governmental Requirements and Governmental Authorizations; ry4!g1| however, that at no time shallan Owner be entitled to post, sell, schedule or make available for scheduling more than its applicable Directional Capacity Allocation Percentage of the Total Directional Capacity of any Segment (which is not part of a Path) in any direction, unless otherwise mutually agreed to in writing by the Owners. (c) Schedulins Over Segments which are Part of a Path. Each Owner shall have the right to post and sell its Directional Capacity Allocation over a Path in accordance with its OATT, and each Owner shall schedule energy or make available for scheduling a Path in each direction consistent with its applicable Directional Capacity Allocation Percentage of the Total Directional Capacity of the Path in each direction and pursuant to Governmental Requirements and Governmental Authorizations; provided, however, that at no time shall an Owner be entitled to post, sell, schedule or make available for scheduling more than its applicable Directional Capacity Allocation Percentage of the Total Directional Capacity of any Path over one or more of the Segments which are part of the Path in any direction, unless otherwise mutually agreed to in writing by the Owners. 3.3 Adjustment of Capacity Allocations and Ownership Interests. (a) Adjustment ofDirectional Capacity Allocations and Directional Capacity Allocation Percentages. (i) Each of the Owners shall be allocated their Pro Rata Share (based on their applicable Directional Capacity Allocation Percentages) of all temporary changes in the Total Directional Capacity of a Segment or Path. (ii) Permanent changes in the Total Directional Capacity of a Segment or Path occur when the first of the following occurs: (A) when the quantity and, if applicable, direction of change in Total Directional Capacity are agreed to by the Owners; or (B) when WECC or the applicable WECC committee recognizes the quantity and, if applicable, direction of change in Total Directional Capacity. JOINT OWNERSHIP AND OPERATING AGREEMENT Page I 13 EXECWION VERSION (iii) Each of the Owners shall be allocated their Pro Rata Share (based on their applicable Directional Capacity Allocation Percentages) of any permanent decrease or permanent increase (which is not the result of a capital upgrade or which is the result of a capital upgrade that both Owners participated in on a Pro Rata Basis (in accordance with their Ownership Interests)) in the Total Directional Capacity of a Segment or Path calculated pursuant to Section 3.3(a)(ii). In the event of a permanent increase in the Total Directional Capacity of a Segment or Path calculated pursuant to Section 3.3(aXii), then the increase in Total Directional Capacity shall be allocated to the Owners based on their participation in the capital upgrade established pursuant to Section 6.1. (iv) In the event there is a perrnanent increase or decrease in the Total Directional Capacity of a Segment or Path calculated pursuant to Section 3.3(aXii), the Owners shall promptly amend the Agreement to update Exhibit C to reflect revisions in the Total Directional Capacity of the Segment or Path as well as the Directional Capacity Allocations and Directional Capacity Allocation Percentages of the Owners in the Segment or Path calculated pursuant to Sections 3.3(aXii) and 3.3(aXiii). (b) Adjustment of Ownership Interests in Segments. (i) Only permanent changes in the Total Directional Capacity of a Segment pursuant to Section 3.3(aXii) have the ability to affect the Owners' Ownership Interests in a Segment. In the event that there is a perrnanent increase or decrease in the Total Directional Capacity of a Segment in accordance with Section 3.3(a)(ii), then the Ownership Interest for each Owner shall be calculated on the following basis: (A) Add both of the Owner's Directional Capacity Allocations in the Segment (taking into account the Owner's Pro Rata Share of the increase or decrease determined in accordance with Section 3.3(a)); (B) Add both of the Segment's Total Directional Capacities (taking into account the increase or decrease of the Segment's Total Directional Capacities determined in accordance with Section 3.3(a)); and (C) Divide the sum of clause A above by the sum of clause B above to produce the Owner's revised Ownership Interest in the Segment. In the event that there is a perrnanent increase or decrease in the Total Directional Capacity of a Segment in accordance with Section 3.3(aXii), the Owners shall promptly amend the Agreement to update Exhibit C to reflect any revisions in the Ownership Interests of the Owners in any Segment calculated in accordance with this Section 3.3(bXi). In addition, the Owners shall promptly amend the Agreement to update Exhibit C to reflect revisions in any Substation O&M Allocation as a result of changes in the Ownership Interests of the Owners in any Substation Segment calculated in accordance with Section 3.3(b)(.i). (c) Reviews. (i) Subject to Section 3.3(cXiii), the Owners shall meet periodically, but not less than every five (5) years beginning in the year 2020, to review: JOINT OWNERSHIP AND OPERATING AGREEMENT Page I 14 EXECUTION VERSION (A) The Directional Capacity Allocations, the Directional Capacity Allocation Percentages and the Substation O&M Allocations set forth in Exhibit C; (B) The formulas for adjusting Directional Capacity Allocation Percentages and Ownership Interests set forth in this Section 3.3; (C) The definition of Pro Rata Share; (D) The treatment of electric losses set forth in Section 9.5; (E) The formulas describing the charges set forth in Exhibit D; and Any other provisions of this Agreement as either Party may elect. (ii) Subject to Section 3.3(cXiii). the Owners shall meet promptly and attempt to reach a mutually agreeable solution in the event that a Governmental Requirement or Governmental Authorization adversely affects: (A) the ability of an Owner to perform its obligations or exercise its rights under this Agreement; or (B) the treatment of assets of an Owner that are subject to or affected by this Agreement. (iii) In no event shallthis Agreement be amended, supplemented or otherwise modified pursuant to Sections 3.3(cXi) or 3.3(cXii), unless the Parties agree in writing to such amendment, supplement or modification. 3.4 Oualified Owner. Each Owner shall take all actions required to continue to be a Qualified Owner during the Term. If at any time during the Term an Owner ceases to be a Qualified Owner, then such Owner shall immediately provide notice thereof to the other Owner and take all actions required to resume being a Qualified Owner. 3.5 No Right to Use. For the avoidance of doubt, the provisions of this Agreement shall not confer upon either Owner the right to use or transmit energy over any transmission facilities owned by the other Owner (other than with respect to the Transmission Facilities and Paths as provided for herein). 3.6 Payments. All payments required to be made by or on behalf of the Owners under the terms ofthis Agreement, including payments to the Operators of the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, the Monthly Common Equipment Charge and Other Costs, shall be made to the account or accounts designated by the Owner or Operator to which the payment is owed, by wire transfer in immediately available funds in the lawfulcurency of the United States. 3.7 Waiver of Partition Riehts. The Owners acknowledge that any exercise of the remedy of partition (whether at law or in equity) of the jointly-owned Transmission Facilities or any portion thereof would be impracticable in view of the purposes and requirements of this Agreement, would violate the spirit and intent ofthis Agreement, and would defeat the Owners' intentions and reasonable expectations as well as the consideration upon which each Owner entered into this Agreement. Accordingly, each Owner agrees that during the Term it: (a) will (F) JOINT OWNERSHIP AND OPERATING AGREEMENT Page I 15 EXECUTION VERSION not, directly or indirectly, commence, maintain, support or join in any action or proceedings of any kind to partition the jointly-owned Transmission Facilities or any portion thereof; and (b) waives, after consultation with its qualified legal counsel, any and all rights that it may have under this Agreement or Governmental Requirements (whether at law or in equity) or otherwise to commence, maintain, support or join in any such action or proceeding. Each Owner acknowledges that the other Owner has entered into and will perform the terms of this Agreement in reliance upon the other Owner's agreement and adherence to the terms of this Section 3.7, and would not have entered into this Agreement but for such reliance; and that it would be unjust and inequitable for any Owner to violate or to seek relief from any provision of this Section 3.7. 3.8 Nonexclusive License to Enter and Use Real Property. (a) Subject to the terms and conditions of this Agreement, including this Section 3.8: (i) PacifiCorp hereby irrevocably grants to Idaho Power a nonexclusive license (the "ldaho Power License") to use and access the real property to which Idaho Power's Ownership Interests in the Transmission Facilities are affixed (the "PacifiCorp Sites"), but only to the extent of, and subject in all respects to, PacifiCorp's real property interests (including fee, rights-of-way, easements and other real property interests) and other real property rights therein (collectively, the "PacifiCorp Real Pro ") and only to the extent such ldaho Power License is permitted by the PacifiCorp Real Property Rights and Govemmental Requirements; and (ii) Idaho Power hereby irrevocably grants to PacifiCorp a nonexclusivelicense(the..Pagi.fiep@',and,togetherwiththeIdahoPowerLicense,the "Real Propertv Licen ') to use and access the real property to which PacifiCorp's Ownership lnterests in the Transmission Facilities are affixed (the "ldaho Power Sites" and, together with the PacifiCorp Sites, the "Transmission Fao "), but only to the extent of, and subject in all respects to, Idaho Power's real property interests (including fee, rights-of-way, easements and other real property interests) and other real property rights therein (collectively, the "!!g@ Power Real Property Rights" and, together with the PacifiCorp Real Property Rights, the "Real Property Rishts") and only to the extent such PacifiCorp License is permitted by the ldaho Power Real Property Rights and Governmental Requirements. (b) Each Real Property License will be utilized by the grantee Owner and its Representatives forthe use of, and rights ofingress, egress and access to, the applicable Transmission Facilities Sites to permit the Owner and its Representatives to exercise the Owner's rights and obligations as to its Ownership Interests in the Transmission Facilities. (c) The rights of the grantee Owner and its Representatives for use of, ingress, egress and access to the applicable Transmission Facilities Sites shall be governed by this Section 3.8 during the period the Real Property License is in effect, including during any period after this Agreement has been terminated but the surviving provisions identified in Section 10.2 (including Section 3.8) remain in effect. (d) Upon the termination or expiration of this Agreement, each Real Property License may be utilized by the grantee Owner and its Representatives for the right of ingress, JOINT OWNERSHIP AND OPERATING AGREEMENT Page I 16 EXECUTION VERSION egress and access to the Transmission Facilities Sites, for the sole purpose of inspection and as provided for in Section 3.8(fl. (e) In the exercise of its rights under the Real Property License: (i) the grantee Owner and its Representatives shall not interfere with the construction, commissioning, operation and maintenance, capital upgrades and improvements to, repair and reconstruction ol and retirement and decommissioning of the Transmission Facilities (or any other equipment or facilities owned, controlled or operated by the grantor Owner on the Transmission Facilities Site) or any portion thereof by the Operator or pose a safety hazard; (ii) the grantee Owner and its Representatives shall comply with any requirements of the Real Property Rights applicable to the Transmission Facilities Sites as of the Effective Date and any other Real Property Rights arising after the Effective Date with respect to which it receives written notice; (iii) the grantee Owner shall provide reasonable prior written notice to the grantor Owner of its intent to exercise any right or privilege granted by the Real Property License; and (iv) the grantee Owner and its Representatives exercising any right or privilege under the Real Property License shall comply with the grantor Owner's or any other contractor's safety and operational procedures and security rules, ryided that such procedures and rules are in writing and are delivered to the grantee Owner in advance. For the avoidance of doubt, the Owners acknowledge that no representations or warranties are made with respect to the Transmission Facilities Sites and that the Real Property Licenses are expressly subject in all respects to all Real Property Rights applicable to the Transmission Facilities Sites. (f) Each Real Property License includes a nonexclusive right of the grantee Owner for the location of equipment in which such Owner has an Ownership Interest, together with any replacements, capital upgrades or improvements thereto, on the Transmission Facilities Sites, to be utilized by such Owner to locate such equipment on such premises, together with the right to access such equipment over and across the Transmission Facilities Sites, provided that any replacements, capital upgrades or improvements to such equipment shall be made in accordance with the provisions of this Agreement prior to its expiration or termination. (g) Each Real Property License shall terminate, in whole or in part, if and to the extent the grantee Owner no longer requires the Real Property License for the uses described in this Section 3.8, including if and to the extent such Owner no longer has an Ownership Interest in the Transmission Facilities affixed to the respective Transmission Facilities Sites, written notice of which the grantee Owner shall promptly provide to the grantor Owner. (h) If and to the extent the Real Property Licenses are not permitted by any of the Real Property Rights with respect to all or any portion of the Transmission Facilities Sites (the "Excluded Transmission Facilities Sites"), then the Parties shall cooperate in good faith to identifu and use Commercially Reasonable Efforts to implement an altemative to the Real Property Licenses with respect to the Excluded Transmission Facilities Sites in order to attempt to provide each of the Parties with the rights that they would have been provided under the Real Property Licenses with respect to the Transmission Facilities Sites; provided, however, in no event shall an Owner be required to amend, revise or modifu in any respect any of its Real Property Rights pursuant to this Section 3.8(h). JOINT OWNERSHIP AND OPERATING AGREEMENT Page I 17 EXECUTION VERSION 3.9 Access to Antelope Substation for Idaho Power Maintenance of Department of Enersv Facilities. (a) PacifiCorp shall provide Idaho Power access to the Antelope Substation for the purpose of maintaining the Department of Energy equipment that is listed on Exhibit E and located in the Antelope Substation. (b) PacifiCorp shall provide ldaho Power access to the Antelope Substation control building to allow Idaho Power to perform the necessary switching to maintain the Department of Energy equipment, and to allow access to Idaho Power's SCADA, communication, telemetry and metering equipment. Idaho Power shall provide PacifiCorp advance notice of its desire to gain access to the control building. opnnaron o r iffitifislJrox racu.nrn s 4.1 Appointment of Operator. (a) The Owners hereby appoint the Party set forth in column M of Exhibit C as the Operator of each of the Transmission Facilities associated with the Party's name on Exhibit C, and the Party hereby accepts appointment, to serve as the Operator and to perform the other covenants and obligations of the Operator expressly set forth in this Agreement, in accordance with the terms and conditions of this Agreement. (b) Each of the Owners hereby authorizes the Operators to utilize its Common Equipment and wholly-owned Transmission Facilities to support the operation of the Transmission Facilities in accordance with the terms of this Agreement. (c) Notwithstanding anything to the contrary contained in this Agreement or Govemmental Requirements, the Owners agree that the Operators shall have no obligations, responsibilities or duties to the Owners other than as are expressly provided for in this Agreement. 4.2 Authoritv of Operator. (a) Subject to the limitations set forth in Articles IV-VIII, each Operator shall be responsible in all respects for the Transmission Facilities and Common Equipment for which it is the Operator in accordance with the terms and conditions of this Agreement. Without limiting the foregoing, each Operator shall supervise and perform, or cause to be supervised and performed, the physical operation and maintenance of, interconnection to, design of, capital upgrades and improvements to, repair and reconstruction of, security of, outage restoration of, and retirement and decommissioning of, the Transmission Facilities and Common Equipment it is responsible for in accordance with this Article IV and Articles V-VIIL In the performance of its obligations under this Agreement, each Operator shall have authority, subject to the other terms of this Article IV and Articles V-lX, to take any or all of the actions it reasonably determines are necessary to perform its obligations under this Agreement. (b) The Owners and the Operators agree that title to all capital upgrades and improvements to the Segments and Common Equipment constructed by or on behalf of the JOINT OWNERSHIP AND OPERATING AGREEMENT Page I l8 EXECUTION VERSION Operators pursuant to Articles V and VI shall vest with the Owner or Owners of such Segments or Common Equipment in accordance with their respective Ownership Interests in such Segments or Common Equipment, and, in the case ofjointly-owned Segments, shall be jointly owned by the Owners as tenants-in-common in accordance with their respective Ownership Interests in the jointly-owned Segments. (c) Each Operator will exercise or enforce all of the benefits, rights and remedies under the Transmission Facilities Contracts for the benefit of the Owners without adverse distinction between the Owners. In furtherance and not in limitation of the immediately preceding sentence, and except as otherwise provided in Section 9.5 with respect to electric losses, each Operator agrees to transfer, assign, distribute, pay over or otherwise make available to the Non-Operating Owner, the Non-Operating Owner's Pro Rata Share (based on its respective Ownership Interest(s), if any) of any payments or proceeds obtained pursuant to any Transmission Facilities Contract. Notwithstanding anything to the contrary contained in this Agreement, the Owners agree that only the Operators shall be entitled to exercise or enforce the benefits, rights and remedies under the Transmission Facilities Contracts. 4.3 Deleeation of Responsibilities. An Operator may, in its sole and absolute discretion, utilize its employees and supervisory personnel, and any independent technical advisors, consultants, contractors and agents which it may select, as may be required to perform its obligations (each, a "@'). Notwithstanding any such delegation, the Operator shall remain responsible and liable for all of its delegated obligations in accordance with the terms of this Agreement. 4.4 Governmental Authorizations. (a) Each Operator is authorized to prepare and submit to all appropriate Governmental Authorities the necessary reports, applications, plans, specifications and other documents to procure all Govemmental Authorizations required to perform its obligations under this Agreement with respect to the Transmission Facilities and Common Equipment it is responsible for or to comply with Governmental Requirements, ptqv_itded that the Operator shall consult with the Non-Operating Owner prior to the submission of any such reports, application, plans, specification and other documents to the extent to which they relate to any jointly-owned Transmission Facilities. To the extent permitted by Governmental Requirements, each Operator shall use Commercially Reasonable Efforts to obtain and structure all Government Authorizations for which it applies after the Effective Date in such a way as to recognize each Owner's applicable Ownership lnterest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)), if any, as contemplated by this Agreement. Notwithstanding anything to the contrary in this Agreement, except as set forth in Section 5.1(b), nothing in this Section 4.4 shall obligate an Operator to prepare and submit to appropriate Governmental Authorities any reports, applications, plans, specifications and other documents to procure any Governmental Authorizations required by the Owners in connection with their ownership of an Ownership Interest in the Transmission Facilities or the Common Equipment or the recovery of any costs and expenses in connection therewith. (b) To the extent that an Operator cannot obtain a Governmental Authorization pursuant to Section 4.4(a) on behalf of one or both of the Owners, each such Owner shall: (i) be responsible for preparing and submitting to the appropriate Governmental Authority the necessary reports, applications, plans, specifications and other documents to JOINT OWNERSHIP AND OPERATING AGREEMENT Page I 19 EXECUTION VERSION procure such Governmental Authorization; and (ii) exercise all Commercially Reasonable Efforts to obtain such Governmental Authorization. Unless and untilthe Owner or Owners are able to obtain such Governmental Authorizations, the Operator shall not perform or continue to perform any of the obligations requiring such Governmental Authorizations if to do so would result in the Owner or Owners or the Operator being in violation of Govemmental Requirements or Govemmental Authorizations. (c) Each Owner shall, at its own cost: (i) reasonably cooperate and support the Operators in obtaining any Governmental Authorizations required pursuant to Section 4.4(a); and (ii) reasonably respond to inquiries or requests issued to it by any Govemmental Authorities in respect of such Governmental Authorizations; provided, however, that an Owner shall not be obligated pursuant to this Section 4.4(c) to disclose Proprietary Information except to the extent that it is otherwise required to disclose such Proprietary Information: (A) by Governmental Requirements; (B) by any Govemmental Authority; or (C) pursuant to the express terms of this Agreement. 4.5 Audit. Each Non-Operating Owner may, at its cost, at any time during normal business hours and with reasonable prior notice of not less than thirty (30) Business Days, but not more often than once in any twelve (12) month period, inspect and audit the books and records of the Operator and any of its Affiliates and Delegates (and the Operator shall secure such rights for the Non-Operating Owner from its Affiliates and Delegates) involved in the provision of services pursuant to this Agreement ("Other Costs Records"), to the extent reasonably relating to the determination of Monthly Transmission Facilities O&M Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges, and Other Costs for which the Non-Operating Owner is liable under this Agreement as shown on an invoice provided to the Non-Operating Owner pursuant to Section 4.7 within eighteen (18) months prior to the date of the audit notice. Each Operator shall, and shall cause any of its relevant Affiliates and Delegates, to keep and maintain all such Other Costs Records to the extent reasonably relating to the determination of Monthly Transmission Facilities O&M Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges, and Other Costs for which the Non-Operating Owner is liable under this Agreement and make such Other Costs Records available to the Non- Operating Owner in accordance with the terms of this Agreement. If any audit discloses that, during such eighteen (18) month period, an overpayment or underpayment of Monthly Transmission Facilities O&M Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges or Other Costs has been made by the Non-Operating Owner or the amount of any Monthly Transmission Facilities O&M Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges, or Other Costs allocated to the Non-Operating Owner in an invoice is incorrect, then such overpayment, underpayment or incorrect amount shall be resolved pursuant to Section 4.8. The Non-Operating Owner requesting the audit shall reimburse one hundred percent (100%) of all reasonable costs and expenses (including internal costs and expenses) incurred by or on behalf of the Operator and any of its Afliliates and Delegates in complying with the provisions of this Section 4.6, provided that the Non-Operating Owner shall not be required to reimburse any such costs if the audit determines that the Non-Operating Owner has made more than Twenty-Five Thousand Dollars ($25,000) in overpayments of Monthly Transmission Facilities O&M Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges, or Other Costs or more than Twenty-Five Thousand Dollars (S25,000) in Monthly Transmission Facilities O&M Charges, Monthly Substation O&M Charges, Monthly Common Equipment Charges, or Other Costs have been incorrectly allocated to the Owner. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 20 EXECUTION VERSION 4.6 Insurance. (a) Owner Insurance. Each Owner shall be responsible for obtaining and maintaining during the Term insurance covering its respective legal liabilities related to its Ownership Interests in the Transmission Facilities and Common Equipment. Insurance required by this Section 4.6(a) will be placed with appropriate carriers and in amounts in accordance with Good Utility Practice and Govemmental Requirements. (b) Property Insurance. Each Operator, on behalf of the Owners and any other named insureds or loss payees, will, with respect to Substations and equipment therein that is included as part of the jointly-owned Transmission Facilities it is responsible for: (i) determine the appropriate property insurance coverages, minimum amounts, self-insured amounts, deductibles and other insurance policy terms which shall be reasonable and customary for similarly situated utilities; (ii) obtain and maintain such property insurance during the Term; and (iii) be solely responsible for pursuing claims and/or negotiating settlements in respect of claims under such insurance coverages. The Operators shall be compensated for the costs of obtaining and maintaining such insurance (including any premiums, taxes and fees, but excluding deductibles, self-insurance or non-insured costs) through the Monthly Substation O&M Charge. Subject to Article VII, each Owner shall be responsible for its Pro Rata Share (based on its applicable Ownership Interest(s)) of any deductibles, self-insurance and non-insured costs, all of which shall be Other Costs. The Operators shall not be obligated to obtain or maintain any other insurance by or on behalf of the Owners with respect to the Transmission Facilities or Common Equipment for which they are responsible. 4.7 Invoices. (a) Each Non-Operating Owner shall pay the respective Operator the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, and the Monthly Common Equipment Charge calculated in accordance with Exhibit D as compensation for the Operator's services under this Agreement. In addition, each Owner shall be responsible for its Pro Rata Share (based on its applicable Ownership Interest(s)) of costs incurred by or on behalf of the Operators pursuant to the terms of this Agreement, including Sections 4.2(a), 4.4(.a), 4.6" 5.2, 6.1,7.1,7.5,8.2 and 16.3 (collectively, the "Other Costs"). In the event that an Operator incurs, or reasonably expects to incur, significant Other Costs in excess of One Hundred Thousand Dollars ($100,000), the Operator shall immediately notify the Owners in writing of such Other Costs. (b) Within thirty (30) days after the end of the first full calendar month during the Term, and within thirty (30) days after the end of each month thereafter during the Term, each Operator will deliver to the Non-Operating Owner an invoice which will show the total amount and each Owner's Pro Rata Share (based on its Ownership Interests) of the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge and the Monthly Common Equipment Charge determined in accordance with the terms and conditions of this Agreement. For purposes of clarity, the first such invoices will include amounts owed for the first full month and any partial month that precedes it during the Term. Within thirty (30) days after the end of the first calendar quarter first occurring during the Term (i.e., within 30 days of the first March 3 I st, June 30th, September 30th, or December 3l't during the Term), and within thirty (30) days after the end of each calendar quarter thereafter during the Term, each Operator will deliver to the Non-Operating Owner an invoice which will show the total amount and each Owner's Pro Rata Share (based on its Ownership Interests) of Other Costs determined in JOINT OWNERSHIP AND OPERATING AGREEMENT Pagel2l EXECUTION VERSION accordance with the terms and conditions of this Agreement; @.ided, however, that Other Costs associated with capital upgrades and improvements to, or repair and reconstruction of, Transmission Facilities: (a) shall not include AFUDC, provided, that the first Other Costs invoice may include accrued AFUDC on Prior Projects up to the Effective Date; and (b) that are a Substation Segment shall be invoiced using estimated Other Costs, provided that each Operator shall provide a final invoice showing a true-up of estimated Other Costs compared to actual Other Costs after the upgrade, improvement, repair or reconstruction is placed into service;. The Non-Operating Owner shall pay its Pro Rata Share (based on its Ownership Interests) of the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, the Monthly Common Equipment Charge and the Other Costs shown on the invoice no later than thirty (30) days after the date of the invoice. Any payment past due will accrue interest, per annum, calculated in accordance with the methodology specified for interest in the FERC regulations at 18 C.F.R. $ 35.19a(a)(2xiii) (the "FERC Methodolosy"). The failure by an Operator to timely deliver an invoice shall not relieve the Non-Operating Owner of its payment obligation in respect of its share of the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, the Monthly Common Equipment Charge and Other Costs as shown on such invoice, or release the Operating Owner of its responsibility for such invoice. 4.8 Disputed Amounts. If any Non-Operating Owner disputes any portion of any amount specified in an invoice delivered by an Operator pursuant to Section 4.7, the Non- Operating Owner shall pay its total amount of the invoice when due, and, if actually known at the time by the Non-Operating Owner, identify the disputed amount and state that the disputed amount is being paid under protest. Any disputed amount shall be resolved pursuant to the provisions of Article XVII. If it is determined pursuant to Article XVII that an overpayment or underpayment has been made by the Non-Operating Owner or the amount of any Monthly Transmission Facilities O&M Charge, Monthly Substation O&M Charge, Monthly Common Equipment Charge, or Other Costs allocated to the Non-Operating Owner on an invoice is incorrect, then: (i) in the case of any overpayment by the Non-Operating Owner, the Operator shall promptly return the amount of the overpayment (or credit the amount of the overpayment on the next invoice) to the Non-Operating Owner; (ii) in the case of an underpayment by the Non-Operating Owner, the Non-Operating Owner shall promptly pay the amount of the underpayment to the Operator (for the benefit of the Operating Owner), otherwise, the Operator shall charge the Non-Operating Owner for the underpayment on the next invoice; and (iii) in the case of an incorrect allocation of Other Costs to an Owner, the allocations of Other Costs on the next invoice shall be adjusted to correct for such incorrect allocation, in each case, together with interest for the period from the date of overpayment, underpayment or incorrect allocation until such amount has been paid or credited against a future invoice calculated in the manner prescribed for calculating interest on refunds under the FERC Methodology. 4.9 Assistance. Each Non-Operating Owner shall cooperate with the Operator promptly, as and when reasonably requested by the Operator, to assist the Operator in the performance of its duties, responsibilities and obligations under this Agreement, including executing and delivering from time to time such additional documents, certificates or instruments, and taking such additional actions, as may be reasonably requested by the Operator. Each Non-Operating Owner shall bear its own costs for providing such cooperation and assistance as requested by the Operator unless the Owners agree otherwise in writing. JOINT OWNERSHIP AND OPERATING AGREEMENT Page 122 EXECUTION VERSION 4.10 Remedies. (a) Notwithstanding any provision to the contrary contained in this Agreement, the Operators shall have no liability to the respective Non-Operating Owners in connection with the performance of their covenants and obligations under this Agreement, except as provided in this Section 4.10 and Section l4.l(c). The Non-Operating Owners agree that they have a duty to mitigate any damages and shall use Commercially Reasonable Efforts to minimize any damages they may incur as a result of an Operator's failure to perform or breach of any of its covenants or obligations under this Agreement. (b) The Owners and Operators acknowledge that the obligations and covenants performed by the Operators hereunder are unique and that the Non-Operating Owners will be irreparably injured should such obligations and covenants not be performed in accordance with the terms and conditions of this Agreement. Consequently, the Non-Operating Owners will not have an adequate remedy at law if the Operators shall fail to perform their obligations and covenants hereunder. The Non-Operating Owners shall have the right, in addition to any other remedy available under this Agreement, to specific performance of the Operators' obligations and covenants hereunder, and the Owners and Operators agree not to take a position in any proceeding arising out of this Agreement to the effect that the Non-Operating Owners have an adequate remedy at law. ARTICLE V OPERATION AND MAINTENANCE OF TRANSMISSION FACILITIES 5.1 Compliance: Standard of Work. (a) The Operator shall perform its obligations set forth in this Agreement: (i) without adverse distinction between the Owners; and (ii) in accordance with Good Utility Practice, Governmental Requirements, Governmental Authorizations and Reliability Standards. (b) Without limiting the generality of Section 5.1(a), each Operator shall comply with Governmental Requirements and Reliability Standards applicable to an owner and an operator of the Transmission Facilities and Common Equipment for which it is responsible, regardless of whether any such Transmission Facilities and Common Equipment are solely owned by the Operating Owner or jointly owned by the Parties. 5.2 Operation and Maintenance: Outaees and Outase Coordination: Capital Uperades and Improvements. (a) Each Operator shall operate and maintain the Transmission Facilities and Common Equipment for which it is responsible in accordance with Good Utility Practice, Governmental Requirements, Governmental Authorizations and Reliability Standards. (b) Each Operator shall provide written notice of planned outages associated with the Transmission Facilities, Common Equipment and Paths for which it is responsible to the Non-Operating Owner's outage coordinator as soon as outage schedules are known, but no later than the later of the period specified in the Operating Owner's OATT or the Northwest Power Pool Processes document dated N|.ay 2014, as it is amended from time-to-time, regarding outage coordination and shall, subject to Good Utility Practice, Governmental Requirements, Governmental Authorizations and Reliability Standards, accommodate reasonable requests of the JOINT OWNERSHIP AND OPERATING AGREEMENT Page 123 EXECUTION VERSION Non-Operating Owner to change the date or period of the planned outage. Each Operator shall promptly notify the Non-Operating Owner's outage coordinator of any event or circumstance that results in a partial or total reduction of the transmission capacity of a Segment or Path set forth in Exhibit C, and shall use Commercially Reasonable Efforts to diligently: (i) coordinate operations during such event or circumstance; (ii) coordinate the restoration of the transmission capacity of such Segment from such event or circumstance with the Non-Operating Owner; and (iii) perform the actions necessary to restore the transmission capacity of such Segment or Path and otherwise recover from the event or circumstance. Notwithstanding any provision to the contrary contained in this Agreement, the Owners shall be allocated their share of a temporary reduction in the transmission capacity of the Transmission Facilities and the Paths pursuant to Section 3.3(aXi), and shall be allocated their share of a permanent reduction in transmission capacity of the Transmission Facilities and the Paths pursuant to Sections 3.3(aXii) and 3.3(a)(iii). The Operator's outage coordinator shall accommodate reasonable requests of the Non-Operating Owner's outage coordinator, and Non-Operating Owner's outage coordinator shall accommodate reasonable requests of the Operator's outage coordinator, in the event of an actual or potential Energy Emergency to take extraordinary steps to protect reliability. (c) Each Operator shall make maintenance renewals and replacements to the Transmission Facilities and Common Equipment it is responsible for: (i) the costs of which are recordable as an operation and maintenance expense under the FERC Uniform System of Accounts; and (ii) that are necessary for the operation of the Transmission Facilities and Common Equipment in accordance with Good Utility Practice, Governmental Requirements, Governmental Authorizations and Reliability Standards. Such maintenance renewals and replacements to the Transmission Facilities are included in the services for which the Operator is compensated by the Monthly Transmission Facilities O&M Charge. The Operator shall not separately invoice the Owners for the costs of such maintenance renewals and replacements to the Transmission Facilities and Common Equipment. Notwithstanding anything to the contrary contained in this Agreement, any maintenance renewals and replacements made pursuant to this Section 6.1(c) to Transmission Facilities shall be Transmission Facilities for purposes of this Agreement, and any maintenance renewals and replacements made pursuant to this Section 6.1(c) to Common Equipment shall be Common Equipment for purposes of this Agreement. (d) Each Operator shall make capital upgrades and improvements to the Transmission Facilities and Common Equipment it is responsible for: (i) the costs of which are recordable as capital expenditures under the FERC Uniform System of Accounts; and (ii) which are necessary for the operation of the Transmission Facilities and Common Equipment in accordance with Good Utility Practice, Governmental Requirements, Governmental Authorizations and Reliability Standards. The Operator shall consult with the Non-Operating Owner and receive prior approval, such approval not to be unreasonably withheld, delayed or conditioned, with respect to any capital upgrade or improvement for which the Non-Operating Owner shall have financial responsibility under this Agreement and which Operator reasonably expects to incur total project costs that exceed Five Hundred Thousand Dollars (5500,000). The Owners shall be responsible for their Pro Rata Share (based on their respective Ownership Interests, if any, in the Transmission Facilities and Common Equipment being upgraded or improved) of any Costs incurred by or on behalf of the Operator in making such capital upgrades or improvements. Such capital upgrades and improvements to the Transmission Facilities and Common Equipment are included in the services for which the Operator is compensated by the Other Costs charge. Notwithstanding anything to the contrary contained in this Agreement, any JOINT OWNERSHIP AND OPERATING AGREEMENT Page 124 EXECUTION VERSION capital upgrades and improvements made pursuant to this Section 6.1(d) to the Transmission Facilities shall be considered Transmission Facilities for purposes of this Agreement, and any capital upgrades and improvements made pursuant to this Section 6.1(d) to Common Equipment shall be considered Common Equipment for purposes of this Agreement. (e) Each Operator shall assume responsibility for completion of "ldaho Power Extraordinary Items," "PacifiCorp Extraordinary ltems," "ldaho Power Planned Improvements," "PacifiCorp Planned Improvements" and completion of a "Casualty Loss" as each is defined in the JPSA (collectively, the "PdolPrqi_gg!S"), underway on the Effective Date on Segments for which it is responsible in accordance with the terms and conditions of this Agreement, and such capital upgrades, improvements, repairs or reconstruction shall not be subject to approval of the Non-Operating Owner. Such Prior Projects are included in the services for which the Operator is compensated by the Other Costs charge. The Owners shall be responsible for their Pro Rata Share (based on their respective Ownership Interests in the Segment being upgraded, improved, repaired or reconstructed) of any Costs incurred by or on behalf of: (i) the Prior Project's Owner prior to the Effective Date; and (ii) the Operator commencing on the Effective Date through the completion of such capital upgrades, improvements, repairs or reconstruction. Notwithstanding anything to the contrary contained in this Agreement, any capital upgrades and improvements made pursuant to this Section 6.1(e) to the Transmission Facilities shall be considered Transmission Facilities for purposes of this Agreement. Insurance proceeds received by a Party related to the Prior Projects, shall be forwarded to the Operator, less an amount equal to that expended by the Party on the Prior Projects up to the Effective Date and not reflected in Net Book Value on the Effective Date. The Operator shall apply such proceeds (up to each Owner's Pro Rata Share (based on its respective Ownership Interest(s) in the Segment being upgraded, improved, repaired or reconstructed)) to the completion of the Prior Projects, and return to the Owners their Pro Rata Share (based on their respective Ownership Interest(s) in the Segment being upgraded, improved, repaired or reconstructed) ofany excess insurance proceeds. 