Loading...
HomeMy WebLinkAbout20140102Application Tariff.pdf3EHM" An IDACORP Companyi '-r. arr- ni'n a1i, l, i.'r LISA D. NORDSTROM Lead Counsel lnordstrom@idahooower.com December 23,2013 Jean D. Jewell, Secretary ldaho Public Utilities Commission 47 2 W est Washington Street P.O. Box 83720 Boise, Idaho 83720-007 4 kc-E-t4'D I Re: Tariff Advice No. 13-08 Annual Compliance Filing to Update the Substation Allowance and Vested lnterest Provisions under Schedule 19, Large Power Service Dear Ms. Jewell: ldaho Power Company hereby submits proposed modifications to Schedule 19, Large Power Service. This is the first annual compliance filing to update the Substation Allowance and Vested lnterest provisions under Schedule 19 as required by ldaho Public Utilities Commission Order Nos. 32893 and 32914. The following tariff sheets identify the proposed modifications: Original Sheet No. 19-5 Original Sheet No. 19-6 Original Sheet No. 19-7 The Company's modifications are necessary for it to implement and administer the new Schedule 19 Substation Allowance and Transmission Vested lnterest provisions as ordered by the Commission in Order No. 32893. The modifications to Schedule 19 are presented in three sections. The first section introduces new defined terms used within the subsequent Substation Allowance and Transmission Vested lnterest sections. The definitions are provided to ensure an understanding and consistent application of the following sections. The Substation Allowance section outlines when a Customer would qualify to receive a Substation Allowance, the maximum possible Substation Allowance to be refunded, and how the Customer wil! be refunded. Lastly, the Transmission Vested lnterest section outlines when a Customer would qualify to receive Transmission PO. Box 70 (837071 1221 W ldaho St. Boise, lD 83702 Jean D. Jewell, Secretary December 23,2013 Page 2 Vested lnterest, when Vested lnterest Refunds occur, and how Vested lnterest Charges to Additional Schedule 19 Applicants will be calculated. ln addition to presenting language additions to Schedule 19, the Company is submitting its first annual update to the Schedule 19 Substation Allowance. The cost estimation methodology the Company used is the same methodology the Company presented in Case No. IPC-E-13-09. The updated Substation Allowance reflects an updated stations overhead rate, which is based on the last 12 months of actual stations overheads and stations-related construction costs. This calculation of overheads is similar to the method used to calculate the Company's general distribution overhead rate, which is updated annually in the Company's Rule H, New Service Attachments and Distribution Line lnstallations or Alterations annual compliance filing. The Company will file both the workpapers used to calculate the stations overhead rate and the total per megawatt Substation Allowance in hard copy as confidential attachments to this tariff advice. The Company respectfully requests that the proposed updates are approved and effective February 1, 201 4. lf you have any questions regarding this tariff advice, please contact Connie Aschenbrenner at 388-5994 or caschen brenner@ ida hopower.com. Sincerely, o€^- !-(^,ut"^, Lisa D. Nordstrom LDN:kkt Enclosures cc w/enc: Greg Said RA File Legal File ldaho Power Company LP.U.C. No. 29. Tariff No. 101 OriqinalSheet No. 19-5 SCHEDULE 19 LARGE POWER SERVICE (Continued) SPECIAL ARRANGEMENTS FOR SUBSTATION ALLOWANCES AND/OR TRANSMISSION VESTED INTEREST Definitions Additional Schedule 19 Applicant is a Schedule 19 Customer whose Application requires the Companv to provide new or relocated service from Substation Facilities served bv an existinq section of Transmission Facilities with a Transmission Vested lnterest. Apolicant is a Schedule 19 Customer whose Application requires the Companv to provide new or relocated service from Substation Facilities served bv Transmission Facilities that are free and clear of any Transmission Vested lnterest. Application is a request bv an Applicant or Additional Schedule 19 Applicant for new electric service from the Companv. Connected Load is the total nameplate MW ratinq of the electric loads connected for Schedule 19 service. Distribution Facilities include structures. wires. insulators. and related equipment that are operated at a 34.5 kilovolt or lower ratinq. Substation Allowance is the portion of the cost of the Substation Facilities funded bv the Company. Substation Facilities include those facilities and related equipment that transform the voltaoe of enerov from a 44 kilovolt or hioher ratinq to a 34.5 kilovolt or lower ratinq. Transmission Facilities include structures. wires. insulators. and related equipment that are ooerated at a 44 kilovolt or hiqher