Loading...
HomeMy WebLinkAbout20150904Corrected Pages Mahlum Direct Redacted.pdf3Iffi*. An TDACORP Companv LISA D. NORDSTROM Lead Counsel I nordstrom@idah opower.com September 4,2015 LDN:csb Enclosures cc: Service List - dencls. Very truly yours, afl:.Pq* Lisa D. Nordstroft ril ! i Ol'l'r..ir,i i l - ll I r,l I VIA HAND DELIVERY Jean D. Jewell, Secretary ldaho Public Utilities Gommission 472 West Washington Street Boise, ldaho 83702 Re: Gase No. IPC-E-15-17 Long Term Program Contract with Siemens Energy, !nc. - Corrected Pages to the Direct Testimony of Trevor Mahlum Dear Ms. Jewell: During the course of preparing discovery responses in the above matter, ldaho Power Company believes a clarification sentence is needed on page 7 of the Direct Testimony of Trevor Mahlum. With the addition of the clarification sentence, the pagination also changed on pages 8 and 9 of Mr. Mahlum's testimony. Moreover, the hash marks on page 9 were not needed anymore and were removed. However, the removalof the hash marks has not been indicated in the redlined copies provided as this would require repagination of all subsequent pages to indicate the removal. To reflect the addition of the clarification sentence, enclosed are nine (9) copies each of corrected redacted pages 7-9 of Mr. Mahlum's testimony in redlined and clean format. Copies of the redacted pages have been marked and enclosed for the Reporter. ln addition, enclosed are eight (8) copies of corrected confidential pages 8 and 9 to Mr. Mahlum's testimony. Please handle the confidential information in accordance with the Protective Agreement issued in this matter. lf you have any questions regarding the enclosed conected pages or this matter, please do not hesitate to contact me. M7*r2-- 122'l W. ldaho St. (83702) PO. Box 70 Boise, lD 83707 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on the 4h day of September 2015 I served a true and conect copy of CORREGTED PAGES 7-9 OF THE DIRECT TESTIMONY OF TREVOR MAHLUM upon the following named parties bythe method indicated below, and addressed to the following: Gommission Staff Karl T. Klein Deputy Attomey General ldaho Public Utilities Commission 472 West Washington (83702) P.O. Box 83720 Boise, ldaho 83720-007 4 lndustrial Customers of ldaho Power Peter J. Richardson Gregory M. Adams RICHARDSON ADAMS, PLLC 515 North 27h Street (83702) P.O. Box 7218 Boise, ldaho 83707 Dr. Don Reading 6070 Hill Road Boise, ldaho 83703 X Hand Delivered U.S. Mai! Ovemight Mail FAXX Email karl.klein@puc.idaho.oov _Hand DeliveredX U.S. Mail _Ovemight Mail FAX Email peter@richardsonadams.com oreo@richardsonadams. com Hand DeliveredX U.S. Mail _Ovemight Mai! _FAXX Email dreadino@mindsprino.com Christa Bearry, Lega! Assistant CERTIFICATE OF SERVICE 1 2 3 4 5 6 7 I 9 10 11 72 13 L4 15 t6 L1 18 19 20 27 22 23 24 25 process. Those third-party proposals were analyzed by both the Company and the contracted professional and it was determined that there are currently no other third-party maintenance providers that could provide servj-ces equivalent to those provided under the LTP Contract with Siemens. Idaho Power did issue a request for proposal for services for the Bennett Mountain and Danskin plants only to evaluate the possibilj-ty of a hybrid approach to maintenance of the Company's gas plants through a combination of a long-term service agreement as well as continued sel-f-management of the Langley Gulch power plant. The responses were evaluated and resulted in the recommendation for the Company to proceed with a l-ong-term maintenance contract with Siemens. Because Si-emens is the OEM for all of the Company's gas plants and is the industry leader in gas plant maintenance, the only available alternative to the LTP Contract with Siemens would be the continuati-on of a Company-managed maintenance program with technical support and parts purchased from Sj-emens. o.Prior to the executj-on of this agreement, was a LTP Contract with Siemens an option? A.Yes. However, when Idaho Power operated only the Danskin and Bennett Mountaj-n plant SCCTs, an LTP Contract was not an economical al-ternative because of the limited frequency of maj-ntenance outages for those plants. CoRRECTED REDACTED - MAHLUM, DI 7 Idaho Power Company 1 2 3 4 5 6 7 8 9 10 11 12 13 23 24 25 SCCT outages are based on the number of start-ups so multiple years exist between scheduled outages at the Danskin and Bennett Mountain plants. Until the addition of the Langley Gulch CCCT, contracting for gas plant maintenance servj-ces with Siemens at each outage lnterval has been the most cost-effectj-ve approach. With the construction of Langley Gu1ch, a baseload CCCT whose maj-ntenance is based upon run-time hours, the Company antici-pates more frequent gas plant maintenance actj-vities to exist going forward. With this in mind, Idaho Power began evaluating and negotiating an agreement with Siemens for a LTP. o.Is there a difference i-n cost to Idaho Power o.Pl-ease describe the LTP Contract the Company is requesting approval of in this proceeding. A.Under the LTP Contract, Siemens will provide 26 scheduled maintenance on all three combustj-on turbines, CoRRECTED REDACTED - MAHLUM, Dr 8 Idaho Power Company 74 between the self-management option and a LTP Contract? 15 A.Yes. The LTP Contract will provide a lower 16 priced alternative to the maj-ntenance of the Company's gas l7 plants; Idaho Power estimates the cost to continue with 18 self-management wou1d be approximately over 79 the l-ife of the contract while the LTP Contract would cost 20 approximately $over the comparable time 21, period, a savings of over the life of the 22 agreement. 