Loading...
HomeMy WebLinkAbout20130515Replacement Sheets Schedule 55.pdfHO PAIER® An IDACORP Company 2fY JF r L:13 LISAD.NORDSTROM Lead Counsel T Hlnordstrom(idahopower.com May 15,2013 VIA HAND DELIVERY Jean D.Jewell,Secretary Idaho Public Utilities Commission 472 West Washington Street Boise,Idaho 83702 Re:Case No.IPC-E-13-10 2013-2014 Power Cost Adjustment (“PCA”)—Replacement Sheet in Schedule 55 (55-2) Dear Ms.Jewell: It has come to the attention of Idaho Power Company (“Company”)that sheet 55-2 of Schedule 55 contains incorrect amounts for the Earnings Sharing Monthly Credit forMicron,Simplot,and the Department of Energy.The amounts on Schedule 55 as filed areannualamountsandshouldinsteadbereflectedasmonthlyamounts.An original and seven (7)copies of corrected sheets 55-2 are enclosed for filing (for both mitigated and unmitigated). If you have any questions regarding the enclosed pages or the corrected Earnings Sharing Monthly Credit,please do not hesitate to contact Tami White at (208)388-6938. Very truly yours, Lisa D.Nordstrom LDN:kkt Enclosures cc:Service List (w/encls.) John Velikoff,Micron (w/encls.) Don Sturtevant,Simplot (w/encls.) Don Blatter,INL (w/encl.) CERTIFICATE OF SERVICE I HEREBY CERTIFY that on this 15th day of May 2013 I served a true and correct copy of the within and foregoing LETTER TO JEAN D.JEWELL DATED MAY 15,2013, upon the following named parties by the method indicated below,and addressed to the following: Commission Staff X Hand Delivered Karl T.Klein ____U.S. Mail Deputy Attorney General ____Overnight Mail Idaho Public Utilities Commission ____FAX 472 West Washington (83702)X Email karl.kleincpuc.idaho.qov P.O.Box 83720 Boise,Idaho 83720-0074 Industrial Customers of Idaho Power ____Hand Delivered PeterJ.Richardson X U.S.Mail Gregory M.Adams ____Overnight Mail RICHARDSON &O’LEARY,PLLC ___FAX 515 North 27th Street (83702)X Email peter(ärichardsonandoleary.com P.O.Box 7218 qreq@richardsonandoleary.com Boise,Idaho 83707 Dr.Don Reading ____Hand Delivered 6070 Hill Road X U.S.Mail Boise,Idaho 83703 ____Overnight Mail ___FAX X Email dreadinqcmindsprinq.com Kimberly Towexecutive Assistant CERTIFICATE OF SERVICE Idaho Power Company Second Revised Sheet No.55-2 Cancels l.P.U.C.No.29,Tariff No.101 First Revised Sheet No.55-2 SCHEDULE 55 POWER COST ADJUSTMENT (Continued) EARNINGS SHARING (Continued) 9T Large General Service —Transmission (0.041 6) 15 Dusk to Dawn Lighting (0.1550) 19S Large Power Service —Secondary (0.0414) 1 9P Large Power Service —Primary (0.0365) 1 9T Large Power Service —Transmission (0.0350) 24 Agricultural Irrigation Service (0.0539) 40 Unmetered General Service (0.0598) 41 Street Lighting (0.0963) 42 Traffic Control Lighting (0.0406) Monthly Credit 26 Micron ($15,058.46) 29 Simplot ($4,599.49) 30 DOE ($5,943.87) 32 Hoku $0.00 POWER COST ADJUSTMENT The Power Cost Adjustment is the sum of:1)95 percent of the difference between the Projected Power Costs in Category 1 and the Base Power Costs in Category 1;2)100 percent of the difference between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2;3)100 percent of the difference between the Projected Power Costs in Category 3 and the Base Power Costs in Category 3;4)the True-ups;and 5)Earnings Sharing. The monthly Power Cost Adjustment rates applied to the Energy rate of all metered schedules and Special Contracts are shown below.The rates below do not include the monthly Earnings Sharing payments for each of the Special Contract customers (Schedules 26,29,30 and 32).The monthly Power Cost Adjustment applied to the per unit charges of the nonmetered schedules is the monthly estimated usage times the cents per kWh rates shown below. Schedule Description per kWh I Residential Service 0.7730 3 Mastered Metered Mobile Home Park 0.7765 4 Residential —Energy Watch Pilot Plan 0.8404 5 Residential —Time-of-Day Pilot Plan 0.7758 7 Small General Service 0.7543 9S Large General Service —Secondary 0.7915 9P Large General Service —Primary 0.7985 