Loading...
HomeMy WebLinkAbout20090113Application.pdfBarton L. Kline Lead Counsel esIDA~PORQD An IDACORP Company January 12, 2009 VIA HAND DELIVERY Jean D. Jewell, Secretary Idaho Public Utilities Commission 472 West Washington Street P.O. Box 83720 Boise, Idaho 83720-0074 Re: Case No. IPC-E-09-01 IN THE MA ITER OF THE APPLICATION OF IDAHO POWER COMPANY FOR ATEMPORARY AMENDMENT OT THE ENERGY SALES AGREEMENT WITH MICRON TECHNOLOYG, INC. .. Dear Ms. Jewell: Enclosed please find for filing an original and seven (7) copies of Idaho Power's Application in the above matter. I would appreciate it if you would return a stamped copy of this letter for my file inthe enclosed stamped, self-addressed envelope. · Vel\ truly yours,ßJ~ Barton L. Kline BLK:sh Enclosures P.O. Box 70 (83707) 1221 W. Idaho St. Boise, ID 83702 BARTON L. KLINE, ISB #1526 LISA D. NORDSTROM, ISB #5733 Idaho Power Company P.O. Box 70 Boise, Idaho 83707 Telephone: 208-388-2682 Facsimile: 208-338-6936 bklineCâidahopower.com InordstromßYidahopower.com RECE r:n 2009 JMll 2 PM 4: 56 Attorneys for Idaho Power Company Street Address for Express Mail: 1221 West Idaho Street Boise, Idaho 83702 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR A TEMPORARY AMENDMENT TO THE ENERGY SALES AGREEMENT WITH MICRON TECHNOLOGY, INC. ) ) CASE NO. IPC-E-09-01 ) ) APPLICATION ) ) Idaho Power Company ("Idaho Powet' or "the Company"), in accordance with Idaho Code § 61-524 and RP 52, hereby respectfully makes application to the Idaho Public Utilities Commission ("I PUC" or "the Commission") for an Order approving a temporary amendment to the Electric Service Agreement ("ESA") between Micron Technology, Inc. ("Micron") and Idaho Power and a revised Schedule 26 containing modified rates and charges for service to Micron. The Application is based on the following: APPLICATION - 1 I. BACKGROUND 1. Idaho Power and Micron are signatories to a Commission-approved ESA dated September 1, 1995, under which Micron purchases electric energy and demand from Idaho Power for its Boise facility. Because Micron's demand exceeds 25,000 kW, the ESA is a special contract under the Company's rate Schedule19. 2. Micron is in the process of restructuring its operations at its Boise facility. Micron estimates that this restructuring wil take approximately six months. The ESA contains a monthly Contract Demand Charge, which may reduce Micron's flexibility in managing its electric consumption during the restructuring period. Idaho Power is amenable to adjusting the ESA Contract Demand Charge to accommodate Micron's restructuring so long as the revenue requirement received from Micron is unaffected based upon current authorized base rates effective June 1, 2008, under the biling determinants presented in IPC-E-08-10. 3. To accomplish the above-described mutual goals, Idaho Power and Micron have entered into a letter agreement which makes several changes to the rates, terms, and charges in the ESA. The letter agreement is enclosed with this Application as Attachment NO.1. In the letter agreement, the parties agree that the monthly Contract Demand Charge wil be set at $0.00 per kW of Contract Demand rather than the existing $1.83 per kW of scheduled Contract Demand. The monthly Billng Demand Charge and the monthly Energy Charge wil be increased so that Idaho Power can obtain the same revenue from Micron as it would have received with the monthly Contract Demand Charge. APPLICATION - 2 4. With the changes to the Special Contract and Schedule 26 set out in the letter agreement, Micron receives the contract flexibility it needs and Idaho Power obtains the same revenues from Micron that it would have otherwise received consistent with paragraph 2 of this Application. 