HomeMy WebLinkAbout20141121Initial Comments.pdf3Effi*.
An IDACORP Company
DONOVAN E. WALKER
Lead Gounsel
dwal ker@idahopower.com
November 20,2014
VIA HAND DELIVERY
Jean D. Jewell, Secretary
ldaho Public Utilities
472 West Washington Street
Boise, ldaho 83702
Re: Case No. IPC-E-1
Clark Solar 1, LL
Dear Ms. Jewell:
Enclosed for filing plea
- ldaho Power Company's lnitia! Comments
find an original and seven (7) copies of ldaho Power
Company's lnitial Comments in above matter.
DEW:csb
Enclosures
dnovan E. Walker
1221 W ldaho St. (83702)
P.O. Box 70
Boise, lD 83707
DONOVAN E. WALKER (lSB No. 5921)
ldaho Power Company
1221West ldaho Street (83702)
P.O. Box 70
Boise, ldaho 83707
Telephone: (208) 388-5317
Facsimile: (208) 388-6936
dwalker@idahopower.com
Attorney for ldaho Power Company
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR
APPROVAL OR REJECTION OF AN
ENERGY SALES AGREEMENT WITH
CLARK SOLAR 1, LLC FOR THE SALE
AND PURCHASE OF ELECTRIC ENERGY.
[).-]r\l- !,'_ -.
?1lli, ljtllt 20 Pi1 t+: 57
BEFORE THE IDAHO PUBLIC UTILIT!ES COMMISSION
CASE NO. IPC-E.14.28
IDAHO POWER COMPANY'S
INITIAL COMMENTS
ldaho Power Company ("ldaho Powe/' or "Company") hereby respectfully
submits the following lnitial Comments to the ldaho Public Utilities Commission
("Commission") in the above-referenced matter:
1. The Comments of the Commission Staff ("Staffl') from Case No.
IPC-E-14-19 (Grand View Solar) and Case No. IPC-E-14-2O (Boise City Solar)
recommended that the rates contained in the Energy Sales Agreement ('ESA") between
ldaho Power and each solar qualifying facility ('QF') be revised to account for energy
cost computation issues identified by Staff. Staff recommended two modifications,
related to assumptions about the fuel forecast and assumptions about displaceable
IDAHO POWER COMPANY'S INITIAL COMMENTS - 1
resources, to the computation of avoided cost rates utilized by the approved
lncremental Cost lntegrated Resource Plan Methodology. ldaho Power incorporated
Staffs recommended adjustments into the model, and submitted replacement pricing for
each ESA. Each QF agreed to replace the pricing in its respective ESA with the
replacement pricing that incorporated the revisions recommended by Staff. The
Commission then subsequently approved each modified ESA containing the
replacement pricing. Order No. 33179 (Grand View Solar); Order No. 33180 (Boise City
Solar).
2. Clark Solar 1, LLC, has requested that ldaho Power re-run the pricing
contained in its ESA to incorporate Staffs recommended adjustments from the Grand
View Solar and Boise City Solar cases. ldaho Power has revised the rates in Clark
Solar 1, LLC's ESA to incorporate Staffs recommended adjustments. ldaho Power has
generated a Replacement Appendix E to the ESA which contains the revised prices.
The Replacement Appendix E is submitted herewith as Attachment 1 in both clean and
redlined format. Additionally, included as Attachment 2, in both clean and redlined
format, are several replacement pages of the ESA that contain the necessary changes
to incorporate the Replacement Appendix E into the ESA.
3. For comparison purposes, the 2O-year levelized rate for the ESA as
originally submitted is $61.71lmegawatt-hour ("MWh') and the rate from the
Replacement Appendix E is $60.22lMWh. The estimated 20-year contractual obligation
based upon the originally submitted prices is $249,756,516 and the estimated 2O-year
contractual obligation with the revised prices is $243,784,875. The levelized integration
charge contained in the ESA is the same in both instances at $4.1s/MWh.
IDAHO POWER COMPANY'S INITIAL COMMENTS - 2
4. Based upon the Commission's decision in Order No. 33159, Case No.
IPC-E-14-22, ennfirming July 2021 as the Company's capacity deficiency period for use
in the Incremental Cost lntegrated Resource PIan Methodology, ldaho Power has not
submitted a Replacement Appendix F and has deleted reference to the alternative
pricing Appendix F in the replacement ESA pages submitted herewith in Attachment 2.
Idaho Power is not cunently aware of whether Clark Solar 1, LLC, wishes to continue to
pursue its argument that the Commission adopt the alternative pricing from Appendix F
that utilized a capacity deficit of July 2016. Additionally, ldaho Power is not currently
aware of whether Clark Solar 1, LLC, agrees to adopt the Replacement Appendix E
which incorporates Staffs recommended changes to the pricing model.
Respectfully submitted this 20h day of November 2014.
Attomey for Idaho Power Company
IDAHO POWER COMPANY'S INITIAL COMMENTS - 3
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on the 20th day of November 20141 served a true and
correct copy of IDAHO POWER COMPANY'S lNlTlAL COMMENTS upon the following
named parties by the method indicated below, and addressed to the following:
Gommission Staff
Kristine A. Sasser
Deputy Attomey General
ldaho Public Utilities Commission
472 West Washington (83702)
P.O. Box 83720
Boise, Idaho 8372O-OOT 4
Clark Solar 1, LLC
Dean J. Miller
McDEVITT & MILLER, LLP
420 West Bannock
Boise, ldaho 83702
Mark van Gulik
Clark Solar 1, LLC
P.O. Box 7354
Boise, ldaho 83701
X Hand Delivered
U.S. Mail
Overnight Mail
FAXX Email kris.sasser@ puc. idaho.oov
Hand Delivered
U.S. Mail
Overnight Mail
FAXX Email ioe@mcdevitt-miller.com
_Hand Delivered
U.S. Mail
Ovemight Mail
FAXX Email mvangulik@suneroyworld.com
IDAHO POWER COMPANY'S INITIAL COMMENTS - 4
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
GASE NO. IPC-E-14-29
IDAHO POWER COMPANY
ATTACHMENT 1
GLEAN FORMAT
E-l
REPLACEMENT APPENDIX E
SOLARFACILITY ENERGY PRICES AND INTEGRATION CHARGES
(Prices based upon the energy shape and capacity specified in Appendix I)
Base Enersy Purchase Prices - For all Base Energy received during Heavy Load Hours Idaho
Power shall pay the Base Energy Heavy Load Purchase Price less the Solar Integration Charge
specified below and for all Base Energy received during Light Load Hours Idaho Power shall pay
the Base Energy Light Ioad Purchase Price less the Solar Integration Charge specified below. All
of these prices are subject to revision as specified within paragraph 7.5.
