HomeMy WebLinkAbout20130515Replacement Sheets Schedule 55.pdfHO
PAIER®
An IDACORP Company
2fY JF r L:13
LISAD.NORDSTROM
Lead Counsel T Hlnordstrom(idahopower.com
May 15,2013
VIA HAND DELIVERY
Jean D.Jewell,Secretary
Idaho Public Utilities Commission
472 West Washington Street
Boise,Idaho 83702
Re:Case No.IPC-E-13-10
2013-2014 Power Cost Adjustment (“PCA”)—Replacement Sheet in
Schedule 55 (55-2)
Dear Ms.Jewell:
It has come to the attention of Idaho Power Company (“Company”)that sheet 55-2
of Schedule 55 contains incorrect amounts for the Earnings Sharing Monthly Credit forMicron,Simplot,and the Department of Energy.The amounts on Schedule 55 as filed areannualamountsandshouldinsteadbereflectedasmonthlyamounts.An original and
seven (7)copies of corrected sheets 55-2 are enclosed for filing (for both mitigated and
unmitigated).
If you have any questions regarding the enclosed pages or the corrected Earnings
Sharing Monthly Credit,please do not hesitate to contact Tami White at (208)388-6938.
Very truly yours,
Lisa D.Nordstrom
LDN:kkt
Enclosures
cc:Service List (w/encls.)
John Velikoff,Micron (w/encls.)
Don Sturtevant,Simplot (w/encls.)
Don Blatter,INL (w/encl.)
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on this 15th day of May 2013 I served a true and correct
copy of the within and foregoing LETTER TO JEAN D.JEWELL DATED MAY 15,2013,
upon the following named parties by the method indicated below,and addressed to the
following:
Commission Staff X Hand Delivered
Karl T.Klein
____U.S.
Mail
Deputy Attorney General
____Overnight
Mail
Idaho Public Utilities Commission
____FAX
472 West Washington (83702)X Email karl.kleincpuc.idaho.qov
P.O.Box 83720
Boise,Idaho 83720-0074
Industrial Customers of Idaho Power
____Hand
Delivered
PeterJ.Richardson X U.S.Mail
Gregory M.Adams
____Overnight
Mail
RICHARDSON &O’LEARY,PLLC
___FAX
515 North 27th Street (83702)X Email peter(ärichardsonandoleary.com
P.O.Box 7218 qreq@richardsonandoleary.com
Boise,Idaho 83707
Dr.Don Reading
____Hand
Delivered
6070 Hill Road X U.S.Mail
Boise,Idaho 83703
____Overnight
Mail
___FAX
X Email dreadinqcmindsprinq.com
Kimberly Towexecutive Assistant
CERTIFICATE OF SERVICE
Idaho Power Company Second Revised Sheet No.55-2
Cancels
l.P.U.C.No.29,Tariff No.101 First Revised Sheet No.55-2
SCHEDULE 55
POWER COST ADJUSTMENT
(Continued)
EARNINGS SHARING (Continued)
9T Large General Service —Transmission (0.041 6)
15 Dusk to Dawn Lighting (0.1550)
19S Large Power Service —Secondary (0.0414)
1 9P Large Power Service —Primary (0.0365)
1 9T Large Power Service —Transmission (0.0350)
24 Agricultural Irrigation Service (0.0539)
40 Unmetered General Service (0.0598)
41 Street Lighting (0.0963)
42 Traffic Control Lighting (0.0406)
Monthly Credit
26 Micron ($15,058.46)
29 Simplot ($4,599.49)
30 DOE ($5,943.87)
32 Hoku $0.00
POWER COST ADJUSTMENT
The Power Cost Adjustment is the sum of:1)95 percent of the difference between the Projected
Power Costs in Category 1 and the Base Power Costs in Category 1;2)100 percent of the difference
between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2;3)100
percent of the difference between the Projected Power Costs in Category 3 and the Base Power Costs
in Category 3;4)the True-ups;and 5)Earnings Sharing.
The monthly Power Cost Adjustment rates applied to the Energy rate of all metered schedules
and Special Contracts are shown below.The rates below do not include the monthly Earnings Sharing
payments for each of the Special Contract customers (Schedules 26,29,30 and 32).The monthly
Power Cost Adjustment applied to the per unit charges of the nonmetered schedules is the monthly
estimated usage times the cents per kWh rates shown below.
