Re: Case Nos. IPC-E-10-06, IPC-E-10-07, IPC-E-10-08, and IPC-E-10-12
Compliance Filing
Dear Ms. Jewell:
Pursuant to Commission Order Nos. 31081, 31091, 31093, and 31097 in the
above-referenced cases, transmitted for filing are the following Idaho Power Company’s
revised Schedules, in conformance with the Commission’s Orders:
Fifth Revised Schedule No. 1-2
Second Revised Schedule No. 3-2
Fourth Revised Schedule No. 4-3
Fourth Revised Schedule No. 5-3
Fifth Revised Schedule No. 7-2
Fifth Revised Schedule No. 9-4
Second Revised Schedule No. 9-5
First Revised Schedule No. 9-6
Third Revised Schedule No. 15-2
Fourth Revised Schedule No. 19-4
Fourth Revised Schedule No. 19-5
Fourth Revised Schedule No. 24-3
Fourth Revised Schedule No. 26-1
Third Revised Schedule No. 29-1
Third Revised Schedule No. 30-1
Fourth Revised Schedule No. 31-1
Fourth Revised Schedule No. 32-1
Fourth Revised Schedule No. 40-2
Fourth Revised Schedule No. 41-2
Third Revised Schedule No. 41-3
Fifth Revised Schedule No. 41-4
Fifth Revised Schedule No. 41-7
First Revised Schedule No. 41-8
Fourth Revised Schedule No. 42-1
Third Revised Schedule No. 45-3
Second Revised Schedule No. 46-1
Second Revised Schedule No. 54-2
Fourth Revised Schedule No. 55-1
RECEIVED
2010 May 28 PM 1:11
IDAHO PUBLIC
UTILITIES COMMISSION
Idaho Power Company Fifth Revised Sheet No. 1-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Fourth Revised Sheet No. 1-2
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093, 31097 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 1
RESIDENTIAL SERVICE
(Continued)
RESIDENTIAL SPACE HEATING
All space heating equipment to be served by the Company's system shall be single-phase
equipment approved by Underwriters' Laboratories, Inc., and the equipment and its installation shall
conform to all National, State and Municipal Codes and to the following:
Individual resistance-type units for space heating larger than 1,650 watts shall be designed to
operate at 240 or 208 volts, and no single unit shall be larger than 6 kW. Heating units of 2 kW or
larger shall be controlled by approved thermostatic devices. When a group of heating units, with a total
capacity of more than 6 kW, is to be actuated by a single thermostat, the controlling switch shall be so
designed that not more than 6 kW can be switched on or off at any one time. Supplemental resistance-
type heaters, that may be used with a heat exchanger, shall comply with the specifications listed above
for such units.
SUMMER AND NON-SUMMER SEASONS
The summer season begins on June 1 of each year and ends on August 31 of each year. The
non-summer season begins on September 1 of each year and ends on May 31 of each year.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
First 800 kWh 6.9899¢ 6.5262¢
801-2000 kWh 8.5156¢ 7.2514¢
All Additional kWh Over 2000 10.2188¢ 8.3389¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Second Revised Sheet No. 3-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 First Revised Sheet No. 3-2
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093, 31097 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, Idaho
SCHEDULE 3
MASTER-METERED MOBILE HOME PARK
RESIDENTIAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit):
Service Charge, per month $4.00
Energy Charge, per kWh
all kWh 7.0752¢
Minimum Charge
The monthly Minimum Charge shall be the sum of the Service Charge, the Energy Charge, and
the Power Cost Adjustment.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fourth Revised Sheet No. 4-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 4-3
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093, 31097 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 4
RESIDENTIAL SERVICE
ENERGY WATCH PROGRAM
(OPTIONAL)
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
Summer
Energy Watch Event hours 20.0000¢ n/a
All other hours 7.2254¢ n/a
Non-summer
First 800 kWh n/a 6.5262¢
801-2000 kWh n/a 7.2514¢
All Additional kWh Over 2000 n/a 8.3389¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fourth Revised Sheet No. 5-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 5-3
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093, 31097 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 5
