Re:Compliance Filing for:
Case No.IPC-E-09-05, Order No. 30814
Case No.IPC-E-09-06, Order No. 30827
Case No.IPC-E-09-07, Order No. 30829
Case No.IPC-E-09-11, Order No. 30828
Dear Ms. Jewell:
Pursuant to Commission Order Nos.30814, 30827, 30829,and 30828, transmitted
for filing are Idaho Power Company’s revised tariff sheets in conformance with the
Commission’s Orders.The Company requests the tariff sheets become effective June 1,
2009:
Effective June 1, 2009
Schedule 1........................Fourth Revised Sheet No.1-2
Schedule 3........................First Revised Sheet No.3-2
Schedule 4........................Third Revised Sheet No.4-3
Schedule 5........................Third Revised Sheet No.5-3
Schedule 7........................Fourth Revised Sheet No.7-2
Schedule 9........................Fourth Revised Sheet No. 9-4
Schedule 24......................Third Revised Sheet No.24-3
Schedule 41......................Third Revised Sheets Nos. 41-4 and 41-7
Schedule 42......................Third Revised Sheet No. 42-1
Schedule 54......................First Revised Sheet No.54-2
Schedule 55......................Third Revised Sheet No.55-1
Schedule 91......................Third Revised Sheet No.91-1
RECEIVED
2009 June 1 AM 10:34
IDAHO PUBLIC
UTILITIES COMMISSION
Jean D. Jewell, Secretary
June 1, 2009
Page 2
If you have any questions regarding this compliance filing, please contact Mike
Youngblood at 388-2882 or Tim Tatum at 388-5515.
I would appreciate it if you would return via electronically a stamped copy of this
letter for my file.
Very truly yours,
Barton L. Kline
BLK:csb
Enclosures
Idaho Power Company Fourth Revised Sheet No. 1-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 1-2
IDAHO Issued by IDAHO POWER COMPANY
Issued Per IPUC Order No.30829 John R. Gale, Vice President, Regulatory Affairs
Effective –June 1, 2009 1221 West Idaho Street, Boise, ID
SCHEDULE 1
RESIDENTIAL SERVICE
(Continued)
RESIDENTIAL SPACE HEATING
All space heating equipment to be served by the Company's system shall be single-phase
equipment approved by Underwriters' Laboratories, Inc., and the equipment and its installation shall
conform to all National, State and Municipal Codes and to the following:
Individual resistance-type units for space heating larger than 1,650 watts shall be designed to
operate at 240 or 208 volts, and no single unit shall be larger than 6 kW. Heating units of 2 kW or
larger shall be controlled by approved thermostatic devices. When a group of heating units, with a total
capacity of more than 6 kW, is to be actuated by a single thermostat, the controlling switch shall be so
designed that not more than 6 kW can be switched on or off at any one time. Supplemental resistance-
type heaters, that may be used with a heat exchanger, shall comply with the specifications listed above
for such units.
SUMMER AND NON-SUMMER SEASONS
The summer season begins on June 1 of each year and ends on August 31 of each year. The
non-summer season begins on September 1 of each year and ends on May 31 of each year.
