Loading...
HomeMy WebLinkAbout20141016Replacement Pages.pdf3!ffi*. An IDACORP Company DONOVAN E. WALKER Lead Counsel ii[Ci: tVl I] 201trOCT l6 PH l: l6 r-, : I l ' r.1. L.Irt.tt1rJ,4,..._t..,, -i l,_'t'i"l'; iiq;i.i;,:t,ii;.S i0l{ October 16,2014 VIA HAND DELIVERY Jean D. Jewell, Secretary Idaho Public Utilities Commission 472 West Washington Street Boise, ldaho 83702 Re: Case No. IPC-E-14-20 Boise City Solar, LLC - Replacement Pages 12 and 48 for Energy Sales Agreement Dear Ms. Jewell: On July 25, 2014, in Case No. IPC-E-14-20, ldaho Power Company ("ldaho Powe/') filed an Application with the ldaho Public Utilities Commission ("Commission") for approval of the Energy Sales Agreement ("ESA") between ldaho Power and Boise City Solar, LLC ("Boise Sola/') under which ldaho Power will purchase electric energy generated by Boise City. Non-substantive clerical errors were discovered on pages 12 and 48 of the ESA. The inconect verb tense and paragraph section on Appendix E, respectively, were referenced. To conect these clerica! erors and prevent any potentia! confusion, Idaho Power seeks to replace pages 12 and 48 of the ESA with the enclosed pages. Redlined versions of pages 12 and 48 showing the corrections are also enclosed for the Commission's ease of reference. ldaho Power has notified Boise Solar about this issue and has sent Boise Solar replacement pages for its final version of the ESA. Therefore, enclosed please find an original and seven (7) copies of replacement pages 12 and 48 of the ESA between Idaho Power and Boise Solar. Please contact me if you have any comments, questions, or concerns. 1221 W. ldaho St. (83702) P.O. Box 70 Boise, lD 83707 a*.fl//^Donovan E. WalkEr DEW:csb Enclosurescc: Kristine A. Sasser- dencls. (via hand delivery) Mark van Gulik - Wencls. (via U.S. mai!) Dean J. Miller - dencls. (via U.S. mail) Randy Allphin - dencls. (via e-mail) 5.2 on the date first written and shall continue in full force and effect for a period of 20 (not to exceed 20 years) Contract Years from the Operation Date. OEreration Date - A single Operation Date will be granted for the entire Facility and may occur only after the Facility has achieved all of the following: a) At the minimum, 75% of the Generation Units planned for this Facility have achieved their First Energy Date. Seller has demonstrated to Idaho Power's satisfaction that all mechanical and electrical testing has been completed satisfactorily and the Facility is able to provide energy in a consistent, reliable and safe manner. Engineer's Certifications - Submit an executed Engineer's Certification of Design & Construction Adequacy and an Engineer's Certification of Operations and Maintenance (O&M) Policy as described in Commission Order No.21690. These certificates will be in the forrn specified in Appendix C but may be modifred to the extent necessary to recognize the different engineering disciplines providing the certificates. d) Seller has requested an Operation Date from [daho Power in a written format. e) Seller has received written confirmation from ldaho Power of the Operation Date. This confinnation will not be unreasonably withheld by Idaho Power. Operation Date Delay - Seller shall cause the Facility to achieve the Operation Date on or before the Scheduled Operation Date. Delays in the interconnection and transmission network upgrade study, dcsign and construction process (This includes any delay in making the required deposit payments set forth in the Facility's GIA) that are not caused by Idaho Power or Force Majeure events accepted by both Parties, shall not prevent Delay Damages or Termination Damages from being due and owing as calculated in accordance with this Agreement. For the avoidance of doubt, delays in the interconnection and/or transmission network upgrade study, design and construction process that are caused by tdaho Power and Force Majeure events affecting Seller b) c) 5.3 t2 E-l APPENDTX E SOLAR FACILITY ENERGY PRICES (Prices based upon the energy shape and capacity specified in Appandix G) Base Energy Purchase Prices - For all Base Energy received during Heavy Load Hours Idaho Power shall pay the Base Energy Heavy Load Purchase Price less the Solar lntegration Charge specified below and for all Base Energy received during Light Load Hours Idaho Power shall pay the Base Energy Light Load Purchase Price less the Solar Integration Charge specified below. All of these