Loading...
HomeMy WebLinkAbout20150507Attorney General Letter.pdfSTATE OF IDAHO OFFICE OF THE ATTORNEY GENERAL LAWRENCE G. WASDEN VIA E.MAIL May 7,2015 Avista Corporation MichaelAndrea m ichael.andrea@avi stacorp.com Avista Utilities 1411 E. Mission PO Box3727 Spokane, WA99220-3727 Rocky Mountain Power Daniel Solander dan iel. so lander@pacifi corp.com Ted Weston ted.weston@pacifi corp.com PacifiCorp dba Rocky Mountain Power One Utah Center 201 S. Main Street, Suite 2300 Salt Lake city, uT 84111 Idaho Power Company Donovan E. Walker dwalker@ idahopower.corn Idaho Power Company PO Box 70 Boise, ID 83707-007 Clint Kalich cl int.kalich@avistacorp.corn Avista Utilities 1411 E. Mission PO Box3727 Spokane, WA99220-3727 Greg Duvall greg.duval l@pac if icorp.com Hui Shu hui. shu@pacifi corp.com Laren Hale I are n. h a I e@pac iflco rp. com PacifiCorp dba Rocky Mountain Power 825 NE Multnomah Street Portland, OR97232 Randy Allphin ral Iphin@idahopower.com Idaho Power Company PO Box 70 Boise, ID 83707-0070 Re: Case Nos. IPC-E-15-16, PAC-E-15-07, AVU-E-IS-04 -- Update to Published Avoided Cost Rates to Reflect an Updated Natural Gas Price Forecast of the U.S. Energy Information Administration (EIA) Pursuant to the Public Utility Regulatory Policies Act of 1978 (PURPA) and the implementing regulations of the Federal Energy Regulatory Commission (FERC), the Idaho Public Utilities Commission (Commission) has approved a Surrogate Avoided Resource (SAR) methodology for po Box,.,,0, ,o,.!1,1Xffi"".?A:#fl:Y:,ff;i1(il'Jit"Jl ilil:Ii:liffi'5!"if,Blt'-",iiiirp,"opuc srare id us Located at 472 West Washington St., Boise, ldaho 83702 May 7,2015 Page2 calculation of avoided cost rates at which PURPA qualifuing cogeneration and small power production facilities ("qualifuing facilities" or "QFs") are paid by Idaho Power, Avista, and PacifiCorp. Avoided cost rates are the purchase price paid to QFs for purchases of QF capacity and energy. The release of a new natural gas price forecast by the U.S. Energy Information Administration (EIA) triggered an updated calculation of avoided cost rates. In accordance with the methodology approved in Order No. 32697, the "reference case" natural gas price forecast for the Mountain Region's Electric Power sector included in EIA's Annual Energy Outlook serves as the basis for computing avoided cost rates. In Order No. 32697, the Commission also found that the final release of Annual Energy Outlook automatically triggers a recalculation of the published avoided cost rates. In Order No. 32802, the Commission clarified that an update should occur on June I or within 30 days of the final release of the Annual Energy Outlook, whichever is later. EIA released the Annual Energy Outlook 2015 on April 14, 2015. Staff has used this forecast to compute the new published avoided cost rates. A copy of the relevant natural gas price forecast is attached. Also attached are updated published avoided cost rates for all three utilities. Please review the rates and file your respective responses (either written or via e-mail) with the Commission on or prior to May 21,2015. The case caption is as follows: UPDATE TO PUBLISHED AVOIDED COST RATES TO REFLECT AN UPDATED NATURAL GAS PRICE FORECAST OF THE U.S. ENERGY INFORMATION ADMINISTRATION (EIA) Thank you for your cooperation. Please contact Yao Yin (vao.yin@puc,idaho.gov) for an electronic copy of the most recent SAR model. Please feel free to contact me or Yao if you have any questions. Sincerely, {1'9'*T-Daphr{e J. Huang Deputy Attorney General Enclosures L: IPC-E- I 5- I 6 PAC-E- I 5-07_AVU-E- I 5-04;ry_djh e=Fw$g E l.al+cLmo=.o-ei q qgr;sH ]-T. =66'O=vlEC'E.<...,oH gaN f E -J€CL H 5g(*rd;go No 5 No gr No O! NCIo No No rO ,9oNo NoN NoNN NoNTr, NoN5 tlii!- itr its= 16 iE iB3 ii iF iil ii',8 r; ii 'a i3 jsr is :E' ,H :SI r- r= i-, i9,9 iE;.::-l 1rl=.i6lrDle lztoi3 1Atoroio 10, itrlo,6l=.;.riElol{lo;rio i rtl? lQ .Z'.V :C)lI i3,3 irli5 != id =:J loi lc loi8 ra rer,d:O, tO, -:' I Ii- i- rL rAi I :9i9 .j 1P'N9r ;gr :lut rUr'O(x'@:N Its:NI i|;!,5!