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
First 800 kWh 6.0994¢5.6953¢
801-2000 kWh 7.4313¢6.3282¢
All Additional kWh Over 2000 8.9177¢7.2774¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2009 June 1, 2009
Per O.N. 30828 & 30829
Jean D. Jewell Secretary
Idaho Power Company First Revised Sheet No. 3-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Original Sheet No. 3-2
IDAHO Issued by IDAHO POWER COMPANY
Issued Per IPUC Order No.30829 John R. Gale, Vice President, Regulatory Affairs
Effective –June 1,2009 1221 West Idaho Street, Boise, Idaho
SCHEDULE 3
MASTER-METERED MOBILE HOME PARK
RESIDENTIAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit):
Service Charge, per month $4.00
Energy Charge, per kWh
all kWh 6.2174¢
Minimum Charge
The monthly Minimum Charge shall be the sum of the Service Charge, the Energy Charge, and
the Power Cost Adjustment.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2009 June 1, 2009
Per O.N. 30828 & 30829
Jean D. Jewell Secretary
Idaho Power Company Third Revised Sheet No. 4-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Second Revised Sheet No. 4-3
IDAHO Issued by IDAHO POWER COMPANY
Issued Per IPUC Order No.30829 John R. Gale, Vice President, Regulatory Affairs
Effective –June 1, 2009 1221 West Idaho Street, Boise, ID
SCHEDULE 4
RESIDENTIAL SERVICE
ENERGY WATCH PROGRAM
(OPTIONAL)
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
Summer
Energy Watch Event hours 20.0000¢n/a
All other hours 6.3281¢n/a
Non-summer
First 800 kWh n/a 5.6953 ¢
801-2000 kWh n/a 6.3281¢
All Additional kWh Over 2000 n/a 7.2774¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2009 June 1, 2009
Per O.N. 30828 & 30829
Jean D. Jewell Secretary
Idaho Power Company Third Revised Sheet No. 5-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Second Revised Sheet No. 5-3
IDAHO Issued by IDAHO POWER COMPANY
Issued Per IPUC Order No.30829 John R. Gale, Vice President, Regulatory Affairs
Effective –June 1, 2009 1221 West Idaho Street, Boise, ID
SCHEDULE 5
RESIDENTIAL SERVICE
TIME-OF-DAY PROGRAM
(OPTIONAL)
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
Summer
On-Peak 9.1840¢n/a
Mid-Peak 6.7529¢n/a
Off-Peak 5.0647¢n/a
Non-summer
First 800 kWh n/a 5.6953¢
801-2000 kWh n/a 6.3281¢
All Additional kWh Over 2000 n/a 7.2774¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2009 June 1, 2009
Per O.N. 30828 & 30829
Jean D. Jewell Secretary
Idaho Power Company Fourth Revised Sheet No. 7-2
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 7-2
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order No.30829 John R. Gale, Vice President, Regulatory Affairs
Effective –June 1, 2009 1221 West Idaho Street, Boise, Idaho
SCHEDULE 7
SMALL GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 54 (Fixed Cost Adjustment), Schedule 55 (Power Cost Adjustment), Schedule 91
(Energy Efficiency Rider), Schedule 95 (Adjustment for Municipal Franchise Fees), and Schedule 98
(Residential and Small Farm Energy Credit).
Summer Non-summer
Service Charge, per month $4.00 $4.00
Energy Charge, per kWh
First 300 kWh 7.0926¢7.0926¢
All Additional kWh 8.4442¢7.4969¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2009 June 1, 2009
Per O.N. 30828 & 30829
Jean D. Jewell Secretary
Idaho Power Company Fourth Revised Sheet No. 9-4
Cancels
I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 9-4
IDAHO Issued by IDAHO POWER COMPANY
Issued Per Order No.30829 John R. Gale, Vice President, Regulatory Affairs
Effective –June 1, 2009 1221 West Idaho Street, Boise, Idaho
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
MONTHLY CHARGE (Continued)
SECONDARY SERVICE Summer Non-summer
Service Charge, per month $12.50 $12.50
Basic Charge, per kW of Basic Load Capacity
First 20 kW $0.00 $0.00
All Additional kW $0.68 $0.68
Demand Charge, per kW of Billing Demand
First 20 kW $0.00 $0.00
All Additional kW $3.99 $3.19
Energy Charge, per kWh
First 2,000 kWh 7.8065¢6.9648¢
All Additional kWh 3.3463¢2.9852¢
Facilities Charge
None.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2009 June 1, 2009
Per O.N. 30828 & 30829
Jean D. Jewell Secretary
Idaho Power Company Third Revised Sheet No. 24-3
Cancels
I.P.U.C. No. 29, Tariff No. 101 Second Revised Sheet No. 24-3
IDAHO Issued by IDAHO POWER COMPANY
Issued Per IPUC Order No.30829 John R. Gale, Vice President, Regulatory Affairs
Effective –June 1, 2009 1221 West Idaho Street, Boise, ID
SCHEDULE 24
AGRICULTURAL IRRIGATION
SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider),Schedule 95
(Adjustment for Municipal Franchise Fees), and Schedule 98 (Residential and Small Farm Energy
Credit).