RESIDENTIAL SERVICE
TIME-OF-DAY PROGRAM
(OPTIONAL)
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
Summer
On-Peak 10.4609¢ n/a
Mid-Peak 7.6916¢ n/a
Off-Peak 5.7679¢ n/a
Non-summer
First 800 kWh n/a 6.5262¢
801-2000 kWh n/a 7.2514¢
All Additional kWh Over 2000 n/a 8.3389¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fifth Revised Sheet No. 7-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Fourth Revised Sheet No. 7-2
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093, 31097 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, Idaho
SCHEDULE 7
SMALL GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
First 300 kWh 8.1747¢ 8.1747¢
All Additional kWh 9.7329¢ 8.6407¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fifth Revised Sheet No. 9-4
Cancels
I.P.U.C. No. 29, Tariff No. 101 Fourth Revised Sheet No. 9-4
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093, 31097 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, Idaho
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
MONTHLY CHARGE (Continued)
SECONDARY SERVICE Summer Non-summer
Service Charge, per month $14.22 $14.22
Basic Charge, per kW of Basic Load Capacity
First 20 kW $0.00 $0.00
All Additional kW $0.77 $0.77
Demand Charge, per kW of Billing Demand
First 20 kW $0.00 $0.00
All Additional kW $4.54 $3.63
Energy Charge, per kWh
First 2,000 kWh 8.8810¢ 7.9237¢
All Additional kWh 3.8074¢ 3.3959¢
Facilities Charge
None.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Second Revised Sheet No. 9-5
Cancels
I.P.U.C. No. 29, Tariff No. 101 First Revised Sheet No. 9-5
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
MONTHLY CHARGE (Continued)
PRIMARY SERVICE Summer Non-summer
Service Charge, per month $243.69 $243.69
Basic Charge, per kW of
Basic Load Capacity $1.10 $1.10
Demand Charge, per kW of
Billing Demand $4.18 $3.85
On-Peak Demand Charge, per kW of
On-Peak Billing Demand $0.78 n/a
Energy Charge, per kWh
On-Peak 3.7419¢ n/a
Mid-Peak 3.4027¢ 2.9706¢
Off-Peak 3.1803¢ 2.8489¢
Facilities Charge
The Company’s investment in Company-owned Facilities Beyond the Point of Delivery times 1.7
percent.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company First Revised Sheet No. 9-6
Cancels
I.P.U.C. No. 29, Tariff No. 101 Original Sheet No. 9-6
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
MONTHLY CHARGE (Continued)
TRANSMISSION SERVICE Summer Non-summer
Service Charge, per month $243.69 $243.69
Basic Charge, per kW of
Basic Load Capacity $0.57 $0.57
Demand Charge, per kW of
Billing Demand $4.00 $3.71
On-Peak Demand Charge, per kW of
On-Peak Billing Demand $0.78 n/a
Energy Charge, per kWh
On-Peak 3.6775¢ n/a
Mid-Peak 3.3520¢ 2.9337¢
Off-Peak 3.1377¢ 2.8227¢
Facilities Charge
The Company’s investment in Company-owned Facilities Beyond the Point of Delivery times 1.7
percent.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Third Revised Sheet No. 15-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Second Revised Sheet No. 15-2
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 15
DUSK TO DAWN CUSTOMER
LIGHTING
(Continued)
NEW FACILITIES
Where facilities of the Company are not presently available for a lamp installation which will
provide satisfactory lighting service for the Customer's Premises, the Company may install overhead or
underground secondary service facilities, including secondary conductor, poles, anchors, etc., a
distance not to exceed 300 feet to supply the desired service, all in accordance with the charges
specified below.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
1. Monthly Per Unit Charge on existing facilities:
AREA LIGHTING
High Pressure Average Base
Sodium Vapor Lumens Rate
100 Watt 8,550 $ 7.10
200 Watt 19,800 $11.47
400 Watt 45,000 $18.37
FLOOD LIGHTING
High Pressure Average Base
Sodium Vapor Lumens Rate
200 Watt 19,800 $13.95
400 Watt 45,000 $20.85
Metal Halide
400 Watt 28,800 $23.31
1000 Watt 88,000 $42.54
2. For New Facilities Installed Before June 1, 2004: The Monthly Charge for New Facilities
installed prior to June 1, 2004, such as overhead secondary conductor, poles, anchors, etc., shall be
1.75 percent of the estimated installed cost thereof.