(JJ:@re ;to i\t ,t lp ixrF'F;!r)oi :H loNl(o;5 t, i lr-5 ,Oo:Orie !i- lirl6 icn ;Fit iip5;\J;@ir:Ao lb! iN gr11 ll lr-lr-5!()r{iu iio lio5 rN tcn ,P rPS,o '{u, ,ro,(oN l{,{ i!-:tol{ ir'l@;(rl I Iit-t(o:u) ; 1r-.:iolst 1 I itrFib(, i :io I IIJ lbo, q!, P!PP'6 N, 'N(^, (n ts'PP6 5'(,|J,,(^' PTPP16 6.(oN:N I P'Hl.r lloP I(A,!l(, a I HlFNJ:(,.'(, ,{(x lor IJ iNi.,, 'P(o lNc);F !(D:P TJ(1, bt{ N(^, io\I NJ(,bts P!o(o P(obor P!oN6 F(o blO) NI(A,(, N bF NP boN Nt,Or! N!,(,rrOl t\)F$! i: , t) I I t i I 1I 1l Il t , : I I i i i!xr+|'6 : I tir:5iNIt I 1stbti(o a 1I I ls:5l- II 1 rDltnio 4 isi(,,U1 rs:\:N t lunt.,Nis!I iu1 !\l : (r' ! l9 iot i9:5icn II lg,l{:ts , rP:6lo Pio5 tsbUT Pioor t.,ots !.(oul NbUl Nbor Nts(4, !.,No Ni.,@ t,u)oi Nb5 1Its:!,)uJlut lerP:(,l(o iei!:5;N, i loo1bi5l t ioo:iU;(n 1e1Fi-r,(jU rP}N:bro !PINJ :UllN ! 1(! iOru, I tI :IJi1l)1ol ;(! ip:FrNi\tt .eFl(o,(, iFi6 :o):N ]N:r,:N oi ol tni rniO|r (Orr lJr! m!oii -i: Fjl r.iiFllNittrll!!ttrilrl *rlt 6r sf, G1! O'(\r <fr mr ao, Olr Or Nr NrN:(\irr rl tl!t l!rl Nr @i (r1r GOj4l al cl (.!i dt r o,lr t\r NrN: rir t t !it{ttlt (\r F{{ Nr (orei cl \: (.,tl Ni oor (o! Gtrc.,ri -ri i Itflrtt;llllr!!(nl ol m1 mini qi \1 '"!iN',OO'ror NrN! -r: I :!ti!ittl ttit:ltrNi LaI u|! Fllai oq; u?i rylro: N! ro! 6rlc.,r; di i i It llitttlt$: rl (o: ori@. fnl mi F{;rri. N. d: c.ilr.{; H. ;: rl ;l !!ito; ol +: NlN 6; N; FI;uil ui; uii ni:r!, Fl; i l ;!ttl1tlooi rnl lo: roll/}, mi r{i r.{r+: dl'dl^i Ir..l Fa, r i{ill Ittf{}ttIttlorl r.: $l rn:O)' 6i O'Flr.dj ui1 dl ci:Nr H.,liltirlttlt lrllor! ool +i rnlm, mr (,)r Flr.l .!mi ln: tni Ni6Ir Flr r rttIIIt ti.l a{} (Yli (Y}i ltlr6i ot, o)r Flr Ni slr lJ)t Nrl\! r-lt r rltrlrillrtlrillti!ti tO. O. F, (o,Nr ln'CDr F{'N sf ,lJ],N'NFi :;;ia, C{! (r)r Ni \tr\: ei cr ntFII sir tOl NiN;-lj : i1ltllirl)tr11r€l 6l r\!()l.1i q, q: .1' rii fYl! (Irr NlN Flr it:t!i,ii!t\i @i 61 6iq: nioqiq:ol mi ut' N!c.li -r; I i 1i!lt!tr AVISTA AVOIDED COST RATES FOR WIND PROJECTS xx xx,2015 $/MWh New Contracts and Replacement Contracts without Full Capacitv Pavments Eligibility for these rates is limited to projects 100 kW or smaller. LEVELIZED NON.LEVELIZED CONTRACT LENGTH /YtrAPQ\ ON-LINE YEAR CONTMCT YEAR NON-LEVELIZED RATES2015 2016 2017 2018 2019 2020 1 2 3 4 5 6 7 8 o 10 11 12 13 14 't5 16 17 18 19 20 36.1 4 36.49 35.85 35.82 36.42 37.74 39.00 40,16 41.20 42.12 43.02 43.9'l 44.69 45.37 45.97 46.52 47.07 47.61 48.14 46.66 36.87 35.69 35.69 36.51 38.'14 39.62 40.93 42.08 43.07 44.04 44.99 45.82 46.53 47.15 47.73 48.30 48.86 49.41 49.96 50,51 34.42 35.03 36.37 38.52 40.31 41.81 43.08 44.15 45.19 46.20 47.07 47.80 48.44 49.04 49.62 50.21 50.78 51.34 51.92 52.51 35.69 37.46 40.'10 42.08 43.65 44.94 46.01 47.05 48.08 48.95 49.67 50.30 50.88 5't.46 52.O4 52.62 53.19 53.78 54.38 54.95 39.37 46.0342.57 47.4744.56 48.6446.05 49.63 47.26 50.454E.24 51.3649.23 52.3050.22 53.0951.07 53.7251.74 54.2652.33 54.7752.89 55.30 53.44 55.86 54.02 56.42 54.58 56.9955.16 57.5955.75 58.2256.36 58.81 56.95 59.4457.56 60.1 1 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 36.14 36.87 34.42 35.69 39.37 46.03 49.02 51.26 53.1 1 54.44 57.08 59.76 60.70 60.85 61.52 62.75 64.81 67.22 69.31 71.76 75.14 78.45 80.37 84.70 89.89 95.35 Note: These rates will be further adjusted with the applicable integration charge. Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'s Annual Energy Outlook20l5,releasedApril 14,2015. SeeAnnual EnergyOutlook20l5,Table3.SEnergyPricesbySector-Mountainat http://www. eia. gov/forecasts/aeo/tables_ref . cf m#supplemenU AVISTA Page I AVISTA AVOIDED COST RATES FOR SOLAR PROJECTS xx xx, 2015 $/MWh New Contracts and Replacement Contracts without Full Capacitv Payments Eligibility for these rates is limited to projects '100 kW or smaller. LEVELIZED NON.LEVELIZED CONTRACT LENGTH IYFARSI ON.LINE YEAR CONTRACT YEAR NON.LEVELIZED PATtrQ2015 2016 2017 20t8 2019 2020 I 2 3 4 5 6 7I 9 10 11 12 13 14 15 16 17 't8 19 20 37.42 37.78 36.74 36.51 37.00 38.42 39.77 40.99 42.07 43.03 43.97 44.89 45.70 46.39 47.O1 47.59 48.15 48.71 49.25 49.78 38.17 35.37 35.1 6 36.87 38.67 40.28 41.67 42.88 43.93 44.94 45.93 46.79 47.52 48.17 48.77 49.35 49.94 50.50 51.06 51.63 34.42 35.03 36.37 38.82 40.80 42.42 43.78 44.93 46.02 47.08 47.99 48.76 49.43 50.05 50.65 51.26 51.85 52.43 53.02 53.62 35.69 37.46 40.52 42.72 44.42 45.80 46.94 48.03 49.10 50.01 50.76 51.4',1 52.01 52.61 53.22 53.81 54.39 55.00 55.61 56.20 39.37 47.40 43.24 48.85 45.45 50.03 47 .05 51.0348.33 5'1.8649.37 52.78s0.40 53,7351.42 54.5352.29 55.16 52.99 55.71 53.60 56.23 54.17 56.7754.74 57.3455.33 57.9155.91 58.4856.49 59.0957.10 59.7257.72 60.3358.32 60.9658.94 51.64 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 37.42 38.17 34.42 35.69 39.37 47.40 50.42 52.67 54.54 55.89 58.56 61.26 62.22 62.39 63.08 64.34 66.43 68.86 70.97 73.45 76.85 80.1 I 42.13 86 48 91.70 97.19 Note: These rates will be further adjusted with the applicable integration charge. Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'s Annual Energy Outlook 2015, released April 14,2015, See Annual Energy Outlook 2015, Table 3.8 Energy Prices by Sector-Mountain at http://www. eia. gov/forecasts/aeo/tables_ref .cfm#supplemenU AVISTA Page 2 AVISTA AVOIDED COST RATES FOR NON.SEASONAL HYDRO PROJECTS xx xx, 2015 $/MWh New Contracts and Replacement Contracts without Full Capacity Payments Eligibility for these rates is limited to projects smaller than 10 aMW. LEVELIZED NON-LEVELIZED CONTRACT LENGTH lYFARS\ ON.LINE YEAR CONTRACT YEAR NON-LEVELIZED RATES2015 2016 2017 2018 20'19 2020 'I 2 3 4 5 6 7 8 o 10 11 12 't3 14 15 16 17 18 19 20 43.32 43.72 40.86 39.71 39.65 41.58 43.29 44.80 46.11 47.26 48.35 49.40 50.33 51.13 51.84 52.50 53.14 53.77 54.37 54.96 44.16 39.48 38.31 38.54 41.14 43.29 45.08 46.60 47.88 49.1 0 50.25 51.26 52.11 52.87 53.57 54.24 54.90 55.54 56.17 56.80 34.42 35.03 36.37 40.23 43.07 45.24 47.06 48.53 49.89 51.15 52.25 53.1 6 53.96 54.70 55.41 56.11 56.78 57.44 58.1 '1 58.77 35.69 37.46 42.48 45.68 47.99 49.79 51.23 52.57 53.82 54.89 55.78 56.s5 57.25 57.94 58.63 59.30 59.95 60.62 61.29 61.93 39.37 53.7546.29 55.2549.55 56.475'1.69 57 .5153.31 58.3954.59 59.3455.80 60.3455.37 6'1.18 57.95 61.8558.76 62.4459.45 62.99 60.10 63.5760.75 64.1761,40 64.7762.04 65.3862.68 66.0363.34 66.69 64.00 67.3264.64 67.99 65.31 68.70 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 43.32 44.16 34.42 35.69 39.37 53.75 56.86 55.21 61.17 62.62 65.39 68.1 I 69.25 69.52 70.32 71.68 73.88 76.42 78.64 81.23 84.75 88.1 9 90.26 94.73 100.07 105.68 Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'s Annual Energy Outlook20l5,releasedApril 14,2015. SeeAnnual EnergyOutlook20l5,Table3.SEnergyPricesbySector-Mountainat http://www. eia. gov/forecasts/aeo/tables_ref . cfm#su pplemenU AVISTA Page 3 AVISTA AVOIDED COST RATES FOR SEASONAL HYDRO PROJECTS xx xx, 2015 $/MWh New Contracts and Replacement Contracts without Full Capacity Payments Eligibility for these rates is limited to proiects smaller than l0 aMW. LEVELIZED NON.LEVELIZED 30NTRACT LENGTH /YFARSI ON-LINE YEAR CONTMCT YEAR NON.LEVELIZED RATES201s 20'16 2017 2018 2019 2020 1 2 3 4 5 6 7I 9 10 11 't2 13 14 15 16 17 18 19 20 33.36 33.70 33.92 34.31 35.1 8 36.25 37.35 38.37 39.30 40.1 3 40.96 41.79 42.52 43.14 43.69 44.21 44.72 45.23 45.73 46.23 34.06 34.23 34.68 35.72 36.97 38.21 39.33 40.33 4',t.21 42.O9 42.96 43.73 44.37 44.94 45.47 46.00 46.53 47.04 47.56 48 08 34.42 35.03 36.37 37.85 39.24 40.46 41.53 42.45 43.37 44.28 45.07 45.73 46.31 46.85 47.39 47.93 48.46 48.99 49.53 50.09 35.69 37.46 39.1 8 40.70 41.97 43.07 43.99 44.92 45.85 46.65 47.31 47.88 48.42 48.95 49.50 50.04 50.58 51.14 51 .71 52.26 39.37 43.05 41.14 44.46 42.64 45.6143.87 46.5844.91 47.3945.78 48.2746.69 49.20 47.62 49.9748.40 50.57 49.03 51.10 49.58 51.59 50. 