Base Energy Heavy
Load Purchase Price
Month./Year (Mills/kWh)
Jan-16 $31.77
Feb-16 $32.08
Mar-16 532.39
Apr-16 $32.70
May-16 533.01
Jtrn-16 $33.32
Jul-16 $33.63
Aug-16 S33.94
Sep-16 $34.25
Oct-16 $34.56
Nov-16 $34.87
Dec-16 $35.18
Jan-17 $35.49
Feb-17 $35.80
Mar-17 $36.1I
Apr-17 536.42
May-17 $36.73
Jun-17 $37.04
Jul-17 S37.35
Aug-17 537.66
Sep-17 $37.97
Oct-17 $38.28
Nov-17 $38.59
Dec-17 $38.90
Jan-18 $39.21
Feb-18 $39.52
Mar-18 $39.83
Base Energy Light Solar Integration
LoadPurchase Price Charge(Mills/kWh) (Mills/kWh)
$29.80
s30.09
s30.37
$30.66
s30.95
$31.24
$31.53
$31.82
$32.1I
$32.40
s32.69
s32.97
$33.26
$33.ss
s33.84
$34. l 3
s34.42
s34.71
$3s.00
$35.28
$3s.s7
$35.86
$36.15
$36.44
$36.73
s37.02
$37.31
$3.20
$3.20
$3.20
$3.20
$3.20
$3.20
$3.20
s3.20
$3.20
s3.20
$3.20
s3.20
s3.29
$3.29
s3.29
s3.29
$3.29
$3.29
$3.29
$3.29
$3.29
s3.29
$3.29
s3.29
s3.39
$3.39
$3.39
47
Apr-18
May-18
Jun-18
Jul- l8
Aug-18
Sep-18
Oct-18
Nov-18
Dec-I8
Jan-19
Feb-19
Mar-19
Apr-19
May-19
Jun-19
Jul-19
Aug-19
Sep-19
Oct-19
Nov-19
Dec-19
Jan-20
Feb-20
Mar-20
Apr-20
May-20
Jun-20
Jul-20
Aug-20
Sep-20
Oct20
Nov-20
Dec-20
Ja*21
Feb-21
Mar-21
Apr-21
May-21
Jun-21
Jul-21
Aug-21
Sep-21
Oct-21
Nov-21
Dec-21
Jan-22
Feb-22
Mar-22
$40.14
$40.45
$40.77
$41.08
s41.39
s41.70
$42.0r
v2.32
942.63
$42.94
$43.2s
$43.s6
s43.87
$44.18
s44.49
$44.80
s45.11
$4s.42
$45.73
$46.04
$46.35
$46.66
$46.97
$47.28
$47.59
$47.90
$48.21
$48.52
$48.83
$49.14
$49.45
s49.76
$s0.07
$50.38
$s0.69
$sr.00
$51.31
$5 r.62
$51.93
$s2.24
$s2.55
$52.86
$53.r7
$s3.48
$53.80
$s4. l r
s54.42
s54.73
$37.60
s37.88
$38.17
$38.46
s38.7s
s39.04
$39.33
s39.62
$39.91
$40.19
s40.48
v0.77
$41.06
$41.3s
$41.64
s4r.93
$42.22
$42.50
$42.79
$43.08
$43.37
$43.66
$43.95
$44.24
$44.s3
$44.82
$4s.10
s45.39
$4s.68
$4s.97
$46.26
s46.5s
$46.84
$47. l3
$47.4r
947.70
947.99
$48.28
$48.57
$48.86
$49.15
s49.44
$49.73
$50.01
$s0.30
$s0.59
$50.88
$s r. r7
$3.39
$3.39
$3.39
$3.39
$3.39
$3.39
$3.39
$3.39
$3.39
$3.49
$3.49
$3.49
$3.49
$3.49
$3.49
$3.49
$3.49
$3.49
$3.49
$3.49
$3.49
$3.60
$3.60
$3.60
$3.60
$3.60
s3.60
$3.60
s3.60
$3.60
s3.60
$3.60
$3.60
$3.71
$3.71
$3.71
$3.71
$3.7r
$3.71
$3.71
$3.71
s3.71
$3.7r
$3.71
s3.71
s3.82
$3.82
$3.82
48
Apr-22
May-22
Jut-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
IN,dar-23
Apr-23
May-23
Jun-23
Jul-23
Aug-23
Sep-23
Oct-23
Nov-23
Dec-23
Jan-24
Feb-24
Mar-24
Apr-24
May-24
Jw-24
Jul-24
Aug-24
Sep-24
Oct-24
Nov-24
Dec-24
Jan-25
Feb-25
Mar-25
Apr-25
INday-25
Jun-25
Jul-25
Aug-25
Sep-25
Oct-25
Nov-25
Dec-25
Jan-26
Feb-26
j&'dar-26
$55.04
$5s.3s
$55.66
$s5.97
$s6.28
$s6.59
$s6.90
$57.21
ss7.s2
$s7.83
$58.14
$s8.45
$s8.76
$59.07
$59.38
s5e.69
$60.00
s60.31
$60.62
$60.93
s61.24
$6l.ss
$61.86
s62.17
$62.48
s62.79
$63.10
s63.41
$63.72
s64.03
$64.34
$64.6s
$64.96
s65.2t
$65.s8
s65.89
$66.20
s66.52
s66.83
s67.14
$67.4s
s67.76
s68.07
s68.38
s68.69
s69.00
$69.31
s69.62
$s1.46
$51.7s
$52.04
s52.32
$s2.6r
ss2.90
$s3.19
$53.48
$s3.77
$s4.06
$s4.3s
$s4.64
$54.92
$ss.2r
$ss.50
$ss.79
$s6.08
ss6.37
$s6.66
$s6.9s
$57.23
$s7.s2
$57.8r
s58.r0
$s8.39
$58.68
$58.97
$s9.26
$s9.s4
$59.83
$60.12
$60.41
$60.70
$60.99
$61.28
$61.57
$61.86
$62.14
$62.43
$62.72
$63.01
$63.30
$63.s9
$63.88
$64.17
s64.4s
$64.74
s65.03
$3.82
$3.82
s3.82
$3.82
s3.82
$3.82
$3.82
$3.82
s3.82
$3.93
s3.93
$3.93
s3.93
$3.93
s3.93
$3.93
$3.93
$3.93
s3.93
$3.93
$3.93
$4.0s
s4.05
s4.0s
$4.0s
$4.05
$4.05
s4.0s
s4.0s
$4.0s
$4.0s
$4.05
s4.05
s4.17
$4.17
$4.17
$4.17
$4.17
$4.17
$4.17
s4.17
$4.17
$4.17
$4.r7
s4.17
s4.30
$4.30
$4.30
49
Apr-26
May-26
Jun-26
Jul-26
Aug-26
Sep-26
Oct-26
Nov-26
Dec-26
Jarr27
Feb-27
Mar-27
Apr-27
May-27
Jwr-27
Jul-27
Atg-27
Sep-27
Oct-27
Nov-27
Dec-27
Jan-28
Feb-28
Mar-28
Apr-28
May-28
Jun-28
Jul-28
Aug-28
Sep-28
Oct-28
Nov-28
Dec-28
Jarr29
Feb-29
Mar-29
Apr-29
May-29
Jrm-29
ht-29
Aug-29
Sep-29
Oct-29
Nov-29
Dec-29
Jan-30
Feb-30
Mar-30
