BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF IDAHO POWER )CASE NO.IPC-E-15-24
COMPANY’S APPLICATION TO )
APPROVE OR REJECT ITS ENERGY )NOTICE OF APPLICATION
SALES AGREEMENT WITH NORTH )
GOODING MAIN HYDRO LLC FOR THE )NOTICE OF
SALE AND PURCHASE OF ELECTRIC )MODIFIED PROCEDURE
ENERGY )
________________________
)ORDER NO.33382
On September 8,2015.Idaho Power Company filed an Application asking the
Commission to accept or reject its Energy Sales Agreement (ESA)with North Gooding Main
Flydro LLC.The ESA is for the sale and purchase of electric energy generated by the North
Gooding Main Hydro Project,a “qualifying facility”as defined under the Public Utility
Regulatory Policies Act (PURPA),located near Gooding,Idaho.Idaho Power asks that its
Application be processed by Modified Procedure.
NOTICE OF APPLICATION
YOU ARE HEREBY NOTIFIED that on July 29,2015,Idaho Power entered into its
FSA with North Gooding —subject to this Commission’s approval —pursuant to the terms and
conditions of various Commission Orders and PURPA.Application at 3.Under PURPA,
electric utilities such as Idaho Power must purchase electric energy from qualifying facilities
(QFs)at rates approved by this Commission.16 U.S.C.§824a-3;Idaho Power Company v.
Idaho PUC.155 Idaho 780,789,316 P.3d 1278,1287 (2013),citing FERC v.Mississippi,456
U.S.742,751 (1982).The purchase or “avoided cost”rate must be “just and reasonable to the
electric consumers ...and in the public interest”and “shall not discriminate against [QFs].”16
U.S.C.§824a-3(b);18 C.F.R.§292.304.
YOU ARE FURTHER NOTIFIED that North Gooding’s facility is a seasonal hydro
project.Application at 3.Under the terms of the ESA,North Gooding elected to contract with
Idaho Power for a 20-year term using the levelized published avoided cost rates1 as currently
The Commission uses the Surrogate Avoided Resource (SAR)methodology to calculate and publish rates for QFs
with a design capacity up to a prescribed eligibility cap.See Order No.32697 at 7-8.For QFs using non-wind,non-
solar resource-types —such as hydro —the published rate eligibility cap is 10 average megawatts (aMW).Id
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33382
established by Commission Order No.33305 for energy deliveries less than 10 average
megawatts (aMW).Ic[
YOU ARE FURTHER NOTIFIED that the nameplate rating of North Gooding’s
facility is 1 .3 megawatts (MW).Id.at 4.According to Idaho Power’s Application,North
Gooding will be required to provide data on the facility that Idaho Power will use to confirm that
under normal or average conditions,the facility will not exceed 10 aMW on a monthly basis.Id.
YOU ARE FURTHER NOTIFIED that North Gooding has selected April 1,2017,as
the Scheduled Operation Date.Id.The ESA contains various requirements that North Gooding
must satisfy in order for Idaho Power to accept energy deliveries from the facility.Id.Idaho
Power will monitor all ongoing requirements through the full term of the ESA.Id.
YOU ARE FURTHER NOTIFIED that,under the ESA,all interconnection charges
and monthly operational or maintenance charges under Schedule 72 will be assessed to North
Gooding.Id.Before the facility xviii deliver any energy to Idaho Power,all requirements of the
Schedule 72 Generator Interconnection Agreement (GIA)must be complete,and the facility
must be designated as a network resource (DN.R)to serve Idaho Power’s retail load on its
system.Id.at 4-5.In its Application,Idaho Power states that a GIA is expected to be signed by
May 1,2016.Id.at 5.
YOU ARE FURTHER NOTIFIED that,by its own terms,the ESA will not become
effective until the Commission has approved all of its terms and conditions and declared that all
payments made by Idaho Power to North Gooding for purchases of energy will be allowed as
prudently incurred expenses for ratemaking purposes.Id.
YOU ARE FURTHER NOTIFIED that the Application and a copy of the ESA have
been filed with the Commission and are available for public inspection during regular business
hours at the Commission offices.The Application and attachments are also available on the
Commission’s web site at v.puc.idaho.gov.Click on the “File Room”tab at the top of the
page,scroll down to “Open Electric Cases,”and then click on the case number as shown on the
front of this document.
NOTICE OF MODIFIED PROCEDURE
YOU ARE FURTHER NOTIFIED that the Commission has determined that the
public interest may not require a formal hearing in this matter and will proceed under Nodified
Procedure pursuant to Rules 201 through 204 of the Idaho Public Utilities Commission’s Rules
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33382 2
of Procedure,IDAPA 31.01.01.201-204.The Commission notes that Modified Procedure and
written comments have proven to be an effective means for obtaining public input and
participation.
YOU ARE FURTHER NOTIFIED that any person desiring to state a position on this
Application may file a written comment in support or in opposition with the Commission within
twenty-one (21)days from the date of this Notice and Order.The comment must contain a
statement of reasons supporting the comment.Persons desiring a hearing must specifically
request a hearing in their written comments.Written comments concerning this Application may
be mailed to the Commission and Idaho Power at the addresses reflected below:
Commission Secretary Donovan E.Walker
Idaho Public Utilities Commission Lead Counsel
P0 Box 83720 Idaho Power Company
Boise,ID 83720-0074 P0 Box 70
Boise,ID 83707-0070
Street Address for Express Mail:E-mail:dwalker@idahopower.com
dockets@idahopower.com
472 W.Washington Street
Boise,ID 83702-59 18 Randy C.Allphin
Energy Contract Administrator
Idaho Power Company
P0 Box 70
Boise,ID 83 707-0070
E-mail:rallphin@idahopower.com
These comments should contain the case caption and case number shown on the first page of this
document.Persons desiring to submit comments via e-mail may do so by accessing the
Commission’s home page located at icjiho,ov.Click the “Case Comment or Question
Form”under the “Consumers”tab,and complete the form using the case number as it appears on
the front of this document.These comments must also be sent to the Company at the e-mail
addresses listed above.
YOU ARE FURTHER NOTIFIED that the Company shall file reply comments,if
necessary,no later than one week from the comment deadline.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are
received within the time limit set,the Commission will consider this matter on its merits and
enter its Order without a formal hearing.If written comments are received within the time limit
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33382 3
set,the Commission will consider them and,in its discretion,may set the same for formal
hearing.
YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held
pursuant to the Commission’s jurisdiction under Title 61 of the Idaho Code.The Commission
has authority under PURPA and the implementing regulations of the Federal Energy Regulatory
Commission (FERC)to set avoided costs,to order electric utilities to enter into fixed-term
obligations for the purchase of energy from qualified facilities and to implement FERC rules.
The Commission may enter any final Order consistent with its authority under Title 61 and
PURPA.
YOU ARE FURTHER NOTIFIED that all proceedings in this matter will be
conducted pursuant to the Commission’s Rules of Procedure,IDAPA 31.01.01.000,et seq.
ORDER
IT IS HEREBY ORDERED that this case be processed under Modified Procedure.
Interested persons and the parties may file written comments no later than 21 days from the date
of this Order.The Company may file a reply,if necessary,no later than one week from the
comment deadline.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33382 4
DONE by Order of the Idaho Public Utilities Commission at Boise,Idaho this
day of September 2015.
4ESIDENPAMKJEL-
MARSHA H.SMITH,COMMISSIONER
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33382
/A
KRFg1hNE RAPER,COMMISSIONER
ATTEST:
mmission Secretary
O:IPC-E-1 5-24djh
5