Loading...
HomeMy WebLinkAbout20110131Comments.pdfKRISTINE A. SASSER DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0357 BARNO. 6618 Rr~CE1\1 tU 11 JA1.1 1,' .-. fn , ~ 111"': 36 _ IOí\l~"l(") U ni l,'¡It:C:-'" .:~t.7 Street Address for Express Mail: 472 W. WASHINGTON BOISE, IDAHO 83702-5918 Attorney for the Commìssìon Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF ) IDAHO POWER COMPANY FOR APPROV AL ) OF A FIRM ENERGY SALES AGREEMENT ) WITH SE HAZELTON A, L.P. FOR THE SALE ) AND PURCHASE OF ELECTRIC ENERGY. ) ) CASE NO. IPC-E-IO-45 COMMENTS OF THE COMMISSION STAFF COMES NOW the Staff of the Idaho Publìc Utìltìes Commìssìon, by and through ìts Attorney of record, Krìstìne A. Sasser, Deputy Attorney General, and ìn response to the Notìce of Applìcatìon and Notìce of Modìfied Procedure ìssued ìn Order No. 32157 on Januar 10,2011, ìn Case No. IPC-E-10-45, submìts the fol1owìng comments. BACKGROUND On December 10,2010, Idaho Power Company fied an Applìcatìon wìth the Commìssìon requestìng approval of a 15-year Fìrm Energy Sales Agreement (Agreement) between Idaho Power and SE Hazelton A, L.P. (Hazelton) dated December 8, 2010. The Applìcatìon states that Hazelton would sell and Idaho Power would purchase electrìc energy generated by the Hazelton A Hydroelectrìc Project (Facìlty) located near Jerome, Idaho. The Applìcatìon states that Hazelton has, ìn complìance wìth an existing agreement approved by the Commìssìon ìn February 1989 (Order No. 22326), desìgned, constructed, ìnstalled, STAFF COMMENTS 1 JANUARY 31, 2011 owns, operates and maìntaìns an 8.1 MW hydroelectrìc generatìng facìlty. i The present Agreement has been negotìated to replace the exìstìng agreement whìch expìred on December 31, 2010. Idaho Power warants that the Agreement comports wìth the terms and condìtìons of the varìous Commìssìon Orders applìcable to PURP A agreements (Order Nos. 30415 and 31025). The Agreement contaìns the current non-Ievelìzed publìshed avoìded cost rates establìshed by the Commìssìon ìn Order No. 31025 for energy delìverìes of less than 10 average megawatts ("aMW"). The nameplate ratìng of the Facìlìty ìs 8.1 MW. Hazelton has elected January 1,201 i, as ìts Fìrst Energy Date and Scheduled Operatìon Date. Sìnce thìs Facìlìty ìs already ìnterconnected and operatìng under ìts exìstìng agreement, the processìng to attaìn the Fìrst Energy and Scheduled Operatìon Date under thìs Agreement wìl ìnclude revìew and eìther acceptance or updatìng of prevìously provìded documentatìon as well as any new requìrements as specìfied by thìs Agreement. Applìcatìon at 4. The Applìcatìon states that, should the Commìssìon approve the Agreement, Idaho Power ìntends the effectìve date of the Agreement to be January i, 2011. Idaho Power maìntaìns that the Facìlty ìs ìn complìance wìth the Company's curent Tarìff Schedule 72 and ìnterconnectìon and transmìssìon processes. Even though the Facìlìty wìl continue to utìlze ìts exìstìng ìnterconnectìon and transmìssìon facìltìes and capacìty, Idaho Power wìl requìre completìon of a Generator Interconnectìon Agreement (GIA) and Transmìssìon Servìce Requests (TSR) ìn order to brìng the Facìlty up-to-date wìth Idaho Power's current tarìffs and processes. Hazelton and Idaho Power have agreed to lìquìdated damages and securìty provìsìons of $45 per kW of nameplate capacìty. Agreement, ~~ 5.3.2, 5.8.1. By ìts own terms, the Agreement wìl not become effectìve until the Commìssìon has approved al1 of the Agreement's terms and condìtìons and declares that all payments made by Idaho Power to Hazelton for purchases of energy wìl be allowed as prudently ìncurred expenses for ratemakìng puroses. Agreement ~ 21.1. STAFF ANALYSIS As stated earlìer, the Agreement submìtted for approval ìs successor agreement to an earlìer 20-year power sales agreement for the same facìlty that expìred on December 31, 2010. The Hazelton A project has operated successfully for 20 years, and Staff has no reason to belìeve that ìt i Hazelton is an irigation canal hydroelectric facilty that generates power only during the irrigation season. STAFF COMMENTS 2 JANUARY 31, 2011 cannot contìnue to operate successfully for the proposed 15-year term of the new Agreement. The project ìs stìl certìfied as a Qualìfyìng Facìlty under FERC rules; consequently, Staffbelìeves that ìt ìs entìtled to a new power sales agreement at publìshed avoìded cost rates. Staff has revìewed the Agreement and confirms that ìt comports wìth al1 of the terms and condìtìons of the varous Commìssìon Orders applìcable to PURP A agreements. The Agreement ìs substantìal1y ìdentìcal to other recently-approved contracts, and presents no new ìssues that merìt dìscussìon by Staff. Although Idaho Power fied a Joìnt Petìtìon wìth the Commìssìon on November 5,2010, seekìng a reductìon ìn the publìshed avoìded cost rate elìgìbìlty cap from 10 aMW to 100 k W2, Idaho Power does not belìeve that thìs Agreement should be ìmpacted by that filìng. Staff agrees. The Agreement was sìgned by Hazelton A on December 7, 2010 and by Idaho Power on December 8,2010. Moreover, the fiìng of the Applìcatìon seekìng approval of the Agreement was prìor to December 14,2010, the effectìve date establìshed by the Commìssìon for ìts decìsìon ìn Case No. GNR-E-10-04 on whether to grant the Joìnt Petìtìon to reduce the publìshed avoìded cost elìgìbìlty cap. RECOMMENDATIONS Staff recommends that the Commìssìon approve al1 of the Agreement's terms and condìtìons and declare that al1 payments made by Idaho Power to Hazelton for purchases of energy wìl be al10wed as prudently ìncurred expenses for ratemakìng purposes. Respectful1y submìtted thìs 31 ~ day of January 201 i. ~Q.a.~_~eAĊĦasser Deputy Attorney General Technìcal Staff: Rìck Sterlìng i: umisc: commentsipce i 0.45ksrps comments 2 Case No. GNR-E-lO-04. STAFF COMMENTS 3 JANUARY 31, 2011 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 31sT DAY OF JANUARY 2011, SERVED THE FOREGOING COMMENTS OF THE COMMISSION STAFF, IN CASE NO. IPC-E-1O-45, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: DONOVAN E WALKER LISA D NORDSTROM IDAHO POWER COMPANY POBOX 70 BOISE ID 83707-0070 E-MAIL: dwalker(iìdahopower.com lnordstrom(iidahopower.com RANDY C ALLPHIN ENERGY CONTRACT ADMIN IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070 E-MAIL: rallphìn(iidahopower.com STEVE CHAMPAGNE SE HAZELTON A, LP ONE TECH DR STE 220 ANDOVER MA 01810 -.~ SECRETAR CERTIFICATE OF SERVICE