HomeMy WebLinkAbout20110805Comments.pdfJean Jewell
From:
Sent:
To:
Subject:
gfleisch986(Çhotmail.com
Friday, August 05, 2011 3:02 AM
Jean Jewell; Beverly Barker; Gene Fadness
PUC Comment Form
A Comment from Gerald Fleischman follows:
Case Number: IPC-E-11-1ø
Name: Gerald Fleischman
Address: 11535 W. Hazeldale Ct.
City: Boise
State: ID
Zip: 83713
Daytime Telephone: 2ø8-941-3715
Contact E-Mail: gfleisch986~hotmail.com
Name of utility Company: Idaho Power Company
Acknowledge: acknowledge
Please describe your comment briefly:
I recommend that the staff contact Paul Klink of Pass Energy who has developed software to
calculate energy production by the minute from solar PV systems. His numbers include the
effects of wind on the temperature of the panel and therefore on the production of the panel.
As you know, on hot afternoons, solar PV panel output can be 3ø percent or more below rated
output due to high panel temperature. Here is his contact information:
Paul Klink
President
Pass/Energy, LLC, Asset Management Specialists
14335 W. Barclay Street
Boise, ID 83713
2ø8-514-ø982
2ø8-83ø-2171
phklink1~sn. com
www.passenergy.com
Development and sales of renewable energy production and revenue prediction software
The form submitted on http://www . puc. idaho. gov /forms/ipuc1/ipuc. html
IP address is 66.193.42.61
1
Jean Jewell
From:
Sent:
To:
Subject:
stevepaint(Çfrontier. com
Friday, August 05, 2011 3:25 AM
Jean Jewell; Beverly Barker; Gene Fadness
PUC Comment Form
A Comment from Steven Thomas Painter follows:
Case Number: ::c-£-/I-/O
Name: Steven Thomas Painter
Address: 12295 Grand Ave.
City: Orofino
State: Idaho
Zip: 83544
Daytime Telephone: 4ø6 546 7348
Contact E-Mail: stevepaint~frontier.com
Name of Utility Company: Idaho Power and Interconnect
Acknowledge: acknowledge
Please describe your comment briefly:
We do not need the high cost per KWH solar and wind power in Idaho. What we need is nuclear
power along with clean hydro- power that can be developed on the Snake & other rivers. I
worked in the federal hydro-power system for over 3ø years at Palisades, and Dworshak dams.
These projects bypass valuable water during the spring and summer months when it could be run
through turbines to produce electricity. The dams are already there, why not install the
needed turbines for far less cost than solar and wind power. One nuclear plant could more
than supply all the wind and solar that could ever be developed, and would be far more cost
efficient and take up less room, with less visual, and sound pollution.
The form submitted on http://www . puc. idaho. gov Iforms/ipuc1/ipuc. html
IP address is 5ø. 37 .118.77
1