3. For New Facilities Installed On or After June 1, 2004: The non-refundable charge for
New Facilities to be installed, such as underground service, overhead secondary conductor, poles,
anchors, etc., shall be equal to the work order cost.
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt, and becomes past due
15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fourth Revised Sheet No. 19-4
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 19-4
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
MONTHLY CHARGE (Continued)
SECONDARY SERVICE Summer Non-summer
Service Charge, per month $14.17 $14.17
Basic Charge, per kW of
Basic Load Capacity $0.77 $0.77
Demand Charge, per kW of
Billing Demand $3.86 $3.62
On-Peak Demand Charge, per kW of
On-Peak Billing Demand $0.78 n/a
Energy Charge, per kWh
On-Peak 5.1105¢ n/a
Mid-Peak 3.9159¢ 3.6075¢
Off-Peak 3.4047¢ 3.1349¢
Facilities Charge
None.
PRIMARY SERVICE Summer Non-summer
Service Charge, per month $243.69 $243.69
Basic Charge, per kW of $1.10 $1.10
Basic Load Capacity
Demand Charge, per kW of $4.18 $3.85
Billing Demand
On-Peak Demand Charge, per kW of
On-Peak Billing Demand $0.78 n/a
Energy Charge, per kWh
On-Peak 4.1226¢ n/a
Mid-Peak 3.1407¢ 2.9076¢
Off-Peak 2.7304¢ 2.5284¢
Facilities Charge
The Company’s investment in Company-owned Facilities Beyond the Point of Delivery times 1.7
percent.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fourth Revised Sheet No. 19-5
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 19-5
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
MONTHLY CHARGE (Continued)
TRANSMISSION SERVICE Summer Non-summer
Service Charge, per month $243.69 $243.69
Basic Charge, per kW of
Basic Load Capacity $0.57 $0.57
Demand Charge, per kW of
Billing Demand $4.00 $3.71
On-Peak Demand Charge, per kW of
On-Peak Billing Demand $0.78 n/a
Energy Charge, per kWh
On-Peak 4.0875¢ n/a
Mid-Peak 3.1283¢ 2.8914¢
Off-Peak 2.7202¢ 2.5140¢
Facilities Charge
The Company's investment in Company-owned Facilities Beyond the Point of Delivery times 1.7
percent.
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt, and becomes past due
15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fourth Revised Sheet No. 24-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 24-3
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093, 31097 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 24
AGRICULTURAL IRRIGATION
SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95
(Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy
Credit).
SECONDARY SERVICE In-Season Out-of-Season
Service Charge, per month $17.92 $3.41
Demand Charge, per kW of
Billing Demand $ 5.57 $0.00
Energy Charge
In-Season
First 164 kWh per kW of Demand 4.6169¢ n.a.
All Other kWh per kW of Demand 4.4822¢ n.a.
Out-of-Season
All kWh n.a. 5.5531¢
Facilities Charge
None.
TRANSMISSION SERVICE In-Season Out-of-Season
Service Charge, per month $244.62 $3.41
Demand Charge, per kW of
Billing Demand $ 5.24 $0.00
Energy Charge
In-Season
First 164 kWh per kW of Demand 4.3021¢ n.a.
All Other kWh per kW of Demand 4.1768¢ n.a.
Out-of-Season
All kWh n.a. 5.1748¢
Facilities Charge
The Company’s investment in Company-owned Facilities Beyond the Point of Delivery times 1.7
percent.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fourth Revised Sheet No. 26-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 26-1
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective - June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 26
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
MICRON TECHNOLOGY, INC.
BOISE, IDAHO
SPECIAL CONTRACT DATED DECEMBER 29, 2009
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
Monthly Contract Demand Charge
$1.47 per kW of Contract Demand.
Monthly Billing Demand Charge
$9.61 per kW of Billing Demand but not less than Minimum Monthly Billing Demand.
Minimum Monthly Billing Demand
The Minimum Monthly Billing Demand will be 25,000 kilowatts.
Daily Excess Demand Charge
$0.272 per each kW over the Contract Demand.
