DONOVAN E. WALKER
Senior Counsel
dwalkercæidahopower.com
December 16,2010
VIA HAND DELIVERY
Jean D. Jewell, Secretary
Idaho Public Utilities Commission
472 West Washington Street
P.O. Box 83720
Boise, Idaho 83720-0074
Re: Case No. IPC-E-10-53
IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY
FOR A DETERMINATION REGARDING THE FIRM ENERGY SALES
AGREEMENT FOR THE SALE AND PURCHASE OF ELECTRIC ENERGY
BETWEEN IDAHO POWER COMPANY AND CHARLIE WIND LLC
Dear Ms. Jewell:
Enclosed for filng please find an original and seven (7) copies of Idaho Power
Company's Application in the above matter.
~(/~
Donovan E. Walker
DEW:csb
Enclosures
1221 W. Idaho St. (83702)
P.O. Box 70
Boise. ID 83707
DONOVAN E. WALKER (ISB No. 5921)
LISA D. NORDSTROM (ISB No. 5733)
Idaho Power Company
P.O. Box 70
Boise, Idaho 83707
Telephone: (208) 388-5317
Facsimile: (208) 388-6936
dwalkerCcidahopower.com
InordstromCcidahopower.com
REC-E
'''i'I'."ffl ntC .1 h p. ..~¡.J :1: LOLt..:f,l UL.-" - ';. .-j __ ~
Attorneys for Idaho Power Company
Street Address for Express Mail:
1221 West Idaho Street
Boise, Idaho 83702
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION )
OF IDAHO POWER COMPANY FOR ) CASE NO. IPC-E-10-53
A DETERMINATION REGARDING THE )
FIRM ENERGY SALES AGREEMENT FOR ) APPLICATION
THE SALE AND PURCHASE OF ELECTRIC )
ENERGY BETWEEN IDAHO POWER )
COMPANY AND CHARLIE WIND LLC. )
)
Idaho Power Company ("Idaho Powet' or "Company"), in accordance with RP 52
and the applicable provisions of the Public Utilty Regulatory Policies Act of 1978
("PURPA"), hereby respectfully applies to the Idaho Public Utilties Commission ("IPUC"
or "Commission") for an Order accepting or rejecting the Firm Energy Sales Agreement
("FESA") between Idaho Power and Charlie Wind LLC ("Charlie" or "Sellet') under
which Charlie would sell and Idaho Power would purchase electric energy generated by
the Charlie Wind ("Facilty") located near Burley, Idaho.
APPLICATION - 1
In support of this Application Idaho Power represents as follows:
I. BACKGROUND
1. Sections 201 and 210 of PURPA, and pertinent regulations of the Federal
Energy Regulatory Commission ("FERC"), require that regulated electric utilities
purchase power produced by cogenerators or small power producers that obtain
qualifying facilty ("QF") status. The rate a QF receives for the sale of its power is
generally referred to as the "avoided cost" rate and is to reflect the incremental cost to
an electric utility of electric energy or capacity or both, which, but for the purchase from
the QF, such utilty would generate itself or purchase from another source. The
Commission has authority under PURPA Sections 201 and 210 and the implementing
regulations of the FERC, 18 C.F.R. § 292, to set avoided costs, to order electric utilties
to enter into fixed-term obligations for the purchase of energy from QFs, and to
implement FERC rules.
2. Charlie proposes to design, construct, install, own, operate, and maintain
a 27.6 megawatt ("MW") (Maximum Capacity Amount) wind generating facilty to be
located near Burley, Idaho. The Facilty wil be a QF under the applicable provisions of
PURPA. The FESA for this Facilty, as well as the FESAs for Alpha Wind LLC, Bravo
Wind LLC, Delta WindLLC, and Echo Wind LLC, has been executed by Kevin
Simmons, Senior Business Development Manager for Shell Wind Energy Inc., in his
capacity as President of the LLCs for each of the aforementioned projects.
3. On November 5, 2010, Idaho Power filed a Joint Petition and Motion
seeking a reduction in the published avoided cost rate eligibilty cap from 10 aMW to
100 kilowatts ("kW"). Case No. GNR-E-10-04. On December 3, 2010, the Commission
APPLICATION - 2
issued Order No. 32131 setting a Modified Procedure comment schedule with which to
develop a record for its decision regarding the Joint Petition and Motion's request to
lower the published avoided cost rate eligibilty cap. Comments are due on December
22, 2010, Reply Comments are due January 19, 2011, and Oral Argument is scheduled
for January 27,2011. The Commission also ordered that its decision regarding whether
to reduce the published avoided cost eligibilty cap become effective on December 14,
2010.
4. Idaho Power has an obligation under federal law, FERC regulations, and
this Commission's Orders, that it has not been relieved of, to enter into power purchase
agreements with PURPA QFs. As stated in the Joint Petition filng, Idaho Power has
received a large amount, in terms of both volume and MWs, of requests from PURPA
QF developers demanding to enter into published avoided cost rate FESAs. The
Company continues to process these requests, in the ordinary course of business, and
file the same for review with this Commission, as is its legal obligation. However, the
request in this Application, as well as several other Applications that have been and wil
be filed over the course of the next couple of months, is made with the specific
reservation of rights and incorporation of the averments set forth in the Joint Petition
regarding the possible negative effects to the both the utilty and its customers of
additional and unfettered PURPA QF generation on system reliabilty, utilty operations,
and costs of incorporating and integrating such a large penetration level of PURPA QF
generation into the utilty's system.
5. As recently as November 2, 2010, in the Yellowstone Power case, the
Commission reiterated to Idaho Power that, "we intend for the Company to assist the
APPLICATION - 3
Commission in its gatekeeper role of assuring that utilty customers are not being asked
to pay more than the Company's avoided cost for the QF contracts. We expect Idaho
Power to rigorously review such contracts." Order No. 32104. Even though Idaho
Power is legally obligated to continue to negotiate, execute, and submit PURPA QF
contracts for Commission review, it also feels obligated to reiterate that the continuing
and unchecked requirement for the Company to acquire additional intermittent and
other QF generation regardless of its need for additional energy or capacity on its
system not only circumvents the Integrated Resource Planning process and creates
system reliability and operational issues, but it also increases the price its customers
must pay for their energy needs.
II. THE FIRM ENERGY SALES AGREEMENT
6. On December 15, 2010, Idaho Power and Charlie entered into a FESA
pursuant to the terms and conditions of the various Commission Orders applicable to
this PURPA agreement for a wind resource. See Order Nos. 30415, 30488, 30738, and
31025. A copy of the FESA is attached to this Application as Attachment NO.1. Under
the terms of this FESA, Charlie elected to contract with Idaho Power for a 20-year term
using the non-Ievelized published avoided cost rates as currently established by the
Commission for energy deliveries of less than 10 average megawatts ("aMW"). This
FESA was executed by Charlie on December 13, 2010. It was subsequently executed
by Idaho Power on December 15, 2010, and now filed for the Commission's review on
December 16, 2010.
7. The nameplate rating of this Facilty is 27.6 MW. As defined in paragraph
1.17 and paragraph 4.1.3 of the FESA, Charlie wil be required to provide data on the
APPLICATION - 4
Facilty that Idaho Power wil use to confirm that under normal and/or average
conditions, the Facility wil not exceed 10 aMW on a monthly basis. Furthermore, as
described in paragraph 7.5 of the FESA, should the Facilty exceed 10 aMW on a
monthly basis, Idaho Power wil accept the energy (Inadvertent Energy) that does not
exceed the Maximum Capacity Amount, but wil not purchase or pay for this Inadvertent
Energy.
8. This PURPA wind agreement includes the Mechanical Availabilty
Guarantee ("MAG"), Wind Integration Cost reduction, and Wind Forecasting cost
sharing as required in Commission Order No. 30488. In addition, Charlie and Idaho
Power have agreed to Delay Liquidated Damages and associated Delay Security
provisions of $45 per kW of nameplate capacity within this FESA that have previously
been approved as reasonable by the Commission in several PURPA FESAs. See Case
Nos. IPC-E-10-02, IPC-E-10-05, IPC-E-10-15, IPC-E-10-16, IPC-E-10-17, IPC-E-10-18,
IPC-E-1 0-19, and IPC-E-10-22.
9. Charlie has elected October 31, 2014, as the Scheduled First Energy Date
and December 31, 2014, as the Scheduled Operation Date for this Facilty. See
Appendix B. Various requirements have been placed upon Charlie in order for Idaho
Power to accept energy deliveries from this Facilty. Idaho Power wil monitor
compliance with these initial requirements. In addition, Idaho Power wil monitor the
ongoing requirements through the full term of this FESA.
10. The FESA, as signed and submitted by the parties thereto, contains non-
levelized published avoided cost rates in conformity with applicable IPUC Orders. All
APPLICATION - 5
applicable interconnection charges and monthly operation and maintenance charges
under Schedule 72 wil be assessed to Charlie.
11. The FESA provides that all applicable interconnection charges and
monthly operational or maintenance charges under Schedule 72 wil be assessed to
Seller. The Facilty is currently in the beginning stages of the generator interconnection
process. Assuming that Seller continues to provide necessary technical information and
make payments for interconnection materials and studies in a timely manner, Idaho
Power's Delivery business unit wil be able to proceed with its interconnection and
transmission study processes, which ultimately results in a Schedule 72 Generator
Interconnection Agreement, or "GIA" between Charlie and Idaho Power. PURPA QF
generation must be designated as a network resource ("DNR") on Idaho Powets
system, which requires Idaho Power - Power Supply to submit a Transmission Service
Request ("TSR") on behalf of the Facilty to Idaho Power Delivery. Upon resolution of
any and all upgrades required to acquire transmission capacity for this Facilty's
generation, and upon execution of the FESA and the GIA, this Facilty may then be
designated as a network resource.
12. Seller has selected October 31,2014, for the Scheduled First Energy Date
and December 31,2014, as the Scheduled Operation Date. Charlie has been advised
that it is Charlie's responsibility to work with Idaho Power's Delivery business unit to
ensure that sufficient time and resources wil be available for Delivery to construct the
interconnection facilties, and transmission upgrades if required, in time to allow the
Facilty to achieve the December 31, 2014, Scheduled Operation date. Seller has been
further advised that delays in the interconnection or transmission process do not
APPLICATION - 6
constitute excusable delays in achieving the Scheduled Operation date and if Seller fails
to achieve the Scheduled Operation date at the times specified in the FESA, delay
damages wil be assessed. The developer of the Facilty has advised Idaho Power that
it is aware of these requirements and the accompanying risk inherent in demanding to
proceed with obligating itself to a Scheduled First Energy Date and Scheduled
Operation Date in the FESA without knowing what upgrades wil be required, and what
time frame the interconnection and potential system network upgrades can be
constructed within. Charlie has advised Idaho Power that is has been advised of and is
wiling to take the responsibilty and risk associated with electing to proceed with this
contract without knowledge of the requirements of interconnection and possible
transmission upgrades.
