HomeMy WebLinkAbout20100316Tariff, Comparison.pdfBEFORE THE
Offí~lh;ï~'~:~~~~.'ISSjon
MAR 15 2010
Boise, Idaho
IDAHO PUBLIC UTiliTIES COMMISSION
CASE NO. IPC-E-10-06
IDAHO POWER COMPANY
ATTACHMENT NO.1
PROPOSED TARIFF
Idaho Power Company Fifth Revised Sheet No. 1-2
Cancels
Fourth Revised Sheet No. 1-2I.P.U.C. No. 29, Tariff No. 101
SCHEDULE 1
RESIDENTIAL SERVICE
(Continued)
RESIDENTIAL SPACE HEATING
All space heating equipment to be served by the Company's system shall be single-phase
equipment approved by Underwriters' Laboratories, Inc., and the equipment and its installation shall
conform to all National, State and Municipal Codes and to the following:
Individual resistance-type units for space heating larger than 1,650 watts shall be designed to
operate at 240 or 208 volts, and no single unit shall be larger than 6 kW. Heating units of 2 kW or
larger shall be controlled by approved thermostatic devices. When a group of heating units, with a total
capacity of more than 6 kW, is to be actuated by a single thermostat, the controllng switch shall be so
designed that not more than 6 kW can be switched on or off at anyone time. Supplemental resistance-
type heaters, that may be used with a heat exchanger, shall comply with the specifications listed above
for such units.
SUMMER AND NON-SUMMER SEASONS
The summer season begins on June 1 of each year and ends on August 31 of each year. The
non-summer season begins on September 1 of each year and ends on May 31 of each year.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
First 800 kWh
801-2000 kWh
All Additional kWh Over 2000
6.1257Ø
7.4634Ø
8.9558Ø
5.7199Ø
6.3555Ø
7.3087Ø
PAYMENT
The monthly bil rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No.
Effective - June 1, 2010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho Power Company Second Revised Sheet No. 3-2
Cancels
First Revised Sheet No. 3-2I.P.U.C. No. 29. Tariff No. 101
SCHEDULE 3
MASTER-METERED MOBILE HOME PARK
RESIDENTIAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit):
Service Charge, per month $4.00
Energy Charge, per kWh
all kWh 6.2429Ø
Minimum Charge
The monthly Minimum Charge shall be the sum of the Service Charge, the Energy Charge, and
the Power Cost Adjustment.
PAYMENT
The monthly bil rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No.
Effective - June 1, 2010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
Idaho Power Company Fourth Revised Sheet No. 4-3
Cancels
Third Revised Sheet No. 4-3I.P.U.C. No. 29. Tariff No. 101
SCHEDULE 4
RESIDENTIAL SERVICE
ENERGY WATCH PROGRAM
(OPTIONAL)
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Effciency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
Summer
Energy Watch Event hours
All other hours
Non-summer
First 800 kWh
801-2000 kWh
All Additional kWh Over 2000
20.0000ø n/a
6.3540Ø n/a
n/a 5.7199Ø
n/a 6.3555Ø
n/a 7.3087Ø
PAYMENT
The monthly bil rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No.
Effective - June 1, 2010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho Power Company Fourth Revised Sheet No. 5-3
Cancels
Third Revised Sheet No. 5-3I.P.U.C. No. 29, Tariff No. 101
SCHEDULE 5
RESIDENTIAL SERVICE
TIME-OF-DAY PROGRAM
(OPTIONAL)
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
Summer
On-Peak
Mid-Peak
Of-Peak
Non-summer
First 800 kWh
801-2000 kWh
All Additional kWh Over 2000
9.2217Ø n/a
6.7806Ø n/a
5.0855Ø n/a
n/a 5.7199Ø
n/a 6.3555Ø
n/a 7.3087Ø
PAYMENT
The monthly bil rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No.
Effective - June 1, 2010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho Power Company Fifth Revised Sheet No. 7-2
Cancels
Fourth Revised Sheet No. 7-2I.P.U.C. No. 29. Tariff No. 101
SCHEDULE 7
SMALL GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
First 300 kWh
All Additional kWh
7.1246Ø
8.4823Ø
7.1246Ø
7.5307Ø
PAYMENT
The monthly bil rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per Order No.