s69.93
$70.24
s70.55
s70.86
$7 r.17
s71.48
$71.79
$72.10
s72.41
$72.72
$73.03
$73.34
$73.65
$73.96
$74.27
$74.s8
$74.89
$7s.20
s75.sl
$75.82
$76.13
s76.44
$76.7s
s77.06
$77.37
$77.68
$77.99
$78.30
$78.61
$78.92
$79.23
$79.55
$79.86
s80.17
$80.48
$80.79
$81.r0
$81.4r
$8 r.72
$82.03
$82.34
$82.65
$82.96
$83.27
s83.s8
$83.89
s84.20
$84.51
$65.32
s6s.6l
$65.90
$66.19
s66.48
s66.77
s67.05
s67.34
$67.63
$67.92
s68.21
s68.50
$68.79
s69.08
$69.36
s69.6s
$69.94
$70.23
$70.s2
$70.81
$71.10
$71.39
$71.68
$7r.96
$72.2s
$72.s4
$72.83
$73.12
s73.41
973.70
$73.99
$74.27
$74.s6
$74.8s
$7s.14
$7s.43
$7s.72
$76.01
$76.30
s76.58
$76.87
$77.16
977.4s
s77.74
$78.03
$78.32
$78.61
$78.90
$4.30
$4.30
$4.30
$4.30
s4.30
$4.30
$4.30
$4.30
$4.30
$4.43
$4.43
$4.43
$4.43
$4.43
$4.43
s4.43
s4.43
$4.43
$4.43
s4.43
M.43
s4.56
s4.56
s4.s6
$4.56
$4.56
$4.56
$4.s6
$4.56
M.s6
$4.s6
$4.56
$4.56
s4.69
$4.69
s4.69
M.69
$4.69
$4.69
M.69
$4.69
s4.69
$4.69
s4.69
$4.69
$4.84
s4.84
$4.84
50
Apr-30
May-30
Jun-30
Jul-30
Aug-30
Sep-30
Oct-30
Nov-30
Dec-30
Jan-3 1
Feb-31
Mar-31
Apr-31
May-31
Jun-31
Jul-31
Aug-31
Sep-3 I
Oct-31
Nov-31
Dec-31
Jar32
Feb-32
Mar-32
Apr-32
May-32
Jun-32
Jul-32
Aug-32
Sep-32
Oct-32
Nov-32
Dec-32
Jan-33
Feb-33
Mar-33
Apr-33
May-33
Jun-33
Jul-33
Aug-33
Sep-33
Oct-33
Nov-33
Dec-33
Jan-34
Feb-34
Mar-34
$84.82
s85.13
s8s.44
$85.7s
$86.06
$86.37
$86.68
$86.99
$87.30
$87.61
$87.92
$88.23
$88.54
$88.85
$89.16
$89.47
$89.78
$90.09
$90.40
$90.71
$91.02
$91.33
s9r.64
$91.9s
$92.27
$92.s8
$92.89
$93.20
$93.51
$93.82
$94.13
$94.44
$94.7s
ses.06
s9s.37
s9s.68
$9s.99
$96.30
$96.61
$96.92
$97.23
$97.54
s97.8s
$98.16
$98.47
$98.78
$99.09
$99.40
s79.r8
$79.47
$79.76
$80.05
$80.34
$80.63
$80.92
$8 r.21
$8 r.49
$81.78
$82.07
$82.36
$82.65
s82.94
$83.23
$83.52
s83.81
s84.09
$84.38
s84.67
$84.96
$85.2s
s85.54
$8s.83
$86.12
s86.40
s86.69
s86.98
$87.27
$87.s6
$87.85
s88.14
$88.43
$88.72
$89.00
$89.29
s89.s8
$89.87
s90.16
$90.45
$90.74
s91.03
$91.31
s91.60
$91.89
$92.18
s92.47
$92.76
$4.84
$4.84
$4.84
$4.84
$4.84
$4.84
$4.84
$4.84
$4.84
s4.98
s4.98
M.98
$4.98
s4.98
M.98
s4.98
$4.98
$4.98
M.98
$4.98
$4.98
$s.13
$s.13
$5.13
$s.13
$s.r3
$5.13
$5.r3
$s.13
$5.13
$5.13
ss.13
$5.13
$s.28
$s.28
$s.28
$s.28
$s.28
ss.28
s5.28
s5.28
$s.28
s5.28
$5.28
ss.28
$5.44
$5.44
55.zt4
5l
Apr-34
May-34
Jun-34
Jul-34
Aug-34
Sep-34
Oct-34
Nov-34
Dec-34
Jan-35
Feb-35
Mar-35
Apr-35
May-35
Jun-35
Jul-35
Aug-35
Sep-35
Oct-35
Nov-35
Dec-35
Jan-36
Feb-36
Mar-36
Apr-36
May-36
Jun-36
Jul-36
Aug-36
Sep-36
Oct-36
Nov-36
Dec-36
$99.7r
s100.02
$100.33
$r00.64
$100.9s
$101.26
$101.57
$101.88
$102.19
$102.s0
$102.81
sl03.l2
$103.43
$103.74
s104.0s
$104.36
$104.67
$104.98
s105.30
$10s.6r
$10s.92
$106.23
s106.54
$106.85
$r07.17
s107.48
$107.80
sl08.l l
$108.43
sl08.7s
$109.07
$109.39
$109.71
$93.05
s93.34
s93.62
s93.91
$94.20
$94.49
s94.78
$9s.07
$95.36
$95.6s
$9s.94
$96.22
$96.51
$96.80
$97.09
$97.38
$97.67
$97.96
$98.25
$98.53
$98.82
s99.1l
$99.40
$99.70
s99.99
$r00.28
$r00.s7
s100.87
$101.16
$101.46
$101.76
$r02.06
$102.36
$5.,+4
$5.2+4
$s.44
$5.44
$5.44
$s.44
$s.44
$5.44
$5.44
$s.61
$5.61
$s.61
$s.61
$s.61
$5.61
$s.6r
$s.61
$5.61
$s.61
$s.61
$5.61
ss.77
$s.77
$s.77
$s.77
$s.77
ss.77
$s.77
ss.77
$5.77
$s.77
$s.t7
s5.77
52
REDLINED FORMAT
E-l
REPLACEMENT APPENDIX E
SOLAR FACILITY ENERGY PRICES AND INTEGRATION CHARGES
(Prices based upon the energy shape and capacity specified in Appendix I)
Base Enersy Purchase Prices - For all Base Energy received during Heavy Load Hours Idaho
Power shall pay the Base Energy Heavy Load Purchase Price less the Solar Integration Charge
specified below and for all Base Energy received during Light Load Hours Idaho Power shall pay
the Base Energy Light Load Purchase Price less the Solar Integration Charge specified below. All
of these prices are subject to revision as specified within paragraph 7.5.