5.3 Requests for Generation or Transmission Interconnection Service. The Owners acknowledge and agree that all requests for interconnection to any of the jointly-owned Transmission Facilities must be coordinated with the Operator responsible for such Transmission Facilities and processed in a manner consistent with the Owner's OATT pursuant to which the request was made ("Interconnection Owner") and any Governmental Requirements. An Interconnection Owner in receipt of a request for interconnection with any jointly-owned Transmission Facilities will promptly notify the responsible Operator and the other Owner, and thereafter the Owners and the Operator will coordinate and cooperate to process the interconnection request. The Operator will coordinate and conduct any studies required to determine the impact of the interconnection request on the jointly-owned Transmission Facilities and other affected systems, including the Owners' Transmission Systems, in accordance with the Interconnection Owner's OATT and any Governmental Requirements. The Operator will notifu the Owners and such affected systems of all meetings held with the entity requesting an interconnection. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 25 EXECUTION VERSION ,*onrrrr. ro* ro" r"rrrr, .o*lll",1J.l1,r r r*o *o r, u" on o*n" * 6.1 Capital Uperades. (a) At any time during the Term, an Owner ("Electing Owner") may elect to make a capital upgrade or improvement to the Transmission Facilities, provided that in no event shall an Electing Owner be entitled to make a capital upgrade or improvement to any Transmission Facilities that reasonably would be expected to have a material adverse effect on the other Owner's ownership, use or enjoyment of its Ownership Interest(s) in such Transmission Facilities (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) as contemplated in this Agreement. An Electing Owner shall provide the other Owner no less than sixty (60) days' prior written notice of its election, together with reasonable details about the proposed upgrade or improvement to the Transmission Facilities (each, a "Caoital Upgrade Notice"). Within sixty (60) days of receipt of the Capital Upgrade Notice, the other Owner may notify the Electing Owner in writing that it elects to participate in the capital upgrade or improvement to the Transmission Facilities. (i) If the other Owner delivers notice to the Electing Owner within the sixty (60) day period that it elects to participate in the capital upgrade or improvement to the Transmission Facilities, then the Owners shall meet and agree on: (A) the final scope of the capital upgrade or improvement; (B) the allocation of increased transmission capacity, if any, associated with such capital upgrade and improvement between the Owners, including any change in the Owners' Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s) which shall be determined in accordance with Section 3.3; (C) any change in each Owner's Ownership Interest with respect to such Transmission Facilities and any applicable Substation O&M Allocation which shall be determined in accordance with Section 3.3; (D) each Owner's share of the costs of such upgrade or improvement (which shall be based on the Owners' respective Ownership Interests in the Transmission Facilities); (E) any change in the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, or the Monthly Common Equipment Charge, if any; and (F) such other matters as the Owners may agree upon, all of which shall be memorialized in an amendment to this Agreement executed by the Owners, including any amendments to the Exhibits hereto which shall be effective as set forth in Section 6.1(b) (the "Agendruenl"); provided, however, that any failure of the Owners to agree on any of the matters specified in subparts (A) through (F) above shall be resolved pursuant to the provisions of Article XVII. Notwithstanding any provisions to the contrary in this Agreement, an Owner shall not be prohibited from making a capital upgrade or improvement to the Transmission Facilities pursuant to this Section 6.1(a) because the Owners fail to agree on any of the matters specified in subparts (A) through (F) of the immediately preceding sentence, and any such disagreement shall be resolved pursuant to Article XVIL (ii) If the other Owner elects not to participate in the capital upgrade or improvement to the Transmission Facilities (or fails to deliver a notice to the Electing Owner within the sixty (60) day period), then the Electing Owner may proceed with the capital upgrade or improvement, prov.ided that the Electing Owner shall coordinate with the Operator responsible for the applicable Transmission Facilities on the final scope of the capital upgrade or improvement. JOINT OWNERSHIP AND OPERATING AGREEMENT Page 126 EXECWION VERSION (b) The applicable Operator shall design, permit, construct, install and commission any upgrades or improvements to the Transmission Facilities provided for in Section 6.1(aXi) in accordance with the Amendment or, if applicable, any resolution pursuant to Article XVII, and otherwise in accordance with Good Utility Practice, Governmental Requirements and Governmental Authorizations. The Owners shall be responsible, based on the Amendment or, if applicable, any resolution pursuant to Article XVII, for all of the Costs incurred by or on behalf of the Operator in connection with such capital upgrade or improvement to the Transmission Facilities. Effective as of the date of successful commissioning of such capital upgrade or improvement, written notice of which the Operator shall provide to the Owners, the Owners' Ownership Interests, Directional Capacity Allocation Percentages and Directional Capacity Allocations in respect of such Transmission Facilities any applicable Substation O&M Allocation shall be adjusted, if at all, in accordance with the Amendment or, if applicable, any resolution pursuant to Article XVII, and the Owners shall memorialize any revised Ownership Interests, Directional Capacity Allocation Percentages, Directional Capacity Allocations and applicable Substation O&M Allocation in a revised Exhibit C which shall be effective as ofthe date of successfulcommissioning of such upgrade or improvement. Notwithstanding anything to the contrary contained in this Agreement, any capital upgrades or improvements provided for in this Section 6.1(b) shall be Transmission Facilities for purposes of this Agreement. (c) The applicable Operator shall design, permit, construct, install and commission any upgrades or improvements to the Transmission Facilities provided for in Section 6.1(a)(ii) in accordance with the final scope of the capital upgrade or improvement established by the Electing Owner pursuant to Section 6.1(aXii), and otherwise in accordance with Good Utility Practice, Governmental Requirements and Governmental Authorizations. The Electing Owner shall be responsible for all of the Costs incurred by or on behalf of the Operator in connection with such capital upgrade or improvement to the Transmission Facilities and title to such capital upgrades or improvement shall vest solely with the Electing Owner. Effective as of the date of successful commissioning of such capital upgrade or improvement, written notice of which the Operator shall provide to the Owners: (i) the Owners' Ownership Interests, Directional Capacity Allocation Percentages and Directional Capacity Allocations in respect of such Transmission Facilities and any applicable Substation O&M Allocation shall be adjusted, if at all, in accordance with Section 3.3; and (ii) the Operator shall operate and maintain such capitalupgrade or improvement in accordance with Section 6.1(a). In addition, the Owners shall meet and agree on: (A) the allocation of increased transmission capacity, if any, associated with such capital upgrade and improvement between the Owners, including any change in the Owners' Directional Capacity Allocation Percentages and Directional Capacity Allocations which shall be determined in accordance with Section 3.3; (B) any change in the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge, or the Monthly Common Equipment Charge, if any; and (C) such other matters as the Owners may agree upon, all of which shall be memorialized in an amendment to this Agreement executed by the Owners, including any amendments to the Exhibits hereto which shall be effective as of the date of successful commissioning of such upgrade or improvement; provided, however, that any failure of the Owners to agree on any of the matters specified in subparts (A) through (C) above shall be resolved pursuant to the provisions of Article XVII. Notwithstanding anything to the contrary contained in this Agreement, any capital upgrades or improvements provided for in this Section 6.1(c) shall be Transmission Facilities for purposes of this Agreement. JOINT OWNERSHIP AND OPERATINC AGREEMENT Pagel2T EXECUTION VERSION (d) Notwithstanding anything to the contrary contained herein, the provisions of this Section 6.1 shall not apply to capital upgrades or improvements made by an Operator pursuant to Section 6.1(c) which are necessary for the operation of the Transmission Facilities in accordance with Good Utility Practice or required by Govemmental Requirements or GovemmentalAuthorizations, which shall be governed by the provisions of Section 5.1(.d). (e) Each Owner shall provide the applicable Operator prompt written notice of any request pursuant to its OATT from a customer to provide additional transmission capacity that will require one or more capital upgrades or improvements to any of the Transmission Facilities. If capital upgrades or improvements are required in accordance with such Owner's OATT, then such capital upgrades and improvements shall be made by the Operator in accordance with the provisions of Section 6.1(a) and Section 6.1(b). 6.2 McNary Transmission Project. Within thirty (30) days after the earlier of the date on which: (a) Idaho Power notifies PacifiCorp in writing that it desires to proceed with negotiations regarding the development, construction, operation and joint ownership of a new transmission line from McNary-Walulla-Walla Walla with capacity to be determined based on future studies and needs (the "McNary Transmission Project"); or (b) PacifiCorp notifies Idaho Power that it plans to proceed with all or a part of the McNary Transmission Project, the Parties will meet and negotiate in good faith to reach agreement on the definitive terms and conditions of construction, ownership and operation agreements for the McNary Transmission Project (the "McNary Transmission Project Agreements") pursuant to which the Parties will develop, design, engineer, procure, construct, test, commission, operate and jointly own the McNary Transmission Project. Any such negotiations shall automatically terminate if the Parties fail to reach agreement on the definitive terms and conditions of the McNary Transmission Project Agreements within ninety (90) days of receipt of the earlier of the notice in Section 6.2(a) and Section 6.2(b) (the "Negotiations End Date"). The Parties will attempt, to the greatest extent possible, to base the Parties' rights, duties, obligations, liabilities and remedies under the McNary Transmission Project Agreements on the Parties' rights, duties, obligations, liabilities and remedies under this Agreement; provided that the Parties agree that PacifiCorp shall be the operator of and responsible for the design, engineering, procurement, construction, testing and commissioning of the McNary Transmission Project under any McNary Transmission Project Agreements and that the terms and conditions associated with PacifiCorp's responsibilities as operator shall be definitively negotiated as part of any McNary Transmission Project Agreements. If the Parties fail to reach agreement by the Negotiations End Date on the definitive terms and conditions of the McNary Transmission Project Agreements pursuant to this Section 6.2,then PacifiCorp may proceed or not proceed with the McNary Transmission Project and Idaho Power will have no further right to participate with PacifiCorp in the development, construction, operation and joint ownership of the McNary Transmission Project. ARTICLE VII PHYSICAL DAMAGE TO TRANSMISSION FACILITIES: CONDEMNATION 7.1 RebuildingDamaeedFacilities. (a) If any of the Transmission Facilities or Common Equipment are materially damaged or destroyed (the "Darnagd_EAqiUlieS"), then within thirty (30) days of the date the damage or destruction occurred, the Operator responsible for such Transmission Facilities and Common Equipment shall deliver to the Owners a written notice (the "Damage Notice") of the Operator's good faith reasonable estimate of the cost to repair or rebuild the Damaged Facilities. JOINT OWNERSHIP AND OPERATING AGREEMENT Page 128 EXECUTION VERSION (i) If the Damaged Facilities consist of Transmission Facilities that are jointly owned by the Owners and the Damage Notice indicates that the total project cost to repair or rebuild the Damaged Facilities is estimated to be Five Million Dollars ($5,000,000) or more, inclusive of insurance proceeds, then the Owners will determine whether the Damaged Facilities will be repaired or rebuilt within thirty (30) days of the date of the Damage Notice. (ii) If the Damaged Facilities consist of Transmission Facilities that are jointly owned and the Damage Notice indicates that the total project cost to repair or rebuild the Damaged Facilities is estimated to be less than Five Million Dollars ($5,000,000), inclusive of insurance proceeds, then, the Operator will determine in accordance with Good Utility Practice whether the Damaged Facilities will be repaired or rebuilt and provide notice thereof to the Owners within thirty (30) days of the date of the Damage Notice. (iiD If the Damaged Facilities consist of an Owner's wholly-owned Transmission Facilities or Common Equipment, then, the Owner will determine in accordance with Good Utility Practice whether the Damaged Facilities will be repaired or rebuilt and provide notice thereof to the Operator within thirty (30) days of the date of the Damage Notice. (b) If the Owners, the Operator, or the Owner determines pursuant to Sections 7.1(aXi), 7.1(aXii), or 7.1 (aXiii). respectively, to repair or rebuild the Damaged Facilities, then the Owners will, upon receipt of any insurance proceeds paid in connection with such Damaged Facilities, apply such proceeds (up to each Owner's Pro Rata Share (based on its respective Ownership Interest(s), if any, in the Damaged Facilities) in the amount to be paid) to the repair and reconstruction of the Damaged Facilities which will be carried out by the Operator. The Operator will be responsible for obtaining any necessary Governmental Authorizations to repair or rebuild the Damaged Facilities and determining the manner in which to repair and reconstruct the Damaged Facilities (including the equipment to be used). Each Owner shall reasonably cooperate with and support the Operator in obtaining any such Governmental Authorizations in accordance with Section 4.4(c). The Operator will cause such repairs or reconstruction to be made so that the Damaged Facilities will be repaired and restored to substantially the same general condition, character and use as existed prior to such damage or destruction. Ifthe cost ofsuch repairs or reconstruction exceeds the insurance proceeds required to be applied to the repair or reconstruction pursuant to this Section 7.1, then the Owners shall pay, in accordance with their applicable Ownership Interests, if any, the shortfall amount. 7.2 Decision not to Rebuild. If the Owners, the Operator, or the Owner determines pursuant to Sections 7.1(aXi), 7.1(aXii), or 7.1(.aXiii), respectively, not to repair or rebuild the Damaged Facilities (or cannot reach agreement to repair or rebuild the Damaged Facilities), then, in each case: (a) each Owner shall: (i) be entitled to retain any insurance proceeds received pursuant to insurance maintained by it with respect to the Damaged Facilities; (ii) receive its Pro Rata Share (based on its respective Ownership Interest(s), if any, in the Damaged Facilities) of any revenues from the salvage or sale of the Damaged Facilities; and (iii) pay its Pro Rata Share (based on its respective Ownership Interest(s), if any, in the Damaged Facilities) of any costs of removal of parts and equipment from the Damaged Facilities; (b) the Operator shall pay to the Owners their Pro Rata Share (based on their respective Ownership Interest(s), if any, in the Damaged Facilities) of any insurance proceeds received from any property insurance obtained by the Operator pursuant to Section 4.6(b); and (c) subject to Section 7.3, this Agreement shall terminate pursuant to Section 2.3(a) solely with respect to such Damaged Facilities. JOINT OWNERSHIP AND OPERATING AGREEMENT Page 129 EXECUTION VERSION 7.3 Purchase of Ownership Interest. If the Owners, the Operator, or the Owner determines pursuant to Sections 7.1(aXi), 7.1(aXii), or 7.1(aXiii), respectively, not to repair or rebuild the Damaged Facilities (or cannot reach agreement to repair or rebuild the Damaged Facilities) and, in each case, one Owner desires to repair or rebuild the Damaged Facilities (the "ep$irui!.g_@"), then the Continuing Owner shall have the option to purchase allof the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) of the other Owner in the Damaged Facilities. In order to exercise its option to purchase all of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) of the other Owner in the Damaged Facilities, the Continuing Owner must give written notice thereof to the other Owner within thirty (30) days of the Owners' or Operator's determination pursuant to Section 7.1 not to repair or rebuild the Damaged Facilities. The Owners shall enter into such documentation as the Continuing Owner shall reasonably request to document the purchase and sale of all of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) of the other Owner in the Damaged Facilities, provided that the purchase price of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) of the other Owner shall be equal to the other Owner's Pro Rata Share (based on its respective Ownership Interest(s) in the Damaged Facilities) of the salvage value of the Damaged Facilities. 7.4 Cooperation. If the Continuing Owner seeks to repair or rebuild the Damaged Facilities purchased from the other Owner pursuant to Section 7.3, then, at the Continuing Owner's request and expense, the other Owner and the responsible Operator (if the Continuing Owner is not the responsible Operator) will, for a reasonable period of time, cooperate with and use Commercially Reasonable Efforts to assist the Continuing Owner in the repair or rebuilding of the Damaged Facilities. This Section 7.4 shall survive the expiration or termination of this Agreement pursuant to Section 2.3(a) solely with respect to such Damaged Facilities. 7.5 Condemnation. If there occurs a loss of title to, or ownership of, or use and possession of, all or any portion of any of the Transmission Facilities or Common Equipment as the result of the exercise of the right of condemnation or eminent domain by or on behalf of any Governmental Authority, then the Operator responsible for such Transmission Facilities or Common Equipment will promptly give notice thereof to the Owners, which notice shall generally describe the nature and extent of such condemnation or eminent domain proceedings (including any negotiations in connection with such proceedings). The Operator shall, in consultation with the Owners, use Commercially Reasonable Efforts to resist the loss of title to, or ownership of, or use and possession of, all or any portion of any of the Transmission Facilities or Common Equipment through condemnation or eminent domain. If, as a result of condemnation or eminent domain, the Owners shall lose title to, or ownership of, or use and possession of, all or any portion of any of the Transmission Facilities or Common Equipment, the Owners shall determine, by mutual agreement, whether: (a) the relevant portion of the Transmission Facilities or Common Equipment is no longer useful for the transmission of electric power and should be retired and decommissioned, in which case the provisions of Article VIII shall control; (b) the relevant portion of the Transmission Facilities or Common Equipment should be replaced or modified, in which case the Owners will, upon receipt of any awards paid in connection with such condemnation or eminent domain, apply such awards to the replacement or modification of the Transmission Facilities or Common Equipment which will be carried out JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 30 EXECUTION VERSION by the Operator responsible for such Transmission Facilities or Common Equipment. The Operator will, consistent with the mutual agreement of the Owners, determine the manner in which to replace or modiff the Transmission Facilities or Common Equipment, and will cause such replacement and modifications to be made so that the Transmission Facilities or Common Equipment are replaced or modified in accordance with the mutual agreement of the Owners. If the cost of replacement or modification of the Transmission Facilities or Common Equipment exceeds the awards received by the Owners in connection with such condemnation or eminent domain, then the Owners shall pay their Pro Rata Share (based on their respective Ownership Interest(s), if any, in the Transmission Facilities or Common Equipment) of the shortfall amount; or (c) if the Owners do not reach mutual agreement on one of the actions provided for in Section 7.5(a) and Section 7.5(b), or on another course of action, within sixty (60) days after the date of the notice provided by the Operator to the Owners pursuant to the first sentence of this Section 7.5, then each Owner shall receive its Pro Rata Share (based on its respective Ownership Interest(s), if any, in the Transmission Facilities or Common Equipment) of all awards received by the Owners (or their Affiliates) in connection with any such condemnation or eminent domain (less the actual cost, fees and expenses incurred by the Operator in collection thereof). ARTICLE VIII RETIREMENT AND DECOMMISSIONING OF TRANSMISSION FACILITIES 8.1 Decision to Retire Transmission Facilities. The Owners will determine in accordance with the terms of this Article VIII when any of the Transmission Facilities or Common Equipment are no longer useful for the transmission of electric power and should be retired and decommissioned. If the Owners mutually agree to retire and decommission any of the Transmission Facilities or Common Equipment ("Retired Transmission Facilities"), then, subject to Section 8.2 and Section 8.3, this Agreement shall terminate pursuant to Section 2.3(a) solely with respect to such Retired Transmission Facilities. 8.2 Costs of Decommissionine. Each of the Owners shall be responsible for paying its Pro Rata Share (based on its respective Ownership Interest(s), if any, in the Retired Transmission Facilities) of the aggregate amount of all costs incurred by or on behalf of the Operator responsible for the Retired Transmission Facilities to retire permanently the Retired Transmission Facilities from service, including decommissioning, dismantling, demolishing and removal of equipment, facilities and structures, security, maintenance, disposing of debris, abandonment and all other costs incurred by or on behalf of the Operator to retire permanently the Retired Transmission Facilities from service, net of any amounts recovered in connection with the sale of any retired equipment, facilities and structures. 8.3 Purchase of Ownership Interest. Each Owner shall give written notice to the other Owner when it believes any of the Transmission Facilities or Common Equipment should be Retired Transmission Facilities (each, a "Decommissioning "). If the other Owner desires to continue the operation of such Retired Transmission Facilities (the "Remaining_Q\ mq"), then the Remaining Owner shall have the option to purchase all of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)), if any, of the other Owner in such Retired Transmission Facilities. In order to exercise its option to purchase all of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) of the other Owner in JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 3l EXECUTION VERSION such Retired Transmission Facilities, the Remaining Owner must give written notice thereof to the other Owner within ninety (90) days of receipt of the other Owner's Decommissioning Notice. The Owners shall enter into such documentation as the Remaining Owner shall reasonably request to document the purchase and sale of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)), if any, of the other Owner in such Retired Transmission Facilities, provided that the purchase price of the Ownership Interest(s) (and associated Directional Capacity Allocation Percentage(s) and Directional Capacity Allocation(s)) of the other Owner shall be equal to the other Owner's Pro Rata Share (based on its respective Ownership Interest(s), if any, in the Retired Transmission Facilities) of the depreciated cost of the Retired Transmission Facilities. 8.4 Cooperation. If the Remaining Owner seeks to purchase and continue the operation of the Retired Transmission Facilities, then, at the Remaining Owner's request and expense, the other Owner and the responsible Operator (if the Remaining Owner is not the responsible Operator) will, for a reasonable period of time, cooperate with and use Commercially Reasonable Efforts to assist the Remaining Owner in the continued operation of the Retired Transmission Facilities. This Section 8.4 shall survive the expiration or termination of this Agreement pursuant to Section 2.3. r uN s rvrr s s r S$Sif LIBB rlL ouxomru s 9.1 Points of Interconnection: Points of Balancins Authority Area Adjacency. (a) Each Owner's Transmission System, which includes the Owner's Ownership Interests in the Transmission Facilities, shall be considered interconnected at the Points of Interconnection, and the location and associated meter for each Point of Interconnection, and any other information required by Govemmental Requirements to be agreed to by the Parties, shall have been mutually agreed to by the Parties in writing and included in operating procedures of the Parties on or before the Effective Date, which the Parties shall review and update annually as necessary. (b) Each Owner's Balancing Authority Area shall be considered Adjacent Balancing Authority Areas at the Points of Balancing Authority Area Adjacency, and the location and associated meter for each Point of Balancing Authority Area Adjacency, and any other information required by Governmental Requirements to be agreed to by the Parties, shall have been mutually agreed to by the Parties in writing and included in operating procedures of the Parties on or before the Effective Date, which the Parties shall review and update annually as necessary. 9.2 E-Tass. Each Party shall cause the Operator of a Path to be included on all e-Tags as a scheduling entity. 9.3 D),namic Transfer Capability Riehts. (a) Notwithstanding any provision of this Agreement to the contrary, Idaho Power authorizes PacifiCorp to utilize up to 400 MW of Dynamic Transfer Capability over the Idaho Power Transmission System in an east to west direction; provided, however, no schedule shall exceed the scheduling capability of any point of receipt and point of delivery combination. JOINT OWNERSHIP AND OPERATING AGREEMENT Page 132 EXECUTION VERSION (b) Idaho Power's grant of, and PacifiCorp's utilization of, Dynamic Transfer Capability scheduling rights pursuant to this Section 9.3 are subject to Good Utility Practice and Governmental Requi rements. (c) The Dynamic Transfer Capability rights provided for in this Section 9.3 does not include the Jim Bridger pseudo-tied generation provided for in Section 9.4 and recognizes that Jim Bridger Project generation does not utilize Automatic Generation Control. If the Parties desire to utilize Automatic Generation Control for Jim Bridger Project generation in the future, it will be designed to have no impact to the Dynamic Transfer Capability or any such impact will be mutually agreed to by the Parties. 9.4 Jim Brideer Pseudo Tie. (a) Idaho Power authorizes PacifiCorp to transfer its share of the electrical output of the Jim Bridger Project from the Jim Bridger Project bus bar meter into its PACW Balancing Authority Area utilizing a pseudo-tie. (b) Idaho Power's grant of, and PacifiCorp's utilization of, the pseudo-tie are subject to Good Utility Practice and Govemmental Requirements. In addition, the pseudo-tie rights provided for in this Section 9.4 may not be sold or transferred by PacifiCorp to anyone without Idaho Power's prior written consent. (c) To calculate the PacifiCorp pseudo tie, PacifiCorp shall subtract Jim Bridger Transmission Losses from PacifiCorp's share of the Jim Bridger Project Net Generation. 9.5 Electric Losses. Each Party agrees that when it is the operator of the Balancing Authority Area containing a Segment for which the other Owner is the transmission provider for the Segment, that it will: (a) provide electric energy for transmission losses as needed to keep transmission service schedules whole within its Balancing Authority Area, consistent with Governmental Requirements and Reliability Standards; and (b) provide compensation for electric losses in accordance with Exhibit G "Joint Ownership Transmission Loss Calculation and Allocation Methodology." 9.6 Jim Brideer Project Generation RAS. The Parties agree that the Jim Bridger Project shall be tripped to implement the Jim Bridger Project Generation RAS schemes according to protocols that shall have been mutually agreed to by the Parties and included in operating procedures of the Parties on or before the Effective Date, which operating procedures the Parties shall review and update annually as necessary. ARTICLE X TRANSMISSION SYSTEMS OPERATION AND MAINTENANCE l0.l ServiceConditions. (a) Operation and Maintenance. Each Owner shall operate and maintain its Transmission System in a manner consistent with Good Utility Practice, Governmental Requirements, GovernmentalAuthorizations and Reliability Standards; provided, however, that nothing in this Section l0.l(a) shall modify or amend such Party's responsibility as an Operator under this Agreement. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 33 EXECUTION VERSION (b) Additional Services. This Article X is applicable only to the physical interconnection of the Owners' Transmission Systems at the Points of Interconnection and does not obligate either Owner to receive or provide any service. Other services provided by one Owner to the other Owner shall be governed by such other agreements as the Owners may enter into from time to time. (c) Interruption of Service. The Owners shall use Commercially Reasonable Efforts, consistent with Good Utility Practice, Reliability Standards and Governmental Requirements, to provide a physical interconnection to be operated in continuous synchronization at the Points of Interconnection, provided that an Owner ("lnterruptins Owner") may temporarily intem"rpt or isolate the interconnected facilities under the following circumstances: (i) by operation of automatic equipment installed for power system protection; (ii) after consultation with the other Owner, other than in an emergency situation where consultation is not practicable, when an Owner deems it necessary for installation, maintenance, inspection, repairs or replacements of equipment on its Transmission System; (iii) at any time that, in the sole judgment of the Interrupting Owneq such action is necessary to preserve the integrity of, or to prevent or limit any instability on its Transmission System; (iv) where necessary to comply with documented directives from a Governmental Authority; (v) as a result of one or more events of Force Majeure; or (vi) where necessary to prevent: (A) death or serious injury to any person; (B) material damage or harm to any property; or (C) any material adverse effect to the security of, or damage to its Transmission System or the electric systems of others to which its Transmission System is directly connected, including the other Owner's Transmission System. An Intemrpting Owner shall use Commercially Reasonable Efforts to provide the other Owner (l) with reasonable advance notice of any planned interruption of the interconnection facilities in accordance with the notice requirements set forth in Section 5.2(b), and (2) with notice of any other intem.rption of the interconnected facilities as soon as practicable after the interruption. If synchronous operation is intemrpted, the Owners shall cooperate so as to remove the cause of such intemrption as soon as commercially practicable consistent with Good Utility Practice, Reliabil ity Standards and Governmental Requirements. (d) Physical and Cyber Securitv. The Operators shall cooperate with the Owners in complying with any physical and cyber security or other security requirement established by Governmental Requirements or Reliability Standards applicable to the Owners and the Transmission Facilities and the Common Equipment, written notice of which the Owners shall provide to the Operators. 10.2 Survival. The provisions of this Article X, together with other provisions of this Agreement (but only to the extent applicable to the surviving provisions of this Article X), shall continue in full force and effect notwithstanding the termination of this Agreement, prov4lgg! that in the event of termination of this Agreement, the Parties shall amend this Agreement to reflect such changes to this Agreement as shall be necessary and mutually acceptable to the Parties to conform this Agreement to the surviving provisions of this Agreement in accordance with this Section 10.2. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 34 EXECUTION VERSION ARTICLE XI FORCE MAJEURE 1 I .l Force Maieure Defined. For purposes of this Agreement, "Force Majeure" means an event or circumstance beyond the reasonable control of and without the fault or negligence of the Party claiming Force Majeure ("Affe4gd_Pa(y"), which, despite the exercise of reasonable diligence, cannot be or be caused to be prevented, avoided or removed by such Affected Party including, to the extent satisfuing the above requirements, acts of God; earthquake; abnormal weather condition; hurricane; flood; lightning; high winds; drought; peril of the sea; explosion; fire; war (declared or undeclared); military action; sabotage; riot; insurrection; civil unrest or disturbance; acts of terrorism; economic sanction or embargo; civil strike, work stoppage, slow- down, or lock-out that are of an industry or sector-wide nature and that are not directed solely or specifically at the Affected Party; the binding order of any Governmental Authority, provided that the Affected Party has in good faith reasonably contested such order; the failure to act on the part of any Governmental Authority, provided that such action has been timely requested and diligently pursued; unavailability of equipment, supplies or products, but only to the extent caused by Force Majeure; failure of equipment, provided that the equipment has been operated and maintained in accordance with Good Utility Practice; and transportation delays or accidents, but only to the extent otherwise caused by Force Majeure; provided, however, that neither insufficiency of funds, financial inability to perform nor changes in market conditions shall constitute Force Maj eure. ll.2 Effect of Force Majeure. (a) If an Affected Party is rendered wholly or partly unable to perform its obligations under this Agreement or its performance is delayed because of Force Majeure, such Affected Party shall be excused from, and shall not be liable for, whatever performance it is unable to perform or delayed in performing due to the Force Majeure to the extent so affected, provided that: (i) The Affected Party, as soon as reasonably practical after the commencement of the Force Majeure, gives the other Party prompt written notice thereof including a desuiption of the particulars of the Force Majeure; (ii) The suspension of perfonnance is of no greater scope and of no longer duration than is required by the Force Majeure; and (iii) The Affected Party uses Commercially Reasonable Efforts to overcome and remedy its inability to perform as soon as reasonably practical after the commencement of the Force Majeure. (b) Notwithstanding anything in this Article XI to the contrary, no payment obligation arising under this Agreement prior to the date of an event of Force Majeure shall be excused by such event of Force Majeure. (c) Whenever an Affected Party is required to commence or complete any action within a specified period and is prevented or delayed by Force Majeure from commencing or completing such action within the specified period, such period shall be extended by an JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 35 EXECUTION VERSION amount equal to the duration of such event of Force Majeure occurring or continuing during such period. ARTICLE XII EVENTS OF DEFAULT l2.l Event of Default. Each of the following events shall constitute an event of default ("EveULpIDefaUIl") by the defaulting Party (a "Defaulting Party"): (a) The failure to make, when due, any payment required pursuant to this Agreement, if such failure is not remedied within thirty (30) days after written notice thereof from the Non-Defaulting Party; (b) Any representation or warranty made by such Defaulting Party herein is false or misleading in any material respect when made, unless: (i) the fact, circumstance or condition that is the subject of such representation or warranty is made true within thirty (30) days after notice thereof from the Non-Defaulting Party, provided that if the fact, circumstance or condition that is the subject ofsuch representation or warranty reasonably cannot be corrected within such thiny (30) day period, then the Defaulting Party shall have an additional period of time (not to exceed sixty (60) days) in which to correct the fact, circumstance or condition that is the subject of such representation or warranty; and (ii) such cure removes any adverse effect on the Non-Defaulting Party of such fact, circumstance or condition being otherwise than as first represented, or such fact, circumstance or condition being otherwise than as first represented does not materially adversely affect the Non-Defaulting Party; (c) A transfer, assignment or other disposition of its interest in this Agreement or its Ownership Interests (or Directional Capacity Allocation Percentages and Directional Capacity Allocations) in the Transmission Facilities, in each case, in violation of Article XIX; (d) The failure to perform or breach of its covenants and obligations in Section 3.7; (e) The failure to be a Qualified Owner, if such failure is not remedied within thirty (30) days after written notice thereof from the Non-Defaulting Party; (0 The failure to perform or breach of any material covenant or obligation set forth in this Agreement (other than provided for in Section l2.l (a), (b), (c), (d) or (e)), if such failure is not remedied within thirty (30) days after written notice thereof from the Non- Defaulting Party, provided that if such failure or breach cannot reasonably be cured within thirty (30) days, then the Defaulting Party shall have an additional period of time (not to exceed ninety (90) days) in which to cure such failure or breach so long as the Defaulting Party commences good faith activities to cure the failure or breach during the initial 30-day cure period and continues to utilize Commercially Reasonable Efforts to effect a cure; or (g) The Defaulting Party becomes Bankrupt. 