BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE PETITION OF
IDAHO POWER COMPANY FORA 120-DAY )
EXTENSION OF THE SPECIAL CONTRACT
FOR ELECTRIC SERVICE BETWEEN
IDAHO POWER AND THE U.S.
DEPARTMENT OF ENERGY AT THE INL
CASE NO. IPC-ll-
ERRATA TO
ORDER NO. 32199
On March 9, 2011 , IPUC Order No. 32199 was issued by this Commission. The
following change(s) should be made to that Order:
Page 2, Findings Section, Paragraph 1 , line 6:
READS:
The 120-day extension continues the existing contract until August 1 L
2011.
SHOULD READ:
The 120-day extension continues the existing contract until September 14,
2011.
Page 3, Order Section, Paragraph 1 , lines 3-
READS:
The 120-day extension to the special contract contained in Schedule 30 shall
run through August I L 2011.
SHOULD READ:
The 120-day extension to the special contract contained in Schedule 30 shall
run through September 14, 2011.
DATED at Boise, Idaho this / (j-r*day of March 2011.
~ew~ll
Commission Secretary