Base Energy Heavy
Load Purchase Price
Month/Year (Mills/kWh)
Jan-16 $31.77$32+t
Feb-16 $32.08$3236
Mar-16 $32.39W#
Apr-16 $32.70$33+t
May-16 S33.01$3333
Jun-16 $33.32$3ffi
Jul-16 S33.63$33=98
Aug-16 $33.94$&l-30
Sep-16 S34.2sW#
Oct-16 $34.56$3t95
Nov-16 $34.87$3#
Dec-16 $35.18$550
Jan-17 $35.49$35.92
Feb-17 $35.80$3gt
Mar-17 $36.11$36.57
Apr-17 $36.42$36"89
May-17 $36.73$37-?t
Jun-17 $37.041$3+54
Jul-17 $37.3s$3+*6
Aug-17 $37.66$38=t8
Sep-17 $37.97$38'tf
Oct-17 $38.28$38*3
Nov-17 $38.59$39J5
Dec-17 S38.90$39+tg
Jan-18 $39.21$9*e
Feb-18 $39.52$40't2
Mar-18 $39.83$40:44
Base Energy Light Solar Integration
Load Purchase Price Charge(Mills/kWh) (Mills/kWh)
$29.80$e56
$30.0e$e9s
s30.37$+Hs
$30.66$3t-55
$30.gs$+r*r
$31.24$34=14
531.53$32+13
s3 L82$34-73
s32.11$33+2
$32.40$l*2
$32.69$#r
$32.97$33J+
$33.26$3s
$33.ss$}Lse
$33.84$&t.+9
$34.r3$3sS9
s34.42$3#
$34.71$3#
$3s.00$3'g
$3s.28$3s
$3s.57$36'56
$3s.86$#
$36.15$3+-t5
s36.44$+re
s36.73$37Js
$37.02$38+4
$37.31$3Bl
s3.20
$3.20
$3.20
$3.20
s3.20
$3.20
$3.20
$3.20
$3.20
$3.20
$3.20
$3.20
$3.29
$3.29
$3.29
$3.29
$3.29
s3.29
s3.29
$3.29
$3.29
$3.29
$3.29
$3.29
$3.39
$3.39
$3.39
47
Apr-18
May-18
Jun-18
Jul-18
Aug-18
Sep-18
Oct-18
Nov-18
Dec-18
Jan-19
Feb-19
Mar-19
Apr-19
May-19
Jun-19
Jul-19
Aug-19
Sep-19
Oct-19
Nov-19
Dec-19
Jarr-20
Feb-20
Mar-20
Apr-20
May-20
Jun-20
Jul-20
Aug-20
Sep-20
Oct-20
Nov-20
Dec-20
Jan-21
Feb-21
Mar-21
Apr-21
May-21
Jun-21
Jul-21
Aug-21
Sep2l
Oct-21
Nov-21
Dec-21
Jan-22
Feb-22
Mar-22
$40.r4$4eJ7
s40.45$4-Le9
$40.77$4+4+
$41.08$41-71
s41.39$42S6
$41.70$4238
s42.0r$+?3+
$42.32W+t
s42.63$4gs
s42.94$g3#8
$43.2s$44S0
s43.s6$WZ
$43.87$445s
s44.r8$44J7
944.49$4#
$44.80$4#
$45.r 1$4#4
$4s.42$4#
$4s.73$4,#9
$46.04$46+r
$463sW
$46.66$4756
s46.97$4+-88
$47.28$49
$47.s9$48S
$47.90$48=85
$48.21$4+r+
$48.s2$49=5e
s48.83$49+2
$49.r4$s+r4
$49.+s$5e47
$49.76$#
$50.07$++r
$50.38$+H
$s0.69$+H
$5r.00$s8
$51.31$52+11
$sr.62$s231
ssl.93$ss
$s2.24$#
$s2.s5$s
$s2.86$ele2
$s3.17$rl-3s
$s3.48$An#+
$53.80$+t.99
$54.1 r$5#
$s4.42$s#
$54.73$s#6
$37.60$38#
$37.88$38J3
s38.r7$3s
$38.46$395+
$38.75$39+r
$39.04$4et+
$39.33$40J0
$39.62$40+e
$39.91$40i9
$40.r9$4s
$40.48$4{-58
$40.77$4{-88
$41.06$4+++
$4l.35$42J+
$41.64$/,',6
$4r.93$43S6
s42.22$M
$42.s0$4+6s
$42.79$/3J.4
$43.08$44+4
$1337$4454
$43.66$44*3
$43.95$4+13
$44.24$4s42
$44.s3$4s#2
$44.82$4#+
$4s.10$4sr
$4s.39$4ffi
$4s.68$4s
$4s.97$4?+9
$46.26$+7-49
$46.55$4++8
$46.84$48,08
$47.r3$48J+
s47.41$485?
s47.70$48J6
$47.99W
$48.28$49Js
$48.s7$49Js
$48.86$s+r4
$49.15$50/4
$49.44$5e34
s49.73$+H3
$s0.01$rH
ss0.3o$+re
$s0.s9$sg
$s0.88$#r
$sl.l7$#r
$3.39
$3.39
$3.39
s3.39
s3.39
$3.39
$3.39
$3.39
$3.39
$3.49
s3.49
$3.49
$3.49
$3.49
$3.49
$3.49
s3.49
s3.49
s3.49
$3.49
$3.49
$3.60
$3.60
$3.60
$3.60
$3.60
s3.60
$3.60
s3.60
$3.60
s3.60
s3.60
$3.60
$3.71
$3.71
$3.71
$3.71
s3.71
s3.71
$3.71
$3.71
$3.71
$3.71
$3.71
s3.7r
$3.82
$3.82
$3.82
48
Apr-22
May-22
Jvr-22
Jtil-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
Apr-23
May-23
Jun-23
Jut-23
Aug-23
Sep-23
Oct-23
Nov-23
Dec-23
Ja*24
Feb-24
Mar-24
Apr-24
May-24
Jl.url,-24
Jul-24
Aug-24
Sep-24
Oct-24
Nov-24
Dec-24
Jarr25
Feb-25
Mar-25
Apr-25
May-25
Jun-25
Jul-25
Aug-25
Sep-25
Ocl-25
Nov-25
Dec-25
Jan-26
Feb-26
Mar-26
$5s.04$sg
$55.3s$s#
$55.66$sg3
$5s.97$#
$56.28$5+58
$56.s9$#
$s6.90$s8+3
$5721$s&5s
$s7.s2$s8*7
ss7.83$sH
$s8.r4$s9s
$s8.4s$s9*r
$s8.76$6W
$s9.07$60+t9
$s9.38$60+r
$s9.69$#
$60.00$6H6
s60.31$ffi
s60.62$62+r
S60.93$62+t3
$61.24$#
$6l.ss$ffi
S61.86$63++0
s62.17$#Z
$62.48$eLOs
s62.79$#+
$63.10$8169
$63.41$6#2
$63.72$#
$64.03$6#
$64.34$6s
$64.6s$6er
$64.96$6#
s6s.27{6#
$6s.58$#
$6s.89$ffi
$66.20$6+J3
$66.52$68+s
$66.83$68#
$67.r4$68*9
s67.4sW+2
$67.76Ws4
$68.07$69*6
$68.38$7e;l9
$68.69Wr
$69.00$+e*3
$69.31$+H
$0q.02$+{:48
s5r.46$#s
s51.7s$+10
$s2.04r$#
$I2.32$s3=69
$s2.61$#
$52.90$*128
$53.19$tt.57
$53.48$r+*+
$s3.77$s+r6
$54.06$55+16
$54.35$55,75
$54.64$#5
$s492$s#4
$ss.2r$s#r
$55.50$s#3
$s5.79$#3
$s6.08$#
$56.37$#'s2
$56.66$58.p
$s6.95$58+t+
$57.23$58-+t
$57.52$s9$e
$s7.81$sH
$s8.10$s959
$58.39$59,89
$58.68$60-t8
$58.97$6er18
$s9.26$60#+
$s9.s4$6W
$s9.83$6H
$60.12$ffi
$60.41$61-95
$60.70$#
$60.99$es4
$6t.zg$62*4
$61.s7$g.B
$6r.86$sr3
$62.14$#
$62.43W+2
s62.72$6432
s63.01$46r
s63.30$er9r
$63.s9$6s4
$63.88$H
$64.17$6s39
$64.4s$66S9
$64.74$,ffi
$6s.03$6ffi
$3.82
s3.82
$3.82
$3.82
$3.82
$3.82
s3.82
s3.82
s3.82
$3.93
$3.93
$3.93
s3.e3
$3.93
$3.93
s3.93
$3.93
$3.93
$3.93
s3.93
$3.e3
$4.05
$4.05
$4.0s
s4.05
$4.0s
$4.05
$4.0s
$4.05
$4.0s
$4.0s
$4.05
$4.0s
$4.17
$4.17
$4.17
$4.17
$4.t7
$4.r7
$4.17
$4.17
$4.17
$4.17
$4.17
$4.17
$4.30
$4.30
$4.30
49
Apr-26
May-26
Jun-26
Jul-26
Aug-26
Sep-26
Oct-26
Nov-26
Dec-26
Iarr27
Feb-27
Mar-27
Apr-27
May-27
Jw-27
Jul-27
Aug-27
Sep-27
Oct-27
Nov-27
Dec-27
Jan-28
Feb-28
Mar-28
Apr-28
May-28
Jun-28
Jul-28
Aug-28
Sep-28
Oct-28
Nov-28
Dec-28
Jan-29
Feb-29
Mar-29
Apr-29
May-29
Jun-29
Jul-29
Aug-29
Sep-29
Oct-29
Nov-29
Dec-29
Jan-30
Feb-30
Mar-30
$69.93$+H0
s70.24572J3
$70'55$+2+5
$74&6$72J?
