HomeMy WebLinkAbout20150924press release.pdf
Case No. IPC-E-15-18, Order No. 33383
Contact: Gene Fadness (208) 334-0339, 890-2712
www.puc.idaho.gov
PUC says Wood River solar projects
must identify owner or owners
BOISE (Sept. 24, 2015) – State regulators are denying an Idaho Power Company petition to
declare that solar projects proposed in the Wood River Valley are actually one, large project
that has been divided into 10 smaller projects in order to qualify for more attractive contract
terms.
The Idaho Public Utilities Commission did not rule on Idaho Power’s claim regarding the
disaggregation of the projects, but denied Idaho Power’s request because the project or
projects do not identify an owner, which is a requirement under the Schedule 73 tariff that
governs projects 100 kilowatts or smaller.
Site Based Energy claims the ten, 100-kilowatt projects are separate, each with a distinct
limited liability corporation (LLC) and distinct owners. Idaho Power claims it is a large 1-
megwatt project with the same developer, John Reuter of Site Based Energy, and that the
project or projects are “all located at the same site, on the same contiguous property, and
divided into ten sections.” Site Based Energy claims the projects have common ownership only
of interconnection equipment and are seeking economies of scale by purchasing and building
together.
The project or projects are seeking sales agreements with Idaho Power under the provisions of
the Public Utility Regulatory Policies Act or PURPA. The federal act requires utilities to buy
output from qualified renewable projects at an “avoided-cost rate,” or the rate the utility
avoids by not having to generate the power itself or buy it from another source.
Intermittent projects (primarily wind and solar) larger than 100 kilowatts must negotiate with
the purchasing utility for a rate, rather than receiving the commission’s published rate. Further,
published rate contracts are for 20 years, while negotiated contracts are for two years.
In an attempt to resolve the impasse, the commission asked Site Based Energy to provide
additional information regarding the owners and copies of the articles or certificates for each
LLC. Site Based provided letters from 10 individuals who wrote they “intend to proceed with
the solar project using a Special Purpose Entity, LLC DBA,” but qualified their intent with, “if the
projects are approved by the PUC.” Nine of the ten proposed owners further conditioned their
intent with the condition “if all the approvals are completed and the economics work out.”
“Site Based did not provide any evidence that these LLCs exist, nor that they existed at the time
the applications were submitted,” the commission said. Idaho statutes state an LLC is created
when a certificate of organization is filed with the secretary of state.
The commission said Idaho Power could have rejected the applications outright because they
did not comply with the requirements of Schedule 73, calling for identification of a project or
projects’ owner. Instead, the utility opted to file a petition seeking a disaggregation finding.
“Having determined that Site Based Energy’s applications do not satisfy Schedule 73, the
commission need not reach the other complex issues presented by the parties,” the
commission said.
The commission’s order and other documents related to this case are available on the
commission’s Website at www.puc.idaho.gov. Click on “Open Cases” under the “Electric”
heading and scroll down to Case No. IPC-E-15-18. Petitions for reconsideration must be filed
with the commission by no later than Oct. 15.
###