5. Also enclosed as Attachment NO.2 is a revised Schedule 26 which reflects the rates and charges described in the ESA. The enclosed Schedule 26 has been denominated as Schedule 26A to differentiate it from the Schedule 26 the Company is currently seeking in the pending general rate case. Attachment No. 2 includes a Schedule 26A in legislative format showing the proposed rate changes. 6. Also enclosed as Attachment No. 3 is a spreadsheet showing the derivation of the rate changes proposed in this filing. 7. Micron is immediately commencing the restructuring of its operations and therefore Idaho Power respectfully requests that the Commission expedite its review of this Application. Idaho Power believes that a hearing is not necessary to consider the issues presented herein and respectfully requests that this Application be processed under modified procedure; i.e., by written submissions rather than by hearing. RP 201, et seq. If, however, the Commission determines that a technical hearing is required, the Company stands ready to present its testimony and support the Application in such hearing. 8. It would be extremely helpful to Micron if the Commission could see fit to make the rate change set out in Schedule 26A effective January 1, 2009. Idaho Power is authorized to advise the Commission that Micron and the Staff of the Commission APPLICATION - 3 have reviewed this Application and concur with the proposed changes, including the Company's request that the rate change be made effective January 1,2009. II. COMMUNICATIONS AND SERVICE OF PLEADINGS 9. Communication and service of pleadings with reference to this Application should be sent to the following: Barton L. Kline Lisa D. Nordstrom Idaho Power Company P.O. Box 70 Boise, Idaho 83707 bklineßYidahopower.com InordstromßYidahopower.com John R. Gale Vice President, Regulatory Affairs Idaho Power Company P.O. Box 70 Boise, Idaho 83707 rgaleßYidahopower.com Rick Malmgren Micron Technology, Inc. 8000 Federal Way P.O. Box 6 Boise, Idaho 83707-0006 remalmgrenßYmicron.com III. REQUEST FOR RELIEF 10. Idaho Power respectfully requests that the Commission issue its Order: (1) approving Attachment NO.1, the letter agreement to temporarily amend Micron's ESA, and (2) approving the rates and charges set out in the enclosed Schedule 26A to be in effect during the term of Attachment NO.1..i DATED at Boise, Idaho, this J "2 of January 2009. ßM~ Barton L. Kline Attorney for Idaho Power Company APPLICATION - 4 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NO. IPC-E-09-01 IDAHO POWER COMPANY LETTER AGREEMENT ATTACHMENT NO.1 J . .' : .0: .' ': . "::. ~.' ........:... ..0.;. ',' ..:.HII. ......:-:.....:.:.:..... .~:..:.: '0. ,0, . 0° ..:.....::...:.':.::.. :.:.....: ...':..:;.~...~.~ :.~ "'..:.... . . ~ :.. .0'.,::. :', '::.0':.:: '0: .::',:;' :':. :'0 " ;... ,0 :.. ..':....... ':.:..~ .,:... :.or,:.: An JDACP copeny . .': ::... '::..:,:::~.. .. .:.:.:. ::::-: ..:::\ :.;.:.::;~; -0 ...... _. . I" ..' ~. JOHNR.GALEV1ci Prekt Reoiy Afli . . ':'. :." .....;.:.. .. .. . ..... ~ .. ..., .":' ":- . 3';:..:::..::...:.:......,..':........:;.:.....\........... .: . ..... ......,. '. January 9, 2009 Dale Eldridge Directr of Facllitie Micrn Tecnology. Inc. 8000 Federal Way P.O. Bo 6 Boise, Idaho 83707-0006 Re: Agreemnt to Temporarily Suspend the Applicon of the Contrct Demand Charge Und the September 1. 1995, Elect Service Agreement between Micron Technology, Inc., and Idaho Por Company Dear Mr. Eldridge: . Representtives of our tw compies hav been discussing Micn Tecnology, Inc.'s t"Mlcron's.) reest for a tempora suspension of the Conra Demand Charge under the above- reference Electc Seice Agrement t"ESAj. Micon is in the proces of reslring it operatins at its Boise fality and the tempora sunsin would provide Micn wtth needed f1exbllit to undertke ifs reuctring. Idaho Powr Is willing to acommoe Micn's rees In a manner that is reenue neutrl for Idaho Power. Base on these understadings. Idaho Power and Micron have reaed the follog agremen: 1. The term of this ageement wil run fr January 1. 