s7r.17$73+0
$7r.48$134?
$7r.7997334
$72.rW14+7
fr2AL$143e
$72.7291+7+
$73.03$+sS4
s73.34$#36
$73.6s$?#
$73.96$+#r
$74.27*7#t
$74.s8$+#
$74.89ffi
$7s.20*7+3e
$7sst$g+e
$7s.82$115s
$75J3$78J+
$76.44$7859
$76.7s$78J2
s77.0691924
$77.37$1956
$77.68$+9*9
$77.99$80+r
$78.30$8e#
$78.61$8e*6
$78.92$&H8
$79.23$&H
$79.s5$ffi3
$79.86$8+rs
$80.17$82,4+
s80.48$82,80
$80.79$8+B
$81.10$83+14
$81.41$83:7+
$81.72$&Le9
$82.03$&r-4r
s82.34$&t.+4
$82.6s$8s46
$82.96$8s
$83.27$85,+t
$83.58$8#3
$83.89$8#5
$84.20$8ffi
$84.sr$8+S0
$65.32$6s
$6s.6r$6++7
$6s.90$6756
$66.19$ffi
$66.48$68-t5
$66.77$68*[5
$67.0s$68+4
$67.34$gg
$67.63$93
$67.92$FB+d-
$68.21$69+3
$68.s0$+m2
$68.79$?e#
$69.08$+0+r
s69.36$++r
$69.65$+r;44
$69.94$++-70
$70.23$+p9
$70.s2$19
s70.81$72"58
$71.10$+2*8
$71.39$+3?t7
$7r.68$13+7
$7r.96911i6
$72.2s$14A6
s72.s4$;14As
$72.83$%s
$73.1291454
$73.41$1s
$73.70W
$73.99$7#3
$74.27$1#
s74.s6$1*2
$74.8s91632
s7s.r4$+?++
$7s.439113+
$75.72$41-@
$76.01$++90
$76.30$+8-t9
$76.58$+&49
s76.87$78+8
$77.16$+9+8
$77.4s$49+7
$77.74919a61
$78.03$+9J6
$78.32$80+5
$78.61$8e5s
$78.90$80*s
$4.30
$4.30
$4.30
s4.30
$4.30
$4.30
$4.30
$4.30
$4.30
$4.43
$4.43
$4.43
$4.43
$4.43
s4.43
$4.43
$4.43
$4.43
$4.43
$4.43
$4.43
$4.56
s4.56
$4.56
$4.s6
s4.56
s4.s6
$4.s6
s4.s6
$4.56
$4.56
s4.s6
$4.s6
s4.69
$4.69
$4.69
$4.69
$4.69
$4.69
$4.69
s4.69
$4.69
$4.69
$4.69
$4.69
$4.84
$4.84
$4.84
50
Apr-30
May-30
Jun-30
Jul-30
Aug-30
Sep-30
Oct-30
Nov-30
Dec-30
Jan-3 I
Feb-31
Mar-31
Apr-31
May-31
Jun-3 I
Jul-31
Aug-31
Sep-31
Oct-31
Nov-31
Dec-31
Jan-32
Feb-32
Mar32
Apr-32
May-32
Jun-32
Jul-32
Aug-32
Sep-32
Oct-32
Nov-32
Dec-32
Jan-33
Feb-33
Mar-33
Apr-33
May-33
Jun-33
Jul-33
Aug-33
Sep-33
Oct-33
Nov-33
Dec-33
Jan-34
Feb-34
Mar-34
$84.82$882
$8s.13$8+5s
$8s.44$8+J7
$85.7s$88+9
$86.06$8852
$86.37$88+r
$86.68$89J6
$86.99$8959
$87.30$89+r
s87.61$90J3
$87.92$9056
$88.23$9+88
$88.54$+s
$88.8s$+H
$89.16$9Hs
$89.47$92-g
$89.78$935e
s90.09$92*3
$90.40$9+14
$90.71$93+17
$91.02$H
$91.33$94+r
$9r.6499444
sgr.9s$9434
$92.27$9ffi
$92.58$95+r+
$92.89$95J3
$9320$9s
$93.s1$9#
$93.82$em
$94.13$9+S2
s94.44W
$94.75$91-g
$9s.06$9+J9
$95.37$98+r
$9s.68$983r
$9s.99$98J6
$96.30$99.28
$96.61$995r
s96.92$9993
$97.23$10H
$97.54$+00"58
$97.85$ee9e
$98.16$++r+2
$98.47$+e,S
$98.78${+87
$99.09$+02.19
$99.40$+{Es
$79.18$eHw$8+4
$29J6$&l#3
$s0.05$82s3
$80.34$82+2
$80.63$8+62
$80.92$82+r
$E-!21$83-+t
$&!19$$5r
$E-1Jg$8+8e
$82.07$&H
$82.36$&r-39
$82.6s$&#
s82.94$e198
$83.23$8#
$83.52$8s#
$83.8r$8s*+
$84.09$8#
$E4.lgsso+s
$84.67$8#
$!4.%$8+ss
$ss.zs$8+J4
$85.54$87i4
$8s.83$8+J3
$86.12$88+3
$86.40$88s
$86.69$88*2
$86.98$89,++
$87.27$89+1+
$87.56$€sr
$87.8s$90$0
$88.r4$9H
$88.43$9059
$88.72$9eJ9
$89.00$9+18
$89.29$+H
$89.s8$eH7
s89.87$92$7
$90.16$92J6
$90.45$9256
$90.74$92Js
$91.03$9#
$91.31$93,54
$91.60$93#
$91.89$ryH
$92.18$ryk3
s92.4799432
$92.76$9*2
s4.84
$4.84
s4.84
s4.84
s4.84
s4.84
M.84
$4.84
s4.84
$4.98
$4.98
$4.98
$4.98
s4.98
$4.98
$4.98
s4.98
s4.98
s4.98
$4.98
$4.98
$5.13
$5.13
$s.13
$s.13
$s.13
$s.13
$s.13
$s.13
$5.13
$5.13
$5.13
$s.13
$s.28
$s.28
$s.28
$5.28
$s.28
$5.28
$s.28
ss.28
ss.28
s5.28
$s.28
$5.28
ss.44
S5.,+4
$s.44
5l
Apr-34
May-34
Jun-34
Jul-34
Aug-34
Sep-34
Oct-34
Nov-34
Dec-34
Jan-35
Feb-35
Mar-35
Apr-35
May-35
Jun-35
Jul-35
Aug-35
Sep-35
Oct-35
Nov-35
Dec-35
Jan-36
Feb-36
Mar-36
Apr-36
May-36
Jun-36
Jul-36
Aug-36
Sep-36
Oct-36
Nov-36
Dec-36
$99.7r$re2*r
$100.02${e#
$100.33${{}34
s100.64$143+r
$100.95${04,+3
$10r.26$14446
$101.57$JS4.+8
$r01.88$e+rc
$102.r9$er43
$102.so$res#s
$102.8r$-106+7
$103.12$ro64g
$103.43$+e#2
$r03.74$Je7J4
$104.0s$1€7J+
$104.36$1€7S9
$104.67$+08S+
$104.98${483r
$105.30$l€8s6
$105.61$+o&98
$105.92$leBr
$106.23$ro9i3
$106.54$+e9J6
$r06.8s$uoJ8
$107.17$+-rc5r
$107.48${-rcJ4
$107.80$+.rJ+7
$108.11$+{{-60
$r08.43$lrJJ3
$108.75$++4-26
$109.07$+r3J9
$109.39$+rrJ3
$109.71$l-13*6
s93.0s$9#r
s93.34$9#r
$93.62$9sJ0
$93.9r$9s
$94.20$96sO
$94.49$9#
$94.78$9+S9
$e5.07$ffi
$95.3_6$e+58
s95.6s$9+J+
$95.94$9&2+
$96.22$9856
$96.51$98*6
$e6.80$9H
$97.09$99+t5
$97.38$99#4
$97.67$+0e+r
$97.96$+eB3
$98.25$+00#
$98.s3$1e093
$98.82$r0r*2
$99.1l$++Hz
$99.40$++*+
$99.70$elu
$99.99$e2++
$100.28$+e2+r
$100.57$re3;Ot
$100.87$4*r
sr0l.r6$+e36r
$101.46$+03J?
