Loading...
HomeMy WebLinkAbout20120309Corrected Appendix C.pdfHECEIV esIDA~POR~ An IDACORP Company DONOVAN E. WALKER Lead Counsel dwalkercæidahopower.com March 9,2012 VIA HAND DELIVERY Jean D. Jewell, Secretary Idaho Public Utilties Commission 472 West Washington Street Boise, Idaho 83702 Re: Case No. IPC-E-11-25 IN THE MATTER OF THE APPLICA TlON OF IDAHO POWER COMPANY FOR A DETERMINATION REGARDING ITS FIRM ENERGY SALES AGREEMENT WITH DYNAMIS ENERGY, LLC Dear Ms. Jewell: In compliance with Idaho Public Utilities Commission ("Commission") Order No. 32470 issued on February 24,2012, Idaho Power Company hereby submits corrected forms contained in Appendix C to the Firm Energy Sales Agreement ("FESA") in the above- referenced case. Therefore, enclosed for filng are an original and seven (7) copies of Appendix C to the FESA to be included as corrected pages in the FESA pursuant to the Commission's Order. Should you have any questions, please do not hesitate to contact me. Donovan E. Walker DEW:csb Enclosures cc: Service List 1221 W. Idaho St. (83702) P.O. Box 70 Boise. ID 83707 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on this 9th day of March 2012 I served a true and correct copy of the REVISED FORMS CONTAINED IN APPENDIX C OF FIRM ENERGY SALES AGREEMENT upon the following named parties by the method indicated below, and addressed to the following: Commission Staff Kristine Sasser Deputy Attorney General Idaho Public Utilties Commission 472 West Washington (83702) P.O. Box 83720 Boise, Idaho 83720-0074 -L Hand Delivered U.S. Mail _ Overnight Mail FAX -L Email kristine.sasser((puc.idaho.gov Dynamis Energy, LLC Ronald L. Willams WILLIAMS BRADBURY, P.C. 1015 West Hays Street Boise, Idaho 83702 Hand Delivered -L U.S. Mail _ Overnight Mail FAX -L Email ron((wiliamsbradburv.com C. Lloyd Mahaffey, CEO Wade D. Thomas, General Counsel 776 East Riverside Drive, Suite 150 Eagle, Idaho 83616 Hand Delivered -L U.S. Mail _ Overnight Mail FAX -L Email L1oyd((dynamisenergy.com wthomas((dynamisenergy.com c~cX,Donovan E. Walker CERTIFICATE OF SERVICE APPENDIXC ENGINER'S CERTIFICATION OF OPERATIONS & MAIENANCE POLICY The undersigned , on behalf of himself and hereinafter collectively referred to as "Engineer," hereby states and certifies to the Seller as follows: i. That Engineer is a Licensed Professional Engineer in good standing in the State ofIdao. 2. That Engineer has reviewed the Energy Sales Agreement, hereinafter "Agreement," between Idaho Power as Buyer, and as Seller, dated 3. That the cogeneration or small power production project which is the subject of the Agreement and this Statement is identified as IPCo Facilty No. and is hereinafter referred to as the "Project." 4. That the Project, which is commonly known as the Project, is located in Section _ Township Range , Boise Meridian, County, Idaho. 5. That Engineer recognzes that the Agreement provides for the Project to fuish electrical energy to Idao Power for a year period. 6. That Engineer has substantial experience in the design, constrction and operation of electric power plants of the same type as this Project. 7. That Engineer has no economic relationship to the Design Engineer of this Project. 8. That Engineer has reviewed and/or supersed the review of the Policy for Operation and Maintenance ("O&M") for this Project and it is his professional opinion that, provided said Project has been designed and built to appropriate standads, adherence to said O&M Policy wil result in the Project's producing at or near the design electrical output, efficiency and plant factor for a twenty (20) year period. 9. That Engineer recognizes that Idao Power, in accordace with paragraph 5.2 of the Agreement, is relyig on Engineer's representations and opinons contained in this Statement. - 38- 10. That Engineer certifies that the above statements are complete, true and accurate to the best of his knowledge and therefore sets his hand and seal below. By (P .E. Stamp) Date - 39- APPENDIXC ENGINER'S CERTIFICATION OF ONGOING OPERATIONS AN MAIENANCE The undersigned , on behalf of himself and hereinafter collectively referred to as "Engineer," hereby states and certifies to the Seller as follows: 1. That Engineer is a Licensed Professional Engineer in good standing in the State ofIdao. 