1 2 3 4 5 6 7 I 9 10 11 72 13 t4 15 16 !7 18 19 20 2L 22 23 24 25 including program parts or repairs, shippi-ng, services, labor, engineering services, and program management services. Program parts consist of the major combustion turbine parts provided by Siemens, including the locking hardware used to affix the parts, the parts installed in the combustion turbine upon the effective date, all- initial spare parts, and all parts changed durlng the length of the contract ("Program Parts"). Some of these Program Parts are the l-atest technology Idaho Power woul-d not otherwise have access to and their superiority eliminates the need for two combustor inspectlon outages at Langley Gulch. Moreover, they are available under the LTP Contract at a ! I dj-scount f rom the list price. Siemens wil-l- al-so perform unscheduled maintenance on all three combustion turbi-nes to the extent such work is not covered by Siemens' other warranties under the contract. Leveraging Siemens' pool of regional j-nventory, outage resources, and technical- expertlse will result in l-ower overall costs to Idaho Power and its customers. o.Aside from lower costs over the life of the contract, how does the LTP Contract differ from the Company' s current sel-f-managed maintenance practice? A.The following chart provides a high 1eve1 comparison of fdaho Power's current maintenance practices compared to offerings under the LTP Contract: CoRRECTED REDACTED - MAHLUM, Dr 9 Idaho Power Company 1 2 3 4 5 6 7 I 9 10 11 72 13 74 15 76 t7 18 19 20 2L 22 23 24 25 process. Those third-party proposals were analyzed by both the Company and the contracted professional and it was determined that there are currentl-y no other third-party maintenance providers that could provj-de services equivalent to those provided under the LTP Contract with Siemens Idaho Power did issue a request for proposal for services for the Bennett Mountain and Danskin plants only to evaluate the possibility of a hybrid approach to maintenance of the Company's gas plants through a combination of a long-term service agreement as wel-l- as continued sel-f-management of the Langley Gulch power plant. The responses were evaluated and resul-ted in the reconrmendation for the Company to proceed with a long-term maintenance contract with Siemens. Because Siemens is the OEM for all of the Company's gas plants and is the industry Ieader in gas plant maintenance, the only available alternative to the LTP Contract with Siemens would be the continuation of a Company-managed maintenance program with technical support and parts purchased from Siemens. o.Prior to the execution of this agreement, was a LTP Contract with Siemens an option? A. Yes. However, when Idaho Power operated only the Danskin and Bennett Mountain plant SCCTs, an LTP Contract was not an economical alternative because of the Iimited frequency of maintenance outages for those plants. CoRRECTED REDACTED - MAHLUM, Dr 7 Idaho Power Company I 2 3 4 5 6 1 8 9 10 11 72 13 t4 15 76 77 18 19 20 2t 22 23 24 25 26 SCCT outages are based on the number of start-ups so multiple years exist between scheduled outages at the Danskin and Bennett Mountain plants. Until the addition of the Langley Gulch CCCT, contracting for gas plant maintenance servj-ces with Sj-emens at each outage interval has been the most cost-effectj-ve approach. With the construction of Langley Gulch, a baseload CCCT whose maintenance is based upon run-time hours, the Company anticipates more frequent gas pJ-ant mai-ntenance activitj-es to exist going forward. With this in mind, Idaho Power began eval-uating and negotiating an agreement with Siemens for a LTP. O.Is there a difference in cost to Idaho Power between the self-management option and a LTP Contract? A.Yes. The LTP Contract will- provide a lower priced al-ternative to the maintenance of the Company's gas plants; Idaho Power estimates the cost to continue with self-management woul-d be approximately over the life of the contract whil-e the LTP Contract would cost approximatel-y $over the comparable time period, a savings of agreement. o. is requesting over the life of the the Company A. PIease describe the LTP Contract approval of in this proceeding. Under the LTP Contract, Siemens scheduled maintenance on all three combustion CORRECTED REDACTED . wilI provj-de turbines, MAHLUM, Dr 8 Power CompanyIdaho 1 2 3 4 5 6 7 I 9 10 11 72 13 14 15 76 t7 18 19 20 21- 22 23 24 25 including program parts or repairs, shipping, services, Iabor, engineering servj-ces, and program management services. Program parts consist of the major combustion turbine parts provided by Siemens, including the locking hardware used to affix the parts, the parts install-ed in the combustion turbine upon the effective date, al-1 initial- spare parts, and all parts changed durj-ng the length of the contract ("Program Parts"). Some of these Program Parts are the latest technology Idaho Power would not otherwise have access to and their superJ-ority eliminates the need for two combustor inspection outages at Langley Gulch. Moreover, they are availabl-e under the LTP Contract at a ! I discount from the rist price. Siemens wil-l- also perform unscheduled maintenance on all three combustion turbines to the extent such work is not covered by Siemens' other warranties under the contract. Leveraging Siemens' pool of regional inventory, outage resources, and technical expertise wil-I result in lower overal-I costs to Idaho Power and its customers. O. Aside from lower costs over the life of the contract, how does the LTP Contract differ from the Company's current self-managed maintenance practice? A.The following chart provides a high l-evel- comparison of ldaho Power's current maintenance practices compared to offerings under the LTP Contract: CoRRECTED REDACTED - MAHLUM, Dr 9 Idaho Power Company