$101.76$++s
$102.06$++t #
$102.36$+04*3
$5.44
$5,44
$5.,{4
$5.44
$5.44
$5.44
$s.44
$5.44
$5.44
ss.6l
ss.61
s5.61
$5.61
$s.61
s5.61
$5.61
$5.61
$s.61
$s.61
$5.61
$s.61
ss.77
$s.77
ss.77
ss.77
$s.77
$s.77
$s.77
s5.77
$s.77
$s.t7
ss.77
ss.77
52
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
GASE NO. IPG.E.14.28
IDAHO POWER COMPANY
ATTACHMENT 2
CLEAN FORMAT
Article
I
2
3
4
5
6
7
8
9
10
1l
t2
l3
t4
l5
t6
t7
l8
t9
20
2t
22
23
24
25
26
27
28
29
ENERGY SALES AGREEMENT
BETIil/EEN
IDAHO POWER COMPAI.IY
AND
CLARK SOLAR I, LLC
TABLE OF CONTENTS
TITLE
Definitions
No Reliance on Idaho Power
Warranties
Conditions to Acceptance of Energy
Term and Operation Date
Purchase and Sale ofNet Energy
Purchase Price and Method of Payment
Environmental Attributes
Facility and Interconnection
Metering, Metering Communications and SCADA Telemetry
Records
Operations
Indemnification and Insurance
Force Majeure
Liability; Dedication
Several Obligations
Waiver
Choice of Laws and Venue
Disputes and Default
Governmental Authorization
Commission Order
Successors and Assigns
Modification
Taxes
Notices and Authorized Agents
Additional Terms and Conditions
Severability
Counterparts
Entire Agreement Signatures
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Appendix H
Appendix I
Generation Scheduling and Reporting
Facility and Point of Delivery
Engineer's Certifi cations
Forms of Liquid Security
Solar Facility Energy Prices and Integration Charges
Deleted in its entirety
Insurance Requirements
Solar Energy Production Forecasting
Estimated Hourly Energy Production
1.15 "FirstEnersyDate" - The day commencing at 00:01 hours, Mountain Time, following the day
that Seller has satisfied the requirements of Article IV and after the Seller requested First Energy
Date.
l.16 "Forcgd_9!tap'- a partial or total reduction of a) the Facility's capacity to produce and/or
deliver Net Energy to the Point of Delivery, or b) Idaho Power's ability to accept Net Energy at
the Point of Delivery for non-economic reasons, as a result of Idaho Power or Facility: l)
equipment failure which was not the result of negligence or lack of preventative maintenance, or
2) responding to a transmission provider curtailment order, or 3) unplanned preventative
maintenance to repair equipment that left unrepaired, would result in failure of equipment prior
to the planned maintenance period, or 4) planned maintenance or construction of the Facility or
electrical lines required to serve this Facility.
l.l7 "Generation Interco ' - The interconnection agreement that specifies
terms, conditions and requirements of interconnecting to the Idaho Power electrical system,
which will include but not be limited to all requirements as specified by Schedule 72.
1.18 "Generation_IJni!" - a complete solar pv electrical generation system within the Facility that is
able to generate and deliver energy to the Point of Delivery independent of other Generation
Units within the same Facility.
l.l9 "Heavy Load (HL) Hous" - The daily hours from hour ending 0700 - 2200 Mountain Time, (16
hours) excluding all hours on all Sundays, New Years Day, Memorial Day, Independence Day,
Labor Day, Thanksgiving and Christmas.
1.20 "Hourlv Enerw Estimates" - the hourly energy estimates provided by the Seller and included in
Appendix I of this Agreement. These hourly energy estimates are a material input used in the
calculation of the energy prices specified in Appendix E.
l.2l "lnterconnection Facilities' - All equipment specified in the GIA.
1.22 "Lieht Load (LL) Hours,'- The daily hours from hour ending 2300 - 0600 Mountain Time (8
hours), plus all other hours on all Sundays, New Years Day, Memorial Day, Independence Day,
Labor Day, Thanksgiving and Christnas.
4
NEA Current Month's Estimated Net Energy Amount (Paragraph 6.2)
SGU = a.) If Idaho Power is excused from accepting the Seller's Net
Energy as specified in paragraph 12.2.1 this value will be
equal to the percentage of curtailment as specified by
Idaho Power multiplied by the TGU as defined below.
b.) If the Seller declares a Suspension of Energy Deliveries as
specified in paragraph 12.3.1 this value will be the sum of
the individual Generation Units size ratings as specified in
Appendix B that are impacted by the circumstances
causing the Seller to declare a Suspension of Energy
Deliveries.
TGU Sum of all of the individual generator ratings of the Generation
Units at this Facility as specified in Appendix B of this
agreement.
Ds,, Actual hours the Facility's Net Energy deliveries were eitherr\urr reduced or suspended under paragraph 12.2.1 or 12.3.1
TH Actual total hours in the current month
Resultine formula being:
f$H::j. NEA ( tffi x NEA ) " (uH ) )Net Energy \ /
Amount
This Adjusted Estimated Net Energy Amount will be used in applicable Surplus Energy
calculations for only the specific month in which Idaho Power was excused from accepting the
Seller's Net Energy or the Seller declared a Suspension of Energy.