Monthly Energy Charge
1.8123¢ per kWh.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Third Revised Sheet No. 29-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Second Revised Sheet No. 29-1
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 29
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
J. R. SIMPLOT COMPANY
POCATELLO, IDAHO
SPECIAL CONTRACT DATED JUNE 29, 2004
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
Contract Demand Charge
$2.01 per kW of Contract Demand
Demand Charge,
$6.87 per kW of Billing Demand but no less than the Contract Demand less 5,000 kW
Daily Excess Demand Charge
$0.272 per each kW over the Contract Demand
Energy Charge
1.8212¢ per kWh
Monthly Facilities Charge
1.7% of the Company’s investment in Distribution Facilities
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Third Revised Sheet No. 30-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Second Revised Sheet No. 30-1
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 30
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
UNITED STATES DEPARTMENT OF ENERGY
IDAHO OPERATIONS OFFICE
SPECIAL CONTRACT DATED MAY 16, 2006
CONTRACT NO. GS-OOP-99-BSD-0124
AVAILABILITY
This schedule is available for firm retail service of electric power and energy delivered for the
operations of the Department of Energy's facilities located at the Idaho National Engineering Laboratory
site, as provided in the Contract for Electric Service between the parties.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
1. Demand Charge, per kW of
Billing Demand $7.44
2. Energy Charge, per kWh 1.9502¢
SPECIAL CONDITIONS
1. Billing Demand. The Billing Demand shall be the average kW supplied during the 30-
minute period of maximum use during the month.
2. Power Factor Adjustment. When the Power Factor is less than 95 percent during the
30-minute period of maximum load for the month, Company may adjust the measured Demand to
determine the Billing Demand by multiplying the measured kW of Demand by 0.95 and dividing by the
actual Power Factor.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fourth Revised Sheet No. 31-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 31-1
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order Nos. 31091, 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 31
IDAHO POWER COMPANY
AGREEMENT FOR SUPPLY OF
STANDBY ELECTRIC SERVICE
FOR
THE AMALGAMATED SUGAR COMPANY
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
Standby Contract Demand Charge, per kW of
Standby Contract Demand $0.32
Standby Facilities Contract Demand Charge
Per kW of Standby Facilities Contract Demand:
Paul Facility: $0.90
Nampa Facility: $0.93
Twin Falls Facility: $0.51
Standby Billing Demand Charge, per kW of
Standby Billing Demand $3.16
Excess Demand Charge
$0.57 per day for each kW taken in excess of the Total Contract Demand during the months of
September through March
$0.85 per day for each kW taken in excess of the Total Contract Demand during the months of
April through August
$5.67 per kW for the highest Excess Demand recorded during the Billing Period. (This charge
will not be prorated.)
Energy Charge Energy taken with Standby Demand will be priced at the applicable Schedule 19
Energy Charge.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company First Revised Sheet No. 32-1
Cancels
I.P.U.C. No. 28, Tariff No. 101 Original Sheet No. 32-1
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, Idaho
SCHEDULE 32
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR HOKU MATERIALS, INC.
POCATELLO, IDAHO
ELECTRIC SERVICE AGREEMENT DATED JUNE 19, 2009
APPLICABILITY
This schedule is applicable to service to Hoku Materials, Inc. (Hoku) served by Idaho Power
Company under the terms of an Electric Service Agreement (ESA) dated June 19, 2009.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges and may also include applicable
charges for Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and
Schedule 95 (Adjustment for Municipal Franchise Fees).
FIRST BLOCK MONTHLY CHARGES
First Block Contract Demand Charge
$2.35 per kW times the First Block Contract Demand
First Block Energy Charge
6.166 cents per kWh times the First Block Energy (subject to the Minimum Billed Energy
amount specified in the ESA)
SECOND BLOCK MONTHLY CHARGES
Second Block Contract Demand Charge
$4.56 per kW times the Second Block Contract Demand
Second Block Energy Charge
2.8482 cents per kWh times the Second Block Energy (subject to Minimum Billed
Energy amount specified in the ESA)
EXCESS DEMAND CHARGES
Daily Excess Demand Charge
$0.56 per each kW of Excess Demand per day
Monthly Excess Demand Charge
$5.63 per kW for the highest Excess Demand recorded during the billing period
EXCESS ENERGY CHARGE
8.7363 cents per kWh of Excess Energy
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fourth Revised Sheet No. 40-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 40-2
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 40
UNMETERED GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The average monthly kWh of energy usage shall be estimated by the Company, based on the
Customer's electric equipment and one-twelfth of the annual hours of operation thereof. Since the
service provided is unmetered, failure of the Customer's equipment will not be reason for a reduction in
the Monthly Charge. The Monthly Charge shall be computed at the following rate, and may also
include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency
Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees).
