DONOVAN E. WALKER
Lead Gounse!
l--,d.ra13 i i'!;
F, -t |- .':- rli\-'J'1.,r.
?fllh Dfl] l9 PFI l+: 35
ll , ri I r .l:'l'I i'-.' I *"- - r- '.
U'i Il-lT! :l:; l ;Lii;i', irlilu;'
December 19,2014
VIA HAND DELIVERY
Jean D. Jewell, Secretary
ldaho Public Utilities Commission
472 West Washington Street
Boise, ldaho 83702
Re: Case No. !PC-E-14-36
Orchard Ranch Solar, LLC - ldaho Power Company's Reply Comments
Dear Ms. Jewell:
Enclosed for filing in the above matter please find an original and seven (7)
copies of ldaho Power Company's Reply Comments.
DEW:csb
Enclosures
1221 W ldaho 5t. (83702)
P.O. Box 70
Boise, lD 83707
Very tryly yours,
DONOVAN E. WALKER (lSB No. 5921)
ldaho Power Company
1221West ldaho Street (83702)
P.O. Box 70
Boise, ldaho 83707
Telephone: (208) 388-5317
Facsimile: (208) 388-6936
dwalker@idahopower.com
Attorney for ldaho Power Company
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
rN THE MATTER OF THE APPLTCATTON )
oF IDAHO POWER COMPANY FOR ) CASE NO. IPC-E-14-36
APPROVAL OR REJECTION OF AN )
ENERGY SALES AGREEMENT WITH ) IDAHO POWER COMPANY'S
ORCHARD RANCH SOLAR, LLC FOR THE ) REPLY COMMENTS
SALE AND PURCHASE OF ELECTRTC )
ENERGY.)
)
ldaho Power Company ("ldaho Powed'), in response to the Notice of Application
and Notice of Modified Procedure issued in Order No. 33172 and Order No. 33189
granting the ldaho Public Utilities Commission ("Commission") Staffs ("Staff') request to
extend the comment deadlines and in response to the Comments of the Commission
Staff filed on December 12, 2014, hereby respectfully submits the following Reply
Comments to the Commission. With these Reply Comments, ldaho Power submits, as
Attachment t hereto, a replacement page 39, to incorporate a change in the project
location into Appendix B of the Energy Sales Agreement ('ESA').
IDAHO POWER COMPANY'S REPLY COMMENTS - 1
1. On November 21, 2014, ldaho Power filed !nitial Comments in this matter
which submitted a "Replacement Appendix E" reflecting the Commission-approved rate
adjustments from the Grand View Solar and Boise City Solar cases. Order No. 33179
(Grand View Solar); Order No. 33180 (Boise City Solar).
2. On December 12,2014, Staff filed Comments recommending, for Orchard
Ranch Solar, that the Commission approve the ESA utilizing the Replacement Appendix
E prices filed with ldaho Powe/s lnitial Comments on November 21,2014.
3. On December 18, 2014, Murphy Flat Power, LLC; Simco Solar, LLC;
American Falls Solar, LLC; American Falls Solar ll, LLC; and Orchard Ranch Solar,
LLC, filed Reply Comments. ln those Reply Comments, Murphy Flat Power, Simco
Solar, and American Falls Solar, each accepted Staffs recommended additional
adjustment from ldaho Powe/s Response to the Third Production Request of Staff, and
consented to ldaho Power preparing and submitting a revised Appendix E for each
project's ESA reflecting that recommended adjustment. American Falls Solar ll and
Orchard Ranch Solar each accepted Staffs recommendation that their ESAs be
approved incorporating the rate adjustments reflected in the "Replacement Appendix E"
that was submitted with ldaho Powe/s lnitial Comments of November 20, 2014.
Additionally, Simco Solar and Orchard Ranch Solar provided information identifying
their respective project locations in Appendix B of the ESAs. Submitted herewith as
Attachment 1 is a replacement page 39, in both clean and redlined format, to
incorporate the change in project location into Appendix B of the ESA for Orchard
Ranch Solar.
IDAHO POWER COMPANY'S REPLY COMMENTS - 2
4. Should the Commission determine to accept Staffs re@mmendation,
ldaho Power recommends incorporation and approval of the replacement page 39, with
the approval of the ESA, rather than incorporating the same through a contract
amendment.
Respectfully submitted this 19h day of December 2014.