12.2 Cure by Non-Defaulting Party. If a Defaulting Party fails to cure an Event of Default, then the Non-Defaulting Party may, in its sole discretion, attempt to cure the Event of JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 36 EXECUTION VERSION Default, provided that the Defaulting Party shall reimburse the Non-Defaulting Party for all costs and expenses incurred by or on behalf of the Non-Defaulting Party pursuant to this Section 12.2. 12.3 Remedies. (a) If an Event of Default occurs and is continuing, then the Non-Defaulting Party shall be entitled to exercise any of it remedies at law or in equity, including recovery from the Defaulting Party of any damages suffered as a result of the Event of Default, subject to Section 14.8. The Non-Defaulting Party shall use Commercially Reasonable Efforts to mitigate any damages suffered as a result of the Event of Default. (b) The Parties acknowledge that the obligations and covenants performed by each Party hereunder are unique and that the Non-Defaulting Party will be irreparably injured should such obligations and covenants not be consummated in accordance with the terms and conditions of this Agreement. Consequently, the Non-Defaulting Party will not have an adequate remedy at law if the other Party shall fail to perform its obligations and covenants hereunder. The Non-Defaulting Party shall have the right, in addition to any other remedy available under this Agreement, to specific performance of the Defaulting Party's obligations and covenants hereundero and the Parties agree not to take a position in any proceeding arising out of this Agreement to the effect that the Non-Defaulting Party has an adequate remedy at law. ARTICLE XIII REPRESENTATIONS AND WARRANTIES I 3.1 Representations and Warranties of Idaho Power. Idaho Power represents and warrants to PacifiCorp as of the Execution Date as follows: (a) It is duly formed, validly existing and in good standing under the laws of the jurisdiction of its formation. (b) It has all requisite corporate power necessary to own its assets and carry on its business as now being conducted or as proposed to be conducted under this Agreement. (c) It has all necessary corporate power and authority to execute and deliver this Agreement and to perform its obligations under this Agreement, and the execution and delivery of this Agreement and the performance by it of this Agreement have been duly authorized by all necessary corporate action on its part. (d) The execution and delivery of this Agreement and the performance by it of this Agreement do not: (i) violate its organizational documents; (ii) violate any Governmental Requirements; or (iii) result in a breach of or constitute a default of any material agreement to which it is a party. (e) This Agreement has been duly and validly executed and delivered by it and constitutes its legal, valid and binding obligation enforceable against it in accordance with its terms, except as the same may be limited by bankruptcy, insolvency or other similar laws affecting creditors' rights generally and by principles of equity regardless of whether such principles are considered in a proceeding at law or in equity. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 37 EXECUTION VERSION (f) Except as disclosed in Schedule l3.l(fl, all materialGovernmental Authorizations required by Governmental Requirements to have been obtained by it prior to the date hereof in connection with the due execution and delivery of this Agreement, have been duly obtained or made and are in full force and effect. (g) It is a Qualified Owner. 13.2 Representations and Warranties of PacifiCorp. PacifiCorp represents and warrants to Idaho Power as of the Execution Date as follows: (a) It is duly formed, validly existing and in good standing under the laws of the jurisdiction of its formation. (b) It has all requisite corporate power necessary to own its assets and carry on its business as now being conducted or as proposed to be conducted under this Agreement. (c) It has all necessary corporate power and authority to execute and deliver this Agreement and to perform its obligations under this Agreement, and the execution and delivery of this Agreement and the performance by it of this Agreement have been duly authorized by all necessary corporate action on its part. (d) The execution and delivery of this Agreement and the performance by it of this Agreement do not: (i) violate its organizational documents; (ii) violate any Governmental Requirements; or (iii) result in a breach of or constitute a default of any material agreement to which it is a party. (e) This Agreement has been duly and validly executed and delivered by it and constitutes its legal, valid and binding obligation enforceable against it in accordance with its terms, except as the same may be limited by bankruptcy, insolvency or other similar laws affecting creditors' rights generally and by principles of equity regardless of whether such principles are considered in a proceeding at law or in equity. (0 Except as disclosed in Schedule 13.2(0, all materialGovernmental Authorizations required by Governmental Requirements to have been obtained by it prior to the date hereof in connection with the due execution and delivery of this Agreement, have been duly obtained or made and are in full force and effect. (g) It is a Qualified Owner. ARTICLE XIV INDEMNIFICATION l4.l Indemnities. (a) Subject to the provisions of Section 14.3 and Section 14.8, each Owner (the "Indemnifyine Party") shall indemnify, defend and hold harmless the other Owner (the "Indemnified Party") and its Representatives, from and against any and all suits, actions, liabilities, legal proceedings, claims, demands, losses, costs and expenses of whatsoever kind or JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 38 EXECUTION VERSION character (including reasonable attomeys' fees and expenses) of third parties (collectively, "Claims"), for injury or death of persons or physical loss of or damage to property of Persons (other than the Indemnified Party and its Representatives) arising from the Indemnifying Party's (including its Representatives'): (i) gross negligence or willful misconduct in connection with the performance of this Agreement; or (ii) failure to perform a material obligation under this Agreement. (b) In addition to and not in limitation of the indemnity provided in Section l4.l(a), but subject to the provisions of Section 14.3 and Section 14.8, each Owner, as IndemnifyingParty, shall severally and not jointly, in accordance with its applicable Ownership Interest(s), indemnify, defend and hold harmless each Operator, as Indemnified Party, and its Representatives from and against any and all Claims for injury or death of persons or physical loss of or damage to property of Persons (other than the Indemnified Party and its Representatives), or fines or penalties levied or imposed by Governmental Authorities or other Losses incurred by the Indemnified Party and its Representatives, in each case, arising under or in connection with this Agreement, including in connection with the performance by the Operator of its obligations under this Agreement, except for such Claims or fines or penalties or other Losses arising from the Operator's or its Representatives': (i) gross negligence or willful misconduct in connection with the performance of this Agreement; or (ii) failure to perform a material obligation under this Agreement. (c) Subject to the provisions of Section 14.3 and Section 14.8, each Operator, as Indemnifying Party, shall indemnify, defend and hold harmless each Owner, as Indemnified Party, and its Representatives from and against any and all Claims for injury or death of persons or physical loss of or damage to property of Persons (including the Indemnified Party and its Representatives), or fines or penalties levied or imposed by Governmental Authorities or other Losses incurred by the Indemnified Party and its Representatives, in each case, arising from the Operator's and its Representatives': (i) gross negligence or willful misconduct in connection with the performance of this Agreement; or (ii) failure to perform a material obligation under this Agreement; provided, however. in no event shall the Operator be obligated to indemniff, defend or hold harmless an Owner and its Representatives from and against any such Claims or fines or penalties or Losses to the extent arising from such Owner's or its Representatives': (i) gross negligence or willful misconduct in connection with the performance of this Agreement; or (ii) failure to perform any material obligation under this Agreement. 14.2 Notice and Participation. (a) If an Indemnified Party intends to seek indemnification under this Article XIV with respect to any Claims, the Indemnified Party shall give the Indemnifying Party prompt written notice of such Claims upon the receipt of actual knowledge or information by the Indemnified Party of any possible Claims or of the commencement of such Claims. The Indemnifying Party shall have no liability under this Article XIV for any Claim for which such notice is not provided, but only to the extent that the failure to give such notice materially impairs the ability of the Indemnifying Party to respond to or to defend the Claim. (b) The Indemnifying Party shall have the right to assume the defense of any Claim, at its sole cost and expense, with counsel designated by the Indemnifuing Party and JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 39 EXECUTION VERSION reasonably satisfactory to the lndemnified Party;ry4!g1!, however, that if the defendants in any such proceeding include both the Indemnified Party and the Indemnifying Party, and the Indemnified Party shall have reasonably concluded that there may be legal defenses available to it which are in conflict with those available to the Indemnifying Party and that such conflict materially prejudices the ability of the counsel selected by the Indemnifying Party to represent both Parties, the Indemnified Party shall have the right to select separate counsel reasonably satisfactory to the Indemnifying Party, at the Indemnifuing Party's expense, to assert such legal defenses and to otherwise participate in the defense of such Claim on behalf of such Indemnified Party, and the Indemnifying Party shall be responsible for the reasonable fees and expenses of such separate counsel. (c) Should any Indemnified Party be entitled to indemnification under this Article XIV as a result of a Claim, and should the Indemnifying Party failto assume the defense of such Claim within a reasonable period of time after the Indemnified Party has provided the Indemnifying Party written notice of such Claim, the Indemnified Party may, at the expense of the Indemnifying Party, contest or, with or without the prior consent of the Indemnifying Party, settle such Claim. (d) Except to the extent expressly provided herein, no Indemnified Party shall settle any Claim with respect to which it has sought or is entitled to seek indemnification pursuant to this Article XIV unless: (i) it has obtained the prior written consent of the Indemnifying Party; or (ii) the Indemnifying Party has failed to assume the defense of such Claim within a reasonable period of time after the Indemnified Party has provided the Indemnifying Party written notice of such Claim. (e) Except to the extent expressly provided otherwise herein, no Indemnifying Party shall settle any Claim with respect to which it may be liable to provide indemnification pursuant to this Section without the prior written consent of the Indemnified Party; provided. however, that if the Indemnifuing Party has reached a bona fide settlement agreement with the plaintiff(s) in any such proceeding, which settlement includes a full release of the Indemnified Party for any and all liability with respect to such Claim and does not obligate the Indemnified Party to take or forbear to take any action, and the Indemnified Party does not consent to such settlement agreement, then the dollar amount specified in the settlement agreement, plus the Indemnified Party's reasonable legal fees and other costs related to the defense of the Claim paid or incurred prior to the date of such settlement agreement, shall act as an absolute maximum limit on the indemnification obligation of the Indemnifuing Party with respect to the Claim, or portion thereof that is the subject of such settlement agreement. 14.3 Net Amount. Subject to the limitation in Section 14.2(e), if applicable, in the event that an Indemnifring Party is obligated to indemniff and hold any Indemnified Party harmless under this Article XIV, the amount owing to the Indemnified Party shall be the amount of such Indemnified Party's actual Claims, fines or penalties or other Losses, as the case may be, net of any insurance or other recovery actually received by the Indemnified Party. 14.4 No Release of Insurers. The provisions of this Article XIV shall not be deemed or construed to release any insurer from its obligation to pay any insurance proceeds in accordance with the terms and conditions of valid and collectible insurance policies. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 40 EXECUTION VERSION 14.5 Mitieation. Each Indemnified Party entitled to indemnification hereunder shall use Commercially Reasonable Efforts to mitigate all Claims, fines, penalties or other Losses, as the case may be, after becoming aware of any event which could reasonably be expected to give rise to any Claims, fines, penalties or other Losses, as the case may be, that are indemnifiable or recoverable hereunder or in connection herewith. 14.6 Assertion of Claims. No Claim of any kind shall be asserted against any Owner or Operator pursuant to this Article XIV, whether arising out of contract, tort (including negligence), strict liability, or any other cause of or form of action, unless it is filed in a court of competent jurisdiction, or a demand for arbitration is made, within the applicable statute of limitations period for such Claim. 14.7 Survival of Oblieation. The duty to indemnify under this Article XIV shall continue in full force and effect notwithstanding the expiration or termination of this Agreement, with respect to any Claim, fine, penalty or other Losses, as the case may be, arising out of an event or condition which occurred or existed prior to such expiration or termination. 14.8 Limitation on Liability. (a) Notwithstanding any provision in this Agreement to the contrary, neither Party shall be liable under this Agreement in any action at law or in equity, whether based on contract, tort or strict liability or otherwise, for any special, incidental, indirect, exemplary, punitive or consequential damages or losses, including any loss of revenue, income, profits or investment opportunities, loss of the use of equipment, or the cost of temporary equipment or services, provided that any fines or penalties or other Losses levied or imposed by Governmental Authorities shall not be excluded under this Section 14.8(a) as special, incidental, indirect, exemplary, punitive or consequential damages or losses. (b) Notwithstanding any provision in this Agreement to the contrary, neither Party shall be liable under this Agreement if and to the extent that the Agreement Limiting Liability Among Western Interconnected Systems executed by ldaho Power on August 5, 1985 and by PacifiCorp on August 22,1973 (the "WIS S.greemen!") is then in effect between the Parties and expressly limits or precludes such liability. Nothing in this Agreement shall amend or otherwise affect in any way the terms and conditions of or liability of the Parties under the WIS Agreement. pnopruntlnlvcrl'"tlrorroN l5.l ,,r",oru." or r- y Proprietary Information of aParty(whetherinitscapacityasOwneroroperator)(the..@,')whichisdisclosedtoor otherwise received or obtained by the other Party (whether in its capacity as Owner or Operator) (the "TranSferee") incident to this Agreement shall be held in confidence and the Transferee shall not (subject to Sections 15.2, 15.3 and 15.5) publish or otherwise disclose any Proprietary Information of the Transferor to any Person for any reason or purpose whatsoever, or use any Proprietary Information for any purpose other than performance under this Agreement, without the prior wriffen approval of the Transferor, which approval may be granted or withheld by the JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 41 EXECUTION VERSION Transferor in its sole discretion. Without limiting the generality of the foregoing, each Transferee shall observe at a minimum the same safeguards and precautions with regard to the Transferor's Proprietary Information which the Transferee observes with respect to its own information of the same or similar kind. 15.2 Disclosure by Representatives. Each Transferee agrees that it will make available Proprietary Information received from a Transferor to its own Representatives only on a need-to- know basis and in compliance with Governmental Requirements, and that all Persons to whom such Proprietary Information is made available will be made aware of the confidential nature of such Proprietary Information, and will be required to agree to hold such Proprietary Information in confidence in accordance with the terms hereof and in compliance with Governmental Requirements. 15.3 Permitted Disclosures. Notwithstanding anything to the contrary contained in this Article XV: (a) A Transferee may provide any Proprietary Information to any Governmental Authority having jurisdiction over or asserting a right to obtain such information, provided that: (i) such Governmental Authority orders that such Proprietary Information be provided; and (ii) unless prohibited from so doing by Governmental Requirements, the Transferee promptly advises the Transferor of any request for such information by such Govemmental Authority and cooperates in giving the Transferor an opportunity to present objections, requests for limitation, and/or requests for confidentiality or other restrictions on disclosure or access, to such Governmental Authority. (b) A Transferee may, to the extent required, disclose Proprietary Information to any Governmental Authority in connection with the application for any Governmental Authorization;ry!I!s(! that unless prohibited from so doing by Governmental Requirements, the Transferee shall provide the Transferor prior written advance notice of such disclosure and the Proprietary Information that is to be disclosed. (c) A Transferee may disclose such Proprietary Information regarding the existence and terms of this Agreement as such Transferee deems necessary to enable it to comply with the Securities Exchange Act of 1934, or the rules, regulations and forms of the Securities and Exchange Commission, issued thereunder or the applicable rules of any stock exchange, or as otherwise required by Governmental Requirements. 15.4 Iniunctive Relief. In the event of a breach or threatened breach of the provisions of this Article XV by any Transferee, the Transferor shall be entitled to an injunction restraining the Transferee from such breach orthreatened breach. Nothing contained herein shall be construed as prohibiting the Transferor from pursuing any other remedies available at law or equity for such breach or threatened breach of this Agreement. 15.5 Publicitv. Any public relations matters, including public announcements and press releases or similar publicity, arising out of or in connection with the terms of this Agreement or the transactions contemplated herein, shall be coordinated and agreed to between the Parties prior to said announcement or release. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 42 EXECUTION VERSION 15.6 Proprietary Information Defined. For purposes of this Agreement, "Proprielry Informationo' means all information, written or oral, which has been or is disclosed by the Transferor, or by any Representative of the Transferor, or which otherwise becomes known to the Transferee, or to any Representative of such Transferee, or any other party in a confidential relationship with, the Transferee, in each case, incident to this Agreement, and which: (a) relates to matters such as patents, trade secrets, research and development activities, draft or final contracts or other business arrangements, books and records, budgets, cost estimates, pro forma calculations, engineering work product, environmental compliance, vendor lists, suppliers, manufacturing processes, energy consumption, pricing information, private processes, and other similar information, as they may exist from time to time; (b) and the Transferor expressly designates in writing to be confidential, provided that "Proprietary Information" shall exclude information falling into any of the following categories: (i) Information that, at the time of disclosure hereunder, is in the public domain, other than information that entered the public domain by breach of this Agreement by Transferee or any of its Representatives; (ii) Information that, after disclosure hereunder, enters the public domain, other than information that enters the public domain by breach of this Agreement by Transferee or any of its Representatives; (iii) Information, other than that obtained from third-parties, that prior to disclosure hereunder, was already in Transferee's possession, either without limitation on disclosure to others or subsequently becoming free of such limitation; (iv) Information obtained by Transferee from a third-party having an independent right to disclose the information; or (v) Information that is available through independent research without use of or access to the Proprietary Information. 15.7 Survival. The provisions of this Article XV shall continue in full force and effect during the Term and for a period of two (2) years thereafter, notwithstanding the termination of this Agreement, with respect to any Proprietary Information obtained by any Transferee prior to such termination. ARTICLE XVI TAXES l6.l No Partnership. Nothing in this Agreement shall be deemed to create or constitute a partnership, joint venture or association between the Owners. Each Owner agrees and covenants that it shall not take or omit to take any action or reporting position with any Governmental Authority contrary to this Section 16.l. 16.2 761 Election. The Owners intend that, as tenants in common and owners of undivided Ownership Interests, for United States income tax purposes the Owners shall elect in accordance with the provisions of section 761 of the Internal Revenue Code of 1986, as amended ("Code"), and the applicable income tax regulations thereunder ("BS&lAIigns"), to be excluded JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 43 EXECUTION VERSION from all of the provisions of Subchapter K of the Code upon the first occasion in which such election may be filed under these Regulations and that, if such election is not filed, this Agreement shall constitute an election under Regulations section 1.761-2(b)(2)(ii) to be excluded from all of the provisions of Subchapter K of the Code and the applicable Regulations, beginning with the first year of the creation of the tenancy in common as contemplated by this Agreement and that no Owner shall object to any such election. 16.3 Responsibility for Taxes. It is the intent of the Owners that so far as possible, each Owner shall separately report, promptly and timely file returns with respect to, be responsible for and pay all property, income, franchise, business, or other taxes or fees ("Taxes"), arising out of its Ownership Interests and the matters contemplated by this Agreement, that such Taxes shall be separately levied and assessed against each Owner severally and that each Owner shall be solely responsible for and shall pay all such Taxes so levied and assessed against it without any responsibility of the other Owner with respect thereto and without the amounts thereof being paid and apportioned between the Owners under this Agreement. To the extent that Taxes (such as property, payroll, sales and use Taxes) may be levied or assessed against the Transmission Facilities, their operation or the Owners in such a manner as to make impossible the carrying out of the foregoing provisions of this Section 16.3, then either Operator shall report, file returns with respect to and pay such Taxes and each Owner shall immediately reimburse such Operator for each such Owner's Pro Rata Share (based on its applicable Ownership Interest(s)) of such Taxes; provided, however, that sales and use tax included in Other Costs or in the Monthly Transmission Facilities O&M Charge, the Monthly Substation O&M Charge or the Monthly Common Equipment Charge shall be recovered by the Operator pursuant to Section 4.7. Neither Operator shall have any obligation to contest or to seek refund of such Taxes; provided, however, that each Operator may, by its personnel or counsel of its selection, pursue such administrative or court proceedings as the Operator may determine. Each Owner shall on request pay to the Operator such Owner's Pro Rata Share (based on its applicable Ownership Interest(s)) of the costs of such proceedings and shall share in any savings resulting from such proceedings in the same proportion. Each Owner agrees to cooperate with the other Owner with respect to reasonable requests for information or other matters with respect to Taxes. 16.4 Indemnification. Each Owner (the "Tax Indemnifring Party") shall indemnifu and hold harmless the other Owner (the "Tax Indemnitee Party"), on an after-tax basis, from and against any Taxes (including any interest or penalties) imposed on such Tax Indemnitee Party or the Transmission Facilities or any part thereof, to the extent such Taxes are the responsibility of the Tax Indemnifying Party pursuant to this Article XVI. 16.5 Determination of Depreciation and Other Matters. Each Owner shall determine the basis and method it will use for purposes of depreciation and other matters where investment of the Transmission Facilities or Common Equipment is relevant. ARTICLE XVII DISPUTES 17.l Exclusive Procedure. Any dispute, controversy or claim arising out of or relating to this Agreement or the breach, interpretation, termination, performance or validity of this Agreement (each, a "Dlgp.ule") shall be resolved pursuant to the procedures of this Article XVII. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 44 EXECUTION VERSION 17.2 Dispute Notices. If a Dispute arises between the Parties, then either Party may provide written notice thereof to the other Party, including a detailed description of the subject maffer of the Dispute (the "Dispute Notice"). Any Party may seek a preliminary injunction or other provisional judicial remedy if such action is necessary to prevent irreparable harm or preserve the status quo, in which case the Parties nonetheless will continue to pursue resolution of the Dispute pursuant to this Article XVII. 17.3 Informal Disnute Resolution. (a) The Parties shall make a good faith effort to resolve any Dispute by prompt negotiations between the Party's representative so designated in writing to the other Party (each a "Managef'). If the Managers are not able to resolve the Dispute within thirty (30) days after the date of the Dispute Notice, then they shall refer the matter to the designated senior officers of their respective companies (the "EXgpgliySfi)"), who shall have authority to settle the Dispute. If the Executives are not able to resolve the Dispute within sixty (60) days after the date of the Dispute Notice, then the Dispute shall be resolved pursuant to Section 17.4. (b) All negotiations, communications and writings exchanged between the Parties pursuant to this Article XVII shall be treated and maintained as Proprietary lnformation, shall be treated as compromise and settlement negotiations for purposes of the federal and state rules of evidence, and shall not be used or referred to in any subsequent adjudicatory process between the Parties, including at FERC, either with respect to the current Dispute or any future Dispute between the Parties. 17.4 Submission of Dispute to FERC or Anproved Courts. If a Dispute cannot be settled amicably between the Parties pursuant to Section 17.3, then any Party may, in its sole discretion, within one (l) year after the conclusion of the time period for informal dispute resolution specified in Section 17.3, submit such Dispute (a) to FERC or (b) to the jurisdiction of the state courts situated in the State of Idaho or the United States District Court for the District of Idaho (the "Ap,prq@.ur!S,"). Each of the Parties, in its capacity as an Owner and Operator, consents to and accepts for itself and in respect of its property, generally and unconditionally, the exclusive jurisdiction of the Approved Courts and appellate courts from any appealthereof, and irrevocably waives any objection which it may now or hereafter have to the jurisdiction of the Approved Courts. Each of the Parties, in its capacity as an Owner and Operator, further irrevocably waives, to the fullest extent permitted by law, any objection that it may now or hereafter have to the laying ofvenue ofany suit, proceeding or other action brought pursuant to this Article XVII in any of the Approved Courts, and irrevocably waives, to the fullest extent permitted by law, and agrees not to plead or claim in any such Approved Court that any suit, proceeding or other action brought therein has been brought in an inconvenient forum. 17.5 Continued Performance. During the pendency of any Dispute, each Party shall continue to perform all of its respective obligations under this Agreement. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 45 EXECUTION VERSION ARTICLE XVII ASSIGNMENT l8.l Prohibited Transfers and Assignments. Neither Party shall have the right to transfer, assign, sell or otherwise dispose of (collectively, "Transfer"), in whole or in part, its interest in this Agreement, including its rights, duties and obligations hereunder, nor to Transfer, in whole or in part, its Ownership Interests (or Directional Capacity Allocation Percentages and Directional Capacity Allocations) in the Transmission Facilities or Common Equipment, except as permitted under this Article XVIII. 18.2 Permitted Assignments and Transfers. Subject to Section 18.3, the restrictions set forth in Section l8.l shall not restrict: (a) Dispositions and sales of equipment or facilities by either Operator incident to renewals or replacements of the Transmission Facilities or Common Equipment; (b) The right of an Owner to subject any of its Ownership Interests (or Directional Capacity Allocation Percentages and Directional Capacity Allocations) to the lien of any mortgage upon all or a portion of its own physical electric utility property or to otherwise collaterally assign its rights and obligations in this Agreement to a lender or other person providing financing to the Owner; (c) The right of an Owner to Transfer voluntarily all of its Ownership Interests (and Directional Capacity Allocation Percentages and Directional Capacity Allocations) and all of its rights and obligations in this Agreement (including as part of such Transfer, all of its rights and obligations in this Agreement as an Operator) in connection with any sale, merger or other transfer of substantially all of such Owner's electric transmission facilities as an operating entity; provided, however, that the effectiveness of such Transfer shall be conditioned upon the transferee: (i) agreeing in writing, in form and substance reasonably satisfactory to the other Owner, to assume all of the rights and obligations of the transferring Owner (including, all of its rights and obligations in this Agreement as an Operator) as of the transfer date; and (ii) qualifuing as a Qualified Owner on the transfer date; (d) The right of an Owner to Transfer voluntarily all of its Ownership Interests (and Directional Capacity Allocation Percentages and Directional Capacity Allocations) and allof its rights and obligations in this Agreement (including as part of such Transfer, all of its rights and obligations in this Agreement as an Operator) to an Affiliate of such Owner which owns all or substantially all of the transmission facilities of such Owner; provided, however, that the effectiveness of such Transfer shall be conditioned upon the transferee: (i) agreeing in writing, in form and substance reasonably satisfactory to the other Owner, to assume all of the rights and obligations of the transferring Owner (including, all of its rights and obligations in this Agreement as an Operator) as of the transfer date; and (ii) qualifying as a Qualified Owner on the transfer date; (e) The right of any Owner to Transfer voluntarily all of its Ownership Interests (and Directional Capacity Allocation Percentages and Directional Capacity Allocations) and all of its rights and obligations in this Agreement (including as part of such Transfer, all of JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 46 EXECUTION VERSION its rights and obligations in this Agreement as an Operator) to a third party; provided that: (i) the other Owner, in its sole discretion, approves such Transfer and approves the third-party purchaser as having demonstrated that it is financially and technically capable of performing the transferring Owner's (and Operator's) obligations under this Agreement; and (ii) the other Owner is offered the right of first refusal to purchase all of such Ownership Interests (and Directional Capacity Allocation Percentages and Directional Capacity Allocations) and Common Equipment and all of the transferring Owner's rights and obligations in this Agreement (including as part of such Transfer, all of its rights and obligations in this Agreement as an Operator), on terms no less favorable than those offered to such proposed third-party purchaser; ry4Qd, however, that the effectiveness of such Transfer shall be conditioned upon the third- party purchaser: (A) agreeing in writing, in form and substance reasonably satisfactory to the other Owner, to assume all of the rights and obligations of the transferring Owner (including as part of such Transfer, all of its rights and obligations in this Agreement as an Operator) as of the transfer date; and (B) qualifuing as a Qualified Owner on the transfer date; and (f) The right of an Owner to post, sell or make available for scheduling transmission capacity or schedule energy in accordance with Sections 3.2(b) and 3.2(.c), unless otherwise mutually agreed to in writing in advance by the other Owner. 18.3 FERC Approval. Any Transfer pursuant to Section 18.2 that is subject to FERC approval shall not take effect until FERC has approved such Transfer and has made it effective. ARTICLE XIX MISCELLANEOUS l9.l Notices. (a) Any notice, demand, request or other communication required or permitted to be given pursuant to this Agreement shall be in writing and signed by the Owner or Operator giving such notice, demand, request or other communication and shall be hand delivered or sent by certified mail, retum receipt requested, or overnight courier to the other Owner and/or Operator at the address set forth below: If to ldaho Power as Owner:Idaho Power Company l22l West Idaho Street Boise, lD 83702 Attn: Director, Load Serving Operations Telephone: 208-388-2360 Idaho Power Company l22l West Idaho Street Boise, lD 83702 With a copy to: Attn: LegalDepartment Telephone: 208-388-2300 If to Idaho Power as Operator: Idaho Power Company l22l West ldaho Street JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 47 With a copy to: EXECUTION VERSION Boise, lD 83702 Attn: Director, Load Serving Operations Telephone: 208-388-2360 Idaho Power Company l22l West Idaho Street Boise, lD 83702 Attn: LegalDepartment Telephone: 208-388-2300 PacifiCorp 825 NE Multnomah Street, Suite 1600 Portland, OR97232 Attn: Director, Transmission Service Telephone: 503-813-67 12 PacifiCorp 825 NE Multnomah Street, Suite 2000 Portland, OR97232 Attn: LegalDepartment Telephone: 503-813-5854 PacifiCorp 825 NE Multnomah Street, Suite 1600 Portland, OR97232 Attn: Director, Transmission Service Telephone: 503-813-67 12 PacifiCorp If to PacifiCorp as Owner: With a copy to: If to PacifiCorp as Operator: With a copy to: 825 NE Multnomah Street, Suite 2000 Portland, OR97232 Attn: Legal Department Telephone: 503-813-5854 (b) Each Party shall have the right to change the place to which any notice, demand, request or other communication shall be sent or delivered by similar notice sent in like manner to the other Party. The effective date of any notice, demand, request or other communication issued pursuant to this Agreement shall be when: (i) delivered to the address of the Party personally, by messenger, by a nationally or internationally recognized overnight delivery service or otherwise; or (ii) received or rejected by the Party, if sent by certified mail, return receipt requested, in each case, addressed to the Party at its address and marked to the attention of the person designated above (or to such other address or person as a Party may designate by notice to the other Party effective as of the date of receipt by the other Party). 19.2 Parties Bound. This Agreement shall be binding upon each of the Parties and their respective successors and permitted assigns. JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 48 EXECUTION VERSION 19.3 Amendments. (a) Except as otherwise provided in Section 19.3(c), this Agreement may not be amended, supplemented or otherwise modified, other than pursuant to an instrument in writing executed by the Parties. (b) Absent agreement of both Parties to the proposed change and except as otherwise provided in Section 19.3(c), the standard of review for changes to this Agreement proposed by a Party, or FERC acting sua sponte, shall be the "public interest" standard of review set forth in United Gas Pipe Line Co. v. Mobile Gas Service Co.p., 350 U.S. 332 (1956) and Federal Power Commission v. Sierra Pacific Power Co., 350 U.S. 348 (1956); provided that the standard of review for any modification to this Agreement requested by non-contracting third parties shall be the most stringent standard permissible under then-applicable Governmental Requirements. (c) Nothing contained in this Agreement shall be construed as affecting in any way the right of either Party to unilaterally make application to FERC under Section 205 or Section 206 of the Federal Power Act for a change in the charges set forth in this Agreement. It is the intent of the Parties that the standard of review that FERC will apply to any such unilateral application shall be the just and reasonable standard of review rather than the "public interest" standard of review. (d) An amendment that is subject to FERC approval shall not take effect until FERC has accepted such amendment for filing and has made it effective. 19.4 Waivers. No waiver by any Party of any one or more breaches or defaults by the other Party in the performance of any of the provisions of this Agreement shall be construed as a waiver of any other breaches or defaults whether of a like kind or different nature. Any delay, less than any applicable statutory period of limitations, in asserting or enforcing any rights under this Agreement shall not be deemed a waiver of such rights. Failure of any Party to enforce any provisions hereof shall not be construed to waive such provision, or to affect the validity of this Agreement or any part thereof, or the right of the other Party thereafter to enforce each and every provision thereof. 19.5 Choice of Law. (a) This Agreement, the rights and obligations of the Parties under this Agreement, and any claim or controversy arising out of this Agreement (whether based on contract, tort, or any other theory), including all matters of construction, validity, effect, performance and remedies with respect to this Agreement, shall be governed by and interpreted, construed, and determined in accordance with, the laws ofthe State of Idaho (regardless of the laws that might otherwise govern under applicable principles of conflicts of law). (b) TO THE FULLEST EXTENT PERMITTED BY LAW, EACH OF THE PARTIES HERETO WAIVES ANY RIGHT IT MAY HAVE TO A TRIAL BY JURY IN RESPECT OF LITIGATION DIRECTLY OR INDIRECTLY ARISING OUT OF, UNDER OR IN CONNECTION WITH THIS AGREEMENT. EACH PARTY FURTHER WAIVES ANY RIGHT TO CONSOLIDATE ANY ACTION TN WHICH A JURY TRIAL HAS BEEN JOINT OWNERSHIP AND OPERATING AGREEMENT Page 149 EXECUTION VERSION WAIVED WITH ANY OTHER ACTION IN WHICH A JURY TRIAL CANNOT BE OR HAS NOT BEEN WAIVED. 19.6 Headines. Article and Section headings used in this Agreement (including headings used in any Exhibits or Schedules attached hereto) are for convenience ofreference only and shall not affect the construction of this Agreement. 19.7 Relationship of Parties. The covenants, obligations, and liabilities ofthe Owners are intended to be several and notjoint or collective, and nothing herein contained shall be construed to create an association, joint venture, trust or partnership, or to impose a trust or partnership covenant, obligation or liability on or with regard to any of the Owners. Each Owner shall be individually responsible for its own covenants, obligations and liability as herein provided. No Owner shall be under the control of or shall be deemed to control, the other Owner. Neither Owner shall have the right or power to bind the other Owner without its express written consent. 