Effective - June 1, 2010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
Idaho Power Company Fifth Revised Sheet No. 9-4
Cancels
Fourth Revised Sheet No. 9-4I.P.U.C. No. 29. Tariff No. 101
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
MONTHLY CHARGE (Continued)
SECONDARY SERVICE Summer Non-summer
Service Charge, per month $12.55 $12.55
Basic Charge, per kW of Basic Load Capacity
First 20 kW
All Additional kW
$0.00
$0.68
$0.00
$0.68
Demand Charge, per kW of Billng Demand
First 20 kW
All Additional kW
$0.00
$4.00
$0.00
$3.20
Energy Charge, per kWh
First 2,000 kWh
All Additional kWh
7.8397Ø
3.3614Ø
6.9947Ø
2.9987Ø
Facilities Charge
None.
IDAHO
Issued Per Order No.
Effective - June 1, 2010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
Idaho Power Company Fourth Revised Sheet No. 24-3
Cancels
Third Revised Sheet No. 24-3I.P.U.C. No. 29, Tariff No. 101
SCHEDULE 24
AGRICULTURAL IRRIGATION
SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95
(Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy
Credit).
SECONDARY SERVICE In-Season Out-of-Season
Service Charge, per month
Demand Charge, per kW of
Billng Demand
$15.80
$ 4.92
$3.00
$0.00
Energy Charge
In-Season
First 164 kWh per kW of Demand
All Other kWh per kW of Demand
Out-of-Season
All kWh
4.0747Ø
3.9557Ø
n.a.
n.a.
n.a.4.9015Ø
Facilities Charge
None.
TRANSMISSION SERVICE In-Season Out-of-Season
Service Charge, per month $215.00 $3.00
Demand Charge, per kW of
Billng Demand
Energy Charge
In-Season
First 164 kWh per kW of Demand
All Other kWh per kW of Demand
Out-of-Season
All kWh
$ 4.61 $0.00
3.7814Ø
3.6713Ø
n.a.
n.a.
n.a.4.5486Ø
Facilities Charge
The Company's investment in Company-owned Facilties Beyond the Point of Delivery times 1.7
percent.
IDAHO
Issued Per IPUC Order No.
Effective - June 1, 2010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho Power Company Fifth Revised Sheet No. 41-4
Cancels
Fourth Sheet No. 41-4I.P.U.C. No. 29, Tariff No. 101
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
ENERGY-ONLY SERVICE
Energy-Only Service is available only to a metered lighting system. Service includes energy
supplied from the Company's overhead or underground circuits and does not include any maintenance
to the Customer's facilities.
A street lighting system receiving service under the Energy-Only Service offering is not eligible
to transfer to any street lighting service option under this schedule that includes maintenance provisions
to the Customer's facilities.
MONTHLY CHARGE
The monthly charges are as follows, and may also include charges as set forth in Schedule 55
(Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for
Municipal Franchise Fees).
Non-Metered Service (Wth Maintenance), per lamp
High Pressure
Sodium Vapor
70 Watt
100 Watt
200 Watt
250 Watt
400 Watt
Average
Lumens
5,450
8,550
19,BOO
24,750
45,000
Base
Rate
$3.24
$3.68
$5.11
$6.09
$8.45
Non-Metered Service - Variable Energy
Energy Charge, per kWh 5.7630Ø
Metered Service (With Maintenance), per lamp
High Pressure Sodium Vapor
70 Watt
100 Watt
200 Watt
250 Watt
400 Watt
Meter Charge, per meter
Energy Charge, per kWh
$2.09
$1.B5
$1.92
$1.85
$1.90
$8.45
5. 1 074Ø
Metered Energy-Only Service (No Maintenance)
Meter Charge, per meter
Energy Charge, per kWh
$B.45
5. 1 074Ø
IDAHO
Issued per Order No.
Effective - June 1, 2010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho Power Company First Revised Sheet No. 41-8
Cancels
Original Sheet No. 41-8I.P.U.C. No. 29. Tariff No. 101
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE
MONTHLY CHARGE (Continued)
Metered Service (With Maintenance) per lamp
Mercury Vapor
175 Watt
Energy Charge, per kWh
$1.93
$2.00
$8.45
5.1074Ø
400 Watt
Meter Charge, per meter
Metered Energy-Only Service (No Maintenance)
Meter Charge, per meter
Energy Charge, per kWh
$8.45
5. 1 074Ø
PAYMENT
The monthly bil rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued per Order No.