13. Charlie has also been made aware of and accepted the provisions of the
FESA and the Company's approved Tariff Schedule 72 regarding non-compensated
curtailment or disconnection of its Facilty should certain operating conditions develop
on the Company's system. According to the standard provisions in Article XII of the
FESA, curtailment without compensation may occur if there is an event of Force
Majeure, a Forced Outage, or a temporary disconnection of the Facility in accordance
with Tariff Schedule 72. If the generation from the Facility wil have an adverse effect
upon Idaho Powets service to its customers, Idaho Power may temporarily disconnect
the Facilty from Idaho Powets transmission/distribution system as specified within
Schedule 72, or take such other reasonable steps as Idaho Power deems appropriate.
The parties' intent and understanding is that non-compensated curtailment would be
exercised when the generation being provided by the Facilty in certain operating
APPLICATION -7
conditions exceeds or approaches the minimum load levels of the Company's system
such that it may have a detrimental effect upon the Company's abilty to manage its
thermal, hydro, and other resources in order to meet its obligation to reliably serve loads
on its system.
14. Section 21 of the FESA provides that the FESA wil not become effective
until the Commission has approved all of the FESA's terms and conditions and declared
that all payments Idaho Power makes to Charlie for purchases of energy wil be allowed
as prudently incurred expenses for ratemaking purposes.
II. MODIFIED PROCEDURE
15. Idaho Power believes that a hearing is not necessary to consider the
issues presented herein and respectfully requests that this Application be processed
under Modified Procedure, Le., by written submissions rather than by hearing. RP 201
et seq. If, however, the Commission determines that a technical hearing is required, the
Company stands ready to prepare and present its testimony in such hearing.
IV. COMMUNICATIONS AND SERVICE OF PLEADINGS
16. Communications and service of pleadings, exhibits, orders, and other
documents relating to this proceeding should be sent to the following:
Donovan E. Walker, Senior Counsel
Lisa Nordstrom, Lead Counsel
Idaho Power Company
1221 West Idaho Street
P.O. Box 70
Boise, Idaho 83707
dwalkerCcidahopower.com
InordstromCcidahopower.com
APPLICATION - 8
Randy C. Allphin
Energy Contract Administrator
Idaho Power Company
1221 West Idaho Street
P.O. Box 70
Boise, Idaho 83707
rallphinCcidahopower.com
v. REQUEST FOR RELIEF
17. Idaho Power Company respectfully requests that the Commission issue
an Order: (1) authorizing that this matter may be processed by Modified Procedure; (2)
accepting or rejecting the Firm Energy Sales Agreement between Idaho Power
Company and Charlie Wind LLC without change or condition; and, if accepted, (3)
declaring that all payments for purchases of energy under the Firm Energy Sales
Agreement between Idaho Power Company and Charlie Wind LLC be allowed as
prudently incurred expenses for ratemaking purposes.
Respectfully submitted this 16th day of December 2010.
~~~
Attorney for Idaho Power Company
APPLICATION - 9
CERTIFICATE OF MAILING
I HEREBY CERTIFY that on the 16th day of December 2010 I served a true and
correct copy of the within and foregoing APPLICATION upon the following named
parties by the method indicated below, and addressed to the following:
Charlie Wind LLC
Attn: Operations Manager
Charlie Wind LLC
c/o Cotterel Wind Energy Center LLC
150 North Dairy Ashford
Building C, Suite 356D
Houston, Texas 77079
Hand Delivered
i. U.S. Mail
_ Overnight Mail
FAX
i. Email dick.willamsCcshell.com
~c¿t(~
Donovan E. Walker
APPLICATION - 10
BEFORE THE
IDAHO PUBLIC UTiliTIES COMMISSION
CASE NO. IPC-E-10-53
IDAHO POWER COMPANY
ATTACHMENT NO.1
FIR ENERGY SALES AGREEMENT
BETWEEN
IDAHO POWER COMPANY
AN
CHAIE WIN LLC
TABLE OF CONTENTS
Aricle
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
TITLE
Defintions
No Reliance on Idao Power
Waranties
Conditions to Acceptance of Energy
Term and Operation Date
Purchase and Sale of Net Energy
Purchase Price and Method of Payment
Environmental Attbutes
Facilty and Interconnection
Metering and Telemetry
Records
Operations
Indemnification and Insurance
Force Majeure
Liability; Dedication
Several Obligations
Waiver
Choice of Laws and Venue
Disputes and Default
Governental Authorization
Commission Order
Successors and Assigns
Modification
Taxes
Notices
Additional Ters and Conditions
Severability
Counterpars
Entire Agreement Signatures
Appendix A
AppendixB
AppendixC
AppendixD
AppendixE
12/10/2010
FIR ENERGY SALES AGREEMENT
(10 aMW or Less)
Project Name: Charlie Wind Project
Project Number: 41455400
THIS AGREEMENT, entered into on this ~ day of December, 2010 between
CHAIE WIN LLC (Seller), and IDAHO POWER COMPAN, an Idao corporation (Idaho Power),
hereinafter sometimes referred to collectively as "Paries" or individually as "Pary."
WITNSSETH:
WHEREAS, Seller wil design, construct, own, maintain and operate an electric generation
facility; and
WHEREAS, Seller wishes to sell, and Idaho Power is wiling to purchase, firm electrc energy
produced by the Seller's Facility.
THEREFORE, In consideration of the mutual covenants and agreements hereinafter set forth, the
Parties agree as follows:
ARTICLE I: DEFINTIONS
As used in this Agreement and the appendices attached hereto, the following terms
shall have the following meanings:
1.1 "Availabilty Shortfall Price" - The curent month's Mid-Columbia Market Energy Cost minus
the curent month's All Hours Energy Price specified in pargraph 7.3 of this Agreement. If this
calculation results in a value less than 15.00 Mils/kWh the result shall be 15.00 Mils/kWh.
1.2 "Business Days" - means any calendar day that is not a Saturday, a Sunday, or a NERC
recognized holiday.
1.3 "Calculated Net Energy Amount" - A monthly estimate, prepared and documented after the fact
by Seller, reviewed and accepted by the Buyer that is the calculated monthly maximum energy
1
12/10/2010
deliveries (measured in kWh) for each individual wind turbine, totaled for the Facilty to
determine the total energy that the Facility could have delivered to Idaho Power durig that
month based upon: (1) each wind turbine's Nameplate Capacity, (2) Suffcient Prie Mover
available for use by each wind turbine durng the month, (3) incidents of Force Majeure, (4)
scheduled maintenance, or (5) incidents of Forced Outages less Losses and Station Use. If the
duration of an event characterized as item 3, 4 or 5 above (measured on each individual
occurrence and individual wind turbine) lasts for less than 15 miutes, then the event wil not be
considered in this calculation. The Seller shall collect and maintain actual data to support this
calculation and shall keep this data for a minimum of 3 years.
1.4 "Commssion" - The Idao Public Utilities Commission.
1.5 "Contract Year" - The period commencing each calendar year on the same calenda date as the
Operation Date and ending 364 days thereafter.
1.6 "Delay Liquidated Damages" - Damages payable to Idaho Power as calculated in paragraph 5.3,
5.4, 5.5 and 5.6.
1.7 "Delay Period" - All days past the Scheduled Operation Date until the Seller's Facility achieves
the Operation Date.
1.8 "Delay Price" - The curent month's Mid-Columbia Market Energy Cost minus the current
month's All Hours Energy Price specified in paragrph 7.3 of this Agreement. If this calculation
results in a value less than 0, the result of this calculation wil be O.
1.9 "Designated Dispatch Facility" - Idao Power's Systems Operations Group, or any subsequent
group designated by Idaho Power.
1.10 "Effective Date" - The date stated in the opening paragraph of this Fir Energy Sales
Agreement representing the date upon which this Fir Energy Sales Agreement was fully
executed by both Paries.
1.11 "Facilty" - That electric generation facility described in Appendix B of this Agreement.
-2-
12110/2010
1.12 "Firt Energy Date" - The day commencing at 00:01 hours, Mountain Time, following the day
that Seller has satisfied the requirements of Aricle IV and the Seller begins delivering energy to
the Idaho Power electrical system at the Point of Delivery.
1.13 "Forced Outage" - a parial or total reduction of a) the Facility's capacity to produce and/or
deliver Net Energy to the Point of Delivery, or b) Idao Power's ability to accept Net Energy at
the Point of Delivery for non-economic reasons, as a result ofIdao Power or Facility: 1)
equipment failure which was not the result of negligence or lack of preventative maintenance, or
2) responding to a transmission provider curilment order, or 3) unplaned preventative
maintenance to repair equipment that left unepaired, would result in failure of equipment prior
to the planed maintenance period, or 4) planed maintenance or construction of the Facilty or
electrical lines required to serve this Facilty. The Parties shall make commercially reasonable
efforts to perform this unplanned preventative maintenance durng periods of low wind
availabilty.
1.14 "Heavy Load Hours" - The daily hours beginng at 7 :00 am, ending at 11 :00 pm Mountain
Time, (16 hours) excluding all hour on all Sundays, New Years Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving and Chrstmas.
1.15 "Inadvertent Energy" - Electric energy Seller does not intend to generate. Inadvertent energy is
more particularly described in paragraph 7.5 of this Agreement.
1.16 "Interconnection Facilities" - All equipment specified in Idaho Power's Schedule 72.
1.17 "Initial Capacity Determination" - The process by which Idaho Power confirs that under
normal or average design conditions the Facility wil generate at no more than 10 average MW
per month and is therefore eligible to be paid the published rates in accordance with Commission
Order No. 29632.
1.18 "Light Load Hours" - The daily hours beginning at 11 :00 pm, ending at 7 :00 am Mountain Time
(8 hours), plus all other hours on all Sundays, New Years Day, Memorial Day, Independence
Day, Labor Day, Thansgiving and Chrstmas.
-3-
12/10/2010
1.19 "Losses" - The loss of electrical energy expressed in kilowatt hours (kWh) occurng as a result
of the transformation and trsmission of energy between the Meterg Point and the point the
Facility's energy is delivered to the Idaho Power electrical system. The loss calculation formula
wil be as specified in Appendix B of this Agreement.
