Loading...
HomeMy WebLinkAbout20071005Comments.pdfPeter J. Richardson ISB 3195 RICHARDSON & O'LEARY PLLC 99 East State Street PO Box 1849 Eagle, Idaho 83616 Telephone: (208) 938-7900 Fax: (208) 938-7904 peter~richrdsonando eary. com Attorneys for Exergy Development Group of Idaho LLC 2Dill OCT - 5 II '-. !, to ", .,0 ; -0. '! t I :.; I I';~ l,J if 1r:.,~. ,", I:-;L ,.../ t~v "-'\j \"""' C:,:: ','; 1 u,~ f':J 0;;:;: ~ ~ (i)r) (fj ","'", , BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF IDAHO POWER COMPANY'S PETITION TO INCREASE THE) PUBLISHED RATE ELIGIBILITY CAP FOR WIND-POWERED SMALL POWER PRODUCTION FACILITIES; AND CASE NO. IPC-07- EXERGY DEVELOPMENT GROUP OF IDAHO LLC'S COMMENTS TO ELIMINATE THE 90%/110% PERFORMANCE BAND FOR WIND- POWERED SMALL POWER PRODUCTION FACILITIES COMES NOW, Exergy Development Group of Idaho LLC ("Exergy ) by and through its attorney of record, Peter J. Richardson, and pursuant to that notice issued by the Idaho Public Utilities Commission ("Commission ) on August 22, 2007, as amended on September 19 2007 and hereby provides its Comments in response to Idaho Power Company s ("Idaho Power" or the Company ) above captioned Petition. In support hereof Exergy says as follows: Exergy Development Group ofIdaho LLC's Comments IPC-O7- SUMMARY OF EXERGY'S POSITION Modified procedure should be utilized in this docket for the sole purpose of denying Idaho Power s Petition. Absent outright denial, Exergy opposes the use of modified procedure to prosecute this highly complex and technical case. BACKGROUND AND STANDARD OF REVIEW This Commission s rules require that a decision to proceed under modified procedure be based upon a finding that "the public interest may not require a hearing to consider the issues presented." IPUC Rules of Procedure IDAPA 31.01.01.201. (herein "Rule ) The Commission decision must be based on the record before it as detailed in Rule 281 which provides that: The Commission bases its decisions and issues its orders on the hearing record (excluding exhibits denied admission), the Commissioners' record and items official noted. The "Commissioner s record" consists of "all pleadings, orders, notices, briefs, proposed orders and position papers." Rule 284.01 The Commissioner s record also includes the "complete hearing record of transcripts and exhibits." Rule 285. The Commission is a fact finding, quasi-legislative body authorized to investigate and determine issues presented by a utility s petition for increased (changed) rates. The Commission s findings must be supported by competent and substantial evidence. Application ofPacifiic Tel. Tel. Co.71 Idaho 476, 480, 233 P.2d 1024 (1951). Exergy Development Group of Idaho LLC's Comments IPC-O7- The substantive record in this docket consists solely! ofIdaho Power s Petition and the attachments thereto. The first attachment is a document prepared by Idaho Power s hired experts entitled "Operational Impacts of Integrating Wind Generation into Idaho Power s Existing Resource Portfolio." (herein "Study ) The ultimate conclusion of the study is that Idaho Power will experience high costs for which it is not compensated in order to integrate wind into its electrical system. The second attachment is a proposed rate schedule that would reduce the avoided cost rates paid to wind QFs. In its Petition, Idaho Power seeks a reduction in the Commission approved avoided cost rates by 10.72 mills per kwh produced by a wind-power QF. That reduction is based on a proposed rate entitled the Wind Integration Cost Adjustment. The rate is 10.72 mills per kilowatt hour produced. The level of wind integration costs depends, according to Idaho Power s Study, on the magnitude of wind power connected to its system. Study p. 4. Idaho Power s proposed Wind Integration Cost Adjustment is set based on the fiction that there are 492 megawatts of installed wind capacity on its system. Study p 4, Petition p. 7- For the reasons stated below, Exergy asserts that Idaho Power s Petition is not supported by substantial and competent evidence and that a full hearing must be held by this Commission prior to issuing its order declaring what Idaho Power s wind integration rate is, or indeed if Idaho Power has a wind integration cost in the first place. III IDAHO POWER'S PETITION SHOULD BE DENIED OUTRIGHT Modified procedure in this docket is appropriate only if the outcome is the denial of Idaho Power s