Schedule Description per kWh
I Residential Service 0.7730
3 Mastered Metered Mobile Home Park 0.7765
4 Residential —Energy Watch Pilot Plan 0.8404
5 Residential —Time-of-Day Pilot Plan 0.7758
7 Small General Service 0.7543
9S Large General Service —Secondary 0.7915
9P Large General Service —Primary 0.7985
9T Large General Service —Transmission 0.7988
15 Dusk to Dawn Lighting 0.6854
1 9S Large Power Service —Secondary 0.7990
1 9P Large Power Service —Primary 0.8039
1 9T Large Power Service —Transmission 0.8054
24 Agricultural Irrigation Service 0.7865
40 Unmetered General Service 0.7806
41 Street Lighting 0.7441
42 Traffic Control Lighting 0.7998
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No.Gregory W.Said,Vice President,Regulatory Affairs
Effective —June 1,2013 1221 West Idaho Street,Boise,Idaho
I Idaho Power Company kstSecond Revised Sheet No.55-2
Cancels
I.P.U.C.No.29,Tariff No.101 Origina?First Revised Sheet No.55-2
SCHEDULE 55
POWER COST ADJUSTMENT
(Continued)
EARNINGS SHARING (Continued)
9T Large General Service —Transmission (0.1568)f0.0416)
15 Dusk to Dawn Lighting (0.5843)(0.1550)
19S Large Power Service —Secondary (0.1557)(0.0414)
19P Large Power Service —Primary (0.1381)(0.0365)
19T Large Power Service —Transmission (0.1302)(0.0350)
24 Agricultural Irrigation Service (0.2072)(0.0539)
40 Unmetered General Service (0.2250)(0.0598)
41 Street Lighting (0.41 28)(0.0963)
42 Traffic Control Lighting (0.1561)(0.0406)
Monthly Credit
26 Micron ($16,803.50)($1 5,058.46)
29 Simplot ($18,362.25)($4,599.49)
30 DOE ($22,905.75)($5,943.87)
32 Hoku ($7,68508)$0.00
POWER COST ADJUSTMENT
The Power Cost Adjustment is the sum of:1)95 percent of the difference between the Projected
Power Costs in Category 1 and the Base Power Costs in Category 1;2)100 percent of the difference
between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2;3)100
percent of the difference between the Projected Power Costs in Category 3 and the Base Power Costs
in Category 3;4)the True-ups;and 5)Earnings Sharing.
The monthly Power Cost Adjustment rates applied to the Energy rate of all metered schedules
and Special Contracts are shown below.The rates below do not include the monthly Earnings Sharing
payments for each of the Special Contract customers (Schedules 26,29,30 and 32).The monthly
Power Cost Adjustment applied to the per unit charges of the nonmeteced schedules is the monthly
estimated usage times the cents per kWh rates shown below.
Schedule Description per kWh
14-5 Residential Service 0.07930.7730
3 Mastered Metered Mobile Home Park 0.09270.7765
4 Residential —Energy Watch Pilot Plan 0.8404
5 Residential —Time-of-Day Pilot Plan 0.7758
7 Small General Service 0.00940.7543
9S Large General Service —Secondary 0.14920.7915
9P Large General Service —Primary 0.17990.7985
9T Large General Service —Transmission 0.17990.7988
15 Dusk to Dawn Lighting (0.2’176)0.6854
19S Large Power Service —Secondary 0.18100.7990
19P Large Power Service —Primary 0.19860.8039
19T Large Power Service —Transmission 0.20650.8054
24 Agricultural Irrigation Service 0.12950.7865
40 Unmetered General Service 0.11170.7806
41 Street Lighting (0.0761)0.7441
42 Traffic Control Lighting 0.18060.7998
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No.s.32552 and 32558 Gregory W.Said,Vice President,Regulatory Affairs
Effective —June 1,20123 1221 West Idaho Street,Boise,Idaho
Idaho Power Company Second Revised Sheet No.55-2
Cancels
l.P.U.C.No.29,Tariff No.101 First Revised Sheet No.55-2
SCHEDULE 55
POWER COST ADJUSTMENT
(Continued)
EARNINGS SHARING (Continued)
9T Large General Service —Transmission (0.0416)
15 Dusk to Dawn Lighting (0.1550)
19S Large Power Service —Secondary (0.0414)
1 9P Large Power Service —Primary (0.0365)
191 Large Power Service —Transmission (0.0350)
24 Agricultural Irrigation Service (0.0539)
40 Unmetered General Service (0.0598)
41 Street Lighting (0.0963)
42 Traffic Control Lighting (0.0406)
Monthly Credit
26 Micron ($15,058.46)
29 Simplot ($4,599.49)
30 DOE ($5,943.87)
32 Hoku $0.00
POWER COST ADJUSTMENT
The Power Cost Adjustment is the sum of:1)95 percent of the difference between the Projected
Power Costs in Category I and the Base Power Costs in Category 1;2)100 percent of the difference
between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2;3)100
percent of the difference between the Projected Power Costs in Category 3 and the Base Power Costs
in Category 3;4)the True-ups;and 5)Earnings Sharing.