10 52.1150.62 52.6551.16 s3.19 5 t.70 53.7452.25 s4.33 52.82 s4.9453.41 55.5253.97 56.1454.57 56.80 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 33.36 34.06 34.42 35.69 39.37 43.05 46.00 48.1 9 49.99 51.27 53.87 56.50 57.39 57.49 58.12 59,30 61.31 63.67 65.70 68.1 0 71.42 74.68 76.55 80.82 85.95 91.36 Note: A "seasonal hydro poect" is defined as a generation facility which produces at least 55% of its annual generation during the months of June, July, and August. Order 32802. Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'s Annual Energy Outlook20l5,releasedApril 14,2015. SeeAnnual EnergyOutlook20l5,Table3.SEnergyPricesbySector-Mountainat http://www, eia. gov/forecasts/aeo/tables_ref . cfm#supplemenU AVISTA Page 4 AVISTA AVOIDED COST RATES FOR OTHER PROJECTS xx xx, 2015 $/MWh New Contracts and Reolacement Contracts without Full Caoacitv Pavments Eligibility for these rates is limited to projects smaller than l0 aMW. LEVELIZED NON.LEVELIZED CONTMCT LENGTH lYFARSI ON-LINE YEAR CONTRACT YEAR NON.LEVELIZED RATES2015 2016 2017 2018 2019 2020 1 2 3 4 5 6 7II 10 11 12 13 14 15 16 17 18 19 20 52.51 52.98 47.26 44.69 43.78 46.49 48.78 50.73 52.39 53.83 55.17 56.43 57.54 58.50 59.36 60.1 5 60.90 61.64 62.34 63.03 53.48 44.31 41.65 41.15 44.99 47.9E 50.38 52.37 54.04 55.56 56.98 58.21 59.26 60.18 61.03 61.85 62.63 63.39 64.11 64.84 34.42 35.03 36.37 42.43 46.60 49.72 52.1 6 54.14 55.90 57.49 58.86 60.02 61.03 61.94 62.82 63.66 64.46 65.24 66.02 66.78 35.69 37.46 45.53 50.27 53.54 55.99 57.91 59.62 61.17 62.49 63.59 64.54 65.41 66.24 67.06 67.84 68.60 69.37 70.1 3 70.85 39.37 63.63 51.04 65.20 55.93 66.4958.92 67.6061.06 68.54 62.71 69.5664.20 70.6265.60 71.5266.77 72.25 67.73 72.90 68.56 73.5169.34 74.1570.09 74.8070.84 75.46 71 .57 76.1272.30 76.8273.04 77.5373.78 78.2174.49 78.9375.22 79.68 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 52.51 53.48 34.42 35.69 39.37 63.63 66.88 69.38 71.49 73.09 76.01 78.97 80.1 9 80.62 81.58 83.1 1 85.47 88.19 90.58 93.34 97.04 1 00.67 102.92 107.57 1 13.1 0 1 18.91 Note: "Other projects" refers to projects other than wind, solar, non-seasonal hydro, and seasonal hydro projects. These "Other projects" may include (but are not limited to): cogeneration, biomass, biogas, landfill gas, or geothermal projects. Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'sAnnual Energy Outlook 2015, released April 14, 2015. See Annual Energy Outlook 2015, Table 3.8 Energy Prices by Sector-Mountain at http: / /vww. eia. gov/forecasts/aeoltables_ref . cfm#supplemenU AVISTA Page 5 IDAHO POWER COMPANY AVOIDED COST RATES FOR WIND PROJECTS xx xx, 2015 $/MWh New Contracts and Replacement Contracts without Full Caoacitv Pavments Eligibility for these rates is limited to projects 100 kW or smaller. LEVELIZED NON.LEVELIZED OONTRAC'I LENGTH /vtraPs\ ON.LINE YEAR CONTRACT YtrAFI NON-LEVELIZED RATES2015 2016 2017 2018 2019 2020 I 2 3 4 5 o 7 8 9 10 11 12 13 14 15 '16 17 18 '19 20 33.36 33.70 33.92 34.31 35.17 36.24 37.68 38.96 40. '10 41.09 42.05 42.98 43.80 44.50 45.1 3 45.70 46.27 46.82 47.36 47.88 34.06 34.23 34.68 35.72 36.96 s8.62 40.04 41.28 42.33 43.35 44.34 45.20 45.93 46.57 47.16 47.74 48.31 48.87 49.42 49.97 34.42 35.03 36.36 37.84 39.77 41.35 42.67 43.78 44.85 45.88 46.78 47.52 48.17 48.77 49.36 49.94 50.51 51.07 51.65 52.23 35.69 37.46 39.17 41.39 43.09 44.47 45.59 46.68 47.73 48.63 49.37 50.01 50.605l.lI 51.78 52.35 52.92 53.5'l 54.1 0 54.67 39.37 43.05 41.14 45.99 43.61 47.65 45.33 48.89 46.68 49.86 47.75 50.8648.8'1 51.8749.84 52.7150.72 53.3751.42 53.94 52.03 54.4752.60 55.02 53.17 55.5953.75 56.1554.32 s6.7354.89 57.3355.49 57.9s56.09 58.54 56.67 59.17 57.28 59.83 2015 2016 2017 201E 201 9 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 33.36 34.06 34.42 35.69 39.37 43.05 49.17 51.40 53.25 54.59 57.23 59.91 60.85 61.00 61.68 62.91 54.98 67.39 69.48 71.93 75.31 78.62 80.55 84.88 90.07 95.53 Note: These rates will be further adjusted with the applicable integration charge. Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'s Annual Energy Outlook20l5,releasedApril 14,2015. SeeAnnual EnergyOutlook20lS,Table3.SEnergyPricesbySector-Mountainat http: //www. eia. gov/forecasts/aeo/tables_ref . cfm#supplemenU IDAHO POWER COMPANY Page 1 IDAHO POWER COMPANY AVOIDED COST RATES FOR SOLAR PROJECTS xx xx, 2015 $/MWh New Contracte and Replacement Contracts without Full Capacitv Pavments Eligibility for these rates is limited to projects '100 kW or smaller. LEVELIZED NON.LEVELIZED CONTMC] LENGTH (YFARS) ON.LINE YEAR CONTRACT YEAR NON-LEVELIZED RATES2015 2016 2017 2018 2019 2020 1 2 3 4 5 b 7 8 9 10 11 12 13 14 15 16 17 18 't9 20 33.36 33.70 33.92 34.31 35.17 36.24 40.94 44.69 47.76 50.32 52.57 54.59 56.35 57.86 59.1 I 60.39 61.51 62.56 63.55 64.49 34.06 34.23 34.68 35.72 36.96 42.59 46.87 50.28 53.05 55.46 57.59 59.43 60.99 62.35 63.58 64.73 65.80 66.81 67.77 68.70 34.42 35.03 36.36 37.84 44.73 49,66 53.42 55.38 58.91 61.13 63.01 64.59 65.97 67.20 68.35 69.43 70.45 7',1 .41 72.35 73.27 35.69 37.46 39.1 7 47.86 53.50 57.s5 60.62 63,20 65.44 67.31 68.86 70.19 71.39 72.51 73.57 74.57 75.52 76.45 77.36 78.22 39.37 43.0541.14 60.03 52.60 66.50 58.90 70.23 63.05 72.7666.04 74.8668.52 76.6970.65 78.1972.41 79.4073.84 80.43 75.07 81.3776.17 a2.2A 77 .21 83.1 778.21 84.0379.16 84.8880.07 85.7380.98 86.5881.87 87.3982.71 88.2283.56 89.07 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 33.36 34.06 34.42 35.69 39.37 43.05 78.40 81.07 83.35 85.12 88.22 91.35 92.75 93.37 94.51 96.23 98.78 101 .69 104.28 107.25 111.14 1 14.98 117.44 122.31 128.0s 134.O7 Note: These rates will be further adjusted with the applicable integration charge. Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'s Annual Energy Outlook 2015, released April 14, 2015. See Annual Energy Outlook 2015, Table 3.8 Energy Prices by Sector-Mountain at http://www. eia. gov/forecasts/aeo/tables_ref . cf m#supplemenU IDAHO POWER COMPANY Page 2 IDAHO POWER COMPANY AVOIDED COST RATES FOR NON-SEASONAL HYDRO PROJECTS xx xx,2015 $/MWh New Contracts and Reolacement Contracts without Full Caoacitv Pavments Eligibility for these rates is limited to projects smaller than l0 aMW. LEVELIZED NON.LEVELIZED CONTMCT LENGTH (YEARS'I ON-LINE YEAR CONTMCT YtrAP NON-LEVELIZED RATES2015 2016 2017 2018 2019 2020 1 2 e 4 6 7 8I 10 11 12 13 14 15 't6 17 18 't9 20 33,36 33.70 33.92 34,31 35.17 36.24 40.62 44.13 47.02 49.42 51.55 53.47 55.1 3 56.56 57.82 58.97 60.03 61.04 6't.98 62.88 34.06 34.23 34.68 35.72 36.96 42.20 46.21 49.41 52.01 54.28 56.31 58.04 59.52 60.82 61.99 63.08 64.11 65.07 65.99 66.88 34.42 35.03 36.36 37.84 44.25 48.85 52.37 55.1 6 57.54 59.65 61.43 62.94 64.24 65.4'l 66.5'l 67.54 68.5'l 69.44 70.34 7',t.22 35.69 37.46 39.1 7 47.23 52.49 56.28 59.16 61.60 63.72 65.49 66.96 68.23 69.37 70.44 71.45 72.41 73.32 74.23 75.11 75.94 39.37 43.0541.14 58.67 51.72 64.6757.58 68.166't.46 70.5364.27 72.5366.60 74.2868.63 75.7270.30 76.87 71.66 77.8672.83 78.7673.88 79.6374.E8 80.5075.84 81.3376.75 82.1477.63 82.9778.50 83.80 79.37 84.59 80.18 85.4081.01 86.23 201 5 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 33.36 34.06 34.42 35.69 39.37 43.05 75.56 78.19 80.43 82.16 85.21 88.30 89.65 90.23 9 t.33 92.99 95.50 98.36 100.90 103.82 107.66 1 1 1.45 1 13.86 1 18.67 124.37 't30.33 Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'s Annual Energy Outlook 2015, released April 14, 2015. See Annual Energy Outlook 201 5, Table 3.8 Energy Prices by Sector-Mountain at http://www. eia. gov/forecasts/aeo/tables_ref . cfm#supplemenU IDAHO POWER COMPANY Page 3 IDAHO POWER COMPANY AVOIDED COST RATES FOR SEASONAL HYDRO PROJECTS xx xx, 2015 $/MWh New Contracts and Reolacement Contracts without Full Caoacitv Pavments Eligibility for these rates is limited to projects smaller than 10 aMW. LEVELIZED NON.LEVELIZED CONTRACI LENGTH TYFARS\ ON-LINE YEAR CONTRACT YEAR NON.LEVELIZED RATES2015 2016 2017 2018 2019 2020 1 2 3 4 5 6 7 8 I 10 11 12 '13 14 15 16 17 18 19 20 33.35 33.70 33.92 34.31 35.17 36.24 42.84 48.03 52.23 55.70 58.71 61.37 63.66 65.65 67.39 68.96 70.40 71.75 73.00 74.17 34.06 34.23 34.68 35.72 36.96 44.90 50.86 55.53 59.30 62.52 65.32 67.72 69.77 71.56 73. 