Energy Charge, per kWh 6.533¢
Minimum Charge, per month $1.50
ADDITIONAL CHARGES
Applicable only to municipalities or agencies of federal, state, or county governments with an
authorized Point of Delivery having the potential of intermittent variations in energy usage.
Intermittent Usage Charge, per unit, per month $1.00
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fourth Revised Sheet No. 41-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Sheet No. 41-2
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093, 31097 Gregory W. Said, General Manager, Regulatory Affairs
Effective - June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
Company-owned lighting systems installed on or after June 1, 2004 shall not be
constructed, operated, or modified in such a way as to allow for the potential or actual variation
in energy usage, such as through, but not limited to, the use of wired outlets or useable plug-ins.
Company-owned systems installed prior to June 1, 2004 that are constructed, operated,
or modified in such a way as to allow for the potential or actual variation in energy usage may
have the estimated annual variations in energy usage charged the Non-Metered Service –
Variable Energy Charge until the potential for variations in energy usage has been eliminated.
Repair, modification or alteration of these facilities is not permitted.
ACCELERATED REPLACEMENT OF EXISTING FIXTURES
In the event a Customer requests the Company perform an accelerated replacement of
existing fixtures with the cut-off fixture, the following charges will apply:
1. The designed cost estimate which includes labor, time, and mileage costs for the
removal of the existing street lighting fixtures.
2. $65.00 per fixture removed from service.
The total charges identified in 1 and 2 above must be paid prior to the beginning of the
fixture replacement and are non-refundable. The accelerated replacement will be performed by
the Company during the regularly scheduled working hours of the Company and on the
Company’s schedule.
MONTHLY CHARGE
The monthly charges are as follows, and may also include charges as set forth in
Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
Lamp Charges, per lamp
High Pressure Average Base
Sodium Vapor Lumens Rate
70 Watt 5,540 $ 8.57
100 Watt 8,550 $ 7.72
200 Watt 19,800 $ 9.04
250 Watt 24,750 $10.22
400 Watt 45,000 $12.87
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Third Revised Sheet No. 41-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Second Revised Sheet No. 41-3
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order Nos. 31091, 31093, 31097 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
MONTHLY CHARGES (Continued)
Non-Metered Service – Variable Energy
Energy Charge, per kWh 6.533¢
Pole Charges
For Company-owned poles installed after October 5, 1964 required to be used for street
lighting only:
Charge
Wood pole, per pole $1.81
Steel pole, per pole $7.18
Facilities Charges
Customers assessed a monthly facilities charge prior to June 1, 2004 for the installation of
underground circuits will continue to be assessed a monthly facilities charge equal to 1.75
percent of the estimated cost difference between overhead and underground circuits.
"B" - CUSTOMER-OWNED SYSTEM
The Customer's lighting system, including posts or standards, fixtures, initial installation of
lamps and underground cables with suitable terminals for connection to the Company's distribution
system, is installed and owned by the Customer.
Customer-owned systems installed on or after June 1, 2004 which are constructed, operated, or
modified in such a way as to allow for the potential or actual variation in energy usage, such as through,
but not limited to, the use of wired outlets or useable plug-ins, are required to be metered in order to
record actual energy usage.
Customer-owned systems installed prior to June 1, 2004 that are constructed, operated, or
modified in such a way as to allow for the potential or actual variation in energy usage may have the
estimated annual variations in energy usage charged the Non-Metered Service – Variable Energy
Charge until the street lighting system is converted to Metered Service, or until the potential for
variations in energy usage has been eliminated, whichever is sooner.