19.8 Severability. In the event that any provision of this Agreement or the application thereof becomes or is declared by a court of competent jurisdiction to be illegal, void or unenforceable, the remainder of this Agreement will continue in full force and effect and the application of such provision to other persons or circumstances will be interpreted so as reasonably to effect the intent of the Parties. The Parties further agree to replace such illegal, void or unenforceable provision of this Agreement with a valid and enforceable provision that will achieve, to the extent possible, the economic, business and other purposes of such illegal, void or unenforceable provision. 19.9 No Third Party Beneficiaries. Nothing expressed or implied in this Agreement is intended to nor shall be construed to confer upon or give to any Person (other than the Parties) any rights or remedies under or by reason of this Agreement or any transaction contemplated herein. 19.10 Further Assurances. Each Party agrees to execute and deliver from time to time such additional documents, and take such additional actions, as may be reasonably required by the other Party to give effect to the purposes and intent hereof. l9.l I Conflict of Interest. Nothing in this Agreement shall prohibit any Party from engaging in or possessing any interest in other projects or business ventures ofany nature and description, independently or with others. 19.12 Exhibits and Schedules. The Exhibits and Schedules to this Agreement are identified as follows, and are incorporated herein by this reference: Exhibit A Description of PacifiCorp Common Equipment Exhibit B Description of ldaho Power Common Equipment Exhibit C Ownership Interests; Directional Capacity Allocations; Directional Capacity Allocation Percentages JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 50 EXECUTION VERSION Exhibit D Monthly Transmission Facilities O&M Charge; Monthly O&M Equipment Charge Exhibit E Department of Energy Equipment Located in the Antelope Substation Exhibit F Acquisition Costs Exhibit G Joint Ownership Transmission Loss Calculation and Allocation Methodology Schedule l3.l(0 ldaho Power Governmental Authorizations Schedule 13.2(f) PacifiCorpGovernmentalAuthorizations 19.13 Countemarts. This Agreement may be executed in one or more counterparts, each of which shall be original, and all of which together shall constitute one agreement. Electronic transmission of any signed original document, and retransmission of any signed electronic transmission, shall be the same as delivery of an original. At the request of either Party, the other Party will confirm electronically transmitted signatures by signing an original document. 19.14 Entire Asreement. This Agreement and the Exhibits and Schedules attached hereto, and the other documents between the Parties referenced herein constitute the entire agreement between the Parties and supersede all prior agreements and understandings, whether oral and written, between the Parties with respect to the subject matter hereof. There are no oral understandings, terms or conditions and the Parties have not relied upon any representation or warranty, expressed or implied, not contained in this Agreement. ISTGNATURE PAGE FOLLOWSI JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 5l EXECUTION VERSION IN WITNESS WHEREOF, each of the Parties has caused its duly authorized representative to execute this Joint Ownership and Operating Agreement as of the date first above written. PACIFICORP, AS OWNER AND OPERATOR Name: .2.'. 4 /u,'/ Title: /P . 7 7'2172g ta,'/.r;tu\ IDAHO POWER COMPANY, AS OWNER AND OPERATOR By: Name: Title: By: JOINT OWNERSHIP AND OPERATING ACREEMENT Pagel 52 EXECWION VERSION IN WITNESS WHEREOF, each of the Parties has caused its duly authorized representative to execute this Joint Ownership and Operating Agreement as of the date first above written. PACIFICORP, AS OWNER AND OPERATOR IDAHO POWER COMPANY, AS OWNER AND OPERATOR By: Name: Title: By: Name: Title: Lisa Grow SVP Power Supply JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 52 This page left blank intentionally. EXECUTION WRSION JOINT OWNERSHIP AND OPERATING AGREEMENT Page | 53 EXECUTION VERSION EXHIBIT AI Description of PacifiCorp Common Equipment2 rThe information contained in this Exhibit is accurate as of December 31,2014. The Parties will update the information in this Exhibit, if necessary, to reflect any PacifiCorp Common Equipment placed in or removed from service between January 1,2015 and the Closing Date in connection with the true-up set forth in Section 2.5(d) of the JPSA. The update shall be completed within 30 days after the completion of the true-up and the updated Exhibit shall replace this Exhibit.2 Excludes the majority of the Jim Bridger substation common equipment which are jointly owned by Idaho Power as part of previous Legacy Agreements (as defined in the JPSA). The common equipment associated with the Jim Bridger substation in this Exhibit A is 345 kV substation common equipment which Idaho Power did not participate in the construction of in the previous Legacy Agreements. Going forward, Idaho Power will continue to jointly own, and participate in the construction of, new common equipment associated with the Jim Bridger 345 kV bus. Idaho Power will participate at Idaho Power's 345 kV bus Ownership Interest. JOINT OWNERSHIP AND OPERATING AGREEMENT_EXHIBIT A Page | 54 EXECUTION VERSION Asset Asset CIass Asset description 2nd Line of Description Location: 013019 - Goshen Substation, lD 303360 35010 Goshen substation and Service center Bl-011 ER 85-8971 303359 35010 Goshen substation and Service center lDBl- 0010 ER 85-318 304L29 3s010 Goshen/Ridgeline/Wolverine lnterconnect tDBl-0021 DZP R I 20 0s I C I OO 4 I 7OO2s 4s O 40050503 3s201 CABLE TRAY CAATS# 62842 400s3163 35201 CABLE TRAY ER 85-8887 40063710 35201 CABLE TRAY ER 85-5207 400637L7 35201 CABLE TRAY ER 85-6999 40053744 35201 CABLE TRAY ER 86-7028 4006s33s 35201 CABLE TRAY wBs Tr lDl20061 cl ooL/ 700297 41,388 WOLV CRK 400535s2 35201 CONTROL BUILDING ER 85-318 40063660 35201 CONTROL BUILDING ER 85-1224 40063674 35201 CONTROL BUILDING ER 85-3370 40063686 3s201 CONTROL BUILDING ER 8s-3926 40053595 35201 CONTROL BUILDING ER 85-8887 40063708 3s201 CONTROL BUILDING ER 85-6053 40063557 35201 HEATER ER 85-2297 40000610 35201 ROOF CMTS# 105120 40063720 35201 ROOF ER 8s-6999 40064214 35201 ROOF - CONTROL HOUSE ER 101852 40063715 3s203 EMERGENCY GENERATOR BUILDING ER 8s-6999 40063746 3s203 EMERGENCY GENERATOR BUILDING ER 85-7028 40053705 35205 AIR CONDITIONER ER 85-6053 40053716 35205 AIR CONDITIONER ER 85-6999 40072736 35205 AIR CONDITIONER TZP R I 2008 I C/T R6/ 1 003 6s 43 4008798s 35205 HVAC (UNIT HEATER)TZP R I 2073 I C lr R6/100s0 366 4006372t 3s20s UNIT HEATER ER 8s-6999 40064778 35207 LOAD CENTER ER 85-7028 40080307 3s209 SECURITY SYSTEM w BS rzP R/2008 / Cl OOt I tOO3s469 40063684 35213 PUMP ER 85-3926 40063689 35213 SEWER SYSTEM ER 85-5790 40053693 35213 SEWER SYSTEM ER 85-8480 40063656 352L3 WELL ER 85-318 40063700 35213 WELL ER 85-8887 40063719 3s219 FOUN DATION AND SUBSTRUCTURE ER 85-6999 GENERATOR BUILDING 40047725 35225 HOIST ER 370304 MANUAL HYDRAULIC TANK 40064863 35225 HOIST ER 85-2019 400s0277 35227 CEMENT CURB rlDM/20031C|007 40092921 35227 CLEARING, GRADING & FILL MATERIAL TtD Al 2077 I C1004/GOSH E NSB 40000613 35227 CLEARING, GRADING, & FILL MATERIAL (SURF CMTS# 104348 40063691 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-7958 4005369s 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-8887 40063707 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 8s-6053 40063772 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-6890 40063718 35227 CLEARING, GRADING, & FILL MATERIAL (5URF ER 8s-6999 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT A Page | 55 EXECUTION VERSION 40063722 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-6294 40063749 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 86-6983 40063777 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 381099 40063781 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-6927 40065337 35227 CLEARING, GRADING, & FILL MATERIAL (SURF wBS TilD/2006/ Cl OO7/ 700297 4L,388 WOLV CRK 40090746 35227 CLEARING, GRADING, & FILL MATERIAL (SURF DZAF I 2O!3 I C/OO UGOSH E N 3 40000615 35227 FENCE CAATS# 104348 40063668 35227 FENCE ER 85-2019 40065343 35227 FENCE wBS Tr r D/200 6/ C/O07/ 100297 41,388 WOLV CRK 40063654 3s227 FENCE & GATES ER 85-318 SHOP 400635ss 35227 FENCE & GATES ER 85-318 40063661 35227 FENCE & GATES ER 85-1332 40063675 3s227 FENCE & GATES ER 85-3370 40063690 3s227 FENCE & GATES ER 85-5942 40063692 35227 FENCE & GATES ER 85-7827 40063697 35227 FENCE & GATES ER 85-8887 40063709 35227 FENCE & GATES ER 85-6053 40063773 35227 FENCE & GATES ER 381099 40063895 3s227 FENCE & GATES ER 85-8513 40092924 35227 FENCE & GATES T tD Al 2077 I C I 004/G OS H E N S B 40053751 3s227 ROADWAY ER3262748 40092949 35227 ROADWAY TIDA/ 207u C1004/GOSH ENSB 40053167 3s229 FLOODLIGHT ER 85-8887 40055876 3s229 FLOODLIGHT ER 85-7959 40092940 35229 LIGHTI NG FIXTURE/SYSTE M Tto Al 2077 I Cloo4lcOSH EN SB 40077758 35301 FIRE PROTECTION ER 8s-3388 40053182 3s301 STATION SERVICE TRANSFORMER ER 85-8887 40055887 3s301 STATION SERVICE TRANSFORMER E R 85-7959 7 200 -724/ 240V 40056316 3s301 STATION SERVICE TRANSFORM ER ER 85-1332 400s6958 35301 STATION SERVICE TRANSFORM ER ER 85-6053 40057070 35301 STATION SERVICE TRANSFORM ER ER 85-3370 40090753 35301 srATroN sE RVtcE TRANSFORMER L20/240 DZAF I 20L3 I ClOo1IGOSH E N 3 40059034 3s301 STATION SERVICE TRANSFORMER 5KVA ER 394015 40063907 35301 STATION SERVICE TRANSFORMER 5KVA ER 85-8513 WEST 40011988 3s377 CABLE TRENCH CMTS# 368834 400t2067 35317 CABLE TRENCH CAATS# 104348 40047968 35377 CABLE TRENCH TIDMl2002lclots 40047976 35317 CABLE TRENCH ER 85-8887 40049276 35317 CABLE TRENCH TIDM/20031C/006/0t 40049773 35317 CABLE TRENCH ER 85-6890 40050495 35377 CABLE TRENCH ER 3269826 40055736 35317 CABLE TRENCH TIDM/zOOslClO34 4005692s 35317 CABLE TRENCH ER 85-6053 40059027 35317 CABLE TRENCH ER 394015 40064140 35377 CABLE TRENCH ER 393983 40064166 353L7 CABLE TRENCH ER 85-6983 40064L79 35317 CABLE TRENCH ER 85-7028 40064224 353t7 CABLE TRENCH ER 381099 4005s336 35377 CABLE TRENCH wBs r rDl20061 cl ooLl L0029741,388 WOLV CRK JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT A Page | 56 EXECUTION VERSION 40092920 35317 CABLE TRENCH TID AI 20771 CIOO4IGOSH ENSB 40072077 35317 CONDUIT CAATS# 104348 40049775 35317 CONDUIT ER 85-6890 400s203s 353t7 CONDUIT w BS DZPR/2005 I Cl DR4 I 70027933 40055872 35317 CONDUIT ER 85-7959 40056926 35317 CONDUIT ER 85-60s3 40063854 35317 CONDUIT ER 85-4771 40064143 353L7 CONDUIT ER 393801 40064767 35317 CONDUIT ER 85-6983 400642t6 35317 CONDUIT ER 358899 40055338 35317 CONDUIT w BS Tr r D/200 6 / Cl 007 / 700297 47,388 WO LV CR K 40066372 35317 CONDUIT wBS TrDM/200slcloss 4007639s 35377 CONDUIT Tr DM/200s/c I 037 I 70037848 40092922 35317 CONDUIT T ID AI 2OI7 I C IOO4IGOSH E NSB 40055879 353t7 GUY UNIT ER 8s-79s9 40057057 35319 ANNUNCIATOR EQS 330585 ER 85-3370 767/69KV 400s6920 35319 ANNUNCTATOR EQ# 330691 ER 85-6053 345KV 40037996 3s319 DIGITAL FAULT RECORDER TIDM/L999lC/O12l0L 40058183 35319 METERTNG PACKAGE (CTIVT)TrD / 2006 I Cl OOU LOO297 47 100% RE r M B INTERCNT 40092942 35319 METERING PACKAGE (CTIVT)S/N EQ# 394727 TIDAI 20771 C/004/GOSHE NSB 40092943 35319 METERING PACKAGE (CTI\rr)S/N EQ# 394728 TtD Al 2O1u Cloo4lGOSH E NSB 40092944 35319 METERING PACKAGE (CTIW)S/N EQ# 394729 T tD Al zOLL / C/004/G OS H E NSB 40011995 35319 RELAY AND CONTROL CAATS# 368834 40072087 35319 RELAY AND CONTROL CAATS# 105622 40036600 35319 RELAY AND CONTROL wBS DSH E/1999 / C/O27 KTNPORT-GOSH EN 34sKV LNR 40047972 3s319 REI.AY AND CONTROL TIDMl2002lC/O7s 40047980 35319 RELAY AND CONTROL ER 85-8887 40049278 35319 RELAY AND CONTROL TIDMl2003lCl006/01 40050501 3s319 RELAY AND CONTROL ER 3259825 40050505 35319 RELAY AND CONTROL CAATS# 62842 40055733 3s319 RELAY AND CONTROL w BS Tr D M/200s I Cl OL3 I O07 400s6967 35319 RELAY AND CONTROL ER 85-6053 40058182 3s319 RELAY AND CONTROL TrD I 2006 I CIOOU 700297 47 100% RE r M B INTERCNT 400s9033 35319 RELAY AND CONTROL ER 394015 40063866 35319 RELAY AND CONTROL ER 8s-7868 40063918 3s319 RELAY AND CONTROL ER 85-8383 40063919 35319 RELAY AND CONTROL ER 85-8217 40063948 3s319 RELAY AND CONTROL ER 85-8498 40053949 35319 RELAY AND CONTROL ER 85-8707 40063961 3s319 RELAY AND CONTROL ER 85-6207 40063989 35319 RELAY AND CONTROL ER 85-6046 40064056 3s319 REI-AY AND CONTROL ER 85-6143 40064068 35319 RELAY AND CONTROL ER 85-6402 40064077 3s319 REI.AY AND CONTROT ER 85-5294 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 57 EXECUTION VERSION 40064084 35319 RELAY AND CONTROT ER 85-6860 40064092 35319 REI.AY AND CONTROL ER 85-6671 40054122 35319 RELAY AND CONTROL ER 85-6782 40064133 35319 RELAY AND CONTROL ER 85-6985 40064734 35319 RELAY AND CONTROL ER 85-9431 40064773 35319 RELAY AND CONTROL ER 8s-6983 40064183 35319 RELAY AND CONTROL ER 495333 40064787 35319 RELAY AND CONTROL ER3279270 40064200 3s319 RELAY AND CONTROL ER 3300340 4006420t 3s319 RELAY AND CONTROL ER 3364403 40064202 35319 REI.AY AND CONTROL ER 3379906 40064203 35319 RELAY AND CONTROL ER 3379922 40064208 35319 RELAY AND CONTROL ER32L473t 40064209 35319 RELAY AND CONTROL ER 3s38195 40064210 35319 REI.AY AND CONTROL ER3576220 400642Lt 35319 RELAY AND CONTROL ER 368702 400642t8 35319 REI.AY AND CONTROL ER 368899 4006s3s6 35319 RELAY AND CONTROL wBs Tr r D/200 6/c/ 00Ll 700297 4L,388 WOLV CRK 40070545 3s319 RELAY AND CONTROL TMGM I 2005 I C I O04 I 700377 7 5 40077424 35319 RELAY AND CONTROL rzP R I 2007 I C lT R2 I 1003 7321 40071930 35319 RELAY AND CONTROL TZP R I 2006 I C lr R4 I 700367244 40076404 3s319 RELAY AND CONTROL TIDM / 200s / c/037/1003 1848 40077955 35319 RELAY AND CONTROT ER 85-6990 40077956 35319 RELAY AND CONTROT ER s08929 40077957 3s319 RELAY AND CONTROL ER 3358371 40077969 35319 RELAY AND CONTROL TIDM/2004/ClO02/O2 40078979 35319 REI.AY AND CONTROL ER 3542123 40078980 35319 RELAY AND CONTROL ER 3664190 40078981 35319 RELAY AND CONTROL ER 3538196 40078982 3s319 RETAY AND CONTROL ER 392340 40078983 35319 RELAY AND CONTROL ER 85-6860 40078984 3s319 RELAY AND CONTROL ER 85-6218 40084168 3s319 RELAY AND CONTROL rzP R I 2O7U ClTR U1004s 3 6s 40088444 35319 RELAY AND CONTROL rzP R I 2073 I C ITR 1/100s060s 40092947 35319 REI.AYAND CONTROL \o Al 20LLl C1004/GOSH ENSB 40072743 35319 SATELLITE CLOCK EQ# 354748 cAATSf 107130 400120s9 35319 SATELLITE CLOCK EQf 354749 CAATS# 707t29 40053162 35327 AUTOMATIC TRANSFER SWITCH ER 85-8887 40048752 35321 BATTERY AND RACK WBS TIDM/2OO3ICIO34 C&D IN 161KV YARD 40064083 3532L BATTERYAND RACK ER 85-57259 40054093 35321 BATTERY AND RACK ER 85-6671 400642L2 35321 BATTERY AND RACK ER 100669 40048153 35321 BATTERY CHARGER wBs TrDM/20O3/C/034 LAMARCHE rN 161KV YARD 40053920 35321 BATTERY CHARGER ER 85-8677 40064213 35321 BATTERY CHARGER ER 100669 400s7255 35321 POWER PANEL ER 65-6053 40064145 35323 GENERATOR ER 393801 40064181 35323 GENERATOR ER 85-7028 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT A Page | 58 EXECUTION VERSION 40064229 3s323 GENERATOR ER 101835 40092926 35325 GROUND GRID TtD Al 2077/ C/004/GOSH ENSB 40053169 35325 GROUND GRID SYSTEM ER 85-8887 40055878 35325 GROUND GRID SYSTEM ER 85-7959 400s6323 35325 GROUND GRID SYSTEM ER 85-5942 40056930 3s32s GROUND GRID SYSTEM ER 85-6053 40059029 3s32s GROUND GRID SYSTEM ER 394015 40063806 3s32s GROUND GRID SYSTEM ER 85-2019 40053852 35325 GROUND GRID SYSTEM ER 8s-7092 40053899 35325 GROUND GRID SYSTEM ER 85-8513 40064076 35325 GROUND GRID SYSTEM ER 85-6294 40064094 35325 GROUND GRID SYSTEM ER 85-6671 40064723 35325 GROUND GRID SYSTEM ER 85-6782 40064775 35325 GROUND GRID SYSTEM ER 85-6983 4006s345 35325 GROUND GRID SYSTEM w BS Tr r D/200 6 / Cl OOt I 700297 47,388 WO LV CR K 40076400 3s32s GROUND GRID SYSTEM Tr D M/200slc I o37 I 70037848 40063808 35325 INSULATED PLATFORM 10'ER 85-2019 40063963 35325 INSULATED PLATFORM 10'ER 85-6707 40064725 3s325 INSULATED PLATFORM 10'ER 85-6782 40050523 35325 INSULATED PLATFORM 14'ER 85-8696 40055881 35325 INSULATED PLATFORM 14'ER 85-7959 40056307 35325 INSULATED PLATFORM 14'ER 85-1332 400s6309 35325 INSULATED PLATFORM 16'ER 85-1332 40039803 3s32s INSULATED PLATFORM 4'ER327L749 40050522 35325 INSULATED PLATFORM 4'ER 85-8595 40053172 35325 INSULATED PLATFORM 4'ER 85-8887 40055880 35325 INSULATED PLATFORM 4'ER 85-7959 400s6308 35325 INSULATED PLATFORM 4'ER 85-1332 400s6324 35325 INSULATED PLATFORM 4'ER 85-5942 40057063 3s32s INSULATED PLATFORM 4'ER 85-3370 40053795 35325 INSULATED PLATFORM 4'ER 85-1495 40063848 3s32s INSULATED PLATFORM 4'ER 85-3782 40063962 35325 INSULATED PLATFORM 4'ER 85-6207 40064724 35325 INSULATED PLATFORM 4'ER 85-6782 40056932 3s32s INSULATED PLATFORM 4' & 6'ER 85-6053 40053171 35325 INSULATED PLATFORM 6'ER 85-8887 40087861 3s327 ANIMIAL GUARDS TZP R I 20 73 I C/T R U 1 0049 9 6 s 40092923 35327 CUTOUT POLYMER, 27KV 1OOA T tD Al 2011 I C1004/GOSH E NSB 40092946 35327 POWER & CONTROL CABLE rD Al 20771 C1004/GOSHENSB 40011940 35327 POWER AND CONTROL CABLE ER 3269825 40077992 35327 POWER AND CONTROL CABLE CAATS# 368834 40012083 35327 POWER AND CONTROL CABLE CAATS# 705622 40036s99 35327 POWER AND CONTROL CABLE CAATS# 64872 40047970 3s327 POWER AND CONTROL CABLE TIDMl2002lcl}Ls 40047978 35327 POWER AND CONTROL CABLE ER 85-8887 40049277 35327 POWER AND CONTROL CABLE TIDMl2003lC/006/01 40049778 35327 POWER AND CONTROL CABLE ER 8s-6890 40050504 35327 POWER AND CONTROL CABLE CAATS# 62842 40050527 35327 POWER AND CONTROL CABLE ER 85-8696 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 59 EXECUTION VERSION 40055732 35327 POWER AND CONTROL CABLE wBS Tt DM/20Os / Cl 073 I 00r 40055885 3s327 POWER AND CONTROL CABLE ER 85-7959 40056328 35327 POWER AND CONTROL CABLE ER 85-5942 40056739 35327 POWER AND CONTROL CABLE TIDMl200slclo34 40056942 35327 POWER AND CONTROL CABLE ER 85-6053 40057068 3s327 POWER AND CONTROL CABLE ER 85-3370 40059032 35327 POWER AND CONTROL CABLE ER 394015 400638s3 35327 POWER AND CONTROL CABLE ER 854843 40063864 35327 POWER AND CONTROL CABLE ER 85-7092 40063906 3s327 POWER AND CONTROL CABLE ER 85-8513 40063946 35327 POWER AND CONTROL CABLE ER 85-8551 40063968 35327 POWER AND CONTROL CABLE ER 85-6207 40064075 35327 POWER AND CONTROL CABLE ER 85-6294 40064082 3s327 POWER AND CONTROL CABLE ER 85-6459 40064097 35327 POWER AND CONTROL CABLE ER 85-6671 40064130 35327 POWER AND CONTROL CABLE ER 85-6782 40064146 35327 POWER AND CONTROL CABLE ER 393801 40064t77 35327 POWER AND CONTROL CABLE ER 8s-6983 40064182 35327 POWER AND CONTROL CABLE ER 85-7028 40064186 35327 POWER AND CONTROL CABLE ER 503946 4006422s 35327 POWER AND CONTROL CABLE ER 381099 400653ss 3s327 POWER AND CONTROL CABLE wBS Tr r D/200 6 I Cl OOU 100297 47,388 WO LV CR K 40076403 35327 POWER AND CONTROL CABLE T tDM I zOOs I C/03 7/1003 1848 40078985 35327 POWER AND CONTROL CABLE CAATS# 104348 40053202 3s32t TERMINATOR (POTHEAD)ER 85-318 40012051 35329 LIGHTING FIXTURE/SYSTE M CAATS# 104348 400s0s00 3s329 LIGHTI NG FIXTURE/SYSTE M ER 3269826 40053199 3s329 LIGHTI NG FIXTURE/SYSTE M ER 85-318 40056315 35329 LIG HTI NG FIXTURE/SYSTEM ER 85-1332 400s6327 35329 LIG HTI NG FIXTURE/SYSTEM ER 85-5942 40056939 3s329 LIGHTI NG FIXTURE/SYSTEM ER 85-6053 40057067 3s329 LIGHTING FIXTURE/SYSTEM ER 85-3370 40063699 35329 LIGHTING FIXTURE/SYSTEM ER 85-8887 40063704 3s329 LIGHTING FIXTURE/SYSTEM ER 85-6053 40063850 35329 LIGHTING FIXTURE/SYSTEM ER 85-3782 40053903 3s329 LIGHTI NG FIXTU RE/SYSTE M ER 85-8513 40063969 3s329 LIGHTI NG FIXTURE/SYSTE M ER 85-6207 40064131 35329 LIG HTI NG FIXTURE/SYSTE M ER 85-5782 40065351 3s329 LIG HTI NG FIXTURE/SYSTEM w BS Tr r D/200 6 I Cl 00U 700297 47,388 WO LV CR K 40064106 35341 INTERPOSITION CABINET ER 85-6807 40045527 35341 METER wBS TrDM/20O3IC/03L10L 161 rNTERTTE SCADA t/o 40025555 35341 REMOTE TERMINAL UNIT (SCADA RTU)cAATSf 105656 40025660 3s341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 705622 40025664 35341 REMOTE TERMINAL UNIT (sCADA RTU)CAATS# 105688 400569s3 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 76897 WlO 7247 40057945 35341 REMOTE TERMINAL UNIT (SCADA RTU)TtDM/2005/C/045 40065357 35341 REMOTE TERMINAL UNIT (SCADA RTU)wBS TltD/2006 I ClOO].l 700297 47.388 WOLV CRK 40077995 35341 REMOTE TERMINAL UNIT (SCADA RTU) UPGRADE T|DM/ 20041 C/OO2|OT WESDAC D20M E UPGRADE CARD JOINT OWNERSHIP AND OPERATING AGREEMENT_EXHIBIT A Page | 60 EXECUTION VERSION 40039996 35342 EQUIPMENT RACK/SHELF WBS TIDM/2OOOICIRDFIOT FOR 345KV SOE 40038011 3s342 SEQUENTIAL EVENT RECORDER EQ# 362693 cENG/1999/c/063/00000001 161KV Hathaway lnstr 4003999s 35342 SEQUENTIAL EVENT RECORDER EQ# 362696 wBS Tr DM/2000 / CIRDF /07 345KV HATHAWAY INST 40063536 36127 CLEARING, GRADING, & FILL MATERIAL (SURF ER 13-1550 GRAVEL 40053549 36207 STATION SERVICE TRANSFORM ER ER 13-1560 40063640 36277 CABLE TRENCH ER 380407 40063641 36277 CONDUIT ER 380407 40063633 36279 RELAY AND CONTROL ER 1-6411 40063634 362L9 RELAY AND CONTROT ER 510214 40063647 362L9 RELAY AND CONTROL ER 380407 40090729 36225 GROUND GRID DZAF I 20L3 I C/00 1/GOS H E N 7 40063ss8 36225 GROUND GRID SYSTEM ER 13-1560 40063643 3622s INSULATED PLATFORM 4'ER 380407 40063644 36225 INSULATED PLATFORM 6'ER 380407 30054527 39005 BUILDING . COTTAGE ER 85-318 300s9607 39011 SEWER SYSTEM ER 3326386 COTTAGE #2 30001166 3940s GENERAL MASS U NITIZATION 1998 BALANCE CONVERSION 30001168 39405 GENE RAL MASS UNITIZATION 1998 BALANCE CONVERSION 3000836s 39505 GENERAL MASS UNITIZATION 1998 BALANCE CONVERSION 30008367 39s0s GENERAL MASS UNITIZATION 1998 BALANCE CONVERSION 30008359 39505 GENERAL MASS UNITIZATION 1998 BALANCE CONVERSION 30063245 39700 cY20L2 GOSHEN SUB COMM EQU|P (C/C 13696) 30064754 39700 cy2013 GOSHEN 161SUB COMM EQU|p (C/C 135951 300647s5 39700 cY2013 GOSHEN 34s SUB COMM EqUrP (C/C 13696) 30065523 39700 9Y2OL4 GOSHEN 161COMM EQU|P (C/C 13696) 30066457 39700 CYZOL4 GOSHEN 161COMM EQUrP (C/C 13696) TtD Al 2077 I C1004/GOSH E NSB 30015435 39705 ALARM RELAY PANEL ER 100387 30058797 3970s AI.ARM RELAY PANEL ER 101623 30056984 39705 AUDIO ALARM AND CONTROL-COMBUSTIBLE GAS DETECTOR ER 393827 GAS DETECTOR/MONTTOR 30048499 3970s COMM. STATION ALARM CONTROL RTU - DSX wBs ilrD/20061 cl00t/ 700297 4L,388 WOLV CRK 30054615 39705 COMM. STATION ALARM CONTROL RTU - DSX DZP R / 2008 I C I 0O2 hOO3 s 62s 30044697 3977t RADIO CONTROL SYSTEM*See Long Descr (Alt Cntl Ctr) cAATSf t6897 WlO L247 30015446 3977L SCADA REMOTE RTU EQ# 337679 CAATS# 7042L8 30045739 397L4 CISCO SYSTEMS MULTI SERVICE NETWORK ROUTERS ctTc/2oo6lcl40sl02Hw rNcL HW RACKS & SYSTM CA 30043225 39774 DATA NETWORK CONNECTION TO CORP NETWORK DZPR / 200s I Cl DU9 I 100287 13 30042944 397L4 MODEM CAATS# 106611 30033439 397L4 MODEM - UPGRADE EQUIPMENT CAATS# 65545 30057021 39777 FIBER OPTIC CABLE - ADSS \DM/2004/Cl002/02 JOTNT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 6l EXECUTION VERSION 30057023 39777 FIBER OPTIC PATCH PANEL TIDM/2004lClOO2l02 30048505 39777 FI BER OPTIC TRANSM ITTER/TRANSCEIVER EQ# 374045 wBs r r D/200 6 l c/ }oL l L0o297 4t,388 WO LV CR K DMX 30057022 39777 FrBER OPTTC TRANSM TTTER/TRANSCE tVER EQf 38s788 TIDM / 2004/ Cl OO2 / 02 DMX H C 30054516 39723 DIGITAL DEHYDRATOR SYSTEM ozP R I 2008 I C I 002 I t003s 62s 30054617 39723 RADrO (RF) CONSTELLATTON HARRTSPSTRATEX EQ# 383334 DZP R I 2008 / C /002/ 1003 s 62 s 30015401 39726 CROSS CON NECT TREE/FRAM E ER 3431160 30015437 39726 CROSS CON NECT TREE/FRAM E ER 100387 30054618 39726 EQUIPMENT RACK/SHELF DZP R I 2008 I C I O02 I L003s625 30057024 39726 EQUIPMENT RACK/SHELF TIDMl2004/Cl002l02 30044698 39725 EQUIPMENT RACK/SHELF*See Long Descr (Alt Cntl Ctr) CAATS# 76897 WlO 7247 30053680 39726 TELEPHON E PROTECTOR BLOCKS ER3726273 30053681 39726 TELEPHONE PROTECTOR BLOCKS- ADDTL COSTS ER3726213 30054404 39729 DIGITAL CHANNEL DZP R I 2008 I C I OO2 I 7003s624 30054808 39729 DIGITAL CHANNEL TIDM I 2005 / C/037/1003 1848 + 10032851 30057025 39729 DIGITAL MULTIPLEX SYSTEM TIDM/2004/C/O02/02 COASTCOM 24 SLOT SHELF 30059171 39729 DIGITAL MULTIPLEX SYSTEM - ATI.AS 550 & coAsTcoM TIIDI?OOT /C/OO1IWCGSP2DA DAF 300s4405 39729 SYNCH RONIZING STAN DARD DZP R / 2008 / C / OO2 / tOO3s624 30054812 39732 PLC TRANSMITTER/RECEIVER SET EQ# 385786 r DM / 200s / cl o37 /10031848 30054621 3973s AC POWER TRANSFER PANEL DZPR / 2oO8 I C / 002 / ro}3s62s 30054619 39735 BATTERY AND RACK ozPR / 2008 I c I oo2 /1003s62s 30015425 39735 BATTERY AND RACK 48VDC ER 3713880 C&D 175A 30033025 39735 BATTERY AND RACK EQ# 331355 CAATS# 65745 30033026 39735 BATTERY CHARGER CMTS# 65746 30048495 39735 BATTERY CHARGER 48VDC w BS Tr r D/200 6 / Cl OOt / t00297 47,388 WOLV CR K 30054520 39735 BATTERY CHARGER SAGEON 151KV YARD EQ# 383338 ozP R / 2008 I c/002/ 1003 s62 s 30057028 39735 GENERATOR TRANSFER PANEL DZP R I 20 10 I C/ D R9 / 100 3 983 4 30058802 39735 UNINTERRUPTIBLE POWER SUPPLY (UPS)ctrcl2006lcl472/zLo 3003303s 39738 Analog Telemetry Receiver wBS DSPT/1999 / Cl O22/ O72 30043724 39738 PANEL-RELAY AND CONTROL CAATS# 101083 30015440 39738 PROTECTIVE RELAYING RECEIVER ER 100387 300s7020 39738 PROTECTIVE RELAYING TERMINAL RFL 9745 EQ# 385787 TIDM I 200s I c1037/1003 1848 30015442 39738 PROTECTIVE RELAYING TRANSM ITTER ER 100387 30015407 39738 TELEM/FSK RECEIVER ASSEM BLY ER 3431150 3001s409 39738 TELEM/FSK TRANSM ITTER ASSEMBLY ER 3431160 30057027 39738 TELEM/TRANSMITTER OR RECEIVER TERMINAL ER3527637 2ND BUS VOLTAGE TELEMETRY POINT 30051553 3974L TNTERNET PROTOCOL (rP) TELEPHONE SYSTEM cffc(2006/c{472/zLO 30015421 39744 CALL SEQUENCER ER 3541547 30015413 39744 PARW LINE SELECTOR ER 3394145 30058371 39744 TELEPHONE LINE SHARING SWITCH TIDM/2004/C(002/02 30048s09 39744 TELEPHONE SWITCH RS-232 wBs r r D/200 6 / c/ 007/ 7oo297 47,388 WOLV CR K JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 62 EXECUTION VERSION 30054523 39747 (2) ANTENNA SYSTEMS - 6'DZPR / 2008 | C I 002 I 7003s62s 30054624 39747 (2) RADOMES 6'TELGAR DZP R I 2008 | C I 002 I 7003s 62s 30054626 39747 (2)WAVEGUIDE DZP R I 2008 I C I 002 / 1003562s 30032828 39747 ANTENNA SYSTEM CAATS# 64872 30054627 39747 GROUNDING GRID DZP R I 2008 I C I OO2 h003s625 30054625 39747 TOWER FOUNDATTON RE-BUTLD (EQ #3624971 DZP R I 2008 I C I OO2 I t003s62s 300ss188 39753 AIR CONDITIONER - FREE STANDING OUTSIDE A/C SYSTEM TZP R | 2009 I C /TR9/1 0038873 30058372 39753 UNDERGROUND ENCLOSURE - VAULT rzP R I 2009 I c/TRg/10038873 Location:068194 - Summer lake Switchvard, OR 40048909 35201 CABLE TRAY rsoMl2003/cl004 40053672 3s201 DUCT ER 31-21397-184 40053657 35309 COMPRESSOR, GAS ER37-27397-784 40048910 35317 CABLE TRENCH rsoul2003lc/004 40003362 35319 RELAYAND CONTROL CAATS# 60808 40003370 35319 RELAY AND CONTROL CAATS# 62306 40003378 35319 RELAY AND CONTROL CMTS# 62306 40048914 3s319 RELAY AND CONTROL TSOMl2003lCl004 40070460 35319 RELAY AND CONTROL TORM/2004/Cl009lOt 40085750 35319 RELAY AND CONTROL TZKLI 20tL I C 1004/1004388s 4008663s 35319 RELAY AND CONTROL TZBEI 20L2 I C fi U2 I tOO47 641 40091006 3s319 RELAY AND CONTROL DA TOREl2073lC/001/10051263 DA 40003374 3s319 SATELLITE CLOCK CAATS# 62306 40053663 35321 BATTERY AND RACK ER 31-21397-184 #3 TCX-580 40053664 35321 BATTERY AND RACK ER 31-21397-L84 #4 TCX-580 40085149 35321 BATTERY CHARGER EQf 393638 rzBE I 20 11 I C lTRs/10044938 40085148 3s321 BATTERY CHARGER EQ# 393639 TZBE / 20 tL / C/TRs/10044938 400489L2 35325 GROUND GRID SYSTEM TSOM/2003/C/004 40003358 35327 POWER AND CONTROL CABLE CMTS# 60808 40048913 35327 POWER AND CONTROL CABLE TSOM/2003/ClOO4 40053677 35327 POWER AND CONTROL CABLE ER 31-21397-184 400704s9 35327 POWER AND CONTROL CABLE TORMl2004lClO09l07 4008s749 3s327 POWER AND CONTROL CABLE TZKLI 2071 I C I O04l 10043 88s 4002647s 35341 RELAY AND CONTROL ER 91-4s504-6303 40026407 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 20286-075 40026471 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER22892-9T LANDIS & GYR 40003366 35342 EQUIPMENT RACK/SHELF CAATS# 62306 30063479 39700 cY20t2 coMM EQUTPMENT lClCL2723)TZKL/ 2O!t I C/004/ 1004388s 3006s848 39700 CY2O74 SUMMER LAKE COMM EQUIP gClC 72123) 30060474 39700 MODEM cAATSf 62306 3006047s 39700 MODEM CAATS# 62306 30051499 39705 REMOTE TERMINAL UNIT (SCADA RTU)TORMl2004lClO09lOt 30051500 39777 FO OPTICAUELECTRICAL CONVERTE R TORM/2004/ClOO9/07 30038166 397t7 SUMMER LAKE BPA SUB FO LINK REPEATER DYMEC 5844 TORM/2004/ClOt2/03 30038167 397L7 SUMMER LAKE SUB SUB FIBER OPTIC CABLE (JUMPERS) TORMl2OO4lCl0t2l03 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 63 30019697 39723 RADIO (RF)CAATS# 59502 30019707 39723 RADIO (RF)cAATSf 60684 C|AC 30051501 39726 EQUIPMENT RACK/SHELF TORMl2004/C/O09/01 30039314 39726 SUMMER LK COMMUNICATIONS RACK ER 45557-6301 30019711 39729 DIGITAL MULTIPLEX SYSTEM CAATS# 706747 300s1s02 39729 DIGITAL MULTIPLEX SYSTEM TORMl2004lCl009lOL 30038168 39729 SUMMER I.AKE DIGITAL MUX COASTCOM UNIVERSAL 24 SLOT TORM/20041C|0L2103 30038169 39729 SUMMER LAKE DIGITL MUX CHANNEL, coAsrcoM 30011-102 TORMl2004/ClOLzl03 30051504 39732 PLC TRANSMITTER/RECEIVER SET 10 WATT TORMl2004lCl009l07 30039322 39732 SUMMER LK COUPLING CAPACITOR TELEMETRY EQUIP ER 51384-6570 30036772 39735 BATTERY AND RACK TSOM/2003/C/00s 30019701 39735 POWER SUPPLY CAATS# 60684 C|AC 3003816s 39738 SUMMER I.AKE BPA SUB RELAY/CONTROL PANEL TORM/2004/ClOtz/03 30038164 39738 SUMMER LAKE MODULE REMOTE I/O SEL 2594 TONE EQUIP TORMI2OO4/Cl072/03 30038163 39738 SUMMER LAKE TONE RFL 9745 RELAY RECEIVA-RANSMITTER roRMl2004/cl0L2/03 30039313 39738 SUMMER LK RTU, 5100, LANDIS & GYR ER 45557-6301 30019699 39738 XMITTER, RECEIVER, 125 VDC, RFL 6750 CAATS# 60808 C|AC 3001959s 39747 ANTENNA SYSTEM CAATS# 59502 30019703 39747 ANTENNA SYSTEM CAATS# 60684 C|AC Location:068190 - Burns Reactive Station, OR 307722 35010 FEE LAND ER 31-16s46-184 SEC 18 T225 R31E 40046458 35201 BUILDINGS (EXPLOSIVES STORAGE)TORMl2007lClO77 40090025 35201 BUILDINGS (TRAILER)TZBE / 20 73 I C lT M 3/100s 1s 2 1 40090026 35201 BUILDINGS (TRAILER)rzBE / 2013 / ClrM 3/100s 1s2 1 40003444 35207 CONTROL BUILDING ER 31-16546-184 40003396 3s205 AIR CONDITIONER (EVAPORATIVE OR REFRIG.) ER 31-16546-184 4009000s 3s205 HVAC (HEATER)rzBE / 20 74 I C lT R6 / 100s2287 40003432 3s207 LOAD CENTER ER 31-16546-184 40076347 3s209 SECURITY SYSTEM w BS TZBEI2007 I CIOOZ I L0033499 ETC 40003420 3s213 PLUMBING SYSTEM ER 31-16546-184 40003452 35213 WATER HEATER ER 31-16546-184 40003428 35213 WELL ER 31-15546-184 40003400 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-16546-184 40089799 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF rzBEl20L3lClOO2 40003456 35227 CULVERT (FOR YARD DRAINAGE SYSTEM)ER 31-16546-184 40003408 35227 FENCE ER 31-15546-184 40065680 35227 FENCE CAATS WO 4870 40070759 35227 FENCE ER 31-16546-184 40070785 35227 OIL STORAGE TANK ER 31-16546-184 40072629 35227 ROADWAY, INC. CLRING, GRADING, SURFACE ER 31-16546-184 40003424 3s227 SIGN ER 31-15546-184 40083194 35227 SORBWEB BERM DORE l2ltLl C/830/1004s073 SPCC 40003404 3s227 UNDERGROUND ENCLOSURE (MAN HOLE)ER 31-16546-184 EXECUTION VERSION JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 64 EXECUTION VERSION 40070760 35229 FLOODLIGHTS ER 31-16546-184 40003412 35229 LIGHTI NG FIXTURE/SYSTEM ER 31-16546-184 40070781 35301 STATION SERVICE TRANSFORM ER ER 31-15546-184 40070773 35315 POWER FUSE MOUNTING 14.4KV ER 31-15546-184 40070757 35317 CABLE TRENCH ER 31-16546-184 40070753 35377 CONDUIT ER 31-15545-184 40076417 35319 ANNUNCIATOR rzBE / 2007 I c lr u2 I t003t67 4 40070750 35319 CABINETS ER 31-16545-184 40070742 35319 OSCILLOGRAPH ER 31-323-91-6089 40003274 35319 RELAY AND CONTROL CAATS# 60585 40049782 35319 RELAY AND CONTROL TORMl2004lClOr7 40070508 35319 RELAY AND CONTROL roRM/2004/cl009/03 40076238 35319 RELAY AND CONTROL WBS TORM/2 OO4I CIOOZIOS BRI DGER RAS 400764L8 35319 REI.AY AND CONTROL TZBE / 2007 I C lT U2 I 7003t67 4 40077762 3s319 RELAY AND CONTROL TZBE / 2009 I C lr R2 I 70 039 t7 8 40077976 35319 RELAY AND CONTROL wBs rzBEl2007 I cl 0otl L0035772,L003286O 40081902 3s319 RELAY AND CONTROL rzBE I 2070 I c lT R2 / t0040822 40083333 35319 RELAY AND CONTROL rzBE I 2077 I C ITR 1/1004s 1 6 I 40040404 35319 SATELLITE CLOCK wBS TORM/2 00tl Cl\ltl 07 40070744 35319 SATELLITE CLOCK ER 31-323-91-5089 40070746 35321 AUTOMATIC TRANSFER SWITCH ER 31-16546-184 40070747 35327 BATTERY AND RACK ER 31-16545-184 40068811 3s321 BATTERY CHARGER TORM/2005/C/014 AMERTCAN BATTERY CHARGING 40070748 3s32L BATTERY CHARGER ER 31-16546-184 40070762 35323 GENERATOR ER 31-16546-184 40070763 35325 GROUND GRID SYSTEM ER 31-16546-184 40049787 35327 POWER AND CONTROL CABLE TORMl2004lClOt7 40070774 35327 POWER AND CONTROL CABLE ER 31-15546-184 40076346 3s327 POWER AND CONTROL CABLE wBS TZBEI2007 I Cl 002 / 70033499 ETC 40070770 35329 LIG HTI NG FIXTURE/SYSTEM ER 31-16545-184 40026395 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 60585 40078993 35341 REMOTE TERMTNAL UNrT (SCADA RTU) EQ# 380030 roRM I 2004 / cl 009 I 03 G E D-20 40070779 35341 SEQUENCE OF EVENTS RECORDER ER 31-16546-184 40049783 35341 SEQUENCE OF EVENTS RECORDER S/N 18891 EO# 368602 TORM/2004/C/017 HATHAWAY DFR 30062754 39700 cy2011 BURNS REACTOR COMM EQUrp (C/C 13746!, 30064760 39700 cy2013 BURNS REACTOR COMM EQU|p (C/C r3746l. 30051600 39708 FILTER SYSTEM DZBE / 2007 I Cl 003 I t00377 29 TE LECT DUAL FE E D FIL 300196s9 3977L MAS SCADA REMOTE RADIO CAATS# 106281 30054747 39774 DATA NETWORK ROUTER - CISCO 2811 w BS TZBEI2007 I Cl 002 / 70033499 ETC 30051601 39774 DATA SWITCH . ESS DZBE I 2007 I C I OO3 I 700377 28 300s1602 39723 DEHYDRATOR SYSTEM DZBE I 2007 I C I OO3 I 700377 28 30051603 39723 RADIO (RF) TO BURNS BUTTE EQ# 377731 DZBE I 2007 I C I O03 /1003 77 28 300s1604 39729 DIGITAL M ULTI PLEX SYSTEM EQ# 377733 DZBE{2007 I ClO03 I L0037729 COASTCOM JOINT OWNERSHIP AND OPERATING AGREEMENT-EXHIBIT A Page | 65 EXECUTION VERSION 30051527 39732 PLC TRANSMITTER/RECEIVER SET 10 WATT roRM/2004/cl0o9103 30051526 39732 PLC TRANSMITTER/RECEIVER SET 50 WATT TORMl2004lCl009/03 30051605 39735 BATTERY AND RACK , 48V EQ# 377734 DZBE 12007 I Cl O03 / 7003L729 C& D MSE N D U R 30051606 3973s BATTERY CHARGER EQ# 377739 DZBE I 2007 I C I OO3 I 700377 2 9 VALAR E 300196s5 39747 COMPUTERIZED DIAL EXCHANGE CAATS# 51698 30051507 39747 ANTENNA SYSTEM 6 FT DZBE I 2007 / C / OO3 I LOO3 77 29 30051608 39747 TOWER - 30 FT DZBE I 2007 I C I OO3 I 7003 t7 29 300627ss 39750 CY2O11 BURNS REACTOR MOBILE RADIO (C/C r37461 Location: 085050 - Threemile Knoll Substation, lD 304274 35010 FEE LAND THREEMILE KNOLL IDCB-0151 Tr D M/200s/c I 037 I 70033667 40076973 35201 CONTROL BUILDING WBS TIDM/20Os / C/037 I tOO3 1845 + 40077028 35201 METAL CABINET WBS TIDM/2001 I ClO37 / 7003 1846 + FILING CABINE 40077040 35209 SECURIW SYSTEM EQ# 382918 WBS Tl DM/200s I C/O37 / t003 1846 + 40077070 35219 FOUNDATION AND SUBSTRUCTU RE WBS Tl DM/200s I clo37 I 7003 1846 + coNTRoL BUILD 40076970 35227 CEMENT CURB WBS TIDM/20O1/C/037l1OO31846 + INSIDE sUB 40076971 35227 cLEARtNG, GRADtNG, & FtLL MATERTAL (SURF WBS TIDM/200s / ClO37 I 7OO3 1846 + 40083s99 35227 CLEARING, GRADING, & FILL MATERIAL (SURF rzPR/ 2009 I cl00 u3 M LTRAN S 40077009 3s227 FENCE WBS Tl DM/20O5 / C/O37 / 7003 1846 + 40077038 35227 ROADWAY, INCL CLRING, GRADING, SURFACE WBS Tl DM/200s I clo37 I 7OO31846 + 40077042 35301 STATION SERVICE TRANSFORM ER WBS TIDM/2001/C/037170031846 + NO DETAIL INF 40077043 35301 STATION SERVICE TRANSFORMER TtDMl2OOslClO3T/1o037845 + NO INFO IDAHO POW 40083611 35301 STATION SERVICE TRANSFORM ER TZPR(2009 I Cl00 1/3 M LTRANS 40076969 353L7 CABLE TRENCH WBS Tl DM/2005 I ClO37 / L0O3 1846 + 40076972 35377 CONDUIT w Bs Tr D M/20 0s I cl 037 / 7003 L846 + 40077045 35317 STORAGE CABINET WBS Tl DM/20Os I Clo37 I 7003 1845 + 40076947 35319 ANNUNCIATOR WBS Tl DM/20O5 I C1037 I 1003 1846 + 40077008 35319 DIGITAL FAULT RECORDER EQf 383154 WBS Tl DM/20os I clo37 I 7003 1846 + 40087925 35319 DIGITAL RELAY TRIPPING DEVICE TWYO/20[/C/004/TMKDTG (SEL 2411) 40077029 3s319 METERING PACKAGE (CTIVT) 345KV WBS Tl D M/20 os / Cl O37 / L0O3 1846 + 40078954 35319 METERING PACKAGE (CTIVT) 345KV w BS Tr D M/20 0s / Cl O37 I L00334s3 40076524 35319 RELAY AND CONTROL w BS Tr D M/20 05 / Cl O37 I 10033453 40077036 3s319 RELAY AND CONTROL WBS Tl DM/20os I C1037 / 7003 1846 + 40077993 35319 RELAY AND CONTROL wBs rJ BM/20 04 I Cl 002 I t}O3ss64 RAS 4009024L 35319 RELAY AND CONTROL T ZRB I 20 7 4 I C I r R2 I LOO520 44 40077039 35319 SATELLITE CLOCK EQ# 382426 WBS TIDM/200s / ClO37 / 7OO31845 + 40076948 3532L AUTOMATIC TRANSFER SWITCH WBS TIDM/200s / clo37 / 70031846 + 40076949 35321 BATTERY AND RACK EQ# 376225 WBs Tl DM/20 0s I cl o37 h003 1845 + 40076950 35321 BATTERY CHARGER EQ# 376224 WBS Tl DM/20os I clo37 I too3 1846 + 400770L2 3s323 GENERATOR wBS Tl DM/200s I ClO37 I t0O3 1845 + 40077013 3s325 GROUND GRID SYSTEM WBS TIDM/20os / cl 037 I 70031846 + 40076s23 35327 POWER AND CONTROL CABLE w BS Tr D M/20 05 I Cl 037 / 10033453 40077033 35327 POWER AND CONTROL CABLE WBS Tl DM/200s I clo37 /1003 1846 + 40077992 35327 POWER AND CONTROL CABLE wBs TJ BM/20 04/ Cl O02 h003ss64 RAS 40077025 3s329 LIGHTI NG FIXTURE/SYSTE M WBS Tl DM/20os / c/037 I t0O3 1846 + 40085832 35341 HMI AUTOMATION ((SOFTWARE)TZP R / 2017 I C/TR6/1004s 18s JOINT OWNERSHIP AND OPERATING AGREEMENT-EXHIBIT A Page | 66 EXECUTION VERSION 40077037 35341 REMOTE TERMINAL UNIT (SCADA RTU)WBS TIDM/200s I C/037 / t003 1846 + 40077047 35341 SEQUENCE OF EVENTS RECORDER WBS TIDM/20O5 I C1037 / 70031846 + 30064302 39700 CY2O72 THREEMILE KNOLL SUB COMM EQUIP (cc 13696) 30064757 39700 CY2O13 THREEMILE KNOLL SUB COMM EQUIP (c/c 13595) 300ss318 397L4 DATA NETWORK ROUTER EQ # 382416 wBs r DM/200s I cl 037 / 70033277 CTSCO 2817 30055078 397L4 DATA NETWORK SWITCH WBS TIDM/200s I c/037 / too3 1846 + 30055317 39774 DATA NETWORK SWITCH w BS Tr D M/20 0s I Cl 037 / t0033277 ETHERSWITCH 300ss084 39714 MODEM WBS TIDM/200s / Cl 037 I 70031846 + 30055320 39777 FIBER OPTIC CABLE - ADSS wBS Tl D M/20 0s I Cl O37 I t0033277 300ss321 39717 FIBER OPTIC PATCH PANELS wBs r D M/20 0s I cl o37 I L0033277 300s5081 397t7 FIBER OPTIC/TRANSMITTER RECEIVER SET EQ# 382417 WBS TIDM/200\/C1037 170031846 + DMX 300ss088 39720 POWER QUALITY MONITOR WBS Tl DM/20O1 I C1037 / 1003 1846 + 30055080 39726 EQUIPMENT RACK/SHELF WBS TIDM/2005 I C1037 I 7003 1846 + 30055079 39729 DIGITAL MULTIPLEX SYSTEM EQ# 382418 WBS TIDM/200s I C1037 I t0O3 1845 + 1003286s 30055070 39735 BATTERY AND RACK EQf 382414 W BS Tl D M/20 05 I Cl 037 I 7OO3 1846 + 30055071 3973s BATTERY CHARGER EQ# 382415 WBS TIDM/20os I c1037 I t003 1846 + 300s5069 39738 AUDIO-TONE PROTECTIVE RELAY TERMINAL RFL 9745 WBS TIDM/200s I Cl 037 I 70031846 + 30055085 39738 PANEL-RELAY AND CONTROL FOR RTU WBS Tl DM/20O5 / Cl 037 / 7003 1846 + 300ss090 39744 TELEPHONE LINE SHARING SWITCH WBS Tl DM/2OOi I c/037 / 1003 1846 + 300586s9 39744 TELEPHONE LINE SHARING SWITCH r JBM / 2004 / C I 002 / 7OO3ss64 30055089 39758 SYNCHRONOUS TIMER EQ# 382426 W BS Tl DM/20 05 I ClO37 I tOO3 1846 + Location: 013209 - Bie Grassv Substation. lD 300955 35010 FEE LAND - BIG GRASSY IDJI-OO4O CAATS# 700974 3s0209013209 3s020 ACCESS ROAD RIGHT OF WAY CAATS# 100974 40051667 35201 CABLE TRAY CAATS# 700974 40051673 3s201 CONTROL BUILDING CAATS# t00974 40051599 35205 UNIT HEATER CAATS# 700974 4005L727 35219 FOUNDATION AND SU BSTRUCTURE CAATS# IOO974 FOR CONTROL BUILDING 40057671 35227 CLEARING, GRADING, & FILL MATERIAL (SURF CAATS# tOO974 40085597 35227 CLEARING, GRADING, & FILL MATERIAL (SURF TZP R I 2009 / C1003/B G RAS U B 40051675 3s227 CULVERT (FOR YARD DRAINAGE SYSTEM)cAATSf 700974 40057677 35227 FENCE CAATS# t00974 40085599 35227 FENCE/GATE TZPRI 2009 I Cloo3/BGRASU B 40051696 35227 SIGN CAATS# t00974 40051568 35317 CABLE TRENCH CAATS# LOO974 40085595 35317 CABLE TRENCH TZPR I 2009 I C 1003/BG RAS U B 40057672 35317 CONDUIT CAATS# 700974 40085598 35317 CONDUIT rzP R I 2009 I c/003/BG RAS U B 40051698 35317 MICROWAVE TOWER cAATSf 700974 40051660 35319 ANNUNCIATOR 12PT CAATS# 100974 40012339 35319 RELAY AND CONTROL CAATS wO BGSYg4RE 56850 40048273 35319 RELAY AND CONTROL TrDM/2003/C 1030107 40051694 3s319 REI.AY AND CONTROL CAATS# 700974 40081301 35319 RELAY AND CONTROL TZP R I 2009 I C I 002 I 10038044 40082329 35319 RELAY AND CONTROL TZP R I 2008 I C/TR2 / 1 003 5 805 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 67 EXECUTION VERSION 4008s622 3s319 RELAY AND CONTROL TZP R I 2OO9 / ClOO3/BG RAS U B 40090276 35319 RELAY AND CONTROL TZPR I 2013 / C lT R2 /10049986 40051661 3s321 BATTERY AND RACK 125VDC CAATS# 700974 ALCAD 40051662 35321 BATTERY CHARGER CAATS# 700974254 40051679 3532s GROUND GRID SYSTEM CAATS# 700974 40085501 3532s GROUND GRID SYSTEM TZP R / 2O0s I Cloo 3/BG RAs U B 40051680 35325 INSULATED PLATFORM 6'CAATS# 100974 40089316 3s327 ANIMAL GUARDS TZP R I 2009 I C/003/Vr B RTN 400sL692 3s327 POWER AND CONTROL CABLE CAATS# 100974 40085606 35327 POWER AND CONTROL CABLE TZP R / 2OO9 I C/OO3/BG RAS U B 40051687 35329 LIGHTI NG FIXTURE/SYSTEM CAATS# tOO974 4008560s 3s329 LIGHTING FIXTURE/SYSTEM rzP R I 2009 I c/003/BG RAS U B 40051686 35341 INTERPOSITION CABINET CAATS# 100974 4005169s 3s341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS# 100974 MG 30063295 39700 CY2O11 BIG GRASSY COMMUNICATION EQ (c/c 13588) TZPR / 2009 I C /003/BG RAS U B 3005s743 39700 cy2o74 coMM EQUTPMENT (BrG GRASSY/C 13695) TZP R I 2073 I ClTR2l10049985 30015863 3970s COMM, STATION ALARM CONTROL RTU CAATS# tO2273 300158s9 39774 MODEM CAATS# L02273 30015857 39723 RADIO (RF)CAATS# 702273 30015875 39726 EQUIPMENT RACK/SHELF CAATS# 702273 30046440 39735 COMM BATTERY AND RACK TIDM/2005/C/046 East Penn Unisv IIAGM seale 3004644t 39735 COMM BATTERY CHARGER TIDM/2005/C1046 48 volt Batterv Charqer Svste 30015877 39744 PARTY LINE SELECTOR CAATS# 702273 30015879 39744 TELEPHONE LINE DATA CAATS# t02273 30015865 39747 ANTENNA