2009, through June 30, 2009. 2. Th reised charges tht wiD implement this agreent are set out in thprop()d SCedule 26A, which is attched as Exibit NO.1. The charges are summaried as follo: a. Monthly Contrct Demand Charge of $0.00 per kW of Contrct Demand which Is set at 85,000 kW. b. Monthly Billng Demand Charge of $8.16 per It of Billing Demand. c. Daily Excess Demand Charge of $0.226 per kW of demand that exces the Contrt Demand of 85.000 kW. d. Base Monthly Energy Charg of $.016628 per kW. 3. Duong the si month term of this agrement unles the partes agee othrwe or,. the Commison specifcally orers a diffnt rate design, any base rate revenue reuirement changes authoried by the Commission that are applicble to Micron wil bereovered frm Micron by adjusting Micron's Biling Demand Chare and Energ Charge. ~ REVIEWED MT Lel ZC?t 4. Charges set out in SCedule 65 (Power Cost Adjusent), Schedule 91 (Energy Effciency Rider), and SchedUl 95 (Adjustment for Municpat Fran.chise Fees) will not be changed by this agreement and will continue to apply in accanc wìt applicae Commission Orers. 5. Prior to the end of the term of this agrement, Micron shall, subj to Idaho Power's resonable approal, designae the Contrct Demand which shall be effctive under the ESA on July 1, 2009. The term of th ESA shall oterise remin unchanged except with repec to resions.to the ESA mually agreed upon between the parties. 6. Unless specifcally modified by this agreement, all other term and conditns of the ESA remain in effct, including the applicaon of th Daily Exo Demand Charge for demand In exce of 85.000 kW. 7. This agreement Is subject to th reiew and approval of the Comission. Idaho Power wlJ frte this agreement and the proposed Schedule 26A. which Is ated hereo as Exhibit No.1, with the Commission. Idaho Pow wil rees exdit review and reques that the Commission make th rae changes set out in Scedule 2eA effece as of Januar 1, 2009. If you concur that th foregoIng accraly set forth the agreement of the parties. please indica your ooncurrnce by signing all thre oopies of this lettr and returning two fully exected oopi to me. Idaho Power wll' file the original wit the Commission. Cordially, i~~de JRG:mka REVIEWED AND ACCEPTED BY: MICRON dEC N L Jj EXHIBIT NO.1 # Idaho Powe Company Fif R.viseà Sheet li:i. 26 1 CaBsels I.P.ll.C. No. 29. Tarff No. 101 Origi Sheet No. 26A-l SCHEULE 26A IDAHO POWER COMPAN. ELECC SERVICE RATE FOR MICRON TEHNOLOGY~ INç. BOISE. IDAHO SPECIAL CONlCT DAmR SEPER 1, 1995 MONTY CHAGE Th Monthy'Charge is th su of the followig chares, and ma also include chages as set fort in Schedule 55 (power Cost Adjustment). Schede 91 (Energ Efciency Rider). and Schede 9S (Adjustent for Muncipal Frachie Fees). Mont Contact Dem Chage ~O.OO per kW of Scheduled Contract De Scheduld Monthy Contrac Deman . The Scheduled Monty Contr Dem is 0 - 140.000 kW as per the contct with one yea wrtt notieaon. Monty BjlJng Deand Chae I $=8.16 per kW of Biling Ded but not less th Scheduled Mimum MontyBillig Dema. Mi Monthy Biling Demand The Mimum Monty Biling Deand will be 25.000 kiowatts. Daily Exces Dean Chae $0.226 pe eah kW over the ~ntct Dem. Th Daily Excess Demand Charge is applicable beging Janua 1997 or once th Contr Demd reaches 100.000 kW. which eve comes fi Mont Energy Chare ~1.6628it per kWh Monty 0 & M Chas Zero percet of tota cost of Substtion Facilties. IDAHO . Ised by IDAHO POWE COMPAN I Issued pel OmeF'Nos. 30556. 30559 aR 30S63John R. Gale. Vice Preident, Regulatory AffrsEffective Jl:e 1. 