Loading...
HomeMy WebLinkAbout20141222Reply Comments.pdfT!lml{oIIIPO'I'ER= An IDACORP Comoanv DONOVAN E. WALKER Lead Gounse! l--,d.ra13 i i'!; F, -t |- .':- rli\-'J'1.,r. ?fllh Dfl] l9 PFI l+: 35 ll , ri I r .l:'l'I i'-.' I *"- - r- '. U'i Il-lT! :l:; l ;Lii;i', irlilu;' December 19,2014 VIA HAND DELIVERY Jean D. Jewell, Secretary ldaho Public Utilities Commission 472 West Washington Street Boise, ldaho 83702 Re: Case No. !PC-E-14-36 Orchard Ranch Solar, LLC - ldaho Power Company's Reply Comments Dear Ms. Jewell: Enclosed for filing in the above matter please find an original and seven (7) copies of ldaho Power Company's Reply Comments. DEW:csb Enclosures 1221 W ldaho 5t. (83702) P.O. Box 70 Boise, lD 83707 Very tryly yours, DONOVAN E. WALKER (lSB No. 5921) ldaho Power Company 1221West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 Telephone: (208) 388-5317 Facsimile: (208) 388-6936 dwalker@idahopower.com Attorney for ldaho Power Company BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION rN THE MATTER OF THE APPLTCATTON ) oF IDAHO POWER COMPANY FOR ) CASE NO. IPC-E-14-36 APPROVAL OR REJECTION OF AN ) ENERGY SALES AGREEMENT WITH ) IDAHO POWER COMPANY'S ORCHARD RANCH SOLAR, LLC FOR THE ) REPLY COMMENTS SALE AND PURCHASE OF ELECTRTC ) ENERGY.) ) ldaho Power Company ("ldaho Powed'), in response to the Notice of Application and Notice of Modified Procedure issued in Order No. 33172 and Order No. 33189 granting the ldaho Public Utilities Commission ("Commission") Staffs ("Staff') request to extend the comment deadlines and in response to the Comments of the Commission Staff filed on December 12, 2014, hereby respectfully submits the following Reply Comments to the Commission. With these Reply Comments, ldaho Power submits, as Attachment t hereto, a replacement page 39, to incorporate a change in the project location into Appendix B of the Energy Sales Agreement ('ESA'). IDAHO POWER COMPANY'S REPLY COMMENTS - 1 1. On November 21, 2014, ldaho Power filed !nitial Comments in this matter which submitted a "Replacement Appendix E" reflecting the Commission-approved rate adjustments from the Grand View Solar and Boise City Solar cases. Order No. 33179 (Grand View Solar); Order No. 33180 (Boise City Solar). 2. On December 12,2014, Staff filed Comments recommending, for Orchard Ranch Solar, that the Commission approve the ESA utilizing the Replacement Appendix E prices filed with ldaho Powe/s lnitial Comments on November 21,2014. 3. On December 18, 2014, Murphy Flat Power, LLC; Simco Solar, LLC; American Falls Solar, LLC; American Falls Solar ll, LLC; and Orchard Ranch Solar, LLC, filed Reply Comments. ln those Reply Comments, Murphy Flat Power, Simco Solar, and American Falls Solar, each accepted Staffs recommended additional adjustment from ldaho Powe/s Response to the Third Production Request of Staff, and consented to ldaho Power preparing and submitting a revised Appendix E for each project's ESA reflecting that recommended adjustment. American Falls Solar ll and Orchard Ranch Solar each accepted Staffs recommendation that their ESAs be approved incorporating the rate adjustments reflected in the "Replacement Appendix E" that was submitted with ldaho Powe/s lnitial Comments of November 20, 2014. Additionally, Simco Solar and Orchard Ranch Solar provided information identifying their respective project locations in Appendix B of the ESAs. Submitted herewith as Attachment 1 is a replacement page 39, in both clean and redlined format, to incorporate the change in project location into Appendix B of the ESA for Orchard Ranch Solar. IDAHO POWER COMPANY'S REPLY COMMENTS - 2 4. Should the Commission determine to accept Staffs re@mmendation, ldaho Power recommends incorporation and approval of the replacement page 39, with the approval of the ESA, rather than incorporating the same through a contract amendment. Respectfully submitted this 19h day of