SECONDARY SERVICE In-Season Out-of-Season
Service Charge, per month $15.75 $3.00
Demand Charge, per kW of
Billing Demand $4.90 $0.00
Energy Charge
In-Season
First 164 kWh per kW of Demand 4.0581¢n.a.
All Other kWh per kW of Demand 3.9397 ¢n.a.
Out-of-Season
All kWh n.a.4.8811¢
Facilities Charge
None.
TRANSMISSION SERVICE In-Season Out-of-Season
Service Charge, per month $215.00 $3.00
Demand Charge, per kW of
Billing Demand $ 4.61 $0.00
Energy Charge
In-Season
First 164 kWh per kW of Demand 3.7814¢n.a.
All Other kWh per kW of Demand 3.6713¢n.a.
Out-of-Season
All kWh n.a.4.5486¢
Facilities Charge
The Company’s investment in Company-owned Facilities Beyond the Point of Delivery times 1.7
percent.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2009 June 1, 2009
Per O.N. 30828 & 30829
Jean D. Jewell Secretary
Idaho Power Company Third Revised Sheet No. 41-4
Cancels
I.P.U.C. No. 29, Tariff No. 101 Second Revised Sheet No. 41-4
IDAHO Issued by IDAHO POWER COMPANY
Issued Per IPUC Order No.30829 John R. Gale, Vice President, Regulatory Affairs
Effective –June 1, 2009 1221 West Idaho Street, Boise, ID
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
MONTHLY CHARGE (Continued)
Non-Metered Service (With Maintenance), per lamp
High Pressure Average Base
Sodium Vapor Lumens Rate
70 Watt 5,450 $3.24
100 Watt 8,550 $3.68
200 Watt 19,800 $5.11
250 Watt 24,750 $6.09
400 Watt 45,000 $8.45
Metered Service (With Maintenance), per lamp
High Pressure Sodium Vapor
70 Watt $2.09
100 Watt $1.85
200 Watt $1.92
250 Watt $1.85
400 Watt $1.90
Meter Charge, per meter $8.45
Energy Charge, per kWh 5.0847¢
Metered Energy-Only Service (No Maintenance)
Meter Charge, per meter $8.45
Energy Charge, per kWh 5.0847¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2009 June 1, 2009
Per O.N. 30828 & 30829
Jean D. Jewell Secretary
Idaho Power Company Third Revised Sheet No. 41-7
Cancels
I.P.U.C. No. 29, Tariff No. 101 Second Revised Sheet No. 41-7
IDAHO Issued by IDAHO POWER COMPANY
Issued Per IPUC Order No.30829 John R. Gale, Vice President, Regulatory Affairs
Effective –June 1, 2009 1221 West Idaho Street, Boise, ID
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE
MONTHLY CHARGE (Continued)
Metered Service (With Maintenance), per lamp
Mercury Vapor
175 Watt $1.93
400 Watt $2.00
Meter Charge, per meter $8.45
Energy Charge, per kWh 4.9810¢
Metered Energy-Only Service (No Maintenance)
Meter Charge, per meter $8.45
Energy Charge, per kWh 5.0847¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2009 June 1, 2009
Per O.N. 30828 & 30829
Jean D. Jewell Secretary
Idaho Power Company Third Revised Sheet No. 42-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Second Revised Sheet No.42-1
IDAHO Issued by IDAHO POWER COMPANY
Issued Per IPUC Order No.30829 John R. Gale, Vice President, Regulatory Affairs
Effective –June 1, 2009 1221 West Idaho Street, Boise, ID
SCHEDULE 42
TRAFFIC CONTROL SIGNAL
LIGHTING SERVICE
APPLICABILITY
Service under this schedule is applicable to Electric Service required for the operation of traffic
control signal lights within the State of Idaho. Traffic control signal lamps are mounted on posts or
standards by means of brackets, mast arms, or cable.
