HomeMy WebLinkAbout20120309Corrected Appendix C.pdfHECEIV esIDA~POR~
An IDACORP Company
DONOVAN E. WALKER
Lead Counsel
dwalkercæidahopower.com
March 9,2012
VIA HAND DELIVERY
Jean D. Jewell, Secretary
Idaho Public Utilties Commission
472 West Washington Street
Boise, Idaho 83702
Re: Case No. IPC-E-11-25
IN THE MATTER OF THE APPLICA TlON OF IDAHO POWER COMPANY
FOR A DETERMINATION REGARDING ITS FIRM ENERGY SALES
AGREEMENT WITH DYNAMIS ENERGY, LLC
Dear Ms. Jewell:
In compliance with Idaho Public Utilities Commission ("Commission") Order No.
32470 issued on February 24,2012, Idaho Power Company hereby submits corrected
forms contained in Appendix C to the Firm Energy Sales Agreement ("FESA") in the above-
referenced case. Therefore, enclosed for filng are an original and seven (7) copies of
Appendix C to the FESA to be included as corrected pages in the FESA pursuant to the
Commission's Order.
Should you have any questions, please do not hesitate to contact me.
Donovan E. Walker
DEW:csb
Enclosures
cc: Service List
1221 W. Idaho St. (83702)
P.O. Box 70
Boise. ID 83707
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on this 9th day of March 2012 I served a true and
correct copy of the REVISED FORMS CONTAINED IN APPENDIX C OF FIRM
ENERGY SALES AGREEMENT upon the following named parties by the method
indicated below, and addressed to the following:
Commission Staff
Kristine Sasser
Deputy Attorney General
Idaho Public Utilties Commission
472 West Washington (83702)
P.O. Box 83720
Boise, Idaho 83720-0074
-L Hand Delivered
U.S. Mail
_ Overnight Mail
FAX
-L Email kristine.sasser((puc.idaho.gov
Dynamis Energy, LLC
Ronald L. Willams
WILLIAMS BRADBURY, P.C.
1015 West Hays Street
Boise, Idaho 83702
Hand Delivered
-L U.S. Mail
_ Overnight Mail
FAX
-L Email ron((wiliamsbradburv.com
C. Lloyd Mahaffey, CEO
Wade D. Thomas, General Counsel
776 East Riverside Drive, Suite 150
Eagle, Idaho 83616
Hand Delivered
-L U.S. Mail
_ Overnight Mail
FAX
-L Email L1oyd((dynamisenergy.com
wthomas((dynamisenergy.com
c~cX,Donovan E. Walker
CERTIFICATE OF SERVICE
APPENDIXC
ENGINER'S CERTIFICATION
OF
OPERATIONS & MAIENANCE POLICY
The undersigned , on behalf of himself and
hereinafter collectively referred to as "Engineer," hereby states and certifies to the Seller as follows:
i. That Engineer is a Licensed Professional Engineer in good standing in the State ofIdao.
2. That Engineer has reviewed the Energy Sales Agreement, hereinafter "Agreement," between Idaho
Power as Buyer, and as Seller, dated
3. That the cogeneration or small power production project which is the subject of the Agreement and this
Statement is identified as IPCo Facilty No. and is hereinafter referred to as the "Project."
4. That the Project, which is commonly known as the Project, is located in
Section _ Township Range , Boise Meridian, County, Idaho.
5. That Engineer recognzes that the Agreement provides for the Project to fuish electrical energy to
Idao Power for a year period.
6. That Engineer has substantial experience in the design, constrction and operation of electric power
plants of the same type as this Project.
7. That Engineer has no economic relationship to the Design Engineer of this Project.
8. That Engineer has reviewed and/or supersed the review of the Policy for Operation and Maintenance
("O&M") for this Project and it is his professional opinion that, provided said Project has been designed and
built to appropriate standads, adherence to said O&M Policy wil result in the Project's producing at or near the
design electrical output, efficiency and plant factor for a twenty (20) year period.
9. That Engineer recognizes that Idao Power, in accordace with paragraph 5.2 of the Agreement, is
relyig on Engineer's representations and opinons contained in this Statement.