Petition. ! Yesterday s filings in this docket was not made in time for Exergy to respond by the close of comment according to the notice. Exergy will respond thereto according to Commission direction. Exergy Development Group ofIdaho LLC's Comments IPC-O7- The gist of Idaho Power s Petition is that large amounts of wind generation on its system will result in high costs to integrate that intermittent resource in a reliable manner. Idaho Power has not averred that it HAS a large amount of wind connected to its system. It avers that it MAY have a large amount of wind at some time in the future. It has not averred that it currently is experiencing any problems with integrating wind into its system at this time. Indeed, Idaho Power s proposed Wind Integration Rate is based on the assumption that it has 492 megawatts of installed wind. In reality it has less than 15 megawatts of installed wind. This is the flip side of retroactive ratemaking. Idaho Power is asking that today s rates be set based upon contingent events that may or may not happen at some point in the future. Given that Idaho Power has (a) successfully stymied all new wind development in Idaho for over two years and (b) that it only has 15 megawatts on its system today; its assertion that it must immediately impose a Wind Integration Rate based on almost five hundred megawatts of wind on its system is simply not credible. The Petition should be denied. Setting rates based on assumptions that are known to be false would violate the most basic of ratemaking tenants. To that end, setting rates to be effective immediately based on a contingent that has not occurred, may not occur and if it does occur, it may not do so for many years is simply reckless and illegal. Idaho Code Section 61-622 requires a showing that "any rate" be "justified". Setting a rate to recover a non-existent cost is unjustifiable. An alternative to denying Idaho Power s Petition outright, would be to implement a system by which the Wind Integration Rate varies as the company s wind integration costs vary (both up and down). It is widely anticipated that integration costs may go up as penetration levels go up. On the other hand it is also widely anticipated that wind integration costs will go down as utilities gain experience with this renewable resource. Setting a fixed rate today based Exergy Development Group ofIdaho LLC's Comments IPC-O7- on an assumed penetration rate of almost five hundred megawatts is, candidly, a blunt unsophisticated and inaccurate attempt to solve for a problem that doesn t exist at this time, and indeed, may never exist. If the Commission chooses to proceed with a wind integration rate that actually is an attempt to accurately reflect wind integration costs at the time they occur, it would have to set a variable wind integration rate. Such a rate would need to have a ceiling in order to provide certainty to the developer that the project can be financed without the potential for an unlimited and unknown reduction in operating revenues. That ceiling would presumably be the expected wind integration rate at an assumed build-out of wind projects on the system. The ceiling would not be a target, but rather a cap above which the wind integration cost rate would not exceed. course, working out the details of such a program would take a process and require a record be developed before the Commission for review and approval. Modified procedure is not the appropriate vehicle for developing such a record. MODIFIED PROCEDURE IS INAPPROPRIATE Idaho Power filed its Petition in this matter on February 6, 2007, as a result of failing to reach a settlement of the issues raised in its wind integration suspension proceeding in Docket No. IPC-05-22 which was opened back in June of2005. In that docket, Idaho Power asked the Commission for a "suspension of the company s obligation under. . . PURPA to enter into new contracts to purchase energy generated by qualifying wind-powered small power production facilities." Order No. 29872 at p. 1. (the "Suspension Docket") Technically, this Commission did not suspend the Company s obligations under PURPA. Rather, it eliminated the opportunity for any wind QF larger than 100 kw to entitlement to the Commission s published avoided cost rates. The real-world effect of the Suspension Docket was to excuse the company s obligations Exergy Development Group of Idaho LLC's Comments IPC-O7- under PURP A