29g8 1221 West Idaho Strt, Boise, ID BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NO. IPC-E-09-01 IDAHO POWER COMPANY SCHEDULE 26A ATTACHMENT NO.2 Idaho Power Company I.P.U.C. No. 29. Tariff No. 101 Original Sheet No. 26A-1 SCHEDULE 26A IDAHO POWER COMPANY ELECTRIC SERVICE RATE FOR MICRON TECHNOLOGY, INC. BOISE, IDAHO SPECIAL CONTRACT DATED SEPTEMBER 1. 1995 MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Effciency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees). Monthly Contract Demand Charge $0.00 per kW of Scheduled Contract Demand Scheduled Monthly Contract Demand The Scheduled Monthly Contract Demand is 0 - 140,000 kWas per the contract with one year written notification. Monthly Biling Demand Charge $8.16 per kW of Biling Demand but not less than Scheduled Minimum Monthly Billng Demand. Minimum Monthly Billng Demand The Minimum Monthly Biling Demand wil be 25,000 kilowatts. Daily Excess Demand Charge $0.226 per each kW over the Contract Demand. The Daily Excess Demand Charge is applicable beginning January 1997 or once the Contract Demand reaches 100,000 kW, whichever comes first. Monthly Energy Charge 1.6628Ø per kWh Monthly 0 & M Charges Zero percent of total cost of Substation Facilities. IDAHO Issued Effective - Issued by IDAHO POWER COMPANY John R. Gale, Vice President, Regulatory Affairs 1221 West Idaho Street, Boise, ID Idaho Power Company FiFSt Revised Sheet No. 26 1 GanGels Original Sheet No. 26A-1I.P.U.C. No. 29, Tariff No. 101 SCHEDULE 268 IDAHO POWER COMPANY ELECTRIC SERVICE RATE FOR MICRON TECHNOLOGY, INC. BOISE. IDAHO SPECIAL CONTRACT DATED SEPTEMBER 1, 1995 MONTHLY CHARGE The Monthly Charge is the sum of the following charges, and may also include charges as set forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Effciency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees). Monthly Contract Demand Charge ~O.OO per kW of Scheduled Contract Demand Scheduled Monthly Contract Demand The Scheduled Monthly Contract Demand is 0 - 140,000 kW as per the contract with one year written notification. Monthly Biling Demand Charge $7a.16 per kW of Billng Demand but not less than Scheduled Minimum Monthly Billng Demand. Minimum Monthly Billng Demand The Minimum Monthly Billng Demand wil be 25,000 kilowatts. Daily Excess Demand Charge $0.226 per each kW over the Contract Demand. The Daily Excess Demand Charge is applicable beginning January 1997 or once the Contract Demand reaches 100,000 kW, whichever comes first. Monthly Energy Charge 1.50681.662aø per kWh Monthly 0 & M Charges Zero percent of total cost of Substation Facilities. IDAHO Issued per Order Nos. 30556, 30559 and 30563 Effective June 1, 2008 Issued by IDAHO POWER COMPANY John R. Gale, Vice President, Regulatory Affairs 1221 West Idaho Street, Boise, 10 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NO. IPC-E-09-01 IDAHO POWER COMPANY SPREADSHEET - DERIVATION OF RATE CHANGES ATTACHMENT NO.3 Id a h o P o w e r C o m p a n y Re c a l c u l a t i o n o f M i c r o n ' s C u r r e n t B a s e R a t e s St a t e o f I d a h o No r m a l i z e d 1 2 - M o n t h s E n d i n g D e c e m b e r 3 1 , 2 0 0 8 Re v e n u e N e u t r a l Mi c r o n Sc h e d u l e 2 6 A (1 ) (2 ) (3 ) (4 ) (5 ) 06 / 0 1 / 0 8 06 / 0 1 / 0 8 Pr o p o s e d Pr o p o s e d Li n e Ba s e Ba s e Ba s e Ba s e No De s c r i p t i o n Us e Ra t e Re v e n u e Ra t e Re v e n u e Bi l l e d k W 1, 0 1 8 , 1 4 0 . 0 $7 . 4 0 $7 , 5 3 4 , 2 3 6 $8 . 1 6 8, 3 0 8 , 0 2 2 2 Ex c e s s D e m a n d k W 0 0. 2 2 6 0 0. 2 6 0 0 3 Bi l e d k W h 70 3 , 4 0 4 , 6 4 0 0. 0 1 5 0 6 8 10 , 5 9 8 , 9 0 1 0. 0 1 6 6 2 2 11 , 6 9 1 , 9 9 2 4 Co n t r a c t k W 1, 0 2 0 , 0 0 0 1. 8 3 1, 8 6 6 , 6 0 0 0. 0 0 0 - 5 To t a l S c h e d u l e B i l l n g $1 9 , 9 9 9 , 7 3 7 $2 0 , 0 0 0 , 0 1 4 No t e : B i l l i n g D e t e r m i n a n t s f r o m G e n e r a l R a t e C a s e N o . I P C - E - 0 8 - 1 0 EX H I B I T N O . 1