prices are subject to revision as specified within paragraph7.4. Base Energy Heavy Load Purchase Month/Year Price (Mills/kWh) Jan-15 $45.90 Feb-15 $46.16 Mar-15 $46.41 Apr-15 $46.67 May-15 546.92 Jun-15 $47.18 Jul-15 $47.43 Aug-15 547.69 Sep-15 $47.94 Oct-15 $48.20 Nov-15 $48.45 Dec-15 $48.71 Jan-16 $48.96 Feb-16 $49.22 Mar-16 $49.47 Apr-16 $49.73 May-16 $49.98 Jun-16 $50.24 Jul-16 $50.49 Aug-16 $50.75 Sep-16 $51.00 Oct-16 $51.26 Nov-16 $51.51 Dec-16 $51.77 Jan-17 $52.03 Feb-17 552.28 Mar-17 $52.54 Base Energy Light Solar Integration Load Purchase Price Charge(Mills/kwh) (Mills/kwh) s44.74 $44.96 $45.r8 $45.40 $45.62 $4s.84 $46.06 $46.28 $46.s0 $46.72 $46.94 s47.t7 $47.39 $47.61 $47.83 $48.0s $48.27 $48.49 $48.71 $48.93 s49.15 $49.37 $49.59 $49.81 $50.03 $s0.26 s50.48 $1.34 $1.34 $1.34 $1.34 $1.34 $1.34 $1.34 $1.34 $1.34 $1.34 $1.34 $1.34 $1.38 $ 1.38 $1.38 $1.38 $1.38 $ 1.38 $1.38 $1.38 $1.38 sl.38 $1.38 $ 1.38 $1.47 $1.47 $1.47 48 5.2 on the date first written and shall continue in full force and effect for a period of 20 (not to exceed 20 years) Contract Years from the Operation Date. Operation Date - A single Operation Date will be granted for the entire Facility and may occur only after the Facility has achieved all of the following: a) At the minimum, 75o/o of the Generation Units planned for this Facility have achieved their First Energy Date. Seller has demonstrated to Idaho Power's satisfaction that all mechanical and electrical testing has been completed satisfactorily and the Facility is able to provide enerry in a consistent, reliable and safe manner. Ensineer's Certifications - Submit an executed Engineer's Certification of Design & Construction Adequacy and an Engineer's Certification of Operations and Maintenance (O&M) Policy as described in Commission Order No.21690. These certificates will be in the form specified in Appendix C but may be modified to the extent necessary to recognize the different engineering disciplines providing the certificates. d) Seller has requested an Operation Date from ldaho Power in a written format. e) Seller has received written confirmation from Idaho Power of the Operation Date. This confirmation will not be unreasonably withheld by Idaho Power. Operation Date Delay - Seller shall cause the Facility to achieve the Operation Date on or before the Scheduled Operation Date. Delays in the interconnection and transmission network upgrade study, design and construction process (This includes any delay in making the required deposit pa)rments set forth in the Facility's GIA) that are not caused by Idaho Power or Force Majeure events accepted by both Parties, shall not prevent Delay Damages or Termination Damages from being due and owing as calculated in accordance with this Agreement. For the avoidance of doubt, delays in the interconnection and/or transmission network upgrade study, design and construction process that are caused by ldaho Power and Force Majeure events afketiet-affecting b) c) 5.3 t2 E-l APPENDX E SOLAR FACILITY ENERGY PRTCES (Prices based upon the energy shape and capacity specified in Appendix G) Base Enerey Purchase Prices - For all Base Energy received during Heavy Load Hours Idaho Power shall pay the Base Energy Heavy Load Purchase Price less the Solar Integration Charge specified below and for all Base Energy received during Light Load Hours Idaho Power shall pay the Base Energy Light Load Purchase Price less the Solar Integration Charge specified below. All of these prices are subject to revision as specified within paragraph+s1A. Base Energy Heavy Load Purchase MontMYear Price (Mills/kWh) Jan-15 $45.90 Feb-15 $46.16 Mar-15 $46.41 Apr-15 $46.67 May-15 $46-92 Jun-15 $47.18 Jul-15 $47.43 Aug-15 $47.69 Sep-15 $47.94 Oct-15 $48.20 Nov-15 $48.45 Dec-15 $48.71 Jan-16 $48.96 Feb-16 549.22 Mar-16 $49.47 Apr-16 $49.73 May-16 $49.98 Jun-16 $50.24 Jul-16 $50.49 Aug-16 $50.75 Sep-16 $51.00 Oct-16 $51.26 Nov-16 $51.51 Dec-16 $51.77 Ian-17 $52.03 Feb-17 $52.28 Mar-17 S52.54 Base Energy Light Solar lntegration Load Purchase Price Charge _ (Millsrkwh) (Mills/kwh) $44.74 944.96 $45.18 $4s.40 $4s.62 s45.84 $46.06 $46.28 $46.50 $46.72 $46.94 $47.17 $47.39 $47.61 $47.83 s48.0s $48.27 $48.49 $48.71 $48.93 $49. l s $49.37 $49.s9 $49.81 $s0.03 $50.26 $s0.48 $1.34 $1.34 s1.34 $1.34 $1.34 $1.34 $1.34 $1.34 $1.34 $1.34 $1.34 $1.34 $1.38 $1.38 $1.38 $i.38 $1.38 $1.38 $1.38 $1.38 $1.38 $1.38 $1.38 $l.38 $1.47 91.47 $1.47 48