Effective - June 1, 2010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho Power Company Fourth Revised Sheet No. 42-1
Cancels
Third Revised Sheet No. 42-1I.P.U.C. No. 29, Tariff No. 101
SCHEDULE 42
TRAFFIC CONTROL SIGNAL
LIGHTING SERVICE
APPLICABI L1TY
Service under this schedule is applicable to Electric Service required for the operation of traffic
control signal lights within the State of Idaho. Traffic control signal lamps are mounted on posts or
standards by means of brackets, mast arms, or cable.
CHARACTER OF SERVICE
The traffic control signal fixtures, including posts or standards, brackets, mast arm, cable,
lamps, control mechanisms, fixtures, service cable, and conduit to the point of, and with suitable
terminals for, connection to the Company's underground or overhead distribution system, are installed,
owned, maintained and operated by the Customer. Service is limited to the supply of energy only for
the operation of traffic control signal lights.
The installation of a meter to record actual energy consumption is required for all new traffc
control signal lighting systems installed on or after June 1, 2004. For traffic control signal lighting
systems installed prior to June 1, 2004 a meter may be installed to record actual usage upon the
mutual consent of the Customer and the Company.
MONTHLY CHARGE
The monthly kWh of energy usage shall be either the amount estimated by the Company based
on the number and size of lamps burning simultaneously in each signal and the average number of
hours per day the signal is operated, or the actual meter reading as applicable. The Monthly Charge
shall be computed at the following rate, and may also include charges as set forth in Schedule 55
(Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for
Municipal Franchise Fees).
Energy Charge, per kWh 4.0078Ø
PAYMENT
The monthly bil rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No.
Effective - June 1, 2010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
BEFORE THE
Idaho PUblic Utilties Commi .
Office of the Secretary ssion
RECEIVED
MAR 15 2010
Boise, Idaho
IDAHO PUBLIC UTILITIES COMMISSION
CASE NO. IPC-E-10-06
IDAHO POWER COMPANY
ATTACHMENT NO.2
TARIFF IN LEGISLATIVE FORM.
Idaho Power Company FourthFifth Revised Sheet No. 1-2
Cancels
I.P.U.C. No. 29. Tariff No. 101 +RFourth Revised Sheet No. 1-2
SCHEDULE 1
RESIDENTIAL SERVICE
(Continued)
RESIDENTIAL SPACE HEATING
All space heating equipment to be served by the Company's system shall be single-phase
equipment approved by Underwriters' Laboratories, Inc., and the equipment and its installation shall
conform to all National, State and Municipal Codes and to the following:
Individual resistance-type units for space heating larger than 1,650 watts shall be designed to
operate at 240 or 20B volts, and no single unit shall be larger than 6 kW. Heating units of 2 kW or
larger shall be controlled by approved thermostatic devices. When a group of heating units, with a total
capacity of more than 6 kW, is to be actuated by a single thermostat, the controllng switch shall be so
designed that not more than 6 kW can be switched on or off at anyone time. Supplemental resistance-
type heaters, that may be used with a heat exchanger, shall comply with the specifications listed above
for such units.
SUMMER AND NON-SUMMER SEASONS
The summer season begins on June 1 of each year and ends on August 31 of each year. The
non-summer season begins on September 1 of each year and ends on May 31 of each year.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
First 800 kWh
801-2000 kWh
All Additional kWh Over 2000
6.001257Ø7.4334Ø
8.9455BØ
5.ê97199Ø6.~555Ø
7.2730B7Ø
PAYMENT
The monthly bil rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No. 30
Effective - June 1, 20Q910
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho Power Company FlSecond Revised Sheet No. 3-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 OriginalFirst Revised Sheet No. 3-2
SCHEDULE 3
MASTER-METERED MOBILE HOME PARK
RESIDENTIAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit):
Service Charge, per month $4.00
Energy Charge, per kWh
all kWh 6.-22429Ø
Minimum Charge
The monthly Minimum Charge shall be the sum of the Service Charge, the Energy Charge, and
the Power Cost Adjustment.