1.20 "Market Energy Reference Price" - Eighty-five percent (85%) of the Mid-Columbia Market
Energy Cost.
1.21 "Material Breach" - A Default (paragraph 19.2.1) subject to paragrph 19.2.2.
1.22 "Maximum Capacity Amount" - The maximum capacity (MW) of the Facility wil be as
specified in Appendix B of this Agreement.
1.23 "Mechancal Availabilty" - The percentage amount calculated by Seller withi 5 days after the
end of each month of the Facility's monthly actual Net Energy divided by the Facility's
Calculated Net Energy Amount for the applicable month. Any daages due as a result of the
Seller fallng short of the Mechancal Availabilty Guarantee for each month shall be determined
in accordance with paragraph 6.4.4.
1.24 "Mechancal Availabilty Guarantee" shall be as defined in paragraph 6.4.
1.25 "Meterig Equipment" - All equipment specified in Schedule 72, this Agreement and any
additional equipment specified in Appendix B required to measure, record and telemeter bi-
directional power flows from the Seller's Facility at the Metering Point.
1.26 "Metering Point" - The physical point at which the Metering Equipment is located that enables
accurate measurement of the Test Energy and Net Energy deliveries to Idaho Power at the Point
of Delivery for this Facility that provides all necessar data to administer this Agreement.
1.27 "Mid- Columbia Market Energy Cost" - The monthly weighted average of the daily on-peak and
off-peak Dow Jones Mid-Columbia Index (Dow Jones Mid-C Index) prices for non-firm energy.
If the Dow Jones Mid-Columbia Index price is discontinued by the reporting agency, both Paries
wil mutually agree upon a replacement index, which is similar to the Dow Jones Mid-Columbia
-4-
12/10/2010
Index. The selected replacement index wil be consistent with other similar agreements and a
commonly used index by the electrical industry.
1.28 "Nameplate Capacity" -The full-load electrical quantities assigned by the designer to a generator
and its prime mover or other piece of electrical equipment, such as transformers and circuit
breakers, under standardized conditions, expressed in amperes, kilovolt-amperes, kilowatts, volts
or other appropriate units. Usually indicated on a nameplate attached to the individual machie
or device.
1.29 "Net Energy - All of the electric energy produced by the Facility, less Station Use, less Losses,
expressed in kilowatt hours (kWh) delivered to Idao Power at the Point of Delivery. Subject to
the terms of this Agreement, Seller commits to deliver all Net Energy to Idao Power at the Point
of Delivery for the full term of the Agreement. Net Energy does not include Inadvertent Energy.
1.30 "Operation Date" - The day commencing at 00:01 hours, Mountain Time, following the day that
all requirements of paragraph 5.2 have been completed.
1.31 "Point of Delivery" - The location specified in Appendix B, where Idaho Power's and the
Seller's electrcal facilties are interconnected and the energy from this Facility is delivered to the
Idao Power electrcal system.
1.32 "Prudent Electrical Practices" - Those practices, methods and equipment that are commonly and
ordinarly used in electrcal engineering and operations to operate electrc equipment lawfully,
safely, dependably, efficiently and economically.
1.33 "Scheduled Operation Date" - The date specified in Appendix B when Seller anticipates
achieving the Operation Date. It is expected that the Scheduled Operation Date provided by the
Seller shall be a reasonable estimate of the date that the Seller anticipates that the Seller's Facilty
shall achieve the Operation Date.
1.34 "Schedule 72" - Idao Power's Tarff No 101, Schedule 72 or its successor schedules as
approved by the Commssion. The Seller shall be responsible to pay all costs of interconnection
-5-
12/10/2010
and integration of this Facility into the Idaho Power electrical system as specified within
Schedule 72 and this Agreement.
1.35 "Season" - The three periods identified in paragraph 6.2.1 of this Agreement.
1.36 "Special Facilities" - Additions or alterations of transmission and/or distribution lines and
transformers as described in Schedule 72.
1.37 "Station Use" - Electric energy that is used to operate equipment that is auxiliar or otherwise
related to the production of electricity by the Facility.
1.38 "Sufficient Prime Mover" means wind speed that is (1) equal to or greater than the generation
unit's manufacturer-specified minimum levels required for the generation unit to produce energy,
and (2) equal to or less than the generation unit's manufacturer-specified maximum levels at
which the generation unit can safely produce energy.
1.39 "Surlus Energy" - All Net Energy produced by the Seller's Facility and delivered by the Facility
to the Idaho Power electrical system prior to the Operation Date.
1.40 "Total Cost of the Facilty" - The total cost of structues, equipment and appurenances.
1.41 "Wind Energy Production Forecast" - A forecast of energy deliveries from this Facility provided
by an Idao Power admnistered wind forecasting modeL. The Facility shall be responsible for an
allocated portion of the total costs of the forecasting model as specified in Appendix E.
ARTICLE II: NO RELIANCE ON IDAHO POWER
2.1 Seller Independent Investigation - Seller warants and represents to Idaho Power that in enterig
into this Agreement and the undertaking by Seller of the obligations set forth herein, Seller has
investigated and determined that it is capable of performing hereunder and has not relied upon
the advice, experience or expertise of Idaho Power in connection with the transactions
contemplated by this Agreement.
2.2 Seller Independent Experts - All professionals or expers including, but not limited to, engineers,
attorneys, or accountants that Seller may have consulted or relied on in undertaking the
transactions contemplated by this Agreement have been solely those of Seller.
-6-
12/10/2010
ARTICLE II: WARIES
3.1 No Warrty by Idaho Power - Any review, acceptance or failure to review Seller's design,
specifications, equipment or facilties shall not be an endorsement or a confiration by Idao
Power and Idaho Power makes no warranties, expressed or implied, regarding any aspect of
Seller's design, specifications, equipment or facilities, includig, but not limited to, safety,
durabilty, reliability, strength, capacity, adequacy or economic feasibility.
3.2 Qualifying Facilty Status - Seller warts that the Facility is a "Qualifyg Facility," as that term
is used and defined in 18 CFR 292.201 et seq. After intial qualification, Seller wil take such
steps as may be required to maintain the Facility's Qualifying Facility status durg the ter of
this Agreement and Seller's failure to maintain Qualifyng Facilty status wil be a Material
Breach of this Agreement. Idaho Power reserves the right to review the Facility's Qualifying
Facility status and associated support and compliance documents at anytime during the term of
this Agreement.
ARTICLE IV: CONDITIONS TO ACCEPTANCE OF ENERGY
4.1 Prior to the First Energy Date and as a condition of Idaho Power's acceptance of deliveries of
energy from the Seller under this Agreement, Seller shall:
4.1.1 Submit proof to Idaho Power that all licenses, permits or approvals necessar for Seller's
operations have been obtained from applicable federal, state or local authorities,
including, but not limited to, evidence of compliance with Subpar B, 18 CFR 292.201 et
seq. as a certified Qualifying Facility.
4.1.2 Opinion of Counsel - Submit to Idaho Power an Opinion Letter signed by an attorney
admitted to practice and in good standig in the State of Idaho providing an opinion that
Seller's licenses, permts and approvals as set forth in paragraph 4.1.1 above are legally
and validly issued, are held in the name of the Seller and, based on a reasonable
independent review, counsel is of the opinion that Seller is in substantial compliance with
-7-
12/10/2010
said permits as of the date of the Opinion Letter. The Opinion Letter wil be in a form
acceptable to Idaho Power and wil acknowledge that the attorney rendering the opinion
understands that Idaho Power is relying on said opinion. Idaho Power's acceptance of the
form wil not be uneasonably withheld. The Opinion Letter wil be governed by and
shall be interpreted in accordance with the legal opinion accord of the American Bar
Association Section of Business Law (1991).
4.1.3 Initial Capacity Determination - Submit to Idao Power such data as Idaho Power may
reasonably require to perform the Initial Capacity Determination. Such data wil include
but not be limited to, Nameplate Capacity, equipment specifications, prime mover data,
resource charcterstics, normal and/or average operating design conditions and Station
Use data. Upon receipt of this information, Idao Power wil review the provided data
and if necessary, request additional data to complete the Initial Capacity Determintion
within a reasonable time.
4.1.3.1 If the Maxium Capacity specified in Appendix B of this Agreement and the
cumulative manufacture Nameplate Capacity rating of the individual generation
units at this Facilty is less than 10 MW, the Seller shall submit detailed,
manufacturer, verifiable data of the Nameplate Capacity ratings of the actual
individual generation unts to be installed at this Facility. Upon verification by
Idao Power that the data provided establishes the combined Nameplate Capacity
rating of the generation units to be installed at this Facility is less than 10 MW, it
wil be deemed that the Seller has satisfied the Initial Capacity Deterination for
this Facility.
4.1.4 Nameplate Capacity - Submit to Idaho Power manufacturer's and engineerig
documentation that establishes the Nameplate Capacity of each individual generation unit
that is included within this entire Facility. Upon receipt of this data, Idao Power shall
review the provided data and determine if the Nameplate Capacity specified is reasonable
-8-
12/10/2010
based upon the manufacturer's specified generation ratings for the specific generation
units.
4.1.5 Engineer's Cerifications - Submit an executed Engineer's Certification of Design &
Construction Adequacy and an Engieer's Certification of Operations and Maitenance
(O&M) Policy as described in Commission Order No. 21690. These certificates wil be
in the form specified in Appendix C but may be modified to the extent necessar to
recognize the different engineerig disciplines providing the certificates.
4.1.6 Insurance - Submit written proof to Idaho Power of all insurance required in Aricle XIII.
4.1.7 Interconnection - Provide written confiration from Idao Power's delivery business
unit that Seller has satisfied all interconnection requirements.
4.1.8 Network Resource Designation - The Seller's Facility has been designated as a network
resource capable of deliverig firm energy up to the amount of the Maximum Capacity.
4.1.8.1 Seller has provided all information required to enable Idaho Power to fie an
initial transmission capacity request.
a) Results of the initial transmission capacity request are known and acceptable
to the Seller.
b) Seller acknowledges responsibilty for all interconnection costs and any costs
associated with acquirg adequate firm transmission capacity to enable the
project to be classified as an Idaho Power designated firm network resource.
c.) If the Facilty is located outside of the Idaho Power servce terrtory, in
addition to the above requirements, the Seller must provide evidence that the
Seller has acquired firm transmission capacity from all required transmitting
entities to deliver the Facility's energy to an acceptable point of delivery on
the Idao Power electrical system.
4.1.9 Written Acceptance - Request and obtain written confiration from Idaho Power that all
conditions to acceptance of energy have been fulfilled. Such written confiation shall be
-9-
12/10/2010
provided withi a commercially reasonable time following the Seller's request and wil
not be uneasonably withheld by Idaho Power.