to offer its avoided cost rates to qualifying wind power small power production facilities. The Commission observed that: Based on the record established in this case the Commission finds reason to believe that wind generation presents operational integration costs to a utility different from other PURPA qualified resources. We find that the unique supply characteristics of wind generation and the related integration costs provide a basis for adjustment to the published avoided cost rates, a calculated figure that may be different for each regulated utility. The procedure to determine the appropriate amount of adjustment, we find, and the identification of what studies, if any, need to be performed to provide such a number is a matter appropriate for further proceedings. The record reflects that a wind integration study, if required, may take six months to develop. Idaho Power has asked for a suspension period from six to nine months. Order No. 39839 at p. 8. Emphasis provided. Twenty six months later we are asked to comment on whether the wind integration study filed in this docket accomplishes the goals established for Idaho Power in IPC-05-22. The intervening two years, during which the wind industry in Idaho has been effectively frozen, have seen construction costs skyrocket and have cost Idaho many millions of dollars in lost economic benefits and will cost Idaho many untold millions into the future due to the lost opportunities suffered by the wind industry in this state. With that said, it is nevertheless critical that if this Commission decides to impose a wind integration rate on wind powered QFs, that it get it right the first time. That is one reason why Exergy opposes the use of modified procedure in this matter for all outcomes except for a denial of the petition. In its final report to the Commission2 regarding progress in working with interested parties to reach a consensus settlement of its wind integration costs, Idaho Power provided a list of individuals and firms who participated in its wind integration workshops. The participants 2 IPC-05-22 filed January 31 , 2006. Exergy Development Group of Idaho LLC's Comments IPC-O7- included the following individuals, companies, state agencies, federal agencies, advocate groups wind developers and public utilities: Advocates for the West A vista Batt & Fisher B.R.E. Inc. Cassia Wind Elmore County Agribusiness Energy Vision Exergy Hanson, John Idaho National Laboratory Idaho Power Idaho Public Utilities Commission Idaho Wind Idaho Wind Farms IDWR-Energy Division Magic Wind McDevitt & Miller NW Energy Coalition PacifiCorp Paine Hamblen Renaissance Engineering Renewable Northwest Project Richardson & O'Leary Ridgeline Energy Snake River Alliance Windadvantage Windland Windlogics Wirt, John After five workshops and settlement conferences and with the combined efforts ofthe above list of experts no consensus was reached. Idaho Power s current filing is not the result of a consensus - either as to methodology or its ultimate conclusions. The wind development industry is opposed to Idaho Power s filing because the industry does not believe it accurately reflects Idaho Power s integration costs. Exergy Development Group of Idaho LLC's Comments IPC-O7- Attached (Attachment A) is a compilation of wind integration study results from multiple jurisdictions indicating that, on its face, Idaho Power s wind integration rate is wildly inaccurate. The table was prepared by Dr. Reading as part of a search of the literature on comparable wind integration rates.3 Idaho Power s rate of$10.74 MW integration rate is twice as high as the next highest integration rate Dr. Reading was able to locate. In some instances it is more than twenty times higher than other utility wind integration costs. While the comparison is not designed indicate what Idaho Power s integration costs actually are, it is offered to show that an evidentiary hearing is necessary in order to determine whether the assumptions and inputs contained in Idaho Power s study are fair, just and reasonable. The attached table suggests that said inputs may actually overstate Idaho Power s true wind integration costs. The validity of Idaho Power s wind integration rate should be subjected to close Commission scrutiny. Idaho Power s study contains many factual assertions that have not been tested nor has this Commission created a record upon which such assumptions have