HomeMy WebLinkAbout20150626Petition.pdfDONOVAN E. WALKER (lSB No. 5921)
ldaho Power Company
1221West ldaho Street (83702)
P.O. Box 70
Boise, ldaho 83707
Telephone: (208) 388-5317
Facsimile: (208) 388-6936
dwalker@ id ahopower. com
Attorney for ldaho Power Company
IN THE MATTER OF THE PETITION
OF IDAHO POWER COMPANY TO
DETERMINE THE CONTRACT TERM
ELIGIBILIW FOR DISAGGREGATED
1OO I<vV SOLAR PROJECTS.
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
GASE NO. |PC-E-15-18
PETITION TO DETERMINE
CONTRACT TERM ELIGIBILITY
FOR DISAGGREGATED 1OO Kru
SOLAR PROJECTS
ldaho Power Company ("ldaho Powe/' or "Gompany"), in accordance with RP 53,
ldaho Powe/s Schedule 73, and the applicable provisions of the Public Utility
Regulatory Policies Act of 1978 ('PURPA"), hereby respectfully petitions the ldaho
Public Utilities Commission ("Commission") for an order determining that the ten 100
kilowatt ("kW') PURPA solar projects, proposed by Site Based Energy as WRCE 1
through WRCE 10, be subject to the Commission's interim relief approving maximum
contract terms of five years as directed in Order Nos. 33222 and 33253 and further, that
such projects also be subject to the Commission's ultimate determination regarding
PETITION TO DETERMINE CONTRACT TERM ELIGIBILIry
FOR DISAGGREGATED 1OO KA/ SOLAR PROJECTS - 1
maximum contract term in Case No. IPC-E-15-01, which is currently scheduled for
technical hearing on June 29,30, and July 1,2015.
In support of this Petition, ldaho Power represents as follows:
I. INTRODUGTION
On January 30, 2015,ldaho Power filed a petition with the Commission seeking
a reduction of the required contract term for PURPA Qualifying Facility ('QF') contracts
to a maximum of two years for new QF contracts that exceed the published rate
eligibility cap. Case No. IPC-E-15-01, ldaho Powe/s Petition at 1-2. On February 6,
2015, the Commission granted interim relief by reducing the maximum contract term to
five years. Order No. 33222. The Commission then clarified that the five year
maximum contract term applied to projects over the published rate eligibility cap, which
is 100 kW for solar QF projects. Order No. 33253.
II. FACTS
On June 15,2015, ldaho Power received hard copy and electronic submissions
for ten 100 kW PURPA solar QF projects, all from the same developer, John Reuter,
from Site Based Energy. See Attachment Nos. 1 through 10, attached hereto and
incorporated herein by this reference, which contain the Energy Sales Agreement
Applications and materials ("Application" or "Applications") ldaho Power received from
WRCE 1 through 10, respectively. These ten projects are all located at the same site,
on the same contiguous property, and divided into ten sections, as show on the map
attached to each Application. ld. Each Applicatlon appears to be nearly identical,
except for the differing Name of Facility, WRCE 1 through 10, respectively, and the
coresponding GPS coordinates for each project. ld. Each Application requests a
contract term of 20 years. ld., al2.
PETITION TO DETERMINE CONTRACT TERM ELIGIBILITY
FOR DISAGGREGATED 1OO I(A/ SOLAR PROJECTS - 2
Idaho Power acknowledged receipt of said Applications on June 16,2015, and
informed Site Based Energy that the Company would review the Applications with
respect to the requirements of Schedule 73. See Attachment No. 11, attached hereto
and incorporated herein by this reference, which contains a copy of the e-mail
communication from Site Based Energy and ldaho Powe/s response e-mail.
Contemporaneous with the filing of this Petition, ldaho Power sent its response letter to
Site Based Energy, as required within ten business days of receipt of the Schedule 73
application, informing Site Based Energy of this filing. See Attachment No. 12, attached
hereto and incorporated herein by this reference.
III. DISCUSSION
The Commission should direct that the five year maximum contract term
limitation cunently in place for projects over the published rate eligibility cap be
applicable to these ten 100 kW disaggregated solar projects. The Commission
instituted the 100 kW published rate eligibility cap for wind and solar QFs in 2011 in
response to the practice of numerous PURPA wind QF projects disaggregating larger
projects into 10 average megawatt increments in order to gain access to published
avoided cost rates, as opposed to the negotiated avoided cost rate methodology
applicable to proposed QF projects over the eligibility cap. Order Nos. 32176 and
32262.
Here, Site Based Energy has specifically designed and proposed its project-
disaggregated into 100 kW increments-in an attempt to avoid application of the
Commission's interim order limiting the maximum contract term to five years. This is
exactly the same kind of manipulation of the Commission's rules-designed to
circumvent the application of the Commission's orders and implementation of PURPA-
PETITION TO DETERMINE CONTRACT TERM ELIGIBILITY
FOR DISAGGREGATED 1OO 1(A/ SOLAR PROJECTS.3
that the Commission determined to prevent in Case Nos. GNR-E-10-04 and
GNR-E-11-01, as well as the previously cited Order Nos. 32176 and32262. There is no
other explanation for the strained and manipulated configuration of the proposed ten
100 kW projects other than to obtain published rate, 20-year contracts. The projects are
all located at the same site and are depicted as being on one contiguous, rectangular
piece of land--divided into ten pieces. See map of proposed project attached to each
Application, Exhibit Nos. 1 through 10. Each Application requests a contract term of 20
years, requests published avoided cost rates, and states, "The facility will be owned by
a separate owner than all other facilities within 1 mile, including other facilities at the
same site." Exhibit Nos. 1 through 10, Applications at 2. However, ldaho Power has
not been provided with any evidence of separate ownership, nor was ldaho Power able
to confirm that the proposed entities are registered with the ldaho Secretary of State.
This is a direct attempt at manipulating the Commission's cunent rulings and orders by
a proposed QF project to the detriment of ldaho Power customers and should not be
permitted by the Commission.
IV. CONCLUSION AND REQUEST FOR RELIEF
A proposed solar QF project over 100 kW is only eligible for a contract with a
maximum contract term of five years. Site Based Energy's proposed ten 100 kW
projects are specifically disaggregated into 100 kW increments using a common design
scheme and nomenclature in an attempt to manipulate the Commission's rulings to
inappropriately gain access to 2O-year contracts. The practice of disaggregating
projects in order to manipulate the Commission's rules has been rejected and
disapproved by the Commission in the past. ldaho Power asks that the Commission
direct its interim relief, maximum contract term of five years, as well as any
PETITION TO DETERMINE CONTRACT TERM ELIG]BILITY
FOR DISAGGREGATED 1OO I(vV SOLAR PROJECTS - 4
determination as to the maximum contract term resulting from Case No. IPC-E-15-01,
be applicable to the ten 100 kW projects identified as WRCE 1 through 10 proposed by
Site Based Energy.
Respectfully submitted this 26h day of June 2015.
PETITION TO DETERMINE CONTRACT TERM ELIGIBILIW
FOR DISAGGREGATED 1OO ](W SOLAR PROJECTS - 5
Attomey for ldaho Power Company
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on the 26th day of June 2015 I served a true and
conect copy of the within and foregoing PETITION TO DETERMINE CONTRACT
TERM ELIGIBILITY FOR DISAGGREGATED 100 l(VV SOLAR PROJECTS upon the
following named parties by the method indicated below, and addressed to the following:
Gommission Staff
Donald L. Howe!!, !l
Daphne Huang
Deputy Attomeys General
ldaho Public Utilities Commission
472 West Washington (83702)
P.O. Box 83720
Boise, ldaho 83720-007 4
John Reuter
Site Based Energy
21 Comet Lane
P.O. Box 3432
Hailey, ldaho 83333
X Hand Delivered
_U.S. Mai!
Ovemight Mail
FAXX Email don.howell@puc.idaho.oov
daohne. huanq@puc. idaho.oov
Hand Delivered
U.S. Mail
Overnight Mail
FAXX Email John@sitebasedenerqv.com(
PETITION TO DETERMINE CONTRACT TERM ELIGIBILITY
FOR DISAGGREGATED lOO I(vV SOLAR PROJECTS - 6
BEFORE THE
IDAHO PUBLIC UTILITIES GOMMISSION
cAsE NO. IPG-E-I5-18
IDAHO POWER COMPANY
ATTACHMENT 1
IDAHO POWER COMPANY
COGENERATION AND SMALL POWER PRODUCTION
QUALIFYING FACILITY ENERGY SALES AGREEMENT APPLICATION
ldaho Power Qualifying Facility (QF) contact information:
Mailing Address: Attn: Energy Contracts, P O Box 70 Boise, lD 83702
Physical Address: L22LW.ldaho Street, Boise, lD 83703
Telephone number: 208-388-6070
E-Mail Address: xxxxx@idahopower.com
Preamble and lnstructions
All generation facilities that qualify pursuant to ldaho Power Company Schedule 73 for a QF
Energy Sales Agreement and wish to sell energy from there facility to ldaho Power must
complete the following information and submit this Application by hand delivery, mail or E-mail
to ldaho Power.
