HomeMy WebLinkAbout20110815Petition to Intervene.pdfPeter J. FUchardson
ISB No. 3195
Gregory Adams
ISB No. 7454
FUchardson & O'Leary
515 N. 27th Street
P.O. Box 7218
Boise, Idaho 83702
Telephone: (208) 938-7901 Tel
Fax: (208) 938-7904 Fax
petercmrichardsonandolear .com
gregcmrichardsonandolear.com
Attorneys for Grand View PV Solar Two
RECEIVED
2011 AUG i 5 Pt1 3: 32
UTI
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION OF)
IDAHO POWER COMPANY FOR A ) CASE NO. IPC-E- 11 - 10
DETERMINATION REGARDING THE FIRM )
ENERGY SALES AGREEMENT WITH ) PETITION TO INTERVENE
INTERCONNECT SOLAR DEVELOPMENT,) OF GRAND VIEW PV SOLAR TWO
LLC, FOR THE SALE AND PURCHASE OF )ELECTRIC ENERGY )
)
COMES NOW, Grand View PV Solar Two, hereinafer referred to as "Intervenor," and
pursuat to this Commission's Rules of Procedure, Rule 71 IDAPA 31.01.01.71 hereby petitions
the Commission for leave to intervene herein and to appear and paricipate herein as a pary, and
as grounds therefore states as follows:
1. The name and address of this Intervenor is:
Grand View PV Solar Two, LLC
Peter FUchardson
515 N. 27th Street
Boise, Idaho 83702
peter(frichardsonandoleary.com
Copies of all pleadings, production requests, production responses, Commission orders
and other documents should be provided to Peter FUchardson as noted above and to:
Dr. Don Reading
6070 Hil Road
Boise, Idaho 83703
(208) 348- 1 700 Tel
(208) 383-0401 Fax
dreadingcmmindspring.com
If the paries utilize electronic service of document please then also include Mr. Robert
Paul on the e-mail list at robertpau108cmgmaiL.com.
1. This Intervenor understads that discovery is curently taing place between the
Staff of the Commission and Idaho Power that indicates changes in the maner in which Idaho
Power calculates avoided cost rates for solar projects that are larger than 100 kw may be
considered. Grand View PV Solar Two has a draft contract offer from Idaho Power with similar
rates to those found in Interconnect Solar's pending contract for approval before this
Commission
2. This Intervenor, Grand View Solar PV Two, LLC claims a direct and substantial
interest in ths proceeding in that it is also a developer of solar QF projects in Idaho and is
interested and directly affected by the methodology used by Idao Power in the determination of
avoided cost rates for solar QFs larger than 100.
3. This Intervenor intends to paricipate herein as a pary, and if necessar, to
introduce evidence, cross-examine witnesses, call and examine witnesses, and be heard in
argument. The nature and quality of evidence which ths Intervenor will introduce is dependent
upon the nature and effect of other evidence in this proceeding.
Intervention - IPC-E-II-IO 2
5. Without the opportity to intervene herein, this Intervenor would be without any
means of paricipation in this proceeding which may have a material impact on the avoided cost
rates contaned in its proffered contract by Idaho Power.
6. Granting this Intervenor's petition to intervene will not unduly broaden the issues
nor wil it prejudice any par to this case.
7. Grand View PV Solar Two recognizes that the Commission has issued a Notice of
Modified Procedure that did not invite petitions for intervention to be fied. The Commission
subsequently modified the deadline in the Notice of Modified Procedure for comments to
accommodate Staff s need for additional time to review the rates contained in Interconnect
Solar's power purchase agreement. The new dates are September 29 for initial comments and
October 6 for reply comments. Grand View Solar may fie comments; however, without status
as a pary, Grand View Solar will not have access to, or rights of, discovery, including access to
confdential Idaho Power models. Grand View PV Solar Two will adhere to the existing
schedule and its paricipation as a pary wil not delay this proceeding nor broaden the issues
herein.
WHEREFORE, Grand View PV Solar Two respectfully requests that this Commission
grant its Petition to Intervene in these proceedings and to appear and paricipate in all matters as
may be necessar and appropriate; and to present evidence, call and examine witnesses, present
arguent and to otherwse fully paricipate in these proceedings.
Intervention - IPC-E.ll-l 0 3
DATED ths 1 Sth day of August, 2011.
Intervention - IPC-E-ll-lO
Peter FUchardson
By_rrA.~
Peter FUchardson
Grand View PV Solar Two
4
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on the15th day of August, 2011, a tre and correct copy of the
withn and foregoing PETITION TO INTERVENE BY GRAND VIEW PV SOLAR TWI
was served in the maner shown to:
Ms. Jean Jewell
Commission Secreta
Idaho Public Utilities Commission
472 W. Washington (83702)
PO Box 83720
Boise, ID 83720-0074
2L Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
Electronic Mail
Lisa Nordstrom
Donovan Walker
Idaho Power Company
PO Box 70
Boise, Idaho 83707-0070
lnordstromcmidahopower.com
bklinecmidahopower.com
2L Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
Electronic Mail
Kriss Sasser
Deputy Attorney General
Idaho Public Utilities Commission
472 W. Washington
Boise ID 83702
Scott. woodburycmpuc.idaho.gov
L Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
Electronic Mail
Ronald Wiliams
Wiliams Bradbur P.C.
1015 W. Hays St
Boise ID 83702
roncmwiliamsbradbur.com
.- Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
Electronic Mail
~ÚMo\~Nina urtis
Administrative Assistat
Intervention - IPC-E-ll-l 0 5