Loading...
HomeMy WebLinkAbout20121113Replacement page 14 to Agreement.pdfRE CE IV t:El 2DI?NOV 13 PM 2: 12 DONOVAN E. WALKER Lead Counsel IDAHO dwalkeridahopower.com UTILITIES coiss ON A An IDACORP company November 13, 2012 VIA HAND DELIVERY Jean D. Jewell, Secretary Idaho Public Utilities Commission 472 West Washington Street Boise, Idaho 83702 Re: Case No. IPC-E-10-26 Ag Power Jerome Contract - Replacement Page 14 Dear Ms. Jewell: On December 16, 2010, in Order No. 32138, Case No. IPC-E-10-26, the Idaho Public Utilities Commission approved the Firm Energy Sales Agreement ("FESA") between Idaho Power Company ("Idaho Power") and AgPower Jerome, LLC ("AgPower") under which Idaho Power purchases electric energy generated by the Double A Digester Project in Lincoln County, Idaho. AgPower recently notified Idaho Power of a clerical error on page 14 of the FESA. The signed and filed version of the FESA is missing a numerator in the formula set forth at the top of that page. Idaho Power and AgPower seek to replace that page with the enclosed page in order to correct that clerical error. Enclosed please find a copy of the replacement page 14 for the FESA between Idaho Power and AgPower. Please contact me should you have any comments, questions, or concerns. Sincerely, Donovan E. Walker DEW:csb Enclosure cc: Peter J. Richardson, AgPower - w/encl. (via e-mail) 1221 W. Idaho St. (83702) P.O. Box 70 Boise, ID 83707 6.3 7.1 Resulting formula being: (G S LU RSH Adjusted Net Energy Amount = NEA - X NEA ) x (TH) T GU This Adjusted Net Energy Amount will be used in applicable Surplus Energy calculations for only the specific month in which Idaho Power was excused from accepting the Seller's Net Energy or the Seller declared a Suspension of Energy. Unless excused by an event of Force Majeure, Seller's failure to deliver Net Energy in any Contract Year in an amount equal to at least ten percent (10%) of the sum of the Initial Year Net Energy Amounts as specified in paragraph 6.2 shall constitute an event of default. ARTICLE VII: PURCHASE PRICE AND METHOD OF PAYMENT Base Energy Heavy Load Purchase Price - For all Base Energy received during Heavy Load Hours, Idaho Power will pay the non-levelized energy price in accordance with Commission Order 30744, 30738 and adjusted in accordance with Commission Order 30415 for Heavy Load Hour Energy deliveries with seasonalization factors applied: Season 1 - (73.50 %) Season 2 - (120.00 %) Season 3 - (100.00 %) Year Mills/kWh Mills/kWh Mills/kWh 2010 57.98 94.67 78.89 2011 59.54 97.21 81.01 2012 61.22 99.95 83.29 2013 62.62 102.23 85.19 2014 64.05 104.57 87.14 2015 65.52 106.97 89.14 2016 67.10 109.55 91.29 2017 68.63 112.05 93.38 2018 70.29 114.77 95.64 2019 71.91 117.40 97.83 2020 73.56 120.10 100.08 2021 75.26 122.87 102.39 2022 76.99 125.70 104.75 2023 78.78 128.61 107.18 2024 80.60 131.59 109.66 2025 82.47 134.65 112.21 2026 84.75 138.37 115.31 2027 87.10 142.21 118.51 -14- 11/2/2012