6.3 Failure to Deliver Minimum Estimated Net Enere], Amounts - Unless excused by an event of
Force Majeure, Seller's failure to deliver Net Energy in any Contract Year in an amount equal to
at least ten percent (10%) of the sum of the Monthly Estimated Generation shall constitute an
event ofdefault.
ARTICLE VII: PURCHASE PRICE AND METHOD OF PAYMENT
7.1 Deleted in its entirety
7.2 Base Enere.v Heavy Load Purchase Price - For all Base Energy received during Heavy Load
t6
7.2
7.3
7.4
7.5
Base Enerey Heaw Load Purchase Price - For all Base Energy received during Heavy Load
Hours, Idaho Power will pay the monthly Base Energy Heavy Load Purchase Price as specified in
the Solar Facility Pricing Schedule including any applicable Price Adjustment, less the Solar
Integration Charge.
Base Enerey Lisht Load Purchase Price - For all Base Energy received during Light Load Hours,
Idaho Power will pay the monthly Base Energy Light Load Purchase Price as specified in the
Solar Facility Pricing Schedule including an applicable Price Adjustrnent, less the Solar
Integration Charge.
Surplus Enerey Price - For all Surplus Energy, Idaho Power shall pay to the Seller the current
month's Market Energy Reference Price or the Base Energy Light Load Purchase Price including
any applicable Price Adjustment, less the Solar Integration Charge for that month, whichever is
lower.
Price Adjustrnent - Upon acceptance of a Seller Adjustment of Estimated Net Energy Amounts as
specified in paragraph 6.2.2,ldaho Power will calculate the Pricing Adjustment Percentage for
the applicable month(s). All pricing contained within the Solar Facility Pricing Schedule for the
t7
ARTICLE XXI: COMMISSION ORDER
2l.l Idaho Power shall file this Agreement for its acceptance or rejection by the Commission. This
Agreement shall only become finally effective upon the Commission's approval of all terms and
provisions hereof without change or condition and declaration that all payments to be made to
Seller hereunder shall be allowed as prudently incurred expenses for ratemaking purposes.
ARTICLE XXII: SUCCESSORS AND ASSIGNS
This Agreement and all of the terms and provisions hereof shall be binding upon and inure to the
benefit of the respective successors and assigns of the Parties hereto. Neither this Agreement nor
any rights or obligations of either Party hereunder may be assigned, in whole or in part, by
operation of law or otherwise, without the prior written consent of both Parties, which consent
shall not be unreasonably withheld. Notwithstanding the foregoing, any party with which Idaho
Power may consolidate, or into which it may merge, or to which it may convey or transfer
substantially all of its electric utility assets, shall automatically, without further act, and without
need ofconsent or approval by the Seller, succeed to all ofldaho Power's rights, obligations and
interests under this Agreement. Any purported assignment in derogation of the foregoing shall
be void. This article shall not prevent a financing entity with recorded or secured rights from
exercising all rights and remedies available to it under law or contract. Idaho Power shall have
the right to be notified by the financing entity that it is exercising such rights or remedies.
ARTICLE XXIII: MODIFICATION
23.1 No modification to this Agreement shall be valid unless it is in writing and signed by both Parties
and subsequently approved by the Commission.
ARTICLE XXIV: TAXES
24.1 Each Party shall pay before delinquency all taxes and other governmental charges which, if failed
to be paid when due, could result in a lien upon the Facility or the Interconnection Facilities.
29
26.3
b) Acknowledged responsibility for all interconnection costs and any costs associated with
acquiring adequate firm transmission capacity to enable the project to be classified as an
Idaho Power Designated Network Resource. If final interconnection or transmission
studies are not complete at the time the Seller executes this Agreement, the Seller
understands that the Seller's obligations to pay Delay and Termination Damages
associated with the project's failure to achieve the Operation Date by the Scheduled
Operation Date as specified in this Agreement is not relieved by final interconnection or
transmission costs, processes or schedules.
This Agreement includes the following appendices, which are attached hereto and included by
reference:
Appendix A - Generation Scheduling and Reporting
Appendix B - Facility and Point of Delivery
Appendix C - Engineer's Certifications
Appendix D - Forms of Liquid Security
Appendix E - Solar Facility Energy Prices
Appendix F - Deleted in its entirety
Appendix G - Insurance Requirements
Appendix H - Solar Energy Production Forecasting
Appendix I - Estimated Hourly Energy Production
ARTICLE XXVII: SEVERABILITY
27.1 The invalidity or unenforceability of any term or provision of this Agreement shall not affect the
validity or enforceability of any other terms or provisions and this Agreement shall be construed
in all other respects as if the invalid or unenforceable term or provision were omiffed.
ARTICLE XXVIII: COUNTERPARTS
28.1 This Agreement may be executed in two or more counterparts, each of which shall be deemed an
original but all of which together shall constitute one and the same instrument.
ARTICLE XXIX: ENTIRE AGREEMENT
29.1 This Agreement constitutes the entire Agreement of the Parties concerning the subject matter
hereof and supersedes all prior or contemporaneous oral or written agreements between the
Parties concerning the subject matter hereof.
32
REDLINED FORMAT
Article
I
2
3
4
5
6
7
8
9
l0
11
t2
l3
t4
l5
t6
t7
18
t9
20
2t
22
23
24
25
26
27
28
29
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
I nppendix F
Appendix G
Appendix H
Appendix I
ENERGY SALES AGREEMENT
BETWEEN
IDAHO POWER COMPANIY
AND
CLARK SOLAR I,LLC
TABLE OF CONTENTS
TITLE
Definitions
No Reliance on Idaho Power
Warranties
Conditions to Acceptance of Energy
Term and Operation Date
Purchase and Sale ofNet Energy
Purchase Price and Method of Payment
Environmental Auributes
Facility and Interconnection
Metering, Metering Communications and SCADA Telemetry
Records
Operations
Indemnification and Insurance
Force Majeure
Liability; Dedication
Several Obligations
Waiver
Choice of Laws and Venue
Disputes and Default
Governmental Authorization
Commission Order
Successors and Assigns
Modification
Taxes
Notices and Authorized Agents
Additional Terms and Conditions
Severability
Counterparts
Entire Agreement Signatures
Generation Scheduling and Reporting
Facility and Point of Delivery
Engineer' s Certifications
Forms of Liquid Security
Solar Facility Energy Prices and Integration Charges
Deleted in its entirety
Insurance Requirements
Solar Energy Production Forecasting
Estimated Hourly Energy Production
l.l5 "FirstEnersyDateu - The day commencing at 00:01 hours, Mountain Time, following the day
that Seller has satisfied the requirements of Article IV and after the Seller requested First Energy
Date.
1.16 "Forced_Qgtap" - a partial or total reduction of a) the Facility's capacity to produce and/or
deliver Net Energy to the Point of Delivery, or b) Idaho Power's ability to accept Net Energy at
the Point of Delivery for non-economic reasons, as a result of Idaho Power or Facility: l)
equipment failure which was 4! the result of negligence or lack of preventative maintenance, or
2) responding to a transmission provider curtailment order, or 3) unplanned preventative
maintenance to repair equipment that left unrepaired, would result in failure of equipment prior
to the planned maintenance period, or 4) planned maintenance or construction of the Facility or
electrical lines required to serve this Facility.
l.l7 "Generation Interconnect " - The interconnection agreement that specifies
terms, conditions and requirements of interconnecting to the Idaho Power electrical system,
which will include but not be limited to all requirements as specified by Schedule 72.