been subject to review. For all of the foregoing, Exergy respectfully requests that Idaho Power s Petition be denied or in the alternative that a full evidentiary hearing be conducted to investigate the true level of wind integration costs for the Idaho Power system. Respectfully submitted this s th day of October 2007. RICHARDSON & O'LEARY PLLC By A(). Peter . Richardson Attorneys for Exergy Development Group of Idaho, LLC 3 Accompanying the table are supporting documents from which the table was derived. Exergy Development Group of Idaho LLC's Comments IPC-O7- ATTACHMENT A Exergy Development Group ofIdaho LLC's Comments IPC-O7- Re c e n t S t u d i e s o f Wi n d I n t e g r a t i o n C o s t s $/ M W h Lo a d Un i t Pe n e t r a t i o n Re g u l a t i o n Fo l l o w i n g Co m m i t m Ga s To t a l Da t e St u d y Co s t s Co s t en t C o s t Su p p l y Im p a c t So u r c e 20 0 3 Xc e l - UW I G $0 . $0 . 4 1 $1 . 4 4 $1 . DO E , N E R L 20 0 3 We E n e r a i e s $1 . $0 . $0 . $1 . DO E , N E R L 20 0 3 We E n e r a i e s 29 . $1 . $0 . $1 . $2 . DO E , N E R L 20 0 4 Xc e l - MN D O C 15 . $0 . $4 . $4 . DO E , N E R L 20 0 4 VT r - Sc a n d i n a v i a 10 . $1 . RN P 20 0 4 VT T - Sc a n d i n a v i a 20 , $2 . RN P 20 0 5 Pa c i f i C o r p 20 . $0 . $1 . $3 . $4 . DO E , N E R L 20 0 5 Pu a e t S o u n d 10 . $4 . RN P 20 0 6 CA R P S $0 . 4 5 $0 . 4 5 DO E , N E R L 20 0 6 Xc e l - PS C o 10 . $0 . $2 . $1 . $3 . DO E , N E R L 20 0 6 Xc e l - PS C o 15 . $0 . $3 . $1 . 4 5 $4 . DO E , N E R L 20 0 6 MN - MI S O $4 . 4 1 DO E , N E R L 20 0 6 MN / M N D O C 20 . $0 . $2 . $2 . Re n e w a b l e E n e r g y C o n s u l t i n a S e r v i c e s , N R E L 20 0 6 MN / M N D O C 34 . $0 . $4 . $4 . 4 1 Re n e w a b l e E n e r a v C o n s u l t i n a S e r v i c e s , N R E L 20 0 7 GE / P i e r / C a l A P 20 . $0 . $0 . NR E L BP A / H i r s t $0 . $1 . $1 . Re n e w a b l e E n e r g y C o n s u l t i n g S e r v i c e s , N R E L New Studies Find That Integrating Wind into Power Systems Is Manageable, But Not Costless Table 6. Key Results from Major Wind Integration Studies Completed 2003-2006 Date Study 2003 Xcel-UWIG 2003 We Energies 2003 We Energies 2004 Xcel-MNDOC 2005 PacifiCorp 2006 CA RPS (multi-year) 2006 Xcel-PSCo 2006 Xcel-PSCo 2006 MN-MISO 20% During the past several years, there has been a considerable amount of analysis on the poten- tial impacts of wind energyon power systems, typically respond- ing to concerns about whether the electrical grid can accommodate significant new wind additions, and at what cost. The sophistica- tion ofthese studies has increased year averagedramatICally In recent years, ' , Source: Naffonal Renewable Energy Laboratory-resu Ing In a e er accoun Ing 0 wind's impacts and costs (recall that these "integration costs werenot included in the busbar wind power prices presented earlier), Table 6 provides a selective listing of results from major wind integration studies completed from 2003 through 2006, Because methods vary and a consistent set of operational impacts has not been included in each study, results from the different analyses are not perfectly comparable, Nonetheless, the key findings of two major new studies completed in 2006 in Colorado and Minnesota are broadly consistent with those in earlier work, and (at a mini- mum) show that wind integration costs are generally approximately $5/MWh, or less, for wind capacity penetrations30 up to about 15% of the local/regional peak load in which the wind power is being delivered.31 Regulation and load-following impacts are generally found to be small, whereas the impacts of wind on unit commit- ment are more significant, Wind Capacity Penetration Cost ($IMWh) Regulation Load Unit Gas TOTALFollowingCommitmentSupply 0.41 0.45*trace 0.45 1.45 41** 29% 15% 20% 10% 15% 31% .. highest over 3-year evaluation period Transmission Is an Increasingly Significant Barrierto Wind , but Solutions Are Emerging Relatively little investment has been made in new transmission over the past 15 to 20 years, and in recent years it has become clear that lack of transmission access and investment are major barriers to wind development in the U.s, New transmission facilities are particularly important for wind resource development because of wind's locational dependence and distance from load centers, In addition, there is a mismatch between the short lead times for developing wind