ARTICLE V: TERM AN OPERATION DATE
5.1 Term - Subject to the provisions of pargrph 5.2 below, this Agreetent shall become effective
on the date first written and shall continue in full force and effect for a period of twenty (20)
Contract Years from the Operation Date.
5.2 Operation Date - The Operation Date may occur only after the Facilty has achieved all of the
following:
a) Achieved the First Energy Date.
b) Commission approval of ths Agreement in a form acceptable to Idao Power has
been received.
c) Seller has demonstrated to Idaho Power's satisfaction that the Facilty is complete and
able to provide energy in a consistent, reliable and safe manner.
d) Seller has requested an Operation Date from Idaho Power in a written format.
e) Seller has received written confiration from Idaho Power of the Operation Date.
This confirmation wil not be unreasonably withheld by Idaho Power.
5.3 Operation Date Delay - Seller shall cause the Facilty to achieve the Operation Date on or before
the Scheduled Operation Date. Delays in the interconnection and transmission network upgrade
study, design and construction process that are not Force Majeure events accepted by both
Paries, shall not prevent Delay Liquidated Damages from being due and owing as calculated in
accordance with this Agreement.
5.3.1 If the Operation Date occur after the Scheduled Operation Date but on or prior to ninety
(90) days following the Scheduled Operation Date, Seller shall pay Idaho Power Delay
Liquidated Damages calculated at the end of each calendar month after the Scheduled
Operation Date as follows:
Delay Liquidated Damages are equal to ((Current month's Initial Year Net
-10-
12/10/2010
Energy Amount as specified in pargraph 6.2.1 divided by the number of days in
the curnt month) multiplied by the number of days in the Delay Period in the
current month) multiplied by the curent month's Delay Price.
5.3.2 If the Operation Date does not occur within ninety (90) days following the Scheduled
Operation Date, the Seller shall pay Idaho Power Delay Liquidated Damages, in addition
to those provided in paragraph 5.3.1, calculated as follows:
Forty-five dollars ($45) multiplied by the Maxmum Capacity with the Maximum
Capacity being measured in kW.
5.4 If Seller fails to achieve the Operation Date within ninety (90) days following the Scheduled
Operation Date, such failure wil be a Material Breach and Idaho Power may terminate this
Agreement at any time until the Seller cures the Material Breach. Additional Delay Liquidated
Damages beyond those calculated in 5.3.1 and 5.3.2 wil be calculated and payable using the
Delay Liquidated Damage calculation described in 5.3.1 above for all days exceeding ninety (90)
days past the Scheduled Operation Date until such time as the Seller cures this Material Breach or
Idaho Power terminates this Agreement.
5.5 Seller shall pay Idao Power any calculated Delay Liquidated Damages within seven (7) days of
when Idaho Power calculates and presents any Delay Liquidated Damages bilings to the Seller.
Seller's failure to pay these daages within the specified time wil be a Material Breach of this
Agreement and Idao Power shall draw fuds from the Delay Securty provided by the Seller in
an amount equal to the calculated Delay Liquidated Damages.
5.6 The Paries agree that the damages Idaho Power would incur due to delay in the Facility
achieving the Operation Date on or before the Scheduled Operation Date would be difficult or
impossible to predict with certainty, and that the Delay Liquidated Damages are an appropriate
approximation of such damages.
5.7 Prior to the Seller executing this Agreement, the Seller shall have agreed to and executed a Letter
of Understanding with Idao Power that contains at a minimum the following requirements:
-11-
12/10/2010
a) Seller has filed for interconnection and is in compliance with all payments
and requirements of the interconnection process.
b) Seller has provided all information required to enable Idao Power to file an
initial trasmission capacity request.
5.8 Within thiy (30) days of the date of a final non-appealable Commission Order as specified in
Aricle XXI approving this Agreement; Seller shall post liquid securty ("Delay Securty") in a
form as described in Appendix D equal to or exceedig the amount calculated in paragraph 5.8.1.
Failure to post this Delay Security in the time specified above wil be a Material Breach of this
Agreement and Idaho Power may terminate ths Agreement.
5.8.1 Delay Securty The greater of forty-five dollar ($45) multiplied by the Maximum
Capacity with the Maximum Capacity being measured in kW or the sum of thee month's
estimated revenue. Where the estimated three months of revenue is the estimated revenue
associated with the first three full months following the estimated Scheduled Operation
Date, the estimated kWh of energy production as specified in paragraph 6.2.1 for those
three months multiplied by the All Hours Energy Price specified in paragraph 7.3 for
each of those three months.
5.8.1.1 In the event (a) Seller provides Idaho Power with certification that (1) a
generation interconnection agreement specifyng a schedule that wil enable this
Facility to achieve the Operation Date no later than the Scheduled Operation
Date has been completed and the Seller has paid all required interconnection
costs, or (2) a generation interconnection agreement is substantially complete and
all material costs of interconnection have been identified and agreed upon and
the Seller is in compliance with all terms and conditions of the generation
interconnection agreement, the Delay Security calculated in accordance with
paragraph 5.8.1 wil be reduced by ten percent (10%).
-12-
12/10/2010
5.8.1.2 If the Seller has received a reduction in the calculated Delay Securty as specified
in paragraph 5.8.1.1 and subsequently (1) at Seller's request, the generation
interconnection agreement specified in paragraph 5.8.1.1 is revised and as a
result the Facility wil not achieve its Operation Date by the Scheduled Operation
Date, or (2) if the Seller does not maintain compliance with the generation
interconnection agreement, the full amount of the Delay Security as calculated in
paragraph 5.8.1 wil be subject to reinstatement and wil be due and owing within
five (5) business days from the date Idaho Power requests reinstatement. Failur
to timely reinstate the Delay Security wil be a Material Breach of ths
Agreement.
5.8.2 Idaho Power shall release any remaining securty posted hereunder after all
calculated Delay Liquidated Damages are paid in full to Idao Power and the
earlier of: 1) thiry (30) days after the Operation Date has been achieved, or 2)
sixty (60) days after the Agreement has been terminated.
ARTICLE VI: PURCHASE AN SALE OF NET ENERGY
6.1 Delivery and Acceptance of Net Energy - Except when either Pary's performance is excused as
provided herein, Idao Power wil purchase and Seller will sell all of the Net Energy to Idaho
Power at the Point of Delivery. All Inadvertent Energy produced by the Facility will also be
"
delivered by the Seller to Idao Power at the Point of Delivery. At no time wil the total amount
of Net Energy and/or Inadvertent Energy produced by the Facility and delivered by the Seller to
the Point of Delivery exceed the Maximum Capacity Amount.
6.2 Net Energy Amounts - Seller intends to produce and deliver Net Energy in the following monthly
amounts. These amounts shall be consistent with the Mechanical Availabilty Guarantee.
-13-
12/1012010
6.2.1 Initial Year Monthly Net Energy Amounts:
Month
Season 1
March
April
May
Season 2
July
August
November
December
Season 3
June
September
October
Januar
Februar
kWh
7,068,000
6,498,000
6,657,859
4,965,384
5,263,994
6,435,097
7,068,000
6,212,107
5,341,725
6,670,988
6,738,454
6,277,632
6.3 Unless excused by an event of Force Majeure, Seller's failure to deliver Net Energy in any
Contract Year in an amount equal to at least ten percent (10%) of the sum of the Initial Year
Monthly Net Energy Amounts as specified in pargraph 6.2 shall constitute an event of default.
6.4 Mechanical Availabilty Guarantee - Afer the Operational Date has been established, the Facilty
shall achieve a minimum monthly Mechanical Availabilty of eighty-five (85%) for the Facility
for each month during the full term of this Agreement (the "Mechanical Availability Guartee").
Failure to achieve the Mechanical Availabilty Guarantee shall result in Idaho Power calculating
daages as specified in paragraph 6.4.4.
6.4.1 At the same time the Seller provides the Monthly Power Production and Availabilty
Report (Appendix A), the Seller shall provide and certify the calculation of the Facility's
current month's Mechanical Availability. The Seller shall include a summar of all
information used to calculate the Calculated Net Energy Amount including but not
limited to: (a) Forced Outages, (b) Force Majeure events, (c) wind speeds and the impact
on generation output, and (c) scheduled maintenance and Station Use information.
6.4.2 The Seller shall maintain and retain for three (3) years detailed documentation supporting
-14-
the monthly calculation of the Facilty's Mechancal Availabilty.
12/10/2010
6.4.3 Idao Power shall have the right to review and audit the documentation supporting the
calculation of the Facilty's Mechancal Availabilty at reasonable times at the Seller's
offices.
6.4.4 If the current month's Mechanical Availability is less than the Mechanical Availabilty
Guartee, daages shall be equal to:
((eighty-five (85) percent of the month's Calculated Net Energy Amount)
minus the month's actul Net Energy deliveries) multiplied by the
Availability Shortfall Price.
6.4.5 Any damages calculated in paragraph 6.4.4 wil be offset against the curent month's
energy payment. If an unpaid balance remains after the damages are offset against the
energy payment, the Seller shall pay in full the remaining balance within thirty (30) days
of the date of the invoice.