PAYMENT
The monthly bil rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No._~
Effective -June 1,20010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
Idaho Power Company +RFourth Revised Sheet No. 4-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 SecondThird Revised Sheet No. 4-3
SCHEDULE 4
RESIDENTIAL SERVICE
ENERGY WATCH PROGRAM
(OPTIONAL)
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
Summer
Energy Watch Event hours
All other hours
Non-summer
First 800 kWh
801-2000 kWh
All Additional kWh Over 2000
20.0000ø6.~540Ø n/a
n/a
n/a
n/a
n/a
5.~7199-Ø6.~555Ø7.~3087Ø
PAYMENT
The monthly bil rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No._~
Effective - June 1, 20Q910
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho Power Company +RFourth Revised Sheet No. 5-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 SecondThird Revised Sheet No. 5-3
SCHEDULE 5
RESIDENTIAL SERVICE
TIME-OF-DAY PROGRAM
(OPTIONAL)
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
Summer
On-Peak
Mid-Peak
Off-Peak
Non-summer
First 800 kWh
801-2000 kWh
All Additional kWh Over 2000
9.482217Ø6.7~06Ø5.0055Ø
n/a
n/a
n/a
n/a
n/a
n/a
5.ê97199Ø6.~555Ø
7.i+3087Ø
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No._~
Effective - June 1, 20G91Q
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho Power Company FourthFifth Revised Sheet No. 7-2
Cancels
I.P.U.C. No. 29. Tariff No. 101 +RFourth Revised Sheet No. 7-2
SCHEDULE 7
SMALL GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
First 300 kWh
All Additional kWh
7.001246Ø
8.4-823Ø
7.001246Ø
7.495307Ø
PAYMENT
The monthly bil rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per Order No._~
Effective -June 1,20010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
Idaho Power Company FourthFifth Revised Sheet No. 9-4
Cancels
I.P.U.C. No. 29, Tariff No. 101 +RFourth Revised Sheet No. 9-4
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
MONTHLY CHARGE (Continued)
SECONDARY SERVICE Summer Non-summer
Service Charge, per month $12.5G§$12.5G§
Basic Charge, per kW of Basic Load Capacity
First 20 kW
All Additional kW
$0.00
$0.68
$0.00
$0.68
Demand Charge, per kW of Billing Demand
First 20 kW
All Additional kW
$0.00~.OO $0.00
$3A-920
Energy Charge, per kWh
First 2,000 kWh
All Additional kWh
7.-S397Ø
3.-33614Ø
6.-99947 Ø2.~9987Ø
Facilities Charge
None.
IDAHO
Issued Per Order No._~
Effective -June 1,20010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
Idaho Power Company +RFourth Revised Sheet No. 24-3
Cancels
I.P.U.C. No. 29, Tariff No. 101SeGondThird Revised Sheet No. 24-3
SCHEDULE 24
AGRICULTURAL IRRIGATION
SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), Schedule 95
(Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy
Credit).
SECONDARY SERVICE In-Season Out-of-Season
Service Charge, per month
Demand Charge, per kW of
Biling Demand
$15.+á0
$ 4.9Q~
$3.00
$0.00
Energy Charge
In-Season
First 164 kWh per kW of Demand
All Other kWh per kW of Demand
Out-of-Season
All kWh
4.0ã747Ø3.~557Ø n.a.
n.a.
n.a.4.ßS9015Ø
Facilities Charge
None.
TRANSMISSION SERVICE In-Season Out-of-Season
Service Charge, per month $215.00 $3.00
Demand Charge, per kW of
Biling Demand
Energy Charge
In-Season
First 164 kWh per kW of Demand
All Other kWh per kW of Demand
Out-of-Season
All kWh
$ 4.61 $0.00
3.7814Ø
3.6713Ø
n.a.
n.a.
n.a.4.5486Ø
Facilities Charge
The Company's investment in Company-owned Facilities Beyond the Point of Delivery times 1.7
percent.
IDAHO
Issued Per IPUC Order NO._30829
Effective - June 1, 20(;10
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho Power Company FourthFifth Revised Sheet No. 41-4
Cancels
+RFourth Sheet No. 41-4I.P.U.C. No. 29, Tariff No. 101
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
ENERGY-ONLY SERVICE
Energy-Only Service is available only to a metered lighting system. Service includes energy
supplied from the Company's overhead or underground circuits and does not include any maintenance
to the Customer's facilities.
A street lighting system receiving service under the Energy-Only Service offering is not eligible
to transfer to any street lighting service option under this schedule that includes maintenance provisions
to the Customer's facilities.
MONTHLY CHARGE
The monthly charges are as follows, and may also include charges as set forth in Schedule 55
(Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for
Municipal Franchise Fees).