Upon receipt of a complete Application, ldaho Power shall process this request for a QF Energy
Sales Agreement pursuant to ldaho Power Company Schedule 73.
Qualifying Facility I nformation
Proposed Proiect
Name of Facility: WRCE 1
Resource Type: (i.e. wind, solor, hydro, etcl: Solar PV
Facility Location: GPS Coordinates: 43"23'52.06"N; 114"15'37.48"W
Nearest City or landmark: Bellevue
County and State: Blaine CounW. lD
Map of Facility, including proposed interconnection point.
See Attached
Anticipated commencement date of energy deliveries to ldaho Power: 3|3L/2OL6
Facility Nameplate Capacity Rating (kW): 100.00 (AC)
Qualifying Facility lnformation (continued)
rage t oi3
ldaho Power Company Energy Sales Agreement Application
Facility Maximum Output Capacity (kW):
Station Service Requirements (kW):
Facility Net Delivery to ldaho Power (kW):
Facility interconnection status:
100.00 (Ac)
1(AC)
100.00 (Ac)
Not Started
Proposed Contracting Term (cannot exceed 20 yeors): 20 years
Requested Rate Option (detoils provided in Schedule 73): Avoided Cost Rate
schedule for Solar PV for Eligible Proiects under 100kW.
Does the Facility have the ability to respond to dispatch orders from ldaho Power
Company (Yes or No): Yes
Please include the following attachments:
/ Hourly estimated energy deliveries (kW) to ldaho Power for every hour of a
one year period.. See Attached
/ List of acquired and outstanding Qualifying Facility permits, including a
description of the status and timeline for acquisition of any outstanding
permits.. At the minimum a FERC issued QF certificate is required and/or
evidence that Facility will be able to obtain a Qualifying Facility
certificate.. The proiect is a Small Power Production Facility as defined bv
18.C.F.R. 292.203 and is exempt from filing requirements pursuant
to 18.C.F.R. 292.203.d.1. The facility will be owned bv a separate
owner than all other facilities within 1 mile, including other facilities
at the same site.
r' lf the Facility will require fuel be transported to the Facility (i.e. natural gas
pipelines, railroad transportation, etc), evidence of ability to obtain sufficient
transportation rights to operate the Facility at the stated Maximum Output
Amount.
. N/A
,/ lf the Facility will not be interconnecting directly to the ldaho Power
electrical system, evidence that the Facility will be able to- interconnect to
Page 2 of 3
ldaho Power Company Energy Sales Agreement Application
-:norher utilitt's electrical system and evidence that the Facility will be able
:o obtain firm transmission rights over all required transmission providers to
:eliver the Facility's energy to ldaho Power at a point acceptable to ldaho
Power -
I Nln
owner lniormation
Owner / Cornpany Narne: WRCE 1 LLC
Contact Person: John Reuter
Address: PO Box 3432
City:
Telephone:
E-mail:
Hailev State: ldaho Zip:83333
(2081727-2922
Joh n @siteoaseoenergv.colT
Applicant Signature
I hereby certify that, to of my knowledge, all information provided in this Qualifuing
Facility Energy Sales is true and corr::-
John Reuter'
Print Name tl
€lttlrftte'l
|.ara€ tr - -
ldaho Power Company Energv Sales Agreement Aoolicaror
....', ..{
it
a.{
f\.
; s".,=. .- t'i'
:,;
''
Ija. I. rlr#'
';'
I
rO
=
OO
o,.';. O..r1, _OI i..
Fa#14t. &:,, ",,,,' C)#.ffr itrffiffi
"j*:.€-i/-- PA:O
.eibr: .,.'Biii.*s+i1,, ,,, =* ui-ffir'1.. c)
,i #,.*_ t lfo H
*
r ci '-':
rri,.- ..." -' . ....',..ror'
,o
ri-.
tO
rol
.rf,1......,.
Ci'
N
ri
O
o
o_
O
ta -t
C!['|i
J-,r,j, :c r-
IxQxc-c.l.^ -' f,
t)*v=-!- -di
--=
:616lO\ri(-.l m!'n -rtrn-Gloot
$-
zo
F
UUJ
UJJ
LUUd
=
olEiEiol
o
=l
ol!loool
o€Eoooatt
6l!id
=i<l
=l
oEI
=l-l
otr
i=ool't
t!o
.9Eoo
o
too
!-
agt
3Eo
Etr
.sr!
)o
=g|
'6
6folo
N-CIJtgo
o
3
=oE'Io(,
6
G
o
ci
tr
.o
.ELotroo
->L
=o
!to+a(E
E
fo
UJ
floooLo-
ru:)o-
T'ooo
CLoLo-
Lo
=oo.
o-cGE
:E
o
o
tii,qiE 5EeESt -c ?'--EO<=gE E *UiEF5EZ a:, ca
EEEEEt6Etro-L{ro=o,. o o =o.<a4<
BEFORE THE
IDAHO PUBLIG UTILITIES GOMMISSION
cAsE NO. IPC-E-{5-19
IDAHO POWER GOMPANY
ATTAGHMENT 2
IDAHO POWER COMPANY
COGENERATION AND SMATL POWER PRODUCTION
QUALIFYING FACILITY ENERGY SALES AGREEMENT APPLICATION
ldaho Power Qualifying Facility (QF) contact information:
Mailing Address: Attn: Energy Contracts, P O Box 70 Boise, lD 83702
PhysicalAddress: t22LW.ldaho Street, Boise, lD 83703
Telephone number: 208-388-6070
E-Mail Address: xxxxx@idahopower.com
Preamble and lnstructions
All generation facilities that qualify pursuant to ldaho Power Company Schedule 73 for a QF
Energy Sales Agreement and wish to sell energy from there facility to ldaho Power must
complete the following information and submit this Application by hand delivery, mail or E-mail
to ldaho Power.
Upon receipt of a complete Application, ldaho Power shall process this request for a QF Energy
Sales Agreement pursuant to ldaho Power Company Schedule 73.
Qualifying Facility !nformation
Proposed Proiect
Name of Facility: WRCE 2
Resource Type: (r.e. wind, solor, hydro, etc/: Solar PV
Facility Location: GPS Coordinates: 43"23'52.05"N; 114"15'35.45"W
Nearest City or landmark: Bellevue
County and State: Blaine County, lD
Map of Facility, including proposed interconnection point.
See Attached
Anticipated commencement date of energy deliveries to ldaho Power: 3/3L/2OL6
Facility Nameplate Capacity Rating (kW): 100.00 (AC)
Qualifying Facility lnformation (continued )
Page I of3
ldaho Power Company Energy Sales Agreement Application
Facility Maximum Output Capacity (kW):
Station Service Requirements (kW) :
Facility Net Delivery to ldaho Power (kW):
Facility interconnection status:
100.00 (Ac)
1(Ac)
100.00 (Ac)
Not Started
Proposed Contracting ferm (cannot exceed 20 years): 20 years
Requested Rate Option (detoils provided in Schedule 73): Avoided Cost Rate
schedule for Solar PV for Eligible Proiects under 100kW.
Does the Facility have the ability to respond to dispatch orders from ldaho Power
Company (Yes or No):Yes
Please include the following attachments:
/ Hourly estimated energy deliveries (kW) to ldaho Power for every hour of a
one year period.. See Attached
/ List of acquired and outstanding Qualifying Facility permits, including a
description of the status and timeline for acquisition of any outstanding
permits.. At the minimum a FERC issued QF certificate is required and/or
evidence that Facility will be able to obtain a Qualifying Facility
certificate.. The proiect is a Small Power Production Facility as defined by
18.C.F.R. 292.203 and is exempt from filing requirements pursuant
to 18.C.F.R. 292.203.d.1. The facilitv will be owned by a separate
owner than all other facilities within 1 mile, including other facilities
at the same site.
/ lf the Facility will require fuel be transported to the Facility (i.e. natural gas
pipelines, railroad transportation, etc), evidence of ability to obtain sufficient
transportation rights to operate the Facility at the stated Maximum Output
Amount.