ARTICLE VII: PURCHASE PRICE AN METHOD OF PAYMENT
7.1 Heavy Load Purchase Price - For all Net Energy received durg Heavy Load Hour,
Idaho Power wil pay the non-levelized energy price in accordance with Commssion Order
31025 adjusted in accordace with Commission Order 30415 for Heavy Load Hour Energy
deliveries, adjusted in accordance with Commission Order 30488 for the wind integration charge,
and with seasonalization factors applied:
Season 2 - (120.00 %)
Mils/kWh
Season 3 - (100.00 %)
Mils/kWhYear
Season 1 - (73.50 %)
Mils/kWh
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
40.52
42.80
45.32
47.71
50.29
53.05
54.64
56.20
57.90
59.57
66.15
69.87
74.00
78.18
82.74
87.64
90.46
93.23
96.25
99.21
55.12
58.24
61.66
64.92
68.42
72.17
74.34
76.61
79.12
81.59
-15-
12/10/2010
2020 61.29 102.27 84.14
2021 63.33 105.90 87.16
2022 65.46 109.67 90.31
2023 67.67 113.59 93.57
2024 69.97 117.66 96.97
2025 72.35 121.90 100.50
2026 74.38 125.49 103.49
2027 76.62 129.20 106.58
2028 78.96 133.03 109.77
2029 81.38 136.97 113.06
2030 83.87 141.04 116.45
2031 87.22 146.51 121.01
2032 90.15 151.30 125.00
2033 93.19 156.26 129.13
7.2 Light Load Purchase Price - For all Net Energy received during Light Load Hours, Idao Power
wil pay the non-levelized energy price in accordace with Commission Order 31025 adjusted in
accordance with Commission Order 30415 for Light Load Hour Energy deliveries, adjusted in
accordance with Commission Order 30488 for the wind integration charge, and with
seasonalization factors applied:
Season 1 - (73.50 %)Season 2 - (120.00 %)Season 3 - (100.00 %)
Year Mils!Wh MilslkWh MilslkWh
2010 35.59 58.11 48.42
2011 37.88 61.84 51.54
2012 40.40 65.95 54.96
2013 42.79 69.86 58.22
2014 45.37 74.06 61.72
2015 48.13 78.91 65.48
2016 49.72 81.73 67.64
2017 51.28 84.50 69.76
2018 52.97 87.51 72.07
2019 54.65 90.47 74.35
2020 56.37 93.53 76.86
2021 58.41 97.16 79.88
2022 60.54 100.93 83.03
2023 62.74 104.85 86.29
2024 65.04 108.92 89.69
2025 67.43 113.16 93.22
2026 69.45 116.76 96.21
2027 71.55 120.47 99.30
-16-
12/10/2010
2028 73.70 124.29 102.49
2029 76.03 128.24 105.78
2030 78.52 132.31 109.17
2031 81.87 137.77 113.73
2032 84.80 142.56 117.72
2033 87.84 147.52 121.85
7.3 All Hour Energy Price - The price to be used in the calculation of the Surlus Energy Price and
Delay Price shall be the non-levelized energy price in accordance with Commission Order 31025
adjusted in accordance with Commission Order 30488 for the wind integration charge,and with
seasonalization factors applied:
Season 1 - (73.50 %)Season 2 - (120.00 %)Season 3 - (100.00 %)
Year Mils/kWh Mils/kWh Mils/kWh
2010 38.33 62.57 52.14
2011 40.61 66.30 55.26
2012 43.13 70.42 58.68
2013 45.52 74.33 61.93
2014 48.10 78.85 65.44
2015 50.86 83.75 69.19
2016 52.45 86.58 71.36
2017 54.01 89.35 73.48
2018 55.71 92.36 75.88
2019 57.37 95.32 78.35
2020 59.10 98.38 80.90
2021 61.14 102.01 83.92
2022 63.27 105.78 87.07
2023 65.48 109.70 90.33
2024 67.78 113.77 93.73
2025 70.16 118.01 97.26
2026 72.18 121.60 100.25
2027 74.28 125.31 103.35
2028 76.58 129.14 106.53
2029 79.00 133.09 109.82
2030 81.49 137.16 113.21
2031 84.84 142.62 117.77
2032 87.77 147.41 121.76
2033 90.81 152.37 125.89
7.4 Surlus Energy Price - For all Surplus Energy, Idaho Power shall pay to the Seller the curent
month's Market Energy Reference Price or the All Hours Energy Price specified in pargraph
-17-
12/10/2010
7.3, whichever is lower.
7.5 Inadvertent Energy -
7.5.1 Inadvertent Energy is electric energy produced by the Facilty, expressed in kWh,
which the Seller delivers to Idao Power at the Point of Delivery that exceeds 10,000
kW multiplied by the hour in the specific month in which the energy was delivered.
(For example Januar contains 744 hours. 744 hours times 10,000 kW = 7,440,000
kWh. Energy delivered in Januar in excess of 7,440, 000 kWh in this example
would be Inadvertent Energy.)
7.5.2 Although Seller intends to design and operate the Facility to generate no more than
ten (10) average MW and therefore does not intend to generate Inadvertent Energy,
Idao Power wil accept Inadvertent Energy that does not exceed the Maximum
Capacity Amount but wil not purchase or pay for Inadvertent Energy.
7.6 Payment Due Date - Undisputed Energy payments, less the Wind Energy Production Forecasting
Monthly Cost Allocation (MCA) described in Appendix E and any other payments due Idaho
Power, wil be disbursed to the Seller within 30 days of the date which Idao Power receives and
accepts the documentation of the monthly Mechancal Available Guartee and the Net Energy
actually delivered to Idaho Power as specified in Appendix A.
7.7 Continuing Jursdiction of the Commission .This Agreement is a special contract and, as such, the
rates, ters and conditions contained in this Agreement wil be construed in accordace with
Idao Power Company v. Idaho Public Utilties Commission and Afon Energy, Inc., 107 Idao
781, 693 P.2d 427 (1984), Idaho Power Company v. Idaho Public Utilities Commssion, 107
Idaho 1122,695 P.2d 1261 (1985), Afton Energy, Inc, v. Idaho Power Company, 111 Idaho 925,
729 P .2d 400 (1986), Section 210 of the Public Utilty Regulatory Policies Act of 1978 and 18
CFR §292.303-308.
-18-
12/10/2010
ARTICLE VII: ENVIRONMENTAL ATTRIUTES
8.1 Seller retains ownership under this Agreement of green tags and renewable energy certificates
(RECs), or the equivalent environmental attributes, directly associated with the production of
energy from the Seller's Facility sold to Idao Power.
ARTICLE IX: FACILITY AN INERCONNCTION
9.1 Design of Facilty - Seller wil design, constrct, install, own, operate and maintain the Facility
and any Seller-owned Interconnection Facilities so as to allow safe and reliable generation and
delivery of Net Energy and Inadvertent Energy to the Idaho Power Point of Delivery for the full
term of the Agreement.
9.2 Interconnection Facilities - Except as specifically provided for in this Agreement, the required
Interconnection Facilities wil be in accordance with Schedule 72, the Generation Interconnection
Process and Appendix B. The Seller is responsible for all costs associated with this equipment as
specified in Schedule 72 and the Generation Interconnection Process, including but not limited to
initial costs incurred by Idaho Power for equipment costs, installation costs and ongoing monthly
Idao Power operations and maintenance expenses.
ARTICLE X: METERIG AN TELEMETRY
10.1 Metering - Idao Power shall, for the account of Seller, provide, install, and maintain Meterg
and Telemetry Equipment to be located at a mutually agreed upon location to record and measure
power flows to Idaho Power in accordance with this Agreement and Schedule 72. The Meterig
Equipment wil be at the location and the type required to measure, record and report the
Facilty's Net Energy, Station Use, Inadvertent Energy and maximum energy deliveries (kW) at
the Point of Delivery in a manner to provide Idaho Power adequate energy measurement data to
administer this Agreement and to integrate this Facility's energy production into the Idaho Power
electrical system.
10.2 Telemetry - Idaho Power wil install, operate and maintain at Seller's expense metering,
-19-
12/10/2010
communications and telemetry equipment which wil be capable of providing Idaho Power with
continuous instantaneous telemetry of Seller's Net Energy and Inadvertent Energy produced and
delivered to the Idaho Power Point of Delivery to Idao Power's Designated Dispatch Facilty.
ARTICLE XI - RECORDS
11.1 Maintenace of Records - Seller shall maintain at the Facility or such other location mutually
acceptable to the Paries adequate total generation, Net Energy, Station Use, Inadvertent Energy
and maximum generation (kW) records in a form and content acceptable to Idaho Power.
11.2 Inspection - Either Party, after reasonable notice to the other Pary, shall have the right, durg
normal business hours, to inspect and audit any or all generation, Net Energy, Station Use,
Inadvertent Energy and maximum generation (kW) records pertaining to the Seller's Facilty.
ARTICLE XII: OPERATIONS
12 .1 Communications - Idaho Power and the Seller shall maintain appropriate operating
communcations through Idao Power's Designated Dispatch Facility in accordace with
Appendix A of this Agreement.
12 .2 Energy Acceptance -
12.2.1 Idaho Power shall be excused from accepting and paying for Net Energy or accepting
Inadvertent Energy which would have otherise been produced by the Facilty and
delivered by the Seller to the Point of Delivery, if it is prevented from doing so by an
event of Force Majeure, Forced Outage or temporar disconnection of the Facility in
accordance with Schedule 72. If, for reasons other than an event of Force Majeure or a
Forced Outage, a temporar disconnection under Schedule 72 exceeds twenty (20) days,
begining with the twenty-first day of such interrption, curtailment or reduction, Seller
wil be deemed to be delivering Net Energy at a rate equivalent to the pro rata daily
average of the amounts specified for the applicable month in paragraph 6.2. Idao Power
wil notify Seller when the interrption, curtailment or reduction is terminated.
-20-
12/10/2010
12.2.2 If, in the reasonable opinion of Idaho Power, Seller's operation of the Facility or
Interconnection Facilities is unsafe or may otherwise adversely affect Idaho Power's
equipment, personnel or servce to its customers, Idao Power may temporarily
disconnect the Facility from Idao Power's transmission/distribution system as specified
within Schedule 72 or tae such other reasonable steps as Idaho Power deems
appropriate.
12.2.3 Under no circumstances wil the Seller deliver Net Energy and/or Inadvertent Energy
from the Facility to the Point of Delivery in an amount that exceeds the Maximum
Capacity Amount at any moment in time. Seller's failure to limit deliveries to the
Maximum Capacity Amount wil be a Material Breach of this Agreement.
12.2.4 If Idaho Power is unable to accept the energy from this Facility and is not excused from
accepting the Facilty's energy, Idaho Power's damages shall be limited to only the value
of the estimated energy that Idao Power was unable to accept. Idaho Power wil have
no responsibility to pay for any other costs, lost revenue or consequential daages the
Facility may incur.
12.3 Scheduled Maintenance - On or before Januar 31 st of each calenda year, Seller shall submit a
written proposed maintenance schedule of significant Facilty maintenance for that calenda year
and Idaho Power and Seller shall mutually agree as to the acceptability of the proposed schedule.
The Paries determination as to the acceptabilty of the Seller's timetable for scheduled
maintenance wil take into consideration Prudent Electrical Practices, Idaho Power system
requirements and the Seller's preferred schedule. Neither Pary shall uneasonably withhold
acceptance of the proposed maintenance schedule.
12.4 Maintenance Coordination - The Seller and Idaho Power shall, to the extent practical, coordinate
their respective line and Facilty maintenance schedules such that they occur simultaneously.
12.5 Contact Prior to Curailment - Idaho Power wil make a reasonable attempt to contact the Seller
prior to exercising its rights to interrpt interconnection or curil deliveries from the Seller's
-21-
12/10/2010
Facility. Seller understands that in the case of emergency circumstances, real time operations of
the electrical system, and/or unplaned events Idaho Power may not be able to provide notice to
the Seller prior to interrption, curtailment, or reduction of electrical energy deliveries to
Idao Power.