ENERGY AND MAINTENANCE SERVICE
Energy and Maintenance Service includes operation of the system, energy, lamp renewals,
cleaning of glassware, and replacement of defective photocells which are standard to the Company-
owned street light units. Service does not include the labor or material cost of replacing cables,
standards, broken glassware or fixtures, painting, or refinishing of metal poles. Individual lamps will be
replaced on burnout as soon as reasonably possible after notification by the Customer and subject to
the Company’s operating schedules and requirements.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fifth Revised Sheet No. 41-4
Cancels
I.P.U.C. No. 29, Tariff No. 101 Fourth Sheet No. 41-4
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order Nos. 31091, 31093, 31097 Gregory W. Said, General Manager, Regulatory Affairs
Effective - June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
ENERGY-ONLY SERVICE
Energy-Only Service is available only to a metered lighting system. Service includes
energy supplied from the Company’s overhead or underground circuits and does not include
any maintenance to the Customer’s facilities.
A street lighting system receiving service under the Energy-Only Service offering is not
eligible to transfer to any street lighting service option under this schedule that includes
maintenance provisions to the Customer’s facilities.
MONTHLY CHARGE
The monthly charges are as follows, and may also include charges as set forth in
Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
Non-Metered Service (With Maintenance), per lamp
High Pressure Average Base
Sodium Vapor Lumens Rate
70 Watt 5,450 $3.67
100 Watt 8,550 $4.17
200 Watt 19,800 $5.79
250 Watt 24,750 $6.90
400 Watt 45,000 $9.58
Non-Metered Service – Variable Energy
Energy Charge, per kWh 6.533¢
Metered Service (With Maintenance), per lamp
High Pressure Sodium Vapor
70 Watt $2.49
100 Watt $2.20
200 Watt $2.28
250 Watt $2.20
400 Watt $2.26
Meter Charge, per meter $8.45
Energy Charge, per kWh 5.8525¢
Metered Energy-Only Service (No Maintenance)
Meter Charge, per meter $8.45
Energy Charge, per kWh 5.8525¢
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fifth Revised Sheet No. 41-7
Cancels
I.P.U.C. No. 29, Tariff No. 101 Fourth Revised Sheet No. 41-7
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order Nos. 31091, 31093, 31097 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE
ENERGY AND MAINTENANCE SERVICE
Energy and Maintenance Service includes operation of the system, energy, lamp
renewals, cleaning of glassware, and replacement of defective photocells which are standard to
the Company-owned street light units. Service does not include the labor or material cost of
replacing cables, standards, broken glassware or fixtures, or painting or refinishing of metal
poles. Individual lamps will be replaced on burnout as soon as reasonably possible after
notification by the Customer and subject to the Company’s operating schedules and
requirements.
ENERGY-ONLY SERVICE
Energy-Only Service is available only to a metered lighting system. Service includes
energy supplied from the Company’s overhead or underground circuits and does not include
any maintenance to the Customer’s facilities.
A street lighting system receiving service under the Energy-Only Service offering is not
eligible to transfer to any street lighting service option under this schedule that includes
maintenance provisions to the Customer’s facilities.
MONTHLY CHARGE
The monthly charges are as follows, and may also include charges as set forth in
Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees).
Non-Metered Service (With Maintenance), per lamp
Average Base
Lumens Rate
Mercury Vapor
175 Watt 7,654 $ 6.33
400 Watt 19,125 $10.00
Non-Metered Service – Variable Energy
Energy Charge, per kWh 6.533¢
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company First Revised Sheet No. 41-8
Cancels
I.P.U.C. No. 29, Tariff No. 101 Original Sheet No. 41-8
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order Nos. 31091, 31093, 31097 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE
MONTHLY CHARGE (Continued)
Metered Service (With Maintenance) per lamp
Mercury Vapor
175 Watt $1.93
400 Watt $2.00
Meter Charge, per meter $8.45
Energy Charge, per kWh 5.8525¢
Metered Energy-Only Service (No Maintenance)
Meter Charge, per meter $8.45
Energy Charge, per kWh 5.8525¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fourth Revised Sheet No. 42-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 42-1
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093, 31097 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 42
TRAFFIC CONTROL SIGNAL
LIGHTING SERVICE
APPLICABILITY
Service under this schedule is applicable to Electric Service required for the operation of traffic
control signal lights within the State of Idaho. Traffic control signal lamps are mounted on posts or
standards by means of brackets, mast arms, or cable.