. N/A
/ lf the Facility will not be interconnecting directly to the ldaho Power
electrica! 1_ysteml evidence that the FacflilV will be able to intelconnect to
Page 2 of 3
ldaho Power Company Energy Sales Agreement Application
another utility's electrical system and evidence that the Facility will be able
to obtain firm transmission rights over all required transmission providers to
deliver the Facility's energy to ldaho Power at a point acceptable to ldaho
Power.. N/A
Owner lnformation
Owner/ Company Name: WRCE 2 LLC
Contact Person: John Reuter
Address:
City:
Telephone:
E-mail:
PO Box 3432
Hailev State: ldaho Zip:83333
(208t.72L-2922
John @sitebasedenergv.com
Applicant Signature
I hereby certify that, to the best of my knowledge, all information provided in this Qualifying
Facility Energy Sales application is true and correct.
Signaturetl
Print Name
Page 3 of3
ldaho Power Compaoy Energy Sales Agreement Application
+ d, tf,
.-. fC 1t-xa:co*N
O:Cv=-II - C\.1-r
z?: (rlr.r o\e";c.{ rr}:n -rl
r{oot
l--
ZaF
UoJ
UJJ
LUUd
=
<ru
O
=-:<OO
9,.j;;
I
t - l!
OInl
E1olo!olor
o
Eoo:
!,c(E
o
E
'6
Jo
=
slLo5R9
d-coIEo
o
3
=
o
Lo
=oo.
o
oT'
xc1+N
od
o
o
ct
UId.
=
:x
o
o
tiA;P
=i! (lsatt
E.e E 3g=2=-go<=it t !E!--oo::::,9ZCEA
=-EEOIHii,EiTE6EEo^L(ro,o., o o =EVL!-A<4G<
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
GASE NO. IPC.E.15.18
IDAHO POWER COMPANY
ATTAGHMENT 3
IDAHO POWER COMPANY
COGENERATION AND SMALL POWER PRODUCTION
QUALIFYING FACILITY ENERGY SALES AGREEMENT APPLICATION
ldaho Power Qualifying Facility (QF) contact information:
Mailing Address: Attn: Energy Contracts, P O Box 70 Boise, lD 83702
PhysicalAddress: L22LW.ldaho Street, Boise, lD 83703
Telephone number: 208-388-5070
E-Mail Address: xxxxx@idahopower.com
Preamble and lnstructions
All generation facilities that qualify pursuant to ldaho Power Company Schedule 73 for a QF
Energy Sales Agreement and wish to sell energy from there facility to ldaho Power must
complete the following information and submit this Application by hand delivery, mail or E-mail
to ldaho Power.
Upon receipt of a complete Application, ldaho Power shall process this request for a QF Energy
Sales Agreement pursuant to ldaho Power Company Schedule 73.
Qualifying Facility lnformation
Proposed Proiect
Name of Facility: WRCE 3
Resource Type: (i.e. wind, solar, hydro, etc/: Solar PV
Facility Location: GPS Coordinates: 43"23'52.06"N; 114"15'35.37"W
Nearest City or landmark: Bellevue
County and State: Blaine CounW, lD
Map of Facility, including proposed interconnection point.
See Attached
Anticipated commencement date of energy deliveries to ldaho Power: 3/3U2OLG
Facility Nameplate Capacity Rating (kW): 100.00 (AC)
Qualifying Facility lnformation (contin ued )
Page I of3
ldaho Power Company Energy Sales Agreement Application
Facility Maximum Output Capacity (kW):
Station Service Requirements (kW):
Facility Net Delivery to ldaho Power (kW):
Facility interconnection status:
100.00 (Ac)
1(AC)
100.00 (Ac)
Not Started
Proposed Contracting Term (cannot exceed 20 years): 20 years
Requested Rate Option (detoils provided in Schedule 73): Avoided Cost Rate
schedule for Solar PV for Elieible Proiects under 100kW.
Does the Facility have the ability to respond to dispatch orders from ldaho Power
Company (Yes or No): Yes
Please include the following attachments:
r' Hourly estimated energy deliveries (kW) to ldaho Power for every hour of a
one year period.. See Attached
./ List of acquired and outstanding Qualifying Facility permits, including a
description of the status and timeline for acquisition of any outstanding
permits.. At the minimum a FERC issued QF certificate is required and/or
evidence that Facility will be able to obtain a Qualifying Facility
certificate.. The proiect is a Small Power Production FaciliW as defined by
18.C.F.R. 292.203 and is exempt from filing requirements pursuant
to 18.C.F.R. 292.203.d.1. The facility will be owned bv a separate
owner than all other facilities within 1 mile. including other facilities
at the same site.
/ lf the Facility will require fuel be transported to the Facility (i.e. natural gas
pipelines, railroad transportation, etc), evidence of ability to obtain sufficient
transportation rights to operate the Facility at the stated Maximum Output
Amount.
. N/A
r' lf the Facility will not be interconnecting directly to the ldaho Power
electrical system, evidence that the Facility will be able to interconnect to
Page 2 of 3
ldaho Power Company Energy Sales Agreement Application
another utility's electrical system and evidence that the Facility will be able
to obtain firm transmission rights over all required transmission providers to
deliver the Facility's energy to ldaho Power at a point acceptable to ldaho
Power.. N/A
Owner lnformation
Owner / Company Name: WRCE 3 LLC
Contact Person: John Reuter
Address:
City:
Telephone:
E-mail:
PO Box 3432
Hailev State: ldaho Zip:83333
(208172L-2922
John @sitebasedenergv.com
Applicant Signature
I hereby certify that, to the best of my knowledge, all information provided in this Qualifying
Facility Energy Sales appl and correct.
Page 3 of3
ldaho Power Company Energy Sales Agreement Application
J-,r,j, :c r-
xiJlcc-c.l
Dxv=-o- -i(
UUJ
>-l6l
ii<trlai
L=
= (rl.\lo\r;(\l rn:rt -.4
6loot
t-
zaF
Uo)
UJJ
LUUd.
=
<%
f.{$f
a*
li
:i:ir'Xi
ta
i
*L "
O
=YOO
C)
_o
=-CO
G
C)
a
C).ta
Oo
o
o_
O
ro
$
(l,
$tk, .\*
t
't
oltiti6lolola1
E1Eol>Io!
=)
o1!loioloi
o,
E
oo
!,
aso
E
.E
o
=
o)
(ntR9
N-CoGo
o
3
=
xc?slN
6
a
od
C;
c
.o
(ELotro(,
.>L
o
E.oOisBtrr'EO LlJ.EriU€.4=o'
E
f;u:fo.Itc,oo
CLoLo.;:.a
oIr!
Ea6P
=i! O549EeEE
t c E:-qo<:B*; -E..EiEr€,r!::E,EZ.=EPEESEEEE'TEEo^Lo{J=o,. o o =LVLLL4<44<
BEFORE THE
IDAHO PUBLIC UTILITIES GOMMISSION
GASE NO. IPC-E-15-19
IDAHO POWER COMPANY
ATTACHMENT 4
IDAHO POWER COMPANY
COGENERATION AND SMATL POWER PRODUCTION
QUALIFYING FACILITY ENERGY SALES AGREEMENT APPLICATION
ldaho Power Qualifying Facility (QF) contact information:
Mailing Address: Attn: Energy Contracts, P O Box 70 Boise, lD 83702
Physical Address: t22tW.ldaho Street, Boise, lD 83703
Telephone number: 208-388-5070
E-Mail Address: xxxxx@idahopower.com
Preamble and lnstructions
Al! generation facilities that qualify pursuant to ldaho Power Company Schedule 73 for a QF
Energy Sales Agreement and wish to sell energy from there facility to ldaho Power must
complete the following information and submit this Application by hand delivery, mail or E-mail
to ldaho Power.
Upon receipt of a complete Application, ldaho Power shall process this request for a QF Energy
Sales Agreement pursuant to ldaho Power Company Schedule 73.
Qualifying Facility lnformation
Proposed Proiect
Name of Facility: WRCE 4
Resource Type: (r.e. wind, solor, hydro, etcl: Solar PV
Facility Location: GPS Coordinates: 43"23'52.06"N; 114"15'34.30"W
Nearest City or landmark: Bellevue
County and State: Blaine Countv, lD
Map of Facility, including proposed interconnection point.
