BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION )
OF IDAHO POWER COMPANY FOR )CASE NO.IPC-E-14-19
APPROVAL OR REJECTION OF AN )
ENERGY SALES AGREEMENT WITH )
GRAND VIEW PV SOLAR TWO,LLC FOR )
THE SALE AND PURCHASE OF )ORDER NO.33179
ELECTRIC ENERGY.)
_____________________________________________________________________________________
)
On July 25,2014,Idaho Power filed an Application with the Commission for
approval or rejection of an energy sales agreement with Grand View PV Solar Two,LLC for the
sale and purchase of electric energy.The Commission issued a Notice of Application on August
20,2014.A Notice of Modified Procedure was issued on September 5,2014,setting a comment
deadline of October 31,2014,and a reply deadline of November 7,2014.Order No.33119.
More than 140 public comments were received,including comments filed by the
Idaho Conservation League,Snake River Alliance,and community leaders.Commission Staff
filed comments and Idaho Power filed a reply.
By this Order,we approve the modified Agreement between Idaho Power Company
and Grand View PV Solar Two as submitted by Idaho Power in its reply,and as more fully set
out in the body of this Order.
THE APPLICATION
Idaho Power requests that the Commission accept or reject the Energy Sales
Agreement between Idaho Power and Grand View PV Solar Two,LLC (Grand View),under
which Grand View would sell and Idaho Power would purchase electric energy generated by
Grand View’s 80 megawatt (MW)solar photovoltaic project located approximately 20 miles
southwest of Mountain Home,Idaho.The Agreement between the parties was executed on July
17,2014.
The Agreement is for a term of 20 years.Idaho Power states that the Agreement was
executed in compliance with the Commission’s Orders directing the implementation of PURPA
for the State of Idaho and contains negotiated avoided cost rates based upon the incremental cost,
integrated resource plan pricing methodology available to solar projects whose generation will
exceed 100 kilowatts (kW).Idaho Power explains that the Agreement also contains negotiated
ORDER NO.33179 1
solar integration charges as directed by the Commission in Order No.33043,as well as several
other negotiated provisions requiring specific Commission approval.
The proposed project is expected to consist of approximately 340,480 polysilicon
photovoltaic panels installed on a single axis tracking system,supported by a fixed post and
beam structure.Grand View selected July 1,2016,as its Scheduled Operation Date.Various
requirements have been placed upon Grand View in order for Idaho Power to accept energy
deliveries from the project.Idaho Power states that it will continue to monitor compliance with
these requirements throughout the term of the Agreement.
Idaho Power explains that this Agreement is the first of its type submitted for
approval that contains negotiated avoided cost rates based upon the incremental cost,integrated
resource plan pricing methodology.Prices were determined on an incremental basis with the
inclusion of this project in its queued position of proposed projects on Idaho Power’s system.
Over the 20-year term of the Agreement,monthly rates vary from approximately $3 1/megawatt
hour (MWh)for light load hours in early months of the Agreement to as high as $159/MWh for
heavy load hours in the later years of the Agreement.The equivalent 20-year levelized avoided
cost rate would amount to approximately $73.4 l/MWh.
The Agreement also contains a solar integration charge that was negotiated and
agreed to by the parties.Although the integration charge is based on Idaho Power’s solar
integration study,the study was not yet complete during contract negotiations.However,the
most currently available data and analysis from the study was used by the parties in the course of
negotiations.The negotiated solar integration charge starts at $0.99/MWh for the first year of
the Agreement (2015)and escalates to $1 .84/MWh in 2036.The equivalent 20-year levelized
solar integration charge would amount to approximately $l.28/MWh.Idaho Power states that
the 20-year estimated contractual obligation based upon estimated generation levels,including
avoided cost rates and solar integration charges,is approximately $310,237,634.
The Agreement does not contain a 90/110 firmness requirement;instead it contains
provisions for a Mechanical Availability Guaranty (MAG),solar forecasting fees,solar
integration charge,and a pricing adjustment.Idaho Power states it prefers a 90/110 firmness
requirement in all PURPA QF agreements.The project developer preferred a MAG and
forecasting costs.Idaho Power maintains that the use of a MAG is not a replacement for the
firmness determinations of the 90/110 provisions;however,based on negotiations and an agreed
ORDER NO.33179 2
to price adjustment,the Company states that it is comfortable and confident that the Agreement
contains provisions to reasonably assure that the project performs in conformance with its
generation estimates and,if not,the project receives a reduced price for the non-conforming
month’s generation.The Agreement allows for a 5%deviation in the monthly net energy
deliveries from the generation profile estimates without assessing a price adjustment.If the
project’s actual generation deviates downward by more than 5%of its generation estimates,then
a corresponding percentage adjustment to the monthly price is imposed.However,the
adjustment is limited to a maximum price reduction of 10%.Idaho Power states that consistent
and material deviations from the hourly energy estimates in the generation profile will be
considered by Idaho Power to be a material breach of the Agreement.
