HomeMy WebLinkAbout20090512notice_of_application_order_no_30804.pdfOffice ofthe Secretary
Service Date
May 12, 2009
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF IDAHO POWER CASE NO. IPC-09-
COMPANY'S APPLICATION SEEKING
AUTHORITY TO IMPLEMENT NOTICE OF APPLICATION
COMMERCIAL AIR CONDITIONER
CYCLING PILOT PROGRAM NOTICE OF
MODIFIED PROCEDURE
ORDER NO. 30804
NOTICE OF APPLICATION
YOU ARE HEREBY NOTIFIED that on April 16, 2009, Idaho Power Company
Idaho Power" or "Company ) filed an Application with the Commission, pursuant to Idaho
Code ~~ 61-502, 61-507, 61-508 and Commission Rules of Procedure 52, seeking authority to
implement a Commercial Air Conditioner (AC) Cycling Pilot Program ("Program
YOU ARE FURTHER NOTIFIED that Idaho Power s Application describes the
Program as directed toward small commercial customers; similar to its Schedule 81 residential
air conditioner cycling program; and developed in response to numerous inquiries and requests
from its small commercial customers.
YOU ARE FURTHER NOTIFIED that participation in the Program will be extended
to Schedule 7 and Schedule 9 secondary customers in Ada and Canyon Counties with a base load
capacity under 200 kW.
YOU ARE FURTHER NOTIFIED that, under the terms and conditions of the
Program, Idaho Power retains discretion as to whether to select or reject Program participants.
Participating commercial customers can elect to either: (1) install a direct load control device
Device ) similar to the one used in the residential program; or (2) install a Programmable
Controllable Thermostat ("PCT") which allows the Company to initiate AC cycling.
YOU ARE FURTHER NOTIFIED that the Program will run for two air conditioning
seasons (June, July, and August) in order to allow the Company to obtain sufficient data and
operational information to evaluate and make a determination as to whether to offer a full-scale
commercial program in the future. The Company envisions that the Program could potentially
address its "summer peaking requirements" by reducing commercial AC use during the summer
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 30804
peaking period. Additionally, the PCT may help reduce overall energy use which could result in
potential savings to all of the Company s customers.
YOU ARE FURTHER NOTIFIED that Idaho Power will have the capability to
initiate a cycling event by sending a radio/paging signal to the PCT or Device. A power line
carrier ("PLC"signal will be used for customers with installed Advanced Metering
Infrastructure ("AMI"). The radio/paging signal system will eventually be replaced by a PLC
system as AMI installation is completed or the paging type switches require service. Cycling
events may last up to four hours, continuous or in various segments, per day during the June-
August AC season. Cycling events are limited to a total of 40 hours each month and 120 hours
per AC season.Compensation for Program participation will consist of a $7.00 monthly
payment for Device participants and the receipt of a PCT for PCT participants.
YOU ARE FURTHER NOTIFIED that Idaho Power requests that the costs of the
Program be paid by the Energy Efficiency Rider funds collected under Schedule 91. The
Company estimates that the costs for the Program will be approximately $325 500 for 2009 and
$340 800 for 2010. In the Application, Idaho Power estimates that due to increased installation
costs, as compared to the Residential AC Cycling Program, the commercial Program is not cost-
effective at this point in time. However, the Company also believes that the Program could
become cost-effective if the average load reduction of at least 2 k W is achieved at a 50% cycling
rate.
YOU ARE FURTHER NOTIFIED that Idaho Power will acquire data regarding the
Program s potential to reduce peak load by installing data loggers on a sample of pilot
participants. The Company will also solicit and evaluate data regarding customer preference
level of comfort and overall satisfaction with the Program.
YOU ARE FURTHER NOTIFIED that Idaho Power s Application includes, as
Attachment No., a copy of a proposed new tariff Schedule 82 which includes: (1) a detailed
description of the Program, (2) terms and conditions for Program participation, and (3)
procedures for withdrawal from Program participation.
NOTICE OF MODIFIED PROCEDURE
YOU ARE FURTHER NOTIFIED that the Commission has determined that the
public interest may not require a formal hearing in this matter and will proceed under Modified
Procedure pursuant to Rules 201 through 204 of the Idaho Public Utilities Commission s Rules
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 30804
of Procedure IDAPA 31.01.01.201 through .204.The Commission notes that Modified
Procedure and written comments have proven to be an effective means for obtaining public input
and participation.
YOU ARE FURTHER NOTIFIED that any person desiring to state a position on this
Application may file a written comment in support or opposition with the Commission within 28
days from the service date of this Notice. The comment must contain a statement of reasons
supporting the comment. Persons desiring a hearing must specifically request a hearing in their
written comments.Written comments concerning this Application shall be mailed to the
Commission and Idaho Power at the addresses reflected below:
Commission Secretary
Idaho Public Utilities Commission
PO Box 83720
Boise, ID 83720-0074
Street Address for Express Mail:
Barton L. Kline
Donovan E. Walker
Idaho Power Company
PO Box 70
Boise, Idaho 83707-0070
E-mail: bkline((i)idahopower.com
dwalker~idahopower .com
472 W. Washington Street
Boise, ID 83702-5918 Darlene N emnich
Greg Said
Idaho Power Company
PO Box 70
Boise, Idaho 83707-0070
E-mail: dnemnich~idahopower.com
gsaid((i)idah opo wer. co m
These comments should contain the case caption and case number shown on the first page of this
document.Persons desiring to submit comments via e-mail may do so by accessing the
Commission s home page located at www.puc.idaho.gov. Click the "Comments and Questions
icon, and complete the comment form, using the case number as it appears on the front of this
document. These comments must also be sent to Idaho Power at the e-mail addresses listed
above.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are
received within the time limit set, the Commission will consider this matter on its merits and
enter its Order without a formal hearing. If written comments are received within the time limit
set, the Commission will consider them and, in its discretion, may set the same for formal
hearing.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 30804
YOU ARE FURTHER NOTIFIED that the Application has been filed with the
Commission and is available for public inspection during regular business hours at the
Commission offices. The Application is also available on the Commission s Web site at
www.puc.idaho.gov by clicking on "File Room" and then "Electric Cases.
YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held
pursuant to the Commission s jurisdiction under Title 6l of the Idaho Code and specifically
Idaho Code ~~ 61-524. The Commission may enter any final Order consistent with its authority
under Title 61.
YOU ARE FURTHER NOTIFIED that all proceedings in this matter will be
conducted pursuant to the Commission s Rules of Procedure, IDAPA 31.01.01.000 et seq.
ORDER
IT IS HEREBY ORDERED that this Application will be processed under Modified
Procedure. Persons interested in submitting written comments regarding this case or protesting
the use of Modified Procedure should do so no later than 28 days from the service date of this
Order.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 30804
DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this J!).
T4.
day of May 2009.
g ~~
1M D. KEMP SIDENT
---
MARSHA H. SMITH, COMMISSIONER
"""
MACK A. REDFORD, COMM lONER
ATTEST:
Commission Secretary
O:IPC-09-
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 30804