See Attached
Anticipated commencement date of energy deliveries to ldaho Power: 3l3LlzOLG
Facility Nameplate Capacity Rating (kW):
Qualifying Facility lnformation (continued)
100.00 (Ac)
Page I of3
ldaho Power Company Energy Sales Agreement Application
Facility Maximum Output Capacity (kW):
Station Service Requirements (kW):
Facility Net Delivery to ldaho Power (kW):
Facility interconnection status:
1oo.oo (Ac)
1(AC)
100.00 (Ac)
Not Started
Proposed Contracting Term (cannot exceed 20 years): 20 years
Requested Rate Option (details provided in Schedule 73): Avoided Cost Rate
schedule for Solar PV for Eligible Proiects under 100kW.
Does the Facility have the ability to respond to dispatch orders from ldaho Power
Company (Yes or No): Yes
Please include the following attachments:
'/ Hourly estimated energy deliveries (kW) to ldaho Power for every hour of a
one year period.. See Attached
List of acquired and outstanding Qualifying Facility permits, including a
description of the status and timeline for acquisition of any outstanding
permits.. At the minimum a FERC issued QF certificate is required and/or
evidence that Facility will be able to obtain a Qualifying Facility
certificate.. The proiect is a Small Power Production Facility as defined by
18.C.F.R. 292.203 and is exempt from filing requirements pursuant
to 18.C.F.R. 292.203.d.1. The facilitv will be owned bv a separate
owner than all other facilities within 1 mile. including other facilities
at the same site.
lf the Facility will require fuel be transported to the Facility (i.e. natural gas
pipelines, railroad transportation, etc), evidence of ability to obtain sufficient
transportation rights to operate the Facility at the stated Maximum Output
Amount.
. N/A
lf the Facility will not be interconnecting directly to the ldaho Power
electrical.systemf evidence that lhe Facility will be able to interconnect to
Page 2 of 3
ldaho Power Company Energy Sales Agreement Application
another utility's electrical system and evidence that the Facility will be able. to obtain firm transmission rights over all required transmission providers to
deliver the Facility's energy to ldaho Power at a point acceptable to ldaho
Power.. N/A
Owner lnformation
Owner / Company Name: WRCE 4 LLC
Contact Person: John Reuter
Address:
City:
Telephone:
E-mail:
PO Box 343?
Hailev State: ldaho Zip:83333
(208172L-2922
John @sitebasedenergy.com
Applicant Signature
I hereby certify that, to the best of my knowledge, all information provided in this Qualifuing
Facility Energy Sales ,rW" and correct.
- ,'r'.1
signature
Page 3 of3
ldaho Power Company Energy Sales Agreement Application
i@iatffie&a+lsY66€ts}e{q,e.8fltr *a*hq
,'&.i&3€4nffi.#:: F
'. "t "1 "
O
=YOO
c)
-o
=.C
O6o
ao.=a
OOol-
o_
O
- Ld. ITL- ",,..s t- *
fk
%,''ffi"
%
,uqo..jr "'&".*
.- c.,-s3gU f-, rn". rl, co r*xnoo' OHC.I_ Ea >,9ooo:Y=O'lJ- 6a{
ffi
*
#)
K;f
-=3(\1c.l O\r';t\.l r.rr!n inaa-({oottY) -$-
zIL
UoJ
J-ts;dd
,il ,i-i
HHdc!
sg!r 46l nl
ltI
3Hol U
UJJ
UJUd
=
=l?f
?f?)
aoqo
-=?-
aoqo
cc?-
aoqo
oqo
oD?-
NN?
oNqo
tsNqo
oN2f
Nqo
DN?3
NNqo
ooqo
ooqo
ooqo
f=?f
5D?l
c=?l
cf?c
ca?-
fq3
Dl?D
aoqo
aoqo
aoq,o
c-
d
aoqo
oqo
DN?=c
$oe;
oqa
3+tD
@sq +?3
tsqo ao
ooqo
ff?3
f?f
c5?D
=?j
ooqo
=D?D
oaqo
aaq =3?c
oaqo
)
=f
aqo
oqa
,
?a
o
5j
@eqo
N@qo
oo?5
@qo
o?-
N6qo
oa-o-oqo
l2?-
DD?c
oa<?o
=???
5c?-
DD?D
ooqo
aoqo =3 ooqo
f?l
aao
@oqo
o
5j
o0?-
@tsqo
6Fqo
,o?
=
6@q
o
N0q-aqo
@@qo
@qo
oqo
aq-
3=?
oaqa
=??3
c3?-
2
?D
ooqo
ooqa
ooqo
ooqo
ca ca
c
NNqo
poP3
Nqo
o€Io
@qo
o
?D
@Nqo
q
?f
oq-?-tsqo
@qo
N?5 q ooqo
-3:25
Dc
=5
o
oo
oo oa =ooqo
c @oqo
ocq
0o?
D
?D
o@co
b€co
D?=
t@qo
op?=
D?-
N€qo
NFqo
oFqo
ooq ooo
oqo
??3
Dc?5
oo oo ooqo
c?
j
ooqo
cqo qI qo
D0?D ?-€qo
€qo
o@qc
@Fqo
0
?=
o @oc;
No
d
DNq-
ooq ooqo
oeqo
ooqa
ocao
oo
d
ooqo =c
c3?3
aa-
@aqo
ood
a@qo ?
=
€qo
N€qo
@tsqo
N@qo
,
?5
D
?3
Iq5
N
?-@qo
oi!j
toqo
ooo
ooqo
ooqo
Oaao
ooq ooqo
3??=
oaqo
cqc
oaqo oo
Nqo
De?5
Noqc
tsqo
cqc
Nq o
?5
p
5j
p
q5
oqo
C?5
aqo
oa<?o
oO
d
ooqo
ooqo
ooqO
aoqo
ooqa
o
a
ooqo
c
=O
ooqo
@qo
N
qo
D
?D
ts
qo
F
qa
aqa
o
qo
+?D
D
a-
p
?5
tstqo
NDq
=
c
=i
oaqo
a oaqo
ooqo
aeo
ooqo
oaqo
3?=
ooqo
f?l
ooqo
ooo
cN?D
N??
€Nqa
oo ooqo
Nsqe
o
?3 ?=
sqo
aqo
cc?c
ccqc
oaco
oqo
ooqo
ooqa
2?=
D
?p
oaqo --
ooq
Q
)
?
ooqo
ooqo
o
?=
o?D
N
qo
€qo qo
@qo
,
?D
NN?-Nqc
o6qo
)D?c
3?c
aoqe o ooqo
ooqo
*c o a I tf o o D D c tN
=oI
=P\i
oI
=oe
=oIo
E
D?o
oeN
=oco
=3?D
=oco
=oe
=CLoeN
=Loo:
=o-acN
EL33r'
=o-oI
E]-
D?o
=L
I?o
=L
D?
=1-
3n
=(Looo
=o-
?o
=o-oe =aIN
=oeN
E
3?
=oIN
=oIo
=oc
E
D?o
=oco
=oeN
=o9o
=aIo
=aIo
=oI
=!Loorn
=o-o
;j
=L3PN
EL??
=L3?c
=L?i
EL3?o
=Lc?
=o-oI@
=o-
=ci
=CLooct
=&oI
at,
Ei:oa,c
oo
t.9E.Eo
Lo
tto
o
Eto
g.!
q,
E
'Flc
I6Itr
lol=ls,t.:It/,lfxlx :
slB eNlii =lollEl6Jlut;l=lorlE!l(!ILlo,
6
o
o
d
c
.9+,tELocoo
->L
oI
!,.oOiE
=tr6.=d6ouJ-CriUs Es
o'Lo.
ot
=o.Itooo
CLoLo-I
o
o
g,Iat!
;E.s-E sEE;E i =E5E=
9r r iE!95Z.=EE
iluscEETE-Loo3s99E<4C<
ai
Eoz
goo
o.
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
GASE NO. IPC-E-15-18
IDAHO POWER COMPANY
ATTACHMENT 5
IDAHO POWER COMPANY
COGENERATION AND SMALL POWER PRODUCTION
QUALIFYING FACILITY ENERGY SALES AGREEMENT APPLICATION
ldaho Power Qualifying Facility (QF) contact information:
Mailing Address: Attn: Energy Contracts, P O Box 70 Boise, 1D 83702
PhysicalAddress: L22lW.ldaho Street, Boise, lD 83703
Telephone number: 208-388-6070
E-Mail Address: xxxxx@idahopower.com
Preamble and lnstructions
All generation facilities that qualify pursuant to ldaho Power Company Schedule 73 for a QF
Energy Sales Agreement and wish to sell energy from there facility to ldaho Power must
complete the following information and submit this Application by hand delivery, mail or E-mail
to ldaho Power.