ratino. Transmission Line lnstallation is anv installation of new Transmission Facilities owned bv the Companv. Transmission Line lnstallation Charqe is the partiallv refundable charoe assessed an Applicant or Additional Schedule 19 Apolicant whenever a Transmission Line lnstallation is built for that individual. Transmission Vested lnterest is the riqht to a refund that an Applicant or Additional Schedule '19 Applicant holds in a soecific section of Transmission Facilities when Additional Schedule 19 Applicants attach to that section of Transmission Facilities. Transmission Vested lnterest Charqe is an amount collected from an Additional Schedule 19 Applicant for refund to a Transmission Vested Interest Holder. Transmission Vested lnterest Holder is a person or entitv that has paid a refundable Transmission Line lnstallation Charoe to the Companv for a Transmission Line lnstallation. IDAHO lssued per Order No. 32893 Effective - February 1,2014 lssued by IDAHO POWER COMPANY Gregory W. Said, Vice President, Regulatory Affairs 1221 West ldaho Street, Boise, ldaho ldaho Power Company |.P.U.C. No. 29. Tariff No. 101 Oriqinal Sheet No. 19-6 SCHEDULE 19 LARGE POWER SERVICE (Continued) SPECIAL ARRANGEMENTS FOR SUBSTATION ALLOWANCES AND/OR TRANSMISSION VESTED INTEREST (Continued) Definitions (Contin ued) Transmission Vested lnterest Portion is that part of the Companv's transmission svstem in which a Transmission Vested !nterest is held. Substation Allowance lf a Schedule 19 Customer's request for service requires the installation of new or upqraded transformer caoacitv in Substation Facilities. the followinq considerations will be included in the separate aoreement between the Customer and the Companv: The Customer will initiallv pav for the cost of new or uporaded Substation Facilities required because of the Customer's request. The Customer will be elioible to receive a one-time Substation Allowance based upon subsequent sustained usaqe of capacitv bv the Customer a. Substation Allowance: The maximum possible allowance will be determined by multiolvino the Customer's proiected increase in load bv $64.580 per MW. but will not exceed the actual cost of the Substation Facilities. b. Substation Allowance Refunds: The Substation Allowance will be refunded to the Customer over a five-vear period. with annual oavments based on the Customer's Basic Load Capacitv at the time of refund. The first refund will be paid one vear followinq the first month enerqy is delivered throuqh the new Substation Facilities. The refunds will occur based on the followino adiustment. which will be added to the Substation Allowance received in the previous year. lf there is no chanoe in load from the previous vear. the Substation Allowance for that year is equalto the Substation Allowance from the previous vear: ((Chanoe in load from the orevious year as measured in MW) x (Substation Allowance per MW)) The Customer's annual refunds will be made in accordance with the Substation Allowance amount stated in the separate construction aqreement between the Customer and the Companv. Transmission Vested lnterest lf a Schedule 19 Customer's request for service requires the installation of new or upqraded capacitv in Transmission Facilities. and those Transmission Facilities are servino the Customer bv a radial feed. the followino considerations will be included in the separate aqreement between the Customer and the Companv: IDAHO lssued per Order No. 32893 Effective - February 1,2014 lssued by IDAHO POWER COMPANY Gregory W. Said, Vice President, Regulatory Affairs 1221 West ldaho Street, Boise, ldaho ldaho Power Company !.P.U.C. No. 29. Tariff No. 101 OriqinalSheet No. 19-7 SCHEDULE 19 LARGE POWER SERVICE (Continued) SPECIAL ARRANGEMENTS FOR SUBSTATION ALLOWANCES AND/OR TRANSMISSION VESTED INTEREST (Continued) Transmission Vested lnterest (Continued) The Customer will initiallv pav for the cost of new or uoqraded Transmission Facilities required because of the Customer's request. The Customer mav be eliqible to receive Transmission Vested lnterest Refunds in accordance with Schedule 19. Transmission Vested lnterest Refunds. Transmission Vested lnterest Refunds will be paid bv the Companv and funded bv the Additional Schedule 19 Applicant's Transmission Vested lnterest Charqe as calculated in accordance with Schedule 19. The initial Applicant will be elioible to receive refunds up to 80 percent of their oriqinal construction cost. Transmission Vested lnterest Refund Limitationsa. Transmission Vested lnterest Refunds will be funded bv no more than 4 Additional Schedule 19 Aoolicants durinq the 5-vear period followino the completion date of the Transmission Line lnstallation.b. ln no circumstance will refunds exceed 100 percent