December 2014. Attomey for ldaho Power Company IDAHO POWER COMPANY'S REPLY COMMENTS - 3 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on the 19h day of December 20141 served a true and conect copy of IDAHO POWER COMPANY'S REPLY COMMENTS upon the following named parties by the method indicated below, and addressed to the following: Commission Staff Kristine A. Sasser Deputy Attomey General ldaho Public Utilities Commission 47 2 W est Washington (83702) P.O. Box 83720 Boise, ldaho 83720-OOT 4 Orchard Ranch Solar, LLC Ron Wi!!iams Williams Bradbury, P.C 1015 West Hays Street Boise, ldaho 83702 Ben Fairlcanks Director, Development First Wind X Hand Delivered U.S. Mail Overnight Mail FAX Email kris.sasser@puc. idaho.ggv Hand Delivered U.S. Mail Ovemight Mail FAXX Email ron@williamsbradburv.com _Hand Delivered U.S. Mail Ovemight Mail FAXX Email bfairbanks@firstwind.com Christa Bearry, Legal Assi IDAHO POWER COMPANY'S REPLY COMMENTS - 4 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION GASE NO. IPG-E-14-36 IDAHO POWER COMPANY ATTACHMENT 1 GLEAN FORMAT B-l APPENDX B FACILITY AND POINT OF DELTVERY Project Name: Orchard Ranch Solar. LLC 25573998 DESCRIPTION OF FACILITY (Must include the Nameplate Capacity rating and VAR capability (both leading and lagging) of all Generation Units to be included in the Facility.) Orchard Ranch Solar. LLC is a 20 MW AC: 26.19 lvIW DC single-axis tracking photovoltaic facilitv to be located on approximatelv 160 acres near Orchard in Ada County. Idaho. The Project consists of l0 (ten) x 2.0 MWac SMA inverters (or equivalent) and 85.880 x JA 305w dc panels (or equivalent). Nameplate: 20 MWac Var Capability (Both leading and lagging) Leadingis0.95 Laggrng is 0.95. B-2 LOCATIONOFFACILITY Near: Pleasant Valley. ID Actual or nearest physical street address: Pleasant Valley Road Ada County, Idaho 83716 GPSCoordinates: LatitudeDecimalDegrees: 43o27'30.15'N Longitude Decimal Degrees: I 16o14'3.32"W State: Idaho County: Ada Description of lnterconnection Location: 34.5kV line near Pleasant Valley Road B-3 SCHEDULED FIRST ENERGY AND OPERATION DATE Seller has selected September 15e.2016 as the Scheduled First Enerry Date. Seller has selected December 1". 2016 as the Scheduled Operation Date. In making these selections, Seller recognizes that adequate testing of the Facility and completion of all requiranents in paragraph 5.2 of this Agreement must be completed prior to the project being granted an Operation Date. 39 REDLINED FORMAT APPENDX B FACILITY AND POINT OF DELIVERY Project Name: Orchard Ranch Solar. LLC Project Number: 25 57 3998 B-I DESCRIPTIONOFFACILITY (Must include the Nameplate Capacity rating and VAR capability (both leading and lagging) of all Generation Units to be included in the Facility.) Orchard Ranch Solar. LLC is a 20 MW AC: 26.19 MW DC single-axis tracking photovoltaic facility to be located on approximately 160 acres near Orchard in Ada County. Idaho. The Project consists of 10 (ten) x 2.0 MWac SMA inverters (or equivalent) and 85.880 x JA 305w dc panels (or equivalent). Nameplate: 20 MWac Var Capability (Both leading and lagging) Leading is 0.95 Laggrng is 0.95. B-2 LOCATION OF FACILITY Near: Orehsrd-fDPleasant Valley. ID Actualornearestphysicalstreetaddress:AdaCounty,Idaho 83716 GPSCoordinates: LatitudeDecimalDegrees: 43"27'30.15"N43332++ Longitude Decimal Degrees: | | 60 | 4' 3.32rW -++642+743- State:Idaho County:P€{fferAda Descriptionof[nterconnectionLocation:34.5kVlinenear@Road B-3 SCHEDULED FIRST ENERGY AND OPERATION DATE Seller has selected Seotember 156. 2016 as the Scheduled First Energy Date. Seller has selected December l't. 2016 as the Scheduled Operation Date. ln making these selections, Seller recognizes that adequate testing of the Facility and completion of all require'ments in paragraph 5.2 of this Agreement must be completed prior to the project being granted an Operation Date. 39