2. That Engineer has reviewed the Energy Sales Agreement, hereinafter "Agreement," between Idao Power as Buyer, and as Seller, dated 3. That the cogeneration or small power production project which is the subject of the Agreement and this Statement is identified as IPCo Facility No. and hereinafter referred to as the "Project". 4. That the Project, which is commonly known as the Project, is located in Section _ Township Range , Boise Meridian, County, Idao. 5. That Engineer recognizes that the Agreement provides for the Project to furnish electrical energy to Idao Power for a twenty (20) year period. 6. That Engineer has substantial experience in the design, construction and operation of electric power plants of the same type as this Project. 7. That Engineer has no economic relationship to the Design Engineer ofthis Project. - 40- 8. That Engineer has made a physical inspection of said Project, its operations and maintence records since the last previous certified inspection. It is Engieer's professional opinon, based on the Project's appearance, that its ongoing O&M has been substantially in accordance with said O&M Policy; that it is in reasonably good operating condition; and that if adherence to said O&M Policy continues, the Project wil continue producing at or near its design electrical output, effciency and plant factor for the remaing year of the Agreement. 9. That Engineer recognzes that Idaho Power, in accordace with pargraph 5.2 of the Agreement, is relying on Engineer's representations and opinons contained in ths Statement. 10. That Engineer certifies that the above statements are complete, true and accurate to the best of his knowledge and therefore sets his hand and seal below. By (P .E. Stamp) Date - 41- APPENDIXC ENGINER'S CERTIFICATION OF DESIGN & CONSTRUCTION ADEQUACY The undersigned on behalf of himself and hereinafter collectively referred to as "Engineer", hereby states and certifies to Idao Power as follows: 1. 2. That Engineer is a Licensed Professional Engineer in good stadig in the State ofIdaho. That Engineer has reviewed the Firm Energy Sales Agreement, hereinafter "Agreement", between Idao Power as Buyer, and as Seller, dated .. 3. That the cogeneration or small power production project, which is the subject of the Agreement and this Statement, is identified as IPCo Facility No and is hereinfter refered to as the "Project". 4. That the Project, which is commonly known as the Project, is located in Section _ Township Range , Boise Merdian, County, Idaho. 5. That Engineer recognizes that the Agreement provides for the Project to fuish electrcal energy to Idaho Power for a twenty (20) year period. 6. That Engineer has substantial experience in the design, construction and operation of electric power plants of the same type as this Project. 7. That Engineer has no economic relationship to the Design Engieer of this Project and has made the analysis ofthe plans and specifications independently. 8. That Engineer has reviewed the engineering design and construction of the Project, including the civil work, electrical work, generating equipment, prime mover conveyance system, Seller fuished Interconnection Facilties and other Project facilties and equipment. - 42- 9. That the Project has been constructed in accordace with said plan and specifications, all applicable codes and consistent with Prudent Electrcal Practices as that ter is described in the Agreement. 10. That the design and construction of the Project is such that with reasonable and prudent operation and maintenance practices by Seller, the Project is capable of performing in accordance with the terms of the Agreement and with Prudent Electrical Practices for a year perod. 11.That Engineer recognizes that Idaho Power, in accordace with pargraph 5.2 of the Agreement, in interconnecting the Project with its system, is relyig on Engineer's representations and opinions contained in this Statement. i 2. That Engineer certifies that the above statements are complete, true and accurate to the best of his knowledge and therefore sets his hand and seal below. By (P .E. Stamp) Date - 43-