projects and the lengthier time often needed to develop new transmission lines, Furthermore, wind's relatively low capacity factor can lead to underutilization of new transmission lines that are intended to only serve wind, The question of "who pays?"for new transmission is also of critical importance to wind developers and investors. Transmission rate pancaking, charges imposed for inaccurate scheduling, and interconnection queuing procedures have also sometimes been identified as impediments to wind capacity expansion, A number of developments occurred in 2006 that promise to help ease some of these barriers over time, The U.s. DOE issued a national transmission congestion study that designated southern California and the mid-Atlantic coastal area from New York City to northern Virginia as critical congestion areas," Under the Energy Policy Act of 2005 (EPAct 2005), the U.s. DOE can nominate National Interest Electric Transmission Corridors, and the Federal Energy Regulatory Commission (FERC) can approve potential new transmis- sion facilities in these corridors if states do not act within one year or do not have the authority to act, among other conditions, Separately, FERC issued a rule allowing additional profit incentives for transmission owners on a case-by-case basis, also as required by EPAct 2005, and thereby potentially encouraging greater transmission investment, In the West, the Western Governors Association adopted a policy resolution through its Clean and Diversified Energy Advisory Committee that included a goal of 30,000 MW of clean energy by 2015, with potentially significant contributions from wind power, The recommendations ofthis committee to advance wind included 30 Wind penetration on a capacity basis (defined as nameplate wind capacity serving a region divided by that region s peak electricity demand) is frequentlyused in integration studies. For a given amount of wind capacity, penetration on a capacity basis is typically higher than the comparable wind penetration inenergy terms. 31 The recently completed study in Minnesota found that a 25% wind penetration within the state, based on energy production (31% based on capacity), wouldcost $4.41/MWh or less, This low cost at such a high penetration rate is caused, in part, by the extensive interactions with the Midwest Independent System Operator (MISO) markets, The low cost found in the California study is partly a reflection of the limited number of cost factors that were considered in theanalysis, 32 A number of additional wind integration analyses are planned for 2007, including a study of even- higher wind power penetrations in Colorado, thecompletion of the California Intermittency Analysis Project, and further work in the Pacific Northwest. Studies evaluating wind integration in the Southwest,and perhaps throughout the West, are also in the early planning stage, 33 The U,S. DOE has since issued draft National Interest Electric Transmission Corridor designations for the two regions identified above and, as of this writing, isreceiving comments on this draft designation. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006 .. . na t i o n a l l a b o r a t o r y o f t h e s. De p a r t m e n t o f E n e r g y +. . - Of f i c e o f E n e r g y E f f i c i e n c y Re n e w a b l e E n e r g y .~ . - ~ I ~ = ! . Na t i o n a l R e n e w a b l e E n e r g y L a b o r a t o r y In n o v a t i o n f o r O u r E n e r g y F u t u r e WE C C O p e r a t i n g Im p a c t s Wi n d P o w e r i n g Am e r i c a Su m m i t Ju n e 6 , 20 0 7 Mi c h a e l M i U i g a n Na t i o n a l W i n d T e c h n o l o g y C e n t e r Na t i o n a l R e n e w a b l e , lE n e r g , v . La b o r a t o r y Co m p a r i s o n o f C o s t - Ba s e d s. O p e r a t i o n a l I m p a c t St u d i e s Da t e St u d y Wi n d Ca p a c i t y Pe n e t r a - ti o n ( % ) Re g u l a - ti o n C o s t ($ / M W h ) Lo a d Fo l l o w i n g Co s t ($ / M W h ) Un i t Co m m i t - me n t C o s t ($ / M W h ) Ga s Su p p l y Co s t ($ / M W h ) 1. 4 4 0. 4 5 * tr a c e tr a c e ** * Ma y ' 03 X c e l - UW I G Se p ' 04 X c e l - MN D O C Ju n e ' 06 C A RP S M u l t i - 4 ye a r Fe b ' 07 GE / P i e r / C A I A P 2 0 Ju n e ' 03 W e En e r g i e s 4 Ju n e ' 1 03 W e En e r g i e s Pa c i f i C o r p )( ~ ~ t i . R $ ~ o " . ' , . . . C i )( e $ I 4 I ? , S C o To t a l Op e r a t i n g Co s t Im p a c t ($ / M W h ) 0. 