Upon receipt of a complete Application, ldaho Power shall process this request for a QF Energy
Sales Agreement pursuant to ldaho Power Company Schedule 73.
Qualifying Facility lnformation
Proposed Proiect
Name of Facility: WRCE 5
Resource Type: (r'.e. wind, solor, hydro, etcl: Solar PV
Facility Location: GPS Coordinates: 43"23'52.06"N; 114"15'33.23"W
Nearest City or landmark: Bellevue
County and State: Blaine Countv, lD
Map of Facility, including proposed interconnection point.
See Attached
Anticipated commencement date of energy deliveries to ldaho Power: 3l3LlzOLG
Facility Nameplate Capacity Rating (kW): 100.00 (AC)
Qualifying Facility lnformation (continued)
Page t of:
ldaho Power Company Energy Sales Agreement Application
Facility Maximum Output Capacity (kW):
Station Service Requirements (kW):
100.00 (Ac)
1{AC)
Facility Net Delivery to ldaho Power (kW): 100.00 (AC)
Facility interconnection status:Not Started
Proposed Contracting Term (cannot exceed 20years): 20years
Requested Rate Option (detoils provided in Schedule 73): Avoided Cost Rate
schedule for Solar PV for Eligible Proiects under 100kW.
Does the Facility have the ability to respond to dispatch orders from ldaho Power
Company (Yes or No): Yes
Please include the following attachments:
,/ Hourly estimated energy deliveries (kw) to ldaho Power for every hour of a
one year period.. See Attached
,/ List of acquired and outstanding Qualifying Facility permits, including a
description of the status and timeline for acquisition of any outstanding
permits.. At the minimum a FERC issued QF certificate is required and/or
evidence that Facility will be able to obtain a Qualifying Facility
certificate.. The proiect is a Small Power Production Facility as defined by
18.C.F.R. 292.203 and is exempt from filing requirements pursuant
to 18.C.F.R. 292.203.d.1. The facilitv will be owned by a separate
owner than all other facilities within 1 mile. including other facilities
at the same site.
/ lf the Facility will require fuel be transported to the Facility (i.e. natural gas
pipelines, railroad transportation, etc), evidence of ability to obtain sufficient
transportation rights to operate the Facility at the stated Maximum Output
Amount.
. N/A
,/ lf the Facility will not be interconnecting directly to the ldaho Power
electrical lystem, evidengg thgl!!.t9 Fagility witl be ab-le to interconnect to
Page 2 of 3
ldaho Power Company Energy Sales Agreement Application
another utility's electrical system and evidence that the Facility will be able
to obtain firm transmission rights over all required transmission providers to
deliver the Facility's energy to ldaho Power at a point acceptable to ldaho
Power.. N/A
Owner lnformation
Owner / Company Name: WRCE 5 LLC
Contact Person: John Reuter
Zip:83333
John @sitebasedenergy.com
Applicant Signature
I hereby certify that, to the best of my knowledge, all information provided in this Qualifying
Facility Energy Sales ment application is true and correct.
Address:
City:
Telephone:
E-mail:
PO Box 3432
Hailev State: ldaho
(208172t-2922
John Reuter
Page 3 of3
ldaho Power Company Energy Sales Agreemeit Application
a-,
+ "' tr,;,rcF
x i-.,1 :co-cl.^ -'l') *,\-=-r_ f- I
UUJ;
zl>l>al
*lol
_=L=: r'.]..{ c)\ric..l m:'l rt
a{o
!--
zo
LkUo
UJJ
LUUd
=
*ne3
ri
.
l
iIA
'- \''r rf&:e.,_
<ru
I
O
=YOO
o
_o
=.C
O
OUo
a
O
.=a
On\
d
o_
O
1
o
o)
CO
F-
(o
ro
lf
c)
6l| .I.-'l\ro
fr+.,- {.f'"i
fu.w.
ol6l
E]oloolcli
{,
E
i=
t
(g
{,
Etr
.E(l
Jo
=
o
=o
(,
Go
o
==
<fOt(n
dN
xo+N
m
G
o
c;
c,o
GLogoo
.>L
o
t,.oo-tE
=FtE,ouJ.C .!* U€.45o't
[
E,3o-
T'ooo
CLoLo-I
o
gt!
EilPiE s3.cESgE E'-go<=gE E €UE!P5E2 tr E?
EEEEETETEEo^LaJ{Jto.. o o =LVgLba<a4<
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
GASE NO. IPC.E.15.18
IDAHO POWER COMPANY
ATTACHMENT 6
IDAHO POWER COMPANY
COGENERATION AND SMALT POWER PRODUCION
QUALIFYING FACILITY ENERGY SALES AGREEMENT APPLICATION
ldaho Power Qualifying Facility (QF) contact informati,on:
Mailing Address: Attn: Energy Contracts, P O Box 70 Boise, lD 83702
Physical Address: L22LW.ldaho Street, Boise, lD 83703
Telephonenumber: 208-388-6070
E-Mail Address: xxxxx@idahopower.com
Preamble and lnstructions
All generation facilities that qualify pursuant to ldaho Power Company Schedule 73 for a QF
Energy Sales Agreement and wish to sell energy from there facility to ldaho Power must
complete the following information and submit this Application by hand delivery, mail or E-mail
to ldaho Power.
Upon receipt of a complete Application, ldaho Power shall process this request for a QF Energy
Sales Agreement pursuant to ldaho Power Company Schedule 73.
Qualifying Facility Information
Proposed Proiect
Name of Facility: WRCE 5
Resource Type: (r.e. wind, solor, hydro, etcl: Solar PV
Facility Location:GPS Coordinates: 43"23'52.06"N; 11ffi
Nearest City or landmark: Bellevue
County and State: Blaine Countv. lD
Map of Facility, including proposed interconnection point.
See Attached
Anticipated commencement date of energy deliveries to ldaho Power: 3l3ll20t6
Facility Nameplate Capacity Rating (kW):
Qualifying Facility lnformation (contin ued)
100.00 (Ac)
Page I of3
ldaho Power Company Energy Sales Agreement Application
Facility Maximum Output Capacity (kW):
Station Service Requirements (kW):
Facility Net Delivery to ldaho Power (kW):
Facility interconnection status:
1oo.oo (Ac)
1(AC)
100.00 (Ac)
Not Started
Proposed Contracting Term (cannot exceed 20 yeors): 20 years
Requested Rate Option (details provided in Schedule 73): Avoided Cost Rate
schedule for Solar PV for Eligible Proiects under 100kW.
Does the Facility have the ability to respond to dispatch orders from ldaho Power
Company (Yes or No):Yes
Please include the following attachments:
,/ Hourly estimated energy deliveries (kW) to ldaho Power for every hour of a
one year period.. See Attached
,/ List of acquired and outstanding Qualifying Facility permits, including a
description of the status and timeline for acquisition of any outstanding
permits.. At the minimum a FERC issued QF certificate is required and/or
evidence that Facility will be able to obtain a Qualifying Facility
certificate.. The proiect is a Small Power Production Facility as defined by
18.C.F.R. 292.203 and is exempt from filing requirements pursuant
to 18.C.F.R. 292.203.d.1. The facilitv will be owned by a separate
owner than all other facilities within 1 mile, including other facilities
at the same site.
r' lf the Facility will require fuel be transported to the Facility (i.e. natural gas
pipelines, railroad transportation, etc), evidence of ability to obtain sufficient
transportation rights to operate the Facility at the stated Maximum Output
Amount.