SYSTEM CAATS# tO2273 3001s869 39747 RADOME CAATS# 702273 30015871 39747 TOWER CAATS# 702273 30015873 39747 WAVEGUIDE CAATS# 702273 3004104s 39753 AIR CONDITIONER (EVAPORATIVE OR REFRIG.) TIDM/2004/Cl0L6 Location: 064003 H urricane Substation, OR 301046 35010 FEE LAND JV 98 30t047 3s010 FEE LAND JV 98 40001602 35201 CONTROL BUILDING ER 31-8240-183 40001511 35201 EMERGENCY LIGHTING SYSTEM ER 31-8240-183 40001638 3s201 EMERGENCY LIGHTING SYSTEM ER 31-45565-4110 40089325 35205 HVAC (ArR CONDTTONER)ww A I 2013 I c/TR6/1 00s 0607 40091058 35205 HVAC (ArR CONDTTTONER) EQ#403884 TZW W / 2014 /C/TR6/10053683 40001508 3520s UNIT HEATER ER 31-8240-183 40001599 35227 CLEARING, GRAD|NG, & FrLL MATERTAL (SURF ER 31-8240-183 40001623 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-15685-183 40001629 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-16685-183 40001635 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-45565-4110 4000150s 35227 FENCE ER 31-8240-183 40059121 35227 FENCE CAATS wO 4909-40920 40001625 35227 GATE ER 31-16685-183 40059011 3s227 ISOI.ATION LINK PANEL CAATS# 61383 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT A Page | 68 EXECUTION VERSION 40001620 35227 LOAD CENTER ER 31-8240-183 40001617 35227 ROADWAY ER 31-8240-183 40001614 35227 SIGN ER 31-8240-183 40090549 35227 SORBWEB BERM DORE I 2074 I Cl 830/100s 196 1 40019081 35301 STATION SERVICE TRANSFORMER 25KVA JV 98 400L9L26 353t7 CONDUIT ER 31-8240-183 40079242 35317 CONDUIT ER 31-45555-4110 40079286 35317 CONDUIT ER37-52228-4310 40019102 35317 UNIT HEATER ER 31-8240-183 40079774 3s319 ANNUNCIATOR ER 31-8240-183 40019150 3s319 RELAY AND CONTROL ER 31-8240-183 40079270 35319 RELAY AND CONTROL ER 31-45598-4077 40019302 3s319 RELAY AND CONTROL ER 31-52228-4310 40079188 35319 RELAY AND CONTROL ER 31-60175 40055951 35319 RELAY AND CONTROL - JLS METER cw Es /2004 / cl 07 7 I 70026626 J L5 M ETE RS 40088248 35321 BATTERY AND RACK 125VDC eq# 398360 TZWW I 20t3 / C/T Rs/ 10048s84 40088249 35321 BATTERY CHARGER EQf 4OOO34 rzw w I 20L3 I c/TR5/10048584 40019098 3s323 GENERATOR ENCLOSURE ER 31-8240-183 40079175 35325 GROUND GRID SYSTEM ER 31-8240-183 40079189 3s325 GROUND GRID SYSTEM ER 31-45555-4110 40079190 35325 GROUND GRID SYSTEM ER 31-52228-4310 40019089 3s329 FLOODLIGHT ER 31-8240-183 40019085 35329 LIGHTI NG FIXTURE/SYSTEM ER 31-8240-183 40019106 35339 FIRE EXTINGUISHER ER 31-8240-183 4002s848 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 31-45598-4077 40058735 35341 REMOTE TERMINAL UNIT (SCADA RTU)CMTS# 6373s/6374t 4002s836 3s343 EQUIPMENT RACK/SHELF ER 31-45598-4077 30050s00 39700 MODEM ENCLOSURE ER 31-45598-4077 30060499 39700 TRANSLATOR CABINET ER 31-45598-4077 Location: 085023 - Jefferson Substation, lD 301873 35010 JEFFERSON 767/69 KV SUB I.AND IDJI.OO34 ER 85-7780 40077561 35201 CONTROL HOUSE ER 85-7780 40003928 35201 ROOF CAATS #105119 40068043 35213 WELL ER 85-7780 40051981 35227 cLEARtNG, GRADtNG, & FtLL MATERTAL (SURF ER 85-8534 40077563 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 85-8138 40078966 35227 FENCE ER 85-7780 INTERIOR FENCE AROUND REACTORS 40077580 35227 FENCE & GATES ER 85-8138 40089462 35227 TREX BERM DZP R I 20t3 I C /7 00 I 700s 7026 40077606 3s301 STATION SERVICE TRANSFORMER ER 83-8355 40051983 35317 CABLE TRENCH ER 85-8534 40068066 35317 CABLE TRENCH ER 85-7780 40077566 35317 CABLE TRENCH ER 85-8138 40068067 35317 CONDUIT ER 85-7780 40077659 35317 CONDUIT ER 101131 40048224 35319 RELAY AND CONTROL TrDM/2003/C lO32l07 400s1990 3s319 RELAY AND CONTROL ER 8s-8534 40051991 35319 RELAY AND CONTROL ER 85-8534 4006803s 35319 RELAY AND CONTROL ER 85-7780 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 69 EXECUTION VERSION 40068093 35319 RELAY AND CONTROL ER 85-7780 40077586 35319 RELAY AND CONTROL ER 85-8138 40077605 3s319 RELAY AND CONTROL ER 83-835s 40077672 35319 RELAY AND CONTROL ER 85-6403 40077629 35319 RELAY AND CONTROL ER 8s-5670 40077633 35319 RELAY AND CONTROL ER 85-6892 & 8s-6906 40077647 35319 RELAY AND CONTROL ER 393587 40077653 35319 RELAY AND CONTROL ER 383754 40077664 35319 RELAY AND CONTROT ER 101131 40048353 35321 BATTERY AND RACK 125VDC wBS DZPR/20O4(C/DR' I 1002 182s C&D 40048364 3s321 BATTERY CHARGER 135VDC w BS DZPR/2004 I Cl DRs I 10021825 C& D 35A 40068100 3532s GROUND GRID SYSTEM ER 85-7780 40068101 35325 GROUND GRID SYSTEM ER 85-7780 40077542 3s325 GROUND GRID SYSTEM ER 85-8138 40077675 3532s INSULATED PLATFORM ER 85-6557 40068104 35325 INSULATED PLATFORM 12'ER 85-7780 40051986 3s325 INSULATED PLATFORM 14,ER 85-8534 40077585 3532s INSULATED PLATFORM 14'ER 85-8138 4005198s 35325 INSULATED PLATFORM 4'ER 85-8534 40068102 35325 INSULATED PLATFORM 4'ER 85-7780 40077584 3s325 INSULATED PLATFORM 4'ER 85-8138 40068103 35325 INSULATED PLATFORM 6.ER 85-7780 40077589 3532s INSULATED PLATFORM 5'ER 85-8137 40051989 35327 POWER AND CONTROL CABLE ER 85-8534 40068109 35327 POWER AND CONTROL CABLE ER 85-7780 40077590 3s327 POWER AND CONTROL CABLE ER 85-8137 40077602 35327 POWER AND CONTROL CABLE ER 83-8355 40077678 35327 POWER AND CONTROL CABLE ER 85-6557 40068130 35329 LIGHTI NG FIXTURE/SYSTEM ER 85-7780 40077607 3s329 LIG HTI NG FIXTURE/SYSTEM ER 83-8355 40077663 35329 LIGHTING FIXTURE/SYSTEM ER 101131 40041681 35341 REMOTE TERMINAL UNIT (SCADA RTU)rDMl20O2lC/009/B L&G s700 RTU Type 14 VAtta 40057992 35341 REMOTE TERMINAL UNIT (SCADA RTU ER 85-8534 40058887 35341 REMOTE TERMINAL UNIT (SCADA RTU CAATS #104220 40068132 35341 REMOTE TERMINAL UNIT (SCADA RTU ER 85-7780 40077657 35341 REMOTE TERMINAL UNIT (SCADA RTU ER 3346400 30054810 39700 cy2013 JEFFERSON SUB COMM EQUrp (C/C 13696) 30065819 39700 cy2014 JEFFERSON SUB COMM EQUrp (C/C 13696 300200s9 39723 DEHYDRATOR SYSTEM CAATS #106921 30020061 39723 RADIO (RF)TO MENAN BUTTE EQ# 333534 ER 6-3360 30020041 39726 CROSS CON NECT TREE/FRAM E ER 100388 3002003s 39729 ANALOG CHANNEL ER 3429610 30020039 39729 ANALOG CHANNEL ER 3639473 30020043 39729 ANALOG CHANNEL ER 100388 30020049 39729 ANALOG CHANNEL CAATS f29638 30058717 39729 ANALOG CHANNEL ER 3394384 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 70 EXECUTION VERSION 30020037 39729 ANALOG MULTIPLEX SHELF ER 3429610 300ss030 39735 BATTERY AND RACK 48V EQ# 386004 DZP R / 2009 I C / DRg I 70039 402 30020045 39738 PROTECTIVE RELAYING RECEIVER ER 100388 30020047 39738 PROTECTIVE RELAYING TRANSM ITTER ER 100388 30020051 39747 COMPUTERIZED DIAL EXCHANGE CAATS #103068 30020057 39747 ANTENNA SYSTEM CAATS #106921 Location:085026 - Antelope Substation, lD 4005L027 35201 CABLE TRAY r|DMl2005lCl077 40077623 35201 CONTROL BUILDING ER 8s-8506 40064983 35201 ROOF TZPR I 2006 I C I LUz I rO0297 88 40077637 3s20s AIR CONDITIONER ER 85-5998 40077632 35205 Heat Pumo ER 6167 40059400 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 393041 40078957 35227 CLEARING, GRADING, & FILL MATERIAL (SURF wBs rzP R/2009/c/TRu10038830 40069401 35227 FENCE & GATES ER 393041 40077624 35227 FENCE & GATES ER 85-8606 40053477 35227 RETAINING WALL ER 8s-8606 40082s03 35227 ROADWAY TZPR I 2011 I Cl7 00 /1004367 4 40082502 35227 TREX BERM TzP R / zOtL I C I 7 O0 / t0O4367 4 spcc 40077634 35229 LIGHTING FIXTURE/SYSTE M ER 85-8506 40077635 35229 LIG HTI NG FIXTURE/SYSTE M ER 85-8606 40053478 35301 STATION SERVICE TRANSFORMER ER 85-8606 GE 400s3484 3s301 STATION SERVICE TRANSFORM ER ER 85-8506 ELEC DRY TYPE 40053480 35301 STATION SERVICE TRANSFORMER sOKVA ER 85-8606 GE 14400-249 40053481 3s301 STATION SERVICE TRANSFORMER sOKVA ER 85-8506 GE L2470-277 40053482 35301 STATION SERVICE TRANSFORMER sOKVA ER 85-8606 WEST 40077642 35301 STATION SERVICE TRANSFORMER sOKVA ER-85-6167 40077678 35317 CABLE TRENCH ER 85-6859 40069480 35317 CONDUIT ftDM/2004/cl004lor 40069820 35317 CONDUIT TZP R I 2007 I C lT R6 I 70034427 40077679 35317 CONDUIT ER 85-5859 40037997 35319 DIGITAL FAULT RECORDER DREX/1999/C lO12l07 40004900 35319 OSCILLOGRAPH ER 383741 ROCHESTER SN 38960 4003846s 3s319 RELAY AND CONTROL CAATS #39053 WBS DSHE/L999/C{O64 40049109 35319 RELAY AND CONTROL wBS TrDM/2004/ClO78 40049275 35319 RELAY AND CONTROL r|DMl2OO3lC/O06 40055764 35319 REI.AY AND CONTROL wBs 1 D M/200s I cl o73 I O02 40066160 35319 RELAY AND CONTROL ER 85-6119 40069399 35319 REI.AY AND CONTROL ER 86-6888 40069485 35319 RELAY AND CONTROL TIDMl2004lcloo4l07 40077640 35319 RELAY AND CONTROL ER 85-8550 40077643 3s319 RETAY AND CONTROL ER 85-6397 40077644 35319 RELAY AND CONTROL ER 8s-5202 40077645 3s319 RELAY AND CONTROL ER 85-6673 40077647 35319 RELAY AND CONTROL ER 85-7088 40077684 35319 RELAY AND CONTROL ER 85-5859 40077708 35321 BATTERY AND RACK ER 393884 Over 100% CIAC 40077709 35321 BATTERY CHARGER ER 393884 Over 100% CIAC 40077685 35325 GROUND GRID SYSTEM ER 85-6859 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 7l EXECUTION VERSION 40077687 35325 INSULATED PLATFORM 10'ER 85-5859 40053457 3s325 INSULATED PLATFORM 4'ER 8s-8606 40077686 35325 INSULATED PLATFORM 4'ER 85-6859 40053458 35325 INSULATED PLATFORM 6'ER 85-8606 40049274 35327 POWER AND CONTROL CABLE TIDM/2003lCl006 40053473 3s327 POWER AND CONTROL CABLE ER 8s-8606 40055763 35327 POWER AND CONTROL CABLE wBS Tr DM/200s I Cl Ot3 / 002 40069484 35327 POWER AND CONTROL CABLE TIDM/20041C/O04l07 40077697 3s327 POWER AND CONTROL CABLE ER 85-6859 40077677 35329 LIGHTI NG FIXTURE/SYSTE M ER 86-6859 40077692 3s329 LIGHTING FIXTURE/SYSTE M ER 85-6859 40026477 35341 INTERPOSITION CABINET ER 85-6805 40045539 35341 METER wBs rDM/20031clo27/07 40026475 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 85-6805 LEEDS & NORTHRUP 40026479 35341 REMOTE TERMINAL UNIT (SCADA RTU)CMTS #103389 LEEDS & NORTHRUP 40026483 3s341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS #105609 HARRIS CONTROLS 40038308 35341 REMOTE TERMINAL UNIT (SCADA RTU)CAATS #101090 40077648 35341 REMOTE TERMINAL UNIT (SCADA RTUI ER 85-5797, 8s-6991 40077649 35341 REMOTE TERMINAL UNIT (SCADA RTU)ER 85-8035 40078832 35341 REMOTE TERMINAL UNIT (SCADA RTU) EQ# 328118 CAATS #104205 LANDIS & GYR MODEL 5410 40038013 3s341 SEQUENTIAL EVENT RECORDER SENGlT99slC/062 40026487 3s349 SATELLITE CLOCK CAATS f21205 30064761 39700 cy2013 ANTELOPE SUB COMM EQU|p (C/C 13596) 30020157 39777 FIBER OPTIC CABLE CAATS #106293 30020159 39777 FIBER OPIC/TRANSMITTER RECEIVER SET CAATS #106293 30034104 39777 FIBER OPTIC/TRANSMITTER RECEIVER SET CAATS #39063 WBS DSHE/19991C1064 30020143 39729 ANALOG CHANNEL ER 3394350 3002014s 39729 ANALOG CHANNEL ER 363945s 30020151 39729 ANALOG CHANNEL ER 100964 30020161 39729 ANALOG CHANNEL CAATS #104205 30058712 39729 ANALOG CHANNEL CAATS #100697 30032507 39729 ANALOG CHANNEL MODEM & TERM UNIT (ANALOG) GRANGER/TELLABS FXS - PROJECT 65543 30020155 39729 DIGITAL MULTIPLEX SYSTEM CAATS f106293 30020149 39735 BATTERY CHARGER ER 5057 30036924 39735 COMM UNICATIONS BATTERY BANK TIDM/2002/ClRDF/011 30036182 39738 PROTECTIVE RELAY TERMINAL - RFL 9745 TIDM/20001c/073 30036183 3974r'.TELEPHONE LINE SIGNALLING UNIT - TELLABS 44L0 T|DM|2OOO/Cl0L3 30042062 39750 CELLULAR TELEPHONE (10761)TIDM/20041C/O18 Location:085051 Pooulus Substation, lD 304311 3s010 POPULUS SUB LAND IDBA-0015 TttD l2OO7 I C|OO2IPSUBR Goldbere Land 3043L2 35010 POPULUS SUB LAND IDBA-0016 TllD l2OO7 I CIOO2IPSUBR Hatfield Land 304313 3s010 POPULUS SUB LAND IDBA-0017 'tttD 12007 / C1002/PSUBR Evans La nd 40080144 35201 CONTROL BUILDING T|tD/20071C1002/PSUB 400801s3 35207 METAL CABINET (FOR FIBER OPTICS)T|tD/20071C1002/PSUB 40080205 35209 SECURITY SYSTEM TrD/2OO7lCloo2lPSUB JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page 172 EXECUTION VERSION 40080149 35219 FOUNDATION AND SUBSTRUCTURE - CTRL BLDG TrD12007lClOo2lPSUB 40080142 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF TrD12007lCl002lPSUB 40080147 35227 FENCE & GATES TilD12007lCl002lPSUB 40080157 35301 STATION SERVICE TRANSFORM ER ltD12007lcl002lPsUB 40080146 35315 DISCONNECT SWITCH 5OA 24OVAC TrD12007lClO02lPSUB 40080384 35317 CABLE TRENCH fltD12007lc/002/PSUB 40080143 35317 CONDUIT TrD12007lcloo2lPsuB 40080148 35317 FOUNDATION AND SUBSTRUCTURE COMMON TrD/20071C/002/PSUB 40080193 35377 FOUNDATION AND SUBSTRUCTURE - JOINTLY OWNED TrD/2007 /C/002/PSUB 40080134 35319 ANNUNCIATOR TrD 12007 I CIOo2lPSUB ROCH ESTER 40080140 35319 CABLE TERMINATION CABINET TrD12007lc/002/PSUB 40080145 3s319 DIGITAL FAULT RECORDER TIID I 2OO7 I CI OO2IPSU B ROCH ESTE R 40090423 35319 DIGITAL FAULT RECORDER/SYNCH ROPHASOR WECC WISP SYS TUTH I 207U Cl 003 I L0047 406 40080201 35319 M ETERI NG PACKAGE (CTIW) 345KV \tD12007 /cloo2lPsUB 40080202 35319 METERING PACKAGE (CTIVr) 345KV SPARE TtD(2OOT /C1002/PSUB 40080155 3s319 RELAY AND CONTROL TrD12007lCl002lPSUB 40080304 35319 RELAY AND CONTROL WBS TIID/2OOTICIOOZIRAS MODIFY RAS SCHEME 40086594 35319 RELAY AND CONTROL TWY O I 20Lt lcloos/PO P DATA 40088586 35319 RELAY AND CONTROL rzP R I 20 72 I C I T R2 I tOO 4837 5 40080135 35321 AUTOMATIC TRANSFER SWITCH TrD12007lcl002lPsuB 40080135 3s321 BATTERY AND RACK 125VDC EQ# 381622 TrD/20071C/002/PSUB 40080137 35321 BATTERY AND RACK 48VDC EQ# 381620 rrD/20071c/oo2lPsUB 40080138 35321 BATTERY CHARGER 125VDC EQ# 381623 TrD12007lClOo2lPSUB 40080139 3s321 BATTERY CHARGER 48VDC EQ# 381621 TrD12007 /ClOo2lPSUB 40080150 35323 GENERATOR TilD/20071C/002/PSUB 40080151 35325 GROUND GRID SYSTEM TtD12007 /C1002/PSUB 40080154 35327 POWER AND CONTROL CABLE TtD12007 /C1002/PSUB 40086693 35327 POWER AND CONTROL CABLE TWY O I 20tt lcl00s/PO P DArA 40080152 35341 HMI AUTOMATION (PC. PRINTER, SOFTWARE)TilD12007lCl002lP5UB 40080156 35341 REMOTE TERMINAL UNIT (SCADA RTU)ltD12007lcloo2lPsUB 300s86s6 39005 PREFAB BUILDING .2 ROOM GFRC CONCRETE tt'x24' T ilD I 2OO7 I C I 002 I 100347 2s 30060173 39011 SITE CLEARING TrD 12007 I C(OO2 I t00347 25 30060174 39011 SITE GROUNDING TrD 12007 I Cl OO2l L003472s 30059151 39700 cy2010 coMMUNrcATroN EQUTPMENT (CC 13696) CA TrD I 2007 I Cl Oo2IPSU BCOM 30060197 39700 CY2O1O COMMUNICATION EQUIPMENT (CC 13695) JO TtD l2OO7 I Cl 002/PSU BCOM 30064303 39700 cY2O72 POPULUS SUB COMM EQU|P (CC 136951 30058541 39705 RTU - GE CANADA T rD / 2007 I Cl O02 h003 47 2s 300s8642 39774 ROUTER - CTSCO 2811 TrD I 2007 / Cl OO2 I LOO347 2s 30058643 39723 DEHYDRATOR SYSTEM TrD I 2oo7 / Cl OO2 I too347 2s 30058644 39723 RAD|O (RF) 77GHZ 28DS1TO RED ROCK EQ#XXXXXX TrD I 2007 / Cl OO2 / tOO347 2s 30058645 39726 EQUIPMENT RACK/SHELF w FUSE PANEL TrD I 2OO7 I C I 002 I 700347 2s JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A PagelT3 EXECUTION VERSION 30058646 39729 DIGITAL MULTIPLEX SYSTEM COASTCOM R409 TrD /2007 I CI OO2 / LOO347 2s 300586s0 39735 AC POWER TRANSFER PANEL r ilD I 2007 I Cl 002 I t0o3 47 2s 30058647 3973s BATTERYAND RACK DEKA EAST PENN UNIGY il EQ#XXXXXX T rD / 2007 / Cl O02 / L00347 2s 30058648 39735 BATTERY AND RACK EQ #XXXXXX TrD I 2007 I CI OO2 I tOO347 2s 30058649 39735 BATTERY CHARGER EQSXXXXXX rffi I 2007 I cl oo2 hoo347 2s 30058651 39735 EMERGENCY POWER GENERATOR SYSTEM ONAN 35KW TnD I 2OO7 / Cl 002 I L0O347 2s 30058652 39735 PROPANE STORAGE TANK T rD / 2007 / Cl OO2 / 100347 2s 300s85s4 39747 ANTENNA SYSTEM - 6'TELGAR RADOME TrD I 2007 / CI O02/ 700347 2s 30058653 39747 ANTENNA SYSTEM - HP6-107-PIA EQ#XXXXXX TtD / 2007 / Cl 002 / 100347 2s 30058655 39747 TOWER SABRE S3TL 150' EQ#XXXXXX r[D I 2007 I cl 002 /100347 2s 30058690 39747 WAVEGUIDE r rD I 2007 I Cl o02 I 100347 25 Location: 238018 - Walla Walla Substation, WA 302032 35010 FEE LAND 1998 BALANCE CONVERSION 302033 35010 FEE LAND 1998 BALANCE CONVERSION 4000611s 35207 CONTROL BUILDING ER 31-11353-283 40006155 35201 CONTROL BUILDING ER37-7297-285 40006163 35201 CONTROL BUILDING ER 31-3032-285 40006171 35201 CONTROL BUILDING ER 31-552s-283 4000619s 35201 CONTROL BUILDING ER 31-8759-283 40006207 35201 CONTROL BUILDING ER 31-11825-284 ADDtTtON 72',X 40' 40006243 3s201 ROOF CAATS# 53356 40005159 35205 FAN SYSTEM ER 31-3726-283 40079192 3520s Heat Pump TZW A I 2009 I C/TR6/ 1 003 99 83 40006227 3s20s UNIT HEATER ER 31.52545-4359 HEAT PUMP 40006191 3s207 LOAD CENTER ER 31-8130-283 4000613s 35213 PUMP ER 31-11353-283 FOR WELL 40006219 3s2L3 WELL ER 31-11185-285 40006091 3s227 cLEARtNG, GRAD|NG, & FtLL MATERTAL (SURF ER 31-11353-283 40006151 35227 CLEARING, GRADtNG, & FtLL MATERTAL (SURF ER 31-19287-283 40006187 35227 CLEARING, GRADING, & FILL MATERIAL (SURF JV 98 40006203 3s227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-87s9-283 40006211 35227 CLEARING, GRADING, & FILL MATERIAL (SURF ER 31-17074-283 4000623s 35227 CLEARING, GRADING, & FILL MATERIAL (SURF CAATS# 62049 40006143 35227 FENCE ER 31-11353-283 40005215 35227 FENCE ER37-77074-283 40006223 35227 FENCE ER 31-51145-4283 40006231 3s227 FENCE CAATS wO sO44-42960 40006239 35227 FENCE CAATS# 62049 40006175 35227 GATE ER 31-6625-283 40006099 3s227 LANDSCAPING W/SPRINKLING SYSTEM ER 31-11353-283 40006123 35227 LIGHTI NG FIXTURE/SYSTEM ER 31-11353-283 40006167 35227 LIG HTI NG FIXTURE/SYSTEM ER 31-5095-286 FOR CONTROL BUILDING 40006111 3s227 ROADWAY ER 31-11353-283 40006183 35227 ROADWAY ER 31-6625-283 40006103 3s227 SIDEWALK ER 31-11353-283 40006107 35227 SIGN ER 31-11353-283 40083979 35227 SORBWEB BERM DWAS/2 0 1 1/C I 830 I LOO4447 7 JOINT OWNERSHIP AND OPERATING AGREEMENT-EXHIBIT A PagelT4 EXECUTION VERSION 40015680 35301 STATION SERVICE TRANSFORMER ER 31-11353-283 15KVA & 75KVA 40015751 35301 STATION SERVICE TRANSFORM ER ER 31-11353-283 2 25KVA s1,020.30 1 50KVA Sas 40015768 35317 CONDUIT ER 31-11353-283 40015873 35317 CONDUIT ER 31-652s-283 40075977 35317 CONDUIT ER 31-8759-283 40015970 35317 CONDUIT ER 31-13569-283 40016031 35317 CONDUIT ER37-77074-283 40079777 35317 CONDUIT TZW Al2O09 I CITR4I10038563 BLUE MOUNTAT N LINE 40016135 35319 RELAY AND CONTROL ER 3145598-408s 40016747 3s319 RELAY AND CONTROL WEST TYPE LCB.MDAR TONE TRANSFER 40016159 35319 RELAY AND CONTROL CAATS# 51140 40076t79 3s319 RELAY AND CONTROL CAATS# 62199 40037827 35319 RELAY AND CONTROL CAATS #6255s 40038965 35319 RELAY AND CONTROL TWAM/2000/C{006107 40039330 35319 REI.AY AND CONTROL twam12000lcl004 40045019 35319 RELAY AND CONTROL TWAM/2000/C(002102 40051649 35319 RELAY AND CONTROL TMGMl200s/C10021007 40062282 3s319 RELAY AND CONTROL CAATS# 64711 40067360 35319 RELAY AND CONTROL wBS TWAM/2 006 I Cl 0081 70030393 40069614 35319 RELAY AND CONTROL Ttw Al 2006 / c1002/10030679 100% crAc 40070542 3s319 RELAY AND CONTROL DZW Al 2007 I C/D R2l1003 3 8s 0 40079277 35319 RELAY AND CONTROL cAATSf 50177 40084368 35319 RELAY AND CONTROL TZW A I 20 t2 I C lT R2 I lOO 4 608s 40084398 35319 RETAY AND CONTROL TZW Al 20L7 / C/TR2I100455 65 40084773 3s319 RELAY AND CONTROL cw Es / 2008 / c/00s/GcP DWA LL 40086983 35319 RELAY AND CONTROL TZW Al 2073 / ClTR2l10048488 40086984 35319 RELAY AND CONTROL TZW A / 2013 I C lT R2 I 70048604 400s6959 35319 RELAY AND CONTROL - JLS METER cwEsl2004l cloT u 70026624 JLs M ETERS 40016191 35319 REI.AY, INSTRUMENT, OR DEVICE CAATS# 62199 40015195 35319 RELAY, INSTRUMENT, OR DEVICE cAATSf 62199 40016199 35319 RELAY, INSTRUMENT, OR DEVICE CAATS# 62199 40040442 35319 SATELLITE CLOCK w BS rwAM/2 OOLI Cl RDF / 70009 183 ARBTTE R 40049636 35321 BATTERY AND RACK 125VDC DZW Al 2003 / C / DRs / 70020340 C& D 40049637 35321 BATTERY CHARGER 125VDC DZW A/2003 I C/DR5/10020340 LAMARCH E 40015809 35323 GENERATOR FUEL TANK ER37-7474-285 40075772 35325 GROUND GRID SYSTEM ER 31-11353-283 40015837 3s32s GROUND GRID SYSTEM ER 31-19287-283 40075974 3s32s GROUND GRID SYSTEM ER 31-13569-283 40016035 35325 GROUND GRID SYSTEM ER 31-17074-283 40079L79 35325 GROUND GRID SYSTEM TZW Al 2009 / C/TR4/10038563 BLU E MO U NTA| N LINE 40015699 35327 CUTOUT ER 31-11353-283 40016063 35327 CUTOUT ER 31-19142-286 40015780 35327 POWER AND CONTROL CABLE ER 31-11353-283 40015986 35327 POWER AND CONTROL CABLE ER 31-13s69-283 40015002 35327 POWER AND CONTROL CABLE ER3r-t4722-283 40016051 3s327 POWER AND CONTROL CABLE ER37-77074-283 40016087 3s327 POWER AND CONTROL CABLE ER 31-20078-285 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page | 75 EXECUTION VERSION 40015107 35327 POWER AND CONTROL CABLE ER 31-3844-296 40016131 35327 POWER AND CONTROL CABLE ER 31-45598-4085 40016155 35327 POWER AND CONTROL CABLE CAATS# 61140 40037826 3s327 POWER AND CONTROL CABLE CAATS f62665 40069613 3s327 POWER AND CONTROL CABLE Ttw Al 2006/ cl 002 I 10030679 100% ctAc 40079180 3s327 POWER AND CONTROL CABLE TZW A12009 / C/TR4I10038s63 BLUE MOUNTAT N LINE 40015739 3s329 LIGHTI NG FIXTURE/SYSTEM ER 31-11353-283 40015845 35329 LIGHTI NG FIXTURE/SYSTEM ER 31-6625-283 40016018 3s329 LIGHTING FIXTURE/SYSTEM ER37-77074-283 40015775 3s339 FIRE PROTECTION SYSTEM ER 31-11353-283 40040993 35341 REMOTE TERMINAL UNIT (SCADA RTU)ruv AM 12002 I cloTl I B GE HA RR|S 40073835 35341 REMOTE TERMINAL UNIT (SCADA RTU)wBS DPrr/2007 I Cl OOU t00337 83 40016139 35342 SEQUENTIAL EVENT RECORDER ER 31.45598-4085 HATHAWAY 30051183 39700 CY2O1l WALLA 2 SUB COMMUNICATION EQU|P (C/C t37491 30064194 39700 CY2O13 WALLA WALI.A SUB COMM EQUIP lclc73747l 3006s027 39700 CY2O13 WALLA WALI.A SUB COMM EQUIP rclcL3749l 30065810 39700 CY2O74 WALLA WALI.A 230 SUB COMM EQU|P (C/C 727371 30060484 39700 PLC TRANSM ITTER/RECEIVER SET CAATS# 50177 30058938 39777 BASE STATION - TAIT TB 81OO DSY S I 2007 I C I 805/P PWW2 3 1 300s8946 397tL RADIO CONTROL - DISPATCH OUTPOST CONTROLLER DSYSI 2007 / C1806/ppWW23 AWEC (A/r CONVERTER) 30058944 39777 RADIO CONTROL SYSTEM - TAIT 1541 NODE DSY S I 2007 I C1806/PPWW23 300s8941 3977L RADIO CONTROL SYSTEM - TAIT CMM DSYS/ 2OO7 / C1806/PPWW23 1 CONTRO L MODULE 30058945 39777 RADIO CONTROL SYSTEM - TAIT DAS DSySlzoO7 I C/806/PPWW23 TA|T DTGTTAL AUDrO SWI 300s8940 397lL RADIO CONTROL SYSTEM - TAIT SMM DSYS I 2007 I C/806/PPWW23 1 SrrE MG MT MODULES 30058939 39777 RF COMBINER DSYSI 2OO7 I CI8O6IPPWW231 DB SPECTRA 30044266 397t7 WW SUB GROUP PENDLETON RADIO coNTROL SYS S350706 DZWW / 2002 I C I DUs I 70073392 30047400 39714 CSU/DSU CAATSS 64711 300s8948 39774 DATA NETWORK ROUTER - CISCO 2811 DSY S / 2007 I Cl 806/P PWW2 3 30058947 39774 DATA NETWORK SWITCH - CISCO ETHERSWITCH DSY S / 2007 / Cl 805/P PWW2 3 30047407 39774 MODEM CAATS# 64711 30044940 397t4 TERMINAL CONTROLLER *see lons descrip.xFR FR 39702 30025520 PRJ629t7 30055181 39777 PATCH PANEL FOR FIBER-OPTICS Tr wA/2 008/c I 005 I LOO37 97 4 300s4429 39723 MICROWAVE RADIO TO KENNEWICK EQ #381360 DZW A{2OO8/ C/002 / L0O3s481 - MOD A84797 FL- A 30040190 39723 MICROWAVE SYSTEM TO COMBINE HILLS EQ fr373072 DWAV2OO4/C/OOL/03 3004s833 39723 MW TOWER *see long descrip.XFR fr 39702 30025518 PRJ L07223 300s8950 39726 EQUIPMENT RACK/SHELF DSYS I 2007 I C I 806/PPWW23 300s8942 39726 EQUIPMENT RACK/SHELF WFUSE PANEL DSYS I 2007 I C1805/PPWW23 1 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page 176 EXECUTION VERSION 30058951 39729 DIGITAL CHANNEL DSY S / 2007 I Cl 806/P PWW2 3 30055182 39729 DIGITAL M ULTIPLEX SYS-IMACS PREM ISYS CHANNEL BANK r w Al 2008 / cl oos I L003797 4 30025616 39729 DIGITAL MULTIPLEX SYSTEM CAATS 106733 30040401 39729 WALLA WALLA CHANNEL CARDS FOR PARTY LINE CONNECTN TWAM/200s/C/030 30040189 39729 WALI.A WALLA SUB MUTTIPLEX SYSTEM DWAu2004lClOOL(03 3002s512 39732 PLC TRANSMITTER/RECEIVER SET CAATS 52199 300s8952 39735 BATTERY AND RACK 48V DEKA DSY S I 2007 I C / 806/P PWW2 3 30058953 39735 BATTERY CHARGER 48VDC AMERICAN POWER DSYS I 2007 I C I 806/P PWW2 3 30044944 39735 DC POWER SUPPLY PANEL *see lone descrip.xFR FR 39702 30025620 PRJ629L7 30058955 39735 EMERGENCY POWER GENERATOR SYSTEM WSAFTEY SWITCH DSY S I 2007 I C 1805/P PWW23 30058954 3973s GROUNDING GRID DSY S I 2007 I C I 80 6/P PWW2 3 300s89s7 39735 PROPANE STORAGE TANK DSYS / 2007 I C I 806/P PWW2 3 30058956 39735 VOLTAGE CONVERTER DC TO DC 48-12 VDC DSY S I 2007 I C I 806/P PWW2 3 3002s614 39744 TELEPHONE SWITCH CAATS 62199 30058943 39747 ANTENNA SYSTEM - VHF FOR TAIT BASE STATION DSYS / 2007 I C1806/P PWW23 1 30040188 39747 WALLA WALLA SUB ANTENNA SYSTEM DWAu2004/Cl00Ll03 30054430 39747 WALLA WALLA SUB ANTENNA SYSTEM DZW A I 2008 / C / 002 / tOO3s 487 30040191 39747 WALLA WALLA SUB RADOME DWALl2004/Cl00tl03 30040192 39747 WALLA WALLA SUB WAVEGUIDE MATERIALS DWAL/2004/Cl00L/03 30046553 39753 WALLA WALLA COMMUNICATIONS ROOM AIR CONDITIONER DWAv2006/C I DRs / 7D12e4ss Location: 540065 - Jim Brideer Substation. 345kV Non-Shared 40084979 35227 CLEARING, GRADING & FILL MATERIAL rrD/2007lc/002rBSUB 40055232 35227 FENCE rwY M / 2002 I C / uOL / 70072388 40055237 35227 ROADWAY rwY M / 2002 I c/00 1/100 1 2 388 40055230 353L7 CABLE TRENCH TUVY M I 2002 I C I 00t I 10072388 40076407 35317 CONDUIT Tr D M/2 005/C I O37 I 70037847 40084980 35317 CONDUIT rfiD/2007 /cl002lBSUB 40037972 35319 RELAY AND CONTROL CAATS #37855 40047923 35319 RELAY AND CONTROT rwY M I 2002 / c I 007 I 700767 83 40055236 35319 RELAY AND CONTROL TWY M / 2002 / C I 00L I 700L2388 4005524L 3s319 RELAY AND CONTROL T JBM / 2005 / C I 00t I 10027 424 40063425 35319 RELAY AND CONTROL CAATS# 64841 4006s263 35319 RELAY AND CONTROL rwYM/200s/cl 046 I 1002s37 0 40076475 3s319 RELAY AND CONTROL T tDM / 200s I c I o37 I LO037847 40084985 3s319 RELAY AND CONTROL TrD12007ICl002lJBSUB 40055234 35325 GROUND GRID SYSTEM TWY M I 2002 / C / 00t / LOOL2388 40076412 35325 GROUND GRID SYSTEM r tDM I 2OOs I Cl 037 / 7003 L847 40084982 35325 GROUND GRID SYSTEM rID/2007/c1002/BsuB 40055235 35327 POWER AND CONTROL CABLE lvvY M I 2002 /C/001/10012388 4006s262 35327 POWER AND CONTROL CABLE TWY M/2 00s/ C I 046 I 1002537 0 400764t4 35327 POWER AND CONTROL CABLE Tr D M/2005/C I 037 I 70037847 40084984 35327 POWER AND CONTROL CABLE filD12007lc/002IBsu B 40084986 35341 SEQUENTIAL EVENT RECORDER TrD/2007lC{Oo2IBSUB 30061281 39700 CY2O1O JB SUM COMM EQUIP (C/C 13918) 30037759 39705 SCADA L&G TWY M I 2002 I C / OO7 / 100723s0 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT A Page 177 EXECUTION VERSION 30047883 39774 MODEM CAATS# 64841 30054817 39777 FIBER OPTIC TRANSCEIVER/MODEM Tr D M/2005/C I O37 I 70037847 30037772 39717 FIBER OPTIC TRANSMITTER/RECEIVER rwY M I 2002 I C I 007 I 10072390 30054816 39729 DIGITAL CHANNEL TIDM/200s/037 I !0037847 + 10032866 300s8806 39729 DIGITAL CHANNEL T tDM I 2005 I O37 I tO032866 30037773 39729 DIGITAL MULTIPLEXER TWY M I 2002 lCl00 1/ 100 1 2 390 30037774 39729 DIGITAL MULTIPLEXER SHELF TWY M I 2002 I C I OO 1 I 10072390 30047287 39729 JB SUB DIG MULT CARD FOR T1 CIRC JB TO CASPER cficl200slcls01/s1 30033442 39738 AUDIO-TONE PROTECTIVE RELAYING SYSTEM CAATS #37577 30033448 39738 AUDIO-TONE PROTECTIVE RE LAYI NG SYSTE M CAATS #37855 30037777 39738 Telemetrv Receiver TWY M / 2002 I C / 007 I 70012390 30037770 39738 Tone Relay Equip TWY M I 2002 I C / 00U 70072390 30047884 39738 TRANSMITTER, RECEIVER, 125 VDC, RFL 6745 CAATS# 64841 30054815 39744 COMMUNICATION CABLE >5OO FT.TIDM I 2005/ C/O37 / 10031847 COAX FO PLC JOINT OWNERSHIP AND OPERATINC AGREEMENT _ EXHIBIT A Page | 78 EXECUTION VERSION EXHIBIT 83 Description of Idaho Power Common Equipment 3 The information contained in this Exhibit is accurate as of December 31,2014. The Parties will update the information in this Exhibit, if necessary, to reflect any Idaho Power Common Equipment placed in or removed from service between January l, 2015 and the Closing Date in connection with the true-up set forth in Section 2.5(d) ofthe JPSA. The update shall be completed within 30 days after the completion of the true-up and the updated Exhibit shall replace this Exhibit. JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B PagelT9 Adelaide Transmission Station FERC Acct Adelaide Asset Description Vintage 35011 I.AND OWNED IN FEE TS 7974 35011 PERMANENT TAND IMPROVEMENTS TS t975 35011 PERMANENT LAND IMPROVEMENTS TS 1977 3s200 DRAI NAGE SYSTE MS-CULVE RTS, ETC 7976 35200 YARD SURFACING - GRAVEL, ETC.L976 35200 YARD SURFACING - GRAVEL, ETC.L977 3s200 ENGR, SURVEYING OR CONSULTING L976 3s200 PERIMETER FENCE & GATES t977 35200 WATER WELL PUMP 1977 35200 SEPTIC TANK & CESSPOOL t977 35200 SEWER LINE t977 3s200 LIGHT LOWERING DEVICE & LIGHT 1977 35200 LIGHT MAST 1977 35200 FOUNDATION - STATION BUILDING 7977 3s200 COMPLETE STATION BUILDING t977 35200 BUILDING PLUMBING SYSTEM t977 35200 BUILDING HVAC SYSTEM L977 35200 BUI LDING ELECTRICAL SYSTE M 7977 35200 BUILDING ELECTRICAL SYSTEM 7977 35200 D.C. EMERGENCY FIXTURE L977 3s200 BUILDING ELECTRICAL SYSTEM 7977 35200 BUILDING ELECTRICAL SYSTEM t977 35200 LOCAL SERVICE FND 7977 35200 FOUNDATION - COMMUNICATION 7977 35200 EQUIPMENT PAD r977 3s200 LIGHTING MAST FND 7977 35200 CONCRETE SURFACE TRENCH WLIDS 7977 35200 CONDUIT & FITTINGS UNDERGROUND 7977 3s200 CONDUIT & FITTINGS UNDERGROUND 1995 3s200 UNIWALKS L977 3s200 LOCAL SERVICE STRUCTURE t977 35200 METAL STRUCT - COMMUNICATION 1977 3s200 15KV BUS SUP, CT, PT, MISC STR 7977 3s300 CABLE TRAY AND ACCESSORIES 7977 35300 CABLE TRAY AND ACCESSORIES 1995 35300 INSULATORS - PIN OR POST 1977 3s300 1/8" X 1" FLAT BAR COPPER 1977 35300 CONTROL WIRE - LOW VOLTAGE 1977 3s300 #18 - #19 CONTROL WtRE 1995 EXECUTION VERSION 35300 #18 - #19 CONTROL WIRE 1980 35300 #18 - #19 CONTROL WrRE 1991 35300 #18 - #19 CONTROL WtRE 1993 35300 #18 - #19 CONTROL WtRE 1995 3s300 *18 - #L9 CONTROL WIRE 1995 3s300 #18 - #19 CONTROL WtRE 1996 35300 f18 - #19 CONTROL WtRE 1980 35300 #18 - #19 CONTROL WtRE 1993 35300 #18 - #19 CONTROL WtRE 1995 3s300 #18 - #19 CONTROL W|RE 1996 35300 *I4 - #T6 CONTROL WIRE 1995 35300 #L4 - #16 CONTROL WIRE 1993 35300 #74 - #L6 CONTROL WIRE 7977 35300 #74 - #76 CONTROL WtRE 1977 3s300 #t4 - #16 coNTROL WtRt 1980 35300 *L4. #76 CONTROL WIRE 1996 35300 #74 - #16 CONTROL WtRr 1995 3s300 #74 - #76 CONTROL WtRE 7977 3s300 #\4. #16 CONTROL WIRE 1980 3s300 frL4 - #76 CONTROL WIRE 1991 3s300 #70 - #L2 CONTROL WIRE 1995 35300 #70 - #72 CONTROL WrRt 1991 35300 #70 - #72 CONTROL WtRE 1993 3s300 #10 - #12 coNTROL WtRE 1995 3s300 #to -#12 coNTRoL wtRE 7977 3s300 #70 -#L2 CONTROL WIRE 1995 35300 #70 - #72 CONTROL WtRE 1991 3s300 #70 - #72 CONTROL WtRE 1995 35300 #L0 - #t2 CoNTROL WtRt 1995 35300 #LO . #T2 CONTROL WIRE 1995 35300 #70 - #72 CONTROL WrRr t977 35300 #7 -#9 CONTROLWIRE L977 35300 #7 -#9 CONTROLWIRE 1977 35300 #7 - #9 CONTROL WIRE 1980 3s300 #7 - #9 CONTROL WIRE t977 35300 #7 - #9 CONTROL WIRE 7977 35300 #1 . #6 CONTROL WIRE 1977 3s300 #7 . #6 CONTROL WIRE 1977 35300 #1- #6 CONTROL WIRE 7977 35300 #1- #6 CONTROL WIRE 7977 3s300 frI - #6 CONTROL WIRE 7977 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 80 EXECUTION VERSION 35300 f1 - #6 CONTROL WIRE 1995 3s300 4/O COPPER CONTROL WIRE 7977 3s300 350 MCM ALUM CONTROL WIRE 7977 35300 350 MCM COPPER CONTROL WIRE 7977 35300 5OO MCM COPPER CONTROL WIRE 7977 3s300 COMPOSITE CABLE - LOW VOLTAGE 1995 35300 GROUNDING AND FITTINGS 1995 3s300 #6 COPPER GROUND L977 35300 #6 COPPER GROUND MAT 7977 3s300 #6 COPPER GROUND MAT 1995 3s300 7/16 COPPER GROUND 1977 35300 2/O COPPER GROUND t977 3s300 250 MCM COPPER GROUND 7977 35300 CONDUIT & FITTINGS ABOVE GROUN 1995 3s300 CONDUIT & FITTINGS ABOVE GROUN 1995 35300 CONDUIT & FITTINGS ABOVE GROUN 1977 35300 CONDUIT & FITTINGS ABOVE GROUN t977 3s300 CONDUIT & FITTINGS ABOVE GROUN 1977 35300 CONDUIT & FITTINGS ABOVE GROUN 1995 35300 CONDUIT & FITTINGS ABOVE GROUN L977 35300 CONDUIT & FITTINGS ABOVE GROUN 7977 3s300 2" - 3-7/2" CONDUTT 1995 35300 2" -3-u2" CONDUTT 1977 3s300 2" -3-u2" CONDUTT L977 35300 5..CONDUIT 7977 3s300 SMALL ELECTRICAL ENCLOSURE 1995 3s300 SMALL ELECTRICAL ENCLOSU RE 7977 35300 5OKVA LOCAL SERVICE XFMR 1977 35300 167-499KVA LOCAL SERVICE XFMR 7977 3s300 SWITCH - POWER FUSE L977 35300 CONTROL RACK/PANEL FRAME 7977 3s300 CONTROL RACK/PAN E L FRAM E 7977 3s300 CONTROL RACK/PANEL FRAM E 1977 3s300 CONTROL RACK/PANEL FRAM E L977 35300 CONTROL RACK/PANEL FRAME t977 35300 CONTROL RACK/PAN E L FRAM E 1991 3s300 CONTROL RACK/PANEL FRAM E 1995 3s300 CONTROL RACK/PAN EL FRAM E 1995 35300 CONTROL RACK/PANEL FRAME 1995 3s300 CONTROL RACK/PAN EL FRAM E L977 35300 CONTROL RACK/PAN E L FRAM E 1977 35300 CONTROL RACK/PANEL FRAM E L977 3s300 PROTECTION EQUIPMENT 1996 3s300 CONTROL COMPUTER & PERIPHERALS 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT r.995 3s300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 35300 METERING EQUIPMENT 1993 3s300 METERING EQUIPMENT 1995 35300 CONTROL EQUIPMENT 7977 3s300 CONTROL EQUIPMENT 1977 35300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1965 35300 CONTROL EQUIPMENT L977 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1965 3s300 CONTROL EQUIPMENT 7977 3s300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT r977 3s300 CONTROL EQUIPMENT 1977 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1995 35300 CONTROL EQUIPMENT 1995 3s300 CONTROL EQUIPMENT 1995 3s300 SCADA EQUIPMENT 1991 3s300 COMM RACK/PANEL FRAME 1977 35300 COMM RACK/PANEL FRAME t977 3s300 COMMUNICATIONS EQUIP 1977 3s300 AUXILIARY LOAD CENTER L977 35300 LOAD CENTER, AC t977 3s300 LOAD CENTER, DC 1995 35300 10 - 40 AMP CIR BRKR 1991 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B EXECUTION VERSION 35300 10 - 40 AMP CIR BRKR 1995 3s300 TRANSFER SWITCH L977 35300 AI.ARM SYSTEMS-WIRED CIRCUITS 7992 3s300 BOX, CABINET OR PANEL 1995 35300 OTHER METERING EQUIPMENT 1995 35300 OTHER METERING EQUIPMENT 1995 35300 MISC OFFICE FURNITURE t975 3s300 CHAIR L952 35300 CHAIR 1953 3s300 CHAIR 7964 35300 DESK 1931 3s300 DESK 1950 35300 DESK 1961 3s300 DESK 7977 35300 FILE CABINET 1977 35300 TABLE 7952 3s300 TABLE 1954 35300 COMPUTER AND PERIPHERAL5 1991 35300 PRINTER 1991 39720 MICROWAVE, ANTENNA 1999 39720 MICROWAVE, ANTENNA 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 35300 #18 - #19 CONTROL WtRt 1999 3s300 #74 - #76 CONTROL WrRE 1999 3s300 #to - #12 coNTRoL wtRt 1999 3s200 SMOKE DETECTOR 2001 35300 METER 1999 39720 MICROWAVE, EQUIPMENT 2000 39720 MICROWAVE, ANTENNA 2000 39720 M tcRowAVE, STRUCT(POLES&FtX)1998 39720 MrcRowAVE, STRUCT(POLES&FrX)1998 3s200 BUILDING HVAC SYSTEM 2004 35300 AUXILIARY LOAD CENTER 2004 3s300 130 VOLT BATTERY CHARGER 2003 3s300 130 VOLT BATTERY 2003 3s300 BATTERY RACK 2003 3s300 SAFEW SWITCH 2003 35300 PROTECTION EQUIPMENT 200s 3s200 SITE PREPARATION & IMPROVEMENT 2005 3s200 SUPERSTRUCTURE ROOF 2005 35300 CONTROL RACK/PANEL FRAME 2006 35300 DISTANCE / FAULT LOCATOR 2005 3s300 COMMUNICATIONS EQUIP 2006 35200 CONDUIT & FITTINGS UNDERGROUND 2006 35300 CONTROL WIRE - LOW VOLTAGE 2005 35300 COAXIAL CABLE 2006 3s300 GROUNDING AND FITTINGS 2006 3s300 CONDUIT & FITTINGS ABOVE GROUN 2006 35300 SMALL E LECTRICAL ENCLOSU RE 2006 3s300 CONTROL RACK/PAN EL FRAM E 2006 3s300 CONTROL RACK/PANEL FRAM E 2006 35300 CONTROL RACK/PAN EL FRAM E 2006 35300 CONTROL RACK/PANEL FRAME 2006 35300 CONTROL RACK/PAN EL FRAM E 2006 35300 PROTECTION EQUIPMENT 2006 3s300 PROTECTION EQUIPMENT 2006 3s300 PROTECTION EQUIPMENT 2006 35300 CONTROL EQUIPMENT 2006 35300 CONTROL EQUIPMENT 2006 35300 CONTROL EQUIPMENT 2006 3s300 CONTROL EQUIPMENT 2006 3s300 AI.ARM/MONITORING EQUIPMENT 2006 35300 ALARM/MONITORING EQUIPMENT 2006 3s300 AI.ARM/MONITORING EQUIPMENT 2006 35300 SCADA RACK/PANEL FRAME 2006 3s300 SCADA RACK/PANEL FRAME 2006 35300 SCADA EQUIPMENT 2006 35300 SCADA COMPUTER AND PERIPHERALS 2006 39740 FIBER, MISC EQUIPMENT 2007 39740 FIBER, MISC EQUIPMENT 2007 39740 FIBER, CARD SHELF 2007 39740 FIBER, CARD SHELF 2007 39740 FIBER, CARD UNIT 2007 39740 FIBER, CARD UNIT 2007 39740 FIBER, WIRE/CABLE 2007 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 82 EXECUTION I/ERSION 39740 FIBER, WIRE/CABLE 2007 3s300 AI.ARM/MON ITORI NG EQU I PMENT 2008 39120 NETWORK EQ 2009 39120 NETWORK EQ 2009 3s300 CONTROL WIRE . LOW VOLTAGE 2009 35300 COAXIAL CABLE 2009 35300 GROUNDING AND FITTINGS 2009 3s300 CONDUIT & FITTINGS ABOVE GROUN 2009 35200 CONDUIT & FITTINGS UNDERGROUND 2008 35300 CONTROL WIRE - LOW VOLTAGE 2008 3s300 CONTROL RACK/PANEL FRAME 2008 35300 CONTROL RACK/PANEL FRAME 2008 35300 CONTROL RACK/PANEL FRAM E 2008 35300 CONTROL RACK/PAN EL FRAM E 2008 3s300 CONTROL RACK/PANEL FRAME 2008 35300 CONTROL RACK/PANEL FRAME 2008 3s300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 3s300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 39s00 OTHER LAB/RESEARCH EQUIPMENT 2009 39s00 OTHER LAB/RESEARCH EQUIPMENT 2009 35300 CONTROL WIRE . LOW VOLTAGE 2072 35300 CONTROL RACK/PANEL FRAME 2012 35300 PROTECTION EQUIPMENT 2012 35300 PROTECTION EQUIPMENT 2072 3s300 CONTROL RACK/PAN EL FRAM E 2008 35300 CONTROL RACK/PAN EL FRAM E 2008 3s300 CONTROL RACK/PANEL FRAM E 2008 3s300 CONTROL RACK/PAN EL FRAM E 2008 3s300 CONTROL RACK/PANEL FRAME 2008 35300 CONTROL RACK/PANEL FRAME 2008 3s300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 3s300 coMMUNtCATtONS EQUTP 2008 3s300 COMMUNICATIONS EQUIP 2008 3s300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 3s300 CONTROL WIRE - LOW VOLTAGE 2007 35300 CONTROL WIRE - LOW VOLTAGE 2007 3s300 FIBER OPTIC CABLE 2007 35300 FIBER OPTIC CABLE 2007 3s300 CONDUIT & FITTINGS ABOVE GROUN 2007 3s300 CONDUIT & FITTINGS ABOVE GROUN 2007 35300 COMM RACK/PANEL FRAME 2007 35300 COMM RACK/PANEL FRAME 2007 3s300 COMMUNICATIONS EQUIP 2007 35300 COMMUNICATIONS EQUIP 2007 3s300 48 VOLT BATTERY CHARGER 2007 3s300 48 VOLT BATTERY CHARGER 2007 35300 48 VOLT BATTERY 2007 3s300 48 VOLT BATTERY 2007 35300 BATTERY RACK 2007 3s300 BATTERY RACK 2007 35300 TRANSFER SWITCH 2007 3s300 TRANSFER SWITCH 2007 35300 METERING EQUIPMENT 2072 35300 COMMUNICATIONS EQUIP 2072 35300 SCADA EQUIPMENT 2073 3s300 SCADA EQUIPMENT 2013 3s300 ALARM/MONITORING EQUIPMENT 2074 3s200 WOOD POLE _ MISC 2014 3s300 CONTROL WIRE - LOW VOLTAGE 20L4 35300 FIBER OPTIC CABLE 2074 35300 CONDUIT & FITTINGS ABOVE GROUN 2014 35300 COMM RACK/PANEL FRAME 2014 35300 COMMUNICATIONS EQUIP 2074 3s300 BUILDING SECURITY SYSTEM 20t4 35300 CONTROL WIRE - LOW VOLTAGE 2074 3s300 CONTROL RACK/PANEL FRAME 20L4 3s300 PROTECTION EQUIPMENT 2014 35300 COMMUNICATIONS EQUIP 2074 35300 CONTROL WIRE - LOW VOLTAGE 1977 35300 CONTROL WIRE - LOW VOLTAGE 7977 3s300 CONTROL RACK/PAN EL FRAM E t977 35300 CONTROL EQUIPMENT 1965 35300 CONTROL EQUIPMENT r977 3s300 CONTROL EQUIPMENT 1980 35300 COMMUNICATIONS EQUIP t977 3s300 PROTECTION EQUIPMENT 2074 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 83 Borah Transmission Station FERC Acct Borah Asset DescriDtion Vintase 35011 LAND OWNED IN FEE TS 7972 35011 LAND OWNED IN FEE TS 1983 35011 PERMANENT LAND IMPROVEMENTS TS L975 35011 PERMANENT I.AND IMPROVEMENTS TS 1983 35200 YARD SURFACING - GMVEI- ETC.L975 35200 YARD SURFACING - GMVEL, ETC.L982 3s200 YARD SURFACING . GRAVEL, ETC.1983 3s200 SITE EXCAVATION 7972 3s200 SITE EXCAVATION 1983 35200 ENGR, SURVEYING OR CONSULTING L972 35200 ENGR, SURVEYING OR CONSULTING 1983 35200 ROAD EXCAVATION 7972 3s200 ROAD EXCAVATION 1983 35200 PERIMETER FENCE & GATES t975 35200 PERIMETER FENCE & GATES L982 3s200 PERIMETER FENCE & GATES 1983 35200 WATER WELL PUMP t975 35200 WATER WELL PUMP 1983 35200 WATER SYSTEM r975 35200 WATER SYSTEM 1983 3s200 WATER WELL 1975 35200 WATER WELL 1983 35200 SEPTIC TANK & CESSPOOL 7975 3s200 SEPTIC TANK & CESSPOOL 1983 35200 SEWAGE DRAIN SYSTEM L975 35200 SEWAGE DRAIN SYSTEM 1983 3s200 SEWER LINE t975 35200 OIL CATCH BASIN L975 35200 LIGHT LOWERING DEVICE t975 35200 LIGHT LOWERING DEVICE 1983 35200 LIGHT MAST t975 3s200 LIGHT MAST 1983 3s200 LIGHT MAST, LOWER DEVICE & LIG L977 3s200 LIGHT MAST, LOWER DEVICE & LIG 1983 35200 FOUNDATION - STATION BUILDING L975 3s200 FOUNDATION - STATION BUILDING 1983 35200 COMPLETE STATION BUILDING 7975 35200 COMPLETE STATION BUILDING 1983 35200 BUILDING PLUMBING SYSTEM L975 EXECUTION VERSION 3s200 BUILDING PLUMBING SYSTEM 1983 3s200 BUILDING HVAC SYSTEM 1983 3s200 ArR CONDTTONERS &/OR COOLERS 1983 35200 EXHAUST FANS & DUCT 1983 3s200 HUMIDIFIER 1983 3s200 BUILDING ELECTRICAL SYSTEM L975 35200 BUILDING ELECTRICAL SYSTE M 1983 35200 BUILDING ELECTRICAL SYSTEM t975 35200 BUILDING ELECTRICAL SYSTEM 1983 3s200 BUILDING ELECTRICAL SYSTEM 1975 3s200 BUILDING ELECTRICAL SYSTEM 1983 35200 BUILDING ELECTRICAL SYSTEM L975 35200 BUILDING ELECTRICAL SYSTE M 1983 3s200 AIR COMPRESSOR FND 7975 35200 FOUNDATION - COMM UNICATION 1975 35200 EQUIPMENT PAD t975 35200 LIGHTING MAST FND 7975 3s200 LIGHTING MAST FND t977 35200 UGHNNG MAST FND 1983 35200 TUNNELS L975 35200 TUNNELs 1983 3s200 CONCRETE ABOVE GROUND CABLEWAY 7975 35200 CONCRETE SURFACE TRENCH WLIDS 7975 3s200 CONCRETE SURFACE TRENCH WLIDS 7982 35200 CONCRETE SURFACE TRENCH WLIDS 1983 3s200 CONDUIT & FITTINGS UNDERGROUND L975 35200 CONDUIT & FITTINGS UNDERGROUND 1979 3s200 CONDUIT & FITTINGS UNDERGROUND 1983 35200 TREAD PLATES 7982 3s200 TREAD PLATES 1983 35200 UNIWALKS t975 35200 UNIWALKS 1983 35200 METAL STRUCT - COMMUNICATION 7975 35200 HEATERS 1975 35200 HEATERS 1983 35200 LIGHTING L975 35200 LIGHTING 1983 35200 WELL HOUSE (INACTIVE)7975 3s200 WELL HOUSE (INACTIVE)1983 35200 TOOL SHED, MAINT BLDG, ETC 7975 35200 TOOL SHED, MAINT BLDG, ETC 1983 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 84 EXECUTION VERSION 3s300 CABLE TRAY AND ACCESSORIES 7975 35300 CABLE TRAY AND ACCESSORIES 1983 3s300 15KV POWER CABLE 7975 35300 15KV POWER CABLE 7975 35300 15KV POWER CABLE 1983 35300 CONTROL WIRE - LOW VOLTAGE 1985 3s300 CONTROL WIRE - LOW VOLTAGE 1991 35300 CONTROL WIRE - LOW VOLTAGE 1993 3s300 CONTROL WIRE - LOW VOLTAGE 1995 35300 CONTROL WIRE - LOW VOLTAGE L975 35300 CONTROL WIRE - LOW VOLTAGE t975 3s300 #18 - #19 CONTROL WtRE 1995 3s300 #18 - #19 CONTROL WtRE t982 3s300 #18 - #19 CONTROL WtRE 1983 35300 #18 - #19 CONTROL WtRt 1985 3s300 #18 - S19 CONTROL WrRE 1991 35300 #18 - #19 CONTROL WtRr 1995 3s300 f18 - #19 CONTROL WtRE 1996 35300 #18 - #19 CONTROL WrRE 7997 3s300 #18 - #19 CONTROL WrRE 1982 3s300 #18 - #19 CONTROL WtRE 1983 35300 #18 - #19 CONTROL WIRE 1985 3s300 #18 - #19 CONTROL WrRr 1996 35300 f18 - #19 CONTROL WIRE 7977 3s300 f18 - #19 CONTROL WrRE 7977 35300 #18 - #19 CONTROL WtRt 7982 3s300 #18 - #19 CONTROL WrRE 1983 35300 #18 - #19 CONTROL W|RE 1985 3s300 #18 - #19 CONTROL WtRE 1993 35300 #18 - #19 CONTROL WtRE 1995 35300 #18 - #19 CONTROL WrRE t977 3s300 #L4 - #L6 CONTROL WIRE t979 35300 #t4 - #16 coNTROL WtRE 1995 35300 #74 - #L6 CONTROL WIRE 7975 35300 #74 - #76 CONTROL WtRE L982 35300 #74 - #16 CONTROL