9T Large General Service —Transmission 0.7988 15 Dusk to Dawn Lighting 0.6854 1 9S Large Power Service —Secondary 0.7990 1 9P Large Power Service —Primary 0.8039 1 9T Large Power Service —Transmission 0.8054 24 Agricultural Irrigation Service 0.7865 40 Unmetered General Service 0.7806 41 Street Lighting 0.7441 42 Traffic Control Lighting 0.7998 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No.Gregory W.Said,Vice President,Regulatory Affairs Effective —June 1,2013 1221 West Idaho Street,Boise,Idaho I Idaho Power Company kstSecond Revised Sheet No.55-2 Cancels I.P.U.C.No.29,Tariff No.101 Origina?First Revised Sheet No.55-2 SCHEDULE 55 POWER COST ADJUSTMENT (Continued) EARNINGS SHARING (Continued) 9T Large General Service —Transmission (0.1568)f0.0416) 15 Dusk to Dawn Lighting (0.5843)(0.1550) 19S Large Power Service —Secondary (0.1557)(0.0414) 19P Large Power Service —Primary (0.1381)(0.0365) 19T Large Power Service —Transmission (0.1302)(0.0350) 24 Agricultural Irrigation Service (0.2072)(0.0539) 40 Unmetered General Service (0.2250)(0.0598) 41 Street Lighting (0.41 28)(0.0963) 42 Traffic Control Lighting (0.1561)(0.0406) Monthly Credit 26 Micron ($16,803.50)($1 5,058.46) 29 Simplot ($18,362.25)($4,599.49) 30 DOE ($22,905.75)($5,943.87) 32 Hoku ($7,68508)$0.00 POWER COST ADJUSTMENT The Power Cost Adjustment is the sum of:1)95 percent of the difference between the Projected Power Costs in Category 1 and the Base Power Costs in Category 1;2)100 percent of the difference between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2;3)100 percent of the difference between the Projected Power Costs in Category 3 and the Base Power Costs in Category 3;4)the True-ups;and 5)Earnings Sharing. The monthly Power Cost Adjustment rates applied to the Energy rate of all metered schedules and Special Contracts are shown below.The rates below do not include the monthly Earnings Sharing payments for each of the Special Contract customers (Schedules 26,29,30 and 32).The monthly Power Cost Adjustment applied to the per unit charges of the nonmeteced schedules is the monthly estimated usage times the cents per kWh rates shown below. Schedule Description per kWh 14-5 Residential Service 0.07930.7730 3 Mastered Metered Mobile Home Park 0.09270.7765 4 Residential —Energy Watch Pilot Plan 0.8404 5 Residential —Time-of-Day Pilot Plan 0.7758 7 Small General Service 0.00940.7543 9S Large General Service —Secondary 0.14920.7915 9P Large General Service —Primary 0.17990.7985 9T Large General Service —Transmission 0.17990.7988 15 Dusk to Dawn Lighting (0.2’176)0.6854 19S Large Power Service —Secondary 0.18100.7990 19P Large Power Service —Primary 0.19860.8039 19T Large Power Service —Transmission 0.20650.8054 24 Agricultural Irrigation Service 0.12950.7865 40 Unmetered General Service 0.11170.7806 41 Street Lighting (0.0761)0.7441 42 Traffic Control Lighting 0.18060.7998 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No.s.32552 and 32558 Gregory W.Said,Vice President,Regulatory Affairs Effective —June 1,20123 1221 West Idaho Street,Boise,Idaho Idaho Power Company Second Revised Sheet No.55-2 Cancels l.P.U.C.No.29,Tariff No.101 First Revised Sheet No.55-2 SCHEDULE 55 POWER COST ADJUSTMENT (Continued) EARNINGS SHARING (Continued) 9T Large General Service —Transmission (0.0416) 15 Dusk to Dawn Lighting (0.1550) 19S Large Power Service —Secondary (0.0414) 1 9P Large Power Service —Primary (0.0365) 191 Large Power Service —Transmission (0.0350) 24 Agricultural Irrigation Service (0.0539) 40 Unmetered General Service (0.0598) 41 Street Lighting (0.0963) 42 Traffic Control Lighting (0.0406) Monthly Credit 26 Micron ($15,058.46) 29 Simplot ($4,599.49) 30 DOE ($5,943.87) 32 Hoku $0.00 POWER COST ADJUSTMENT The Power Cost Adjustment is the sum of:1)95 percent of the difference between the Projected Power Costs in Category I and the Base Power Costs in Category 1;2)100 percent of the difference between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2;3)100 