. N/A
r' lf the Facility will not be interconnecting directly to the ldaho Power
electrical system, evidence that the Facility will be able to intercon_nect to
Page 2 of 3
ldaho Power Company Energy Sales Agreement Application
another utility's electricalsystem and evidence that the Facility will be able
to obtain firm transmission rights over all required transmission providers to
deliver the Facility's energy to ldaho Power at a point acceptable to ldaho
Power.. N/A
Owner lnformation
Owner / Company Name: WRCE 6 LLC
Contact Person: John Reuter
Address:
City:
Telephone:
E-mail:
PO Box 3432
Hailey State: ldaho Zip:83333
QOql721-2922
John@sitebasedenergv.com
Applicant Signature
I hereby certify that, to the best of my knowledge, all information provided in this Qualifying
Facility Energy Sales Agreerggnt application is true and correct.; AgreeDF
{:;
John Reuter
Print Name
Signature
Page 3 of3
ldaho Power Company Energy Sales Atreement Application
<ru
O
=
r<
OO
o
-o
n**d
n_
O
t - -r'rni"i: -s-.&F
c-,
-.t Ct, c.,t€,X4 C?, t7,j, rc r-t)x.c-ol.^ r' l.
t-L - Cl:E
z?: C..l..1 C)\ria..l mr, -ur
Glco!-
v-
UJJ
LU
Ud
=
o
Eo)o
co
GLocoo
->L
o
t,of,(E
E+,oLll
+aoooLo-
ru
=o-t,ooo
CLoLo-
Lo
=oo.
oEog
E
o
o)
E
i=
'6
=o
=
of
SL(n5R9
N-Ct)Gq,
o
3
=
x(n+N
6
o
odci
u(J
d
=
.:a
IUo
Ea,i PiE 5EcESgE:=lgO<:
Er r.E..E=:Iior!:::=EZEEEEEEEETETEEo^-aro,o,, o o =LVLLT4<4C<
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
GASE NO. IPC-E-15-18
IDAHO POWER COMPANY
ATTACHMENT 7
IDAHO POWER COMPANY
COGENERATION AND SMALL POWER PRODUCTION
QUALIFYING FACILITY ENERGY SALES AGREEMENT APPLICATION
ldaho Power Qualifying Facility (QF) contact information:
Mailing Address: Attn: Energy Contracts, P O Box 70 Boise, lD 83702
PhysicalAddress: 1221W. ldaho Street, Boise, lD 83703
Telephone number: 208-388-6070
E-Mail Address: xxxxx@idahopower.com
Preamble and lnstructions
All generation facilities that qualify pursuant to ldaho Power Company Schedule 73 for a QF
Energy Sales Agreement and wish to sell energy from there facility to ldaho Power must
complete the following information and submit this Application by hand delivery, mail or E-mail
to ldaho Power.
Upon receipt of a complete Application, ldaho Power shall process this request for a QF Energy
Sales Agreement pursuant to ldaho Power Company Schedule 73.
Qualifying Facility lnformation
Proposed Proiect
Name of Facility: WRCE 7
Resource Type: (i.e. wind, solar, hydro, etcl: Solar PV
Facility Location: GPS Coordinates: 43"23'52.05"N; 114"15'31.02"W
Nearest City or landmark: Bellevue
County and State: Blaine Countv, lD
Map of Facility, including proposed interconnection point.
See Attached
Anticipated commencement date of energy deliveries to ldaho Power: 3|3L/20LG
Facility Nameplate Capacity Rating (kW): 100.00 (AC)
Qualifying Facility Information (continued)
Page I of3
ldaho Power Company Energy Sales Agreement Application
Proposed Contracting Term (cannot exceed 20 yeors): 20 years
Requested Rate Option (detoils provided in Schedule 73): Avoided Cost Rate
schedule for Solar PV for Eligible Proiects under 100kW.
Does the Facility have the ability to respond to dispatch orders from ldaho Power
Facility Maximum Output Capacity (kW):
Station Service Req uirements (kW) :
Facility Net Delivery to ldaho Power (kW):
Facility interconnection status:
Company (Yes or No):
Please include the following attachments:
100.00 (Ac)
1(Ac)
1oo.oo (Ac)
Not Started
Yes
,/ Hourly estimated energy deliveries (kW) to ldaho Power for every hour of a
one year period.. See Attached
/ List of acquired and outstanding Qualifying Facility permits, including a
description of the status and timeline for acquisition of any outstanding
permits.. At the minimum a FERC issued QF certificate is required and/or
evidence that Facility will be able to obtain a Qualifying Facility
certificate.. The proiect is a Small Power Production Facility as defined by
18.C,F.R. 292.203 and is exempt from filing requirements pursuant
to 18.C.F.R. 292.203.d.1. The facility will be owned by a separate
owner than all other facilities within 1 mile, including other facilities
at the same site.
/ lf the Facility will require fuel be transported to the Facility (i.e. natural gas
pipelines, railroad transportation, etc), evidence of ability to obtain sufficient
transportation rights to operate the Facility at the stated Maximum Output
Amount.
. N/A
,/ lf the Facility will not be interconnecting directly to the ldaho Power
electrical system, evidence that the Facility will be able to interconnect to
Page 2 of 3
ldaho Power Company Energy Sales Agreement Application
another utility's electrical system and evidence that the Facility will be able
to obtain firm transmission rights over all required transmission providers to
deliver the Facility's energy to ldaho Power at a point acceptable to ldaho
Power.. N/A
Owner lnformation
Owner / Company Name: WRCE 7 LLC
Contact Person: John Reuter
Address:
City:
Telephone:
E-mail:
PO Box 3432
Hailev State: ldaho Zip:83333
QOgl72L-2922
John @sitebasedenergy.com
Applicant Signature
I hereby certify that, to the best of my knowledge, all information provided in this Qualifying
Facility Energy Sales t application is true and correct.
Page 3 of3
ldaho Power Company Energy Sales Agreement Application
ct a'r',
J ct, rr,d,rr-Ix:l)c
^ -^J
uya\,=-I - Cl
I
hi
Lo=dl+t
lul
3ln
,,UUVJ>..,d6t ol
=uli-t
01 9l
Z_=: a..lc.l O\r;c..l m!n .rt
Al o
s-
Z
a
Uo)
UJJ
LUUd.
=
<ru
'll:l;a.,
t
O
=YOO
C)
-o
:
=.C
O6
O
ao.ta
O
C)
o
o_
O
{!t \'-L- }\hL\"4 't*tFe.rs. '5*',"r
t'
T
i'.i
1. r@1r*a**1..1r;:
t.
o-
C')
o
F-
to
lo
<f
g)
N
*,..": ''.*1.-.:-
" *"{r"d3it ;o kro
"..._,
g:
o
IEo
o
t!,o5
tro
*aGL.otroo
=o
Eofr!
E
o
UJ€oo'g
o-
rufa-
!,ooo
CLoLo.
Lo
=oo-
o
Gt
!,ctso
EF
.s(E
L
o
=
65
ttL(nfs9
N-Cuoo
o
==
tlol-le
=ercul"9 5lotg-l
!EEIEEIEet
Aa
o
Il!r
gUgiE s
3EEc= EJ90<ir tiiicgEz.EEEEEE
o999o^-aroo,. o oE<4C
xm+N
md
G
odci
r(J
G,3
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
GASE NO. IPC-E-15-18
IDAHO POWER COMPANY
ATTACHMENT 8
IDAHO POWER COMPANY
COGENERATION AND SMALT POWER PRODUCTION
QUALIFYING FACILITY ENERGY SALES AGREEMENT APPLICATION
ldaho Power Qualifying Facility (QF) contact information:
Mailing Address: Attn: Energy Contracts, P O Box 70 Boise, lD 83702
PhysicalAddress: L22LW.ldaho Street, Boise, lD 83703
Telephonenumber: 208-388-6070
E-Mail Address: xxxxx@idahopower.com
Preamble and lnstructions
All generation facilities that qualify pursuant to ldaho Power Company Schedule 73 for a QF
Energy Sales Agreement and wish to sell energy from there facility to ldaho Power must
complete the following information and submit this Application by hand delivery, mail or E-mail
to ldaho Power.
Upon receipt of a complete Application, ldaho Power shall process this request for a QF Energy
Sales Agreement pursuant to ldaho Power Company Schedule 73.
Qualifying Facility lnformation
Proposed Proiect
Name of Facility: WRCE 8
Resource Type: (r.e. wind, solar, hydro, etcl: Solar PV
Facility Location: GPS Coordinates: 43"23'52.06"N: 114"15'29.75"W
Nearest City or landmark: Bellevue
County and State: Blaine CounW. lD
Map of Facility, including proposed interconnection point.
See Attached
Anticipated commencement date of energy deliveries to ldaho Power: 3/3LIZOLG
Facility Nameplate Capacity Rating (kW):
Qualifying Facility lnformation (continued)
1oo.oo (Ac)
Page I of3
ldaho Power Company Energy Sales Agreement Application
Facility Maximum Output Capacity (kW):
Station Service Requirements {kW):
Facility Net Delivery to ldaho Power (kW):
Facility interconnection status:
100.00 (Ac)
1(AC)
100.00 (Ac)
Not Started
Proposed Contracting Term (cannot exceed 20 yeors): 20 years
Requested Rate Option (detoils provided in Schedule 73): Avoided Cost Rate
schedule for Solar PV for Eligible Proiects under 100kW.