ARTICLE XII: INEMNIFICATION AN INSURCE
13.1 Indemnification - Each Party shall agree to hold harless and to indemnfy the other Pary, its
offcers, agents, affiliates, subsidiaries, parent company and employees against all loss, damage,
expense and liability to third persons for injury to or death of person or injur to property,
proximately caused by the indemnifying Pary's (a) construction, ownership, operation or
maintenance of, or by failure of, any of such Pary's works or facilities used in connection with
this Agreement, or (b) negligent or intentional acts, errors or omissions. The indemnifyng Pary
shall, on the other Pary's request, defend any suit asserting a claim covered by this indemnity.
The indemnifyg Pary shall pay all documented costs, including reasonable attorney fees that
may be incurred by the other Pary in enforcing this indemnity.
13.2 Insurance - During the term of this Agreement, Seller shall secure and continuously car the
following insurance coverage:
13.2.1 Comprehensive General Liability Insurance for both bodily injur and property daage
with limits equal to $1,000,000, each occurrence, combined single limit. The deductible
for such insurance shall be consistent with curent Insurce Industry Utilty practices for
similar property.
13.2.2 The above insurance coverage shall be placed with an insurance company with an A.M.
Best Company rating of A- or better and shall include:
(a) An endorsement naming Idaho Power as an additional insured and loss payee as
applicable; and
(b) A provision stating that such policy shall not be canceled or the limits of liabilty
reduced without sixty (60) days' prior wrtten notice to Idaho Power.
-22-
12/1012010
13.3 Seller to Provide Certificate of Insurance - As required in paragraph 4.1.6 herein and annually
thereafter, Seller shall fuish Idaho Power a cerificate of insurance, together with the
endorsements required therein, evidencing the coverage as set forth above.
13.4 Seller to Notify Idaho Power of Loss of Coverage - If the insurance coverage required by
paragraph 13.2 shall lapse for any reason, Seller will imediately notify Idaho Power in writing.
The notice wil advise Idaho Power of the specific reason for the lapse and the steps Seller is
takg to reinstate the coverage. Failure to provide this notice and to expeditiously reinstate or
replace the coverage wil constitute a Material Breach of this Agreement.
ARTICLE XIV: FORCE MAJEUR
14.1 As used in this Agreement, "Force Majeure" or "an event of Force Majeure" means any cause
beyond the control of the Seller or of Idaho Power which, despite the exercise of due diligence,
such Pary is unable to prevent or overcome. Force Majeure includes, but is not limited to, acts of
God, fire, flood, storms, wars, hostilties, civil strife, strkes and other labor distubances,
earhquakes, fires, lightning, epidemics, sabotage, or changes in law or regulation occurng after
the Effective Date, which, by the exercise of reasonable foresight such pary could not reasonably
have been expected to avoid and by the exercise of due diligence, it shall be unable to overcome.
If either Pary is rendered wholly or in par unable to perorm its obligations under this
Agreement because of an event of Force Majeure, both Paries shall be excused from whatever
performance is affected by the event of Force Majeure, provided that:
(1) The non-performing Pary shall, as soon as is reasonably possible after the
occurence of the Force Majeure, give the other Party written notice describing
the pariculars of the occurence.
(2) The suspension of performance shall be of no greater scope and of no longer
duration than is required by the event of Force Majeure.
(3) No obligations of either Pary which arose before the occurence causing the
suspension of performance and which could and should have been fully
-23-
12/10/2010
performed before such occurence shall be excused as a result of such
occurrence.
ARTICLE XV: LIAILITY; DEDICATION
15.1 Limitation of Liability. Nothing in this Agreement shall be construed to create any duty to, any
standad of care with reference to, or any liabilty to any person not a Pary to this Agreement.
Neither pary shall be liable to the other for any indiect, special, consequential, nor punitive
damages, except as expressly authorized by this Agreement.
15.2 Dedication. No undertakng by one Pary to the other under any provision of this Agreement
shall constitute the dedication of that Pary's system or any portion thereof to the Pary or the
public or affect the status of Idao Power as an independent public utility corporation or Seller as
an independent individual or entity.
ARTICLE XVI: SEVERA OBLIGATIONS
16.1 Except where specifically stated in this Agreement to be otherwise, the duties, obligations and
liabilties of the Paries are intended to be several and not joint or collective. Nothing contained
in this Agreement shall ever be construed to create an association, trst, parership or joint
venture or impose a trust or partnership duty, obligation or liabilty on or with regard to either
Pary. Each Party shall be individually and severally liable for its own obligations under this
Agreement.
ARTICLE XVII: WAIVER
17.1 Any waiver at any time by either Party of its rights with respect to a default under this Agreement
or with respect to any other matters arising in connection with this Agreement shall not be
deemed a waiver with respect to any subsequent default or other matter.
-24-
12110/2010
ARTICLE XVII: CHOICE OF LAWS AND VENU
18.1 This Agreement shall be construed and interpreted in accordace with the laws of the State of
Idao without reference to its choice of law provisions.
18.2 Venue for any litigation arsing out of or related to this Agreement wil lie in the District Cour of
the Four Judicial District ofIdao in and for the County of Ada.
ARTICLE XIX: DISPUTES AN DEFAULT
19.1 Disputes - All disputes related to or arising under this Agreement, including, but not limited to,
the interpretation of the terms and conditions of ths Agreement, wil be submitted to the
Commission for resolution.
19.2 Notice of Default
19.2.1 Defaults. If either Pary fails to perform any of the terms or conditions of this
Agreement (an "event of default"), the non-defaulting Pary shall cause notice in
writing to be given to the defaulting Party, specifyng the maner in which such
default occurred. If the defaulting Pary shall fail to cure such default withi the sixty
(60) days after service of such notice, or if the defaulting Pary reasonably
demonstrates to the other Party that the default can be cured within a commercially
reasonable time but not within such sixty (60) day perod and then fails to dilgently
purue such cure, then, the non-defaulting Pary may, at its option, terminate this
Agreement and/or pursue its legal or equitable remedies.
19.2.2 Material Breaches - The notice and cure provisions in paragraph 19.2.1 do not apply
to defaults identified in this Agreement as Material Breaches. Material Breaches must
be cured as expeditiously as possible following occurence of the breach.
19.3 Security for Performance - Prior to the Operation Date and thereafter for the full ter of this
Agreement, Seller wil provide Idaho Power with the following:
19.3.1 Insurance - Evidence of compliance with the provisions of paragraph 13.2. If Seller
-25-
12/10/2010
fails to comply, such failure wil be a Material Breach and may only be cured by
Seller supplying evidence. that the required insurace coverage has been replaced or
reinstated;
19.3.2 Engineer's Certifications - Every three (3) years after the Operation Date, Seller will
supply Idaho Power with a Certification of Ongoing Operations and Maintenance
(O&M) from a Registered Professional Engineer licensed in the State of Idaho, which
Certification of Ongoing 0 & M shall be in the form specified in Appendix C. Seller's
failure to supply the required certificate wil be an event of default. Such a default
may only be cured by Seller providing the required certificate; and
19.3.3 Licenses and Permits - Durig the full term of this Agreement, Seller shall maintai
compliance with all permits and licenses described in pargraph 4.1.1 of this
Agreement. In addition, Seller wil supply Idaho Power with copies of any new or
additional perits or licenses. At least every fifth Contract Year, Seller wil update the
documentation described in Paragraph 4.1.1. If at any time Seller fails to maintain
compliance with the permits and licenses described in pargraph 4.1.1 or to provide
the documentation required by this paragraph, such failure wil be an event of default
and may only be cured by Seller submitting to Idaho Power evidence of compliance
from the permitting agency.
ARTICLE XX: GOVERNENTAL AUTORIATION
20.1 This Agreement is subject to the jursdiction of those governental agencies having control over
either Pary of this Agreement.
ARTICLE XXI: COMMISSION ORDER
21.1 This Agreement shall become finally effective upon the Commission's approval of all terms and
provisions hereof without change or condition and declaration that all payments to be made to
Seller hereunder shall be allowed as prudently incured expenses for ratemakng purposes.
-26-
12/10/2010
ARTICLE XXII: SUCCESSORS AN ASSIGNS
22.1 This Agreement and all of the terms and provisions hereof shall be bindig upon and inure to the
benefit of the respective successors and assigns of the Parties hereto, except that no assignent
hereof by either Pary shall become effective without the written consent of both Parties being
first obtained. Such consent shall not be unreasonably withheld. Notwithstanding the foregoing,
any pary which Idao Power may consolidate, or into which it may merge, or to which it may
conveyor transfer substantially all of its electric utilty assets, shall automatically, without fuher
act, and without need of consent or approval by the Seller, succeed to all ofIdao Power's rights,
obligations and interests under this Agreement. This arcle shall not prevent a financing entity
with recorded or secured rights from exercising all rights and remedies available to it under law
or contract. Idaho Power shall have the right to be notified by the finacing entity that it is
exercising such rights or remedies.
ARTICLE XXII: MODIFICATION
23.1 No modification to this Agreement shall be valid unless it is in wrting and signed by both Paries
and subsequently approved by the Commission.
ARTICLE XXIV: TAXES
24.1 Each Pary shall pay before delinquency all taxes and other governental charges which, if failed
to be paid when due, could result in a lien upon the Facility or the Interconnection Facilties.
ARTICLE XXV: NOTICES
25.1 All written notices under this Agreement shall be directed as follows and shall be considered
delivered when faxed, e-mailed and confirmed with deposit in the U.S. Mail, first-class, postage
prepaid, as follows:
-27-
12/10/2010
To Seller:
Original document to:
Charlie Wind LLC
Attention: Operations Manager
C/O Cotterel WindEnergy Center LLC
150 N. Dair Ashford,
Building C, Suite 356D
Houston, TX 77079
Phone: 832-337-2555
E-mail: dick.wi1iams~she11.com
To Idaho Power:
Original document to:
Senior Vice President, Power Supply
Idao Power Company
P.O. Box 70
Boise, Idaho 83707
Email: Lgrow~idahopower.com
Copy of document to:
Cogeneration and Small Power Production
Idaho Power Company
P.O. Box 70
Boise, Idao 83707
E-mail: rallphiimidaopower.com
Either Pary may change the contact person and/or address information listed above, by providing written
notice from an authorized person representing the Party.