WtRE 1983 35300 #74 - #76 CONTROL WIRE 1993 3s300 #14 - #76 CONTROL WtRE 1995 35300 #L4 - #76 CONTROL WlRt t975 3s300 frL4 - #76 CONTROL WIRE L975 3s300 #74 - #76 CONTROL WtRt 7975 35300 #74 - #L6 CONTROL WIRE 1985 35300 #74 - *76 CONTROL WtRE 1991 35300 *74 - #16 CONTROL WIRE t975 3s300 #74 - #76 CONTROL WtRE t982 3s300 #14 - #76 CONTROL WtRE 1983 35300 COAXIAL CABLE 7982 35300 COAXIAL CABLE 1982 35300 COAXIAL CABLE 1983 35300 fi10 - #72 CONTROL WtRE L982 3s300 #10 - #12 CONTROL WtRE 1983 3s300 #10 - #12 CONTROL WtRE 1985 35300 #10 -#t2 coNTRoL wrRE 1985 3s300 #70 - #L2 CONTROL WIRE 1991 35300 *10 - #L2 CONTROL WIRE 1993 3s300 #70 - #72 CONTROL WtRE 1995 35300 #70 - #72 CONTROL WtRE 1995 3s300 #70 - #72 CONTROL WtRE 1980 35300 #10 - #12 CONTROL W|RE 1981 3s300 frto - #t2 coNTRoL wtRE 1982 35300 #to - #12 coNTRoL wrRE 1983 35300 #to - #72 CoNTROL W|RE 1995 3s300 fiLO - #T2 CONTROL WIRE 7975 35300 #70 - fiLz CONTROL WIRE 7975 3s300 #10 - #12 CONTROL WrRE L982 35300 #10 - fi72 CoNTROL WIRE 1983 3s300 #70 - #72 CONTROL WtRE 1985 35300 fi70 - fi72 CONTROL WtRt 1991 3s300 #70 - #72 CONTROL WtRE 1993 35300 #10 - f12 CONTROL WrRr 1995 3s300 #TO - #72 CONTROL WIRE 1996 35300 #LO - #L2 CONTROL WIRE 1981 35300 #LO -*12 CONTROL WtRE 1984 3s300 #IO - #L2 CONTROL WIRE 7987 35300 #70 - #72 CONTROL WlRt 1995 3s300 fi70 - #72 CONTROL WtRE 1979 35300 #10 - #12 coNTRoL wrRE t975 3s300 #ro - #12 coNTRoL wtRt 1975 3s300 #TO - #T2 CONTROL WIRE t975 35300 #70 - #L2 CONTROL WIRE 1981 3s300 #10 - #72 CONTROL W|RE 7942 35300 #to - fi12 coNTRoL wrRE 1983 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT Page | 85 35300 #to - #72 coNTROL WIRE 1991 3s300 #10 - #72 CONTROL WIRE 1995 35300 #LO - #72 CONTROL WIRE L975 3s300 #7 - #9 CONTROL WIRE 7975 35300 #7 -#9 CONTROLWIRE 1975 35300 #7 - #9 CONTROL WIRE L977 35300 #7 -#9 CONTROLWIRE 1980 35300 #7 -#9 CONTROLWIRE 1982 3s300 #7 - *9 CONTROL WIRE 1983 35300 #L - #6 CONTROL WIRE 1985 3s300 #L - #6 CONTROL WIRE 7975 35300 #1- #6 CONTROL WIRE r975 35300 S1 - #6 CONTROL WIRE t975 3s300 #1 - #6 CONTROL WIRE 1982 35300 #1 - #5 CONTROL WIRE 1983 3s300 #1 - #5 CONTROL WIRE 1995 3s300 #1. #6 CONTROL WIRE 7982 35300 11 . #6 CONTROL WIRE 1983 35300 #1 - #6 CONTROL WIRE 1995 35300 S1 - f6 CONTROL WIRE 7975 3s300 #1 - #6 CONTROL WIRE 7982 35300 #L - #6 CONTROL WIRE 1983 35300 #1- #6 CONTROL WIRE L982 3s300 f1 - #6 CONTROL WIRE 1983 35300 #1 . f6 CONTROL WIRE 1995 3s300 #1 . f6 CONTROL WIRE 7975 35300 1/O COPPER CONTROL WIRE 7975 35300 2/0 coPPER CONTROL WtRE 1982 35300 2/0 coPPER CONTROL WIRE 1983 35300 5OO MCM ALUM CONTROL WIRE t975 3s300 1/O ALUM CONTROL WIRE 1975 3s300 GROUNDING AND FITTINGS L982 3s300 GROUNDING AND FITTINGS 1983 35300 GROUNDING AND FITTINGS t975 3s300 GROUNDING AND FITTINGS 1982 35300 GROUNDING AND FITTINGS 1983 3s300 #4 COPPER GROUND 7975 35300 #4 COPPER GROUND 1983 35300 #6 COPPER GROUND MAT 7975 3s300 #6 COPPER GROUND MAT t982 3s300 #6 COPPER GROUND MAT 1983 EXECUTION VERSION 35300 7/15 COPPER GROUND 7975 35300 7/16 COPPER GROUND 7982 3s300 7/16 COPPER GROUND 1983 35300 2/O COPPER GROUND 1975 35300 2/O COPPER GROUND 7979 3s300 2/O COPPER GROUND 7982 3s300 2/O COPPER GROUND 1983 3s300 250 MCM COPPER GROUND 7975 3s300 250 MCM COPPER GROUND L979 35300 250 MCM COPPER GROUND 1980 3s300 250 MCM COPPER GROUND t982 35300 250 MCM COPPER GROUND 1983 35300 5OO MCM COPPER GROUND 1975 3s300 5OO MCM COPPER GROUND 1983 35300 CONDUIT & FITTINGS ABOVE GROUN 7977 3s300 CONDUIT & FITTINGS ABOVE GROUN L975 3s300 CONDUIT & FITTINGS ABOVE GROUN 7975 3s300 CONDUIT & FITTINGS ABOVE GROUN L975 35300 CONDUIT & FITTINGS ABOVE GROUN 7982 35300 CONDUIT & FITTINGS ABOVE GROUN 1983 3s300 CONDUIT & FITTINGS ABOVE GROUN 1975 35300 CONDUIT & FITTINGS ABOVE GROUN L982 35300 CONDUIT & FITTINGS ABOVE GROUN 1983 3s300 CONDUIT & FITTINGS ABOVE GROUN 7975 35300 CONDUIT & FITTINGS ABOVE GROUN 1975 35300 CONDUIT & FITTINGS ABOVE GROUN 1981 35300 CONDUIT & FITTINGS ABOVE GROUN L975 35300 2" -3-7/2" CONDU|T L975 35300 2" -3-712" CONDUtT t975 35300 2" -3-7/2" CONDUtT 1981 3s300 2" -3-L/2" CONDUTT 7982 35300 2" - 3-712" CONDU|T 1983 3s300 2" -3-U2" CONDU|T t975 3s300 2" -3-712" CONDUTT 1981 35300 2" -3-tl2" CONDUlr 1982 3s300 2" -3-t/2" CONDUtT 1983 35300 2" - 3-t/2" CONDUIT 1975 35300 2" -3-7/2" CONDU|T L982 3s300 2" -3-112" CONDUtT 1983 35300 4'' CONDUIT 7975 3s300 4'' CONDUIT 7979 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 86 35300 4'' CONDUIT 7982 3s300 4,'CONDUIT 1983 35300 4'' CONDUIT 1982 3s300 4'' CONDUIT 1983 3s300 5" CONDUIT 1982 35300 5..CONDUIT 1983 35300 SMALL ELECTRICAL ENCLOSURE \975 3s300 SMALL ELECTRICAL ENCLOSURE 1981 35300 SMALL E LECTRICAL ENCLOSU RE 1982 3s300 SMALL ELECTRICAL ENCLOSURE 1983 3s300 15-49KVA LOCAL SERVICE XFMR 7975 35300 15-49KVA LOCAL SERVICE XFMR 7975 35300 15-49KVA LOCAL SERVICE XFMR 7975 35300 15-49KVA LOCAL SERVICE XFMR 7982 3s300 15-49KVA LOCAL SERVICE XFMR 1983 35300 SWITCH - POWER FUSE t975 3s300 CONTROL RACK/PANEL FRAM E L975 35300 CONTROL RACK/PANEL FRAM E 1983 35300 CONTROL RACK/PAN EL FRAM E 1975 35300 CONTROL RACK/PAN EL FRAM E 1996 35300 CONTROL RACK/PANEL FRAME 7975 3s300 CONTROL RACK/PAN EL FRAM E 7975 35300 CONTROL RACK/PAN EL FRAM E 1983 35300 CONTROL RACK/PANEL FRAM E 1985 35300 CONTROL RACK/PANEL FRAME 1985 35300 CONTROL RACK/PAN EL FRAM E 1975 35300 CONTROL RACK/PANEL FRAME 1975 35300 CONTROL RACK/PANEL FRAME L975 35300 CONTROL RACK/PANEL FRAME L975 3s300 CONTROL RACK/PANEL FRAME 7975 35300 CONTROL RACK/PANEL FRAM E 1991 35300 CONTROL RACK/PANEL FRAM E 1995 3s300 CONTROL RACK/PANEL FRAM E 1995 3s300 CONTROL RACK/PAN EL FRAM E 1995 35300 CONTROL RACK/PAN EL FRAM E 7975 35300 CONTROL COMPUTER & PERIPHERALS 1995 3s300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 EXECUTION VERSION 35300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1996 3s300 PROTECTION EQUIPMENT 1991 35300 PROTECTION EQUIPMENT 1991 3s300 METERING EQUIPMENT L982 35300 METERING EQUIPMENT 1983 35300 CONTROL COMPUTER & PERIPHERALS 1996 3s300 ALARM/MONITORING EQUIPMENT 7975 3s300 METERING EQUIPMENT 7982 35300 METERING EQUIPMENT 1983 3s300 CONTROL COMPUTER & PERIPHERALS 1995 35300 METERING EQUIPMENT 1993 3s300 CONTROL EQUIPMENT 1995 35300 CONTROL EQUIPMENT 7974 3s300 CONTROL EQUIPMENT 7975 35300 CONTROL EQUIPMENT 7975 3s300 CONTROL EQUIPMENT 7975 35300 CONTROL EQUIPMENT 7975 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT \975 3s300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 7975 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1983 3s300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 1975 3s300 CONTROL EQUIPMENT t977 35300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT r975 3s300 CONTROL EQUIPMENT t977 3s300 CONTROL EQUIPMENT t982 35300 CONTROL EQUIPMENT 1983 35300 CONTROL EQUIPMENT 1985 3s300 CONTROL EQUIPMENT 1981 35300 CONTROL EQUIPMENT 1984 35300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 1987 35300 CONTROL EQUIPMENT L975 JOINT OWNERSHIP AND OPERATING AGREEMENT-EXHIBIT B Page | 87 35300 CONTROL EQUIPMENT 198s 3s300 CONTROL EQUIPMENT 1991 35300 CONTROL EQUIPMENT 1995 35300 CONTROL EQUIPMENT 1995 3s300 CONTROL EQUIPMENT 1995 35300 CONTROL EQUIPMENT 1995 3s300 CONTROL EQUIPMENT 1995 35300 SCADA RACK/PANEL FRAME L975 3s300 SCADA RACK/PANEL FRAME 1983 35300 SCADA RACK/PANEL FRAME 7975 3s300 SCADA RACK/PANEL FRAME 1983 3s300 SCADA RACK/PANEL FRAME L975 35300 SCADA RACK/PANEL FRAME 1983 35300 SCADA RACK/PANEL FRAME 1985 35300 SCADA EQUIPMENT L976 35300 SCADA EQUIPMENT 1983 3s300 SCADA EQUIPMENT 7976 35300 SCADA EQUIPMENT 1983 3s300 SCADA EQUIPMENT L976 35300 SCADA EQUIPMENT 1983 35300 SCADA EQUIPMENT 1985 3s300 YARD LOCAL SERV OR LOAD CENTER 7975 35300 48 VOLT BATTERY CHARGER 7982 3s300 48 VOLT BATTERY CHARGER 1983 35300 48 VOLT BATTERY L982 3s300 48 VOLT BATTERY 1983 3s300 BATTERY RACK 7975 35300 BATTERY RACK L982 35300 BATTERY RACK 1983 35300 LOAD CENTER. AC 7975 35300 LOAD CENTER, AC L975 35300 LOAD CENTER, AC 1982 35300 LOAD CENTER, AC 1983 35300 LOAD CENTER, DC 1975 35300 LOAD CENTER, DC 1982 3s300 LOAD CENTER, DC 1983 35300 10 - 40 AMP CIR BRKR 1995 35300 VOLTAGE ALARM 1975 35300 VOLTAGE ALARM 1983 3s300 AUXILIARY POWER XFMR 1PH 7975 35300 AUXILIARY POWER XFMR 1PH 1983 EXECUTION VERSION 35300 25KVA 1 PH XFMR 1975 3s300 25KVA 1 PH XFMR 1983 35300 sOKVA 1 PH XFMR t975 3s300 5OKVA 1 PH XFMR 1983 35300 75KVA 3 PH XFMR 7975 35300 75KVA 3 PH XFMR 1983 3s300 112KVA 3 PH XFMR t975 3s300 112KVA 3 PH XFMR 1983 35300 sOOKVA 3 PH XFMR 1975 3s300 sOOKVA 3 PH XFMR 1983 3s300 TKVA 480/240-120 VOLT XFMR 7975 35300 lKVA 480/240-120 VOLT XFMR 1983 3s300 OTHER METERING EQUIPMENT L982 35300 OTHER METERING EQUIPMENT 1983 3s300 MISC OFFICE FURNITURE 7979 3s300 MISC OFFICE FURNITURE 1983 3s300 CHAIR 1975 35300 CHAIR 1983 3s300 DESK L975 3s300 DESK 1983 3s300 FILE CABINET 7975 35300 FILE CABINET 7979 3s300 FILE CABINET 1983 3s300 PRINT HOLDER 1975 35300 PRINT HOLDER 1983 3s300 TABLE 1956 3s300 TABLE 1983 3s300 COMPUTER AND PERIPHERALS t992 35300 INTERCOM SYSTEM t975 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD SHELF 1999 39720 MICROWAVE, CARD SHELF 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 88 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 35300 #18 - f19 CONTROL WIRE 1999 35300 CONTROL RACK/PANEL FRAME 1999 3s300 CONTROL COMPUTER & PERIPHERALS 1999 35200 EQUIPMENT PAD 1999 3s300 15KV POWER CABLE 1999 3s300 #18 - #19 CONTROL WtRE 1999 35300 #LO - #I2 CONTROL WIRE 1999 35300 2" - 3-7/2" CONDUTT 1999 3s300 4" CONDUIT 1999 3s300 AUXILI.ARY GENERATOR 1999 35300 #I4 - #L6 CONTROL WIRE 1999 3s300 CONTROL RACK/PANEL FRAM E 1999 35300 CONTROL RACK/PANEL FRAM E 1999 3s300 ALARM/MONITORING EQUIPMENT 1999 35300 ALARM/MONITORING EQUIPMENT 1999 35300 CONTROL COMPUTER & PERIPHERALS 1999 3s300 CONTROL WIRE - LOW VOLTAGE 1999 3s300 #18 - #19 CONTROL W|RE 1999 3s300 fr74 - #76 CONTROL WtRE 1999 35300 fr70 - #12 CONTROL WtRE 1999 3s300 PROTECTION EQUIPMENT 1999 39720 MICROWAVE, BATTERY 1999 39720 MICROWAVE, BATTERY 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 35300 130 VOLT BATTERY CHARGER 2000 3s300 130 VOLT BATTERY 2000 35300 BATTERY RACK 2000 3s300 SAFETY SWITCH 2000 39720 M ICROWAVE. STRUCT( POLES&FIX)1998 39720 M ICROWAVE, STRUCT(POLES&FIX)1998 39720 MICROWAVE, PANEL UNIT 1998 39720 MICROWAVE, PANEL UNIT 1998 35200 COMPLETE STATION BUILDING 2007 35200 SMOKE DETECTOR 2007 35300 METERING EQUIPMENT 1999 35300 METERING EQUIPMENT 1999 35300 METERING EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 2000 35300 CONTROL RACK/PANEL FRAM E 1998 3s300 ALARM/MONITORING EQUIPMENT 1998 35200 CONDUIT & FITTINGS UNDERGROUND 2003 35300 CONTROL WIRE . LOW VOLTAGE 2003 3s300 CONTROL RACK/PAN EL FRAM E 2003 3s300 CONTROL RACK/PAN EL FRAM E 2003 3s300 PROTECTION EQUIPMENT 2003 35300 MDF BOARD FOR COMMUNICATIONS 2003 35300 COMMUNICATIONS EQUIP 2003 3s300 COMMUNICATIONS EQUIP 2003 3s300 COMMUNICATIONS EQUIP 2003 3s300 AUXILIARY LOAD CENTER 2003 35300 CONTACTOR 2003 35300 COMMUNICATIONS EQUIP 2004 3s300 COMMUNICATIONS EQUIP 2004 35300 CONTROL WIRE - LOW VOLTAGE 2004 39720 MICROWAVE, EQUIPMENT 2004 3s300 PROTECTION EQUIPMENT 2005 35300 DISTANCE / FAULT LOCATOR 200s 3s300 COMMUNICATIONS EQUIP 2007 35300 COMMUNICATIONS EQUIP 2007 3s200 CONCRETE SURFACE TRENCH WLIDS 2007 35300 BARRIER - FENCE, EQUIP PROT 2007 3s300 GRATING 2007 35300 CONTROL WIRE - LOW VOLTAGE 2007 3s300 CONTROL RACK/PANEL FRAM E 2007 35300 PROTECTION EQUIPMENT 2007 35300 SCADA RACK/PANEL FRAME 2007 35300 SCADA RACK/PANEL FRAME 2007 3s300 SCADA RACK/PANEL FRAME 2007 3s300 SCADA EQUIPMENT 2007 3s300 SCADA EQUIPMENT 2007 35300 SCADA COMPUTER AND PERIPHERALS 2007 35300 AUXILIARY POWER XFMR 3 PH 2007 3s300 ALARM/MONITORING EQU IPMENT 2008 35300 CONTROL RACK/PANEL FRAME 2007 35300 CONTROL RACK/PANEL FRAME 2007 3s300 PROTECTION EQUIPMENT 2007 35300 PROTECTION EQUIPMENT 2007 39740 FIBER, MISC EQUIPMENT 2008 39740 FIBER, CARD SHELF 2008 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 89 39740 FIBER, CARD UNIT 2008 39740 FIBER, WIRE/CABLE 2008 35200 CONDUIT & FITTINGS UNDERGROUND 2007 35300 CONTROL WIRE - LOW VOLTAGE 2007 3s300 GROUNDING AND FITTINGS 2007 35300 COMM RACK/PANEL FRAME 2007 35300 COMM RACK/PANEL FRAME 2007 3s300 COMM RACK/PANEL FRAME 2007 35300 YARD LOCAL SERV OR LOAD CENTER 2007 39120 NETWORK EQ 2009 39720 NETWORK EQ 2009 3s300 CONTROL WIRE . LOW VOLTAGE 2008 35300 CONTROL WIRE - LOW VOLTAGE 2008 3s300 FIBER OPTIC CABLE 2008 3s300 FIBER OPTIC CABLE 2008 35300 CONDUIT & FITTINGS ABOVE GROUN 2008 3s300 CONDUIT & FITTINGS ABOVE GROUN 2008 35300 CONTROL RACK/PANEL FRAM E 2008 35300 CONTROL RACK/PAN EL FRAM E 2008 35300 CONTROL RACK/PANEL FRAM E 2008 35300 CONTROL RACK/PANEL FRAME 2008 35300 PROTECTION EQUIPMENT 2008 35300 PROTECTION EQUIPMENT 2008 3s300 PROTECTION EQUIPMENT 2008 3s300 PROTECTION EQUIPMENT 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 3s300 COMMUNICATIONS EQUIP 2008 3s300 COMMUNICATIONS EQUIP 2008 39720 MICROWAVE, BATTERY 2009 39720 M ICROWAVE, BATTERY CHARGE R 2009 39720 MICROWAVE. EQUIPMENT 2009 35300 COMM RACK/PANEL FRAME 2009 35300 COMMUNICATIONS EQUIP 2009 35300 CONTROL WIRE - LOW VOLTAGE 2009 35300 CONDUIT & FITTINGS ABOVE GROUN 2009 3s300 AUXILIARY LOAD CENTER 2009 3s200 BUILDING HVAC SYSTEM 2009 35200 BUILDING HVAC SYSTEM 2070 3s300 CONTROL WIRE - LOW VOLTAGE 2017 35300 GROUNDING AND FITTINGS 20Lr EXECUTION VERSION 35300 LARGE ELECTRICAL ENCLOSURE 2011 35300 COMPOSITE CABLE. LOW VOLTAGE 2010 3s300 COMMUNICATIONS EQUIP 20LO 35300 coMMUNtCAT|ONS EQUTP 2077 3s300 CONTROL WIRE - LOW VOLTAGE 2072 35300 CONTROL WIRE - LOW VOLTAGE 2072 35300 COMM RACK/PANEL FRAME 20t2 35300 COMM RACK/PANEL FRAME 2072 3s300 COMMUNICATIONS EQUIP 2012 35300 COMMUNICATIONS EQUIP 2012 35300 CONTROL WIRE - LOW VOLTAGE 2072 3s300 CONTROL WIRE - LOW VOLTAGE 20t2 3s300 COMM RACK/PANEL FRAME 2012 35300 COMM RACK/PANEL FRAME 2012 35300 COMMUNICATIONS EQUIP 2072 3s300 COMMUNICATIONS EQUIP 2072 35300 COMMUNICATIONS EQUIP 20L2 3s300 COMMUNICATIONS EQUIP 2072 3s200 CONDUIT & FITTINGS UNDERGROUND 2070 3s200 CONDUIT & FITTINGS UNDERGROUND 2010 3s300 CONTROL WIRE - LOW VOLTAGE 2010 35300 CONTROL WIRE - LOW VOLTAGE 2070 35300 COAXIAL CABLE 2010 35300 COAXIAL CABLE 2010 3s300 CONTROL RACK/PANEL FRAM E 20L0 3s300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PANEL FRAM E 2010 35300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAME 2010 35300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2070 35300 PROTECTION EQUIPMENT 2070 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 3s300 COMMUNICATIONS EQUIP 2070 3s300 COMMUNICATIONS EQUIP 2010 35300 AUXILIARY LOAD CENTER 2070 3s300 AUXILIARY LOAD CENTER 2010 35300 CONTROL WIRE . LOW VOLTAGE 2010 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 90 EXECUTION VERSION 3s300 CONTROL WIRE - LOW VOLTAGE 2010 3s300 COMPOSITE CABLE - LOW VOLTAGE 2070 3s300 COMPOSITE CABLE - LOW VOLTAGE 20t0 35300 COAXIAL CABLE 2010 3s300 COAXIAL CABLE 2010 35300 CONTROL RACK/PAN EL FRAM E 2070 35300 CONTROL RACK/PANEL FRAM E 2010 3s300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PANEL FRAM E 2010 3s300 CoNTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PAN EL FRAM E 20LO 35300 CONTROL RACK/PANEL FRAME 2070 3s300 CONTROL RACK/PANEL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAM E 2070 35300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PAN EL FRAM E 2070 3s300 CONTROL RACK/PANEL FRAME 2010 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 CONTROL EQUIPMENT 2070 35300 CONTROL EQUIPMENT 2070 35300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2010 3s300 PROTECTION EQUIPMENT 2072 35300 CONTROL WIRE - LOW VOLTAGE 2072 3s300 GROUNDING AND FITTINGS 2072 35300 CONDUIT & FITTINGS ABOVE GROUN 2012 35300 LARGE ELECTRICAL ENCLOSURE 2012 3s300 YARD LOCAL SERV OR LOAD CENTER 2072 3s300 CONTROL WIRE - LOW VOLTAGE 2008 35300 CONTROL WIRE - LOW VOLTAGE 2008 35300 FIBER OPTIC CABLE 2008 35300 FIBER OPTIC CABLE 2008 35300 CONDUIT & FITTINGS ABOVE GROUN 2008 3s300 CONDUIT & FITTINGS ABOVE GROUN 2008 35300 CONTROL RACK/PANEL FRAM E 2008 35300 CONTROL RACK/PAN EL FRAM E 2008 35300 CONTROL RACK/PANEL FRAME 2008 35300 CONTROL RACK/PANEL FRAME 2008 35300 PROTECTION EQUIPMENT 2008 35300 PROTECTION EQUIPMENT 2008 35300 PROTECTION EQUIPMENT 2008 3s300 PROTECTION EQUIPMENT 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 3s300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2007 3s300 COMMUNICATIONS EQUIP 2007 35300 METERING EQUIPMENT 2072 35200 CONCRETE SURFACE TRENCH W/LIDS 2073 35300 STN POWER CABLE AND FITTINGS 2073 36600 PAD-3PH SECT ENCLOSURE- PRIMAR 20L3 35500 VAULT BASE SECTION 2013 36600 VAULT TOP SECTION 2073 36600 CONDUIT DUST-DIRECT BURIAL-PRI 2013 36700 UG CONDUCTOR-PRIMARY 15KV 2073 36700 SECT ENCLOSURE 3PH - PRIMARY 2013 35300 GROUNDING AND FITTINGS 2073 39720 M tcRowAVE, STRUCT( POLES&FlX)20t2 39720 MICROWAVE, EQUIPMENT 2072 39720 MICROWAVE, WIRE/CABLE 2072 3s200 FOUNDATION - COMMUNICATION 2012 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Hemingway Transmission Station FERC Acct Heminswav Asset Description Vintage 35011 LAND OWNED IN FEE TS 2008 3s300 COMMUNICATIONS EQUIP 2077 3s200 SITE PREPARATION & IMPROVEMENT 2070 3s200 PERIMETER FENCE & GATES 2010 35200 WATER SYSTEM 2010 3s200 WATER WELL 2010 35200 COMPLETE SEPTIC SYSTEM 2010 35200 YARD LIGHT SYSTEM 2010 35200 FOUNDATION - STATION BUILDING 2010 35200 COMPLETE STATION BUILDING 2070 3s200 BUILDING PLUMBING SYSTEM 2010 35200 BUILDING HVAC SYSTEM 2070 35200 BUILDI NG ELECTRICAL SYSTEM 2070 35200 BUILDING FIRE PROTECTION 2010 35200 FOUNDATION - STRUCTURE 2070 3s200 FOUNDATION - OTHER EQUIPMENT 2010 35200 CONCRETE SURFACE TRENCH WLIDS 20t0 35200 CONDUIT & FITTINGS UNDERGROUND 2010 35200 METAL STRUCT - OTHER SUPPORT 2070 35200 METAL STRUCT - EQUIPMENT 2070 35200 WOOD POLE _ MISC 2070 3s300 CABLE TRAY AND ACCESSORIES 2010 35300 CABLE TRAY AND ACCESSORIES 2070 35300 CABLE TRAY AND ACCESSORIES 2010 35300 CABLE TRAY AND ACCESSORIES 2010 35300 CABLE TRAY AND ACCESSORIES 2010 3s300 CABLE TRAY AND ACCESSORIES 2010 3s300 CABLE TRAY AND ACCESSORIES 2070 35300 CABLE TRAY AND ACCESSORIES 2070 3s300 CABLE TRAY AND ACCESSORIES 2070 3s300 INSULATORS - PIN OR POST 2070 35300 BUS - RIGID WITH FITTINGS 2070 35300 STN POWER CABLE AND FITTINGS 2010 35300 STN POWER CABLE AND FITTINGS 2010 35300 CONTROL WIRE - LOW VOLTAGE 2010 35300 CONTROL WIRE - LOW VOLTAGE 2010 35300 COAXIAL CABLE 2070 35300 FIBER OPTIC CABLE 2010 35300 GROUNDING AND FITTINGS 2070 EXECUTION VERSION 3s300 75KVA LOCAL SERVICE XFMR 2010 35300 5OO.1499KVA LOCAL SERVICE XFMR 2070 3s300 SWITCH - POWER FUSE 2070 3s300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PANEL FRAM E 2010 35300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PANEL FRAME 2070 3s300 CONTROL RACK/PAN EL FRAM E 2070 35300 CONTROL RACK/PANEL FRAM E 2010 35300 CONTROL RACK/PANEL FRAME 2070 35300 CONTROL RACK/PANEL FRAME 2070 35300 CONTROL RACK/PAN EL FRAME 2070 3s300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PANEL FRAM E 2070 3s300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PAN EL FRAM E 2070 3s300 CONTROL RACK/PANEL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAME 2070 3s300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PAN EL FRAM E 2070 35300 CONTROL RACK/PANEL FRAM E 2010 35300 CONTROL RACK/PAN EL FRAM E 2070 3s300 CONTROL RACK/PAN EL FRAM E 2070 3s300 CONTROL RACK/PANEL FRAME 2070 35300 CONTROL RACK/PAN EL FRAM E 2070 35300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PANEL FRAM E 2010 3s300 CONTROL RACK/PAN EL FRAME 2010 35300 CONTROL RACK/PANEL FRAME 20to 35300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PAN E L FRAM E 2010 35300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PAN EL FRAME 2070 35300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PANEL FRAM E 2070 3s300 CONTROL RACK/PAN EL FRAME 2010 3s300 PROTECTION EQUIPMENT 2070 35300 PROTECTION EQUIPMENT 2070 35300 PROTECTION EQUIPMENT 2010 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page 192 3s300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2070 35300 PROTECTION EQUIPMENT 2070 35300 PROTECTION EQUIPMENT 2070 3s300 PROTECTION EQUIPMENT 2010 35300 CONTROL EQUIPMENT 2010 35300 CONTROL EQUIPMENT 20LO 35300 METERING EQUIPMENT 2010 35300 ALARM/MONITORING EQUIPMENT 2070 3s300 SCADA RACK/PANEL FRAME 20t0 3s300 SCADA RACK/PANEL FRAME 2070 35300 SCADA RACK/PANEL FRAME 2070 35300 SCADA RACK/PANEL FRAME 20LO 3s300 SCADA RACK/PANEL FRAME 2070 35300 SCADA EQUIPMENT 2010 35300 SCADA EQUIPMENT 2010 35300 SCADA EQUIPMENT 2010 3s300 SCADA EQUIPMENT 2070 3s300 SCADA EQUIPMENT 2010 3s300 COMM RACK/PANEL FRAME 20L0 35300 COMM RACK/PANEL FRAME 2010 35300 COMM RACK/PANEL FRAME 2070 35300 COMM RACK/PANEL FRAME 2010 3s300 COMM RACK/PANEL FRAME 2010 3s300 COMM RACK/PANEL FRAME 2010 3s300 COMM RACK/PANEL FRAME 2010 35300 COMM RACK/PANEL FRAME 2010 3s300 DISTANCE / FAULT LOCATOR 2010 35300 COMMUNICATIONS EQUIP 2070 3s300 COMMUNICATIONS EQUIP 2070 3s300 COMMUNICATIONS EQUIP 2070 3s300 COMMUNICATIONS EQUIP 20LO 35300 COMMUNICATIONS EQUIP 2070 35300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2070 3s300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2010 3s300 YARD LOCAL SERV OR LOAD CENTER 2010 35300 48 VOLT BATTERY CHARGER 2070 3s300 48 VOLT BATTERY CHARGER 2070 EXECUTION VERSION 3s300 130 VOLT BATTERY CHARGER 2070 35300 48 VOLT BATTERY 2010 3s300 130 VOLT BATTERY 2010 3s300 BATTERY RACK 2010 35300 TRANSFER SWITCH 2070 3s300 BUILDING SECURITY SYSTEM 2010 3s300 BUILDING SECURITY SYSTEM 2010 35300 BOX, CABINET OR PANEL 2010 3s300 MISC OFFICE FURNITURE 2010 3s300 MISC OFFICE EQUIPMENT 2070 3s300 COMMUNICATIONS EQUIP 2077 3s200 WOOD POLE - MISC 2073 35300 CONTROL WIRE - LOW VOLTAGE 2073 35300 FIBER OPTIC CABLE 2013 35300 GROUNDING AND FITTINGS 20L3 3s300 CONDUIT & FITTINGS ABOVE GROUN 2073 35300 COMM RACK/PANEL FRAME 2073 35300 COMM RACK/PANEL FRAME 2013 3s300 coMMUN|CAT|ONS EQUIP 2073 3s300 BUILDING SECURIry SYSTEM 2073 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 93 Kinport Transmission Station FERC Acct KinDort Asset Description Vintage 35011 LAND OWNED IN FEE TS 7970 35011 LAND OWNED IN FEE TS 1972 35011 LAND OWNED IN FEE TS 7976 35200 RETAINING WALLS !972 3s200 SITE PREPARATION & IMPROVEMENT 1972 3s200 DRAINAGE SYSTEMS-CULVERTS, ETC 7972 35200 YARD SURFACING - GMVEI" ETC.t972 3s200 YARD SURFACING - GRAVEL, ETC.L976 3s200 YARD SURFACING - GRAVEL, ETC.t979 3s200 SITE EXCAVATION 7972 35200 BI.ACKTOP t972 35200 GRAVEL 7972 3s200 GRAVEL 7976 3s200 CULVERTS 1972 35200 ROAD EXCAVATION L972 35200 ROAD REGRADING 1984 3s200 CONCRETE WALK 1980 3s200 PERIMETER FENCE & GATES 7976 3s200 PERIMETER FENCE & GATES L992 35200 WATER WELL PUMP L976 3s200 WATER SYSTEM 7976 35200 WATER WELL \976 35200 COMPLETE SEPTIC SYSTEM t976 35200 WATER STORAGE RESERVOIR t976 35200 YARD LIGHT SYSTEM t976 35200 YARD LIGHT SYSTEM 1980 3s200 YARD LIGHT SYSTEM L992 3s200 YARD LIGHT SYSTEM 7976 3s200 YARD LIGHT SYSTEM 1980 35200 YARD LIGHT SYSTEM 7976 3s200 LIGHT STANDARD 7976 3s200 LIGHT STANDARD 7992 3s200 FOUNDATION - CONDENSER BLDG 1980 35200 FOUNDATION . STATION BUILDING 7976 35200 COMPLETE STATION BUILDING 7976 3s200 COMPLETE STATION BUILDING 1980 35200 COMPLETE CONDENSER CNTRL BLDG 1980 35200 COMPLETE CONDENSER CNTRL BLDG 1980 35200 PIPING FOR PLUMBING 7976 EXECUTION VERSION 3s200 SHOWER t976 35200 WATER HEATER 7976 35200 BUILDING HVAC SYSTEM 1976 3s200 HEATER & AIR CONDITIONER COMBI 1980 3s200 HEATER & AIR CONDITIONER COMBI 1980 35200 AIR CONDITIONER TRANSFORMER 1980 35200 BUILDING ELECTRICAL SYSTEM 1976 3s200 BUILDING ELECTRICAL SYSTEM 7976 3s200 BUILDING LIGHT FIXTURE 1980 3s200 BUILDING ELECTRICAL SYSTEM 1980 3s200 BUILDING ELECTRICAL SYSTEM t976 35200 BUILDING ELECTRICAL SYSTEM 1980 35200 D.C. EMERGENCY FIXTURE 7976 35200 BUILDING ELECTRICAL SYSTEM 7976 35200 CATWALK FND t976 3s200 FOUNDATION - COMM UNICATION 7976 35200 COMMUNICATION BOX FND 1976 3s200 EQUIPMENT PAD 1980 35200 OUTDOOR CABINET FND 1993 3s200 FOUNDATION . METAL CLAD 7976 35200 LIGHTING MAST FND 1992 3s200 TUNNELS 7976 35200 CONCRETE ABOVE GROUND CABLEWAY 7976 35200 CONCRETE SURFACE TRENCH W/LIDS L976 35200 CONCRETE SURFACE TRENCH WLIDS 1981 35200 CONCRETE SURFACE TRENCH W/LIDS 1992 3s200 CONDUIT & FITTINGS UNDERGROUND L979 35200 CONDUIT & FITTINGS UNDERGROUND 1980 3s200 CONDUIT UNDER GROUND CABLEWAY 1981 35200 CONDUIT & FITTINGS UNDERGROUND 1981 3s200 UNIWALKS 7976 35200 CONCRETE MANHOLE WCOVER 1981 35200 CONCRETE MANHOLE WCOVER 7992 3s200 CABLE RISER SUPPORT 7976 3s200 CATWALK STRUCTURE 7976 35200 METAL STRUCT - COMMUNICATION 1976 3s200 STATIC BAR SUPPORT STRUCTURE 7976 3s200 WELL HOUSE (INACTIVE)7976 35200 TOOL SHED, MAINT BLDG, ETC 7976 3s200 HEATERS 7976 3s200 LIGHTING t976 JOINT OWNERSHIP AND OPERATING AGREEMENT-EXHIBIT B Page 194 35200 PLUMBING 1976 35300 BARRIER - FIRE, SWITCHING, ETC t976 35300 HANDRAIL 7976 35300 GRATING r976 3s300 CABLE TRAY AND ACCESSORIES L976 35300 2/O AWG CONDUCTOR COPPER 1985 35300 250 MCM CONDUCTOR COPPER 1981 3s300 266.8 MCM CONDUCTOR ALUMINUM 7976 3s300 336.4 MCM CONDUCTOR ALUMINUM t976 35300 397.5 MCM CONDUCTOR ALUMINUM L976 3s300 15KV POWER CABLE L976 35300 15KV POWER CABLE 7976 35300 15KV POWER CABLE 1980 35300 15KV POWER CABLE 1976 3s300 CONTROL WIRE . LOW VOLTAGE 7976 35300 CONTROL WIRE - LOW VOLTAGE 1976 35300 #18 - #19 CONTROL WrRE 1991 3s300 #18 - #19 CONTROL WtRE 1995 35300 #18 - #19 CONTROL WrRE t976 35300 #18 - #19 CONTROL WtRE 1980 35300 #18 - #19 CONTROL WtRE 1981 3s300 #18 - #19 CONTROL WtRE 1986 35300 #18 - #19 CONTROL WrRE 1990 3s300 H18 - #19 CONTROL WIRE 1991 35300 #18 - #19 CONTROL WrRE 1992 35300 #18 - #19 CONTROL WrRE 1993 35300 #18 - #19 CONTROL WrRE 1995 3s300 #18 - #19 CONTROL WtRE 1996 35300 #18 - #19 CONTROL WIRE t997 3s300 #18 - #19 CONTROL WtRE 1980 3s300 #18 - #19 CONTROL WtRt 7992 3s300 #18 - #19 CONTROL WtRE L976 35300 #18 - #19 CONTROL WrRr 7979 35300 #18 - #19 CONTROL WtRE 1981 3s300 #18 - #19 CONTROL WtRE 1991 35300 #18 - #19 CONTROL WrRr 7992 3s300 #18 - #19 CONTROL WtRE 7976 35300 #18 - #19 CONTROL WtRE 7979 3s300 #18 - #19 CONTROL WrRE 1982 3s300 #74 - #L6 CONTROL WIRE 7976 35300 fi14 - #16 coNTROL WtRt 7979 EXECUTION VERSION 3s300 #74 - #76 CONTROL WtRE 1981 35300 #14 - #16 coNTROL WrRr 1996 3s300 #r4 -#76 CONTROL WtRt 7992 3s300 #74 - #76 CONTROL WtRE 1976 35300 *14 -#76 CONTROL WrRE 7979 35300 #74 - #76 CONTROL WtRE 1991 35300 #74 - #76 CONTROL WtRt L992 35300 #74 - #76 CONTROL WtRE 1993 35300 frL( -#76 CONTROL WIRE 1980 3s300 #74 - #76 CONTROL WtRt 1980 3s300 fi74 - #L6 CONTROL WIRE 1993 3s300 #74 - #16 CONTROL WtRt 1996 35300 #74 - #76 CONTROL WrRE 1990 35300 #74 - #76 CONTROL WtRt 1980 3s300 #74 - #76 CONTROL WtRE 1981 3s300 #14 - #76 CONTROL WtRE 1991 35300 #74 -#76 CONTROL WtRE 1976 35300 *74 -#76 CONTROL WrRE 1980 35300 #74 - #76 CONTROL WtRE 1981 35300 #74 - #76 CONTROL WtRE 1990 35300 COAXIAL CABLE 7976 35300 #70 -#12 CONTROL WrRE t976 35300 #70 - #12 coNTROL WtRE 1980 3s300 #70 - #72 CONTROL WtRE 1981 35300 #\O - #72 CONTROL WIRE 7992 35300 #70 - #72 CONTROL WtRE 1995 3s300 #70 - #72 CONTROL WtRE 1980 35300 #LO -#\2 CONTROL WIRE 1980 35300 #70 - #72 CONTROL WtRE 1990 35300 #70 - #12 CONTROL WrRE 1991 3s300 #70 - #72 CONTROL WrRE 1992 3s300 frto - #12 coNTRoL wrRE 1995 35300 #10 - #12 CONTROL WtRE 1979 35300 #7O - #I2 CONTROL WIRE 1980 3s300 #70 - #72 CONTROL WrRE 1995 35300 #70 - #72 CONTROL W|RE 7976 3s300 #10 - #12 coNTRoL wrRE 1980 3s300 #r0 - #12 coNTRoL wrRr 1981 35300 #70 - #12 CONTROL WtRE 1981 35300 #10 - #12 CONTROL WtRE 1991 3s300 #to - #72 CoNTROL WtRE 7992 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Page | 95 35300 #IO -#72 CONTROL WIRE 1996 35300 #to - #12 CoNTROL WIRE 1980 35300 #10 - #12 CONTROL WIRE L992 3s300 #7O - #L2 CONTROL WIRE 7976 3s300 #70 - #12 coNTROL WtRE 1992 35300 #70 - #12 CoNTROL WtRE 1980 35300 #10 - #12 CONTROL WIRE 1981 35300 #LO - #L2 CONTROL WIRE 1984 35300 #70 - #12 CoNTROL WrRE 7987 3s300 #to - #72 CoNTROL WIRE 1995 3s300 #TO - #L2 CONTROL WIRE 1979 35300 #70 - #72 CONTROL WtRE 1976 3s300 #to - #L2 CoNTROL WtRt 1983 35300 #70 - #t2 CoNTROL WtRt 1991 35300 #L0 - #t2 coNTROL WrRt L992 3s300 #10 - s12 CONTROL WtRE 1995 35300 #70 - #72 CONTROL WtRt 1996 35300 #70 - #72 CONTROL WrRE 1976 3s300 #10 - #12 CONTROL WlRt 1981 35300 #10 - #72 coNTROL WrRE 1981 35300 #to - #12 coNTRoL wtRt 1976 3s300 #70 - *72 CONTROL WrRt 1981 3s300 #7 -#9 CONTROLWIRE 1981 35300 #7.#9 CONTROLWIRE 1976 35300 ff7 - #9 CONTROL W|RE L979 35300 #7 - #9 CONTROL WIRE 1983 3s300 #7 -#9 CONTROLWIRE 7976 35300 *7 -#9 CONTROLWIRE 1980 35300 #7 -#9 CONTROLWIRE 1983 35300 #7 - #9 CONTROL WIRE 1981 3s300 #7 -#9 CONTROLWIRE 1980 3s300 #L - #5 CONTROL WIRE 7992 35300 #T - #6 CONTROL WIRE 1976 3s300 #1 - f6 CONTROL WIRE 1981 35300 #1 - #6 CONTROL WIRE 1980 35300 #1 - #6 CONTROL WIRE 1980 35300 #1- #6 CONTROL WIRE 7976 35300 f1 - #6 CONTROL WIRE 1976 3s300 #1 - #6 CONTROL WIRE 1976 35300 #1 . #6 CONTROL WIRE 1992 35300 #1 . #5 CONTROL WIRE 1976 EXECUTION VERSION 3s300 #7 - #6 CONTROL WIRE 7979 3s300 #1 - f6 CONTROL WIRE 7992 3s300 1/O ALUM CONTROL WIRE 1980 35300 2/O COPPER CONTROL WIRE 7976 3s300 250 MCM ALUM CONTROL WIRE 7976 35300 250 MCM ALUM CONTROL WIRE t976 3s300 350 MCM COPPER CONTROL WIRE 1976 35300 350 MCM COPPER CONTROL WIRE L976 35300 350 MCM COPPER CONTROL WIRE 1980 35300 350 MCM COPPER CONTROL WIRE 1980 3s300 5OO MCM ALUM CONTROL WIRE L976 3s300 750 MCM COPPER CONTROL WIRE 1980 3s300 1OOO MCM COPPER CONTROL WIRE 1980 3s300 1/O ALUM CONTROL WIRE 1980 35300 COMPOSITE CABLE - LOW VOLTAGE 1995 35300 COMPOSITE CABLE - LOW VOLTAGE 1996 3s300 GROUNDING AND FITTINGS 7992 35300 GROUNDING AND FITTINGS t976 35300 #6 COPPER GROUND MAT 1976 3s300 #6 COPPER GROUND MAT 1980 3s300 #6 COPPER GROUND MAT 7992 35300 #7 COPPER GROUND t976 35300 7/16 COPPER GROUND 7976 35300 7/16 COPPER GROUND L992 35300 2/O COPPER GROUND 7976 35300 2/O COPPER GROUND L979 35300 2/O COPPER GROUND 1980 3s300 2/O COPPER GROUND 1981 3s300 2/O COPPER GROUND 1984 35300 2/O COPPER GROUND 1985 35300 2/O COPPER GROUND 1987 35300 2/O COPPER GROUND L992 3s300 4/O ALUMINUM GROUND 7976 3s300 250 MCM COPPER GROUND 1976 35300 250 MCM COPPER GROUND 1979 3s300 250 MCM COPPER GROUND 1980 3s300 250 MCM COPPER GROUND 1981 35300 250 MCM COPPER GROUND 7992 35300 5OO MCM COPPER GROUND 7976 3s300 5OO MCM COPPER GROUND 1980 3s300 CONDUIT & FITTINGS ABOVE GROUN 7976 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 96 35300 CONDUIT & FITTINGS ABOVE GROUN 7979 3s300 CONDUIT & FITTINGS ABOVE GROUN 7976 35300 CONDUIT & FITTINGS ABOVE GROUN 7976 3s300 CONDUIT & FITTINGS ABOVE GROUN L992 35300 CONDUIT & FITTINGS ABOVE GROUN \976 35300 CONDUIT & FITTINGS ABOVE GROUN r976 35300 CONDUIT & FITTINGS ABOVE GROUN L976 3s300 CONDUIT & FITTINGS ABOVE GROUN L979 35300 CONDUIT & FITTINGS ABOVE GROUN 1981 35300 CONDUIT & FITTINGS ABOVE GROUN L976 3s300 CONDUIT & FITTINGS ABOVE GROUN 1976 35300 CONDUIT & FITTINGS ABOVE GROUN 1981 35300 CONDUIT & FITTINGS ABOVE GROUN 1980 35300 CONDUIT & FITTINGS ABOVE GROUN 7976 3s300 CONDUIT & FITTINGS ABOVE GROUN 1976 35300 CONDUIT & FITTINGS ABOVE GROUN 7979 35300 CONDUIT & FITTINGS ABOVE GROUN 7976 35300 2" -3-t/2" CONDUTT t976 35300 2" -3-u2" CONDUIT L976 35300 2" - 3-7/2" CONDU|T t992 35300 2" - 3-7/2* CONDU|T 7992 3s300 2" -3-7/2" CONDUTT t976 3s300 4" CONDUIT 7976 35300 4" CONDUIT t979 3s300 4,'CONDUIT 7992 3s300 4'' CONDUIT 7976 3s300 5" CONDUIT 7979 35300 5'' CONDUIT t992 3s300 SMALL ELECTRICAL ENCLOSURE r992 35300 SMALL ELECTRICAL ENCLOSU RE 1976 3s300 SMALL ELECTRICAL ENCLOSU RE 1981 3s300 SMALL ELECTRICAL ENCLOSU RE L992 35300 5OO.1499KVA LOCAL SERVICE XFMR 1980 35300 5OO-1499KVA LOCAL SERVICE XFMR 1980 35300 UNDER 15KVA LOCAL SERVICE XFMR 7982 3s300 15-49KVA LOCAL SERVICE XFMR L976 3s300 15-49KVA LOCAL SERVICE XFMR r992 35300 167-499KVA LOCAL SERVICE XFMR 1981 3s300 5OO-1499KVA LOCAL SERVICE XFMR 7973 35300 5OO-1499KVA LOCAL SERVICE XFMR 1981 3s300 CONTROL RACK/PANEL FRAM E 7976 EXECUTION VERSION 35300 CONTROL RACK/PANEL FRAME 1976 3s300 CONTROL RACK/PANEL FRAME L976 35300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PANEL FRAME 1980 3s300 CONTROL RACK/PANEL FRAM E t976 35300 CONTROL RACK/PAN EL FRAM E 7976 35300 CONTROL RACK/PAN EL FRAM E L976 3s300 CONTROL RACK/PAN EL FRAM E 7976 35300 CONTROL RACK/PAN E L FRAM E 1976 35300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PAN EL FRAM E 1980 35300 SWITCHBOARD RACK OR PANET 1980 35300 CONTROL RACK/PANEL FRAME 1980 35300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PANEL FRAM E 1980 35300 SWITCHBOARD RACK OR PANEL 1980 35300 CONTROL RACK/PANEL FRAM E 1980 3s300 SWITCHBOARD RACK OR PANEL 1980 35300 CONTROL RACK/PAN EL FRAM E 1980 35300 SWITCHBOARD RACK OR PANEL 1980 35300 CONTROL RACK/PANEL FRAME 1980 3s300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PANEL FRAME 1980 3s300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PANEL FRAM E 1980 35300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PAN EL FRAM E 1980 3s300 CONTROL RACK/PANEL FRAME t992 35300 CONTROL RACK/PANEL FRAME t976 35300 CONTROL RACK/PAN EL FRAM E 1991 3s300 CONTROL RACK/PAN E L FRAM E 1991 3s300 CONTROL RACK/PANEL FRAM E 1995 35300 CONTROL RACK/PANEL FRAM E 7976 3s300 CONTROL RACK/PANEL FRAME 7976 3s300 CONTROL RACK/PANEL FRAM E 1976 3s300 CONTROL RACK/PAN E L FRAM E r990 3s300 CONTROL RACK/PANEL FRAME 1996 35300 SWITCHBOARD RACK OR PANEL 1980 3s300 CONTROL RACK/PANEL FRAM E 1980 35300 SWITCHBOARD RACK OR PANEL 1980 35300 CONTROL RACK/PAN EL FRAM E 1980 JOINT OWNERSHIP AND OPERATING AGREEMENT_ EXHIBIT B Page 197 3s300 CONTROL RACK/PANEL FRAME t976 3s300 SWITCHBOARD RACK OR PANEL L979 35300 CONTROL RACK/PANEL FRAM E 7979 35300 CONTROL RACK/PANEL FRAM E t992 35300 CONTROL RACK/PAN EL FRAM E t976 35300 CONTROL RACK/PANEL FRAME t976 3s300 PROTECTION EQUIPMENT 7992 35300 CONTROL COMPUTER & PERIPHERALS 1996 35300 PROTECTION EQUIPMENT 1996 3s300 PROTECTION EQUIPMENT 1996 3s300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1981 35300 PROTECTION EQUIPMENT 1990 35300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1996 35300 PROTECTION EQUIPMENT 1992 35300 PROTECTION EQUIPMENT 1990 3s300 CONTROL COMPUTER & PERIPHERALS 1996 35300 AI.ARM/MONITORI NG EQUIPMENT L976 35300 METERING EQUIPMENT 1990 35300 METERING EQUIPMENT 1990 3s300 ALARM/MONITORING EQUI PMENT 1986 35300 ALARM/MONITORI NG EQUIPME NT 1985 35300 ALARM/MONITORING EQUIPMENT 1980 35300 ALARM/MONITORING EQUIPMENT 1980 35300 METERING EQUIPMENT 1993 3s300 CONTROL EQUIPMENT 7997 3s300 CONTROL EQUIPMENT L976 35300 CONTROL EQUIPMENT 7976 35300 CONTROL EQUIPMENT L976 35300 CONTROL EQUIPMENT 7976 3s300 CONTROL EQUIPMENT 1976 35300 CONTROL EQUIPMENT t976 3s300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1983 35300 CONTROL EQUIPMENT t972 35300 CONTROL EQUIPMENT L975 3s300 CONTROL EQUIPMENT 7976 3s300 CONTROL EQUIPMENT t979 35300 CONTROL EQUIPMENT 1981 EXECUTION YERSION 35300 CONTROL EQUIPMENT 1984 35300 CONTROL EQUIPMENT 7987 35300 CONTROL EQUIPMENT 1981 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1986 35300 CONTROL EQUIPMENT 1986 3s300 CONTROL EQUIPMENT 1990 35300 CONTROL EQUIPMENT 1990 3s300 CONTROL EQUIPMENT 1991 35300 CONTROL EQUIPMENT 1990 35300 CONTROL EQUIPMENT 1996 3s300 CONTROL EQUIPMENT 7992 3s300 CONTROL EQUIPMENT 1992 35300 CONTROL EQUIPMENT 1995 35300 CONTROL EQUIPMENT 1996 3s300 SCADA RACK/PANEL FRAME 1991 35300 SCADA EQUIPMENT 1992 35300 COMM RACK/PANEL FRAME 7976 35300 COMM RACK/PANEL FRAME 1976 35300 YARD LOCAL SERV OR LOAD CENTER 1976 3s300 JUNCTION BOX 1980 3s300 48 VOLT BATTERY CHARGER 1997 35300 48 VOLT BATTERY 1997 35300 LOAD CENTER, AC L976 35300 LOAD CENTER, AC 1980 3s300 LOAD CENTER, DC 1976 35300 LOAD CENTER, DC L992 35300 10 - 40 AMP CIR BRKR 1992 3s300 41 . 1OO AMP CIR BRKR L992 35300 3 POLE DISCONNECT 7976 35300 3 POLE DISCONNECT 1980 3s300 3 POLE DISCONNECT 1997 35300 CONTACTOR 7976 3s300 VOLTAGE ALARM L976 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 98 3s300 AUXILIARY POWER XFMR 1PH t976 35300 1OOKVA 1 PH XFMR 1976 3s300 AUXILIARY POWER XFMR 3 PH 7976 35300 sOOKVA 3 PH XFMR t976 3s300 45KV 480 VOLT XFMR t976 35300 3OKV 480 VOLT XFMR t976 35300 EVENTS RECORDER (INACTIVE)t982 35300 ALARM SYSTEMS.WIRE D CI RCUITS L992 3s300 SPECIAL METERING COMPUTER 7976 3s300 MISC OFFICE FURNITURE 1989 35300 MISC OFFICE FURNITURE 1982 3s300 MISC OFFICE FURNITURE 1982 3s300 CHAIR 1976 35300 CHAIR 1981 35300 DESK L976 3s300 DESK 7952 3s300 DESK 1953 35300 DESK 1980 3s300 FILE CABINET 7979 3s300 FILE CABINET 1976 3s300 FILE CABINET 1979 35300 FILE CABINET 1980 3s300 DRAFTING TABLE 7947 3s300 DRAFTING TABLE 1950 3s300 TABLE 1976 3s300 TABLE 1949 3s300 COMPUTER AND PERIPHERALS 1995 35300 COMPUTER AND PERIPHERAL5 1995 3s300 COMPUTER AND PERIPHERALS L992 35300 INTERCOM SYSTEM r975 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE. CARD UNIT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, CARD SHELF 1999 39720 MICROWAVE, CARD SHELF 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 35300 #18 - #19 CONTROL WrRE 1999 35300 CONTROL RACK/PAN EL FRAM E 1999 3s300 CONTROL COMPUTER & PERIPHERALS 1999 EXECUTION VERSION 3s300 #T4 - #76 CONTROL WIRE 1999 3s300 CONTROL RACK/PANEL FRAME 1999 35300 AI.ARM/MON ITORI NG EQU I PMENT 1999 3s300 CONTROL COMPUTER & PERIPHERALS 1999 3s200 EQUIPMENT PAD 1999 35200 CONDUIT & FITTINGS UNDERGROUND 1999 3s300 15KV POWER CABLE 1999 3s300 AUXILLARY GENERATOR 1999 3s300 #18 - #19 CONTROL WtRE 1999 35300 #74 -#t6 CONTROL WrRE 1999 3s300 #70 - #t2 coNTROL WrRt 1999 3s300 CONTROL RACK/PANEL FRAM E 1999 35300 PROTECTION EQUIPMENT 1999 . 