Does the Facility have the ability to respond to dispatch orders from ldaho Power
Company (Yes or No): Yes
Please include the following attachments:
/ Hourly estimated energy deliveries (kW) to ldaho Power for every hour of a
one year period.. See Attached
/ List of acquired and outstanding Qualifying Facility permits, including a
description of the status and timeline for acquisition of any outstanding
permits.. At the minimum a FERC issued QF certificate is required and/or
evidence that Facility will be able to obtain a Qualifying Facility
certificate.. The proiect is a Small Power Production Facility as defined by
18.C.F.R. 292.203 and is exempt from filing requirements pursuant
to 18.C.F.R. 292.203.d.1. The facilitv will be owned bv a separate
owner than all other facilities within 1 mile. includine other facilities
at the same site.
r' lf the Facility will require fuel be transported to the Facility (i.e. natural gas
pipelines, railroad transportation, etc), evidence of ability to obtain sufficient
transportation rights to operate the Facility at the stated Maximum Output
Amount.
. N/A
r' lf the Facility will not be interconnecting directly to the ldaho Power
electrical rystgm, evile1ce that t!1efa9illtv will be able t9 !nte19onf_!! !9
Page 2 of 3
ldaho Power Company Energy Sales Agreement Application
another utili$s electrical system and evidence that the Facility will be able
to obtain firm transmission rights over all required transmission providers to
deliver the Facility's energy to ldaho Power at a point acceptable to ldaho
Power.. NIA
Owner lnformation
Owner / Company Name: WRCE 8 LLC
Contact Person: John Reuter
Address:
City:
Telephone:
E-mail:
PO Box 3432
Hailey State: ldaho Zip:83333
/2081721-2922
John @sitebasedenergv.com
Applicant Signature
I hereby certify that, to the best of my knowledge, all information provided in this QualifiTing
Facility Energy Sales ment application is true and correct.
Signature
Page 3 of3
ldaho Power Company Energy Sales Agreement Application
t <%
t iii -,]#'s5*,-.
t' 31&W O
=
r<
OO
C)
-o
=.C
O"#i* 1% FO
o
(n
G'
h
(o
l,(,
<l
(o
GI
fl'$#ffi;m#
.,.,-. t t- .",D- s,'*Yf "- O'* ".r&** r" \-"rrui;*:r o
o
o_
O
rl
; seH
c?,
./. :c r-
x !-l )Cc-o.l
,x.v=^:- - c-l
-I
Il-nll=:
rd a!B ti,Ir.l l7 '<q iol omi!'r Iol
-lI ,,U
J!
-d5l oi-ulil ul<l uldl J_lol ul
UJJ
LUUd
=
z
a.IN6I!n
a.l
zo
F
Uo)
c,
.9+.GLocoo
.>L
o-
tcag
o
Etr
'a
a5oE
o
<,L(n=R9
N-C(,o(,
o
==
n
G
od
c;
!,.oOG}FIEolusriU€.4=o-Lo-
dtrfo-
T'oooELoLo-I
oglu
!
iiP
=i!.E50essES.r=C>- c ca-EO<=gE E €;E!5ZEE!
E ,!,i i'attE!oo,,. o o =<a-c,<
U
E(E2
o'g
E
xo+N
E]EI
t11
!ioi
-l
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
cAsE NO. IPC-E-15-18
IDAHO POWER GOMPANY
ATTAGHMENT 9
IDAHO POWER COMPANY
COGENERATION AND SMALT POWER PRODUCTION
QUALIFYING FACILITY ENERGY SALES AGREEMENT APPL]CATION
ldaho Power Qualifying Facility (QF) contact information:
Mailing Address: Attn: Energy Contracts, P O Box 70 Boise, lD 83702
Physical Address: L22tW.ldaho Street, Boise, lD 83703
Telephone number: 208-388-6070
E-Mail Address: xxxxx@idahopower.com
Preamble and lnstructions
All generation facilities that qualify pursuant to ldaho Power Company Schedule 73 for a QF
Energy Sales Agreement and wish to sell energy from there facility to ldaho Power must
complete the following information and submit this Application by hand delivery, mail or E-mail
to ldaho Power.
Upon receipt of a complete Application, ldaho Power shall process this request for a QF Energy
Sales Agreement pursuant to ldaho Power Company Schedule 73.
Qualifying Facility lnformation
Proposed Proiect
Name of Facility: WRCE 9
Resource Type: (i.e. wind, solar, hydro, etc);
Facility Nameplate Capacity Rating (kW):
Qualifying Facility lnformation (continued)
Solar PV
100.00 (Ac)
Page I of3
ldaho Power Company Energy Sales Agreement Application
Facility Location: GPS Coordinates: 43"23'52.06"N: 114"15'28.63"W
Nearest City or landmark: Bellevue
County and State: Blaine Countv. lD
Map of Facility, including proposed interconnection point.
See Attached
Anticipated commencement date of energy deliveries to ldaho Power: 3/3L12O16
Facility Maximum Output Capacity (kW):
Station Service Requirements (kW):
Facility Net Delivery to ldaho Power (kW):
Facility interconnection status:
100.00 (Ac)
1(AC)
100.00 (Ac)
Not Started
Proposed Contracting Term (connot exceed 20 yeors): 20 years
Requested Rate Option (detoils provided in Schedule 73): Avoided Cost Rate
schedule for Solar PV for Eligible Proiects under 100kW.
Does the Facility have the ability to respond to dispatch orders from ldaho Power
Company (Yes or No): Yes
Please include the following attachments:
,/ Hourly estimated energy deliveries (kW) to ldaho Power for every hour of a
one year period.. See Attached
/ List of acquired and outstanding Qualifying Facility permits, including a
description of the status and timeline for acquisition of any outstanding
permits.. At the minimum a FERC issued QF certificate is required and/or
evidence that Facility will be able to obtain a Qualifying Facility
certificate.. The proiect is a Small Power Production Facility as defined by
18.C.F.R. 292.203 and is exempt from filing requirements pursuant
to 18.C.F.R. 292.203.d.1. The facilitv will be owned bv a separate
owner than all other facilities within 1 mile, including other facilities
at the same site.
/ lf the Facility will require fuel be transported to the Facility (i.e. natural gas
pipelines, railroad transportation, etc), evidence of ability to obtain sufficient
transportation rights to operate the Facility at the stated Maximum Output
Amount.
. N/A
,/ lf the Facility will not be interconnecting directly to the ldaho Power
electrical system, evidence that the Facility will be ablg to interconnect to
Page 2 of 3
ldaho Power Company Energy Sales Agreement Application
another utility's electrical system and evidence that the Facility will be able
to obtain firm transmission rights over all required transmission providers to
deliver the Facility's energy to ldaho Power at a point acceptable to ldaho
Power.. N/A
Owner lnformation
Owner/ Company Name:WRCE 9 LLC
Contact Person: John Reuter
Address:
City:
Telephone:
E-mail:
PO Box 3432
Hailev State: ldaho Zip:83333
(20817?L-2922
John @sitebasedenergy.com
Applicant Signature
I hereby certify that, to the best of my knowledge, all information provided in this Qualifying
Facility Energy Sales ent application is true and correct.
Signature
Page 3 of 3
ldaho Power Company Energy Sales Agreement Application
(isggf r-, rn+, oo rr
XIJOOCHC-lrn -' o\(.)6\/=oI! € a\t
-.1-
ffi,
_*ffit*f
-;z_=:a{(\lo\r'i(\,l r'r!n -,rtrq-t1 ootaYl -t-
zq
Uo)
s+dds+,il .ii
HE
!!tr dqo
3ssltdU
UJJ
LUUd.
=
O
=YOO
o
-o
=.C
O
CIJ
G)
a
G)
.=
U)
OoolE
o_
O, li
E5
- .*, \
&
er-
l:r...,,r
ry1r'r,
1 o "'n,. '1 irr"
' .1
:,ri1r.i::t,i:w
,t
*, rr
-gEIo{9lotEtl
ol!J
E1ol>lo12l
olEIoiolol
olEIEIolootarrl
otr
i=6
aDc'too
.9
r!o
o
t,(,
0
aG
!,c(g
o
E
'Flcl6l=IJlol=lorlcl6l:lxlx i
3lE.eNlii -eloI(El6Jt;t;l=lorI Erl(Elb
6
o:
od
c;
UUc.3
co
.Et-otroo
o
Eo+ao
E
oIIJ+roo
oL.o.