CHARACTER OF SERVICE
The traffic control signal fixtures, including posts or standards, brackets, mast arm, cable,
lamps, control mechanisms, fixtures, service cable, and conduit to the point of, and with suitable
terminals for, connection to the Company's underground or overhead distribution system, are installed,
owned, maintained and operated by the Customer. Service is limited to the supply of energy only for
the operation of traffic control signal lights.
The installation of a meter to record actual energy consumption is required for all new traffic
control signal lighting systems installed on or after June 1, 2004. For traffic control signal lighting
systems installed prior to June 1, 2004 a meter may be installed to record actual usage upon the
mutual consent of the Customer and the Company.
MONTHLY CHARGE
The monthly kWh of energy usage shall be either the amount estimated by the Company based
on the number and size of lamps burning simultaneously in each signal and the average number of
hours per day the signal is operated, or the actual meter reading as applicable. The Monthly Charge
shall be computed at the following rate, and may also include charges as set forth in Schedule 55
(Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for
Municipal Franchise Fees).
Energy Charge, per kWh 3.9916¢
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2009 June 1, 2009
Per O.N. 30828 & 30829
Jean D. Jewell Secretary
Idaho Power Company Third Revised Sheet No. 55-1
Cancels
I.P.U.C. No. 29, Tariff No. 101 Second Revised Sheet No. 55-1
IDAHO Issued by IDAHO POWER COMPANY
Issued Per IPUC Order No.30828 John R. Gale, Vice President, Regulatory Affairs
Effective –June 1, 2009 1221 West Idaho Street, Boise, ID
SCHEDULE 55
POWER COST ADJUSTMENT
APPLICABILITY
This schedule is applicable to the electric energy delivered to all Idaho retail Customers served
under the Company’s schedules and Special Contracts. These loads are referred to as "firm" load for
purposes of this schedule.
BASE POWER COST
The Base Power Cost of the Company's rates is computed by dividing the sum of the
Company's power cost components by firm kWh sales. The power cost components are segmented
into two categories;Category 1 and Category 2.Category 1 power costs include the sum of fuel
expense and purchased power expense (excluding purchases from cogeneration and small power
producers), less the sum of off-system surplus sales revenue and revenue from market-based special
contract pricing.Category 2 power costs include purchased power expense from cogeneration and
small power producers.The Base Power Cost is 1.0251 cents per kWh, which is comprised of Category
1 power costs of 0.5913 cents per kWh and Category 2 power costs of 0.4338 cents per kWh.
PROJECTED POWER COST
The Projected Power Cost is the Company estimate, expressed in cents per kWh, of the
Category 1 and Category 2 power cost components for the forecasted time period beginning April 1
each year and ending the following March 31. The Projected Power Cost is 1.5218 cents per kWh,
which is comprised of Category 1 power costs of 1.1669 cents per kWh and Category 2 power costs of
0.3549 cents per kWh.
TRUE-UP AND TRUE-UP OF THE TRUE-UP
The True-up is based upon the difference between the previous Projected Power Cost and the
power costs actually incurred. The True-up of the True-up is the difference between the previous
year’s approved True-Up revenues and actual revenues collected. The total True-up is 0.9055 cents
per kWh.
POWER COST ADJUSTMENT
The Power Cost Adjustment is the sum of 1)95 percent of the difference between the Projected
Power Costs in Category 1 and the Base Power Costs in Category 1,2) 100 percent of the difference
between the Projected Power Costs in Category 2 and the Base Power Costs in Category 2 and 3)the
True-ups.
The monthly Power Cost Adjustment applied to the Energy rate of all metered schedules and
Special Contracts is 1.4022 cents per kWh. The monthly Power Cost Adjustment applied to the per unit
charges of the nonmetered schedules is the monthly estimated usage times 1.4022 cents per kWh.
EXPIRATION`
The Power Cost Adjustment included on this schedule will expire May 31,2010.
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
June 1, 2009 June 1, 2009
Per O.N. 30828 & 30829
Jean D. Jewell Secretary