Non-Metered Service (With Maintenance), per lamp
High Pressure
Sodium Vapor
70 Watt
100 Watt
200 Watt
250 Watt
400 Watt
Average
Lumens
5,450
8,550
19,800
24,750
45,000
Base
Rate
$3.24
$3.68
$5.11
$6.09
$8.45
Non-Metered Service - Variable Energy
Energy Charge, per kWh 5.7630Ø
Metered Service (With Maintenance), per lamp
High Pressure Sodium Vapor
70 Watt
100 Watt
200 Watt
250 Watt
400 Watt
Meter Charge, per meter
Energy Charge, per kWh
$2.09
$1.85
$1.92
$1.85
$1.90
$8.45
5.Q81074Ø
Metered Energy-Only Service (No Maintenance)
Meter Charge, per meter
Energy Charge, per kWh
$8.45
5.Q81074Ø
IDAHO
Issued per Order No. September 2, 200Q
Effective - _No'/emberJune 1, 20010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho Power Company First Revised Sheet No. 41-8
Cancels
Original Sheet No. 41-8I.P.U.C. No. 29, Tariff No. 101
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE
MONTHLY CHARGE (Continued)
Metered Service (With Maintenance) per lamp
Mercury Vapor
175 Watt
Energy Charge, per kWh
$1.93
$2.00
$8.45
4.Q8105.1074Ø
400 Watt
Meter Charge, per meter
Metered Energy-Only Service (No Maintenance)
Meter Charge, per meter
Energy Charge, per kWh
$8.45
5.Q81074Ø
PAYMENT
The monthly bil rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued September 2, 200Qper Order No.
Effective - NovemberJune 1, 20010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho Power Company +RFourth Revised Sheet No. 42-1
Cancels
I.P.U.C. No. 29, Tariff No. 101SesondThird Revised Sheet No. 42-1
SCHEDULE 42
TRAFFIC CONTROL SIGNAL
LIGHTING SERVICE
APPLICABILITY
Service under this schedule is applicable to Electric Service required for the operation of traffic
control signal lights within the State of Idaho. Traffic control signal lamps are mounted on posts or
standards by means of brackets, mast arms, or cable.
CHARACTER OF SERVICE
The traffic control signal fixtures, including posts or standards, brackets, mast arm, cable,
lamps, control mechanisms, fixtures, service cable, and conduit to the point of, and with suitable
terminals for, connection to the Company's underground or overhead distribution system, are installed,
owned, maintained and operated by the Customer. Service is limited to the supply of energy only for
the operation of traffic control signal lights.
The installation of a meter to record actual energy consumption is required for all new traffic
control signal lighting systems installed on or after June 1, 2004. For traffic control signal lighting
systems installed prior to June 1, 2004 a meter may be installed to record actual usage upon the
mutual consent of the Customer and the Company.
MONTHLY CHARGE
The monthly kWh of energy usage shall be either the amount estimated by the Company based
on the number and size of lamps burning simultaneously in each signal and the average number of
hours per day the signal is operated, or the actual meter reading as applicable. The Monthly Charge
shall be computed at the following rate, and may also include charges as set forth in Schedule 55
(Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for
Municipal Franchise Fees).
Energy Charge, per kWh 3.QQ164.0078Ø
PAYMENT
The monthly bil rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No._~
Effective - June 1,20010
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho PU~lic Utiities Commission
Office of the Secretary
RECEIVED
MAR 15 2010
BEFORE THE Boise, Idaho
IDAHO PUBLIC UTILITIES COMMISSION
CASE NO. IPC-E-10-06
IDAHO POWER COMPANY
ATTACHMENT NO.3
COMPARISON OF REVENUES
cii:
=ei:::
LL
.. i~ ii~ Q. ~i:E ..oil- 't..Q. CD CD 0
E :: 0 iJ C'
o i:.i il .o ~ ~ Q.~'-&,- E.i;.. õ;'l:
00 CD:¡ ~D.i:'1U..0'" I! 'tO._rn._ CD.i'1 c_il_ uiLL
:E B .!ii ilo CD.iUrn
~
CDUl
~ :gÆ ~~æ.si6CD .c CD 2D.OUlu.IIai
~ ~~ ..æ
't CDQ) Q) ::Ul Ul c:o II Q)
1ai æ
.l
- i6 il ~SEIlC:oûíai~
I- :: 0 &,~-
iJ
l!