Attomey for ldaho Power Company
IDAHO POWER COMPANY'S REPLY COMMENTS - 3
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on the 19h day of December 20141 served a true and
conect copy of IDAHO POWER COMPANY'S REPLY COMMENTS upon the following
named parties by the method indicated below, and addressed to the following:
Commission Staff
Kristine A. Sasser
Deputy Attomey General
ldaho Public Utilities Commission
47 2 W est Washington (83702)
P.O. Box 83720
Boise, ldaho 83720-OOT 4
Orchard Ranch Solar, LLC
Ron Wi!!iams
Williams Bradbury, P.C
1015 West Hays Street
Boise, ldaho 83702
Ben Fairlcanks
Director, Development
First Wind
X Hand Delivered
U.S. Mail
Overnight Mail
FAX
Email kris.sasser@puc. idaho.ggv
Hand Delivered
U.S. Mail
Ovemight Mail
FAXX Email ron@williamsbradburv.com
_Hand Delivered
U.S. Mail
Ovemight Mail
FAXX Email bfairbanks@firstwind.com
Christa Bearry, Legal Assi
IDAHO POWER COMPANY'S REPLY COMMENTS - 4
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
GASE NO. IPG-E-14-36
IDAHO POWER COMPANY
ATTACHMENT 1
GLEAN FORMAT
B-l
APPENDX B
FACILITY AND POINT OF DELTVERY
Project Name: Orchard Ranch Solar. LLC
25573998
DESCRIPTION OF FACILITY
(Must include the Nameplate Capacity rating and VAR capability (both leading and lagging) of
all Generation Units to be included in the Facility.)
Orchard Ranch Solar. LLC is a 20 MW AC: 26.19 lvIW DC single-axis tracking photovoltaic
facilitv to be located on approximatelv 160 acres near Orchard in Ada County. Idaho. The
Project consists of l0 (ten) x 2.0 MWac SMA inverters (or equivalent) and 85.880 x JA 305w dc
panels (or equivalent).
Nameplate: 20 MWac
Var Capability (Both leading and lagging) Leadingis0.95 Laggrng is 0.95.
B-2 LOCATIONOFFACILITY
Near: Pleasant Valley. ID
Actual or nearest physical street address: Pleasant Valley Road Ada County, Idaho 83716
GPSCoordinates: LatitudeDecimalDegrees: 43o27'30.15'N
Longitude Decimal Degrees: I 16o14'3.32"W
State: Idaho County: Ada
Description of lnterconnection Location: 34.5kV line near Pleasant Valley Road
B-3 SCHEDULED FIRST ENERGY AND OPERATION DATE
Seller has selected September 15e.2016 as the Scheduled First Enerry Date.
Seller has selected December 1". 2016 as the Scheduled Operation Date.
In making these selections, Seller recognizes that adequate testing of the Facility and completion
of all requiranents in paragraph 5.2 of this Agreement must be completed prior to the project
being granted an Operation Date.
39
REDLINED FORMAT
APPENDX B
FACILITY AND POINT OF DELIVERY
Project Name: Orchard Ranch Solar. LLC
Project Number: 25 57 3998
B-I DESCRIPTIONOFFACILITY
(Must include the Nameplate Capacity rating and VAR capability (both leading and lagging) of
all Generation Units to be included in the Facility.)
Orchard Ranch Solar. LLC is a 20 MW AC: 26.19 MW DC single-axis tracking photovoltaic
facility to be located on approximately 160 acres near Orchard in Ada County. Idaho. The
Project consists of 10 (ten) x 2.0 MWac SMA inverters (or equivalent) and 85.880 x JA 305w dc
panels (or equivalent).
Nameplate: 20 MWac
Var Capability (Both leading and lagging) Leading is 0.95 Laggrng is 0.95.
B-2 LOCATION OF FACILITY
Near: Orehsrd-fDPleasant Valley. ID
Actualornearestphysicalstreetaddress:AdaCounty,Idaho
83716
GPSCoordinates: LatitudeDecimalDegrees: 43"27'30.15"N43332++
Longitude Decimal Degrees: | | 60 | 4' 3.32rW -++642+743-
State:Idaho County:P€{fferAda
Descriptionof[nterconnectionLocation:34.5kVlinenear@Road
B-3 SCHEDULED FIRST ENERGY AND OPERATION DATE
Seller has selected Seotember 156. 2016 as the Scheduled First Energy Date.
Seller has selected December l't. 2016 as the Scheduled Operation Date.
ln making these selections, Seller recognizes that adequate testing of the Facility and completion
of all require'ments in paragraph 5.2 of this Agreement must be completed prior to the project
being granted an Operation Date.
39