of the refundable portion of anv partv's cash payment to the Companv. Transmission Vested lnterest Gharses: Additional Schedule 19 Applicants with a Connected Load of qreater than 1 MW who connect to a Transmission Vested lnterest Portion of a Transmission Line lnstallation will pav a Transmission Vested lnterest Charoe to be refunded to the Transmission Vested lnterest Holder. An Additional Schedule 19 Apolicant will oav an amount determined bv this equation: Transmission Vested lnterest Charoe = A x B where: A = Load Ratio: Additional Schedule 19 Applicant's Connected Load divided bv the sum of Addi load. B = Vested lnterest Holder's un-refunded contribution The Additional Schedule 19 Apolicant has no Transmission Vested tnterest and the Transmission Vested lnterest Holder remains the Transmission Vested lnterest Holder. The Transmission Vested lnterest Holder's Transmission Vested lnterest will be reducpd bv the newest Additional Schedule 19 Applicant's pavment. The Transmission Vested lnterest Charoe will not exceed the sum of the Transmission Vested lnterests in the Transmission Line lnstallation. lf an Additional Schedule 19 Apolicant connects to a portion of a vested Transmission Line lnstallation which was established under a prior rule or schedule. the Transmission Vested lnterest Charqes of the previous rule or schedule apply to the Additional Schedule 19 Applicant. IDAHO Issued per Order No. 32893 Effective - February 1,2014 lssued by IDAHO POWER COMPANY Gregory W. Said, Vice President, Regulatory Affairs 1221 West ldaho Street, Boise, ldaho ldaho Power Company !.P.U.C. No. 29. Tariff No. 101 Orioinal Sheet No. 19-5 SCHEDULE 19 LARGE POWER SERVICE (Continued) SPECIAL ARRANGEMENTS FOR SUBSTATION ALLOWANCES AND/OR TRANSMISSION VESTED INTEREST Definitions Additional Schedule 19 Applicant is a Schedule 19 Customer whose Application requires the Company to provide new or relocated service from Substation Facilities served by an existing section of Transmission Facilities with a Transmission Vested !nterest. Aoplicant is a Schedule 19 Customer whose Application requires the Company to provide new or relocated service from Substation Facilities served by Transmission Facilities that are free and clear of any Transmission Vested lnterest. Application is a request by an Applicant or Additional Schedule 19 Applicant for new electric service from the Company. Connected Load is the total nameplate MW rating of the electric loads connected for Schedule 19 service. Distribution Facilities include structures, wires, insulators, and related equipment that are operated at a 34.5 kilovolt or lower rating. Substation Allowance is the portion of the cost of the Substation Facilities funded by the Company. Substation Facilities include those facilities and related equipment that transform the voltage of energy from a 44 kilovolt or higher rating to a 34.5 kilovolt or lower rating. Transmission Facilities include structures, wires, insulators, and related equipment that are operated ata 44 kilovolt or higher rating. Transmission Line lnstallation is any installation of new Transmission Facilities owned by the Company. Transmission Line lnstallation Charoe is the partially refundable charge assessed an Applicant or Additional Schedule 19 Applicant whenever a Transmission Line lnstallation is built for that individual. Transmission Vested Interest is the right to a refund that an Applicant or Additional Schedule 19 Applicant holds in a specific section of Transmission Facilities when Additional Schedule 19 Applicants attach to that section of Transmission Facilities. Transmission Vested lnterest Charoe is an amount collected from an Additional Schedule 19 Applicant for refund to a Transmission Vested lnterest Holder. Transmission Vested lnterest Holder is a person or entity that has paid a refundable Transmission Line lnstallation Charge to the Company for a Transmission Line lnstallation. IDAHO lssued by IDAHO POWER COMPANY lssued per Order No. 32893 Gregory W. Said, Vice President, Regulatory Affairs Effective - February 1,2014 1221 West ldaho Street, Boise, ldaho ldaho Power Company I.P.U.C. No. 29. Tariff No. 101 Oriqinal Sheet No. 19-6 SCHEDULE 19 LARGE POWER SERVICE (Continued) SPECIAL ARRANGEMENTS FOR SUBSTATION ALLOWANCES AND/OR TRANSMISSION VESTED INTEREST (Continued) Definitions (Continued) Transmission Vested lnterest Portion is that part of the Company's transmission system in which a Transmission Vested lnterest is held. Substation Allowance lf a Schedule 19 Customer's request for service requires the installation of new or upgraded transformer capacity in Substation Facilities, the following considerations will be included in the separate agreement between the Customer and the Company: The Customer will initially pay for the cost of new or upgraded Substation Facilities required because of the Customer's request. The Customer will be eligible to receive a one- time Substation Allowance based upon subsequent sustained usage of capacity by the Customer. a. Substation Allowance: The maximum possible allowance will be determined by multiplying the Customer's projected increase in load by $64,580 per MW, but will not exceed the actual cost of the Substation Facilities. b. Substation Allowance Refunds: The Substation Allowance will be refunded to the Customer over a five-year period, with annual payments based on the Customer's Basic Load Capacity at the time of refund. The first refund will be paid one year following the first month energy is delivered through the new Substation Facilities. The refunds will occur based on the following adjustment, which will be added to the Substation Allowance received in the previous year. lf there is no change in load from the previous year, the Substation Allowance for that year is equalto the Substation Allowance from the previous year: ((Change in load from the previous year as measured in MW) x (Substation Allowance per MW)) Number of Substation Allowance Refunds remaining in five-year period The Customer's annual refunds will be made in accordance with the Substation Allowance amount stated in the separate construction agreement between the Customer and the Company. Transmission Vested lnterest lf a Schedule 19 Customer's request for service requires the installation of new or upgraded capacity in Transmission Facilities, and those Transmission Facilities are serving the Customer by a radial feed, the following considerations will be included in the separate agreement between the Customer and the Company: IDAHO lssued per Order No. 32893 Effective - February 1,2014 lssued by IDAHO POWER COMPANY Gregory W. Said, Vice President, Regulatory Affairs 1221West ldaho Street, Boise, ldaho ldaho Power Company |.P.U.C. No. 29. Tariff No. 101 Orioinal Sheet No. 19-7 SCHEDULE 19 LARGE POWER SERVICE (Continued) SPECIAL ARRANGEMENTS FOR SUBSTATION ALLOWANCES AND/OR TRANSMISSION VESTED INTEREST (Continued) Transmission Vested lnterest (Continued) The Customer will initially pay for the cost of new or upgraded Transmission Facilities required because of the Customer's request. The Customer may be eligible to receive Transmission Vested lnterest Refunds in accordance with Schedule 19. Transmission Vested Interest Refunds. Transmission Vested lnterest Refunds will be paid by the Company and funded by the Additional Schedule 19 Applicant's Transmission Vested lnterest Charge as calculated in accordance with Schedule 19. The initial Applicant will be eligible to receive refunds up to 80 percent of their original construction cost. Transm ission Vested I nterest Refund Li m itationsa. Transmission Vested lnterest Refunds will be funded by no more than 4 Additional Schedule 19 Applicants during the S-year period following the completion date of the Transmission Line !nstallation.b. ln no circumstance will refunds exceed 100 percent of the refundable portion of any party's cash payment to the Company. Transmission Vested lnterest Charges: Additional Schedule 19 Applicants with a Connected Load of greater than 1 MW who connect to a Transmission Vested lnterest Portion of a Transmission Line lnstallation will pay a Transmission Vested lnterest Charge to be refunded to the Transmission Vested lnterest Holder. An Additional Schedule 19 Applicant will pay an amount determined by this equation: Transmission Vested lnterest Charge = A x B where; A = Load Ratio: Additional Schedule 19 Applicant's Connected Load divided by the sum of Additional Applicant's Connected Load and Transmission Vested lnterest Holder's load. B = Vested lnterest Holder s un-refunded contribution The Additional Schedule 19 Applicant has no Transmission Vested lnterest and the Transmission Vested lnterest Holder remains the Transmission Vested lnterest Holder. The Transmission Vested lnterest Holder's Transmission Vested lnterest wil! be reduced by the newest Additiona! Schedule 19 Applicant's payment. The Transmission Vested lnterest Charge wil! not exceed the sum of the Transmission Vested lnterests in the Transmission Line lnstallation. lf an Additional Schedule 19 Applicant connects to a portion of a vested Transmission Line lnstallation which was established under a prior rule or schedule, the Transmission Vested lnterest Charges of the previous rule or schedule apply to the Additional Schedule 19 Applicant. IDAHO lssued per Order No. 32893 Effective - February 1, 2014 lssued by IDAHO POWER COMPANY Gregory W. Said, Vice President, Regulatory Affairs 1221West ldaho Street, Boise, ldaho