HomeMy WebLinkAbout20140611notice_of_application_order_no_33056.pdfOffice ofthe Secretary
Service Date
June 11,2014
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION )CASE NO.IPC-E-14-07
OF IDAHO POWER COMPANY FOR )
APPROVAL OR REJECTION OF AN )NOTICE OF APPLICATiON
ENERGY SALES AGREEMENT WITH )
NORTH SIDE ENERGY COMPANY,INC.,)NOTICE OF
FOR THE SALE AND PURCHASE OF )MODIFIED PROCEDURE
ELECTRIC ENERGY FROM THE HEAD )
OF U CANAL PROJECT.)ORDER NO.33056
On April 30,2014,Idaho Power Company filed an Application requesting that the
Commission accept or reject an Agreement between Idaho Power and North Side Energy
Company (North Side),Inc.,for the sale and purchase of electric energy generated by the Head
of U Canal Project.On May 27,2014,Idaho Power filed an Amendment to its Application that
included a summary of terms and conditions contained in the proposed Agreement that are
different from prior agreements approved by this Commission.Idaho Power requests that its
Application be processed by Modified Procedure.
NOTICE OF APPLICATION
YOU ARE HEREBY NOTIFIED that,on April 23,2014,Idaho Power and North
Side entered into an Agreement pursuant to the terms and conditions of various Commission
Orders applicable to PURPA agreements for seasonal hydro projects.Idaho Power states that
North Side proposes to operate and maintain a 1.28 megawatt (MW)seasonal hydro energy
facility to be located near Jerome,Idaho.The Company maintains that the project will be a
qualified facility (QF)under the applicable provisions of the Public Utility Regulatory Policies
Act (PURPA).
YOU ARE FURTHER NOTIFIED that,under the terms of the Agreement,i’orth
Side elected to contract with Idaho Power for a 20-year term using the non-levelized other
published avoided cost rates as currently established by the Commission in Order No.32817 for
energy deliveries of less than 10 average MW (aMW).As defined in paragraphs 1.20 and 4.1.4
of the Agreement,North Side will be required to provide data on the facility that Idaho Power
will use to confirm that under normal and/or average conditions,the facility will not exceed 10
aMW on a monthly basis.As described in paragraph 7.5 of the Agreement.should the facility
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33056
exceed 10 aMW on a monthly basis,Idaho Power will accept the inadvertent energy that does
not exceed the maximum capacity amount,but will not purchase or pay for inadvertent energy.
YOU ARE FURTHER NOTIFIED that North Side has selected May 1,2015,as the
project’s Scheduled Operation Date.Various requirements have been placed upon North Side in
order for Idaho Power to accept energy deliveries from this facility.Idaho Power will monitor
compliance with these requirements.Idaho Power will continue to monitor the ongoing
requirements throughout the term of the Agreement.
YOU ARE FURTHER NOTIFIED that the Agreement provides that all applicable
interconnection charges and monthly operational or maintenance charges under Schedule 72 will
be assessed to North Side.A Schedule 72 Generator Interconnection Agreement (GIA)between
North Side and Idaho Power was executed on July 29,2013.Idaho Power states that PURPA QF
generation must be designated as a network resource (DNR)to serve Idaho Power’s retail load
on its system.In order for the facility to maintain its DNR status and maintain compliance with
Idaho Power’s non-discriminatory administration of its Open Access Transmission Tariff
(OATT)and FERC requirements there must be a power purchase agreement (PPA)associated
with its transmission service request.
YOU ARE FURTHER NOTIFIED that Article 21 of the Agreement provides that the
PPA will not become effective until the Commission has approved all terms and conditions and
declared that all payments Idaho Power makes to North Side for purchases of energy will be
allowed as prudently incurred expenses for ratemaking purposes.
YOU ARE FURTHER NOTIFIED that Idaho Power filed an Amendment to its initial
Application on May 27,2014.The Amendment provides a summary of terms and conditions
contained in the proposed Agreement that are different from prior agreements approved by this
Commission.In its Amendment,Idaho Power explains that the recent hydro agreements are the
first hydro-based agreements submitted for approval “that contain revised terms and conditions
subsequent to the Commission’s final and reconsideration orders from Case No.GNR-E-1l-03.
As such,the form of the [Agreement]has several terms and conditions that vary from previously
approved agreements in order to comply with the Commission’s recent orders.”Amendment at
5.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33056 2
YOU ARE FURTHER NOTIFIED that Idaho Power and North Side also agreed to
changes in some standard provisions that the parties now propose for Commission approval.