percent of the difference between the Projected Power Costs in Category 3 and the Base Power Costs in Category 3;4)the True-ups;and 5)Earnings Sharing. The monthly Power Cost Adjustment rates applied to the Energy rate of all metered schedules and Special Contracts are shown below.The rates below do not include the monthly Earnings Sharing payments for each of the Special Contract customers (Schedules 26,29,30 and 32).The monthly Power Cost Adjustment applied to the per unit charges of the nonmetered schedules is the monthly estimated usage times the cents per kWh rates shown below. Schedule Description per kWh 1 Residential Service 1.1632 3 Mastered Metered Mobile Home Park 1.1667 4 Residential —Energy Watch Pilot Plan 1.2306 5 Residential —Time-of-Day Pilot Plan 1.1660 7 Small General Service 1.1445 9S Large General Service —Secondary 1.1817 9P Large General Service —Primary 1.1 887 91 Large General Service —Transmission 1.1890 15 Dusk to Dawn Lighting 1.0756 19S Large Power Service —Secondary 1.1892 19P Large Power Service —Primary 1.1941 19T Large Power Service —Transmission 1.1956 24 Agricultural Irrigation Service 1.1767 40 Unmetered General Service 1.1708 41 Street Lighting 1.1343 42 Traffic Control Lighting 1.1900 IDAHO Issued by IDAHO POWER COMPANY Issued per Order No.Gregory W.Said,Vice President,Regulatory Affairs Effective —June 1,2013 1221 West Idaho Street,Boise,Idaho I Idaho Power Company rstSecond Revised Sheet No.55-2 Cancels I l.P.U.C.No.29,Tariff No.101 OriginalFirst Revised Sheet No.55-2 SCHEDULE 55 POWER COST ADJUSTMENT (Continued) EARNINGS SHARING (Continued) Large General Service —Transmission (0.1 568)(0.0416) Dusk to Dawn Lighting (0.5843)(0.1550) Large Power Service —Secondary (0.1557)(0.0414) Large Power Service —Primary (0.1381)(0.0365) Large Power Service —Transmission (0.1302)(0.0350) Agricultural Irrigation Service (0.2072)(0.0539) Unmetered General Service (0.2250)(0.0598) Street Lighting (0.’l 1 28)(0.0963) Traffic Control Lighting (0.1561 )(0.0406) Monthly Credit Micron ($46,803.50)($15,058.46) Simplot ($1 8,362.25)($4,599.49) DOE ($22,905.75)($5,943.87) Hoku ($7,685.08)$0.00 POWER COST ADJUSTMENT The Power Cost Adjustment is the sum of:1)95 percent of the difference between the Projected Power Costs in Category 1 and the Base Power Costs in Category 1;2)100 percent of the difference between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2;3)100 percent of the difference between the Projected Power Costs in Category 3 and the Base Power Costs in Category 3;4)the True-ups;and 5)Earnings Sharing. The monthly Power Cost Adjustment rates applied to the Energy rate of all metered schedules and Special Contracts are shown below.The rates below do not include the monthly Earnings Sharing payments for each of the Special Contract customers (Schedules 26,29,30 and 32).The monthly Power Cost Adjustment applied to the per unit charges of the nonmetered schedules is the monthly estimated usage times the cents per kWh rates shown below. Schedule __________ per kWh 145 0.07931.1632 3 0.09271.1667 4 1.2306 5 1.1660 7 0.00941.1445 9S 0.14921.1817 9P 0.17991.1887 9T 0.17991.1890 15 (0.2176)1.0756 19S 0.18101.1892 19P 0.19861.1941 19T 0.20651.1956 24 0.12951.1767 40 0.11171.1708 41 (0.0761)1.1343 42 0.18061.1900 9T 15 19S 1 9P 1 9T 24 40 41 42 26 29 30 32 Description Residential Service Mastered Metered Mobile Home Park Residential —Energy Watch Pilot Plan Residential —Time-of-Day Pilot Plan Small General Service Large General Service —Secondary Large General Service —Primary Large General Service —Transmission Dusk to Dawn Lighting Large Power Service —Secondary Large Power Service —Primary Large Power Service —Transmission Agricultural Irrigation Service Unmetered General Service Street Lighting Traffic Control Lighting IDAHO Issued by IDAHO POWER COMPANY Issued per Order Nos.32552 and 32558 Gregory W.Said,Vice President,Regulatory Affairs Effective —June 1,20123 1221 West Idaho Street,Boise,Idaho