CHARACTER OF SERVICE
The traffic control signal fixtures, including posts or standards, brackets, mast arm, cable,
lamps, control mechanisms, fixtures, service cable, and conduit to the point of, and with suitable
terminals for, connection to the Company's underground or overhead distribution system, are installed,
owned, maintained and operated by the Customer. Service is limited to the supply of energy only for
the operation of traffic control signal lights.
The installation of a meter to record actual energy consumption is required for all new traffic
control signal lighting systems installed on or after June 1, 2004. For traffic control signal lighting
systems installed prior to June 1, 2004 a meter may be installed to record actual usage upon the
mutual consent of the Customer and the Company.
MONTHLY CHARGE
The monthly kWh of energy usage shall be either the amount estimated by the Company based
on the number and size of lamps burning simultaneously in each signal and the average number of
hours per day the signal is operated, or the actual meter reading as applicable. The Monthly Charge
shall be computed at the following rate, and may also include charges as set forth in Schedule 55
(Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for
Municipal Franchise Fees).
Energy Charge, per kWh 4.540¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Third Revised Sheet No. 45-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Second Revised Sheet No. 45-3
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 45
STANDBY SERVICE
(Continued)
PARALLEL OPERATIONS
Parallel operations will only be authorized by the Company under the terms of the Uniform
Standby Service Agreement with the Customer. The Company will install a system protection package
at the Customer's expense prior to the start of parallel operations. The Customer will also pay a
Maintenance Charge of 0.7 percent per month times the investment in the protection package.
MONTHLY CHARGE
The Monthly Charge for Standby Service is the sum of the Standby Reservation Charge, the
Standby Demand Charge, and the Excess Demand Charge, if any, at the following rates:
Standby Reservation Charge, per kW of Summer Non-summer
Available Standby Capacity
Primary Service $1.75 $1.58
Transmission Service $0.50 $0.33
Standby Demand Charge, per kW of
Standby Billing Demand
Primary Service $5.77 $4.91
Transmission Service $5.45 $4.64
Excess Demand Charge
$0.57 per kW times the sum of the daily Excess Demands recorded during the Billing Period,
plus $5.67 per kW for the highest Excess Demand recorded during the Billing Period. This
charge will not be prorated.
Minimum Charge
The monthly Minimum Charge shall be the sum of the Standby Reservation Charge, the
Standby Demand Charge, and the Excess Demand Charge.
CONTRIBUTION TOWARD MINIMUM CHARGES ON OTHER SCHEDULES
Any Standby Service Charges paid under this schedule shall not be considered in determining
the Minimum Charge under any other Company schedule.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Second Revised Sheet No. 46-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 First Revised Sheet No. 46-1
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order Nos. 31091, 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 46
ALTERNATE DISTRIBUTION
SERVICE
AVAILABILITY
Alternate Distribution Service under this schedule is available at points on the Company's inter-
connected system within the State of Idaho where existing facilities of adequate capacity and desired
phase and voltage are adjacent to the location where Alternate Distribution Service is desired, and where
additional investment by the Company for new distribution facilities is not necessary to supply the
requested service. When additional transmission or substation facilities are required, separate
arrangements will be made between the Customer and the Company.
Alternate Distribution Service is available only to Customers taking Primary Service under
Schedule 9 or 19.
AGREEMENT
Service shall be provided only after the Uniform Alternate Distribution Service Agreement is
executed by the Customer and the Company. The term of the initial agreement shall be dependent upon
the investment required by the Company to provide the Alternate Distribution Service, but shall in no
event be less than one year. The Uniform Alternate Distribution Service Agreement shall automatically
renew and extend each year, unless terminated under the provisions of the Agreement.
TYPE OF SERVICE
Alternate Distribution Service consists of a second distribution circuit to the Customer which backs
up the Customer's regular distribution circuit through an automatic switching device. Alternate
Distribution Service facilities include, but are not limited to, the automatic switching device and that
portion of the distribution substation and the distribution line required to provide the service. The kW of
Alternate Distribution Service capacity shall be specified in the Uniform Alternate Distribution Service
Agreement.