4 5 69 * * * r: E C' ::'1' : ::Ltc. - 0'7 ~,\\\I"lb 'lfH";~'="P I' ; :;""' ~U L-u t::' .ill February 9, 2007 ILJ;\dij H..:UL\G UTiLlT;::: COL~:.13SI(;." Renl!W~ Northwest PnIjt!ct Jean D. Jewell, Secretary Idaho Public Utilities Commission 472 West Washington Street P. O. Box 83720 Boise, ll) 83720-0074 Via email Re: Operational Impacts of Integrating Wind Generation into Idaho Power's Existing Resource Portfolio Dear Ms. Jewell: We appreciate the time and effort Idaho Power Company expended in preparing their study Operation Impacts of Integrating W"md Generation into Idaho Power s Existing Resource Portfolio (Study). In addition, Idaho Power Company s analysts have been generous in sharirig their intermediate results and discussing their methodology with the Northwest Wind Integration Action Plan (NWIAP) Peer Review Committee of which we are participants. Unfortunately, due to perceived urgency felt by Idaho Power, the Study was filed with the Idaho Commission prior to completing the NWIAP peer review process. Taking extra time would allow parties on the Peer Review Committee to have confidence in the results. We believe this report is premature and we urge the Commission not to accept it until the peer review process is complete. We also feel it is critical not to base any other decisions, such as those proposed in Idaho s filing on PURPA rules, on the study results until the report has been fully vetted. Allowing Idaho Power extra time, and extra funding for their consultant if needed, is important to this process. We also hope the Commission will encourage Idaho Power to continue to share complete details of their wind data and analysis methodology with regional stakeholders. The timing was particularly unfortunate because the peer review group identified some areas of concern in the calculations and methodology that had the effect of systematically overestimating the reserve requirements. The peer review committee wished to investigate further. Some of the concerns identified include: Inflated Market Price Data. We appreciate that Idaho Power was interested in understanding the differences in system operations under low average, and high water years. However, the market prices that corresponded to the average water year are inflated because of the 2000-2001 energy crisis. These high prices result in integration costs for those years that are unreasonably high. ;-.., - Dr:":'!-Jt:,,~: ':::, ~:;;:::',' :' '"C~ ::::"~:~:::' :;C 5 " :'!';; , 2005 Mar 2005 May 2003 Sep 2004 Jun 2003 Jun 2003 Apr 2006 Apr 2006 Nov 2006 Nov 2006 Dee 2004 Dee 2004 Attachment Recent Wind Integration Studies Summary PaeifiCorp puget Sound Energy Xcel-UWIG Xeel-MNDOC WE Energies WE Energies Xeel-PSCo Xeel-PSCo Enemex- MN Enemex- MN VfT - Scandinavia VfT - Scandinavia 15* 25* 10* 20* 1.85 1.9 4.41 1.29** 58** Notes *Penetration based on MWh generation / MWh load **Euros/MWh converted to dollars ~ 1.29 Euro/dollar Sources: Grid Impacts of Wind Power Variability: Recent Assessments froma Variety of Utilities in the UnitedStates," Parsons/Milligan et ai, NREL, July 2006 Final Report- Minnesota Wind Integration Study, Minnesota Public Utility Commission, November 302006 The Impact of Large Scale Wind Power Production on the Nordic System " Holtinen, V1T Processes, December 2004 Short-term Operational Impacts of Wind Generation on the Puget Sound Energy Power System , Golden Energy Services, Inc., March 3, 2005. ... . A n a t i o n a l la b o r a t o r y o l t h e U . S. D e p a r t m e n t 0 1 E n e r g y .. . Of f i c e 0 1 E n e r g y E l l i c i e n c y Re n e w a b l e E n e r g y .~ . .~ I ~ = ! . Na t i o n a l R e n e w a b l e E n e r g y L a b o r a t o r y In n o v a t i o n f o r O u r E n e r g y F u t u r e Wi n d - Ge n e r a t e d E l e c t r i c i t y : Te c h n o l o g y , I n t e g r a t i o n Tr a n s m i s s i o n I s s u e s PN W E R An n u a l M e e t i n g An c h o r a g e , A l a s k a JU l y 2 4 " 20 , 0 1 ' Co m p a r i s o n o f C o s t - Ba s e d S. O p e r a t i o n a l I m p a c t St u d i e s Da t e St u d y Wi n d Ca p a c i t y Pe n e t r a - ti o n ( % ) Re g u l a - ti o n C o s t ($ / M W h ) Lo a d Un i t Fo l l o w i n g . C o m m i t - Co s t me n t C o s t ($ / M W h ) ($ / M W h ) Ga s Su p p l y Co s t ($ / M W h ) Ma y ' 03 X c e l - UW I G Se p ' 04 X c e l - MN D O C Ju n e ' 06 C A RP S M u l t i - ye a r Fe b ' 07 GE / P i e r / C A I A P 2 0 Ju n e ' 03 W e En e r g i e s 4 Ju n e O3 W e En e r Q i i e s 2 9 . P ~ c i f i 8 o r p 2 . , - ~G e l ~ P $ ( J o .J O . , :'- " , ' :: . , ~~ ~ l ~ ~ $ ( : ; o 0. 