LlS "Ge!@i!" - a complete solar pv electrical generation system within the Facility that is
able to generate and deliver energy to the Point of Delivery independent of other Generation
Units within the same Facility.
1.l9..@'-Thedailyhoursfromhourending0700-2200MountainTime,(l6
hours) excluding all hours on all Sundays, New Years Day, Memorial Day, Independence Day,
Labor Day, Thanksgiving and Christmas.
1.20 "Hourlv Enerev Estimates" - the hourly energy estimates provided by the Seller and included in
Appendix I of this Agreement. These hourly energy estimates are a material input used in the
t.2l
1.22
calculation of the energy prices specified in Appendix E-andF.
"Interconnection Facilities" - All equipment specified in the GIA.
"Lieht Load (LL) Hourf'- The daily hours from hour ending 2300 - 0600 Mountain Time (8
hours), plus all other hours on all Sundays, New Years Day, Memorial Day, Independence Day,
Labor Day, Thanksgiving and Christnas.
4
Where:
NEA Current Month's Estimated Net Energy Amount (Paragraph 6.2)
SGU a.) If Idaho Power is excused from accepting the Seller's Net
Energy as specified in paragraph 12.2.1 this value will be
equal to the percentage of curtailment as specified by
Idaho Power multiplied by the TGU as defined below.
b.) If the Seller declares a Suspension of Energy Deliveries as
specified in paragraph 12.3.1 this value will be the sum of
the individual Generation Units size ratings as specified in
Appendix B that are impacted by the circumstances
causing the Seller to declare a Suspension ofEnergy
Deliveries.
TGU Sum of all of the individual generator ratings of the Generation
Units at this Facility as specified in Appendix B of this
agreement.
DeLr Actual hours the Facility's Net Energy deliveries were eitherr\urr reduced or suspended under paragraph 12.2.1 or 12.3-l
TH Actual total hours in the current month
Resulting formula being:
Adjusted
Estimated
Net Energy
Amount
This Adjusted Estimated Net Energy Amount will be used in applicable Surplus Energy
calculations for only the specific month in which Idaho Power was excused from accepting the
Seller's Net Energy or the Seller declared a Suspension of Energy.
Failure to Deliver Minimum Estimated Net Enerey Amounts - Unless excused by an event of
Force Majeure, Seller's failure to deliver Net Energy in any Contract Year in an amount equal to
at least ten percent (10%) of the sum of the Monthly Estimated Generation shall constitute an
event ofdefault.
ARTICLE VII: PURCHASE PRICE AND METHOD OF PAYMENT
7.1 The Selar Fasility Pr:eing Sehedule te be ineluded in this rtgreement is dis-uted by the Pert:es,
NEA (tr*r-,xNEA)"(H ))
6.3
16
7.2
7.3
7.4
ission
in
hereUy agre€ go euknit t
is-issue'
Base Enerey Heavy Load Purchase Price - For all Base Energy received during Heavy Load
Hours, Idaho Power will pay the monthly Base Energy Heavy Load Purchase Price as specified in
the Solar Facility Pricing Schedule including any applicable Price Adjustment, less the Solar
Integration Charge.
Base Enerey Lieht Load Purchase Price - For all Base Energy received during Light Load Hours,
Idaho Power will pay the monthly Base Energy Light Load Purchase Price as specified in the
Solar Facility Pricing Schedule including an applicable Price Adjustrnent, less the Solar
Integration Charge.
Surplus Enerev Price - For all Surplus Energy, Idaho Power shall pay to the Seller the current
month's Market Energy Reference Price or the Base Energy Light Load Purchase Price including
any applicable Price Adjustment, less the Solar Integration Charge for that month, whichever is
lower.
Price Adjustment - Upon acceptance of a Seller Adjusftnent of Estimated Net Energy Amounts as
specified in paragraph 6.2.2,ldaho Power will calculate the Pricing Adjustnent Percentage for
the applicable month(s). All pricing contained within the Solar Facility Pricing Schedule for the
7.5
17
ARTICLE XXI: COMMISSION ORDER
2l.l Idaho Power shall file this Agreement for its acceptance or rejection by the Commission-and
reselutien ef the di . This
Agreement shall only become finally effective upon the Commission's approval of all terms and
provisions hereof without change or condition and declaration that all payments to be made to
Seller hereunder shall be allowed as prudently incurred expenses for ratemaking purposes.
ARTICLE XXII: SUCCESSORS AND ASSIGNS
22.1 This Agreement and all of the terms and provisions hereof shall be binding upon and inure to the
benefit of the respective successors and assigns of the Parties hereto. Neither this Agreement nor
any rights or obligations of either Party hereunder may be assigned, in whole or in part, by
operation of law or otherwise, without the prior written consent of both Parties, which consent
shall not be unreasonably withheld. Notwithstanding the foregoing, any party with which Idaho
Power may consolidate, or into which it may merge, or to which it may convey or transfer
substantially all of its electric utility assets, shall automatically, without further act, and without
need ofconsent or approval by the Seller, succeed to all ofldaho Power's rights, obligations and
interests under this Agreement. Any purported assignment in derogation of the foregoing shall
be void. This article shall not prevent a financing entity with recorded or secured rights from
exercising all rights and remedies available to it under law or contract. Idaho Power shall have
the right to be notified by the financing entity that it is exercising such rights or remedies.
ARTICLE XXIII: MODIFICATION
23.1 No modification to this Agreement shall be valid unless it is in writing and signed by both Parties
and subsequently approved by the Commission.
ARTICLE XXIV: TAXES
24.1 Each Party shall pay before delinquency all taxes and other governmental charges which, if failed
to be paid when due, could result in a lien upon the Facility or the Interconnection Facilities.
29
26.3
b) Acknowledged responsibility for all interconnection costs and any costs associated with
acquiring adequate firm transmission capacity to enable the project to be classified as an
Idaho Power Designated Network Resource. If final interconnection or tansmission
studies are not complete at the time the Seller executes this Agreement, the Seller
understands that the Seller's obligations to pay Delay and Termination Damages
associated with the project's failure to achieve the Operation Date by the Scheduled
Operation Date as specified in this Agreement is not relieved by final interconnection or
transmission costs, processes or schedules.
This Agreement includes the following appendices, which are attached hereto and included by
reference:
Appendix A - Generation Scheduling and Reporting
Appendix B - Facility and Point of Delivery
Appendix C - Engineer's Certifications
Appendix D - Forms of Liquid Security
Appendix E - Solar Facility Energy Prices
Appendix E Alterna i€€s
Appendix G - Insurance Requirements
Appendix H - Solar Energy Production Forecasting
Appendix I - Estimated Hourly Energy Production
ARTICLE XXVII: SEVERABILITY
27.1 The invalidity or unenforceability of any term or provision of this Agreement shall not affect the
validity or enforceability of any other terms or provisions and this Agreement shall be construed
in all other respects as if the invalid or unenforceable term or provision were omitted.
ARTICLE XXVIII: COUNTERPARTS
28.1 This Agreement may be executed in trvo or more counterparts, each of which shall be deemed an
original but all of which together shall constitute one and the same instrument.
ARTICLE XXIX: ENTIRE AGREEMENT
29.1 This Agreement constitutes the entire Agreement of the Parties conceming the subject matter
oral or written agreements between thehereof and supersedes all prior or contemporaneous
Parties concerning the subject matter hereof.
32