New provisions providing for actual delay damages as opposed to liquidated damages
are included in the Agreement,consistent with Order No.32697.The parties negotiated a 50/50
split of environment attributes (aka renewable energy credits).As with all PURPA QF
generation,the project must be designated as a network resource (DNR)to serve Idaho Power’s
retail load on its system.Consequently,the Agreement contains provisions requiring completion
of a Generator Interconnection Agreement (GIA),compliance with GIA requirements,and
designation as an Idaho Power network resource as conditions of Idaho Power accepting delivery
of energy and paying for the same under the Agreement.In order for the project to maintain its
DNR status,there must be a power purchase agreement associated with its transmission service
request that maintains compliance with Idaho Power’s non-discriminatory administration of its
Open Access Transmission Tariff (OATT)and maintains compliance with FERC requirements.
Article 21 of the Agreement provides that the Agreement will not become effective
until the Commission has approved all of the Agreement’s terms and conditions and declared
that all payments Idaho Power makes to Grand View for purchases of energy will be allowed as
prudently incurred expenses for ratemaking purposes.
COMMENTS
More than 140 public comments were filed with the Commission regarding this
Application,including comments filed by the Idaho Conservation League,Snake River Alliance,
Elmore County Board of Commissioners,and the Mayor and Office of Economic Development
of Mountain Home.While many of the comments appeared to be based on a form letter
campaign,many others were original and thoughtful comments from citizens who appeared
ORDER NO.33179 3
concerned about the environment and optimistic about the contribution that the Grand View
project will have on the local economy.We appreciate the public’s participation in our process.
Staff Comments
Staff acknowledged the potential benefits of a QF,but noted that the Commission’s
authority with regard to PURPA contracts,and therefore Staffs focus,is to ensure that the rates,
terms and conditions contained in proposed power sales agreements are reasonable.The rates in
the agreements must accurately reflect the utility’s avoided costs,and the terms and conditions
must fairly protect the QFs,the utility and its ratepayers.
Staff explained that rates in the Agreement were determined using the incremental
cost IRP methodology.The rates consist of three components:(1)the avoided cost of energy,(2)
the avoided cost of capacity,and (3)the solar integration charge.The avoided cost of energy is
based upon the incremental costs the utility would incur,but for the addition of the QF resource,
to generate power itself or to purchase power from another source.The avoided cost of capacity
reflects the cost of constructing or purchasing a generation resource capable of producing that
energy.The solar integration charge is intended to account for the expense of integrating solar
resources into the utility’s distribution and transmission system.
After a detailed review of Idaho Power’s application of the incremental cost IRP
methodology,Staff identified several concepts used by Idaho Power that Staff believes make the
final results deviate significantly from the true avoided cost of energy.First,as proposed,the
incremental cost IRP methodology assumes that the resource of the highest displaceable
incremental cost always has enough volume to be displaced.Idaho Power acknowledged that
“[t]his simplification may introduce some error...[lit will always be in favor of the QF since
Idaho Power begins with the highest incremental cost resource that is displaceable to set the
avoided cost for any hour.”See Case No.GNR-E-ll-03,Bokenkamp,Di.pp.26.
Staff explained that this simplification introduces significant error that becomes
greater as the project size increases.For Grand View,the difference amounts to millions of
dollars over the life of the contract.Staff proposed that the Company modify its
calculation/methodology by assigning QF capacity to different resources in the order of
incremental cost values (i.e.,from the highest displaceable to the second highest displaceable to
the third highest displaceable)until all the QF capacity is distributed.The final price is the
weighted average of a set of incremental costs with different displacements.Staff reasoned that
ORDER NO.33179 4
its proposed method takes into account the capacities of the actual resources that the QF
generation displaces.
The second issue identified by Staff involves the fuel price used within the
incremental cost IRP methodology.Idaho Power’s proposed methodology assigns one fuel price
to each year,assuming the fuel price stays the same over the entire year.Staff explained that,
while coal prices may not fluctuate within the year,fuel prices for gas-fired plants vary
significantly from month to month.When the IRP methodology applies a fixed annual natural
gas price without considering the monthly variations,solar QFs are underpaid in the winter and
overpaid in the summer.Staff stated that,because solar QFs produce more energy in the summer
when natural gas prices are lower,the overall effect is overpayment to solar QFs.Consequently,
Staff asserted that it is inappropriate and not an accurate reflection of the Company’s avoided
cost to use an annual average natural gas price in calculating the avoided cost of energy.
Staff believed that the negotiated solar integration charges utilized within the
Agreement are reasonable.Staff further confirmed that new provisions providing for actual
delay damages as opposed to liquidated damages are included in the Agreement and are
consistent with Commission Orders.See Order No.32697.Staff believed that the additional
contract provisions,including but not limited to,a mechanical availability guarantee,price
adjustments,forecasting fees,and ownership of renewable energy credits are reasonable and
comply with prior Commission Orders.