4 1 1. 4 4 0. 4 5 * tr a c e tr a c e ** * 20 0 5 A , ' . r f A -, : , p r h ~, . " ~r i t i ~~ . De c . ' To t a l Op e r a t i n g Co s t Im p a c t ($ / M W h ) 0. 4 5 69 * * * CERTIFICATE OF SERVICE I HEREBY CERTIFY that on this day, October 5, 2007, I caused a true and correct copy of the foregoing EXERGY DEVELOPMENT GROUP OF IDAHO LLC COMMENTS IPC-O7-03 to be served by the method indicated below, and addressed to the following: Ms. Jean Jewell Commission Secretary Idaho Public Utilities Commission POBox 83720 Boise 10 83720-0074 ( ) U.S. Mail, Postage Prepaid (X) Hand Delivered ( ) Overnight Mail ( ) Facsimile ( ) Electronic Mail Barton L. Kline Idaho Power Company PO Box 70 Boise ID 83707-0070 bkline~idahopower. com ( ) US, Mail, Postage Prepaid (X) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail Monica Moen Idaho Power Company PO Box 70 Boise ID 83707-0070 mmoen~idahopower, com ( ) U.S. Mail, Postage Prepaid (X) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail Natalie McIntire Renewable Northwest Project 917 SW Oak St. Ste. 910 Portland, OR 97205 (X) US, Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile ( ) Electronic Mail Scott Woodbury Idaho Public Utilities Commission 424 W Washington Street Boise ID 83702 scott. woodbury~puc.idaho, gov ( ) US, Mail, Postage Prepaid (X) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail EXERGY DEVELOPMENT GROUP, LLC CERTIFICATE OF SERVICE COMMENTS IPC-07- Michael G. Andrea Staff Attorney 1411 E Mission Ave PO Box 3727 MSC- Spokane W A 99201 Michael, andrea~a vistacorp, com (X) US, Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail R. Blair Strong Jerry K, Boyd Paine, Hamblen, Coffin, Brooke & Miller LLP 717 West Sprague Avenue Ste 1200 Spokane WA 99201-3505 r. blair. strong~painehamblen,com (X) U.S. Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail Dean Brockbank Rocky Mountain Power 201 S, Main St. Ste. 2300 Salt Lake City, Utah 84111 dean. brockbank~pacificorp. com (X) U,S, Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail Brian Dickman Rocky Mountain Power 201 S, Main St. Ste. 2300 Salt Lake City, Utah 84111 brian, dickman~pacificorp, com (X) U.S. Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail William Eddie Advocates for the West 610 SW Alder St, Ste. 910 Portland, OR 97205 beddi e~ad v ocateswe st. org (X) US, Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail EXERGY DEVELOPMENT GROUP, LLC CERTIFICATE OF SERVICE COMMENTS IPC-07- Rich Rayhill Ridgeline Energy 720 W, Idaho Street, Ste, 39 Boise, Idaho 83702 rrayhill~rl-en. com (X) u.S. Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail Robert Ellis 4 Nickerson, Ste, 301 Seattle, W A 98109 rellis(~,rl-en,com (X) u.S. Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail Glenn Ikemoto Idaho Windfarms 672 Blair Ave Piedmont, CA 94611 glenni~pacbell.net (X) U,S, Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail Dean J. Miller PO Box 2564 Boise, Idaho 83701 i oe~mcdevitt - miller, com (X) U,S, Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail Ronald K. Arrington John Deere Renewables 6400 NW 86th St. PO Box 6600 Johnston, IA 50131 (X) u.S. Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile ( ) Electronic Mail Ken Miller Snake River Alliance PO Box 1731 Boise, ID 83701 kmiller~snakeri veralliance. org (X) U.S. Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail EXERGY DEVELOPMENT GROUP, LLC CERTIFICATE OF SERVICE COMMENTS IPC-07- Gerald Fleischman 11535 W, Hazeldale Ct. Boise, ID 83713 Gfeisch986~hotmail.com (X) u.S. Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail Brian Jackson 2792 Desert Wind Rd, Oasis, ID 83647-5020 brian~clever - ideas. com (X) u.S, Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail J. Humphries 2630 Central Ave, Idaho Falls, ID 83406 bl ueri b bonenergy~gmail, com (X) u.S. Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail Gary Seifert Kurt Myers INL Biofuels & Renewable Energy 2525 S. Fremont Ave PO Box 1625, MS 3810 Idaho Falls, Idaho 83415-3810 Gary, seifert~inl. gov Kurt.myers~inl.gov (X) u.S, Mail, Postage Prepaid ( ) Hand Delivered ( ) Overnight Mail ( ) Facsimile (X) Electronic Mail By (i J()Peter Richardson ISB # 3195 EXERGY DEVELOPMENT GROUP, LLC CERTIFICATE OF SERVICE COMMENTS IPC-07-