Idaho Power identifies the major changes as follows:
•Change to the definition of “Mid-Columbia Market Energy Cost”to
replace reference to the Dow Jones index with reference to the
Intercontinental Exchange (ICE)index and formula consistent with the
proposed settlement in Case No.IPC-E-13-251;
•Addition of definitions and provisions,paragraphs 1.29,1 .38,1.39,3.4
and 7.6 to incorporate definitions of “non-seasonal hydro facility”and
“seasonal hydro facility”as well as “seasonal hydro facility test periods”
to incorporate and maintain separate rates for seasonal and non-seasonal
hydro projects and to ensure that seasonal hydro projects perform within
the requirements of generating 55 percent of their annual generation in the
months of June,July and August;
•Removal of the provisions providing for delay liquidated damages and
maintained provisions to provide for delay security and actual delay
damages as provided for by the Commission’s adoption of the partial
stipulation in Commission Order No.32697;
•Change to Article VIII,“Environmental Attributes,”to indicate that North
Side owns all Environmental Attributes or Renewable Energy
Credits/Certificates;
•Change to paragraph 6.2 to allow North Side to adjust the “Initial Year
Monthly Net Energy Amounts”on a monthly,rather than quarterly,basis;
•Revision to paragraph 12.4 relating to Scheduled Maintenance;and
•Several other minor revisions in an attempt to add clarity.
NOTICE OF MODIFIED PROCEDURE
YOU ARE FURTHER NOTIFIED that the Commission has determined that the
public interest may not require a formal hearing in this matter and will proceed under Modified
Procedure pursuant to Rules 201 through 204 of the Idaho Public Utilities Commission’s Rules
of Procedure,IDAPA 3 1.01.01.201-204.The Commission notes that Modified Procedure and
This change is relevant to the 90/110 performance requirement.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33056 3
written comments have proven to be an effective means for obtaining public input and
participation.
YOU ARE FURTHER NOTIFIED that any person desiring to state a position on this
Application may file a written comment in support or in opposition with the Commission no
later than Friday,July 11,2014.The comment must contain a statement of reasons supporting
the comment.Persons desiring a hearing must specifically request a hearing in their written
comments.Written comments concerning this Application may be mailed to the Commission
and Idaho Power at the addresses reflected below:
Commission Secretary Donovan E.Walker
Idaho Public Utilities Commission Lead Counsel
P0 Box 83720 Idaho Power Company
Boise,ID 83720-0074 P0 Box 70
Boise,ID 83707-0070
E-mail:dwaIkcr(i,idahopower.corn
Street Address for Express Mail:Randy C.Aliphin
472 W.Washington Street Energy Contract Administrator
Boise,ID 83702-59 18 Idaho Power Company
P0 Box 70
Boise,ID 83707-0070
E-mail:ral1phinidahopower.corn
These comments should contain the case caption and case number shown on the first page of this
document.Persons desiring to submit comments via e-mail may do so by accessing the
Commission’s home page located at www.puc.idaho.gov.Click the “Case Comment or Question
Form”under the “Consumers”tab,and complete the comment form using the case number as it
appears on the front of this document.These comments must also be sent to Idaho Power at the
e-mail addresses listed above.
YOU ARE FURTHER NOTIFIED that reply comments may be filed no later than
Friday,July 18,2014.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are
received within the deadline,the Commission may consider the matter on its merits and may
enter its Order without a formal hearing.If comments or protests are filed within the deadline,
the Commission will consider them and in its discretion may set the matter for hearing or may
decide the matter and issue its Order based on the written positions before it.IDAPA
3 1.01.01.204.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33056 4
YOU ARE FURTHER NOTIFIED that the Application and supporting workpapers
have been filed with the Commission and are available for public inspection during regular
business hours at the Commission offices.The Application is also available on the
Commission’s web site at www.puc.idaho.gov.Click on the “File Room”tab at the top of the
page,scroll down to “Open Electric Cases,”and then click on the case number as shown on the
front of this document.
YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held
pursuant to the Commission’s jurisdiction under Title 61 of the Idaho Code and that the
Commission may enter any final order consistent with its authority under Title 61.
YOU ARE FURTHER NOTIFIED that all proceedings in this matter will be
conducted pursuant to the Commission’s Rules of Procedure,IDAPA 3 1.01.01.000,etseq.
ORDER
IT IS HEREBY ORDERED that this case be processed under Modified Procedure.
Interested persons and the parties may file written comments no later than July 11,2014.
IT IS FURTHER ORDERED that reply comments be filed no later than July 18,
2014.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33056 5
DONE by Order of the Idaho Public Utilities Commission at Boise.Idaho this /1
day of June 2014.
ATTEST:
LL..-/
Jean D.Jewell
Commission Secretary
O:IPC-E-I 4-O7ks
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33056
MACK A.REDFORD,COMMISSIONER
MARSHA H.SMITH,COMMISSIONER
PAUL
6