35300 AI.ARM/MONITORI NG EQUIPME NT 1999 3s300 SAFEW SWITCH 1999 39720 M ICROWAVE, STRUCT(POLES&FIX)1998 39720 M ICROWAVE, STRUCT(POLES&FIX)1998 39720 MICROWAVE, RADIO 2000 35200 COMPLETE STATION BUILDING 2001 35200 SMOKE DETECTOR 2001 35300 METERING EQUIPMENT 1999 35300 METERING EQUIPMENT 1999 35300 METERING EQUIPMENT 1999 3s300 ALARM/MON ITORING EQU I PMENT 1999 35300 COMMUNICATIONS EQUIP 2002 35300 COMMUNICATIONS EQUIP 2002 3s300 COMMUNICATIONS EQUIP 2002 35300 SWITCHBOARD RACK OR PANEL 2007 35300 CONTROL RACK/PAN EL FRAM E 2001 3s300 ALARM/MONITORING EQUIPMENT 2001 3s300 ALARM/MONITORING EQUIPMENT 2001 3s300 CONTROL RACK/PANEL FRAME 1998 35300 CONTROL RACK/PANEL FRAME 1998 35300 PROTECTION EQUIPMENT 1998 3s300 PROTECTION EQUIPMENT 1998 35300 CONTROL RACK/PANEL FRAM E 200L 3s300 CONTROL RACK/PANEL FRAM E 2007 3s300 PROTECTION EQUIPMENT 2001 35300 ALARM/MONITORING EQUIPMENT 2001 35300 CONTROL RACK/PANEL FRAM E 2007 3s300 CONTROL RACK/PAN EL FRAM E 2001 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 99 35300 PROTECTION EQUIPMENT 2001 3s300 PROTECTION EQUIPMENT 2001 3s300 f18 - #19 CONTROL WIRE 2001 3s300 frLO - #t2 CONTROL WlRt 2001 3s300 CONTROL RACK/PANEL FRAME 2001 3s300 PROTECTION EQUIPMENT 2001 35300 PROTECTION EQUIPMENT 2001 3s300 PROTECTION EQUIPMENT 2001 3s300 CONTROL EQUIPMENT 2001 397t0 TELEPHONE, CARD UNIT 200L 35300 CONTROL RACK/PANEL FRAME 2004 3s300 PROTECTION EQUIPMENT 2004 3s300 CABLE TRAY AND ACCESSORIES 2004 3s300 CONTROL WIRE . LOW VOLTAGE 2004 35300 METERING EQUIPMENT 2004 35300 AUXILIARY LOAD CENTER 2004 39720 MICROWAVE, CARD SHELF 2004 39720 MICROWAVE, CARD UNIT 2004 39720 MICROWAVE, EQUIPMENT 2004 39740 FIBER, MISC EQUIPMENT 2004 3s300 CONTROL RACK/PAN EL FRAM E 200s 35300 CONTROL RACK/PAN E L FRAM E 2005 3s300 PROTECTION EQUIPMENT 2005 3s300 PROTECTION EQUIPMENT 200s 35300 130 VOLT BATTERY CHARGER 2006 35300 130 VOLT BATTERY 2006 35300 BATTERY RACK 2006 35300 SAFETY SWITCH 2006 3s300 130 VOLT BATTERY CHARGER 2005 35300 SAFETY SWITCH 2006 35300 MISC TEST EQUIPMENT 2007 35300 MISC TEST EQUIPMENT 2007 3s300 MISC TEST EQUIPMENT 2007 35300 CABLE TRAY AND ACCESSORIES 2007 3s300 CABLE TRAY AND ACCESSORIES 2007 35300 CONTROL RACK/PAN EL FRAM E 2007 3s300 CONTROL RACK/PAN EL FRAM E 2007 3s300 CONTROL RACK/PAN E L FRAM E 2007 35300 CONTROL RACK/PANEL FRAM E 2007 35300 PROTECTION EQUIPMENT 2007 35300 PROTECTION EQUIPMENT 2007 EXECUTION VERSION 35300 SCADA RACK/PANEL FRAME 2007 3s300 SCADA RACK/PANEL FRAME 2007 35300 SCADA EQUIPMENT 2007 35300 SCADA EQUIPMENT 2007 3s300 SCADA COMPUTER AND PERIPHERALS 2007 35300 SCADA COMPUTER AND PERIPHERALS 2007 39720 MICROWAVE, BATTERY 2007 39730 BASE STATION, MISC EQUIPMENT 2007 3s300 ALARM/MONITORING EQUIPMENT 2008 35200 METAL STRUCT - COMMUNICATION 2007 35200 CONDUIT & FITTINGS UNDERGROUND 2007 35300 CONTROL WIRE - LOW VOLTAGE 2007 35200 BUILDING HVAC SYSTEM 2009 35200 FOUNDATION - OTHER EQUIPMENT 2008 3s200 CONDUIT & FITTINGS UNDERGROUND 2008 35300 CONTROL WIRE . LOW VOLTAGE 2008 3s300 GROUNDING AND FITTINGS 2008 3s300 CONTROL RACK/PANEL FRAME 2008 35300 CONTROL RACK/PAN EL FRAM E 2008 3s300 CONTROL RACK/PANEL FRAME 2008 3s300 PROTECTION EQUIPMENT 2008 3s300 CONTROL EQUIPMENT 2008 35300 COMMUNICATIONS EQUIP 2008 39740 FIBER, MISC EQUIPMENT 2009 3s300 CONTROL WIRE - LOW VOLTAGE 2008 3s300 CONTROL WIRE - LOW VOLTAGE 2008 35300 CONTROL EQUIPMENT 2008 35300 CONTROL EQUIPMENT 2008 3s300 CONTROL EQUIPMENT 2008 3s300 CONTROL EQUIPMENT 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMM RACK/PANEL FRAME 2009 35300 coMMUNtCATtONS EQUrP 2009 35300 CONTROL WIRE - LOW VOLTAGE 2009 35300 CONDUIT & FITTINGS ABOVE GROUN 2009 3s300 130 VOLT BATTERY 2009 3s300 BATTERY RACK 2009 3s300 PROTECTION EQUIPMENT 2009 3s300 PROTECTION EQUIPMENT 2009 35300 COMM RACK/PANEL FRAME 2009 JOINT OWNERSHIP AND OPERATING AGREEMENT-EXHIBIT B Page | 100 EXECUTION VERSION 3s300 COMM RACK/PANEL FRAME 2009 35300 COMM RACK/PANEL FRAME 2009 35300 COMM RACK/PANEL FRAME 2009 3s300 COMMUNICATIONS EQUIP 2009 35300 COMMUNICATIONS EQUIP 2009 35300 COMMUNICATIONS EQUIP 2009 3s300 COMMUNICATIONS EQUIP 2009 39720 MICROWAVE, RADIO 2077 39720 MICROWAVE. ANTENNA 2077 3s300 COMMUNICATIONS EQUIP 2077 39720 MICROWAVE, RADIO 2017 39720 MICROWAVE, RADIO 20LL 39720 MICROWAVE, ANTENNA 2077 39720 MICROWAVE, ANTENNA 2077 39720 MICROWAVE, WIRE/CABLE 2077 39720 MICROWAVE, WIRE/CABLE 2077 3s300 CONTROL WIRE - LOW VOLTAGE 2077 3s300 CONDUIT & FITTINGS ABOVE GROUN 207L 3s300 LARGE ELECTRICAL ENCLOSURE 2077 35300 CONTROL WIRE - LOW VOLTAGE 2010 3s300 CONTROL WIRE - LOW VOLTAGE 2010 35300 COMPOSITE CABLE - LOW VOLTAGE 2010 35300 COMPOSITE CABLE - LOW VOLTAGE 2010 35300 COAXIAL CABLE 2010 35300 COAXIAL CABLE 2010 3s300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PANEL FRAME 2070 3s300 CONTROL RACK/PANEL FRAM E 2070 35300 CONTROL RACK/PANEL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAME 20to 35300 CONTROL RACK/PANEL FRAME 2010 35300 PROTECTION EQUIPMENT 2070 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 20LO 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2070 35300 SCADA EQUIPMENT 2070 3s300 SCADA EQUIPMENT 2010 3s300 SCADA EQUIPMENT 2070 35300 SCADA EQUIPMENT 2010 35300 SCADA EQUIPMENT 2070 35300 SCADA EQUIPMENT 2010 3s300 COMMUNICATIONS EQUIP 2070 3s300 COMMUNICATIONS EQUIP 2010 35300 AUXILIARY LOAD CENTER 2010 35300 AUXILIARY LOAD CENTER 2070 3s300 METERING EQUIPMENT 2072 35300 CONTROL WIRE - LOW VOLTAGE 2008 35300 CONTROL WIRE . LOW VOLTAGE 2008 3s300 CONTROL EQUIPMENT 2008 35300 CONTROL EQUIPMENT 2008 3s300 CONTROL EQUIPMENT 2008 3s300 CONTROL EQUIPMENT 2008 3s300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2008 35300 COMMUNICATIONS EQUIP 2002 3s300 CONTROL WIRE - LOW VOLTAGE 2073 35300 TRANSFER SWITCH 2013 3s200 CONDUIT & FITTINGS UNDERGROUND 2073 3s300 CONTROL WIRE - LOW VOLTAGE 2073 3s300 GROUNDING AND FITTINGS 2013 35200 SITE PREPARATION & IMPROVEMENT 2013 35200 YARD LIGHT SYSTEM 2013 35200 CONDUIT & FITTINGS UNDERGROUND 2073 35300 CONTROL WIRE - LOW VOLTAGE 2073 3s300 COAXIAL CABLE 2013 35300 FIBER OPTIC CABLE 2013 35300 GROUNDING AND FITTINGS 2013 35300 SMALL ELECTRICAL ENCLOSURE 2073 35300 sOKVA LOCAL SERVICE XFMR 2013 3s300 SWITCH - POWER FUSE 2013 35300 CONTROL RACK/PANEL FRAME 2013 3s300 CONTROL RACK/PANEL FRAME 2013 3s300 CONTROL RACK/PANEL FRAM E 20t3 3s300 CONTROL RACK/PAN E L FRAM E 2013 35300 CONTROL RACK/PAN EL FRAM E 2073 35300 CONTROL RACK/PAN EL FRAM E 2013 35300 CONTROL RACK/PAN EL FRAM E 2013 3s300 CONTROL RACK/PAN E L FRAM E 2013 3s300 CONTROL RACK/PANEL FRAME 2073 35300 PROTECTION EQUIPMENT 2073 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page I 101 35300 PROTECTION EQUIPMENT 2073 3s300 PROTECTION EQUIPMENT 2013 3s300 PROTECTION EQUIPMENT 20L3 35300 CONTROL EQUIPMENT 20L3 3s300 CONTROL EQUIPMENT 20L3 35300 CONTROL EQUIPMENT 20L3 3s300 METERING EQUIPMENT 2013 35300 METERING EQUIPMENT 2073 3s300 ALARM/MONITORING EQUIPMENT 2013 35300 SCADA EQUIPMENT 2073 35300 COMM RACK/PANEL FRAME 2073 35300 COMMUNICATIONS EQUIP 2013 3s300 48 VOLT BATTERY CHARGER 20L3 35300 BATTERY RACK 2073 35300 AUXILIARY LOAD CENTER 2073 35300 TRANSFER SWITCH 2013 35200 SUPERSTRUCTURE ROOF 2013 3s200 COMPLETE CONDENSER CNTRL BLDG 20L3 35200 BUILDING HVAC SYSTEM 20L3 3s200 BUILDING ELECTRICAL SYSTEM 20L3 3s200 CONCRETE SURFACE TRENCH WLIDS 20L3 3s300 CONTROL WIRE - LOW VOLTAGE 20t4 35300 COAXIAL CABLE 2014 3s300 COMM RACK/PANEL FRAME 2014 3s300 COMMUNICATIONS EQUIP 20L4 35300 COAXIAL CABLE 1976 35300 PROTECTION EQUIPMENT 1998 35300 PROTECTION EQUIPMENT 1998 35300 COMM RACK/PANEL FRAME t976 3s200 CONDUIT & FITTINGS UNDERGROUND 2074 35300 CONTROL WIRE - LOW VOLTAGE 20t4 3s300 GROUNDING AND FITTINGS 20L4 35300 CONDUIT & FITTINGS ABOVE GROUN 20L4 35300 CONTROL EQUIPMENT 20L4 3s300 SCADA EQUIPMENT 20L4 3s300 CONTROL EQUIPMENT 1991 EXECWION VERSION JOINT OWNERSHIP AND OPERATING AGREEMENT _EXHIBIT B Page | 102 EXECWION VERSION M idpoint Tra nsmission Station FERC Acct Midooint Asset Descriotion Vintage 35200 YARD SURFACING - GMVEL, ETC.1988 39740 FIBER, WIRE/CABLE 2009 35011 LAND OWNED IN FEE TS 1965 35011 I.AND OWNED IN FEE TS t976 35011 LAND OWNED IN FEE TS 1980 35011 LAND OWNED IN FEE TS 1988 35011 PERMANENT LAND IMPROVEMENTS T5 1966 35011 PERMANENT LAND IMPROVEMENTS TS t976 35011 PERMANENT LAND IMPROVEMENTS TS 1980 35200 DRAI NAGE SYSTE MS-CULVERTS, ETC 1988 3s200 YARD SURFACING - GRAVEL, ETC.1955 35200 YARD SURFACING - GRAVEL, ETC.1966 3s200 YARD SURFACING - GRAVEL, ETC.7977 35200 YARD SURFACING - GRAVEL, ETC.1980 3s200 YARD SURFACING - GRAVEL, ETC.1981 35200 PARKING CHOCKS 1988 35200 MANHOLES & GRATES 1988 3s200 DRAIN ROCK 1980 35200 PERIMETER FENCE & GATES 1965 3s200 PERIMETER FENCE & GATES 1966 35200 PERIMETER FENCE & GATES 7977 35200 PERIMETER FENCE & GATES 1980 35200 PERIMETER FENCE & GATES 1981 35200 PERIMETER FENCE & GATES 1983 3s200 PERIMETER FENCE & GATES 1988 3s200 WATER WELL PUMP t977 35200 WATER WELL PUMP 1988 3s200 WATER SYSTEM 1988 35200 WATER WELL 7977 35200 WATER WELL 1988 35200 COMPLETE SEPTIC SYSTEM 1988 35200 YARD LIGHT SYSTEM 1965 3s200 YARD LIGHT SYSTEM 1966 35200 YARD LIGHT SYSTEM 7977 35200 YARD LIGHT SYSTEM 1981 35200 YARD LIGHT SYSTEM 1988 35200 LIGHT STANDARD 1965 3s200 LIGHT STANDARD 1966 35200 FOUNDATION - STATION BUILDING 1965 35200 FOUNDATION - STATION BUILDING 1983 3s200 FOUNDATION - STATION BUILDING 1988 35200 COMPLETE STATION BUILDING 1965 35200 COMPLETE STATION BUILDING 1983 35200 COMPLETE STATION BUILDING 1983 3s200 COMPLETE STATION BUILDING 1983 35200 COMPLETE STATION BUILDING 1988 35200 EYE WASH STATION 1983 3s200 EYE WASH STATION 1988 35200 WATER HEATER 1988 3s200 BUILDING HVAC SYSTEM 1988 3s200 EXHAUST FANS & DUCT 1965 35200 EXHAUST FANS & DUCT 1988 35200 HEATER & AIR CONDITIONER COMBI 7992 3s200 BUILDING ELECTRICAL SYSTEM 1983 3s200 BUILDING ELECTRICAL SYSTEM 1988 35200 BUILDING ELECTRICAL SYSTEM 1980 3s200 JUNCTION BOX MEDIUM OR LARGE 1983 35200 BUILDING ELECTRICAL SYSTEM 1980 3s200 BUI LDING ELECTRICAL SYSTEM 1983 3s200 BUILDING ELECTRICAL SYSTE M 1988 35200 D.C. EMERGENCY FIXTURE 1983 3s200 BUILDING ELECTRICAL SYSTEM 1983 35200 BUILDING ELECTRICAL SYSTEM 1988 35200 LOCAL SERVICE FND 1980 3s200 LOCAL SERVICE TRANSFORMER FND 1988 3s200 AIR COMPRESSOR FND 1976 35200 345KV XFMR, REG, REACTOR FND 1983 3s200 AIR COMPRESSOR FND 1966 35200 CULVERTS 1981 3s200 EQUIPMENT PAD 1988 3s200 OUTDOOR CABINET FND 1988 3s200 MISCELLANEOUS BUILDING FND 1955 3s200 SPILL GAP SUPPORT FND 1988 35200 LIGHTING MAST FND 1955 3s200 LIGHTING MAST FND 1966 35200 YARD MONUMENT MARK (INACTIVE)1965 35200 YARD MONUMENT MARK (INACNVE)1966 3s200 CONCRETE SURFACE TRENCH WLIDS L976 35200 CONCRETE SURFACE TRENCH WLIDS 1988 3s200 CONCRETE SURFACE TRENCH WLIDS 1988 JOINT OWNERSHIP AND OPERATING AGREEMENT_EXHIBIT B 3s200 CONCRETE SURFACE TRENCH WLIDS 1965 35200 CONCRETE SURFACE TRENCH W/LIDS 1966 35200 CONCRETE SURFACE TRENCH WLIDS L976 35200 CONCRETE SURFACE TRENCH W/LIDS 1980 35200 CONCRETE SURFACE TRENCH WLIDS 1981 35200 CONCRETE UNDER GROUND CABLEWAY 1981 35200 CONDUIT & FITTINGS UNDERGROUND 1968 3s200 CONDUIT & FITTINGS UNDERGROUND L976 35200 CONDUIT & FITTINGS UNDERGROUND 7979 3s200 CONDUIT & FITTINGS UNDERGROUND 1980 35200 CROSSOVER TRENCH 1981 35200 TREAD PLATES 1981 35200 CONCRETE MANHOLE WCOVER 1965 35200 LOCAL SERVICE STRUCTURE 1980 3s200 LOCAL SERVICE STRUCTURE 1988 35200 OUTDOOR CABINET SUP STR 1988 3s200 SPILL GAP SUPPORT STRUCTURE 1988 35200 TOOL SHED, MAINT BLDG, ETC 1955 35200 TOOL SHED, MAINT BLDG, ETC 1976 35200 TOOL SHED, MAINT BLDG, ETC 1988 3s300 BARRIER. FIRE, SWITCHING, ETC 1988 35300 CABLE TRAY AND ACCESSORIES 1983 35300 4-7KV PIN/POST INSULATORS t976 3s300 3/8 STATIC WIRE 7964 35300 3/8 STATIC WIRE 1965 35300 250 MCM CONDUCTOR COPPER t976 3s300 250 MCM CONDUCTOR COPPER 1988 35300 350 MCM CONDUCTOR COPPER 1983 35300 8 SHIELD, 7 STMND ALUM 1981 3s300 3" - 3-3/4" ALUM TUBE 1983 35300 15KV POWER CABLE 1983 35300 CONTROL WIRE - LOW VOLTAGE L976 35300 CONTROL WIRE - LOW VOLTAGE 7976 3s300 CONTROL WIRE - LOW VOLTAGE 1993 35300 CONTROL WIRE - LOW VOLTAGE 1995 35300 #18 - S19 CONTROL WtRt 1995 35300 #18 - #19 CONTROL WrRt r976 3s300 #18 - #19 CONTROL WtRE 1988 35300 #18 - #19 CONTROL WtRt 1989 35300 f18 - #19 CONTROL WtRE 7976 35300 #18 - #19 CONTROL WtRt 1981 JOINT OWNERSHIP AND OPERATING AGREEMENT_EXHIBIT B EXECUTION VERSION 35300 f18 - #19 CONTROL WrRt 1983 3s300 #18 - #19 CONTROL WtRE 1989 35300 #18 - #19 CONTROL WIRE 1990 3s300 #18 - #19 CONTROL WtRE L992 35300 #18 - #19 CONTROL WtRE 7994 3s300 #18 - #19 CONTROL WrRE 199s 35300 f18 - #19 CONTROL WtRE 1995 35300 #18 - #19 CONTROL WrRE 1980 35300 f18 - #19 CONTROL WIRE 1981 35300 #18 - #19 CONTROL WrRE 1983 35300 fr18 - #79 CONTROL WtRE 1989 3s300 #18 - #19 CONTROL WtRE 1990 3s300 s18 - #19 CONTROL WtRE 1993 35300 #18 - #19 CONTROL WtRE 1995 35300 #18 - #19 CONTROL WrRE 1996 3s300 #18 - #19 CONTROL WtRE 1979 35300 #18 - #19 CONTROL WrRE 1980 35300 #18 - #19 CONTROL WtRE 1981 35300 #18 - #19 CONTROL WrRE 1983 35300 fi18 - #19 CONTROL WtRE 1990 3s300 #18 - #19 CONTROL WtRt 1993 35300 #18 - #19 CONTROL WrRE 7994 3s300 r18 - #19 CONTROL WtRE 1995 35300 #18 - #19 CONTROL WrRE t979 35300 #18 - #19 CONTROL WtRE 1980 35300 #14 - #76 CONTROL WrRE 1979 3s300 #T4 - #T6 CONTROL WIRE 1980 3s300 #74 - #76 CONTROL WtRt 1981 35300 #14 - #76 CONTROL WtRE 1989 35300 #14 - #L6 CONTROL WrRr 1980 3s300 #74 - #76 CONTROL WtRE 1993 3s300 #74 - #76 CONTROL WtRE 1983 35300 #L4 - #76 CONTROL WIRE 1989 3s300 #T4 - #L6 CONTROL WIRE 1993 35300 frt4 - #76 CONTROL WtRE 1995 3s300 #L4 - #16 CONTROL WIRE 1995 35300 #74 - #76 CONTROL WrRE r976 35300 #74 - #t6 CONTROL WrRE 7976 35300 #74 - #76 CONTROL WrRE 1965 3s300 #14 - #76 CONTROL WrRE 1965 35300 #14 - #76 CONTROL WtRE 1980 Page | 104 3s300 #t4 - #16 coNTROL WrRE 1981 3s300 #74 - #L6 CONTROL WtRE 1983 35300 fit4 - #76 CONTROL WrRE 1989 35300 #74 - #76 CONTROL WtRE t976 35300 #74 - #76 CONTROL WtRE 1980 3s300 COAXIAL CABLE 1965 35300 COAXIAL CABLE 1980 35300 COAXIAL CABLE 1981 3s300 #LO - #I2 CONTROL WIRE 1988 35300 #10 - #72 CoNTROL WtRE 1983 3s300 #LO -#I2 CONTROL WIRE 1988 3s300 #70 - #T2 CONTROL WIRE 1989 35300 #70 - #12 CONTROL W|RE 7992 35300 #70 - #t2 CoNTROL WtRE 1995 35300 #70 - #L2 CONTROL WIRE 1989 3s300 #10 - #r2 coNTRoL wrRE 1993 35300 #70 - #12 CONTROL WtRE 1995 3s300 #70 - #L2 CONTROL WIRE 1996 35300 #10 - #12 CONTROL WIRE 1965 35300 #70 - #72 CONTROL W|RE 1955 35300 #70 - #72 CONTROL WtRE 1966 35300 #70 - #72 CONTROL WIRE t979 3s300 #10 - #72 CONTROL WrRE 1980 35300 #7O - #L2 CONTROL WIRE 1981 35300 #10 - #72 CONTROL W|RE 1983 35300 #70 - #12 CoNTROL WtRE 1989 35300 #t0 - #72 CoNTROL WrRE 1995 35300 #70 - #!2 CONTROL WtRE 1988 35300 #70 - #72 CONTROL W|RE 1979 35300 #10 - s12 CONTROL WtRE 1981 3s300 frLO - fiIz CONTROL WIRE 1983 3s300 frto - #12 coNTRoL wtRE 1988 35300 #10 - #72 CONTROL WtRE 1989 35300 #10 - #72 CONTROL WtRE 1980 3s300 frLO - #I2 CONTROL WIRE 1983 35300 #t0 - #72 coNTROL WtRE 1988 35300 frLO - #I2 CONTROL WIRE 1989 35300 #10 - #12 CONTROL WrRE 1990 35300 #70 - #12 CONTROL WtRE 1995 3s300 fi70 - #L2 CONTROL WIRE 1996 3s300 #70 - #L2 CONTROL WIRE 1981 EXECUTION VERSION 35300 fi70 - #72 CONTROL W|RE L976 35300 fr70 - #72 CONTROL W|RE L976 3s300 #70 - fi72 CONTROL W|RE 1980 3s300 #70 - #72 CONTROL WlRt 1988 35300 frto - #72 CoNTROL W|RE 1980 3s300 #7 -#9 CONTROLWIRE 1965 3s300 fr7 -#9 CONTROL WIRE 1965 3s300 #7 -#9 CONTROL WIRE 1955 35300 #7 - #9 CONTROL WIRE 1979 3s300 fr7 -*9 CONTROL WIRE 1988 35300 #7 -#9 CONTROLWIRE 1988 3s300 #7 -#9 CONTROL WIRE 1988 3s300 #7 -*9 CONTROLWIRE 1988 3s300 #7 -#9 CONTROL WIRE 1956 35300 #7 - #9 CONTROL WIRE 1980 3s300 #7 -#9 CONTROLWIRE 1981 3s300 fi7 -#9 CONTROLWTRE 1965 35300 #7 . #9 CONTROL WIRE 1966 3s300 #7 -#9 CONTROLWIRE 1980 3s300 #7 -#9 CONTROLWIRE 1981 3s300 #7 - #9 CONTROL WIRE 1966 35300 #7 -#9 CONTROLWIRE 1988 3s300 #7 -#9 CONTROLWIRE 1955 35300 #T - #6 CONTROL WIRE 1988 35300 #L - #6 CONTROL WIRE 7992 35300 #L - #6 CONTROL WIRE 1995 3s300 #7 - #6 CONTROL WIRE 1981 35300 #L - #6 CONTROL WIRE 1983 3s300 #1 - #6 CONTROL WIRE t976 35300 #1 - #6 CONTROL WIRE 1980 3s300 #1 . #6 CONTROL WIRE 1983 35300 #1 - #6 CONTROL WIRE L976 3s300 f1 - #6 CONTROL WIRE 1981 35300 #1 - #6 CONTROL WIRE 1988 35300 #1 - #6 CONTROL WIRE 1983 3s300 #7 . #6 CONTROL WIRE 7977 35300 #I - #6 CONTROL WIRE 1965 35300 #I - #6 CONTROL WIRE 1956 3s300 #7 - #6 CONTROL WIRE 1968 35300 #1 - #6 CONTROL WIRE L976 3s300 #L. #6 CONTROL WIRE 1981 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 105 EXECUTION VERSION 35300 #1 - #6 CONTROL WIRE 1988 35300 #1 - #6 CONTROL WIRE 1992 3s300 trl - #6 CONTROL WIRE 1983 3s300 1/O ALUM CONTROL WIRE 7976 35300 1/O ALUM CONTROL WIRE 1980 3s300 UO ALUM CONTROL WIRE 1988 35300 1/O COPPER CONTROL WIRE 1988 35300 1/O COPPER CONTROL WIRE 1995 35300 2/0 coPPER CONTROL WtRE 1965 35300 2/O COPPER CONTROL WIRE 1983 3s300 2/0 coPPER CONTROL WrRE 1988 35300 3/O COPPER CONTROL WIRE 1988 3s300 4/0 coPPER CONTROL WrRE 1988 35300 250 MCM COPPER CONTROL WIRE 1988 3s300 350 MCM ALUM CONTROL WIRE L976 3s300 350 MCM COPPER CONTROL WIRE 1983 35300 5OO MCM COPPER CONTROL WIRE 1983 3s300 5OO MCM ALUM CONTROL WIRE 1955 3s300 COMPOSITE CABLE - LOW VOLTAGE 1988 3s300 COAXIAL CABLE 1988 35300 COMPOSITE CABLE . LOW VOLTAGE 1995 35300 COMPOSITE CABLE - LOW VOLTAGE 1996 35300 #1 COPPER GROUND 1965 35300 GROUNDING AND FITTINGS 1980 3s300 GROUNDING AND FITTINGS 1981 35300 GROUNDING AND FITTINGS L976 35300 GROUNDING AND FITTINGS 1996 35300 GROUNDING AND FITTINGS 1965 35300 GROUNDING AND FITTINGS 1965 35300 GROUNDING AND FITTINGS L976 35300 #6 COPPER GROUND 1976 35300 #6 COPPER GROUND 7976 35300 f6 COPPER GROUND 1981 35300 #6 COPPER GROUND MAT L976 35300 #6 COPPER GROUND MAT 7979 3s300 16 COPPER GROUND MAT 1980 3s300 #6 COPPER GROUND MAT 1981 35300 #6 COPPER GROUND MAT 1988 35300 #6 COPPER GROUND MAT 1989 3s300 1/4 COPPER GROUND 1980 35300 7/L6 COPPER GROUND t976 3s300 7/16 COPPER GROUND 1980 3s300 7/76 COPPER GROUND 1981 3s300 9/15 COPPER GROUND 1988 35300 1/O COPPER GROUND 1988 35300 2/O COPPER GROUND 1965 3s300 2/O COPPER GROUND 1955 35300 2/O COPPER GROUND 1976 35300 2/O COPPER GROUND 7979 35300 2/O COPPER GROUND 1980 35300 2/O COPPER GROUND 1981 35300 2/O COPPER GROUND 1989 35300 4/O COPPER GROUND 1988 35300 4/O ALUMINUM GROUND 1966 35300 250 MCM COPPER GROUND 1955 35300 250 MCM COPPER GROUND 7972 35300 250 MCM COPPER GROUND t976 3s300 250 MCM COPPER GROUND 7979 35300 250 MCM COPPER GROUND 1980 35300 250 MCM COPPER GROUND 1981 35300 250 MCM COPPER GROUND 1983 35300 250 MCM COPPER GROUND 1989 35300 350 MCM COPPER GROUND 1983 3s300 5OO MCM COPPER GROUND 1965 35300 5OO MCM COPPER GROUND 1966 35300 5OO MCM COPPER GROUND 1983 3s300 5OO MCM COPPER GROUND 1988 35300 CONDUIT & FITTINGS ABOVE GROUN 1966 3s300 CONDUIT & FITTINGS ABOVE GROUN 7976 35300 CONDUIT & FITTINGS ABOVE GROUN 1981 35300 CONDUIT & FITTINGS ABOVE GROUN 1983 3s300 CONDUIT & FITTINGS ABOVE GROUN 1988 3s300 CONDUIT & FITTINGS ABOVE GROUN 1988 3s300 CONDUIT & FITTINGS ABOVE GROUN 1988 35300 CONDUIT & FITTINGS ABOVE GROUN 1966 35300 CONDUIT & FITTINGS ABOVE GROUN 1976 35300 CONDUIT & FITTINGS ABOVE GROUN 1981 35300 CONDUIT & FITTINGS ABOVE GROUN 1988 35300 CONDUIT & FITTINGS ABOVE GROUN 1965 3s300 CONDUIT & FITTINGS ABOVE GROUN 1983 35300 CONDUIT & FITTINGS ABOVE GROUN 1955 3s300 CONDUIT & FITTINGS ABOVE GROUN L976 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B 35300 CONDUIT & FITTINGS ABOVE GROUN 1980 3s300 CONDUIT & FITTINGS ABOVE GROUN 1988 35300 CONDUIT & FITTINGS ABOVE GROUN 1966 35300 CONDUIT & FITTINGS ABOVE GROUN 7976 35300 CONDUIT & FITTINGS ABOVE GROUN 1976 3s300 CONDUIT & FITTINGS ABOVE GROUN 1980 35300 CONDUIT & FITTINGS ABOVE GROUN 1980 35300 CONDUIT & FITTINGS ABOVE GROUN 1981 35300 CONDUIT & FITTINGS ABOVE GROUN 1988 35300 2" -3-u2" CONDU|T t976 3s300 2" - 3-7/2" CONDUTT 1980 35300 2" - 3-LI2" CONDUIT 1981 35300 2" - 3-L/2" CONDUTT 1988 35300 2" - 3-712" CONDUIT 1980 35300 2" -3-712" CONDUTT 1965 3s300 2" - 3-t/2" CONDUTT 1988 35300 2" -3-7/2" CONDUTT 1965 3s300 2" - 3-712" CONDUtT L976 35300 2" - 3-112" CONDUTT 1988 35300 2" -3-L/2" CONDU|T 1976 3s300 2" -3-L12" CONDU|T 1980 35300 2" - 3-L/2" CONDUTT 1981 35300 2" -3-u2" CONDUTT 1983 35300 2" -3-712" CONDUIT 1980 3s300 2" -3-t/2" CONDUTT 1981 35300 2" - 3-7/2" CONDUTT 1983 35300 2" -3-u2" CONDUTT 1988 35300 4" CONDUIT 1965 3s300 4'' CONDUIT 7976 35300 4'' CONDUIT L979 3s300 4" CONDUIT 1980 3s300 4'' CONDUIT 1981 35300 4..CONDUIT 1989 3s300 4..CONDUIT 1980 35300 4" CONDUIT 1989 35300 5'' CONDUIT 1965 3s300 5,.CONDUIT 1981 35300 6'' CONDUIT 1988 3s300 SMALL ELECTRICAL ENCLOSURE 1988 35300 SMALL ELECTRICAL ENCLOSURE 1988 35300 SMALL ELECTRICAL ENCLOSURE 1988 EXECWION VERSION 35300 SMALL ELECTRICAL ENCLOSURE 1988 3s300 SMALL ELECTRICAL ENCLOSURE 7976 3s300 SMALL E LECTRICAL ENCLOSU RE 1980 35300 SMALL E LECTRICAL ENCLOSU RE 1981 3s300 SMALL ELECTRICAL ENCLOSURE 1983 3s300 25KVA 34KV GRND XFMR 1988 35300 UNDER 15KVA LOCAL SERVICE XFMR 1980 3s300 UNDER 15KVA LOCAL SERVICE XFMR 1988 35300 75KVA LOCAL SERVICE XFMR 1983 35300 1OO-166KVA LOCAL SERVICE XFMR 1983 3s300 1OO-166KVA LOCAL SERVICE XFMR 1988 35300 167-499KVA LOCAL SERVICE XFMR 1981 35300 35KV OR LESS 1 PH REGUI.ATOR 1988 35300 35KV OR LESS 1 PH REGUI.ATOR 1988 35300 35KV OR LESS 1 PH REGUI.ATOR 1991 3s300 35KV OR LESS 1 PH REGULATOR 1988 35300 35KV OR LESS 1 PH REGULATOR 1988 3s300 CONTROL RACK/PANEL FRAME 1976 35300 CONTROL RACK/PANEL FRAME 1989 35300 CONTROL RACK/PANEL FRAM E 1955 35300 CONTROL RACK/PAN EL FRAM E 1965 35300 CONTROL RACK/PANEL FRAME 1965 3s300 CONTROL RACK/PAN EL FRAM E 1996 35300 CONTROL RACK/PANEL FRAME 1988 35300 CONTROL RACK/PANEL FRAME 1988 35300 CONTROL RACK/PANEL FRAM E 1988 3s300 CONTROL RACK/PANEL FRAME 1988 3s300 CONTROL RACK/PANEL FRAME 1965 3s300 CONTROL RACK/PAN EL FRAM E L976 3s300 CONTROL RACK/PANEL FRAME 7976 3s300 CONTROL RACK/PANEL FRAME 7976 3s300 CONTROL RACK/PAN EL FRAME 7976 35300 CONTROL RACK/PAN EL FRAM E 1980 3s300 CONTROL RACK/PANEL FRAME 1983 35300 CONTROL RACK/PANEL FRAME 1983 3s300 CONTROL RACK/PAN EL FRAM E 1989 35300 CONTROL RACK/PAN EL FRAM E 1989 35300 CONTROL RACK/PANEL FRAME 1989 3s300 CONTROL RACK/PANEL FRAME 1995 35300 CONTROL RACK/PAN EL FRAM E 1995 35300 CONTROL RACK/PAN EL FRAM E 1996 JOINT OWNERSHIP AND OPERATING AGREEMENT_EXHIBIT B Page | 107 3s300 CONTROL RACK/PANEL FRAME 1988 35300 CONTROL RACK/PANEL FRAME 1993 35300 CONTROL RACK/PANEL FRAME 1993 35300 CONTROL RACK/PAN EL FRAM E 1965 35300 CONTROL RACK/PANEL FRAME L976 3s300 CONTROL RACK/PANEL FRAM E 1996 3s300 CONTROL RACK/PANEL FRAM E 1996 3s300 CONTROL RACK/PANEL FRAME 1976 3s300 CONTROL RACK/PAN E L FRAM E 1988 35300 CONTROL RACK/PAN EL FRAM E 1988 3s300 PROTECTION EQUIPMENT 1988 3s300 PROTECTION EQUIPMENT 1988 35300 PROTECTION EQUIPMENT 1988 35300 PROTECTION EQUIPMENT 1981 35300 PROTECTION EQUIPMENT 1981 3s300 PROTECTION EQUIPMENT 1989 3s300 PROTECTION EQUIPMENT 1981 35300 PROTECTION EQUIPMENT 1981 35300 PROTECTION EQUIPMENT 1981 35300 PROTECTION EQUIPMENT 1981 35300 CONTROL COMPUTER & PERIPHERALS 1996 35300 CONTROL COMPUTER & PERIPHERALS 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1996 35300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1996 35300 PROTECTION EQUIPMENT 1981 35300 PROTECTION EQUIPMENT 1995 3s300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1996 3s300 PROTECTION EQUIPMENT 1995 35300 PROTECTION EQUIPMENT 1988 35300 PROTECTION EQUIPMENT 7994 35300 ALARM/MONITORING EQUIPMENT r994 35300 ALARM/MONITORING EQUIPMENT 1993 35300 ALARM/MON ITORING EQU I PMENT 1981 3s300 AI.ARM/MONITORING EQUIPM E NT 1994 EXECUTION VERSION 35300 ALARM/MONITORING EQUIPMENT 7994 3s300 ALARM/MONITORING EQUIPMENT 1989 3s300 CONTROL COMPUTER & PERIPHERALS 1989 35300 CONTROL COMPUTER & PERIPHERALS 1989 3s300 PROTECTION EQUIPMENT 1989 3s300 PROTECTION EQUIPMENT 1989 3s300 PROTECTION EQUIPMENT 1989 3s300 PROTECTION EQUIPMENT 1989 35300 METERING EQUIPMENT 1993 35300 METERING EQUIPMENT 1993 3s300 CONTROL EQUIPMENT 7982 35300 CONTROL EQUIPMENT 1984 35300 CONTROL EQUIPMENT 1983 3s300 CONTROL EQUIPMENT 1965 35300 CONTROL EQUIPMENT 7976 3s300 CONTROL EQUIPMENT 1965 3s300 CONTROL EQUIPMENT 7976 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1965 3s300 CONTROL EQUIPMENT 7976 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1981 3s300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT t975 3s300 CONTROL EQUIPMENT 1979 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1981 3s300 CONTROL EQUIPMENT L976 35300 CONTROL EQUIPMENT 7976 3s300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1980 35300 CONTROL EQUIPMENT 1981 35300 CONTROL EQUIPMENT 1980 3s300 CONTROL EQUIPMENT 1983 3s300 CONTROL EQUIPMENT !984 35300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 1983 35300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 1988 3s300 CONTROL EQUIPMENT 1988 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 108 3s300 CONTROL EQUIPMENT 1988 35300 CONTROL EQUIPMENT 1988 3s300 CONTROL EQUIPMENT 1988 35300 CONTROL EQUIPMENT 1989 35300 CONTROL EQUIPMENT 1989 35300 CONTROL EQUIPMENT 1989 3s300 CONTROL EQUIPMENT 1989 35300 CONTROL EQUIPMENT 1996 35300 CONTROL EQUIPMENT 1993 35300 CONTROL EQUIPMENT 1993 3s300 CONTROL EQUIPMENT 1995 35300 CONTROL EQUIPMENT 1995 3s300 CONTROL EQUIPMENT 1996 35300 CONTROL EQUIPMENT 1995 35300 CONTROL EQUIPMENT 1996 3s300 CONTROL EQUIPMENT 1989 3s300 CONTROL EQUIPMENT 1985 35300 CONTROL EQUIPMENT 1985 35300 SCADA RACK/PANEL FRAME 1981 35300 SCADA RACK/PANEL FRAME 1990 35300 SCADA EQUIPMENT 1991 3s300 SCADA EQUIPMENT 1990 35300 COMMUNICATIONS EQUIP 1955 35300 COMMUNICATIONS EQUIP 1983 3s300 COMMUNICATIONS EQUIP 1984 3s300 OIL STORAGE TANKS 1988 35300 YARD LOCAL SERV OR LOAD CENTER 1966 3s300 YARD LOCAL SERV OR LOAD CENTER 1983 35300 YARD LOCAL SERV OR LOAD CENTER 1988 3s300 LOAD CENTER, AC L976 35300 LOAD CENTER, AC 1980 35300 LOAD CENTER, AC 1981 35300 LOAD CENTER, AC 1983 3s300 LOAD CENTER, AC 1988 35300 LOAD CENTER, DC 1965 3s300 LOAD CENTER. DC 7976 35300 LOAD CENTER, DC L979 3s300 LOAD CENTER, DC 1981 35300 LOAD CENTER, DC 1983 3s300 LOAD CENTER, DC 1995 35300 10 - 40 AMP CIR BRKR 1989 EXECUTION VERSION 35300 10 - 40 AMP CIR BRKR 1995 3s300 41 - 1OO AMP CIR BRKR 1992 35300 3 POLE DISCONNECT 1988 35300 TRANSFER SWITCH 1988 35300 TRANSFER SWITCH 1990 3s300 ALARM SYSTEMS-WIRE D CIRCUITS 7992 35300 MISC OFFICE FURNITURE 1968 3s300 MISC OFFICE FURNITURE 1938 3s300 MISC OFFICE FURNITURE 1981 35300 MISC OFFICE FURNITURE 1981 35300 cRT/ MONTTOR 1954 3s300 CHAIR 7976 35300 CHAIR 1956 3s300 CHAIR 1968 35300 CHAIR 7974 3s300 CHAIR 1974 35300 CHAIR 1975 3s300 DESK L976 3s300 DESK 1950 3s300 FILE CABINET t976 3s300 FILE CABINET 7934 35300 FILE CABINET 1955 3s300 DRAFTING TABLE 7975 3s300 TABLE 1938 35300 TABLE 1968 35300 HYDROGEN ANALYZER 1988 3s300 LOCKER 1954 35300 MODEM 1988 3s300 VACUUM GAUGE 1988 35300 VISE 1984 3s300 SIGN 1988 3s300 COM PUTER AND PERIPHERALS 7992 35300 PRINTER 1988 35300 PRINTER 1989 35300 PRINTER t992 35300 PRINTER t992 35300 INTERCOM SYSTEM 7976 39720 MICROWAVE, PANEL UNIT 1999 39720 MICROWAVE, PANEL UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page | 109 EXECWION VERSION 39720 MICROWAVE, RADIO 1999 39720 MICROWAVE, RADIO 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, EQUIPMENT 1999 39720 MICROWAVE, CARD UNIT 1999 39720 MICROWAVE, CARD UNIT 1999 3s300 CONTROL RACK/PAN EL FRAM E 1999 35300 CONTROL COMPUTER & PERIPHERAL5 1999 3s200 OUTDOOR CABINET FND 1999 3s300 #18 - #19 CONTROL WrRt 1999 35300 #14 - #16 CONTROL WIRE 1999 3s300 #70 - #72 CONTROL WrRE 1999 3s300 fi1 - f6 CONTROL WIRE 1999 3s300 #6 COPPER GROUND MAT 1999 35300 250 MCM COPPER GROUND 1999 3s300 4" CONDUIT 1999 35300 SMALL ELECTRICAL ENCLOSURE 1999 35300 #10 - #12 CONTROL WIRE 1999 35300 ALARM/MONITORING EQUIPMENT 1999 35300 CONTROL COMPUTER & PERIPHERAL5 1999 3s300 CONTROL WIRE - LOW VOLTAGE 1999 35300 #18 - #19 CONTROL WIRE 1999 35300 #10 - #12 CONTROL WIRE 1999 3s300 FIBER OPTIC CABLE 2001 39720 MICROWAVE, BATTERY 2000 39720 MICROWAVE, EQUIPMENT 2000 35300 CONTROL WIRE - LOW VOLTAGE 2001 3s300 #TO - #L2 CONTROL WIRE 2001 35300 COAXIAL CABLE 2001 35300 FIBER OPTIC CABLE 200L 35300 COMPUTER AND PERIPHERALS 2001 35200 COMPLETE STATION EUILDING 2001 3s200 SMOKE DETECTOR 2001 35200 CEMENT WALL (FENCE)1998 35300 CONTROL RACK/PANEL FRAME 1998 35300 CONTROL RACK/PANEL FRAM E 1998 35300 AI.ARM/MONITORING EQUIPMENT 1998 3s300 ALARM/MONITORING EQUIPMENT 2002 3s300 SCADA RACK/PANEL FRAME 2002 3s300 SCADA RACK/PANEL FRAME 2002 35300 SCADA RACK/PANEL FRAME 2002 35300 SCADA RACK/PANEL FRAME 2002 3s300 SCADA RACK/PANEL FRAME 2002 3s300 SCADA EQUIPMENT 2002 35300 SCADA EQUIPMENT 2002 3s300 SCADA EQUIPMENT 2002 3s300 2/O AWG CONDUCTOR COPPER 2002 35300 250 MCM CONDUCTOR COPPER 2002 3s300 5OO MCM CONDUCTOR COPPER 2002 3s300 #18 - #19 CONTROL WtRE 2002 35300 #74 - #76 CONTROL WtRE 2002 3s300 #LO - #I2 CONTROL WIRE 2002 35300 #6 COPPER GROUND 2002 35300 2" _3_U2" CONDUTT 2002 35300 4'' CONDUIT 2002 3s300 PROTECTION EQUIPMENT 2002 35300 PROTECTION EQUIPMENT 2004 35300 PROTECTION EQUIPMENT 2004 3s300 PROTECTION EQUIPMENT 2004 3s300 PROTECTION EQUIPMENT 2004 3s300 COMMUNICATIONS EQUIP 2004 35300 COMMUNICATIONS EQUIP 2004 3s300 COMMUNICATIONS EQUIP 2004 3s300 COMMUNICATIONS EQUIP 2004 35200 CONDUIT & FITTINGS UNDERGROUND 2004 3s300 CONTROL WIRE - LOW VOLTAGE 2004 35300 GROUNDING AND FITTINGS 2004 3s300 CONTROL RACK/PANEL FRAME 2004 35300 CONTROL RACK/PANEL FRAME 2004 35300 PROTECTION EQUIPMENT 2004 3s300 SCADA EQUIPMENT 2004 39720 MICROWAVE, RADIO 2005 39720 MICROWAVE, EQUIPMENT 2005 3s300 SCADA EQUIPMENT 2005 3s300 CONTROL WIRE - LOW VOLTAGE 2005 3s300 CONTROL EQUIPMENT 200s JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B 3s300 METERING EQUIPMENT 2005 35300 METERING EQUIPMENT 200s 3s300 METER 2005 35300 130 VOLT BATTERY CHARGER 2004 35300 130 VOLT BATTERY 2004 3s300 BATTERY RACK 2004 35300 SAFETY SWITCH 2004 35200 WOOD POLE - COMMUNICATION 2006 3s300 FIBER OPTIC CABLE 2006 3s300 COMMUNICATIONS EQUIP 2006 35300 COMPUTER AND PERIPHERALS 2006 35300 CONTROL WIRE - LOW VOLTAGE 2006 3s300 CONTROL RACK/PAN EL FRAM E 2006 3s300 PROTECTION EQUIPMENT 2006 35300 CONTROL EQUIPMENT 2006 3s300 CONTROL EQUIPMENT 2006 3s300 130 VOLT BATTERY CHARGER 2006 35300 130 VOLT BATTERY 2006 35300 BATTERY RACK 2006 3s300 SAFETY SWITCH 2006 35200 CONDUIT & FITTINGS UNDERGROUN D 2007 35200 CONDUIT & FITTINGS UNDERGROUND 2007 35200 WOOD POLE - COMMUNICATION 2007 35200 WOOD POLE - COMMUNICATION 2007 3s200 WOOD POLE - COMMUNICATION 2007 3s200 WOOD POLE - COMMUNICATION 2007 35300 MISC TEST EQUIPMENT 2007 3s200 CONDUIT & FITTINGS UNDERGROUND 2006 35300 BARRIER - FENCE, EQUIP PROT 2006 35300 CONTROL WIRE . LOW VOLTAGE 2006 35300 CONTROL RACK/PANEL FRAME 2006 35300 CONTROL RACK/PAN EL FRAM E 2006 3s300 PROTECTION EQUIPMENT 2006 3s300 SCADA RACK/PANEL FRAME 2006 35300 SCADA EQUIPMENT 2006 35300 SCADA COMPUTER AND PERIPHERALS 2006 3s300 CONTROL WIRE - LOW VOLTAGE 2006 35300 GROUNDING AND FITTINGS 2006 3s300 CONTROL EQUIPMENT 2006 3s300 AI.ARM/MON ITORING EQU I PMENT 2007 35300 CONTROL RACK/PANEL FRAM E 2007 EXECUTION VERSION 3s300 CONTROL RACK/PANEL FRAME 2007 35300 CONTROL RACK/PANEL FRAME 2007 35300 CONTROL RACK/PAN EL FRAM E 2007 35300 CONTROL RACK/PANEL FRAME 2007 35300 CONTROL RACK/PAN EL FRAM E 2007 3s300 CONTROL RACK/PAN EL FRAM E 2007 3s300 CONTROL RACK/PANEL FRAME 2007 35300 CONTROL RACK/PANEL FRAM E 2007 35300 CONTROL RACK/PANEL FRAME 2007 3s300 PROTECTION EQUIPMENT 2007 3s300 PROTECTION EQUIPMENT 2007 35300 PROTECTION EQUIPMENT 2007 3s300 PROTECTION EQUIPMENT 2007 3s300 ALARM/MONITORING EQUIPMENT 2007 35300 ALARM/MONITORING EQUIPMENT 2007 3s300 SCADA RACK/PANEL FRAME 2007 3s300 SCADA RACK/PANEL FRAME 2007 35300 SCADA EQUIPMENT 2007 3s300 SCADA EQUIPMENT 2007 3s300 SCADA COMPUTER AND PERIPHERALS 2007 35300 SCADA COMPUTER AND PERIPHERALS 2007 35300 COMM RACK/PANEL FRAME 2007 3s300 COMM RACK/PANEL FRAME 2007 35300 COMM RACK/PANEL FRAME 2007 3s300 COMM RACK/PANEL FRAME 2007 3s300 DISTANCE / FAULT LOCATOR 2007 35300 DISTANCE / FAULT LOCATOR 2007 3s300 COMMUNICATIONS EQUIP 2007 35300 coMMUN|CAT|ONS EQUTP 2007 3s300 COMMUNICATIONS EQUIP 2007 35300 COMMUNICATIONS EQUIP 2007 3s300 COMMUNICATIONS EQUIP 2007 3s300 coMMUNtCATtONS EQUTP 2007 3s300 48 VOLT BATTERY CHARGER 2007 3s300 48 VOLT BATTERY CHARGER 2007 35300 48 VOLT BATTERY 2007 3s300 48 VOLT BATTERY 2007 3s300 BATTERY RACK 2007 35300 BATTERY RACK 2007 3s300 BATTERY RACK 2007 3s300 BATTERY RACK 2007 JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT B Pagel lll EXECWION VERSION 35300 AUXILIARY LOAD CENTER 2007 35300 AUXILIARY LOAD CENTER 2007 35300 TRANSFER SWITCH 2007 35300 TRANSFER SWITCH 2007 35200 CONDUIT & FITTINGS UNDERGROUND 2008 3s300 CONTROL WIRE . LOW VOLTAGE 2008 397L0 TELEPHONE, MISC EQUIPMENT 2009 39740 FIBER, MISC EQUIPMENT 2009 3s300 CONTROL WIRE - LOW VOLTAGE 2009 35300 GROUNDING AND FITTINGS 2009 35300 CONDUIT & FITTINGS ABOVE GROUN 2009 35300 COMMUNICATIONS EQUIP 2006 35200 SUPERSTRUCTURE ROOF 2009 35300 CONTROL WIRE - LOW VOLTAGE 2009 3s300 PROTECTION EQUIPMENT 2009 35300 CONTROL WIRE - LOW VOLTAGE 2070 3s300 GROUNDING AND FITTINGS 2010 35300 CONDUIT & FITTINGS ABOVE GROUN 2010 3s300 SMALL ELECTRICAL ENCLOSURE 2010 3s300 CONTROL WIRE . LOW VOLTAGE 2009 3s300 CONDUIT & FITTINGS ABOVE GROUN 2009 3s300 SMALL E LECTRICAL ENCLOSURE 2009 35300 BUS - CONDUCTOR WITH FITTINGS 2010 35300 CONTROL WIRE - LOW VOLTAGE 2010 3s300 YARD LOCAL SERV OR LOAD CENTER 2010 35300 TRANSFER SWITCH 2010 3s200 CONDUIT & FITTINGS UNDERGROUND 2009 35300 COAXIAL CABLE 2009 35300 COMM RACK/PANEL FRAME 2009 35300 COMMUNICATIONS EQUIP 2009 3s300 CONTROL WIRE - LOW VOLTAGE 2070 3s300 CONDUIT & FITTINGS ABOVE GROUN 2010 3s200 CONDUIT & FITTINGS UNDERGROUND 2070 3s300 CONTROL WIRE - LOW VOLTAGE 2010 35300 CONTROL WIRE - LOW VOLTAGE 2010 35300 CONTROL WIRE - LOW VOLTAGE 2071 35300 COAXIAL CABLE 20tt 35300 CONDUIT & FITTINGS ABOVE GROUN 20tt 35300 MISC TEST EQUIPMENT 2071 35200 CONDUIT & FITTINGS UNDERGROUND 2010 35200 CONDUIT & FITTINGS UNDERGROUND 2010 35200 CONCRETE MAN HOLE W/COVER 2010 3s200 CONCRETE MANHOLE W/COVER 2010 3s300 COMPOSITE CABLE - LOW VOLTAGE 2010 35300 COMPOSITE CABLE . LOW VOLTAGE 2010 35300 CONTROL RACK/PANEL FRAME 2070 3s300 CONTROL RACK/PAN EL FRAM E 20to 3s300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PANEL FRAM E 2010 35300 CONTROL RACK/PANEL FRAM E 2070 3s300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAM E 20L0 3s300 CONTROL RACK/PANEL FRAM E 2070 35300 CONTROL RACK/PANEL FRAME 20to 3s300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PANEL FRAME 2070 35300 CONTROL RACK/PANEL FRAME 2010 35300 PROTECTION EQUIPMENI 20to 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2070 35300 CONTROL COMPUTER & PERIPHERALS 20to 3s300 CONTROL COMPUTER & PERIPHERALS 2010 3s300 CONTROL COMPUTER & PERIPHERALS 2010 35300 CONTROL COMPUTER & PERIPHERALS 2010 35300 CONTROL COMPUTER & PERIPHERALS 2010 35300 CONTROL COMPUTER & PERIPHERALS 2070 3s300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2070 3s300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2010 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B 3s300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2010 35200 COMPLETE STATION BUILDING 2077 3s200 CONCRETE SURFACE TRENCH WLIDS 20Lt 35300 GROUNDING AND FITTINGS 2077 35300 CONTROL WIRE - LOW VOLTAGE 2077 3s300 SMALL E LECTRICAL ENCLOSU RE 2077 35300 SWITCH - AIR BREAK OR BYPASS 2077 35300 CONTROL RACK/PANEL FRAME 2017 3s300 CONTROL RACK/PAN EL FRAM E 20LL 3s300 CONTROL RACK/PANEL FRAME 20LL 3s300 CONTROL RACK/PAN EL FRAM E 207L 35300 PROTECTION EQUIPMENT 201_7 35300 PROTECTION EQUIPMENT 2077 3s300 PROTECTION EQUIPMENT 2077 35300 COMMUNICATIONS EQUIP 2077 3s300 COMMUNICATIONS EQUIP 20LL 35300 CONTROL WIRE - LOW VOLTAGE 207L 3s300 CONTROL RACK/PANEL FRAM E 2077 35300 PROTECTION EQUIPMENT 2077 3s300 COMMUNICATIONS EQUIP 2017 35300 COMMUNICATIONS EQUIP 2017 35300 COMMUNICATIONS EQUIP 207t 39720 MICROWAVE, EQUIPMENT 2070 39720 MICROWAVE, WIRE/CABLE 2010 35300 CONTROL WIRE - LOW VOLTAGE 2072 3s300 COMM RACK/PANEL FRAME 20L2 35300 COMMUNICATIONS EQUIP 2072 35300 CONTROL WIRE - LOW VOLTAGE 2072 35300 FIBER OPTIC CABLE 2072 3s300 CONDUIT & FITTINGS ABOVE GROUN 2072 3s300 SCADA EQUIPMENT 20L2 35300 PROTECTION EQUIPMENT 2072 35300 MISC TEST EQUIPMENT 207L 35300 PROTECTION EQUIPMENT 2012 35300 PROTECTION EQUIPMENT 2072 35300 COMMUNICATIONS EQUIP 2012 35300 COMMUNICATIONS EQUIP 20L2 EXECUTION VERSION 3s300 PROTECTION EQUIPMENT 2004 35300 PROTECTION EQUIPMENT 2004 35300 PROTECTION EQUIPMENT 2004 35300 PROTECTION EQUIPMENT 2004 3s300 COMMUNICATIONS EQUIP 2004 3s300 COMMUNICATIONS EQUIP 2004 35300 COMMUNICATIONS EQUIP 2004 3s300 COMMUNICATIONS EQUIP 2004 3s200 CONDUIT & FITTINGS UNDERGROUND 2010 35200 CONDUIT & FITTINGS UNDERGROUND 2010 35200 CONCRETE MAN HOLE W/COVER 2010 3s200 CONCRETE MANHOLE W/COVER 2010 35300 COMPOSITE CABLE - LOW VOLTAGE 2070 35300 COMPOSITE CABLE - LOW VOLTAGE 20to 35300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PANEL FRAME 2010 35300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PAN EL FRAM E 2010 3s300 CONTROL RACK/PAN EL FRAM E 2070 35300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PANEL FRAM E 2010 35300 CONTROL RACK/PANEL FRAME 2010 3s300 CONTROL RACK/PAN EL FRAM E 20to 3s300 CONTROL RACK/PAN EL FRAM E 20to 3s300 CONTROL RACK/PAN EL FRAM E 2010 35300 CONTROL RACK/PANEL FRAM E 2070 3s300 PROTECTION EQUIPMENT 2010 35300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 20t0 3s300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 2070 35300 PROTECTION EQUIPMENT 2010 3s300 PROTECTION EQUIPMENT 20LO 35300 CONTROL COMPUTER & PERIPHERALS 2070 35300 CONTROL COMPUTER & PERIPHERALS 2070 3s300 CONTROL COMPUTER & PERIPHERALS 2070 3s300 CONTROL COMPUTER & PERIPHERALS 2010 3s300 CONTROL COMPUTER & PERIPHERALS 2010 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page I I 13 35300 CONTROL COMPUTER & PERIPHERALS 2070 35300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2070 3s300 COMMUNICATIONS EQUIP 2070 35300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2070 3s300 COMMUNICATIONS EQUIP 2070 35300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2010 3s300 COMMUNICATIONS EQUIP 2010 35300 COMMUNICATIONS EQUIP 2070 3s300 COMMUNICATIONS EQUIP 2070 3s300 COMMUNICATIONS EQUIP 2070 35300 COMMUNICATIONS EQUIP 2010 3s300 coMMUNtCATtONS EQUIP 2010 35200 CONDUIT & FITTINGS UNDERGROUND 2007 35200 CONDUIT & FITTINGS UNDERGROUND 2007 3s200 CONCRETE MANHOLE WCOVER 2007 3s200 CONCRETE MANHOLE WCOVER 2007 3s200 WOOD POLE - COMMUNICATION 2007 3s200 WOOD POLE - COMMUNICATION 2007 35200 WOOD POLE - COMMUNICATION 2007 35200 WOOD POLE - COMMUNICATION 2007 3s300 COMMUNICATIONS EQUIP 2007 3s300 COMMUNICATIONS EQUIP 2007 3s300 CONTROL WIRE - LOW VOLTAGE 2072 35300 CONTROL RACK/PAN EL FRAM E 2012 35300 PROTECTION EQUIPMENT 2072 35300 METERING EQUIPMENT 2072 35200 CONCRETE SURFACE TRENCH WLIDS 2073 3s200 CONDUIT & FITTINGS UNDERGROUND 2073 35300 CONTROL WIRE - LOW VOLTAGE 2013 35300 GROUNDING AND FITTINGS 20!3 35300 UNDER 15KVA LOCAL SERVICE XFMR 20t3 3s200 SITE PREPARATION & IMPROVEMENT 2073 35200 YARD LIGHT SYSTEM 2073 35200 CONCRETE SURFACE TRENCH WLIDS 2013 3s300 CONTROL WIRE - LOW VOLTAGE 2073 35300 GROUNDING AND FITTINGS 2073 3s300 AUXILIARY LOAD CENTER 20t3 35300 AUXILIARY POWER XFMR 3 PH 2073 EXECUTION VERSION 35200 CONDUIT & FITTINGS UNDERGROUND 20tL 35300 CONTROL WIRE - LOW VOLTAGE 2071 3s300 GROUNDING AND FITTINGS 2017 35200 SITE PREPARATION & IMPROVEMENT 2013 3s200 CONDUIT & FITTINGS UNDERGROUND 2073 35300 CONTROL WIRE - LOW VOLTAGE 2073 3s300 CONTROL RACK/PAN EL FRAM E 2013 3s300 CONTROL RACK/PAN EL FRAM E 2013 3s300 YARD LOCAL SERV OR LOAD CENTER 2013 35300 CONTROL WIRE . LOW VOLTAGE 2013 35300 CONTROL WIRE - LOW VOLTAGE 2013 JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT B Page I I 14 EcGoo ooo =U 4 @:hE- jig,Gd ou.cgc'Eoo6 ui oN .i o! Eoooo Euloc o,= @E c'6 .sG EEgGo goooo o:c coo = r)3:'EFEEo-cFf;X!t! cl6Lc :--oz- o=crzrFlO r'16-9& o<t.iz :F edo oi lrlE='A 9a n!oo=-o 9.2B'; <u 9o-4ti s'.? frAbd or=.>'c Z.to>@o-s€oo.ShEPZoPo< E- vlotr c .9ti.2 E.Atr(! U)C)Eboz(n ()o C)Jo- o HYC)o o(uad-() v4 c)0.,liAo ,a co .=!PBH(!+i C)X9rrl {- .=octaoC6U Suo oC)L H6;o C)L() q< rn() z q tr< s ts\F\ Utr))aa xxxtsNYdd9@6= 3'>Ru:E f.0=66oJ <$4 oOGodu 7 s q oA ob i5; c fl =9s;-o == Y coqotEEoU OJ3Su=b E>.otuuUE+ f o3u 4 >!: t*+oEC -!ooYOd fl ffooood4 6uEX =o 6 ,.)odU_ 6uESU o .5E9 == F =9 o =YoL .i. G -(J g =5>F ,.3 uis o3cr4 x co,ao o a .euooo(J 6c.9 o i5 = c.o ooa ll 6ooU6c.o U E >RX\ r--o@@@ xxd1 d'! .!oN x6ciN xxNNdoiNN xxococroN N qqoooo66 di di 66 octosfN oooo ocio@ ocio oct6o co6N ooc, ctoo$<i NN @a ad? 66 c.o .9 E coF o =oE =o E J FoFF U =tUloo-.o ?$ ;i* oisloooo(9G OUu@==60 ts hn< NA. ts FF.:b(-)FQ= kl I (!, ct UF cn Xr! IFzrI] rrlr4 zF d,rrl o Az =a&E]z Fz totr tro thvl Evltro F \o obo(Ba- x-ubczo 5r-lf4o- t ,.., fqo o O=z J =bstOUz<6d E l3E =5t5o(J oe Et2H x c.o 6ooa:uooo(J iig .ooo.=o = c.oooa: 6o6(., 6C.9 o i5 xx s{ xx44 NN eq$s cq+s ccoo qq <$ cco46m qqoooo c.9 .9 E coF P(9 .!g6 oE o(9 @ o(9 .!so Eo o 0 @ co o o coE o(, ^Xu+E fb=E9oBcr oSx u 6Aoo6CU.o66r@lx{H., - F =P 5-@u =+ f-o.o iJo€t-u=c OJ*su=b c=FcZ-OCE.- ? -or ':'o =lJ c IxlRxlqcqt OOOrooo! I !q .c! 6@@!6Ndlco @ ol Iaaal666!6 6 6lm6ml I.1 e "r!o66!r@@l<t N Nl utgq!d66!N66l66ml Iqqe!oooi Iu1 nnl.idi;l IN66l=6omlH I I I,r! --!sslmoliNrEt: c cl;3 3.t = EEEi E'= O Ol FXPPIr!!-Cl9nEr*i = t+fi -o c Ei 4o (! F! d.E 6 5! oY@6la c .o .9 Eco F o3Eoo6 xaooct ctoo >sxooci ct J F.-oF (J o (Jd J FoF u 4 U4 x o =o oU x @u o o = 3 = U =o oU = dU o o = x c.9oI -9 '6ooo(J Eg .o o.:o = Eo oIoa .: 6ooU6 o'auo i5 xxqqoooo xxcqoo cqooooo@ qqoooo@@ cqoo qgoooo@(o qgoooo@@ qcoo c.o .9 E cGF o oup o E coEo4(Jc om uc o od coEooUd o N oG o c'o 4 @U€'=6 x @3o 6U x ouo o = = o3o 6U = Uo o = s c.9 a oa oooU;c.o o i5 = c.o o -9a oooU 6c.o o.:o a 6ir xo) NN }Rdl o >RNdi q @6o fioi@@ \@@N q @6Ol \Nts6 dl m6 c.o .g E c6 Ftooc =o=o|9 4s Eooc =coc o(9 ge PPt ;$E fi =E d=E BEE =d'6 uHOd .o =doxLo x :3 ; F-4H E =lpe ; -'=o * O FH H &'oi c 5E 3olNE uiEE E OE;;E& -oo oo@!oc ot-'F Er'6 oo-rE; Boo P_c.c i;; ;!: s !o o6o!E .=! i! E60L=CJOELsot E@o'= 6 =4 EoEtsoiEo=:g es s B _ae $P.:= o@ F> O = dr o.=roY;;? E = Pi E3'!i I!.J0: EE = 'PESE= Uy'oie.P u H r"tz ;o =.= o!EtrO'T ioo-'v EET 9 fi E uE F I Lcq.=LiE q E AgE.EE =COO O IIJ'=qoor'r oo==E sfi3E ? E$EE 2EttEe? -PL--/EegE<tro >: cQa.66E69^@=5on\J E qE E Te 3'i g 3'5f{co{FA4hi4+=9r,!6 eti*AESs;ilg E u I p'9EioE>g#Ec#e=ue-u9v#EESE'cit c.EEOEEOEO66=sE- 1Aotr =o 1A1A Eultro =o4n<Ns,u \J\F\5U FrI,a= 6'8r-r .E= 60 -9a..r<_oc GO.a06u;E S 9o6iob i5; d F =9 =E>= EcoaofF- ti:Y66-c.lad .a OJ3Eu=b E> F .oa 0dg .oi 0dg95 sot o =u c 5'8L) EB60-9;u13e 6Co66UEsdOO ulo6.:oYo== F =9 -P5g H cod.o?g.Euag OJd46iu=b ;<F u=bE>F.9;g6 s6fto =u + 6's.-r .e= 60!i.,<'S4 f oC.o66u 6 o4 .96Eioh.=oYo3= - F =9=-o>=E aodof'iPhH6-r,r OJ*su=bE>F.o iioduE+ f;o3 r'rc c.o .9E co F @3Etoz oEo! =oaa< s ts Frb(.) Ba x rU3o Gr x ou o o = = o =o oU = ouo tu = = =co oIo EoooTJ6g .9o .go x-t) E4z o tr-lfro- leEL.,t<da of!fL,64z. =fE -to2(JifE3OL'qC =F=9 fo ..AElritOU1r q6 d qo d qo L) =o Xrq IFzrD r! 14c,o o ZF dEIAooz A adr4z oFzo ootr tr .9Ut.g Eaico F ts q A< F{\ \.)N= UN AJ Y ct (J (!, U =g XrI] IFztrl g.l rrl&(, zF dlI.] ooz A U)&slz oF Zo tr o Eoco co .so! @ Et.s E oF o E o c6 F G o lDE o9 rE9PTvl'llid JOvrz 5'*u:E f.E=609?.:JHUS,E e Gqs66UuB<E.f 'Esi '9o iJ-!@b.EOYa== - s =b3fi>gY 6d q?* otJjUar 6J3=5 Cv.oH6+ugs si5+ - o3u o xxxxNHsfstd^i+*@NOO il6s3N"i xxN6oi.iN6 6ERci >>i --lo@l \\l661<$i il!vJlqHoi.:+*iE o 6to .: .=lF-EEi 9 =Ebbi 9,E.=FFlqi E P EI ! =Fi:iloTE€€i ::gEEi g FYFFIO o\ obI)d 6Uv<oi43o ;LJ64 "";<6rU o*EH5- =b>F o ,.=x64 {i, orLl 4 3h>tr oUUss o3 t-.,4 Ec.o o o P @oGU Ec.o o i5 = a.oooIa 2 6o6(J6co o.:o xxxXNNtsYuidde@ao= XXXe.,1 o? d] 66 6 m j xxxXNYoioioiPNNr= XXXeeoqc6ooo:NNN9 cqqoooooo664 d! c d] 666 NNNutaci@@6N N d qqqoooooot$t \\\@@@ ri ni di6€O c.9o 3f n<f ocY 3 oo EF qo-u!olrou'tr60oqG- JG EOqh.tr.=icE';E EoM=FFEE-bE.b E!!r-!ttrco;-PEE 6E =(,F ts C4 n< s tsCFF!bUski c\ 0)bI) C,= I (.I, $s-E.EEEEEEEEESEs6 =s888888888898=;H d H d d d i d d d -' d x:R:exx>RxxxxxxXxEB6io6ooqoooooo-crctci;uic;doddcicidoo$ci== EEEE66EEEEEHxxd ci ci d d c; o ci ci ci ci r q qoooooooooooi,oo :Rxxxaxx>sxle:eX55qcgqcqcoooo*_:.i-ici ct ci ct c, ci d d ct ci c, S = = Xu+Ef6=E+ofi(J ! oo.r!X(J o34CuEs 4 €"iJtE;i5g E - s;b>FSt-a cod.ot33o-(J 3B 5 Oh EE Xo+ o =u o oooodiqiaa<i<dd egoCmo.imNN5= qqQo ohoaiNNr qqooOst Qoo ,: ocdoo ??e?ssHH66!Y@@mmoodddd@sf\\\\\\60dddd+<o@6@6 m d d d d -Nd+4@6UU*+ilI .E = =EEE6?-;6EEEEEE IEFE EEEPPE#'gEEE}PEEEE'9bEEEEEE9iTEEPEgEEEEEEEgE==E'sE;BBBee€-:E?AEE$!aacccctrc9 6666!e;tsFFFi63o-A,idAgo x o =o oU x oU o o = J =b=F @+Hoa ou(J q J =b=F ,.Er-ris +r, o =t.l o U o (J d Uo U4 x Eo.F 6I =.1l @o€(,, Ec.o o i5 = E.o 6 I : 6oGU 6 ,o o.=o >exoooooo xxq9oo xsNNd cxi xxcog @6 qqoooonn qcoooonn ooct c, qgoo6n66 qcoooo qcoo6n+\i oE6@ti 6 .c E oF G =@c.E @I olqi 6i6l .tr1 Ei!i Ei =r,;l 0 fo oo co o !f oo6 E l6 U =g XEl IFz,! r!El o ZF &t!o.o Az t ailt!z oFvo ttro l! IAtl3tl ts q o< szo\F\ U F.l r"i N Obod= 3aci9oo xB9c,oo AtJ o =o EUdAu- X(J 6Uo 3e == J =Eo3 r-res;. 6-u g s =b=Fd,E t-tif+ o3ug x c.9oI f 6 o(J 6c.9 @ i5 = c.9 G -9 li @o6(J 6c .9 o.=o E6Xct HERg q sl g $ qo q $ qn q€o o f6 @ ltE .E E oF o E o 6 F 6cEcicu=FE oi LC#-egi5 UF t0 xt! IFzr! t!El& (,zF rrlo. !z U)drI]z oFzo UIco o li .Cl tn ^XcJ+E f63E9OBUa'f;= .oAEi#gE *= P EE Up90E90i-*o3u ;RXXXXqeqccooooooooood d d i d xxlsxxqqqqqooooo SHEEESXEEE 66s66KRooci qa <f$ eq sf <t Ioolc;c;l eq eq qqacooo >>!t!l o60l.P@@t=Eddlo@@is 3gi6 ri fll6dNtr lt +i=c c:O .= .=lEE_EEi fiE .b q t t! {.E-->EEEi 3ESirri :I .ee 5" E E! S(,6ttFlr oodc;oo xxqcoo RedtP 8;q-63ci :R(Jp( o =o ;UGEu Xu 64@U o E9 == =H o =t.l63 6uu c =b>F #(rif o3L,4 x cor:6 -9 .ti ooo(J 6co{; o.:o = c.9 d oa f oo@UEc.o o.=o qooo qoo co c.9 6 !J oo6o o) o E Ef k 4 A< sz ti U !.1 r-l c{N oboad = I (!, I UF E ;EXrI] IF7H g.l rrl& ozF &r! z F aIrI]z BoFz t^co o 13 =vt o .o *xxxxxiqqqqqqlooooool600000:i d d d d Hl I IxXXXXxleqcqqqrooooool 5'8(J?E f.e= GOs;u d6c f oo$06(JUP^<=<=fto:q.90 oa.Eo\1o3= -=H>trS;5# Hsoo.o .i 3HOU(J o '6Jo< ,q= b ;> F Oo! U UEe fofio3 r.ro eAXXXXIaqqqqqlJoooool =oooooi'' d d d d Hr Sxxxxreooooo6ctcidcici e6ot q 6Or qo c€o q ts qoN tr.oo !l o Ns 6 =so = tt!J!lool@@r =ool,': d 6ivNdt 9aruibs*igqqr6-'6i c c:P;EEi s'?.4 E. b bi g = tr = c F tsl qg;EEbb! : ", ; .o : F Fl lE.sE;,e€i : =EE*EEi sI>=IFFIN x o =o og x G o o = = o3o oU 3 or o o3 c.9 G oa v @o @(J Ec .o o.:o = c.o G oa 2uooG(J Ec.9 o.