[
E,3o-
T'oooctoLo-
Lo
=oo.
o
Gtt
:E
ouo
Ea,i PiE,9E orE?;E E }
'
g EJ!o<:Et t TL9--eiiEE59lc,EA: E'Eiiit'6tEEo-s(Jarto,. o o =LVL!La-<a-a.<
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
GASE NO. IPC-E-I5-19
IDAHO POWER COMPANY
ATTACHMENT 10
IDAHO POWER COMPANY
COGENERATION AND SMAtt POWER PRODUCTION
QUALIFYING FACILIW ENERGY SALES AGREEMENT APPLICATION
ldaho Power Qualifying Facility (QF) contact information:
Mailing Address: Attn: Energy Contracts, P O Box 70 Boise, lD 83702
Physical Address: L22LW.ldaho Street, Boise, lD 83703
Telephone number: 208-388-5070
E-Mail Address: xxxxx@idahopower.com
Preamble and lnstructions
All generation facilities that qualify pursuant to ldaho Power Company Schedule 73 for a QF
Energy Sales Agreement and wish to sell energy from there facility to ldaho Power must
complete the following information and submit this Application by hand delivery, mail or E-mail
to ldaho Power.
Upon receipt of a complete Application, ldaho Power shall process this request for a QF Energy
Sales Agreement pursuant to ldaho Power Company Schedule 73.
Qualifying Facility lnformation
Proposed Proiect
Name of Facility: WRCE 10
Resource Type: (r.e. wind, solar, hydro, etcl: Solar PV
Facility Location: GPS Coordinates: 43"23'52.06"N; 114"15'27.37"W
Nearest City or landmark: Bellevue
County and State: Blaine County, lD
Map of Facility, including proposed interconnection point.
See Attached
Anticipated commencement date of energy deliveries to ldaho Power: 3l3t/2OL6
Facility Nameplate Capacity Rating (kW): 100.00 (AC)
Qualifying Facility lnformation (continued )
Page I of3
ldaho Power Company Energy Sales Agreement Application
Proposed Contracting Term (cannot exceed 20 years): 20 vears
Requested Rate Option (detoils provided in Schedule 73): Avoided Cost Rate
schedule for Solar PV for Eligible Proiects under 10OkW.
Does the Facility have the ability to respond to dispatch orders from ldaho Power
Facility Maximum Output Capacity (kW):
Station Service Requirements (kW):
Facility Net Delivery to ldaho Power (kW):
Facility interconnection status:
Company (Yes or No):
Please include the following attachments:
100.00 (Ac)
1(AC)
loo.oo (Ac)
Not Started
Yes
Hourly estimated energy deliveries (kW) to ldaho Power for every hour of a
one year period.. See Attached
List of acquired and outstanding Qualifying Facility permits, including a
description of the status and timeline for acquisition of any outstanding
permits.. At the minimum a FERC issued QF certificate is required and/or '
evidence that Facility will be able to obtain a Qualifying Facility
certificate.. The proiect is a Small Power Production FaciliW as defined by
18.C.F.R. 292.203 and is exempt from filing requirements pursuant
to 18.C.F.R. 292.203.d.1. The faciliry will be owned bv a separate
owner than all other facilities within 1 mile. including other facilities
at the same site.
lf the Facility will require fuel be transported to the Facility (i.e. natural gas
pipelines, railroad transportation, etc), evidence of ability to obtain sufficient
transportation rights to operate the Facility at the stated Maximum Output
Amount.
. N/A
lf the Facility will not be interconnecting directly to the ldaho Power
electrical system, evidence that the Facility will be able to interconnect to
Page 2 of 3
ldaho Power Company Energy Sales A8reement Application
Facility Energy Sales nt appllcation is true and correct.
another utility's electrical system and evidence that the Facility will be able
to obtain firm transmission rights over all required transmission providers to
deliver the Facility's energy to ldaho Power at a point acceptable to ldaho
Power.. N/A
Owner lnformation
Owner / Company Name: WRCE 10 LLC
Contact Person: John Reuter
Zip:83333
John@sitebasedenergy.com
Applicant Signature
I hereby certify that, to the best of my knowledge, all information provided in this Qualifying
John Reuter
Print Name
Address:
City:
Telephone:
E-mail:
PO Box 3432
Hailev State: ldaho
(208172t-2922
Page 3 of 3
ldaho Power Company Energy Sales Agreement Application
<%
t-
{ . : ' ,.' ;*uit+ 'i"}ak 6co , r*' '' .s;;;;; . ()
.kxPrW'
F r|:!............:!r
O
=-YOO
O
_o
@ *-: -+ts,ffio_*:,,. a: #+'B-#Frffig
oL-
0_
O
.i .pi
e. .*&fF
.t'J'f^
+ ,-, tr,;xr-
It)nC-(..I.i -']
''D ac!-=-t- =it:E
l
a
+-llrl
1;i
I F,l<-lo1
t,U)
5l
(-tl1o
-2L== a..l6tO\r;dm:o -rr
m-a.l oo.f
$-
Zo-
UoJ
UJJ
IJJUd
=
EI
ut
=loi-l
ttraI
o
Etr
.E(l,
o
=
oJ
o
IJ!!o
o
==
sl(no!t\,1
N
x(n+N
m
G
o
ci
gUe.
=
=o
GLocoo
L
oIt,o+ao
E
flo
IJJ
+aoo
oLo-
rtrfo.ttooo
CLoLo-
Loioo.
o
Gg
;:.
8,
o
or
iiU!
iE,s-> o o!:.s ? >
-grJ-qo<=E;:.ECEE+'Or!::::tEZ.EE!EEEEEt'6'ttro^L o o,o.. o o =EVLLbr<cr<
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
GASE NO. IPC-E-15-19
IDAHO POWER COMPANY
ATTACHMENT 11
Glenn, Jill
From:
Sent:
To:
Subject:
John
Glenn, Jill
Tuesday, June 16, 2015 8:58 AM
'John'
RE: Updated PPAs for Bellevue solar
ldaho Power is in receipt of the Schedule 73 applications for the ten 100kW Solar projects. We will review the
applications to determine if the information is complete with respect to the requirements outlined in Schedule 73.
Please let me know if you have any questions,
JillGlenn
SR ENERGY CONTRACTS COORDINATOR
ldaho Power I Power Supply
Work 208-388-2265
Email islenn@idahooower.com
Flom: John lmailto:john@sitebasedenergy.com]
Sent: Monday, June 15, 2015 5:12 PM
To: Glenn, Jill
Subject: Updated PPAs for Bellevue solar
Jill,
My apologies, I addressed you as Jim in the prior email - oopsl Also I had the online date as 20L5, when it should be
2016. The corrected versions are attached.
Thank you,
John
John Reuter
o. (208)928-7583
c. (2O81721-2922
Corporate Headquarters
P.O. Box 3432
21 CometLane
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
CASE NO. IPG.E.15-18
IDAHO POWER COMPANY
ATTACHMENT 12
nlmt0rNrPg66P^
An IDACORP ComornV
Jvne26,2015
Site based energy
John Reuter
PO Box 3432
21 Comet Lane
Hailey,Idaho 83333
Sent Via: Email (ohn@sitebasedenergy.com), U.S. Certified Mail
Subject: Schedule 73 Applications and Requests for indicative pricing for 10, 100 W solar projects
Dear John,
Idaho Power Company ('Idaho Powet'') is in receipt of an email from Site Based Energy dated June 15, 2015,
which contains updated ldaho Schedule 73 Applications and requests for indicative pricing proposals for ten,
100 kilowatt (*kW") proposd solarprojects ("Projects"). Schedule 73 states that Idaho Power will notifr the
applicant of any deficiencies or an indicative pricing proposal within l0 business days. 10 business days
following yourJune 15, 2015, submission is June 29,2015.
On June 26,zDls,Idaho Power frled a petition with the ldaho Public Utilities Commission ('Commission')
requesting the Commission's determination as to tle appropriate contract temr for your ten, 100 kW PURPA
solar projects, proposed as WRCE I through WRCE 10. In that Petition, Idaho Power requests that your
Projects be subject to the Commission's interim relief approving maximum contract terms of five years as
directed in Order Nos. 33222 and33253, and further that such Projects also be subject to the Commission's
ultimate determination in Case No. IPC-E-I5-01, which is currently scheduled for technical hearing on June 29,
30, and July l, 2015.
Please let this letter, and its reference to the petition, serv€ as Idaho Power's response pursuant to Schedule 73,
until such time as the Commission makes its determination upon Idaho Power's petition.
Idaho Power CompanylPower Supply
j glenn@idahopower. com
208-388-226s
cc: Donovan Walker (IPC)
Randy Allphin (IPC)