ARTICLE XXVI: ADDITIONAL TERMS AN CONDITIONS
26.1 This Agreement includes the following appendices, which are attached hereto and included by
reference:
Appendix A
AppendixB
AppendixC
AppendixD
AppendixE
MontWy Power Production and Availabilty Report
Facility and Point of Delivery
Engineer's Certifications
Forms of Liquid Securty
Wind Energy Production Forecasting
-28-
12/10/2010
ARTICLE XXVII: SEVERAILITY
27.1 The invalidity or unenforceability of any term or provision of this Agreement shall not affect the
validity or enforceabilty of any other terms or provisions and this Agreement shall be constred
in all other respects as if the invalid or unenforceable term or provision were omitted.
ARTICLE XXVII: COUNERPARTS
28.1 This Agreement may be executed in two or more counterpars, each of which shall be deemed an
original but all of which together shall constitute one and the same instrument.
ARTICLE XXIX: ENTIR AGREEMENT
29.1 This Agreement constitutes the entire Agreement of the Paries concerning the subject matter
hereof and supersedes all prior or contemporaneous oral or wrtten agreements between the
Paries concernng the subject matter hereof.
IN WITNESS WHEREOF, The Paries hereto have caused this Agreement to be executed
in their respective names on the dates set forth below:
Idaho Power Company Charlie Wind LLC
By
'lM d. ~JLisa A Grow
Sr. Vice President, Power Supply
By k:~k-
President
Dated
12- ./5 -fa
Dated 17-¡'3~
"Idao Power""Seller"
-29-
12/10/2010
APPENDIX A
A -1 MONTHLY POWER PRODUCTION AND AVAIABILITY REPORT
At the end of each month the following required documentation wil be submitted to:
Idao Power Company
Attn: Cogeneration and Small Power Production
P.O. Box 70
Boise, Idaho 83707
The meter readings required on this report wil be the readings on the Idaho Power Meter Equipment
measuring the Facilty's total energy production delivered to Idao Power and Station Usage and the
maximum generated energy (kW) as recorded on the Meterig Equipment and/or any other required
energy measurements to adequately administer this Agreement. This document shall be the document to
enable Idaho Power to begi the energy payment calculation and payment process. The meter readings
on this report shall not be used to calculate the actul payment, but instead wil be a check of the
automated meter reading information that wil be gathered as described in item A-2 below:
This report shall also include the Seller's calculation of the Mechanical Availability.
-30-
12/10/2010
Idaho Power Company
Cogeneration and Small Power Production
MONTHLY POWER PRODUCTION AND AVAIABILITY REPORT
Month Year
Project Name Project Number:
Address Phone Number:
City State Zip
Net Facilty
Output
Station
Usage
Station
Usage
Metered
Maximum Generation
Meter Number:
End of Month kWh Meter Reading:
Beginning of Month kWh Meter:
Difference:
Times Meter Constant:
kW
Net Generation
kWh for the Month:
Metered Demand:
Mechanical Availabilty Guarantee
Seller Calculated Mechanical Availabilty
As specified in this Agreement, the Seller shall include with this monthly report a summary statement of the
Mechanical Availabilty of this Facilty for the calendar month. This summary shall include details as to how
the Seller calculated this value and summary of the Facilty data used in the calculation. Idaho Power and
the Seller shall work together to mutually develop a summary report that provides the required data. Idaho
Power reserves the right to review the detailed data used in this calculation as allowed within the Agreement.
Signature Date
-31-
12/10/2010
A-2 AUTOMATED METER READING COLLECTION PROCESS
Monthly, Idaho Power will use the provided Metering and Telemetry equipment and processes to collect
the meter reading inormation from the Idaho Power provided Metering Equipment that measures the Net
Energy and energy delivered to supply Station Use for the Facility recorded at 12:00 AM (Midnght) of
the last day of the month.
The meter information collected wil include but not be limited to energy production, Station Use, the
maximum generation (kW) and any other required energy measurements to adequately administer this
Agreement.
A-3 ROUTIN REPORTING
Idaho Power Contact Information
Daily Energy Production Reporting
Call daily by 10 a.m., 1-800-356-4328 or 1-800-635-1093 and leave the following
information:
. Project Identification - Project Name and Project Number
· Current Meter Readig
· Estimated Generation for the current day
· Estimated Generation for the next day
Planed and Unplaned Project outages
Call 1-800-345-1319 and leave the following information:
. Project Identification - Project Name and Project Number
· Approximate time outage occured
Estimated day and time of project coming back online
Seller's Contact Information
24-Hour Project Operational Contact
Name:
Telephone Number:
Cell Phone:
-32-
12/10/2010
Project On-site Contact information
Telephone Number:
-33-
1211012010
APPENDIXB
FACILITY AN POIN OF DELIVERY
Project Name: Charlie Wind Project
Project Number: 41455400
B-1 DESCRITION OF FACILITY
(Must include the Nameplate Capacity rating and V AR capabilty (both leading and lagging) of all
generation units to be included in the Facility.)
The Facility wil consist of 12 Siemens wind tubines with individual generator nameplate ratings
of 2.3 MW for each unt, for a total Facility generator nameplate rating of 27.6 MW, with a
maximum Facility output of 27.6 MW. Each generating unit has a reactive power capability
(V AR capabilty) of 1,114 kVA delivered (lagging) to 1, 114 kVA consumed (leading). Seller
and Idaho Power may mutually agree to substitution, any time prior to the Operation Date, a
different manufacturer and/or model wind turbine provided that the aggregate nameplate rating of
the Facilty does not exceed 28 MW.
If the Seller wishes to substitute different wind turbines, the Seller shall provide detailed
specifications of the proposed substitute wind tubines to Idao Power. Idaho Power wil then
review this detailed information and either accept or reject the Seller's proposed substitute wind
turbines. Idao Power's acceptance of the substitute wind tubines wil be required by both
confirmations that the interconnection is able to accommodate the substitute wind turbines and
that the substitute wind turbines are acceptable under this Agreement. Only after Idao Power's
acceptance of the substitute wind tubines shall the Seller be allowed to install the substitute wind
tubines, which acceptance shall not be unreasonably withheld.
-34-
12/10/2010
B-2 LOCATION OF FACILITY
Near: Burley, ID
SEC 25 & 36, TIl S, R25E, County: Cassia, ID
SEC 30 & 31, TIl S, R26E, County: Cassia, ID
SEC 1, TI2S. R25E. County: Cassia, ID
SEC 6, TI2S, R26E, County: Cassia, ID
Description of Interconnection Location: On-site in SEC 25, TIl S, R25E, Elmore County, Id.
Interconnect with an existing Idaho Power 138 kV distribution line. Exact point of
interconnection to be determed as par of the Idao Power delivery business unt's
interconnection study process.
Nearest Idaho Power Substation: Mindoka Substation
B-3 SCHEDULED FIRST ENERGY AN OPERATION DATE
Seller has selected October 31, 2014 as the Scheduled First Energy Date.
Seller has selected December 31,2014 as the Scheduled Operation Date.
In making these selections, Seller recognizes that adequate testing of the Facility and completion
of all requirements in pargraph 5.2 of this Agreement must be completed prior to the project
being grted an Operation Date.
B-4 MAXIMUM CAPACITY AMOUN:
Ths value wil be 27.6 MW which is consistent with the value provided by the Seller to
Idaho Power in accordace with Schedule 72. This value is the maximum energy (MW) that
potentially could be delivered by the Seller's Facilty to the Idaho Power electrical system at any
moment in time.
B-5 POIN OF DELIVERY
"Point of Delivery" means, unless otherwise agreed by both Paries, the point of where the Sellers
Facility's energy is delivered to the Idaho Power electrcal system. Schedule 72 wil determine
-35-
12/10/2010
the specific Point of Delivery for ths Facilty. The Point of Delivery identified by Schedule 72
wil become an integral par of this Agreement.
B-6 LOSSES
If the Idaho Power Meterig equipment is capable of measuring the exact energy deliveries by the
Seller to the Idao Power electrical system at the Point of Delivery, no Losses wil be calculated
for this Facility. If the Idaho Power Meterig equipment is unable to measure the exact energy
deliveries by the Seller to the Idao Power electrical system at the Point of Delivery, a Losses
calculation wil be established to measure the energy losses (kWh) between the Seller's Facilty
and the Idaho Power Point of Delivery. This loss calculation wil be intially set at 2% of the
kWh energy production recorded on the Facility generation metering equipment. At such time as
Seller provides Idaho Power with the electrcal equipment specifications (transformer loss
specifications, conductor sizes, etc.) of all of the electrical equipment between the Facilty and the
Idaho Power electrcal system, Idaho Power wil configue a revised loss calculation formula to
be agreed to by both paries and used to calculate the kWh Losses for the remaining term of the
Agreement. If at any time durng the term of this Agreement, Idaho Power determines that the
loss calculation does not correctly reflect the actua kWh losses attrbuted to the electrical
equipment between the Facility and the Idaho Power electrical system, Idaho Power may adjust
the calculation and retroactively adjust the previous months kWh loss calculations.
B-7 METERIG AN TELEMETRY
Schedule 72 wil determine the specific metering and telemetry requirements for this Facility. At
the minimum, the Meterig Equipment and Telemetry equipment must be able to provide and
record hourly energy deliveries to the Point of Delivery and any other energy measurements
required to administer this Agreement. These specifications wil include but not be limited to
equipment specifications, equipment location, Idaho Power provided equipment, Seller provided
equipment, and all costs associated with the equipment, design and installation of the
Idaho Power provided equipment. Seller wil arange for and make available at Seller's cost
-36-
12/10/2010
communication circuit(s) compatible with Idao Power's communications equipment and
dedicated to Idaho Power's use terinating at the Idaho Power facilities capable of providig
Idaho Power with continuous instataneous information on the Facilties energy production.
Idaho Power provided equipment wil be owned and maintained by Idaho Power, with total cost
of purchase, installation, operation, and maintenance, including admistrative cost to be
reimbursed to Idaho Power by the Seller. Payment of these costs wil be in accordance with
Schedule 72 and the total metering cost wil be included in the calculation of the Monthly
Operation and Maintenance Charges specified in Schedule 72.
B-8 NETWORK RESOURCE DESIGNATION
Idaho Power cannot accept or pay for generation from this Facility until a Network Resource
Designation ("NR") application has been accepted by Idao Power's delivery business unit.
Federal Energy Regulatory Commission ("FERC") rules require Idao Power to prepare and
submit the NR. Because much of the information Idaho Power needs to prepare the NR is
specific to the Seller's Facility, Idaho Power's ability to fie the NR in a timely maner is
contingent upon timely receipt of the required information from the Seller. Prior to Idao Power
beginning the process to enable Idaho Power to submit a request for NR status for this Facilty,
the Seller shall have completed all requirements as specified in Paragrph 5.7 of this Agreement.