Idaho Power Reply
Based on Staffs recommendations,Idaho Power re-ran its model for pricing Grand
View’s generation.Although the Company was able to incorporate Staffs concepts into its
avoided cost price model,the results differed slightly.Idaho Power submitted its revised prices
with reply comments.Grand View agreed to the revised pricing,but requested that its First
Energy Date and Scheduled Operation Date be moved out by two months.
FINDINGS AND CONCLUSIONS
The Idaho Public Utilities Commission has jurisdiction over Idaho Power,an electric
utility,and the issues raised in this matter pursuant to the authority and power granted it under
Title 61 of the Idaho Code and the Public Utility Regulatory Policies Act of 1978 (PURPA).The
Commission has authority under PURPA and the implementing regulations of the Federal
Energy Regulatory Commission (FERC)to set avoided costs,to order electric utilities to enter
ORDERNO.33179 5
into fixed-term obligations for the purchase of energy from qualified facilities (QFs)and to
implement FERC rules.The Commission is also empowered to resolve complaints between QFs
and utilities and approve QF contracts.
PURPA requires that utilities purchase generation produced by QFs under a federal
rate mechanism (i.e.,avoided cost)that is established and implemented by state utility
commissions.18 C.F.R.§292.304(b)(2);Order No.32697 at 7.“Avoided costs”are the
incremental costs to the electric utility of power which,but for the purchase from the QF,such
utility would generate itself or purchase from another source.18 C.F.R.§292.l01(b)(6).
PURPA and FERC regulations direct not only that rates for purchases shall not discriminate
against QFs,but also that avoided cost rates be just and reasonable to the utility’s ratepayers and
in the public interest.18 C.F.R.§292.304(a)(l).The rates at which Idaho electric utilities
purchase QF power must be approved by this Commission.Idaho Power Co.v.idaho Public
Utilities Commission,155 Idaho 780,789,316 P.3d 1278,1287 (2013).
PURPA and FERC regulations mandate that QF projects be compensated according
to their ability to provide a utility with needed energy and capacity at a rate that reflects the costs
that the utility avoids by purchasing QF generation.As we have stated on numerous occasions,
the purpose of utilizing the IRP methodology for large QF projects is to more precisely value the
energy being delivered to the utility.The IRP methodology must be implemented in a way that
recognizes the individual generation characteristics of each project by assessing when the QF is
capable of delivering its resources against when the utility is most in need of such resources.
We recently undertook a detailed review of the implementation of PURPA in Idaho.
See generally GNR-E-1l-03.Specifically with regard to the IRP methodology,we noted that
“[tihe TRP Methodology had its inception in 1995 (Case No.IPC-E-95-9)but has seldom been
utilized —even by large QF projects....Therefore,the IRP Methodology has not had the benefit
of adjustments over time to ensure that the calculation produces an accurate representation of the
utility’s avoided cost.”Order No.32697 at 17.We intend that the IRP methodology be a
flexible tool,taking into account many different variables,and producing a result that accurately
values a QF’s capability to deliver resources in relation to the timing and magnitude of the
utility’s need for such resources.
We find that the IRP methodology must reflect the incremental cost associated with
each project’s unique ability to deliver generation to the utility.We further find that
ORDER NO.33179 6
consideration of each displaceable resource based on the capacity of the QF is fair and
reasonable.We also find it reasonable to account for monthly variations in natural gas prices —
as opposed to use of an annual average.We appreciate Staff’s diligent and detailed review of the
variables to be used within a methodology that,thus far,has been under-utilized and,therefore,
untested.We find that,based on the proposed and accepted modifications,the resultant pricing
is more reflective of the true value of QF energy being delivered to the utility.By utilizing the
modified variables within the IRP methodology,we find that the community’s environmental
and economic interests can be met without Idaho Power’s ratepayers being harmed.
Therefore,we find that the proposed,modified Agreement,including Replacement
Appendix B regarding on-line dates and Replacement Appendix E regarding rates calculated by
Idaho Power using Staff’s concepts is just,reasonable and in the public interest.We approve the
modified Agreement between Idaho Power and Grand View PV Solar Two,LLC without
material change or condition.We find it reasonable to allow payments made under the
Agreement as prudently incurred expenses for ratemaking purposes.
ORDER
IT IS HEREBY ORDERED that the modified Agreement between Idaho Power and
Grand View PV Solar Two is approved,without change or condition.
THIS IS A FINAL ORDER.Any person interested in this Order may petition for
reconsideration within twenty-one (21)days of the service date of this Order.Within seven (7)
days after any person has petitioned for reconsideration,any other person may cross-petition for
reconsideration.See Idaho Code §6 1-626.
ORDER NO.33179 7
DONE by Order of the Idaho Public Utilities Commission at Boise,Idaho this