- 38-
10. That Engineer certifies that the above statements are complete, true and accurate to the best of his
knowledge and therefore sets his hand and seal below.
By
(P .E. Stamp)
Date
- 39-
APPENDIXC
ENGINER'S CERTIFICATION
OF
ONGOING OPERATIONS AN MAIENANCE
The undersigned , on behalf of himself and
hereinafter collectively referred to as "Engineer," hereby states and certifies to
the Seller as follows:
1. That Engineer is a Licensed Professional Engineer in good standing in the State ofIdao.
2. That Engineer has reviewed the Energy Sales Agreement, hereinafter "Agreement," between Idao
Power as Buyer, and as Seller, dated
3. That the cogeneration or small power production project which is the subject of the Agreement and this
Statement is identified as IPCo Facility No. and hereinafter referred to as the "Project".
4. That the Project, which is commonly known as the Project, is located in
Section _ Township Range , Boise Meridian, County, Idao.
5. That Engineer recognizes that the Agreement provides for the Project to furnish electrical energy to
Idao Power for a twenty (20) year period.
6. That Engineer has substantial experience in the design, construction and operation of electric power
plants of the same type as this Project.
7. That Engineer has no economic relationship to the Design Engineer ofthis Project.
- 40-
8. That Engineer has made a physical inspection of said Project, its operations and maintence records
since the last previous certified inspection. It is Engieer's professional opinon, based on the Project's
appearance, that its ongoing O&M has been substantially in accordance with said O&M Policy; that it is in
reasonably good operating condition; and that if adherence to said O&M Policy continues, the Project wil
continue producing at or near its design electrical output, effciency and plant factor for the remaing
year of the Agreement.
9. That Engineer recognzes that Idaho Power, in accordace with pargraph 5.2 of the Agreement, is
relying on Engineer's representations and opinons contained in ths Statement.
10. That Engineer certifies that the above statements are complete, true and accurate to the best of his
knowledge and therefore sets his hand and seal below.
By
(P .E. Stamp)
Date
- 41-
APPENDIXC
ENGINER'S CERTIFICATION
OF
DESIGN & CONSTRUCTION ADEQUACY
The undersigned on behalf of himself and
hereinafter collectively referred to as "Engineer", hereby states and certifies to
Idao Power as follows:
1.
2.
That Engineer is a Licensed Professional Engineer in good stadig in the State ofIdaho.
That Engineer has reviewed the Firm Energy Sales Agreement, hereinafter "Agreement",
between Idao Power as Buyer, and as Seller, dated ..
3. That the cogeneration or small power production project, which is the subject of the Agreement
and this Statement, is identified as IPCo Facility No and is hereinfter refered to as the
"Project".
4. That the Project, which is commonly known as the Project, is located in
Section _ Township Range , Boise Merdian, County, Idaho.
5. That Engineer recognizes that the Agreement provides for the Project to fuish electrcal
energy to Idaho Power for a twenty (20) year period.
6. That Engineer has substantial experience in the design, construction and operation of electric
power plants of the same type as this Project.
7. That Engineer has no economic relationship to the Design Engieer of this Project and has
made the analysis ofthe plans and specifications independently.
8. That Engineer has reviewed the engineering design and construction of the Project, including
the civil work, electrical work, generating equipment, prime mover conveyance system, Seller fuished
Interconnection Facilties and other Project facilties and equipment.
- 42-
9. That the Project has been constructed in accordace with said plan and specifications, all
applicable codes and consistent with Prudent Electrcal Practices as that ter is described in the Agreement.
10. That the design and construction of the Project is such that with reasonable and prudent
operation and maintenance practices by Seller, the Project is capable of performing in accordance with the terms
of the Agreement and with Prudent Electrical Practices for a year perod.
11.That Engineer recognizes that Idaho Power, in accordace with pargraph 5.2 of the Agreement,
in interconnecting the Project with its system, is relyig on Engineer's representations and opinions contained in
this Statement.
i 2. That Engineer certifies that the above statements are complete, true and accurate to the best of
his knowledge and therefore sets his hand and seal below.
By
(P .E. Stamp)
Date