STANDARD OF SERVICE
The Alternate Distribution Service provided under this schedule is not an uninterruptible supply
and is subject to the same standard of service as provided under Rule J.
MONTHLY CHARGES
The Monthly Charge is the sum of the Capacity Charge and the Mileage Charge at the following
rates:
Capacity Charge
$1.39 per contracted kW of capacity
Mileage Charge
$.006 per kW per tenth of a mile in excess of 1.7 miles.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Second Revised Sheet No. 54-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 First Revised Sheet No. 54-2
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order No. 31081 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 54
FIXED COST ADJUSTMENT
(Continued)
ACTUAL FIXED COSTS RECOVERED AMOUNT
The Actual fixed costs Recovered amount is computed by multiplying the weather-normalized
energy load for Residential and Small General Service customers by the appropriate Residential and
Small General Service FCE rate.
FIXED COST ADJUSTMENT
The Fixed Cost Adjustment (FCA) is the difference between the Allowed Fixed Cost Recovery
Amount and the Actual Fixed Costs Recovered Amount divided by the estimated weather-normalized
energy load for the following year for Residential and Small General Service Customers.
The monthly Fixed Cost Adjustment for Residential Service (Schedules 1, 3, 4, and 5) is 0.1218
cents per kWh. The monthly Fixed Cost Adjustment for Small General Service (Schedule 7) is 0.1535
cents per kWh.
EXPIRATION
The Fixed Cost Adjustment included on this schedule will expire May 31, 2011.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary
Idaho Power Company Fourth Revised Sheet No. 55-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 55-1
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 31093 Gregory W. Said, General Manager, Regulatory Affairs
Effective – June 1, 2010 1221 West Idaho Street, Boise, ID
SCHEDULE 55
POWER COST ADJUSTMENT
APPLICABILITY
This schedule is applicable to the electric energy delivered to all Idaho retail Customers served
under the Company’s schedules and Special Contracts. These loads are referred to as "firm" load for
purposes of this schedule.
BASE POWER COST
The Base Power Cost of the Company's rates is computed by dividing the sum of the
Company's power cost components by firm kWh sales. The power cost components are segmented
into two categories; Category 1 and Category 2. Category 1 power costs include the sum of fuel
expense and purchased power expense (excluding purchases from cogeneration and small power
producers), less the sum of off-system surplus sales revenue and revenue from market-based special
contract pricing. Category 2 power costs include purchased power expense from cogeneration and
small power producers. The Base Power Cost is 1.5003 cents per kWh, which is comprised of Category
1 power costs of 1.0573 cents per kWh and Category 2 power costs of 0.4430 cents per kWh.
PROJECTED POWER COST
The Projected Power Cost is the Company estimate, expressed in cents per kWh, of the
Category 1 and Category 2 power cost components for the forecasted time period beginning April 1
each year and ending the following March 31. The Projected Power Cost is 1.6407 cents per kWh,
which is comprised of Category 1 power costs of 1.1892 cents per kWh and Category 2 power costs of
0.4515 cents per kWh.
TRUE-UP AND TRUE-UP OF THE TRUE-UP
The True-up is based upon the difference between the previous Projected Power Cost and the
power costs actually incurred. The True-up of the True-up is the difference between the previous
year’s approved True-Up revenues and actual revenues collected. The total True-up is 0.1710 cents
per kWh.
POWER COST ADJUSTMENT
The Power Cost Adjustment is the sum of: 1) 95 percent of the difference between the Projected
Power Costs in Category 1 and the Base Power Costs in Category 1; 2) 100 percent of the difference
between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2; and 3) the
True-ups.
The monthly Power Cost Adjustment applied to the Energy rate of all metered schedules and
Special Contracts is 0.3114 cents per kWh. The monthly Power Cost Adjustment applied to the per unit
charges of the nonmetered schedules is the monthly estimated usage times 0.3114 cents per kWh.
EXPIRATION
The Power Cost Adjustment included on this schedule will expire May 31, 2011.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2010 June 1, 2010
Per O.N. 31093, 31081, 31097, 31091
Jean D. Jewell Secretary