't6 74.63 76.01 77.28 78.48 79.63 34.42 35.03 36,36 37.84 47.63 54,51 59.68 63.72 67.1',| 70.02 72.48 74.55 76.35 77.95 79.43 80.80 82.08 83.28 84.43 85.54 35.69 37.46 39.1 7 51.63 59.57 65.1 8 69.39 72.83 75.76 78.20 80.22 81.97 83.52 84.94 86.28 87.52 88.70 89.84 90.93 91.96 39.37 43.0541.14 60.2257.84 77.49 66.8'1 82.67 72.60 86.1 176.72 88.8580.01 91.1782.78 93.0685.06 94.5886.92 95.8988.51 97.0789.92 98.1891.24 99.27 92.48 100.3093.65 101.3094.76 102.3095,84 1$.2496.90 104.22 97.90 105.1798.89 106.13 2015 201 6 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 t3.36 14.06 t4,42 15.69 r9.37 13.05 )5.45 )8.37 00.90 02.93 06.29 09.69 1 1.35 12.24 13.67 15.66 1 8.50 21.70 24.58 27.84 32.04 36.1 I 38.96 44.14 50.21 56.55 Note: A "seasonal hydro project" is defined as a generation facility which produces at least 55% of its annual generation during the months of June, July, and August. Order 32802. Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'s Annual Energy Outlook20lS,releasedApril '14,2015. SeeAnnual EnergyOutlook20l5,Table3.SEnergyPricesbySector-Mountainat http://www. eia. gov/forecasts/aeo/tables_ref . cfm#supplemenV IDAHO POWER COMPANY Page 4 IDAHO POWER COMPANY AVOIDED COST RATES FOR OTHER PROJECTS xx xx, 2015 $/MWh New Gontracts and Replacement Contracts without Full Gapacity Payments Eligibility for these rates is limited to projects smaller than 10 aMW. LEVELIZED NON-LEVELIZED LENGTH lYtrAFIS\ ON-LINE YEAR CONTMCT VtrAFt NON.LEVELIZED RATES2015 2016 2017 2014 2019 2020 1 2 J 4 A A 7 8 9 10 11 12 13 14 15 16 17 18 19 20 33.36 33.70 33.92 34.31 35.17 36.24 39.76 42.62 45.00 46.99 48.78 50.41 51.82 53.04 54.12 55.10 56.01 56.89 57.71 58.50 34.06 34.23 34.68 35.72 36.96 41.16 44.41 47.03 49.19 51.09 52.81 54.30 55.56 56.66 57.66 58.60 59.50 60.34 61.15 6'1.95 34.42 35,03 36.36 37.84 42.94 46.66 49.54 51.84 53.84 55.63 57.1 6 58.44 59,55 60.56 61.50 62.41 63.26 64.08 64.89 65.68 35.69 37.46 39.17 45.52 49.74 52.83 55.20 57.24 59.05 60.57 61.83 62.92 63.90 64.82 65.71 66.56 67.37 68.18 68.98 69.73 39.37 43.0541.14 54.9749.35 59.7054.01 62.5357.15 64.5059.45 66.2061.41 67.74 63.15 69.0064.59 70.0165,76 70.8866.76 71.6767.67 72.4568.54 73.2369,39 73.98 70.20 74.7370.99 75.4971.79 76.2672.58 76.93 73.32 77.7474.OE 76.53 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 33.36 34.06 34.42 35.69 39.37 43.05 67.86 70.37 72.50 74.11 77.05 80.02 81.25 81.70 82.68 84.22 86.59 89.32 91.74 94.51 98.22 10'l .87 104.14 10E.El 't 14.36 120.18 Note: "Other projects" refers to projects other than wind, solar, non-seasonal hydro, and seasonal hydro poects. These "Other projects" may include (but are not limited to): cogeneration, biomass, biogas, landfill gas, or geothermal projects, Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'s Annual Energy Outlook 2015, released April 14,2015. See Annual Energy Outlook 2015, Table 3.8 Energy Prices by Sector-Mountain at http: //www. eia. gov/forecasts/aeo/tables_ref . cfm#su pplemenU IDAHO POWER COMPANY Page 5 PACIFICORP AVOIDED COST RATES FOR WIND PROJECTS xx xx,2015 $/MWh New Contracts and Replacement Contracts without Full Caoacitv Pavments Eligibility for these rates is limited to projects 100 kW or smaller. LEVELIZED NON.LEVELIZED CONTRACT LENGTH ryEARSI ON.LINE YEAR CONTRACT YEAR NON-LEVELIZED RATES2015 2016 2017 2018 2019 2020 1 2 c 4 5 6 7 8 I 10 11 12 't3 14 't5 16 17 18 19 20 36.21 36.56 36.80 37.21 38.10 39.1 I 40.30 41.34 42.29 43.1 3 43,98 44.81 45.56 46.1 I 46.76 47.29 47.81 48.34 48.84 49.35 36.94 37.14 37.61 38.67 39.93 41 .18 42.32 43.34 44.24 45.13 46.02 46.80 47.45 48.04 48.5E 49.12 49.66 50. t9 50.7 t 51.25 37.35 37.98 39.33 40.84 42.25 43.49 44.57 45.51 46.44 47.37 48.17 48.85 49.44 49.99 50.54 51.10 51.64 52.18 52.74 53.30 38.66 40.45 42.19 43.72 45.02 46.1 3 47.07 48.02 48.97 49.79 50.46 5't.04 51.59 52.14 52.70 53.25 53.81 54.38 54.96 55.52 42.38 46.'t044.17 47.5445.69 48.7146.94 49.7048.01 50.5248.89 51.4349.82 52.3750.76 53.1651.57 53.79 52.21 54.3352.78 54,8453.31 55.37 53.85 55.92 54 40 56.48 54.95 57.05 55.52 57.6556.'10 58.2756.70 58.8657.28 59.4957.88 60.16 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 36.21 36.94 37.35 38.66 42.38 46.10 49. 