.E
!li:
~
Õ
~II
E
E::rn
~ ~~ ..æ
~ Q) ~CD Ul c:
t: co Q)
8 ai æ
~ ~;:¡:= ClII .. .cE ~ s:5 W -"Z
Q) 'õ-~CJ '-0)
!!.8 E~ § .soc z g¡o
~~ ~I
~ ~I
I
,*èf'è'è';*,,*?f'#'g~..o..............oz oz oz oz oz oz oz oz oz oz0000000000
CIoz....ozozO..CICOC'(!C"....('I"..oco
cO N ir ir e' ci e' cO 0 ciCOCOCOCOClozlOlOozlO
O..O..NCOIO..CIO.. CI (J oz CI (J 10 oz .. CINIO..O(JO(JIOCIozci .. ri ci ai Ñ .. ri ci ciozOIO....(J..IOCOCIIOC"~~..C"(J....C"ci~ riai..~~ÑC" ..ozCl CIC" ~..~ 10~ ~ ~
..NozCO..(JCI..OOoilO....CO("CONLO..C"NNC"..CICICOCO(Jci.,~~iô..iô~~..C"~ 10010 10C" ~co C" C";; ~~ ~
..(JIOIOOozClozNNo C" (J CI CI .. oz (J (J cocON....Ncie'ircrciCOCOCOCOClozlOlOC"1O
NIOCOIO....COO..(JNC"..NOIOCONCOCO(JC"(J..NNO(J..IOaicôÑ"'"""'aiÑcici00 10"' NCI 1010 COC"NC"~~....IO....0ai~ rici"'~~ciN ..ozCl CIM lR .. tl U'~ ~ ~
....ozozcl..(JC"C"coen .. .(t (0 co "' ..N .. LO(J 0 (0 L( .. co .. LC co ..
cô ci iô ci ri iô ., ri Ñ ciOO....()It(tO)(t..(WC"(JCI....ozO..OC".... "'iôci"'Ñ""""CI co (J C" (J(J .. 0 co CIot C" or 0)
..N..CIozCO(JN..OCIN 10.... C".. C" 00CI NCIC"..C"(Jri ci ci cô ai(J NC".. coC" oz
enrn:!N..C"ozlO..(J~~oz
iu
~
~
l
~
!!
il
ii.2
~
!!
~
Egc:::
~ .c
il ~ ¡;
Q) ;; C
g ~ 'É:i ei di ~
~Æ~8-g '~UlCD 0 8 8 '2: 8 ~ 1:!E.2 :! .- .- Q) CD ~ Cl iu
~"C ~ ~enrn c: ::i-~ ~~~~~ 8 gi"e E
7u"Q"ieÜ.:g ~~Eë 0;~+::¡ Q) CD O)O~c: c: c: (! (! g :: () c:Q)~CDQ) .__u::~ë;~~=æ~~:SE~Q)mQ)Q)Ecu.~~~o
0: :! 0: 0: en .. -= en I- I-Q)c:::..
..oN
¡;
¡;:!
o..oN
..NC"ozIOCO..CI(J~~..
Id
a
h
o
P
o
w
e
r
C
o
m
p
a
n
y
Ca
l
c
u
l
a
t
i
o
n
o
f
R
e
v
e
n
u
e
I
m
p
a
c
t
St
a
t
e
o
f
I
d
a
h
o
Ra
t
e
S
c
h
e
d
u
l
e
s
D
i
r
e
c
t
l
y
I
m
p
a
c
t
e
d
b
y
A
M
I
F
u
n
d
i
n
g
Fi
l
e
d
M
a
r
c
h
1
5
,
2
0
1
0
Su
m
m
a
r
y
o
f
R
e
v
e
n
u
e
I
m
p
a
c
t
To
t
a
l
Pe
r
c
e
n
t
Ra
t
e
Av
e
r
a
g
e
No
r
m
a
l
i
z
e
d
Cu
r
r
e
n
t
Ad
j
u
s
t
m
e
n
t
s
Pr
o
p
o
s
e
d
Ch
a
n
g
e
Li
n
e
Sc
h
.
Nu
m
b
e
r
o
f
En
e
r
g
y
Bi
l
e
d
Mi
l
s
to
B
i
l
e
d
To
t
a
l
B
i
l
e
d
Mi
l
s
Bi
l
e
d
t
o
B
i
l
l
e
d
No
Ta
r
i
f
f
D
e
s
c
r
i
p
t
i
o
n
No
.