=o IJ 4 Uc U 4 U4 J FoF U d Ug J FoF U 4 (J4 xx>sqqcoooooo xaaqqqooo xxX diaie {{E 6 6 qg6€oo cgooor ol qcoo cq@€oo cc NN cqh nNN tr.9 o !l o N o 6.9 f- Goc.=E ELLOqFFC-qo =E!gP o Jo o Noc@'= f- +ic E UF oE o o F g:xu:E T.E=E6oJ <.qd o6uur<EsdOo 9J@b i5; q -=FSxE#Hcoo.otgEU otoE U U86 S.: 'iOE 3u u.!qi6Si+NlNNI,ol4Ci@+r6@lHdl Icc!oo!661 hid!+1NI I *iqt EE'Eiir E E E Ei gET: Ei 3o o E il 6iEE€i :E E E Ei s@i<FlN 4q Ftls, ts \F\ U !.1tl= Y I u, o 6 (-) =co XF.l IFzE] rrl 11] o ZF q.lAooz g a&F]z>oF Zo IAco IE IAtt =tl c7)N oboGIo-x o =o ou x oU o o = = o =o ou = Gu o @ = x c.9ouo a: oaoU]ic .ooo.:o 3 c.o @ oa =ooGUE .o o.=o J FoF (J o L)C FoF U 4 (Jc C\*!NHsi ICN@lgsBi IOodlod.il@ool dS@ a-!r@o-a&*'6 '6cc.E .E cOO'=FFt:gso@gEE troo 3EE(,FF nl <.1 si!i EiEl olFl bl si Etoltrr o f6 @ co.F o !l o ooooc x o =o oU >R 6Uo o = = o =o oU = o o o = >R c.o G -9 .t NooUEc .9 Io.:a = c .o ooe -g 6ooUEc .o o.:o FoF (J d Uo FoF o C Uo x:Rxd) i? d] aaxNNNci6d@ @ @ eq\NooNj6 6 0 Idddvl mmN@d;ni+ost<fmo Nr6dutdd;.i66@@ co.F o !l @ I I I I^^t>>i oo!ool @@i --ldN++66dNcc**'='-EE iFOOEE ooooccFFt!oooo =OO66OUA6FF 6'x u?E f.e=coo .:,1'S s @d u;$ f o6 9Jo6Eg E s3o =;Eg ?5i d E*3$ (ras OJo<6\LuS i1.> tr o9t r+r (J .!E C6J o3uG HXNEE6EddddePPo@@@=== xExSx>Rxxdldlcd?666o6 6 6 0 : : i ^m 6 m m u NNNNEEEEIRRRREEEEi I EEEEEEE€iRRRRddcjcii ooooc,ctctoooooo660 .1 d'! e n:omommoo6hoo6 \\\\@o@@@@@aNNNN cqqqoooooooosf$<f<t .:\\\o@@oi d d d6mmm o o m oddid;dio6mo 'i'aoo 60@o&d ii oddoo66(JL) oo'E=o€@@Eg6 6 --- .=EEEEh:.c.cqq##EE66AS-' EIEEEE?Eig EEETI::ti iFlm zoq na !.ts ts Si U F.lN=s6l {)bodp.xxxXXXxxxNFTYYYTTN333E88333 XXXe*:e*XXd!FldlEtstscdld'! SSBctcic,SBS x 0 =o oU x ou o o = Js =bag? 6G+i oUL'c J =eoU(J+ffIU =u e xxleXXX***dNNYYEitsts]\RRRgEESsE S{EEEE$$ERRRciociSBS oooct ci ci6000000 d: d'! d! omohn6 t:\\@lo(D@@o tststsduidmmo d!ed:600oo@ 533qqq(l,(,|9E ?te;;;HctBBBiiid.gss.qq.qE.q.:9U6666hhaEEssssHgG G6!iddoA6@.=_f,,f.Grc++*+ 6666GG;fE.E.E.=.g.c.E':.=.=EEEEEE=Fl-ooooooEeErtttttE*$ E E E E E E =esbbbbbEo==666qqqo))ccccEc-E Bo g e g g e g Fd.AFFFFFF U =EA +r XE] IFzE] E]E]&o oz F dr!Aoaz g r!V)dEIz oFzo vlco lE IAo =tn k q n< F1s, |\F.:5Utrl =ki E |c o UFtr Xt! IFzrrl r! 14 o ozF &Ho.ooz g U)&rI]z oFv ttro l! 1A .Gl tl 1t: ::!.!.t ^>e u+E f b= E+o; u<fi d i 6o '!:R u EH 4CU €+E;6g E xEx*xsEhhE HEXXEsEqsE HEEEE REctcict xx55E:Yooo:Joooo I I I I I I I I I II - F50 o .. 5r 6UUI d -F50 =F#ur< o3L)& = coE6 o 2 Go6(J 6c-o o.=o qqq o@6ONN@@@ o'l d: d-1 oomo@@60m rmo@uiuio@oN N N qaqoooooo<t6m tsqiqedoo mqAd B3w m 6 co d !f 6<fmEo o6 oo@oGiqdcioo_ats;6v6N6A@G6'i-sotm99- =Gqq.tr.s.c '='=tEEF>iioooOOFFFFFHNidN**y*tEee.E.SX!200+=5009ooEE:33==E o f6 ot o.t ou0dA 8f Eff €+E;6g = 3sc6€i3Eou X*Sxi N G 6 JIr@$"1 IIaxxX!omtYlNdidPlN66=l $NEsSRdci SSEE,::oooH99 qqa@om400or@a ai ri ri€om@@nm Ntsdddd@@NNNSf oo6do.i60No<t6 rr6i@CNdo66 o6u.! ocoi; EiErl; xl-t Bl!t $i6q= =iEE=Ei EEEEi E € a €i6 3E Ei(9aZFl ^x uqE f,b3 E+oA (J a3 d .i @oaX u Es & .9AEYgH UE6i5g E -=5>Ft;E.g 3c6 c€i33OU U !=5=56> F Cuo9fi{ H!E Xo*03 r-rr ESSEEEhhoo :RXXxNNNY ^i ^i ^i I<t<t$H :RX;RAcqqqoooo xxx;Rqqeqooooooood I - I o@oaidq;NNN@@o d; d; d;600 d! d! dl @ooNNN aaqooo cqqooo aaa ooo c.o G !5 n<f o =3a! I I I I^-t>>i o6lmol<. <.rohlE XH! ciNt: r s:g E..i- c 1Ei*EEEEi g c = o o ol ;'o E F h ll 9poPsgPi nsr.{tsiii 6<!€Ell IEEEoEEi i6dz.FFlm \oa.l oo0(BA ts qq i<) F\ ts\F-u= !.1 ki I (!, Et L'(J Fg EXrrl IFzt! t! rr.l IJ ozF rI]A.onz U)&t!z oF Zo vltro o t .Ct =v, xx!.- \NNrN )RXd] ilrrNN L) =o 3U(J 4 (J =GU =c,l C F =9=o3kod o-(J c J F =9 T<or {5 o3uo >s coEooo .tu6o6U6E.ooo.!o = c.9 GIoa HuoooUEc -ouo i5 ocio4 o C,Olo co qoo4 octoo qo \f qqooooho qqoo qqoooohm I I I I I Iriol 6! Bi =t EibrFlbt si2t6tir o 6@ei odo6(J o oI6.g E oF o;@c EoI =6>3Y;i 4 .o J, G@3-c,)C HxE N:=N qqooooqh cqoooloo6 octCdo Qoo :EH cqoooo6d qqooo6N<f Eaiool t or6O:6l 6 -lc 6l.= a:F .=lc A i! 11EtPi gP! Ei Ni: Ei :E E €i =E-E Ei a26Fl 4 Xur{o =o fi(JoeU X(Jp( oU o 6Uod = F>o o}Yod oU(J g J F +?OG o3(J d iR Eor:o o z 6ooU Eg ,o o.=o = c.o o oa .: ooo(J 6c .o oi- s$$s{EEi ShldSctdi IsxxEH€$iui 6i ^,i P Fj P Pln$s=N==l xxxxxxxiqqcqcqqro o o o o c) ol IIx*xxxxxtcqcqqccioooooooroooooooid d d d H i il +@oQdidtciP6 N N =6@@:i 66mQdiditrie@@@xmmm= dmmoctdrictN@@d<tNN$ 6csq.ididiQNoo=6O6= oooooocrct 6+<9.idid;PNoo=omm= E.o G f sf c'oop o f6 6sf I! I ei 3l{lr6l 3i NIriPI.=lElbrFl Ei E!2tatil t!ooccEqcooiinPEEg ExooG -tE6=;66-!a==EG.:6oacEEE=.EE.E'=Eid.o EO@F-ooF-PotrFdN!i:=t+i+o>BoCE226gEEScE v6@rhF EXECWION VERSION EXHIBIT D Monthly Transmission Facilities O& M Charge; Monthly Substation O&M Charge; Monthly Common Equipment Charge l. Interpretation: Cooperation. (a) Capitalized terms not defined in this Exhibit D are defined in Article I of this Agreement. (b) The Parties shall cooperate as necessary to update this Exhibit D in the event that FERC formula rate filing references change over time. 2. Monthly Transmission Facilities O&M Charee. (a) The Monthly Transmission Facilities O&M Charge for each Transmission Segment each month during the Term shall be equal to: (i) the product of, (A) the Acquisition Cost of the Transmission Segment as of such month; and (B) the O&M Expense Factor as of such month; divided by (ii) twelve (12). (b) Beginning the first month after the Effective Date and each month thereafter throughout the Term, pursuant to Section 4.7 of this Agreement, each Operator shall invoice the Non-Operating Owner for its Pro Rata Share (based on its Ownership Interest in the Transmission Segment) of the Monthly Transmission Facilities O&M Charge with respect to each Transmission Segment for which it is responsible. The invoice shall show the total Monthly Transmission Facilities O&M Charge with respect to each Transmission Segment for which it is responsible as well as each Owner's Pro Rata Share (based on its respective Ownership Interest in the Transmission Segment). 3. Monthly Substation O&M Charee. (a) The Monthly Substation O&M Charge for each Substation each month during the Term shall be calculated as follows: (i) If the description of any Substation Segment in such Substation on Exhibit C indicates that any Substation Segment contains Line Terminal Equipment, then the Monthly Substation O&M Charge for such Substation shall be calculated as the sum of the following: (A) For each Substation Segment in the Substation, the portion of the Monthly Substation O&M Charge for the Line Terminal Equipment in each such Substation Segment shall be equalto: (l) the product of: (x) the Acquisition Cost of the Line Terminal Equipment in each such Substation Segment as of such month; and (y) the O&M Expense Factor as of such month; divided by (2) twelve (12); and JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT D Page | 127 EXECUTION VERSION (B) The portion of the Monthly Substation O&M Charge for the Substation Bus Equipment in the Substation shall be equal to: (l) the product of: (x) the Acquisition Cost of the Substation Bus Equipment of such Substation as of such month; and (y) the O&M Expense Factor as of such month; divided by (2) twelve (12).. (ii) If the description of the Substation Segments in the Substation on Exhibit C does not indicate that any of the Substation Segments contain Line Terminal Equipment, then the Monthly Substation O&M Charge for such Substation shall be equal to: (A) the product of: (l) the Acquisition Cost of the Substation Bus Equipment of such Substation as of such month; and (2) the O&M Expense Factor as of such month; divided by (B) twelve (12). (b) Beginning the first month after the Effective Date and each month thereafter throughout the Term, pursuant to Section 4.7 of this Agreement, each Operator shall invoice the Non-Operating Owner for its Pro Rata Share of the Monthly Substation O&M Charge with respect to each Substation it is responsible for as follows. (i) For any Monthly Substation O&M Charge calculated pursuant to Section 3(a)(i), the Non-Operating Owner's Pro Rata Share of the Monthly O&M Substation Charge shallequal the sum of: (A) For each portion of the Monthly Substation O&M Charge calculated pursuant to Section 3(aXiXA), with respect to each Substation Segment, the Non-Operating Owner's Pro Rata Share shall be based on its Ownership Interest in each Substation Segment in such Substation; and. (B) Forthe portion of the Monthly Substation O&M Charge calculated pursuant to Section 3(aXiXB), the Non-Operating Owner's Pro Rata Share shall be based on the applicable Substation O&M Allocation. (ii) For any Monthly Substation O&M Charge calculated pursuant to Section 3(aXii), the Non-Operating Owner's Pro Rata Share shall be based on the applicable Substation O&M Allocation. 4. Monthly Common Equipment Charge. (a) The Monthly Common Equipment Charge for the Common Equipment at each Substation each month during the Term shall be equal to: (i) the sum of the Return on Capital, the Recovery of Capital, the State and Federal Income Taxes, the Local Property Taxes and the Transmission O&M Expense, in each case, with respect to the Common Equipment; divided by (ii) twelve (12). (b) Beginning the first month following the Effective Date and each month thereafter throughout the Term, pursuant to Section 4.7 of this Agreement, each Operator shall invoice the Non-Operating Owner for its Pro Rata Share (based on its Common Equipment JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT D Page | 128 EXECWION VERSION Allocation Factor in the Substation) of the Monthly Common Equipment Charge with respect to each Substation for which it is responsible. The invoice shall show the total Monthly Common Equipment Charge with respect to each Substation for which it is responsible as well as each Owner's Pro Rata Share (based on its respective Common Equipment Allocation Factor in the Substation). 5. Annual Adjustment. The following terms shall be adjusted each June (in the case of PacifiCorp) and each October (in the case of Idaho Power) following the Effective Date by the Operator responsible for the Transmission Segment, the Substation Segment or the Common Equipment, as appropriate, as follows (collectively, the "4nqgAl_Adj_ustm-qn1"): (a) the Acquisition Cost of the Common Equipment, the Acquisition Cost of the Line Terminal Equipment, the Acquisition Cost of the Substation Bus Equipment, the Acquisition Cost of the Substation Segment, the Acquisition Cost of the Transmission Segment, and Net Book Value, all of which shall: (i) exclude any costs included in CWIP; (ii) not be reduced for accumulated depreciation (except for Net Book Value); and (iii) be adjusted as follows: (l) Increased to reflect the cost ofcapital upgrades to such Transmission Segment, Substation Segment or Common Equipment placed in service during the months since the Effective Date or the last date of the immediate, prior annual adjustment; and (2) Decreased to reflect the cost of equipment comprising such Transmission Segment, Substation Segment or Common Equipment which has been retired (and no longer placed in service) during the months since the Effective Date or the date of the immediate, prior annual adjustment. (b)The following factors from each Party's annual rate filing: (i) Return on Capital; (ii) Recovery of Capital; (iii) State and Federal Income Taxes; (iv) Local Property Taxes; (v) Accumulated Deferred Income Taxes: (l) Account 190; (2) Account 281; (3) Account 282; (4) Account 283; (vi) Transmission Net Property, Plant & Equipment; and (vii) Transmission Plant in Service. Adjustments shall be reasonably determined by the Operator responsible for Segment, Substation Segment or Common Equipment. Each of the Annual such Transmission JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT D Page | 129 EXECUTION VERSION 6. Definitions. "Accumulated Defered 'means: (A) In respect of the Common Equipment at each Substation owned by Idaho Power, an amount equal to the sum of Sections (AXl) and (AX2) below: (l) Account 282based on the product of: (a) Transmission-related Account 282 is the product (i) Total Account2S2 (ldaho Power Rate Filing - Schedule 1, Line 4); and (ii) the sum of (l) Transmission Plant Allocator (Idaho Power Rate Filing - Schedule l, Line 8) and (2) General & Intangible Plant Allocator (ldaho Power Rate Filing - Schedule l, Line 47);and The quotient of: (i) Net Book Value of the Common Equipment; and (ii) Transmission Rate Base (ldaho Power Rate Filing - Rate Calculation, Line 20). Accounts 281,283 and 190 based on the product of: (a) Transmission related Accounts 281,283 and 190 is the product of: (i) Total Accounts 281, 283 and 190 (Idaho Power Rate Filing - Schedule l, Lines 3, 5 and 6); and The sum of (l) Transmission Plant Allocator (Idaho Power Rate Filing - Schedule l, Line 8) and (2) General & Intangible Plant Allocator (ldaho Power Rate Filing - Schedule 1, Line 47);and The quotient of: (i) The Acquisition Cost of the Common Equipment, and (ii) Acquisition Value of Transmission Plant, Property and Equipment (Idaho Power Rate Filing - Rate Calculation, the sum of Lines I through 8). (B) In respect of the Common Equipment at each Substation owned by PacifiCorp, &r amount equal to the sum of Sections (BXl) and (BX2) below: (1) Account 282based on the product of: (a) Transmission-related Account 282 is the product of: (b) (2) (ii) o) JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT D Page | 130 EXECUTION VERSION (i) Account 282 (PacifrCorp Rate Filing, Attachment lA, Line l); and (ii) The Allocator (PacifiCorp Rate Filing, Attachment lA, Line 6); and O) The quotient of: (aa) The Net Book Value of the Common Equipment; and (bb) Total Net Property, Plant & Equipment (PacifiCorp Rate Filing, Line 32). (2) Accounts 281,283 and 190 based on the product of: (a) Transmission-related Accounts 281,283 and 190 is the product of: (i) The sum of Accounts 281, 283 and 190 (PacifiCorp Rate Filing, Attachment lA, Lines 2,3 and4); and (ii) The Allocator (PacifiCorp Rate Filing, Attachment lA, Line 6); and (b) The quotient of, (aa) the Acquisition Cost of the Common Equipment; and (bb) Total Plant in Rate Base (PacifiCorp Rate Filing, Line 24). "Acquisition Cost " means, in respect of a Substation Segment, the cost of the Line Terminal Equipment in the Substation Segment as initially determined on the Effective Date and set forth on Exhibit F, as the same may be adjusted from time to time by the Annual Adjustment. "Acquisition Cost 'means, in respect of a Substation, the cost of the Substation Bus Equipment in the Substation as initially determined on the Effective Date and set forth on Exhibit F, as the same may be adjusted from time to time by the Annual Adjustment. "Acquisition Cost of the Substation Segment" means, in respect of a Substation, the cost of the Substation Segment as initially determined on the Effective Date and set forth on Exhibit F. as the same may be adjusted from time to time by the Annual Adjustment. "Acquisition Cost " means, in respect of each Transmission Segment, the cost of the Transmission Segment as initially determined on the Effective Date and set forth on Exhibit F, as the same may be adjusted from time to time by the Annual Adjustment; ry4!gg[, however, that (i) in the case of the Antelope-Goshen Transmission Segment, the Acquisition Cost of the Transmission Segment shall be reduced by 44.44% to account for the fact that only approximately 25 miles of the approximately 45-mile Antelope-Goshen Transmission Segment is jointly-owned Transmission Facilities and (ii) in the case of the JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT D Page | 131 EXECWION VERSION American Fall- Malad Transmission Segment, the Acquisition Cost of the Transmission Segment shall be reduced by 57.28o/o to account for the fact that only approximately 29 miles of the approximately 68-mile American Fall - Malad Transmission Segment is jointly-owned Transmission Facilities. "Acquisition Cost 'means, in respect of Common Equipment in a Substation, the cost to the Owner of such Common Equipment as initially determined on the Effective Date and set forth on Exhibit F, as the same may be adjusted from time to time by the Annual Adjustment. "AnnuAlAli_ustmenl" is defined in Section 5 of this Exhibit D. "Common Equipment " means, in respect of each Substation and each Owner, the Substation O&M Allocation for such Substation and such Owner, provided that prior to the Effective Date the Parties shall work together to determine whether an alternative allocation factor should be used for purposes of allocating the Monthly Common Equipment Charge as between the Owners. (.CVy'lP" means Construction Work in Progress. "Idaho Power Rate Filine - Rate Calculation" means the rate calculation tab of ldaho Power's current year annual FERC formula rate filing. "Idaho Power Rate Filing - Schedule l " means the schedule I tab of Idaho Power's current year annual FERC formula rate filing. "Line Terminal Equi " means all series capacitors, shunt reactors and phase shifters and all other equipment that the Parties mutually agree is "Line Terminal Equipment." All Line Terminal Equipment which is part of a Substation Segment on the Effective Date, sorted by Substation Segment, is identified on Exhibit F. "Local Property Taxes" means, in respect of the Common Equipment at each Substation, an amount equal to the product ot (A) The Acquisition Cost of the Common Equipment; and (B) The Property Tax Rate for the State of Idaho. "Net Book Value" means, in respect of the Common Equipment at each Substation, an amount equal to: (A) The Acquisition Cost of the Common Equipment; (B) Less, the Accumulated Depreciation. JOINT OWNERSHIP AND OPERATING ACREEMENT-EXHIBIT D Pagel 132 EXECUTION VERSION "O&M Expense Factor" means, in respect of each Operator, an amount equal to the quotient ofl (A) The Total Transmission O&M Expense of the Operator; and (B) The Transmission Plant in Service of the Operator. ..@,,meanSPacifiCorp,scurrentyearformularatetrue-up. "R4lg_Base" means, in respect of the Common Equipment at each Substation, an amount equal to: (A) The Net Book Value; (B) Less, the Accumulated Deferred Income Taxes. "Bgcovq if Capital" means, in respect of the Common Equipment at each Substation, an amount equalto the product of (A) The Acquisition Cost of the Common Equipment; and (B) The FERC approved depreciation rate for Account 353 Transmission Plant Substation Equipment. "Bg!q!_gn_eap ital" mean s : (A) In respect of the Common Equipment at each Substation owned by Idaho Power, an amount equal to the product of: (l) The Rate Base; and (2) The Rate of Retum (Idaho Power annual FERC Formula Rate Filing, Rate Calculation,Line 23). ln respect of the Common Equipment at each Substation owned by PacifiCotp, dn amount equal to the product of: (l) the Rate Base; and (2) the Rate of Return (PacifiCorp annual True-Up Rate Filing, Schedule l, Line 126). "State and Federal In 'means: (A) In respect of the Common Equipment at each Substation owned by Idaho Power, an amount equal to the product of: (l) the Rate Base; and (2) the Composite Income Tax (Federal and State) (Idaho Power annual FERC Formula Rate Filing, Rate Calculation,Line24). (B) JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT D Page | 133 EXECUTION VERSION (B) In respect ofthe Common Equipment at each Substation owned by PacifiCorp, ar amount equal to the product of: (l) the Rate Base; and (2) the Composite Income Tax (Federal and State) Factor, which shall be equal to the product of: (a) the weighted cost of preferred and common (PacifiCorp annual True-Up Rate Filing, Schedule l, Lines 124 and 125); and (b) the income tax factor (PacifiCorp annual True-Up Rate Filing, Schedule l, Line 132). "Substation Bus Equipment" means all equipment necessary to support the operation of the substation bus, including foundations, lally columns, bus conductoq fittings, circuit breakers, air break switches, shunt capacitor banks, potential transformers, current transformers, ground switches and enclosures attached to or associated with the bus. All Substation Bus Equipment which is part of a Substation Segment on the Effective Date, sorted by Substation Segment, is identified on Exhibit F. "Substation O&M Allffi" means, with respect to each Substation, the "Substation O&M Allocation" set forth in Exhibit C, as the same may be amended from time to time pursuant to Section 3.3(b) of this Agreement. "Substation Segments" means, with respect to a Substation, the Substation Segments which are listed on specific rows under the Substation on Exhibit C. "Total Transmissio " means: (A) In respect of Idaho Power, the amount calculated as follows based on items identified in Idaho Power's annual FERC Formula Rate Filing: (l) the Transmission O&M Expense (Idaho Power annual FERC Formula Rate Filing, Rate Calculation, Line 33); (2) less, Account 561 (Load Dispatching) (Idaho Power annual FERC Formula Rate Filing, Rate Calculation, Line 34); (3) less. Account 565 (Transmission of Electricity By Others) (Idaho Power annual FERC Formula Rate Filing, Rate Calculation, Line 35); and (4) plus, O&M Expense: A&G (Idaho Power annual FERC Formula Rate Filing, Rate Calculation, Line 36). JOINT OWNERSHIP AND OPERATING AGREEMENT_EXHIBIT D Page | 134 EXECUTION VERSION A sample calculation of Idaho Power's Total Transmission O&M Expense based on Idaho Power's 2013 FERC Formula Rate Filing is attached hereto as Attachment I for information purposes only. (B) In respect of PacifiCorp, the amount calculated as follows based on items identified in PacifiCorp's annual FERC Formula True-Up Rate Filing: (l) the Transmission O&M Expense (PacifiCorp annual True-Up Rate Filing, Schedule 1, Line 53); (2) less. Cost of Providing Ancillary Services Accounts 561.0-5 (PacifiCorp annual True-Up Rate Filing, Schedule 1, Line 54); (3) less, Account 565 (PacifiCorp annual True-Up Rate Filing, Schedule l, Line 55); (4) pluq, A&G Expense Allocated to Transmission (PacifiCorp annual True- Up Rate Filing, Schedule l, Line 66); (5) p!us, Accounts 928 and 930.1 - Transmission Related (PacifiCorp annual True-Up Rate Filing, Schedule l, Line 69); and (6) fu, A&G Directly Assigned to Transmission (PacifiCorp annual True- Up Rate Filing, Schedule l,Line74). A sample calculation of PacifiCorp's Total Transmission O&M Expense based on PacifiCorp's 2013 FERC True-Up Rate Filing is attached hereto as Attachment 2 for information purposes only. "Transmission O&M E " means, in respect of the Common Equipment at each Substation, an amount equal to the product of: (A) the Acquisition Cost of the Common Equipment; and (B) the O&M Expense Factor. "Transmission Plant in Service" means: (A) in respect of Idaho Power, the amount calculated as follows based on items identified in Idaho Power's annual FERC Formula Rate Filing: (l) the Transmission Plant in Service (Idaho Power Rate Filing - Rate Calculation, Line 1); (2) less, Generator Step-Up Facilities (Idaho Power Rate Filing - Rate Calculation Line 2); and (3) less, Large Generator Interconnects (Idaho Power Rate Filing - Rate Calculation, Line 3). JOINT OWNERSHIP AND OPERATING AGREEMENT-EXHIBIT D Page | 135 EXECWION VERSION (B) in respect ofPacifiCorp, the amount calculated as follows based on items identified in PacifiCorp's annual FERC Formula True-Up Rate Filing: (l) the Average Transmission Plant in Service (PacifiCorp Rate Filing, Line l5). JOINT OWNERSHIP AND OPERATING AGREEMENT_EXHIBIT D Page | 136 EXECUTION VERSION EXHIBIT E Department of Energy Equipment Located in the Antelope Substation Oil Circuit Breaker 8103. Govt. Prop. No. 85420 Westinghouse Type BM-48, De-ion Grid Oil Circuit Breaker. Acquired 1957, Moved from TRA 1981. SerialNo. l-71-578-8 Rated Voltage 138 kV Rate Amps 1200 A Impulse kV 650kV Interrupting MVA 3500 MVA 810 gallons of oil per tank weight 39,500 lbs. Oil Circuit Breaker 8164. Bus Tie Breaker Westinghouse Type l6GM3l.5, Acquired 1982. Serial No. l-38Y5468 Rated Voltage l69kV Impulse kV 750kV Short Circuit Amps 31,500 A l3l5 Gallons of oilpertank weight 54,000 lbs. Circuit Switcher 165,{. Govt. Prop. No. 83712 S&C Circuit Switcher/'l\4ark V, Acquired 1982. Catalog No. 157320- SerialNo. 8l-31857 kV Nominal 161 kV Maximum Design Voltage 169 kV BIL 75OKV Amps, Continuous 1200 A Amps, RMS Symmetrical Fault, Closing, 30 duty cycle 30,000 S&C Operator, Type CS-IA Operator Voltage 125 V DC Catalog No. 3 8846R3-BBHPW Serial No. 181400 l. 2. 3. JOINT OWNERSHIP AND OPERATING AGREEMENT _ EXHIBIT E Page | 137 EXECWION VERSION 4. Circuit Switcher 1624. Acquired 1982 S& C Circuit Switcher/lvlark V Serial No. 8l-31735 Same information as item 3 above S&C Operator Type CS-IA Serial No. 8l-31735 5. Transformer. Govt. Proo. No. 5-220. Acquired 1957. l6l kv/r38 kv Feeds #l Antelope-Scoville Tie Line Westinghouse 137,600lbs Serial No. 6534543 55 MVA, OA 73-ll3 MVA, FOA, with fans on both sets of fins (3 fans are already on I set of fins) gl-213 MVA, FOA, with 3'd stage cooling (addition of 2 oil pumps, one pump is already installed). Y-Y auto transformer with delta tertiary Includes no-load tap changer, 5 steps, for voltages from 16905 volts to 152950. Tap lever is locked on step 3. o/o Z -l .5o/o at 55 MVA. I 6l kv/l 38 kV 6. Transformer. Govt. Prop. No. 5-587. Acouired 1982 16l kv/l38kv Feeds #2 Antelope-Scoville Tie Line General Electric Serial No. Ml0l875 167,000 lbs. 55 MVA, O(A) 73.3 MVA, FA 91.6 MVA, FOA, 55o C, has I set of fins with oil pump and 3 fans and oil. 102.7 MVA, FOA, 65 o C, expansion tank on top, Y-Y auto transformer with delta tertiary. Includes no- Ioad tap changers, 5 steps for voltages from 109050 volts to 152950 volts. Tape lever is locked on step 3. YoZvolts- 1.47 at 55 MVA, l6l kvil38 kV 7. Ouindar Transfer Trio Control System QP-l l/l2s (Aerojet Nuclear Co. E-45408C-3) JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT E Page | 138 c)bn(dA rLF EA XtI] IFzrI] HrI]do zF &r!o.o Hz aIt!z oFzo .EI OE+os*ogfJdrgftsEgE caoosi .og cstooc=o PO3eEEoo Qort jP co ii6 @>co9E'-- o.:m€.EtE?t EoCo': E_OE'Eo@oEoL!o_ E6 o6EOs€GEEf9oJt =.4=o? 6Jo€oqEEFpE ;i;o-NE JEoU 9EEUA-o.=3r ;Io=g; 6E 33Soo! .:6€<{.eu5 .2- =EpE ;6-iE<u c-ioo".or ucY 6-9bots=9 to6e.,i€C Eg e.:-!! o<l-oxs 6U V) 6 -(Jc- ;o -1, ax'= qfo oo CO @z ccooEEco 8E Ira: aN6u;6.1 ofo E.o=.9fo >@e .E@:ro o Er*E 3;6!!6Nl:E o.,{o6 qioN zEr.EoUO o Es<.ts.9 ;;oodtsu Nc6o o;o lc6ou- g*<.E€lmo staotoqoN ftr@oEi Eo>oodo uior d. 5co@U. Es<.id=@o N oi@NdiN$ 5c60 E? E,d5@r d f EA 5c6oiz E*o'5 ME rqro uiNa,l >trooEi Eol6gNU o oiq N ECooEEco 8E a G EF c 'FG !f ocso c olo oo6 oz cco@EEco OlUO <f oi{Nd@q ol o E.o!.2loI l6Z>o!c 6.=d=,. cxrr 6a @q a foEiEdc@'=d;(J@4 o@Noc*N.! cEooEEE.98E 6@ od N d;$oq c.o G !l @clEcoI gv606e .so E6d o:o ooo oz ccooEEco OlUE q @nr6N 'i of6 coE.9:6 lo!>oJErr-t o ?'Ir onou'! mn 3r>q:E ho+'=odUU4 6 + o$oqN ECooEEco 6E o .jNN a{' N.n c.o 6 !f o =ooE o =6 ooo oz ccooEEEO 8E FooF A c( c .9:.r:cL occoJEu.9<f40U o +NN+qo 9E.:c E3 c oor lo?>cvco>o.=6- H,I4 c Gtctc 6 Jt?EocCl '=6EUEe E* r(FG ccooEEcc8I N N d?€6qNq c.9o 3l E.9 6 o uooE-.2aLOfc,o6 O+ () ood IL =4 Xt! IFzt! r!ll] o oz F &rrl o Hz A ad,Hz oFzo =B- E Hg EEoOOEra '5o9o ro i! ue;€ 5 - dui ={ta 9eCES iE E sT gE EEe- gEiE? gB*i! E=ze? osb sf, ETE o'l 9Pd E EE ie* <':P _E s6xE ts -9ig-'H s $oo:: oot cE 'tc9E o I oo E E o+ = b.+ EtE;+ rcsoo EoEacooE* E T.EqE E c 6E;8 E:EbE i .sEI ; E =-e*E*; lfla c a E= E =€ E E>gff>od! c !! edOO-L 66 E E ! :E>Hn L oE.;i ;e"E;.9 OS;;E EE€a o ; BinE E=Ei:. EE BE i EE6EZ9.IE EE6.-.o;EbEE^bac =elloooE.s; beEUcIEE> E E E E# E{;= g+E 3 E-b6>F =s=-i : -E E*eeilEE-d6--!E:.i Hri E E E *: Eet,Eea E E9;;Eeet6,.!=aEbE.stEEFOo.,! gE'Ee Hu 6u@Ft6 0<06 () o:o oo6 oz ci9iEFE.9o:(JE c6N N$N.n o =6 go :a:6 Hr@c i3PE 3Ei\U CUT4 Fu.lN6u'l @ + *oE-E$;EI6= EofFc * oo cUO=[*'ts cc C6 ttso +'o E *6NJ cllt o 9 = 6= taf E sofo=4 oqJ EE3E- 4nnnjo<l f6=>o!E €.3 -- 6xur tsq oa@oqN E:>qrE40t=6d(JUr o+<toui@arlN ECooEEco 8E NN 6.io@ Eo 6 !l ?E +Eof!oOUp-P 6J-aEC =o o =G oo6 oz ccooEEE.9O=of c(coFccC o =o c.9.e.9fU N=:ElE =.9ofooOUL)@<.sGJ c G V atsr.a6C =oFeug4-: ccc d liIEfE = .-oofogCUL)@<.Edi G uocc6 i€d6c =a Ps(Jg d.: dior NNo l@?>oJEOO gE d d <, c C )dE>qJtoo<=m;(J@g A(u €o CEo@EEco 8E r(o odo6oi6oq c.9 G !l EG oEO + out)d ogo oo6 oz ccooEEcoolUO c o ( of6 c .9.:,9fo SEE E€Emhd <Fd EG oc _a= 6EO{bE'4t.9scfod6UIU O!d:oq staI lo!>bvF E.Edl ?Ed o6+Noo 6+ 36E>9rtdoo'=d;(Jr d c)q <fo@.i<fh foe>o!E 6O ilI.. dYqd q om h h N =6E>q!toc<t '=oE(Jr4 e o$$'or.{ ccooEEE.g8E @q @NuiNN co o ol coo'E9Eh €Eq.= E6-3E "!28 O3 E6 rLFo Xtd IFzlrl E]rrl&, zF EJAo z o. U) trlz oFz oao oo@ oz ccooEEco 8E rrl N@tsci@ of G o =.9l6 >E36GC(,.9 _!-o ?odi(Jo<co= aN\fs.4o<tq >c 6.E .Lo eoq(JO4c-= Nodttsq N :6Z>oxc @.=if.. oErc 6ol o d;N4 :6E>qvtdo6=dd(Ju4 oq Nq o ccooEEco 8E \ a6ino co G !f oo @ co o o @l G oo6 oz EEooEEco LJo 6ogN6 dist 0 ofo g .9ll.9l6 fo2>ox9B.idf HEc Na ts N EriEoco=N;L)o4 ocot<i<f6No CEooEEEO 8E sqoN+. oo c.oo o = od o Noco.P>irf6-@ o t oo6 oz ccooEEco Ofoo oq6r@. NN@.€ ol G c.of .!-tlro coc!coE= E,7s.e?384 ocon6o'ttam 9oEEcoE5 Ef@o r-rQd o dNqooo 36l>olc B.E6f ?E4 Nt:6oOlri€d1tsq =6EiEooo=o;(Ju4 €qooN.iNdlo gcooEECQ 8E \n aooON c.9 6 !l 63EE Eo- Nt oa0CIA. 8e6=rS2 ccooEEcoolUO oqtsN\o@Nd @ =6 go .i:r -otseen6.9(Jl dU NN d;N...!oq @ 56E>qIEooo'=4;(JUg o.1Nn d;q o cc E3E A llG E( 3, E =.=.sE_E cEfoC EEPoJaU N'=f*E oqts IooN ECo@ob.E E6JOuI! =4*E -U N\@o 6iN<f EEPoJa 3rE oNd; dl N ECooob.s E6Jor-r i '5 d*o -U <fo:NoN+ >! 9qEo6.g(Jl dU 6n.i66.n@dl :d 66Esff:66.=EE q c(o rt ccooEEco OfUO 6rouou o cor=G !I .Ecc = o =G oo6 oz CEooEEE.!8E 6tsoo N <t of G co :Efo oc eE 5. .9O=4O(Ju d +@@+n@.i oc 9o d.so:crtJ-4 N dl €6 oc5! E9IE6Oo=(9E(JU C f(r C oc JcgoocisOfl.,o(Jug ets(D .i :6!>oJEno dil.. EEU4 oqo@ ci<t d f6E>q!Eno+=o;(Jr4 .iNqsfou!r cco@EEE.98E @qo@o) NN d c .9o,f tsooc EF c0 lIXr! IFzr! rrlIrl/, ZF /,rI]0.ooz g adr!z oFzo o!o Jooco oz E=ooEEco ofUE @ao uiq @:E q .9.:.9 o >z 8eE66.9(Jf<oAU o;6o utoq @ >l:dO6go==66.=EE cqo6uleq cEooEEEO 8E Gr qctsi go 6 If C6 Eo c ! 'o oJ o-E.Eofo ofo oo6 oz ccooEEcoo:UE Nhdio c;Fqo<t o:o co :ef6o tPLOcogo -@= E.=No6 *'5ldg4 cq Aqd E t!-qtroco@= FPaE6*f HdE c co tAt w f6?>ErE S.em>gE d € 4 h6c;m =6E =Eno<f=6EUro NtsdtoN.im.!o ccooEEco OfUE o{G g\lC co G 3f Eco ra<f C)hI)d ILF tr XrI] IFzHzE]E]&o ozF &E] Az * aillI]z Fz of G ooao oz CEooEEcoo:oE 6ooiN d;@o1N o =6 E =.9 oU gE 8E'tro +o ?pGj <iqNtsqmNo OEqo6E:E fU(JoEE-= o EIc J(o:>ot, 3.EN=pEo NsfdN a,isld! I _.6E>!!xtoo6'=N= tl r.!4 n6dqoo ccooEEco ^foE N@N@F.itso'! 6 Eo G !f o N _oa =g o = o =G !oo6 oz ccooEEEO OfUO e n\qFddlc o E co :Efro oE ;o@tsEq'='=6dL'U 4 6o+€@oFqo0 @c)cLOoe EO L=6E(Jr d tsqqE!tsnq fo!>o!E $.s16 l 9,3r o .i o cO d 3oE?Eno<f '=mE(Jr4 lf Nsf u,tsq ccooEEco Ol(Jff oN NrNso c.9o !t =ocYo.E ooEF l +* o60clp. tuF ta Xt! IFzt! z,glI! o (,zF &r!Ao Hz g EU)&rr)z>oFzo .a .. I:E X REs d jEg E E@! . FELd= .Es- f Euf.=3 *E E ErE[E EX}OE ,; s EBs" HEzEt s EeEFi. EuY>mo E;fir flE;iE €#9E3 c.E P=-E o6.=6P 3tE r o E g :E =Eo]9 EttUi'= 6 6=.= Eo.cH.Sl E 66I.--=[€c E IEeE; I EEET ;E PE T. g9.= U o cjE=o EE€,TE EE*E€ Eotr90 Ec= L o c: Y o-iE*E E H i; H ?*sEE H;#ii a E EEH FI O.= c ci6g-.e ii##s E e =o c i '=-'=<sg -Eii 6 oE .=^ _i e5 E "J = H EEIE;EgE: e;sE.= :I€EIEII::EqE-a EEEHfEE *:EE:*EjiEIfEiiE o;ooEo= i:"E fi; f rE=XEgEg s E i'# [s:c oo tr o c JOdNO=OL)e Xi= ;r q oo ooo (J 4 I q (J+Ud (J e o c U 4 L) o o @J oE Ef I 6 'u .E o- Uq (J 4 U 4 (J 4 L) d U d (Jr (Jc d L d o d qo'F_ '=o d=UO o6o;N6{ or.,jq q dnu o sq6@ oi<fq o oq or<tts(osf.6 n\ 6d?oq +aF6 oio Nq N !'l Nd N oi6 6N d;0 NqoNoq O!o46 o1@<f o'odN @q€rqN<t N cioN+ F 6aoNul hOrco 6N oodlo1t ,rjNg <,c(c!ccF ( F t- o'6nds ono@NoiOd] @g N@ ^i<fo Gi ts o;ooqoN..1 coEUo c.o .!! E c6F o 6 cooot3 I!oucGu oE 6m * o Ioo -9oc o<t lt c'ooP =op!oE go o6 o t* .goo = op @o1' Eo o6 @ @oIoc Ico o(9 o 6(, .g6 coE o(, do co o o IcoE oc, 4<lotoqE Itrot o(, oc oo coqoo oE@! I 6 =E.E Eof o 6) oE Ef Iotr oo cobIgo oEop o o (9 .do Ico o o 6<t cos o(, od! d E 6<i 1t =looI I odE 6 E 6sl N+ ==ooo I oEE 6 E 6st6 '6op =roo .=Y oon o,{.=Eor I c'oqp lrE( cd I v:cca nst Eooc I 5aooC o Noc6 fI Ig o =!f = EXHIBIT G Joint Ownership Transmission Loss Calculation and Allocation Methodology PacifiCorp and ldaho Power agree that as joint Owners of certain Transmission Facilities, defined in this Agreement, the companies shall calculate, allocate and seffle the electric losses associated with these Transmission Facilities in accordance with this Exhibit. Collection for Losses: This Exhibit G does not affect PacifiCorp's and Idaho Power's respective OATT-based losses methodologies. PacifiCorp and Idaho Power shall continue to collect for electric losses in accordance with their OATTs. Calculation of the Ouantitv of Losses: The quantity of losses for each jointly-owned transmission line or transformer will be calculated by implementing an I2R calculation based on measurements at one end of each transmission asset using existing metering equipment and assumed series resistance for each asset. The calculations and selection of inputs, such as which line or transformer terminal is metered, which quantities are used (amps or MVA/voltage), and what resistance values for each transmission element are used, will be agreed upon by each Party. In the case ofjointly-owned transformers, a constant core loss value agreed upon by each Party shall be included in the calculation. The metering devices used to provide the inputs to the loss calculations may or may not be revenue quality. A metering device calibration process and schedule shall be agreed upon between the Parties. The Party responsible for the calculation of losses for each jointly-owned asset is described in Table l, below. Calculations are to be developed for all hours each calendar month and results are to be shared with the other Party no later than the 7th working day of the following month. Allocation of Losses: The quantity of electric losses on each jointly-owned transmission line or transformer shall be allocated between each Party consistent with each Party's asset ownership percentage. Losses for each asset will be calculated for each hour and multiplied by the asset Ownership Interest of each Party. Losses will be totaled on a monthly basis differentiating between on-peak hours and off-peak hours. The Idaho Power portion of losses for all assets located within a PacifiCorp Balancing Area will be summed and owed to PacifiCorp. The PacifiCorp portion of losses for all assets located within the ldaho Power Balancing Area will be summed and owed to Idaho Power. Table l, below, defines the Balancing Area of each asset, the Party measuring the losses for the asset, and each Party's Ownership Interest. Return of Losses to PacifiCorp: Other than losses for the Jim Bridger generator main step-up transformers (which are described below), for each calendar month, if the losses owed to PacifiCorp are greater than the losses owed to ldaho Power, Idaho Power will choose to settle either financially or physically. If settled JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT C Page | 145 financially, Idaho Power's will settle financially with PacifiCorp in accordance with PacifiCorp loss return business practice. If settled physically, Idaho Power will return losses to PacifiCorp. Losses to be returned are the amount owed from Idaho Power to PacifiCorp less the amount owed from PacifiCorp to ldaho Power. The loss return period will begin on the l5th of the next month and will continue until the 15fr one month later. On-peak losses for the month will be evenly distributed across all on-peak hours in the loss return period and off-peak losses for the month will be evenly distributed across all off-peak hours in the loss return period. Return of Losses to ldaho Power: For each calendar month, if the losses owed to Idaho Power are greater than the losses owed to PacifiCorp, PacifiCorp will settle financially with ldaho Power in accordance with Idaho Power's loss return business practice. Losses to be settled financially are the amount owed from PacifiCorp to ldaho Power less the amount owed from Idaho Power to PacifiCorp. Table 113 13 ln the event of a conflict between the percentage of asset Ownership lnterest set forth in columns (3) and (a) of this table and those set forth in Exhibit C for such asset, the Parties agree that the percentage of asset Ownership lnterest set forth in Exhibit C shall control. (1)QI (3)(41 Asset Asset Balancing Area Partv Asset Loss Calculation Performed Bv IPC Loss Allocation (Asset Ownership Interest) PAC Loss Allocation (Asset Ownership Interest Kinoort-Midnoint 345kV Line IPC IPC 73.zYo 26.8% Borah-Adelaide Tap (Borah- Adelaide-Midpoint #l 345kV Line) IPC IPC 64.4%35.6% Adelaide-Adelaide Tap (Borah- Adelaide-Midpoint #l 345kV Line) IPC IPC 64.4%35.6% Midpoint-Adelaide Tap (Borah- Adelaide-Midpoint #l 345kV Line) IPC IPC 64.4Yo 35.60/o Borah-Adel aide#2 345kV Line IPC IPC 64.4Yo 35.6% Adelaide-Midooint#2 345kV Line IPC IPC 64-4o/o 3s.6% Midoo nt 5 00/3 45kV Transf'ormer PAC IPC 63.7%36.3o/o Midpo nt-Hemineway 500kV Line PAC IPC 37.OYo 63.0Yo Hemingway-Summer Lake 500kV Line PAC PAC 22.OYo 78.0o/o American Falls-Arbon Valley (American Falls-Malad l38kV Line)PAC IPC 3.6%96.4% Hurricane-Walla Walla 230kV L ne PAC PAC 40-8o/o 59.zYo JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT G Page | 146 Goshen 345/1 6 I kV Transforme# I PAC PAC 5.6%94.4% Goshen 3 45 / I 6lkV Transforme#2 PAC PAC 5.6%94.4% Goshen-Haven Tap (Goshen- Antelope l6lkV Line)PAC PAC 2l.9Yo 78.1o/o Antelope 230/ I 61kV Transformer PAC PAC 26.8o/o 73.2% Antelope I 6 l/l 38kV Transforme# I PAC PAC 66.7v,33.3o/o Antelope I 6 I /l 38kV Transforme#2 PAC PAC 66.7%33.3% Antelone-Scoville#1 l38kV Line PAC PAC ll.5Yo 88.s% Antelope-Scoville#2 I 38kV Line PAC PAC tl.sv,88.5% Goshen-Jefferson I 6 lkV Line PAC PAC 37.8%62.z%o Jefferson-Bis Grassy l6lkV Line PAC PAC 37.8%62.2o/o Jefferson l6lkV Phase Shifting Transformer PAC PAC 37.80h 62.2% Bridger-Three Mile Knoll 345kV Line PAC PAC 29.2%708% Goshen-Three Mile Knoll 345kV Line PAC PAC 29.2o/o 70.8Y" Bridser-Ponulus# I 345kV L ne PAC PAC 29.2%70.8% Bridser-Pooulus#2 345kV L ne PAC PAC 29.2%70.8% Populus-Bo rah# I 3 4 5kV Line PAC PAC 29.2%70.8% Pooulus-Kinoort 345kV Line PAC PAC 29.2Yo 70.8% Goshen-Kinoort 345kV Line PAC PAC l8.3Yo 8l.7Yo Jim Bridger Generator Main Step-up Transformer Losses: Losses on the Jim Bridger generator main step-up transformers shall be allocated each hour between Idaho Power and PacifiCorp based on each Party's pro rata share of Jim Bridger project net generation for such hour. The calculation of such losses shall be in accordance with the following: l) Jim Bridger #l generator main step-up transformer loss : ((Jim Bridger #l generation)2 x (4.4 x lO-6;; + 0.3 MWh 2) Jim Bridger #2 generator main step-up transformer loss: ((Jim Bridger #2 generation)2 x (4.4 x tO-!; + 0.3 MWh 3) Jim Bridger #3 generator main step-up transformer loss : ((Jim Bridger #3 generation)2 x (4.4 x 10-61; + 0.3 MWh JOINT OWNERSHIP AND OPERATING AGREEMENT - EXHIBIT G Pagel 147 4) Jim Bridger #4 generator main step-up transformer loss = ((Jim Bridg er #4 generation)2 x (4.4 x I O-6;; + 0.3 MWh Jim Bridger main step-up transformer loss : Jim Bridger # I step-up transformer loss + Jim Bridger #2 step-up transformer loss * Jim Bridger #3 step-up transformer loss * Jim Bridger #4 step-up transformer loss. Idaho Power's share of Jim Bridger main step-up transformer losses shall be physically returned to PacifiCorp. Such losses shall be scheduled to PacifiCorp 168 hours after the hour in which such obligation for losses was incurred. JOINT OWNERSHIP AND OPERATING AGREEMENT-EXHIBIT G Page | 148 SCHEDULE 13.1(0 Idaho Power Governmental Authorizations Federal Power Act, Section 203 Approval Federal Power Act, Section 205 Approval Approval of the transaction by the ldaho Public Utilities Commission Approval of the transaction by the Oregon Fublic Utility Commission l. 2. 3. 4. EXECUTION VERSION JOrNT OWNERSHTP AND OPERATTNG AGREEMENT- SCHEDULE t3.l(0 Page | 149 EXECUTION VERSION SCHEDULE t3.2(f) PacifiCorp Govemmental Authorizations l. Federal Power Act, Section 203 Approval 2. Federal Power Act, Section 205 Approval 3. Approval of the transaction by the California Public Utilities Commission 4. Approval of the transaction by the Idaho Public Utilities Commission 5. Approval of the transaction by the Oregon Public Utility Commission 6. Approval of the transaction by the Utah Public Service Commission 7. Approval of the transaction by the Washington Utilities and Transportation Commission 8. Approval of the transaction by the Wyoming Public Service Commission JOrNT OWNERSHTP AND OPERATTNG AGREEMENT - SCHEDULE 13.2(f)Page | 150 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NOS. !PC-E-1441 and PAG-E-14-11 ATTACHMENT 3 THIS ATTACHMENT IS CONFIDENTIAL AND WILL BE PROVIDED TO THOSE PARTIES THAT HAVE SIGNED THE PROTECTIVE AGREEMENT IN THIS MATTER CERTIFICATE OF ATTORNEY ASSERTION THAT MATERIALS REQUESTED AND PROVIDED DURING THE COURSE OF AN IDAHO PUBLIC UTILITIES COMMISSION PROCEEDING ARE PROTECTED FROM PUBLIC INSPECTION Case Nos. IPC-E-1441 and PAC-E-14-11 The undersigned attorney, in accordance with RP 67, believes that portions of pages 11-15 of and Attachment 3 to ldaho Power Company's Order No. 33313 Compliance Filing and Request for Verification of Regulatory Accounting contain information that ldaho Power Company claims is a trade secret as described in ldaho Code S 74-101, et seg., and S 48-801, ef seg., and as such are exempt from public inspection, examination, or copying. DATED this 19th day of February 2016. Attorney for ldaho Power Company