't0 51.33 53.18 54.51 57.16 59.84 60.78 60.93 61.60 62.83 64.90 67.31 69.40 7'1.85 75.23 78.54 80.46 84.79 89.98 95.45 Note: These rates will be further adjusted with the applicable integration charge. Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'s Annual Energy Outlook 2015, released April '14, 2015. See Annual Energy Outlook 2015, Table 3.8 Energy Prices by Sector-Mountain ai http://www. eia. gov/forecasts/aeo/tables_ref . cfm#supplemenU PACIFICORP Page 1 PACIFICORP AVOIDED COST RATES FOR SOLAR PROJECTS xx xx, 2015 $/MWh New Contracts and Replacement Contracts without Full Capacity Payments Eligibility for these rates is limited to projects 100 kW or smaller. LEVELIZED NON.LEVELIZED LENGTH 1YtrAFlq\ ON-LINE YEAR CONTRACT YEAR NON-LEVELIZED RATES2015 2016 2017 2018 2019 2020 1 2 3 4 5 6 7I 9 10 11 't2 '13 14 't5 16 17 18 't9 20 62.42 62.96 63.39 63.98 65.03 66.29 67.57 68.78 69.89 70.89 7't.89 72.87 73.76 74.54 75.25 75.92 76.57 77.22 77.86 78.48 63.54 63.93 64,58 65.82 67.26 68.69 70.00 71 .18 72.24 73.30 74.34 75.27 76.07 76.80 77.49 78.17 78.84 79.50 80.15 80.8'l 64.34 65.1 5 66.70 68.39 69.97 71.39 72.65 73.76 74.85 75.94 76.91 77.74 78.48 79.18 79.87 80.57 81.25 81.92 82.61 83.30 66.04 68.03 69.96 71.68 73.16 74.45 75.56 76.68 77.80 78.78 79.6'1 80.36 81.06 81.76 82.46 83.1 6 83.85 84.55 85.27 85.95 70.17 74.2972.15 75.9373.86 77.2975.30 78.4876.55 79.4977.62 80.5878.73 81.70 79.84 82.67 80.82 83.46 81.63 84.1782.36 84.8583.05 85.5483.74 86.2684.45 86.97 85.15 87.69 85.86 88.43 86.58 89. t987.32 89.93 88.02 90.69 88.76 9'r.49 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 202s 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 62.42 63.54 64.34 66.04 70.17 74.29 77.70 80.35 82.63 84.39 87.48 90.60 91.99 92.59 93.73 95.43 97.98 1 00.87 103.46 106.41 110.29 114.1',| 1 16.56 121.42 127.15 I 33.1 6 Note: These rates will be further adjusted with the applicable integration charge. Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'s Annual Energy Outlook2015,releasedApril14,2015. SeeAnnualEnergyOutlook20l5,Table3.SEnergyPricesbySector-Mountainat http:/Aivww. eia. gov/forecasts/aeo/tables_ref . cfm#supplemenU PACIFICORP Page 2 PACIF!CORP AVOIDED COST RATES FOR NON€EASONAL HYDRO PROJECTS xx xx, 20,t5 $/MWh New Contracts and Reolacement Contracts without Full Caoacitv Pavments Eligibility for these rates is limited to projects smaller than 10 aMW. LEVELIZED NON.LEVELIZED CONTRACT LENGTH /YFARS'I ON-LINE YEAR CONTRACT YEAR NON.LEVELIZED RATES2015 2016 2017 20'18 2019 2020 1 2 3 4 5 6 7I 9 10 11 12 '13 14 15 't6 17 18 19 20 59.88 60.40 60.81 61.38 62.42 63.66 64.93 66.1 1 67.21 68.1 9 69.'18 70.15 71.O3 71 .79 72.48 73.14 73.78 74.42 75.04 75.65 60.96 61.33 61.96 63.1 I 64.61 66.02 67.31 68.46 69.52 70.56 71,59 72.50 73.30 74.01 74.69 75.35 76.01 76.66 77.29 77.94 61.72 62.52 64.04 65.71 67.28 68.68 69.92 71.O1 72.10 73.'t7 74.12 74.93 75.66 76.35 77.03 77 .71 78.37 79.03 79.71 80.39 63.38 65.35 67.26 68.96 70.42 71.70 72.80 73.90 75.00 75.96 76.78 77.51 78.20 78.88 79.57 80.25 80.93 81.62 82.33 83.00 67 .47 71.5669.44 73.1I71.13 74.52 72.s5 75.6973.78 76.6874.83 77.7575.92 78.8577.O2 79.8077.98 80.5878.77 81.2879.49 81.94 60.16 82.6180.84 83.3181.54 84.0182.22 84.7182.91 85.44 83.62 86.19 84.35 86.9185.04 87.6665.76 88.45 2015 20'16 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 59.88 60.96 61.72 63.38 67.47 71.56 74.92 77.54 79.77 81.49 84.53 87.6'l 88.96 89.52 90.61 92.27 94.77 97.62 1 00.1 5 1 03.05 1 06.89 't 10.66 't 13.06 1 17.86 123.54 I 29.50 Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'sAnnual Energy Outlook 2015, released April 14, 2015. SeeAnnual Energy Outlook 2015, Table 3.8 Energy Prices by Sector-Mountain at http: //www. eia. gov/forecasts/aeo/tables_ref . cfm#supplemenU PACIFICORP Page 3 PACIFICORP AVOIDED COST RATES FOR SEASONAL HYDRO PROJECTS xx xx, 2015 $/MWh New Contracts and Replacement Contracts without Full Capacity Payments Eligibility for these rates is limited to projects smaller than '10 aMW. LEVELIZED NON.LEVELIZED LENGTH (YEARS) ON-LINE YEAR CONTRACT YEAR NON.LEVELIZED RATES201s 2016 2017 2018 2019 2020 I 2 3 4 5 6 7 I I 10 11 12 13 14 15 16 17 18 't9 20 77.72 78.36 78.89 79.59 80.74 82.11 83.48 84.78 85.99 87.08 88.'l 7 89.24 90.22 91.08 91.87 92.62 93.35 94.07 94.78 95.48 79.06 79.55 80.31 81.66 83.21 84.73 86.1 4 87.42 88.58 89.72 90.85 91.87 92.77 93.58 94.35 95.'l 1 95.86 96.60 97.32 98.05 80.08 81.01 82.66 84.46 86,1 5 87.67 89.03 90.23 9'1.43 92.61 93.67 94.59 95.42 96.21 96.98 97.76 98.52 99.27 1 00.03 100.79 82.01 84.11 86.'l 5 87.98 89.57 90.96 92.1 8 93.40 94.61 95.69 96.62 97.45 98.24 99.03 99.82 100.60 101.37 102.15 102.95 103.70 86.38 90.7488.47 92.49 90.29 93.97 91.85 95.26 93.20 96.3894.38 97.5895.59 98.8196.81 99.8897.88 100.78 98.79 101.5899.61 '102 36 100.40 103.14 't01 . 18 103.95 101.98 104.75 102.77 105.56'103.55 106.39104.36 107 .23105.18 108.05 105.96 108.89 106.77 109.76 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 77.72 79.06 80.08 82.01 86.38 90.74 94.39 97.28 99.80 101.82 1 05.1 6 1 08.54 110.t9 111.07 112.47 114.45 117.27 120.45 123.32 1 26.56 130.74 134.87 137.62 142.79 148.83 1 55.1 6 Note: A "seasonal hydro project" is defined as a generation facility which produces at least 55% of its annual generation during the months ofJune, July, and August. Order 32802. Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'s Annual Energy Outlook 2015, released April 14,2015. See Annual Energy Outlook 2015, Table 3.8 Energy Prices by Sector-Mountain at http:/Aauw. eia. gov/forecasts/aeo/tables_ref , cfm#supplemenU PACIFICORP Page 4 PACIFICORP AVOIDED COST RATES FOR OTHER PROJECTS xx xx, 2015 $/MWh New Contracts and Replacement Contracts without Full Caoacitv Pavments Eligibility for these rates is limited to projects smaller than 10 aMW. LEVELIZED NON.LEVELIZED CONTRACT LENGTH /VFAPA\ ON.LINE YEAR CONTRACT YtrAFI NON-LEVELIZED PATFS2015 2016 2017 2018 2019 2020 1 2 2 4 5 6 7I I 10 11 12 13 14 15 16 17 18 19 20 52.97 53.44 53.80 54.33 55.32 56.52 57.74 58.88 59.94 60.88 61.82 62.76 63.59 64.32 64.98 65.60 66.20 66.8'l 67.40 67.98 53.95 54.27 54.85 56.03 57.41 58.77 60.02 61.15 62.15 63.14 64.1 3 65.00 65.76 66.43 67.07 67.70 68.32 68.93 69.54 70.15 54.61 55.36 56.83 58.45 59.98 6't.33 62.53 63.57 64.61 65.64 66.55 67.32 68.01 68.66 69.30 69.94 70.57 71.20 71.84 72.48 56.1 7 58.08 59.95 61.60 63.0'l 64.24 65.29 66.35 67.40 68.33 69. '10 69.79 70.43 71.08 71 .73 72.3E 73.02 73.67 74.34 74.98 60.15 64.1362.06 65.7063.70 66.9965.08 68.1066.26 69.0467.26 70.0768.31 71.1369.36 72.0370.27 72.7671.02 73.4171.69 74.0372.33 74.6672.97 75.3273.62 75.9874.27 76.6474.92 77.3375.59 78.0476.28 78.7376.94 79.44 77 .62 80. 't9 2015 2016 2017 2018 201 I 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 52.97 53.95 54.61 56.17 60.1 5 64.13 67.39 69.89 72.O'.| 73.62 76.55 79.51 80.74 81.18 82.15 83.68 86.05 88.77 91.18 93.95 97.65 101.29 103.55 108.21 1',t3.75 1 19.56 Note: "Other projects" refers to p@ects other than wind, solar, non-seasonal hydro, and seasonal hydro projects. These "Oiher projects" may include (but are not limited to): cogeneration, biomass, biogas, landfill gas, or geothermal projects. Note: The rates shown in this table have been computed using the U.S. Energy lnformation Administration (ElA)'s Annual Energy Outlook20l5,releasedApril 14,2015. SeeAnnual EnergyOutlook20l5,Table3.SEnergyPricesbySector-Mountainat http: //www. eia. gov/forecasts/aeo/tables_ref . cf m#supplemenU PACIFICORP Page 5