Cu
s
t
o
m
e
r
s
(
1
(k
W
h
)
(
1
)
Re
v
e
n
u
e
Pe
r
kW
h
Re
v
e
n
u
e
Re
v
e
n
u
e
Pe
r
k
W
h
Re
v
e
n
u
e
Un
i
f
o
r
m
T
a
r
i
f
f
R
a
t
e
s
:
1
Re
s
i
d
e
n
t
i
a
l
S
e
r
v
i
c
e
1
39
3
,
8
8
1
4,
9
8
7
,
3
8
6
,
9
9
1
$4
1
7
,
4
1
8
,
8
6
1
83
.
6
9
$1
,
4
0
1
,
9
1
9
$4
1
8
,
8
2
0
,
7
8
0
83
.
9
8
0.
3
4
%
2
Ma
s
t
e
r
M
e
t
e
r
e
d
M
o
b
i
l
e
H
o
m
e
P
a
r
k
3
22
4,
9
1
0
,
0
7
7
$3
9
2
,
3
3
3
79
.
9
0
$1
,
3
1
2
$3
9
3
,
6
4
4
80
.
1
7
0.
3
3
%
3
Re
s
i
d
e
n
t
i
a
l
S
e
r
v
i
c
e
E
n
e
r
g
y
W
a
t
c
h
4
51
81
5
,
6
3
4
$6
7
,
3
6
1
82
.
5
9
$2
2
5
$6
7
,
5
8
5
82
.
8
6
0.
3
3
%
4
Re
s
i
d
e
n
t
i
a
l
S
e
r
v
i
c
e
T
i
m
e
-
o
f
-
D
a
y
5
78
1,
1
9
8
,
5
6
4
$9
8
,
8
5
7
82
.
4
8
$3
3
1
$9
9
,
1
8
8
82
.
7
6
0.
3
3
%
5
Sm
a
l
l
G
e
n
e
r
a
l
S
e
r
v
i
c
e
7
28
,
2
1
4
16
5
,
7
5
3
,
1
8
8
$1
6
,
7
8
7
,
9
7
5
10
1
.
2
8
$5
8
,
4
3
1
$1
6
,
8
4
6
,
0
6
10
1
.
6
4
0.
3
5
%
6
La
r
g
e
G
e
n
e
r
a
l
S
e
c
o
n
d
a
r
y
9S
30
,
8
3
6
3,
0
9
0
,
4
3
5
,
8
4
7
$1
9
9
,
1
8
8
,
7
4
3
64
.
4
5
$6
3
3
,
5
6
9
$1
9
9
,
8
2
2
,
3
1
2
64
.
6
6
0.
3
2
%
7
Ir
r
i
g
a
t
i
o
n
S
e
c
o
n
d
a
r
y
24
S
16
,
3
7
9
1,
6
3
7
,
0
9
1
,
7
1
9
$1
1
4
,
6
7
3
,
4
2
2
70
.
0
5
$3
7
2
,
7
9
3
$1
1
5
,
0
4
6
,
2
1
5
70
.
2
7
0.
3
3
%
8
St
r
e
e
t
L
i
g
h
t
i
n
g
41
M
13
2
2,
7
3
3
,
5
2
3
$1
9
8
,
5
1
3
72
.
6
2
$6
5
0
$1
9
9
,
1
6
4
72
.
8
6
0.
3
3
%
9
Tr
a
f
f
c
C
o
n
t
r
o
l
L
i
g
h
t
i
n
g
42
30
7
4,
0
1
2
,
6
1
3
$2
2
4
,
0
4
0
55
.
8
3
$6
8
1
$2
2
4
,
7
2
1
56
.
0
0
0.
3
0
%
10
To
t
a
l
U
n
i
f
o
r
m
T
a
r
i
f
f
s
46
9
,
9
0
0
9,
8
9
4
,
3
3
8
,
1
5
6
$7
4
9
,
0
5
0
,
1
0
5
75
.
7
0
$2
,
4
6
9
,
9
1
1
$7
5
1
,
5
2
0
,
0
1
6
75
.
9
5
0.
3
3
%
(1
)
J
u
n
e
1
,
2
0
1
0
-
M
a
y
3
1
,
2
0
1
1
F
o
r
e
c
a
s
t
e
d
T
e
s
t
Y
e
a
r