Seller's failure to provide complete and accurate information in a timely manner can
significantly impact Idaho Power's abilty and cost to attain the NR designation for the
Seller's Facilty and the Seller shall bear the costs of any of these delays that are a result of
any action or inaction by the Seller.
-37-
12110/2010
APPENDIXC
ENGINER'S CERTIFICATION
OF
OPERATIONS & MAIENANCE POLICY
The undersigned , on behalf of himselflerself and
, hereinafter collectively referred to as "Engineer," hereby states and certifies to the Seller
as follows:
1. That Engineer is a Licensed Professional Engineer in good standig in the State of Idaho.
2. That Engineer has reviewed the Energy Sales Agreement, hereinafter "Agreement," between
Idaho Power as Buyer, and as Seller, dated
3. That the cogeneration or small power production project which is the subject of the Agreement
and this Statement is identified as IPCo Facilty No.and is hereinafter refered to as
the "Project."
4.That the Project, which is commonly known as the Project, is located in
Section _ Township Range , Boise Meridian,County, Idaho.
5. That Engineer recognizes that the Agreement provides for the Project to fush electrical energy
to Idaho Power for a 20 year period.
6. That Engineer has substantial experience in the design, construction and operation of electric
power plants ofthe same type as this Project.
7. That Engineer has no economic relationship to the Design Engineer of this Project.
8. That Engineer has reviewed and/or supervised the review of the Policy for Operation and
Maintenance ("O&M") for this Project and it is his professional opinion that, provided said Project has
been designed and built to appropriate standads, adherence to said O&M Policy wil result in the
Project's producing at or near the design electrical output, effciency and plant factor for a 20 year period.
-38-
12/1012010
9. That Engineer recognizes that Idaho Power, in accordace with paragraph 5.2 of the Agreement,
is relyig on Engineer's representations and opinons contained in this Statement.
10. That Engineer certifies that the above statements are complete, true and accurate to the best of
his!her knowledge and therefore sets his!her hand and seal below.
By
(P .E. Stamp)
Date
-39-
12110/2010
APPENDIXC
ENGINER'S CERTIFICATION
OF
ONGOING OPERATIONS AN MAIENANCE
The undersigned , on behalf of hiself!erself
hereinafter collectively referred to as "Engineer," hereby states andand
certifies to the Seller as follows:
1. That Engineer is a Licensed Professional Engineer in good standing in the State of Idao.
2. That Engineer has reviewed the Energy Sales Agreement, hereinafter "Agreement," between
Idao Power as Buyer, and as Seller, dated
3. That the cogeneration or small power production project which is the subject of the Agreement
and this Statement is identified as IPCo Facilty No. and hereinafter refered to as the
"Project".
4. That the Project, which is commonly known as the Project, is located in
Section _ Township Range , Boise Meridian, County, Idao.
5. That Engineer recognizes that the Agreement provides for the Project to fush electrical energy
to Idaho Power for a 20 year period.
6. That Engineer has substantial experience in the design, construction and operation of electrc
power plants of the same type as this Project.
7. That Engineer has no economic relationship to the Design Engineer of this Project.
-40-
12/10/2010
8. That Engineer has made a physical inspection of said Project, its operations and maintenance
records since the last previous certified inspection. It is Engineer's professional opinon, based on the
Project's appearance, that its ongoing O&M has been substantially in accordance with said O&M Policy;
that it is in reasonably good operating condition; and that if adherence to said O&M Policy continues, the
Project will continue producing at or near its design electrical output, efficiency and plant factor for the
remaining years of the Agreement.
9. That Engineer recognzes that Idaho Power, in accordance with pargraph 5.2 of the Agreement,
is relyig on Engineer's representations and opinions contaied in this Statement.
10. That Engineer certifies that the above statements are complete, tre and accurate to the best of
his!her knowledge and therefore sets his!her hand and seal below.
By
(P .E. Stamp)
Date
-41-
12/10/2010
APPENDIXC
ENGINER'S CERTIFICATION
OF
DESIGN & CONSTRUCTION ADEQUACY
The undersigned , on behalf of hiself/herself and
hereinafter collectively referred to as "Engineer", hereby states and
certifies to Idao Power as follows:
1.That Engineer is a Licensed Professional Engineer in good stading in the State ofIdao.
2.That Engineer has reviewed the Fir Energy Sales Agreement, hereinafter "Agreement",
between Idaho Power as Buyer, and as Seller, dated
3.That the cogeneration or small power production project, which is the subject of the
Agreement and this Statement, is identified as IPCo Facilty No and is hereinafter
referred to as the "Project".
4.That the Project, which is commonly known as the Project, is located in
Section _ Township Range , Boise Merdian,County, Idaho.
5.That Engineer recognizes that the Agreement provides for the Project to furnish electrical
energy to Idaho Power for a 20 year perod.
6.That Engineer has substantial experience in the design, construction and operation of
electric power plants of the same type as this Project.
7.That Engineer has no economic relationship to the Design Engineer of this Project and
has made the analysis of the plans and specifications independently.
8.That Engineer has reviewed the engineerig design and construction of the Project,
including the civil work, electrical work, generating equipment, prie mover conveyance system, Seller
furnshed Interconnection Facilities and other Project facilities and equipment.
-42-
12/10/2010
9. That the Project has been constructed in accordace with said plans and specifications, all
applicable codes and consistent with Prudent Electrical Practices as that term is described in the
Agreement.
10. That the design and construction of the Project is such that with reasonable and prudent
operation and maintenance practices by Seller, the Project is capable of performing in accordance with the
terms of the Agreement and with Prudent Electrical Practices for a 20 year period.
11. That Engineer recognzes that Idaho Power, in accordace with paragraph 5.2 of the
Agreement, in interconnecting the Project with its system, is relying on Engineer's representations and
opinions contained in this Statement.
12. That Engineer certifies that the above statements are complete, true and accurate to the
best ofhislher knowledge and therefore sets his/her hand and seal below.
By
(P .E. Stamp)
Date
-43-
12/10/2010
APPENDIXD
FORMS OF LIQUID SECURTY
The Seller shall provide Idaho Power with commercially reasonable securty instruents such as Cash
Escrow Security, Guarantee or Letter of Credit as those terms are defmed below or other forms ofliquid
financial securty that would provide readily available cash to Idaho Power to satisfy the Delay Securty
requirement and any other security requirement within this Agreement.
For the purose of this Appendix D, the term "Credit Requirements" shall mean acceptable financial
creditworthiness of the entity providing the securty instrument in relation to the term of the obligation in
the reasonable judgment ofIdaho Power, provided that any guarantee and/or letter of credit issued by any
other entity with a short-term or long-term investment grade credit rating by Standad & Poor's
Corporation or Moody's Investor Servces, Inc. shall be deemed to have acceptable fmancial
creditworthiness.
1. Cash Escrow Securty - Seller shall deposit fuds in an escrow account established by the
Seller in a banng institution acceptable to both Paries equal to the Delay Security or any
other required securty amount(s). The Seller shall be responsible for all costs, and receive
any interest eared associated with establishing and maintaining the escrow account(s).
Guarantee or Letter of Credit Securty - Seller shall post and maintain in an amount equal to the Delay
Security or other required securty amount(s): (a) a guaranty :fom a pary that satisfies the Credit
Requirements, in a form acceptable to Idaho Power at its discretion, or b) an irrevocable Letter of Credit
in a form acceptable to Idaho Power, in favor ofIdaho Power. The Letter of Credit wil be issued by a
fmancial institution acceptable to both paries. The Seller shall be responsible for all costs associated
with establishing and maintaining the Guarantee(s) or Letter(s) of Credit.
-44-
12/10/2010
APPENDIXE
WIN ENERGY PRODUCTION FORECASTING
As specified in Commission Order 30488, Idao Power shall make use of a Wind Energy Production
Forecasting model to forecast the energy production from this Facility and other Qualifyng Facility wind
generation resources. Seller and Idaho Power wil share the cost of Wind Energy Production Forecasting.
The Facility's share of Wind Energy Production Forecasting is determined as specified below. Sellers
share wil not be greater than 0.1 % of the total energy payments made to Seller by Idao Power durng the
previous Contract Year.
a. For every month of this Agreement beginnng with the first full month after the
First Energy Date as specified in Appendix of this Agreement, the Wind Energy
Production Forecasting Monthly Cost Allocation (MCA) wil be due and payable
by the Seller. Any Wind Energy Production Forecasting Monthly Cost
Allocations (MCA) that are not reimbursed to Idaho Power shall be deducted
from energy payments to the Seller.
b. As the value of the 0.1 % cap of the Facilities total energy payments wil not be
known until the fist Contract Year is complete, at the end of the first Contract
Year any prior allocations that exceeded the 0.1 % cap shall be adjusted to reflect
the 0.1 % cap. If the Facility has paid the monthly allocations, a refud wil be
included in equal monthly amounts over the ensuing Contract Year. If the
Facility has not paid the monthly allocations, the amount due to Idaho Power wil
be adjusted accordingly and the unpaid balance wil be deducted from the
ensuing Contract Year's energy payments.
-45-
12/1012010
c. The cost allocation formula described below wil be reviewed and revised if
necessar on the last day of any month in which the cumulative MW nameplate
rating of wind projects havig Commission approved agreements to deliver
energy to Idaho Power has been revised by an action of the Commssion.
d. The monthly cost allocation wil be based upon the following formula:
Where: Total MW (TM is equal to the total nameplate rating of all QF wind
projects that are under contract to provide energy to Idaho Power
Company.
Facilty MW (F is equal to the nameplate rating ofthis Facility as
specified in Appendix B.
Annual Wind Energy Production Forecasting Cost (AFCost) is equal
to the total anual cost Idaho Power incurs to provide Wind Energy
Production Forecasting. Idaho Power wil estimate the AFCost for the
current year based upon the previous year's cost and expected costs for
the current year. At year-end, Idaho Power wil compare the actual costs
to the estimated costs and any differences between the estimated AFCost
and the actual AFCost wil be included in the next year's AFCost.
Annual Cost Allocation (ACA) = AFCost X (FMW / TMW
And
Monthly Cost Alocation (MCA) = ACA / 12
e. The Wind Energy Production Forecasting Monthly Cost Allocation (MCA) is
due and payable to Idaho Power. The MCA wil first be netted against any
monthly energy payments owed to the Seller. If the netting of the MCA against
the monthly energy payments results in a balance being due Idaho Power, the
Facility shall pay this amount within 15 days of the date of the payment invoice.
-46-