The monthly Power Cost Adjustment rates applied to the Energy rate of all metered schedules
and Special Contracts are shown below.The rates below do not include the monthly Earnings Sharing
payments for each of the Special Contract customers (Schedules 26,29,30 and 32).The monthly
Power Cost Adjustment applied to the per unit charges of the nonmetered schedules is the monthly
estimated usage times the cents per kWh rates shown below.
Schedule Description per kWh
1 Residential Service 1.1632
3 Mastered Metered Mobile Home Park 1.1667
4 Residential —Energy Watch Pilot Plan 1.2306
5 Residential —Time-of-Day Pilot Plan 1.1660
7 Small General Service 1.1445
9S Large General Service —Secondary 1.1817
9P Large General Service —Primary 1.1 887
91 Large General Service —Transmission 1.1890
15 Dusk to Dawn Lighting 1.0756
19S Large Power Service —Secondary 1.1892
19P Large Power Service —Primary 1.1941
19T Large Power Service —Transmission 1.1956
24 Agricultural Irrigation Service 1.1767
40 Unmetered General Service 1.1708
41 Street Lighting 1.1343
42 Traffic Control Lighting 1.1900
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No.Gregory W.Said,Vice President,Regulatory Affairs
Effective —June 1,2013 1221 West Idaho Street,Boise,Idaho
I Idaho Power Company rstSecond Revised Sheet No.55-2
Cancels
I l.P.U.C.No.29,Tariff No.101 OriginalFirst Revised Sheet No.55-2
SCHEDULE 55
POWER COST ADJUSTMENT
(Continued)
EARNINGS SHARING (Continued)
Large General Service —Transmission (0.1 568)(0.0416)
Dusk to Dawn Lighting (0.5843)(0.1550)
Large Power Service —Secondary (0.1557)(0.0414)
Large Power Service —Primary (0.1381)(0.0365)
Large Power Service —Transmission (0.1302)(0.0350)
Agricultural Irrigation Service (0.2072)(0.0539)
Unmetered General Service (0.2250)(0.0598)
Street Lighting (0.’l 1 28)(0.0963)
Traffic Control Lighting (0.1561 )(0.0406)
Monthly Credit
Micron ($46,803.50)($15,058.46)
Simplot ($1 8,362.25)($4,599.49)
DOE ($22,905.75)($5,943.87)
Hoku ($7,685.08)$0.00
POWER COST ADJUSTMENT
The Power Cost Adjustment is the sum of:1)95 percent of the difference between the Projected
Power Costs in Category 1 and the Base Power Costs in Category 1;2)100 percent of the difference
between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2;3)100
percent of the difference between the Projected Power Costs in Category 3 and the Base Power Costs
in Category 3;4)the True-ups;and 5)Earnings Sharing.
The monthly Power Cost Adjustment rates applied to the Energy rate of all metered schedules
and Special Contracts are shown below.The rates below do not include the monthly Earnings Sharing
payments for each of the Special Contract customers (Schedules 26,29,30 and 32).The monthly
Power Cost Adjustment applied to the per unit charges of the nonmetered schedules is the monthly
estimated usage times the cents per kWh rates shown below.
Schedule
__________
per kWh
145 0.07931.1632
3 0.09271.1667
4 1.2306
5 1.1660
7 0.00941.1445
9S 0.14921.1817
9P 0.17991.1887
9T 0.17991.1890
15 (0.2176)1.0756
19S 0.18101.1892
19P 0.19861.1941
19T 0.20651.1956
24 0.12951.1767
40 0.11171.1708
41 (0.0761)1.1343
42 0.18061.1900
9T
15
19S
1 9P
1 9T
24
40
41
42
26
29
30
32
Description
Residential Service
Mastered Metered Mobile Home Park
Residential —Energy Watch Pilot Plan
Residential —Time-of-Day Pilot Plan
Small General Service
Large General Service —Secondary
Large General Service —Primary
Large General Service —Transmission
Dusk to Dawn Lighting
Large Power Service —Secondary
Large Power Service —Primary
Large Power Service —Transmission
Agricultural Irrigation Service
Unmetered General Service
Street Lighting
Traffic Control Lighting
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order Nos.32552 and 32558 Gregory W.Said,Vice President,Regulatory Affairs
Effective —June 1,20123 1221 West Idaho Street,Boise,Idaho